Loading...
HomeMy WebLinkAbout2.a. Dakota County EngineeringEXECUTIVE SUMMARY City Council Work Session: April 6, 2021 AG ENDA ITEM: Dakota County Engineering AGENDA SECTION: Discussion PREPARED BY: Brian Erickson, PE, Director of Public Works / City Engineer AGENDA NO. 2.a. ATTACHMENTS: CSAH 42 Visioning Study Presentation Excerpt APPROVED BY: ELF RECOMMENDED ACTIONS: None, Discussion only. BACKGROUND: Dakota County Engineer Mark Krebsbach, Assistant County Engineer Erin Laberee, and Senior Project Manager Doug Abere will be attending the work session to discuss various county items with the Council. In addition, Dakota County Commissioners Atkins and Hamann-Roland plan to attend as well. Items that are planned for discussion are: -Traffic signal installation - CSAH 42 corridor study -CSAH 46 improvements - Dakota County Transportation Plan SUMMARY: Discussion of the Dakota County road projects and transportation plan. 3/31/2021 1 County Highway 42 Visioning Study Rosemount Council Work Session Doug Abere, Project Manager Dakota County Transportation Department April 6, 2021 PREVIEW •Introduction & Review •Study Overview & Highway 42 Updates •Process, Schedule, & Goals/Objectives •What’s New? – Need for Updated Plan •Overall Vision and Intersection Planning •Highway 42 in Rosemount (preliminary highlights) •Stakeholders and Outreach •Current Work and Next Steps Presentation Outline PREVIEW 1 2 3/31/2021 2 Highway 42 in Rosemount Intersection Guidance Intersection Reconfigure or Grade‐Separated Signal/Turn Lane Updates Change in access/control type KEY ISSUES:  •Hwy 3 (S Robert Trail) –Safety  (including RR crossing), congestion  •Managing access and traffic  controls •Development / Redevelopment •Serving pedestrians, bicyclists, &  transit riders S. Robert St/Hwy 3Canada DrShannon PkwyChippendale AveBusiness PkwyBiscayne Ave(new signal)145thStreet(new signal)Auburn AveBlaine Ave(new signal)SB Hwy 52 RampNB Hwy 52 RampUMore Park Hwy 3  (S Robert Trail) Biscayne Ave,  145th St, & S‐Curve Abbeyfield Ave(2021 construction) DCTC Hwy 52  Interchange Preliminary access/control recommendations are consistent with  Adopted 1999/2007 Plan, with updates to 2040 & more options PREVIEW Study Stakeholder Groups Hwy 42 Stakeholder  Groups Cities Dakota  County MVTA MnDOT & Fed  Hwy Admin Business  Interests Met Council  & Other Project Management  Team (PMT) Study Advisory  Committee (SAC) County Planning  Commission City Councils County Board PREVIEW 3 4