BACKGROUND:
Dakota County Engineer Mark Krebsbach, Assistant County Engineer Erin Laberee, and Senior Project
Manager Doug Abere will be attending the work session to discuss various county items with the Council.
In addition, Dakota County Commissioners Atkins and Hamann-Roland plan to attend as well.
Items that are planned for discussion are:
-Traffic signal installation
- CSAH 42 corridor study
-CSAH 46 improvements
- Dakota County Transportation Plan
SUMMARY:
Discussion of the Dakota County road projects and transportation plan.
3/31/2021
1
County Highway 42 Visioning Study
Rosemount Council Work Session
Doug Abere, Project Manager
Dakota County Transportation Department
April 6, 2021
PREVIEW
•Introduction & Review
•Study Overview & Highway 42 Updates
•Process, Schedule, & Goals/Objectives
•What’s New? – Need for Updated Plan
•Overall Vision and Intersection Planning
•Highway 42 in Rosemount (preliminary highlights)
•Stakeholders and Outreach
•Current Work and Next Steps
Presentation Outline PREVIEW
1
2
3/31/2021
2
Highway 42 in Rosemount
Intersection Guidance
Intersection Reconfigure or Grade‐Separated
Signal/Turn Lane Updates
Change in access/control type
KEY ISSUES:
•Hwy 3 (S Robert Trail) –Safety
(including RR crossing), congestion
•Managing access and traffic
controls
•Development / Redevelopment
•Serving pedestrians, bicyclists, &
transit riders S. Robert St/Hwy 3Canada DrShannon PkwyChippendale AveBusiness PkwyBiscayne Ave(new signal)145thStreet(new signal)Auburn AveBlaine Ave(new signal)SB Hwy 52 RampNB Hwy 52 RampUMore Park
Hwy 3
(S Robert Trail)
Biscayne Ave,
145th St, & S‐Curve
Abbeyfield Ave(2021 construction)
DCTC
Hwy 52
Interchange
Preliminary access/control recommendations are consistent with
Adopted 1999/2007 Plan, with updates to 2040 & more options
PREVIEW
Study Stakeholder Groups
Hwy 42 Stakeholder
Groups Cities Dakota
County MVTA MnDOT & Fed
Hwy Admin
Business
Interests
Met Council
& Other
Project Management
Team (PMT)
Study Advisory
Committee (SAC)
County Planning
Commission
City Councils
County Board
PREVIEW
3
4