HomeMy WebLinkAbout6.m. Request by Tamarack Land Development for Final Plat Approval of Ardan Place
EXECUTIVE SUMMARY
City Council Regular Meeting: March 16, 2021
AGENDA ITEM: 21-04-FP Request by Tamarack Land
Development for Final Plat Approval of
Ardan Place
AGENDA SECTION:
Consent
PREPARED BY: Kyle Klatt, Senior Planner AGENDA NO. 6.m.
ATTACHMENTS: Resolutions (Final Plat and Minor PUD
Amendment); Subdivision Agreement;
Location Map; Preliminary Plat Area;
Final Plat; Cover Sheet, Site Survey,
Grading Plan, Storm Water Plan, Tree
Inventory, Tree Preservation Plan, Utility
Plan, Street Light and Signage Plan,
Landscape Plan, Engineer Review Memo
APPROVED BY: LJM
RECOMMENDED ACTION: The Planning Commission and Staff recommend the City
County adopt the following motions:
1. Motion to adopt a resolution approving the Final Plat for Ardan Place subject to
conditions.
2. Motion to approve the Subdivision Agreement for Ardan Place and authorize the
Mayor and City Clerk to enter into the agreement.
3. Motion to adopt a Resolution Approving a Minor Amendment to the Ardan Place
Planned Unit Development Agreement revising the impervious coverage
requirement for certain lots.
SUMMARY
The City Council is being asked to consider a request from Tamarack Land Development for approval of a
final plat for Ardan Place to allow development of 42 single-family and 55 townhouse lots. The proposed
plat represents the first of two eventual phases associated with the Ardan Place Planned Unit
Development (PUD) approved by the City last year. The final plat is necessary to facilitate subdivision of
the subject property into individual residential lots, outlots, and public streets. Staff finds the application
consistent with the Ardan Place Preliminary Plat and Master PUD Development Plan and recommends
approval of this application subject to the conditions detailed in the attachments.
In conjunction with the final plat approval, staff is also recommending that the City Council approve a
minor amendment to the Ardan Place PUD Agreement to revise the impervious coverage requirements
for the subdivision. The specific revisions and the reasons for the amendment are addressed as part of the
staff report below.
2
Applicant: Tamarack Land Development (Developer/Applicant); D.R.
Horton, Inc. Minnesota (Builder)
Comp. Guide Plan Designation: LDR – Low Density Residential
Current Zoning: R1 PUD/R2 PUD – Low and Moderate Density Residential (Ardan
Place Planned Unit Development)
Gross Area: 25.4 Acres (Phase 1 including ROW); 52.2 Acres Overall
Net Area: 23.9 Acres
Lots/Units: 42 Single Family Lots/55 Townhouse Lots (97 Total Units)
Gross Density: 1.86 units/acre
Net (Met Council) Density: 4.06 units/acre
PLANNING COMMISSION REPORT
The Planning Commission reviewed and recommended approval the request at their February 23, 2021
meeting. The item was on the consent agenda as no public hearing is required for approval of a final plat
or minor PUD amendment. There were no questions by the Commission or public on the request.
BACKGROUND
In November of 2020, the City Council approved a preliminary plat, PUD master development plan with
rezoning, and zoning ordinance amendment for Ardan Place, which was comprised of 79 single-family lots
and 135 townhouse units on property located approximately one-quarter mile west of Akron Avenue and
along the south side of Bonaire Path. The subdivision will be situated between a new elementary school
site to the east, the Meadows of Bloomfield neighborhood to the west, and Union Pacific Railroad right-
of-way to the south. The applicant is proposing to final plat the overall subdivision in two phases divided
roughly in half from east to west starting on the eastern side next to the elementary school site. In
addition to the lots platted within the phase one area, the applicant will be dedicating right-of-way for the
internal and adjacent street system and platting two larger outlots (Outlots A and B) set aside for
development of phase two of Ardan Place.
The construction plans for the subdivision have been prepared to follow the location of the two planned
development stages, adhering to the mass grading plan and street layout approved with the preliminary
plat. The phasing works well because it allows the connection between the single-family and townhouses
areas to be completed with the initial final plat and permits the storm water plan can be constructed in two
phases from east to west as well. Public utilities are available to serve the eastern half of the property
without a connection into existing systems serving the Meadows of Bloomfield neighborhood to the west.
The second project phase will include all necessary connections to loop the system into existing adjacent
developments.
ISSUE ANALYSIS
Legal Authority . This application is a Quasi-Judicial action. The final plat application is Quasi-Judicial
because the City has a set of standards and requirements for reviewing this type of application that is
described in detail below. Generally, if the final plat meets the ordinance requirements it must be
approved.
Land Use and Zoning . The proposed 42-lot single family and 55-unit townhouse final plat is consistent
with the current land use and zoning classifications (as amended last year with the preliminary plat). The
subject property is guided LDR – Low Density Residential and is now split between two zoning districts:
R-1PUD and R-2PUD, Low and Medium Density Residential Planned Unit Development. Both districts
are considered appropriate under the land use guidance, with the R-1 area covering the northern portion
of site and R-2 area following a private road south of the single-family lots. As a result of the City’s
previous approvals, the property is subject to the standards of the R-1 (single-family areas) and R-2
(townhouses) zoning districts as well as the standards for the entire subdivision documented the approved
3
PUD. Through the PUD process, the developer requested and was granted flexibility from certain
requirements of the zoning ordinance; the most notable deviations are listed below. All these items were
anticipated in the preliminary plat approval and were part of the initial PUD approval.
• Section 11-4-5 F. 1. R-1 Minimum Lot Area: The minimum lot area shall be 8,000 square feet
(10,500 square feet for corner lots).
• Section 11-4-5 F. 2. R-1 Minimum Lot Width: The minimum lot width shall be 65 feet (75 feet
for corner lots).
• Section 11-4-5 F. 4. R-1 Minimum Front Yard Setback: The minimum front yard setback shall
be 25 feet.
• Section 11-4-5 F. 5. R-1 Minimum Side Yard Setback: The minimum side yard setback shall be
7.5 feet.
• Section 11-6-3 E.10: The required tree replacement is 728 caliper inches (which is in addition to
the base zoning district landscaping requirement of one tree per lot).
• Section 11-4-5 F. 9. R-1 Maximum Lot Coverage: The maximum lot coverage shall be 40% for
lots below 10,000 square feet and 30% for lots over 10,000 square feet.
The proposed final plan and final development plans follow the preliminary plat closely and will meet all
applicable zoning standards with the PUD exceptions noted above.
Impervious Surface Coverage
Since the preliminary plat approval, the developer has spent some time examining the potential impervious
surface coverage for each of the lots based on the typical home plans that will be offered within Ardan
Place. As a result of this review, the developer believes that several of their homes may be difficult to
construct under the lot coverage requirements of 30% or 40% as approved by the City. All home plans
will fit within the individual lots in terms of width, depth, setbacks, and other variables; however, once all
potential hard surfaces are considered (house pad, driveways, patios, and sidewalks), some lots will exceed
the maximum thresholds allowed in the PUD. The developer is asking that the City approve a standard
more consistent with the Caramore Crossing, Meadow Ridge, and Dunmore developments which allowed
a 35% to 45% impervious coverage maximum based on the size of the lot.
Staff has considered the request and is recommending approval of a lot coverage standard allowing a 35%
maximum lot coverage for lots larger than 10,000 square feet and 45% for lots smaller than 10,000 square
feet. Because this change would not alter the number of approved lots or the overall project density in any
manner, it is considered a minor PUD changes that could be approved by the City Council. This
recommendation is noted as a condition of plat approval and is being presented to the Council as part of
the Commission’s final plat review.
During this discussion staff has found some variability in hard surface coverage requirements for recent
neighborhoods. A more standardized approach to new development may be warranted. Most of these
neighborhoods are single family and most likely should be held to the same standard, regardless of
developer. Another topic for further conversation is setting a minimum lot size for the small lot PUD’s.
Staff’s position has been that the developer is platting lots that accommodate their homes styles. After the
fact, developers come to the City requesting variations from the approved standards because not all their
model homes fit on the smaller lots. The discussion needs to be had up front that the proposed lot sizes
meet their needs, as part of the initial review and approvals.
Final Plat. Standards for reviewing subdivision requests are detailed in Title 12 of the Rosemount City
Code. This section of the Code outlines the two-step Preliminary and Final Plat process for land
4
subdivision. In this case, the preliminary plat was approved in November of 2020 consisting of 215 single-
family and townhouse lots and various outlots. The Ardan Place final plat will subdivide the existing
unplatted land into 42 single-family lots, 55 townhouse lots, two large outlots that will be further platted
into residential lots in the future, dedicated right-of-way for all subdivision pubic roads, and two outlots
for storm water ponding and common areas around individual townhomes. Please note that the final plat
indicates that the townhouse street would be dedicated as public right-of-way; however, the City has
required that this road remain private and therefore it should be platted as a separate outlot or combined
with one of the adjoining outlots surrounding the townhouses.
