BACKGROUND
Utility Commissioners requested that staff provide updates on the following items for
meetings going forward.
MET Council Well Assessment – Staff will be reviewing this information over the
winter to establish the need for expanding the current well system. Currently, the
consultant from the Comprehensive Water Plan is updating a ‘trigger’ chart which will
indicate the proper timing for adding wells and/or towers to the system.
Smart Meter Update – Staff has been in contact with one neighboring community to
discuss their experiences with moving to a ‘smart meter’ program. Approximately 90%
of the meters have been changed and one of the benefits at this point is a knowledge
of leaks in the system downstream of the meter which allowed the property owner to
be alerted to make repairs. In addition, the new technology eliminates moving parts
on the meters. Staff will be coordinating a meeting with a supplier in late March to
establish a meter replacement program.
Staff is also received quotes for removing the irrigation meter currently installed
in single family homes. Final planning and potential start of this project will
happen in the upcoming months with a goal of a start date in early spring. A
service agreement is being prepared for removal of approximately one-third of
these meters this year. This agreement was presented to the City Council at
the March 16, 2021 meeting. At this time the Council has tabled the removal of
irrigation meters.
Water Usage for 2020 – As provided separately (Item 8b.), the annual pumping for all
municipal wells has been compiled. Staff will provide an update on the highest usages
at the February 2021 meeting. The water usage for city facilities is provided as a
separate document for this meeting. A letter to the top 10% of users was mailed out
after the February 2021 meeting and staff has received some calls in response to
those letters.
Tour of a Water Tower – Postponed until spring of 2021 at the earliest.
C:\\Users\\jab\\AppData\\Local\\Temp\\8.c. Action Items & Issues List_641277\\8.c. Action Items & Issues List.docx
Five Year Pond Maintenance Plan – A draft maintenance plan was presented earlier
in this meeting.
Water/Stormwater Rebate Update (quarterly) – Next update will be at the April 2021
meeting.
Smart Well Field – An update on this item will be provided at the April 2021 meeting,
2