HomeMy WebLinkAbout6.o. Deepwoods Court Improvements, City Project 2020-03 Final Acceptance and Authorization of Final Payment EXECUTIVE SUMMARY City Council Meeting: January 19, 2021 AGENDA ITEM: Deepwoods Court Improvements, City AGENDA SECTION: Project 2020-03 Final Acceptance and Consent Authorization of Final Payment PREPARED BY: Brian Erickson, PE, Director of Public AGENDA NO. 6.o. Works / City Engineer ATTACHMENTS: Resolution, Engineer’s Recommendation, Final Payment APPROVED BY: LJM Application RECOMMENDED ACTIONS: Resolution to Approve Final Payment to McNamara Construction, Inc. for Deepwoods Court Improvements, City Project 2020-03 and Accepting the Improvements for Perpetual Maintenance BACKGROUND In the Spring of 2019, staff received a request from residents living on Deepwoods Court that the condition of their road be addressed. At that time, Deepwoods Court was listed in the Capital Improvement Plan for rehabilitation in 2022. As the pavement condition rapidly deteriorated during the 2018/2019 winter, staff discussed possible repair and maintenance options with the City Council and was directed to move the project forward to construction in 2020. The Deepwoods Court Improvement Project, CP 2020-03, which was awarded April 21, 2020, consisted of pavement reclamation, asphalt overlay and minor drainage improvements. Ribbon curb was added to the project at the resident’s request and shall be paid for by assessment. At this time, McNamara Construction, Inc. has completed all the improvements as detailed in the contract and WSB and Associates has recommended acceptance and issuing the final payment for this work. Based on final quantities, the cost of the work is $242,354.72 or 2.5% below the awarded amount of $248, 666.67. The final payment is $77,530.94. RECOMMENDATION Staff recommends that the City Council adopt the attached resolution accepting the improvements and authorizing final payment to McNamara Construction, Inc. for Deepwoods Court Improvements, City Project 2020-03. c:\\users\\jab\\appdata\\local\\temp\\6.o. deepwoods court improvements, city project 2020-03 final acceptance and_631222\\6.o. deepwoods court improvements, city project 2020-03 final accept.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2021 – 05 A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR DEEPWOODS COURT IMPROVEMENTS CITY PROJECT 2020-03 WHEREAS, McNamara Construction, Inc. has completed the required construction as per the scope of the contract, and; WHEREAS, the City received a concurrence from WSB and Associates that the work has been completed in accordance with the approved plans and specifications and finds the improvements acceptable; WHEREAS, the contractor has completed all necessary administrative requirements to close out the contract. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROSEMOUNT, MINNESOTA: 1. The improvements completed under said agreement are hereby accepted for perpetual maintenance and ownership. 2. Final payment to the contractor is authorized. th ADOPTED this 19 day of January, 2021. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\015059-000\Admin\Construction Admin\Pay Voucher\Final Payment\2021.01.04 Memo - Project Closeout.docx 540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM Memorandum To: Brian Erickson, PE, Public Works Director/City Engineer City of Rosemount From: Tim Hanson, PE, Senior Project Manager Date: January 4, 2021 Re: Deepwoods Court Improvements City Project No. 2020-03 WSB Project No. 015059-000 The City of Rosemount is in the process of closing out and accepting the street and improvements for the Deepwoods Court Improvement Project. The improvements, consisting of storm sewer improvements and street reconstruction by reclamation and paving were designed and inspected by WSB in accordance with the City’s Standard Specifications and Engineering Guidelines. The public improvements were constructed by McNamara Contracting, Inc. Improvements were constructed in the summer of 2020. McNamara Contracting has submitted the paperwork necessary for final payment including IC 134 contractor affidavit, Mechanic’s Lien Waivers, Maintenance Warranty and the signed final pay voucher for final payment. The final project cost is $242,354.72. Final Payment amount is $77,530.94. WSB recommends approval and acceptance of the public improvements and final payment to McNamara Contracting Inc. as indicated. Please contact me at thanson@wsbeng.com or 612-219-2553 with any comments or questions. Sincerely, WSB Timothy Hanson, PE Senior Project Manager