Streets & Access. The overall plans for the subdivision include access to Bonaire Path West from the
existing Autumn Path connection at the west side of the preliminary plat area and via a new extension of
Ardroe Avenue from the east side. The final plat will therefore include construction of the eastern access
and extension of Ardroe Avenue in addition to the interior roads servicing the eastern single-family and
townhouse areas. All streets providing access to single-family lots will be public, while all townhouses will
front onto a private street system. The final plat area does include a connection between the private and
public street sections in the middle portion of the subdivision, and this street segment should also be
private and outside of a dedicated right-of-way. Since the preliminary plat approval, the plans have been
updated to accurately align with the configuration of Ardroe Avenue presently under construction on the
north side of Bonaire Path West. The two public streets that will continue west into the phase two plat
area will be constructed with temporary cul-de-sacs at western edge of the final plat area. A condition of
approval notes that the cul-de-sacs should be kept out of the any private buildable lot area.
Water and Sanitary Sewer. Public utilities serving the subdivision will connect into the sanitary sewer
and water lines currently located within the Bonaire Path West right-of-way. These services will follow the
dedicated public street or private alignments and will be stubbed for further extensions to the west with
the second addition. A small portion of the phase two sewer line will connect into the existing
infrastructure in the Meadows of Bloomfield development, while the water lines will be looped into this
adjacent system and back out to Bonaire Path from Autumn Path. Drainage and utility easements must be
provided on the plat for those lines that run underneath the private townhouse roads.
Landscaping and Berming . Prior to preliminary plat approval by the City Council, the applicant
updated the tree preservation and replacement plan to save an existing heritage tree (defined by tree type
and size) and some other significant trees along the western property boundary. In order to accommodate
reduced grading and disturbance in this area, some of the townhouses have been reconfigured to provide
more room along the lot line. These changes are reflected in the updated overall project plans for the
subdivision, but are outside of the area included in the final plat (this area will be further reviewed when
the second project phase moves forward). In addition to saving a small number of existing trees, the
applicant was also required to increase the overall amount of caliper inches being replaced within the
project. The landscape plan has been updated to address the preliminary plat conditions and now includes
729 caliper inches of replacement trees (an increase of roughly 50 caliper inches from the previous plans).
Along with this modest increase in replacement trees, the landscape plan continues to provide the required
number of trees for development within an R-1 and R-2 zoning district based on the number of overall
buildable lots with the subdivision.
Overall the first subdivision phase includes 188 trees (just under half of the trees planned for the entire
subdivision) comprised of a mix trees on individual lots and replacement trees within common open space
areas. At $300 per tree based on the City fee schedule the required landscaping security totals $62,040
(188 trees plus 10%).
Storm Water Management. The proposed storm water management system consists of catch basis,
storm water pipe, and infiltration and retention basins located along the southern property line and will be
constructed in two stages following final plat boundary running through the middle of the property. The
5
western-most storm water retention basin will be sized to meet the storm water requirements for the final
plat area; however, once the next phase is constructed it will be reduced in size as more infiltration and
retention areas are constructed within phase two. The reduction in area will allow the developer to regrade
a part of this area to accommodate the planned dog park. The City Engineer has reviewed the surface
water management plans for the site and has noted several minor modifications and updates that will need
to be addressed by the developer in the attached review letter.
Grading . The grading plans adhere to the overall grading plans approved with the Ardan Place
preliminary plat. As noted in the preceding section, an area for the private dog park will be regraded with
the next project phase and with the construction of additional storm water ponding areas further to the
west. In order to construct the new extension of Ardroe Avenue, which crosses into the adjacent school
district site, the applicant will need to secure easements from the school district for the road and related
grading adjacent to the road. Draft easements have been submitted with the final plat and will need to be
finalized prior to release of the plat for recording.
Parks and Open Space. Parks and Recreation staff reviewed the plans for final plat of Ardan Place and
found them to be consistent with the preliminary approval. The City is not planning on any public parks
within the subdivision area, and staff is recommending that the City collect cash in-lieu of land for the 97
units. This amount totals $299,550 (42 single family units at $3400 per unit and 55 townhouse units at
$2,850). The proposed dog park is a private open space amenity for the neighborhood and will not be
controlled or maintained by the City in any manner. The dog park will be constructed with the second
phase of the project.
Sidewalks, Trails, and Pathways . Consistent with the City’s policies for sidewalks in new subdivisions,
the construction plans depict sidewalks along one side of all public streets, including the addition of a
sidewalk along Ardroe Avenue connecting the townhouse area to Bonaire Path West. The plans also
include a larger, multi-purpose bituminous trail along the southern edge of the townhouse area that will
connect back to the sidewalk system at the eastern edge of the subdivision and along the private street
connecting the townhouse and single-family areas. This middle trail connection will also provide direct
access to the planned dog park for properties further to the north. Staff is still working to determine
whether the bituminous trill will be able to connect into the Meadows of Bloomfield development, and
this issue will need to be addressed before the second addition is considered by the City.
Engineering Comments. The Project Engineer has reviewed the proposed Ardan Place final plat and
has provided comments in the Engineer’s Memo dated January 29, 2021. Notable comments include: the
developer will need to pay for the required area charges as specified in the City’s fee schedule, some
existing street, drainage, and utility easements will need to be vacated before the plat can be recorded,
expanded easements will be needed over certain lots, and the construction plans will need to be updated to
address modifications requested by the City Engineer. Development fees as detailed in the Engineer’s
Memo are due with the final plat and subdivision agreement.
CONCLUSION & RECOMMENDATION
Staff and the Planning Commission recommend approval of the Final Plat for Ardan Place creating 42
single-family lots and 55 townhouse lots. This recommendation also includes a minor amendment to the
Ardan Place PUD Agreement to revise the impervious coverage requirement for lots within the
subdivision. This recommendation is based on the information submitted by the applicant, findings made
in this report, and the conditions detailed in the attached memorandums.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2020-
A RESOLUTION APPROVING THE FINAL PLAT
FOR ARDAN PLACE (1st ADDITION)
WHEREAS, Tamarack Land Development (Applicant) has submitted an application to the City of
Rosemount for a Final Plat concerning property legally described as follows:
The West Half of the Southwest Quarter of Section 22, Township 115, Range 19, Dakota County, Minnesota, lying
North of the Chicago Rock Island and Pacific Railroad, and lying Southerly of the centerline of 135th Street West as
now established (also known as County Road No. 38).
WHEREAS, on February 23, 2021, the Planning Commission of the City of Rosemount reviewed the Final
Plat for Ardan Place; and
WHEREAS, on February 23, 2021, the Planning Commission recommended approval of the Final Plat for
Ardan Place, subject to conditions; and
WHEREAS, on March 16, 2021, the City Council of the City of Rosemount reviewed the Planning
Commission’s recommendation and the Final Plat for Ardan Place.
NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of Rosemount hereby
approves the Final Plat for Ardan Place, subject to the following conditions:
1) Execution of a Subdivision Agreement.
2) Extension of the temporary cul-de-sac at western end of street running east and west between
Blocks 1 and 2 so it does not encroach into adjacent private lots.
3) The City Engineer must approve a final turn-around design for the southern terminus of Ardroe
Avenue at its intersection with the private street serving the townhouses and future school site.
4) The final plat shall include all easements as requested by City.
5) Provision of $62,040 for landscaping surety.
6) Payment of $299,550 for Fee-In-Lieu of Park Dedication.
7) Completion of the private dog park with the phase two improvements.
8) Elimination of dedicated public street right-of-way for all streets providing access to townhouses
and inclusion of the private street within a separate outlot or combined with an adjacent existing
outlot.
9) Provision of drainage and utility easements over all utilities within private roads or common
open space areas.
10) Trail easements shall be provided to city over the multi-use trail.
11) Easements shall be provided over all temporary turn around areas within the subdivision.
12) Finalization of all easements required with the school district, including the turn-around area off
of Ardroe Avenue and all easements needed for construction grading and access.
13) Removal of the existing barb wire and snow fencing along the railroad right-of-way.
14) Adherence with conditions of preliminary plat and master development plan approvals.
15) Compliance with all other conditions and standards within the City Engineer’s Memorandum
dated January 29, 2021.
ADOPTED this 16th day of March 2021, by the City Council of the City of Rosemount.
2
__________________________________________
William H. Droste, Mayor
ATTEST:
___________________________________
Erin Fasbender, City Clerk
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2021 -
A RESOLUTION APPROVING A MINOR AMENDMENT TO THE ARDAN PLACE
PLANNED UNIT DEVELOPMENT (PUD) AGREEMENT REVISING THE MAXIMUM
LOT COVERAGE STANDARD
WHEREAS, the Community Development Department of the City of Rosemount received a
request from Tamarack Land Development to amend the Ardan Place Planned Unit Development
Agreement to revise the maximum impervious coverage allowed for lots within the subdivision; and
WHEREAS, staff has prepared and recommends a Minor PUD Amendment to increase the lot coverage
from 30% to 35% for lots larger than 10,000 square feet and from 40% to 45% for lots less than 10,000
square feet.
WHEREAS, on March 16, 2021, the City Council of the City of Rosemount reviewed the request
and staff recommendation.
NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of Rosemount hereby
approves the Minor Amendment to the Ardan Place Planned Unit Development Agreement to
increase the maximum lot coverage for lots within the subdivision as follows:
1. Increase the maximum lot coverage to forty-five percent (45%) for lots less than 10,000
square feet in size and thirty-five (35%) for lots larger than 10,000 square feet.
