HomeMy WebLinkAbout6.n. Approve Plans and Specifications and Authorize Advertisement for Bids for the 2021 Street Improvement Project, City Project 2021-01
EXECUTIVE SUMMARY
City Council Meeting: January 19, 2021
AGENDA ITEM: Approve Plans and Specifications and
Authorize Advertisement for Bids for the AGENDA SECTION:
2021 Street Improvement Project, City Consent
Project 2021-01
PREPARED BY: Brian Erickson, PE, Director of Public
AGENDA NO. 6.n.
Works / City Engineer
ATTACHMENTS: Resolution, Location Map APPROVED BY: LJM
RECOMMENDED ACTIONS: Motion to Adopt a Resolution Receiving the Plans and
Specifications and Authorizing the Advertisement for Bids for the 2021 Street Improvement
Project, City Project 2021-01.
BACKGROUND
The 2021 Street Improvement Project, City Project 2021-01, is proposed to consist of an asphalt mill and
overlay and/or reclamation on the following streets:
th
Upper 149 St W between Crandall Ave and Colorado Ave
thth
Covington Ave between 147 St W and Upper 149 St W
Colorado Ave
th
157 Ct W
th
157 St W
th
Darling Path between Danbury Ave and 200 feet south of Upper 156 St W
th
156 St W between Darling Path and Shannon Parkway
th
Upper 156 St W
th
156 Ct W
Dapple Ct
Dapple Cir
thth
Danville Ave between 156 St W and 156 Ct W
Cumberland Ave
Crocus Ave
Crocus Ct
Crystal Ct
Crystal Path between Danville Ave and Shannon Parkway
Minor utility work, rehabilitation of pedestrian ramps to meet current ADA requirements, and boulevard
ash tree removals within the project limits will also be included.
On August 4, 2020 the Council approved a contract for engineering services with Bolton & Menk, Inc.
(BMI) for 2021 Street Improvement Project, City Project 2021-01. BMI authored a report on the feasibility
of this project. Detailed project information is included in the Feasibility Report available on file in the
c:\\users\\jab\\appdata\\local\\temp\\6.n. approve plans and specifications and authorize advertisement for bids f_631220\\6.n. approve plans and specifications
and authorize advertisement fo.docx
TOTAL PROJECT COST ESTIMATETOTAL PROJECT FUNDING
ItemFunding SourceCIP Funding
Feasibility Report Final Design
Item
Street$ 964,383$ 900,000
Cost EstimateCost Estimate
Assessments$ 519,283$ 250,000
Street 1,108,000 1,123,989
Storm$ 142,210$ 65,000
Storm 59,000 107,735
Sanitary$ 23,100$ 160,000
Sanitary 18,000 17,500
Water$ 121,044$ 55,000
Water 107,000 91,700
TOTAL FUNDING$ 1,770,020$ 1,430,000
Subtotal 1,292,000 1,340,923
Contingency (10%) 129,200 134,092
Engineering Department. The report found this project, as proposed, to be feasible, cost effective, and
Construction Total 1,421,200 1,475,016
Indirect Costs (20%) 284,240 295,003
Total Project Cost 1,705,440 1,770,019
necessary.
City staff hosted a neighborhood meeting on October 8, 2020. Residents within the project area asked
questions about the assessment amounts and policies for payment along with the construction timeline
and proposed ash tree removals.
On November 17, 2020, City Council held a public hearing regarding the proposed improvements and
heard comments regarding the project. Additionally, the City Council passed a resolution authorizing the
preparation of plans and specifications.
DISCUSSION
The Feasibility Report estimated the project cost at $1,705,000 and now that the final design has been
completed the estimated cost is approximately $1,770,000. As part of the estimate, an alternative bid item
was established for reclamation of the pavement vice mill and overlay due to existing pavement distress.
The project will be funded by a combination of Street CIP funds, utility funds, and special assessments of
benefitting properties. The following table shows the anticipated funding breakdown by funding type.
Once bids are received the breakdown will be recalculated based on the actual bid prices.
This project is scheduled in the 2020-2029 CIP. The final engineer’s estimate is approximately 23% higher
than the CIP estimate. Most of the cost increase is due to water and storm utilities and pedestrian
improvements. Staff recommends that the project be advertised for bid and will continue to review
options for controlling costs through additive alternate bid items.
2
SCHEDULE
Should the Council approve this resolution, the proposed project schedule is shown below. Items marked
“CC” will require City Council approval in order to move forward.
CC Receive Feasibility Report and Set Improvement Hearing October 20, 2020
CC Improvement Hearing, Order Improvement and November 17, 2020
Authorize Preparation of Plans & Specs
CC Approve Plans & Specs and Order Advertisement for Bid January 19, 2021
Bid Opening February 22, 2021
CC Set Assessment Hearing February 2021
Public Open House July 2019
CC Assessment Hearing, Award Contract March 2021
Construction Start Summer 2021
Substantial Completion Fall 2021
RECOMMENDATION
Staff recommends Council adoption of the attached resolution receiving the plans and specifications and
authorizing the advertisement for bids for the 2021 Street Improvement Project, City Project 2021-01.
3
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2021 – 08
A RESOLUTION RECEIVING THE PLANS AND SPECIFICATIONS
AND AUTHORIZING THE ADVERTISEMENT FOR BIDS FOR
2021 STREET IMPROVEMENT PROJECT, CITY PROJECT 2021-01
WHEREAS, the City Council of the City of Rosemount has ordered the preparation of plans and
specifications for 2021 Street Improvement Project, City Project 2021-01, and such plans and
specifications have been presented to this Council for approval:
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Rosemount,
Minnesota:
1. Such plans and specifications are hereby approved and ordered placed on file in the office of
the City Clerk.