ADOPTED this 16th day of March, 2021, by the City Council of the City of Rosemount.
__________________________________________
William H. Droste, Mayor
ATTEST:
___________________________________
Erin Fasbender, City Clerk
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
SUBDIVISION AGREEMENT
Ardan Place 1st Addition
AGREEMENT dated this ________ day of ________________________, 2021, by and between the
CITY OF ROSEMOUNT, a Minnesota municipal corporation, (the "City"), and Tamarack Land – Ardan Place
LLC, a Minnesota limited liability company, (the "Developer").
1. Request for Plat Approval. The Developer has asked the City to approve the subdivision of land and
a plat of land to be known as Ardan Place 1st Addition, which land is legally described on ATTACHMENT
ONE, attached hereto and hereby made a part hereof (hereinafter referred to as the “subject property”).
2. Conditions of Plat Approval. The City has approved the subdivision and the plat on the following
conditions:
a. Incorporation of recommendations of the City Engineer concerning design and installation of
public infrastructure and including grading, erosion control, streets and utilities.
b. Execution of a Subdivision or Development Agreement to secure the public and private
improvements.
c. Payment of all applicable fees including GIS, Park Dedication and other fees identified in the
current fee schedule.
d. Incorporation of any easements necessary to accommodate drainage, ponding, trails, underpasses,
conservation areas, streets and utilities.
e. Provision of $62,040 for landscaping surety.
f. Payment of $299,550 for Fee-In-Lieu of Park Dedication
3. Phased Development. The City may refuse to approve final plats of subsequent additions of the plat
if the Developer has breached this Agreement and the breach has not been remedied. Development of
subsequent phases may not proceed until Subdivision Agreements for such phases are approved by the
City.
4. Effect of Subdivision Approval. For two (2) years from the date of this Agreement, no amendments
to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service
area, or official controls shall apply to or affect the use, development density, lot size, lot layout or
dedications of the approved plat unless required by state or federal law or agreed to in writing by the
City and the Developer. Thereafter, notwithstanding anything in this Agreement to the contrary, to the
full extent permitted by state law, the City may require compliance with any amendments to the City's
Comprehensive Guide Plan, official controls, platting or dedication requirements enacted after the date
of this Agreement.
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
5. Development Plans. The subject property shall be developed in accordance with the following plans,
specifications and contract documents, original copies of which are on file with the City Engineer. The
plans and contract documents may be prepared, subject to City approval, after entering this Agreement,
but before commencement of any work on the Subject Property. If the plans vary from the written
terms of this Agreement, the written terms shall control. The plans are:
Plan A - Plat
Plan B - Soil Erosion Control Plan and Schedule
Plan C - Drainage and Storm Water Runoff Plan
Plan D - Plans and Specifications for Public Improvements
Plan E - Grading Plan and House Pad Elevations
Plan F - Street Lights
Plan G - Landscape Improvements
All Improvements, including Developer Improvements and City-Installed Public Infrastructure
Improvements (if any) that lie within the public right-of-way or easements and are improvements listed
in Minnesota Statutes, Section 429.021 (hereinafter Public Improvements) will be designed by the
Developer and must be approved by the City Engineer. The Developer will prepare plans and
specifications for Public Improvements which shall be approved by the City Engineer. Such approvals
shall not be unreasonably withheld and the City shall approve or provide Developer with necessary
revision comments within 30 calendar days of Developer submittal of Public Improvement plans and
specifications. The City will perform all construction inspection for the Public Improvements, at the
Developer’s expense. Construction inspection includes but is not limited to inspection,
documentation, and monitoring.
6. Installation by Developer. The Developer shall install or cause to be installed and pay for the
following, hereinafter referred to as the “Developer Improvements”:
A. Surveying and staking
B. Surface improvements (paved streets, sidewalks, trails, etc.)
C. Water main improvements
D. Sanitary sewer improvements
E. Storm sewer improvements
F. Setting of lot and block monuments
G. Gas, electric, telephone, and cable lines
H. Site grading
I. Landscaping
J. Streetlights
K. Other items as necessary to complete the development as stipulated herein or in other
agreements
7. Time of Performance. The Developer shall install all required improvements, excepting the wear
course of pavement, enumerated in Paragraph 6 that will serve the subject property by December 31,
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
2021, subject to delays due to inclement weather, casualty, labor strikes, material shortages, or other
force majeure not within the Developer’s reasonable control. The pavement wear course shall be
completed by December 31, 2022. The Developer may, however, request an extension of time from
the City. If an extension is granted, it shall be conditioned upon updating the security posted by the
Developer to reflect cost increases and the extended completion date.
8. City-Installed Public Infrastructure. The following improvements, hereinafter referred to as “City-
Installed Public Infrastructure Improvements” (known as City Project 2021-04), shall be designed,
inspected, surveyed and administered by the City, and installed in the Subject Property at Developer
expense by a Contractor selected by the City through the public bidding process:
A. None
9. [This Section Intentionally Left Blank]
10. Security for Developer Improvements. To guarantee compliance with the terms of this Agreement,
payment of the costs of all Developer Improvements, and construction of all Developer Improvements
(as noted in Paragraph 6), the Developer shall furnish the City with a cash deposit or irrevocable letter
of credit from a local bank (“security”) in the amount of Two Million Five Hundred Eight Thousand
Nine Hundred Eighty Four Dollars ($2,508,984). The amount of the security was calculated as follows:
Refer to Exhibit A and Exhibit B for an explanation of each item.
The bank and form of the letter of credit or other security shall be subject to the approval of the City
Administrator. The letter of credit shall be automatically renewable until the City releases the developer
from responsibility. The letter of credit shall secure compliance with all terms of this Agreement and
all obligations of the Developer under it. The City may draw down on the letter of credit without notice
if the obligations of the Developer have not been completed as required by this Agreement. In the
event of a default under this Subdivision Agreement by the Developer, the City shall furnish the
Developer with written notice by certified mail of Developers default(s) under the terms of this
Subdivision Agreement. If the Developer does not remove said default(s) within two (2) weeks of
receiving notice, the City may draw on the letter of credit and take such steps as it deems necessary to
remedy the default. With City approval, the letter of credit may be reduced from time to time as financial
obligations are paid and Developer Improvements and other Developer obligations are completed to
the City’s requirements.
11. Grading Plan/Site Grading. Site grading shall be completed by the Developer at its cost and approved
by the City Engineer. The completion of grading activities will need to be coordinated by the City in
Cost 110%
Grading & Erosion Control (25.4 acres @ $3,500/acre) 88,900$ 97,790$
Pond Restoration and Erosion Control Removal 25,000$ 27,500$
Survey Monumentation (97 lots @ $500/lot)48,500$ 53,350$
Landscaping (188 trees @ $300/tree)56,400$ 62,040$
Street Lighting (10 lights @ $4,000/light)40,000$ 44,000$
Cost 125%
Surface Improvments 583,444$ 729,305$
Water Main Improvements 410,629$ 513,286$
Sanitary Sewer Improvements 307,936$ 384,920$
Storm Sewer Improvements 477,434$ 596,793$
Total 2,038,243$ 2,508,984$
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
conjunction with the installation of utilities. Developer shall furnish the City Engineer satisfactory proof
of payment for the site grading work and shall submit a certificate of survey of the development to the
City as the site grading is completed by phase, with street and lot grades. If the installation of u tilities
by the City is occurring simultaneously with the grading, the utility contractor shall have preference over
the grading activities. No substantial grading activities can be completed over installed utilities unless
otherwise protected. All improvements to the lots and the final grading shall comply with the grading
plan as submitted and shall be the responsibility of the Developer.
12. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license
to enter the Subject Property to perform all work and inspections deemed appropriate by the City. Such
license shall terminate as to all single-family residential lots within the subject property upon acceptance
by the City of the public infrastructure improvements.
13. Erosion Control. Prior to site grading, and before any utility construction is commenced or building
permits are issued, the erosion control plan, Plan B, shall be implemented, inspected and approved by
the City. All areas disturbed by the excavation and backfilling operations shall be reseeded within 72
hours after the completion of the work in that area. Except as otherwise provided in the erosion control
plan, seed shall be rye grass or other fast-growing seed suitable to the existing soil to provide a temporary
ground cover as rapidly as possible. All seeded areas shall be mulched and disc-anchored as necessary
for seed retention.
All basement and/or foundation excavation spoil piles shall be kept completely off City right-of-way
and shall be completely surrounded with an approved erosion control silt fence. Approved erosion
control fencing shall be installed around the perimeter of each lot or at City-approved locations at the
time of building permit issuance and remain in place until the lot is seeded or sodded. A 20-foot opening
will be allowed on each lot for construction deliveries.
The parties recognize that time is critical in controlling erosion. If development does not comply with
the erosion control plan and schedule, or supplementary instructions received from the City, the City
may take such action as it deems appropriate to control erosion. This right also applies to the required
erosion control for basement and/or foundation excavation spoil piles. The City will attempt to notify
the Developer in advance of any proposed action, but failure of the City to do so will not affect the
Developer’s or City’s rights or obligations hereunder. If the Developer does not reimburse the City for
any cost the City incurred for such work within thirty (30) days, the City may draw down the letter of
credit to pay any costs. No development will be allowed, and no building permits will be issued unless
the Subject Property is in full compliance with the erosion control requirements.
14. Planting and Seeding. Landscaping shall be in accordance with Landscape Plans approved by the City
Planner.
15. Clean up. The Developer shall clean streets of dirt and debris that has resulted from construction work
by the Developer, its agents or assignees. The City will inspect the site on a weekly basis and determine
whether it is necessary to take additional measures to clean dirt and debris from the streets. Costs for
City inspection of onsite erosion and sediment control shall be at the Developer’s expense. After a 24-
hour verbal or written notice to the Developer, the City will complete or contract to complete the clean-
up at the Developer’s expense in accordance with the procedures specified in Paragraph 13. The
Developer shall inspect and, if necessary, clean all catch basins, sumps, and ponding areas of
erosion/siltation and restore to the original condition at the end of home construction within this
development. All silt fence and other erosion control should be removed following the establishment
of turf. These items are to be secured through the letter of credit as is noted in Exhibit A.
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
16. Ownership of Improvements. Upon completion and City acceptance of the work and construction
required by this Agreement, the Public Improvements lying within public rights-of-way and easements
shall become City property without further notice or action unless the improvements are specifically
identified herein as private infrastructure.
17. Warranty. The Developer warrants all work required to be performed by it against poor material and
faulty workmanship for a period of two (2) years after its completion and acceptance by the City or such
longer period as is specified in plans and specifications for Public Improvements.
All trees, grass and sod shall be warranted to be alive, of good quality and disease free for twenty-four
(24) months after planting.
Vegetation surrounding ponds and/or wetlands shall be warranted to be alive, of good quality and weed
free for three (3) years after planting.
For each pond/wetland in the development, the developer shall provide to the City Engineer an
inspection report by July 31 each year which includes the following:
A. Date of inspection
B. Name of person responsible for inspection
C. Photos of the pond/wetland area confirming the vegetation is established as intended
D. Maintenance plan describing the required maintenance activities and tentative schedule.
18. Responsibility for Costs.
A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in
conjunction with the development of the Subject Property including, but not limited to, Soil and
Water Conservation District charges, legal, planning, engineering and inspection expenses
incurred in connection with approval and acceptance of the subdivision and the plat, the
preparation of this Agreement and any amendments hereto, and all costs and expenses incurred
by the City in monitoring and inspecting the development of the Subject Property.
B. The Developer shall reimburse the City for costs incurred in the preparation and enforcement of
this Agreement, including engineering and attorney’s fees. Upon request, the City shall provide
invoices, in reasonable detail, as to any such fees. The estimated City fees of $292,797 shall be
deposited with the City at the time this Agreement is signed, and represent the following amounts:
If the actual City fees exceed this estimate, the Developer shall pay the additional costs to the City
within thirty (30) business days of the request. If actual City fees are lower than this estimate, any
surplus funds will be returned to the developer when the project fund is reconciled and closed.
C. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under
this Agreement within thirty (30) business days after receipt. If the bills are not paid on time, the
City may halt development work and construction including, but not limited to, the issuance of
177,944$ Engineering Fees (10% of construction)
3,000$ Attorney Fees
88,972$ City Fees (5% of construction cost estimate)
7,200$ Street Light Energy Cost
5,820$ GIS Fees
3,078$ Trail Fog Seal
6,783$ Seal Coat
292,797$ Total Amount Due
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
building permits for lots that the Developer may or may not have sold, until the bills are paid in
full. Bills not paid within thirty (30) days shall accrue interest at the rate of nine percent (9%) per
year.
D. The Developer shall pay all energy costs for street lights installed within the Subject Property for
24-months at a cost of $30/month/light. After that, the City will assume the energy costs.
E. The Developer will pay the cost of sealcoating the public streets within the development at a cost
of $1.70/SY. The sealcoating will be completed within three (3) years following wear course
placement.
F. The Developer will pay the cost of fog sealing the public trails within the development at a cost
of $0.30/SF. The fog sealing will be completed within three (3) years following trail installation.
19. Indemnification. The Developer shall hold the City and its officers, agents and employees harmless
from claims made by itself and third parties for damages sustained or costs incurred resulting from plat
or subdivision approval and development of the Subject Property, except for any costs or expenses
arising from the intentional acts or gross negligence of the City, it’s agents, employees or contractors.
The Developer shall indemnify the City and its officers, agents and employees for all costs, damages or
expenses that the City may pay or incur in consequence of such claims, including attorney’s fees.
Notwithstanding any other provision in this Agreement to the contrary, Developer agrees that it will
not be able to submit a claim for extra work or for monetary damages (for delay or otherwise), or request
an extension of time to complete the work, for any reason arising out of or relating to: (1) the COVID-
19 pandemic; or (2) any national, state, or local declaration, resolution, or order relating to the COVID-
19 pandemic, unless such declaration, resolution or order prohibits work on the project. The contract
completion date shall be extended for the period of the required stoppage in work but without any claim
for delay damages.
20. Insurance. The Developer agrees to take out and maintain or cause to be taken out and maintained
until six months after the City has accepted the Subdivision Improvements, public liability and property
damage insurance covering personal injury, including death, and claims for property damage which may
arise out of Developer’s work or the work of its contractors or subcontractors. Liability limits shall not
be less than $500,000 when the claim is one for death by wrongful act or omission or for any other claim
and $2,000,000 for any number of claims arising out of a single occurrence, and twice said limits when
the claim arises out of the release or threatened release of a hazardous substance. The City shall be
named as an additional insured on the policy. The certificate of insurance shall provide that the City
must be given the same advance written notice of the cancellation of the insurance as is afforded to the
Developer.
21. Park and Utility Fees.
The Developer agrees to pay fees, charges and assessments set forth in this Section prior to, or at the
time of execution of this agreement by the City:
A. Park dedication fees in the amount of $299,550
B. Storm Sewer Trunk Area Charges in the amount of $165,447
C. Sanitary Sewer Trunk Area Charges in the amount of $19,311
D. Watermain Trunk Area Charges in the amount of $74,744
Or other amounts for such fees as in effect at the time of plat approval.
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
22. Service Charges.
The Developer understands that builders will be required to pay for the Subject Property fees, charges
and assessments in effect at the time of issuance of building permits. The rates for each of these items
will be set according to the current rate structure at the time the building permit is received. The fees,
charges, and assessments in effect as of the date of this agreement are:
A. Metropolitan Council Environmental Services Availability Charges per SAC unit (current rate is
$2,485).
B. Storm Sewer Connection Charges per single family unit and per multiple family unit (single family
currently at $770; multi-family currently at $290 per housing unit).
C. Sanitary Sewer Availability Charges per SAC unit (currently at $1,200/SAC unit).
D. Water Availability Charges per SAC unit (currently at $2,475/SAC unit for single family residential
and multi-family residential).
23. Building Permits. No occupancy permits shall be issued until:
A. The site grading is completed and approved by the City.
B. All public utilities are tested, approved by the City Engineer, and in service.
C. All curbing is installed and backfilled.
D. The first lift of bituminous is in place and approved by the City.
E. All building permit fees are paid in full.
F. No early building permits will be issued without prior authorization from the City Building
Official.
The Developer, in executing this Agreement, assumes all liability and costs for damage or delays incurred
by the City in the construction of Public Improvements caused by the Developer, its employees,
contractors, subcontractors, material men or agents. No occupancy permits shall be issued until the
public streets and utilities referred to in paragraph 6 and 8 are in and approved by the City (excluding
the final wear course of bituminous), unless otherwise authorized in writing by the City Engineer.
24. Record Drawings. At project completion, Developer shall submit record drawings of all public and
private infrastructure improvements in accordance with the City’s Engineering Guidelines. No
securities will be fully released until all record drawings have been submitted and accepted by the City
Engineer.
25. Developer’s Default. In the event of default by the Developer as to any of the work to be performed
by it hereunder, the City may, at its option, perform the work and the Developer shall promptly
reimburse the City for any expense incurred by the City, provided the Developer is first given notice of
the work in default, not less than 48 hours in advance. This Agreement is a license for the City to act,
and it shall not be necessary for the City to seek a court order for permission to enter the land. When
the City does any such work, the City may, in addition to its other remedies, draw on the letter of credit
or other security described in section 10, or levy the cost in whole or in part as a special assessment
against the Subject Property. Developer waives its rights to notice of hearing and hearing on such
assessments and its right to appeal such assessments pursuant to Minnesota Statutes, Section 429.081.
26. Miscellaneous.
A. The Developer represents to the City that the development of the Subject Property, the
subdivision and the plat comply with all city, county, metropolitan, state and federal laws and
regulations including, but not limited to: subdivision ordinances, zoning ordinances and
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
environmental regulations. If the City determines that the subdivision, or the plat, or the
development of the Subject Property does not comply, the City may, at its option, refuse to allow
construction or development work on the Subject Property until the Developer does comply.
Upon the City’s demand, the Developer shall cease work until there is compliance.
B. Third parties shall have no recourse against the City under this Agreement.
C. Breach of the terms of this Agreement by the Developer shall be grounds for denial of building
permits, including lots sold to third parties.
D. If any portion, section, subsection, sentence, clause, paragraph or phase of this Agreement is for
any reason held invalid, such decision shall not affect the validity of the remaining portion of this
Agreement.