2. The City Clerk shall prepare and cause to be inserted in the official City newspaper and the
Finance and Commerce an advertisement for bids upon the making of such improvements
under such approved plans and specifications for City Project 2021-01.
3. The advertisement shall be published in each of said publications at least once not less than
three (3) weeks before the date set for opening bids, specifying the work to be done, stating
the bids will be publicly opened on February 22, 2021 at 10:00 a.m. at the Rosemount City
Hall in said City, and that no bids will be considered unless sealed and filed with the City
Clerk and accompanied by a cash deposit, cashier’s check, bid bond or certified check
payable to the City Clerk for five (5%) percent of the amount of such bid.
4. Such advertisement for bids is hereby authorized by the Council.
th
ADOPTED this 19 day of January, 2021.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
CAMERO LNCLARET AVECRANDALL AVECHIANTIDELMAR CTPA
T
H
CTPKWY TH ST W (CSAH 42)AVESHANNONDARTMOORCT
DECEMBER TRL
BOULDER AVEBISCAYNE AVEU 145THST W
CIMARRONAVEWDAW
S
O
N
P
L
DENVER CTBITTER
-SWEETCT150TH ST W (CSAH 42)DECEMBERBI
T
T
E
R
-S
W
E
E
T
CI
RBLOOOMFIELDWAY
U. 149TH ST W
153RD ST W
151ST ST W
STATION TRLBRAZIL AVE
156TH ST W
144TH ST W
DIAMOND PATH (CR 33)155TH ST W
147TH ST W
146TH
BLOOOMFIELDPL
BLOOMFIELD
CIRCOBBLER AVEDELFT AVE WCAMEO AVE148TH ST WDALLARA BLANCA AVE154TH ST W
CT
COBALT DR
CRYSTALPATH
152ND ST WDANVILLE AVE WBOULDER TRL BLOOMFIELDDARLING PATH CANADAAVE145TH ST W
BOXWOOD PATHCORNELL TRL
158TH ST W
148TH ST W
COVINGTON AVEBEECH ST W
CT147TH ST W
CAMBRIAN AVEBURMA AVECOLORADO AVEDAVENPORTAVECHIPPENDALE AVEST
STW COBAL
TLANE154TH CT W CARROUSELWAYU. 147TH ST W
B AY B E R RY T R L
CARDINAL
L. 147THDAWSON CT
CASCADE
158TH CT W
157TH CT W
D
A
M
A
S
K
153RD ST WDAMASK AVEDAKOTA DR159TH CT W
157TH ST WDANBURYAVEW
160TH ST W (CSAH 46)CROCUSAVEU. 148TH ST WDAHOMEY AVE W149TH ST W
CRESTVIEW152ND CT W
COLUMBIAL. 150TH ST W
DANBURYDANVILLE
AVEWCHI LI CT BUSINESSPKWYBAYBERRY
BURNLEY AVEBOYSENBERRY CTCHROME
CRESTONEAVEBLACKBERRY
AVECIR150C OLU
MBIA151ST CT W
CUMBERLANDCANTATA AVE WCHORLEYCAMFIELDU 145TH ST W
CHARLSTON AVEAVEST WCARDINAL PATHAVECICERONECIRCLEB LU EB ER R YC TCROCUS
C TBI S C A Y NEWAYDAKOTALNBAYBERRYST W
156 T H STW
153RD ST W CANADA AVE148TH ST W147TH ST W
U.149TH
154TH ST W
149TH
158TH ST W
151ST ST W
156TH ST W
146TH ST W
DODD CIMARRONAVEWUPPER 149TH ST W
U.149H ST W
155TH ST W
147TH ST W
CIMARRONAVEW152ND
144TH ST W
151ST
ST W CIMARRON
A
V
E
146TH ST W
DANVILLEAVEDANVILLE AVE WLOWER 147TH ST W
CHILI AVECLARET AVEU. 148THST W
CICERONEPATHWAY S
ROB
ER
T
TR
L
DECEMBERWAY
CHERRYCOLUMBARY
CTCTCORNELLCT SCRYSTALDAPPLECIRDAPPLE CTCARDINALCIREVER
L
E
I
G
H
C
I
R
DERBYCIR
CRESTONECIRCRESTVIEWCIRCLARETCIR CIMARRON CIMARRON CTCTDEWBERRY CT
DARJEE
L
I
N
G
CT
155TH
CT W
COLUMBARY CIR
CHOKECHERRY AVEU. 149TH CTBRENNER CT
BOSTONCIR
CRESCENT CIR
CHASEWOOD CTC
H
E
S
T
N
U
TWA
Y
CIRCTWAY
WAY
U. 156TH
W156TH
C
T
WDARLING PATHDARLING PATH
CINN A M ONWAYCORNELLCT N
CTCRESTONECTCRESTONEPATHTRL
CANADA CIRCHEVELLECT151ST
S
T
WDAMASKC
T WAYPATHBLVD ATWATER WAY
AVEB ENTLEYST W
CIC E RONEPATHBOISECIR
DARJEELINGPATHCO R N E LL
AZALEA P A THC
O
B
A
L
T
A
V
E
D
A
LLARAAVEW144THST W
TRL (STH 3)160TH ST W (CSAH
4
6
)S ROBERT(STH 3)U 145TH ST W
146THST W
145TH ST W
CHRYSLERDAYBREAK AVEAURORA AVE
160TH ST W (CSAH 46)
B
O
U
L
D
E
R
CT---- 149TH ST WL 147THCT
149TH ST W ALLINGHAMAVEALMAAVE158TH CIR W
2021 Street CIP
5/12/2020
2021 Street Rehabilitation Project
Document Path: T:\Project\Engineering\Derick\2021_Street_CIP.mxd