E. If building permits are issued prior to the completion and acceptance of Public Improvements,
the Developer assumes all liability and costs resulting in delays in completion of Public
Improvements and damage to Public Improvements caused by the City, the Developer, its
contractors, subcontractors, material men, employees, agents or third parties.
F. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of
this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties
and approved by written resolution of the City Council. The City’s failure to promptly take legal
action to enforce this Agreement shall not be a waiver or release.
G. This Agreement shall run with the land and may be recorded against the title to the subject
property. The Developer shall take such steps, including execution of amendments to this
Agreement, as are necessary to effect the recording hereof. After the Developer has completed
the work required of it under this Agreement, at the Developer’s request, the City will execute and
deliver to the Developer a release.
H. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every
other right, power or remedy, express or implied, now or hereafter arising, available to the City, at
law or in equity, or under any other agreement, and each and every right, power and remedy herein
set forth or otherwise so existing may be exercised from time to time as often and in such order
as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any
time thereafter any other right, power or remedy.
I. The Developer may not assign this Agreement without the written permission of the City Council.
J. The Developer acknowledges that the City may issue additional requirements outside of the 2015
General Specifications and Standard Detail Plates for Street and Utility Construction or the 2008
Engineering Guidelines as the City is in the process of updating these documents. The review
process may require additional time and expense due to this process, which shall be the
Developer’s responsibility. The Developer shall not be billed for the time required for the City to
update and approve their revisions to the 2015 General Specifications and Standard Details Plates
for Street and Utility Construction or the 2008 Engineering Guidelines.
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
27. Notices. Required notices to the Developer shall be in writing, and shall be either hand delivered
to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following
address:
Tamarack Land – Ardan Place
Attn: Dale Willenbring
1536 Beachcomber Blvd
Waconia, MN 55387
With a copy to:
Grassel Law, PLLC
Attn: Jake Grassel
712 Vista Blvd, Suite 187
Waconia, MN 55387
Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or
mailed to the City by registered mail in care of the City Administrator at the following address:
City Administrator
Rosemount City Hall
2875 145th Street West
Rosemount, Minnesota 55068
[Remainder of page intentionally left blank.]
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
IN WITNESS WHEREOF, the parties have hereunto set their hands the day and year first above written.
CITY OF ROSEMOUNT
BY:
William H. Droste, Mayor
BY:
Erin Fasbender, City Clerk
STATE OF MINNESOTA )
) SS
COUNTY OF DAKOTA )
The foregoing instrument was acknowledged before me this _____ day of _____________________, 2020,
by William H. Droste, Mayor, and Erin Fasbender, City Clerk, of the City of Rosemount, a Minnesota
municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council.
Notary Public
Tamarack Land – Ardan Place, LLC
BY:
Dale Willenbring, President
STATE OF MINNESOTA )
) SS
COUNTY OF _____________)
The foregoing instrument was acknowledged before me this ____ day of ______________________, 2021
by Dale Willenbring, President of Tamarack Land – Ardan Place LLC, a Minnesota limited liability company,
on behalf of said corporation.
Notary Public
Drafted By:
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
EXHIBIT A
The following clarifies the various portions of the letter of credit for Developer Improvements that are
outlined in the Subdivision Agreement:
Grading & Erosion Control – A restoration and erosion control bond to ensure re-vegetation and erosion
control ($3,500/acre). Note: The minimum surety amount is set at $25,000.
Pond Restoration/Erosion Control Removal – A security to allow for cleaning of sedimentation ponds prior
to City acceptance, and removal of any installed erosion control measures such as silt fence and wood fiber
blanket following development of 75 percent of adjoining lots (estimated lump sum).
Survey Monumentation – An amount equal to 110% of the cost to monument all lots within the development.
Landscaping – An amount equal to 110% of the cost to complete the minimum required landscaping. If
additional landscaping is planned, a surety for that cost is not required.
Street Lighting – An amount equal to 110% of the cost to complete the minimum required lighting. If
additional lighting is planned, a surety for that cost is not required ($4,000 per light has been used to calculate
this cost).
Ardan Place 1st
EXHIBIT B (Page 1 of 2)
No.Item Cost 110%Calculation
1 Grading and Erosion Control 88,900$ 97,790$ $3,500/ac x 25.4 acres. Minimum $25,000
2 Pond Restoration and Erosion Control Removal 25,000$ 27,500$ Minimum $25,000
3 Survey Monumentation 48,500$ 53,350$ $500/lot x 97 lots
4 Landscaping 56,400$ 62,040$ Per City Planner (188 trees x $300)
5 Street Lights 40,000$ 44,000$ $4,000/light x 10 lights
6 Surface Improvements 583,444$ 729,305$ 125%
7 Water Main Improvements 410,629$ 513,286$ 125%
8 Sanitary Sewer Improvements 307,936$ 384,920$ 125%
9 Storm Sewer Improvements 477,434$ 596,793$ 125%
Total 2,038,243$ 2,508,984$
No.Item Cost
Estimated Construction Cost 1,779,443$
1 Engineering Fees 177,944$
2 Attorney Fees 3,000$
3 5% City Administrative Fees 88,972$
4 Street Light Energy Cost 7,200$
5 GIS Fees 5,820$
6 Trail Fog Seal 3,078$
7 Seal Coating 6,783$
Total 292,797$
No.Item Cost
1 Storm Sewer Trunk Charge 165,447$
2 Sanitary Sewer Trunk Charge 19,311$
3 Water Trunk Charge 74,744$
5 Park Dedication 299,550$
Total 559,052$
Estimate
5% of Estimated Construction Cost
10 lights x 24 months x $30/month
$60/unit x 97 units, or $120/acre
$0.30/SF x 10,260 SF
10% of Estimated Construction Cost
Letter of Credit for Developer Improvements (due with signed agreement)
City Fees (due with signed agreement)
Calculation
Developer's Estimate
$6,500/acre x 25.4 acres
$1.70/SY x 3,990 SY
Development Fees (due before signed plat is released)
42 SF units x $3,400/unit + 55 TH units x $2,850
Calculation
$6,865/net developable acre x 24.1 acres
$1,075/acre x 25.4 acres
Block Lots Units Block Lot Units SQ FT Acres
1 9 9 1 1 1 11804 0.271
2 10 10 1 2 1 10712 0.246
3 8 8 1 3 1 10092 0.232
4 15 15 1 4 1 10901 0.250
5 3 3 1 5 1 11948 0.274
6 6 6 1 6 1 13574 0.312
7 6 6 1 7 1 13659 0.314
8 6 6 1 8 1 17277 0.397
9 6 6 1 9 1 19450 0.447
10 6 6 2 1 1 8132 0.187
11 6 6 2 2 1 8302 0.191
12 4 4 2 3 1 8646 0.198
13 6 6 2 4 1 9655 0.222
14 6 6 2 5 1 12118 0.278
Total 97 97 2 6 1 8082 0.186
2 7 1 12231 0.281
Total Plat Area = 52.207 acres 2 8 1 9196 0.211
Total Park Area = 0.000 acres 2 9 1 8709 0.200
Future Plat Area = 26.813 acres 2 10 1 8899 0.204
Developable Area * = 25.394 acres 3 1 1 12064 0.277
Ponding to HWL = 1.319 acres 3 2 1 11773 0.270
Net Developable Area =24.076 acres 3 3 1 12442 0.286
3 4 1 8959 0.206
* Excludes future plat and park areas (all outlots)3 5 1 12385 0.284
3 6 1 9905 0.227
3 7 1 11887 0.273
3 8 1 12656 0.291
4 1 1 11108 0.255
4 2 1 9270 0.213
4 3 1 8926 0.205
4 4 1 9336 0.214
4 5 1 9711 0.223
4 6 1 10870 0.250
4 7 1 10178 0.234
4 8 1 10580 0.243
4 9 1 9397 0.216
4 10 1 8973 0.206
4 11 1 9286 0.213
4 12 1 9285 0.213
4 13 1 9285 0.213
4 14 1 9285 0.213
4 15 1 12379 0.284
5 1 1 2015 0.046
5 2 1 1690 0.039
5 3 1 2015 0.046
6 1 1 2015 0.046
6 2 1 1690 0.039
6 3 1 1690 0.039
6 4 1 1690 0.039
6 5 1 1690 0.039
6 6 1 2015 0.046
7 1 1 2015 0.046
7 2 1 1690 0.039
7 3 1 1690 0.039
7 4 1 1690 0.039
7 5 1 1690 0.039
7 6 1 2015 0.046
8 1 1 2015 0.046
8 2 1 1690 0.039
8 3 1 1690 0.039
8 4 1 1690 0.039
8 5 1 1690 0.039
8 6 1 2015 0.046
Ardan Place 1st
EXHIBIT B (Page 2 of 2)
Totals
9 1 1 2015 0.046
9 2 1 1690 0.039
9 3 1 1690 0.039
9 4 1 1690 0.039
9 5 1 1690 0.039
9 6 1 2015 0.046
10 1 1 2015 0.046
10 2 1 1690 0.039
10 3 1 1690 0.039
10 4 1 1690 0.039
10 5 1 1690 0.039
10 6 1 2015 0.046
11 1 1 2015 0.046
11 2 1 1690 0.039
11 3 1 1690 0.039
11 4 1 1690 0.039
11 5 1 1690 0.039
11 6 1 2015 0.046
12 1 1 2015 0.046
12 2 1 1690 0.039
12 3 1 1690 0.039
12 4 1 2015 0.046
13 1 1 2015 0.046
13 2 1 1690 0.039
13 3 1 1690 0.039
13 4 1 1690 0.039
13 5 1 1690 0.039
13 6 1 2015 0.046
14 1 1 2015 0.046
14 2 1 1690 0.039
14 3 1 1690 0.039
14 4 1 1690 0.039
14 5 1 1690 0.039
14 6 1 2015 0.046
Outlot A 1016031 23.325
Outlot B 151923 3.488
Outlot C 82724 1.899
Outlot D 177926 4.085
Outlot E 68472 1.572
ROW 224281 5.149
Total Boundary 2274134 52.207
Ardan Place 1st Addition
February / 2021
G:\ENGPROJ\2021-04 Ardan Place\Subdivision Agreement\Subdivision Agreement 2021-04.docx
ATTACHMENT ONE
Ardan Place 1st Addition
Final Plat
AILSBURY AVENUEAUTUMN PATHUNION
PACIFIC
RAILROADBONAIRE PATH W (COUNTY ROAD 38)L=130.68 R=2865.00
Δ=2°36'48"N85°22'32"W 319.43L=879.86R=11459.00Δ=4°23'58"N0°05'15"W 2039.49
N67°07'26"E
1437
.67
N0°00'02"W 1407.20DOGPARK 122465789101156789101413112324252627282931230DOGPARK12246578910115678910141311232425262728293123019-050
09/29/2020
ARDAN PLACE
TAMARACK LAND DEVELOPMENT, LLC
ROSEMOUNT, MN
N CAMPION
ENGINEERING
SERVICES, INC.
Civil Engineering Land Planning
1 1
SITE PLAN EXHIBIT
DRAINAGE AND UTILITY EASEMENTS:
LEGEND
N12/10/2020
Final Plat Area
WENCKASSOCIATESARDAN PLACE
S0°05'15"E 2036.74N0°00'02"W 1407.66N67°08'10"E 1437.54L=879.86 R=11459.00 Δ=4°23'58"CH=879.65 CHB=S87°34'31"EN85°22'32"W 319.43L=130.68 R=2865.00Δ=2°36'48"AUTUMN PATHOUTLOT ABONAIRE PATH W (COUNTY ROAD 38)INSET AINSET BΔΔΔΔΔOUTLOT BΔWENCKASSOCIATESLEGEND ARDAN PLACE
N0°00'02"W 438.46OUTLOT BINSET BBLOCK 3BLOCK 2BLOCK 1BLOCK
4
STREET NAME1234 567891234567891012345678123456789101112131415ΔΔSTREET NAMESTREET NAME
STREET NAMEΔSTREET
NAMEΔΔWENCKASSOCIATESLEGEND ARDAN PLACEINSET A
STREET NAMESTREET NAME1231234561234561234561234566543211234561234561234123456OUTLOT CINSET AOUTLOT DΔ567891011121314WENCKASSOCIATESLEGEND ARDAN PLACE
1
COVER SHEET
N
GOVERNING SPECIFICATIONS:
PROJECT DIRECTORY
LEGEND
19-050
01/26/2021
ARDAN PLACE
TAMARACK LAND DEVELOPMENT, LLC
ROSEMOUNT, MN
N CAMPION
ENGINEERING
SERVICES, INC.
Civil Engineering Land Planning
8
2 OF 10
FUTUREDOGPARK1224101156789101413112324312F U T U R E F U T U R EF U T U R EF U T U R E3
GRADING PLAN
LEGEND
N19-050
01/26/2021
ARDAN PLACE
TAMARACK LAND DEVELOPMENT, LLC
ROSEMOUNT, MN
N CAMPION
ENGINEERING
SERVICES, INC.
Civil Engineering Land Planning
8
BONAIRE PATH W (COUNTY ROAD 38)FUTUREDOGPARK1241156789101413112324312F U T U R E F U T U R EF U T U R E4
LEGEND
NSTORM WATER POLLUTION
PREVENTION PLAN
PROJECT DIRECTORY
19-050
01/26/2021
ARDAN PLACE
TAMARACK LAND DEVELOPMENT, LLC
ROSEMOUNT, MN
N CAMPION
ENGINEERING
SERVICES, INC.
Civil Engineering Land Planning
8
5
REPLACEMENT CALCS
TREE INVENTORY
&19-050
01/26/2021
ARDAN PLACE
TAMARACK LAND DEVELOPMENT, LLC
ROSEMOUNT, MN
N CAMPION
ENGINEERING
SERVICES, INC.
Civil Engineering Land Planning
8
UNION
PACIFIC
RAILROADBONAIRE PATH W (COUNTY ROAD 38)FUTUREDOGPARK12411567891014131123312F U T U R E F U T U R EF U T U R E19-050
01/26/2021
ARDAN PLACE
TAMARACK LAND DEVELOPMENT, LLC
ROSEMOUNT, MN
N CAMPION
ENGINEERING
SERVICES, INC.
Civil Engineering Land Planning
86
TREE PRESERVATION PLAN N
AUTUMN PATHUNION
PACIFIC
RAILROADBONAIRE PATH W (COUNTY ROAD 38)FUTUREDOGPARK122465789101156789101413112324252627282931230F U T U R E F U T U R EF U T U R EF U T U R EF U T U R E19-050
01/26/2021
ARDAN PLACE
TAMARACK LAND DEVELOPMENT, LLC
ROSEMOUNT, MN
N CAMPION
ENGINEERING
SERVICES, INC.
Civil Engineering Land Planning
223
COMPOSITE UTILITY PLAN
LEGEND
N”
”””“”
“”
“”
”
BONAIRE PATH W (COUNTY ROAD 38)FUTUREDOGPARK1241156789101413112324312F U T U R E F U T U R EF U T U R E19-050
01/26/2021
ARDAN PLACE
TAMARACK LAND DEVELOPMENT, LLC
ROSEMOUNT, MN
N CAMPION
ENGINEERING
SERVICES, INC.
Civil Engineering Land Planning
224
SIGNAGE & STREET LIGHT PLAN
LEGEND
N
F U T U R EF U T U R E
F U T U R E
F U T U R E
F U T U R EAUTUMN PATHUNIO
N
P
A
C
I
F
I
C
R
A
I
L
R
O
A
D
BONAIRE PATH W (COUN
T
Y
R
O
A
D
3
8
)
1
2
2
4
6
5
7
8
9
10
11
5
6
7
8
9
10
14
13
11
23
24
25
26
27
28
29
3
12
30
c
2OFARDAN PLACE 1ST ADDITION
ROSEMOUNT, MINNESOTA
TAMARACK LAND DEVELOPMENT, LLC1-26-2021
JLT\TLM
Name
Reg. No.Date
Revisions Date
Designed
Drawn
Mendota Heights, MN 55120
2422 Enterprise Drive (651) 681-1914
Fax: 681-9488www.pioneereng.com
LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS
1-26-2021
I hereby certify that this plan was prepared by
me or under my direct supervision and that I
am a duly Licensed Landscape Architect
under the laws of the State of Minnesota 44763
Jennifer L. Thompson L1LANDSCAPE PLAN
01-PLAN-120203-SHEET-LAND
JLT\TLM
c
2OFARDAN PLACE
ROSEMOUNT, MINNESOTA
TAMARACK LAND DEVELOPMENT, LLC1-26-2021
JLT
JLT
Name
Reg. No.Date
Revisions Date
Designed
Drawn
Mendota Heights, MN 55120
2422 Enterprise Drive (651) 681-1914
Fax: 681-9488www.pioneereng.com
LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS
1-26-2021
I hereby certify that this plan was prepared by
me or under my direct supervision and that I
am a duly Licensed Landscape Architect
under the laws of the State of Minnesota 44763
Jennifer L. Thompson L2LANDSCAPE PLAN
K:\016934-000\Admin\Docs\Arden Place Phase One Constrution Plan Memo - DRAFT.docx
Memorandum
To: Anthony Nemcek, Planner
CC: Kim Lindquist, Community Development Director
Stacy Bodsberg, Planning & Personnel Secretary
Brian Erickson, Director of Public Works/City Engineer
From: Tim Hanson, WSB Engineering Consultant
Stephanie Smith, Assistant City Engineer
Date: January 29, 2021
Re: Ardan Place, Phase One Construction Plan – Engineering Review
SUBMITTAL:
The final plat and construction plans for Ardan Place have been submitted, they were prepared
by Campion Engineering Services, Inc of Maple Plain, MN. The developer of the site is
Tamarack Land Development, LLC. Engineering review comments were generated from the
following plat documents included in the submittal consisting of:
▪ Final Plat
▪ ALTA/NPSPS Land Title Survey dated 2/17/2020
▪ Grading, Drainage, & Erosion Control Plans dated 1/26/2021
▪ Sanitary Sewer and Watermain Plans dated 1/26/2021
▪ Street and Storm Sewer Plans dated 1/26/2021
▪ Storm Water Pollution Prevention Plan dated 1/26/2021
▪ Tree Preservation Plan dated 1/26/2021
▪ Storm Water Management Plan dated 9/29/2020
GENERAL COMMENTS – FINAL PLAT:
1. The development Fees are indicated below based on the 2021 Schedule of Rates and
Fees. These fees are due with the final plat and subdivision agreement.
▪ Sanitary Sewer Trunk Charge: $1075/acre
▪ Watermain Trunk Charge: $6500/acre
▪ Storm Sewer Trunk Charge: $6865/acre
2. The existing Street, Drainage and Utility Easements within Ardan Place must be vacated
with the platting of the final plat.
3. Doc. 2442129 (Item #11)
4. Doc2433691 (Item #10)
5. The ponding area and access portion of Outlot D shall be dedicated to the City.
6. The bike trail shall have a permanent trail easement place over its alignment.
7. The easement width between block 7 and block 8 and between block 13 and 14 is not
adequate for maintenance of the storm sewer pipe that extends between the blocks.
8. The D & U easement along the west lot line of Lot 1, Block 1 must be identified a s “10”.
9. The additional easement width at the corner of Lot 7, Block 1 is not shown on the
construction plans.
10. Label “INSET B".
11. Provide temporary street easements for the temporary turnarounds.
Anthony Nemcek
10/16/2020
Page 2
K:\016934-000\Admin\Docs\Arden Place Phase One Constrution Plan Memo - DRAFT.docx
12. The barb wire fence and plastic snow fence along the Union Pacific Railroad must be
removed.
SANITARY SEWER AND WATERMAIN
13. Sheet 3, Note 3, Sanitary Sewer & Watermain - Hydrants have an 8.5 foot bury.
14. Sheet 3, Add a note indicating service saddles for water services shall be installed on all
corporation stops.
15. Sheet 5, The sanitary sewer run between MH1 and MH2 needs to be in bold line weight.
16. Sheet 5, The data for the existing MH is cut off.
17. Sheet 5, This sheet does not have the centerline stationing indicated.
18. Sheet 5, The” SEE DETAIL A” for the sewer run between MH1 and MH2 overwrites a
platting leader line. The platting information can be removed from these sheets.
19. Sheet 5, The 12” X 8” Tee at station 0+18 will have to be a 12” X 12” Tee with two 8”
Reducers.
20. All watermain sheets – the valve placements will be reviewed by Rosemount Utilities.
21. Number and locates of valves shall meet City of Rosemount Engineering Guidelines.
22. The bar scale on the construction sheets is not accurate. It should be 1” = 100’
23. The notes for sanitary sewer service extension indicates the elevation is at 10 feet past
the property line. Rosemount’s detail indicates the elevation is at 9 foot past the property
line. Please correct/clarify.
24. Sheet 6,7,8 & 9, There are several riser lengths or location issues on these sheets.
Sewer services need 2’ separation from the storm sewer, minimum.
25. Sheet 6, There are a couple of locations along the watermain alignment where it appears
a 11 ¼ or 22 ½ degree bend should be noted. Please review.
26. Sheet 6, Add hydrant at the intersection of Street 3 and Street 4.
27. Sheet 6, Move the hydrant on Ardore Avenue to the intersection with Street 3.
28. Sheet 7, 9, do the sanitary sewer stubs (3) need a manhole shown in the future for
staking and reference?
29. Sheet 7, Locate the hydrant on the lot line of Lots 4 & 5.
30. Sheet 8, The hydrant between the future lot lines in the temporary cul-de-sac could be
moved one lot to the west.
31. Sheet 8, In addition to the note show the watermain lowered to 958.30 as it passes under
the storm sewer at station 12+22.
32. Sheet 9, The sanitary invert for the west leg out of MH9 does not have a 0.1 drop
indicated.
33. Sheet 9, Add a hydrant at the intersection of Street 4 and Street 3.
34. Sheet 10, The line weight for the watermain is not bold.
35. Sheet 11, The storm sewer at station 0+88 is not at the low point of the street profile.
36. Sheet 11, Ardore Avenue street alignment needs to be offset to avoid a electric pole on
the north with its future extension. Was this completed.
37. Sheet 11, Provide a typical section for Ardore Avenue.
38. Sheet 11, A pedestrian access ramp is required on the east side of Ardore Avenue
across from the pedestrian ramp on Street 3.
39. Several sheets and storm sewer runs, Storm sewer depth at structures in the street
section need to be in excess of 3.5 feet in depth to minimize frost heaving of the street.
40. Several sheets and storm sewer leads, Show sanitary sewer and water service depth
where the storm sewer crosses.
41. Sheet 12, Place structure STMH 2 in the curb line.
42. Sheet 12, The storm sewer at station 1+81 is not at the low point of the street profile.
43. Sheet 12, The storm sewer run between structures CBMH 6 and CBMH 9 is Detail E on
sheet 17.
Anthony Nemcek
10/16/2020
Page 3
K:\016934-000\Admin\Docs\Arden Place Phase One Constrution Plan Memo - DRAFT.docx
44. Sheet 12, The storm sewer run between structures CBMH 12 & CB 5 is Detail H on sheet
17, please label.
45. Sheet 12, Move STMH 3 to be 10 feet from the sanitary sewer line.
46. Sheet 12, The Centerline – Centerline data in the plan view and profile view are not the
same.
47. Sheet 12, The horizontal curve of Street 3 is below a 30 MPH radius, approximately 22
MPH.
48. Sheet 12, Extend the length of the vertical curve at station 9+00 to 120 feet or more.
49. Sheet 13, The profile on Detail A is duplicated on sheet 12 for the portion east of CBMH
23.
50. Sheet 13, Placed structure STMH 9 in the curb line.
51. Sheet 14, Label the storm sewer run between CBMH 13A and CBMH 16A. DETAIL E,
SHEET 17.
52. Sheet 14, Placed structure STMH 4 in the curb line.
53. Sheet 15, Label spot curb elevations of the parking bay.
54. Sheet 15, The storm sewer at station 2+00 is not at the low point of the street profile.
55. Sheet 15, Placed structure STMH 1 in the curb line.
56. Sheet 15, Bulkhead the storm sewer stub to the north on Street 4.
57. Sheet 15, Label the storm sewer run between CBMH 6 and CBMH 9. DETAIL G, SHEET
17.
58. Sheet 15, Label the storm sewer run between CBMH 10 and CB 4. DETAIL F, SHEET
17.
59. Sheet 16, Label the storm sewer run between CBMH 2 and CB 1. DETAIL A, SHEET 17.
60. Sheet 16, Provide a profile for the storm sewer run between the ponds. FES 2 – FES 3.
61. Sheet 16, Show the length of rip rap required to extend it to the bottom of the pond
graphically.
62. Sheet 16. Label spot curb elevations of the parking bays.
63. Sheet 16, The storm sewer at station 18+16 is not at the low point of the street profile.
64. Sheet 16, Placed structure STMH 5 in the curb line.
65. Sheet 16, , Label the storm sewer run between CBMH 17 and CB 10. DETAIL G, SHEET
17.
66. Sheet 17, It would be nice to cross reference each profile with the plan sheet it is located.
67. Sheet 17, As previously noted, Show sanitary sewer and watermain locations at
crossings.
68. Sheet 18, The contours have a bold line weight and a standard line weight, make them all
standard.
69. Sheet 20, The weir wall in the pond outlet control structure has a single horizontal line
that makes it appear there should be an aperture. Remove the line.
70. Sheet 22, The typical section details are washed out and blurry.
71. Provide a typical section for the private streets.
STREETS AND SIDEWALKS
Ardan Place consists of four local residential streets and two private streets. Access extends
from Bonaire Path on a local street (Adore Avenue) that will also provide access to the school
property to the east. A local street and a private street extend from Adore Avenue along the
plat’s east boundary. These two streets extend west into the plat completing a loop within the
plat.. Two local streets extend from the public street, terminating with temporary cul-de-sacs in
the central portion of the posed plat.
72. Ardore Avenue extending from Bonaire Path is shared by the adjacent property to the
east, property owned by the Independent School District 196 (ISD 196). The School
Anthony Nemcek
10/16/2020
Page 4
K:\016934-000\Admin\Docs\Arden Place Phase One Constrution Plan Memo - DRAFT.docx
District must grant an easement for the easterly portion of this street connection and
acknowledge that this access will provide appropriate access for their site.
73. Coordinate southern end of Ardore Avenue with ISD 196 to provide a T-intersection
allowing for bus turning movements into ISD 196 property.
74. Provide a 50 foot long street (pavement section) at the easterly terminus of Ardore
Avenue for snow plow turnaround.
75. Stub streets shall be terminated with type 3 barricades (two at each terminus) with
“Future thru Street” sign attached.
76. The temporary turnarounds are located on a portion of the platted lots and or boulevard
of the platted lot, please move the temporary turn around off of the final platted area.
77. Grading east of Ardore Avenue will extend beyond the proposed easement area.
LANDSCAPE PLAN
1. Sheet L1, Tree planting south of lot 3, block 4 is over the storm sewer line, 4 trees.
2. Sheet L1, Tree planting between block 7 and block 8 is too close to the storm sewer run.
3. Sheet L1, Tree planting between block 13 and block 14 is too close to the storm sewer
run.
INFILTRATION BASINS
78. Access to ponds and rear yard catchbasins should meet Engineering Guidelines and be
shown on the plans.
79. Upon completion of the infiltration basin, the applicants Engineer shall complete
infiltration testing and certify the functionality of the basin as needed.
The city’s storm water consultant is reviewing the submittal, their comments on the plans and the
Ardan Place Stormwater Management Report will be submitted shortly.
G:\2021\Planning Cases\21-04-FP Tamarack Land - Ardan Place LLC Final Plat\Ardan Place - Minea Property Rosemount Stormwater Management Review -
02012021.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum
To: Brian Erickson, City of Rosemount
From: Bill Alms, PE
Laura Kivisto, EIT
Date: February 1, 2021
Re: Ardan Place, Minea Property Plan Review
WSB Project No. 016934-000
We have completed a secondary review of the documents provided by Campion Engineering
Services on January 26, 2021 for the Ardan Place, Minea Property in Rosemount, MN.
Documents reviewed include:
• 19-050 Ardan Place 11x17.pdf, prepared by Campion Engineering Services, 1/26/2021
• 19-050 Ardan Place GRADING 11x17.pdf, prepared by Campion Engineering Services,
1/26/2021
• 20-0113 Geo Bundle – Final.pdf, prepared by Haugo Geotechnical Services, 3/18/2020
• 20-0113 Minea Infiltration Letter-Final.pdf, prepared by Haugo Geotechnical Services,
3/4/2019
• 210119_Ardan Place Stormwater Management Report.pdf, prepared by Civil Methods,
Inc., 1/19/2021
• ARDAN PLACE STORM SEWER DESIGN.pdf, prepared by Campion Engineering
Services, 1/13/2021
Applicant should provide responses to each comment. We offer the following comments below
(greyed out comments have been addressed, comments in red are new to this review, and
comments in standard text still apply).
Grading, Drainage, and Erosion Control Comments:
1. General
a. Show the lowest opening elevation of the proposed homes.
b. Please provide a detail to clarify the house elevations. It was assumed that G
stands for garage floor and LL stands for lower level or basement elevation.
c. Label the driveway slopes.
d. Show or define access routes for maintenance purposes to all inlets, outlets and
manholes. The drainage and utility easements allow for access to the stormwater
infrastructure over most of the site, but please provide clarity regarding the
drainage and utility easement and access to the stormwater infrastructure on the
south end of the site.
e. Plans shall be signed by a licensed Professional Engineer.
f. The proposed dog park is located within the infiltration basin on the grading plan,
but outside the infiltration basin on the proposed drainage area map. Clarify the
location.
Stephanie Smith
02/01/2021
Page 2
G:\2021\Planning Cases\21-04-FP Tamarack Land - Ardan Place LLC Final Plat\Ardan Place - Minea Property Rosemount Stormwater Management Review -
02012021.docx
i. Multi-use green space is considered acceptable, but fence locations and
other components must be reviewed to reduce maintenance issues with
the expected high water levels in the basin.
2. Ponds and Wetlands
a. Please reference the Surface Water Management Plan pond number (1620) on
the plan sheets.
b. The 100-year HWL and 100-year snowmelt elevations differ by 0.1 between
HydroCAD and the plans for the NURP basin and infiltration basin. Modify values
to match.
c. The NW I indicates a wetland to the east of the site that appears to be near the
proposed roadway in the northeast corner of the site. Please show the wetland
on the map and indicate that an adequate buffer distance is provided.
d. NURP basins will be required to be lined. Please add a comment or detail to the
plans indicating this.
e. Request Ponds 1 and 2 be consolidated in the SW corner of the site and push
the infiltration basin east. This will allow more efficient treatment and
consolidation of maintenance of the NURP basins.
i. How will the stormwater management for the future phase of the
development tie into the Phase 1 system?
3. Emergency Overflow Routes:
a. Label all rear yard and street low point EOFs.
4. Retaining Walls:
a. No comments.
5. Erosion Control:
a. An NPDES Permit is required. Please provide.
b. Please provide a complete and accurate SWPPP including a narrative that
complies with and includes all components of the NPDES permit.
c. Provide an operations and maintenance plan for the stormwater system which
identifies who is responsible for long-term maintenance.
d. Where 10 or more acres drain to a common location, permittees must provide a
temporary sediment basin that provides live storage for a calculated volume of
runoff from a 2-year 24-hour storm from each acre drained to the basin.
Temporary basins may be converted to permanent basins after construction is
complete. Please indicate on plans.
e. Ensure all proposed and existing catch basins that receive drainage are marked
with inlet protection. In particular, consider CB-7. and the existing catch basins
immediately outside of the work area.
f. Include information about how the site will be stabilized.
6. Grading:
a. Minimum slopes of 2% are allowed. There are several site locations that do not
meet minimum grade requirements, in particular, the dog park.
b. Show the limits of grading. In some cases, the proposed grades extend beyond
the property boundary.
Stormwater Management Plan:
1. General Storm Sewer Design
Stephanie Smith
02/01/2021
Page 3
G:\2021\Planning Cases\21-04-FP Tamarack Land - Ardan Place LLC Final Plat\Ardan Place - Minea Property Rosemount Stormwater Management Review -
02012021.docx
a. All storm sewer shall be designed to accommodate the 10-year rainfall event.
Please submit rational calculations.
i. Ensure pipe slopes and lengths match between the rational calculations
and the plans. Several pipes were found that do not match (i.e. CBMH
20 – STMH 8, CB 11 – CBMH 19, STMH 4 – CBMH 14, CBMH 16A –
CBMH 16, CBMH 7 – STMH 1, CBMH 5 – CBMH 4).
ii. CBMH 16A – CBMH 16 is under capacity according to the rational
calculations.
b. The minimum storm sewer diameter shall be 15”. Currently, the storm sewer pipe
from CB 1 to Ex. CB on the corner of Bonaire Path and Autumn Path is proposed
to be a 12” RCP.
c. Junction manholes should be designed to limit the hydraulic head increase by
matching flow lines (0.1-foot drop across the structure for incoming and outgoing
pipes of the same diameter and matching crowns for pipes with different
diameters where feasible).
d. Indicate quantity and size of riprap at the FES outlets.
e. Insert the City of Rosemount Standard Detail SD 11, Trash Guard for Storm
Sewer Aprons, into the plans.
f. Indicate the casting type for the yard drains.
g. 3-foot sump catch basins or manholes are required within the street just prior to
discharging to a waterbody (CBMH-1).
h. Provide call out or note to storm sewer sheets to reference sheet piling detail on
flared end sections 24-inches or larger.
i. Modify the low point roadway catch basin placement so the catch basins are
located at the low points shown on the roadway profiles.
j. Pond flared end sections shall be installed with half the pipe diameter below the
NWL elevation unless directed otherwise by the City Engineer. As currently
designed, the FES invert into the NURP basin is too low and should be raised to
meet requirements.
2. Water Quantity
a. Per past comments provided to the developer, provisions must be provided such
as a regional outlet control structure to connect the overflows from the site to the
east as shown in the City SWMP.
i. An outlet control structure and a stub must be installed from the
proposed regional basin 1620 to the property line, consistent with the
CSWMP routing map and the snip below.
Stephanie Smith
02/01/2021
Page 4
G:\2021\Planning Cases\21-04-FP Tamarack Land - Ardan Place LLC Final Plat\Ardan Place - Minea Property Rosemount Stormwater Management Review -
02012021.docx
3. Volume Control
a. The NPDES permit indicates that infiltration is prohibited if the field measured
infiltration rate is above 8.3 inches per hour. Field tested infiltration rate is about
30 inches per hour, but it is noted that soils will be amended to slow the
infiltration rate to below 8.3 inches per hour. Please document this in the
stormwater management report.
4. Freeboard
a. Please provide 1.5 feet of freeboard between the EOF of the low lying rear yard
drainage areas and the low opening of the homes (north side of site).
5. Water Quality
a. No comments.
6. Easements
a. No comments.
7. Modeling
a. Recommend using a minimum time of concentration value of 7 minutes.
b. Revise the area of Existing Subcatchment 3 to match between the HydroCAD
model and area summary table.
c. The proposed HydroCAD model labels shall match the proposed drainage area
map.
d. Modify the slope of the primary outlet pipe from the SW NURP Pond (Pond 2) in
HydroCAD to match the detail shown on Plan Sheet 25.
e. Because the HWL exceeds the RIM elevation of the OCS, include the horizontal
opening in the HydroCAD calculations for the NURP basin.
f. The 3.8 acres of adjacent site runoff to the NURP basin is not included in the
HydroCAD model (states in stormwater management report that the offsite runoff
enters the NURP pond). Please modify the HydroCAD calculations to include the
offsite drainage.
g. Modify the drainage area to the proposed NURP basin to include the future
development areas that will be connected into the system via storm sewer at the
north end of the site.
8. Flooding Concerns
a. The berm is not shown to extend all the way around the perimeter of the NURP
basin meaning that the 10-day snowmelt high water level will exceed the pond
depth and flow to the east or potentially over the railroad tracks. Extend the
contours on the plan sheet on the east and south sides of the site to determine
any potential flooding impacts. Ensure that 100-year high water levels are not
increasing within the railroad right of way along the south boarder of the site.
i. In conjunction, model the capacity of the outlet pipe to convey the 10-day
snowmelt event downstream.