Loading...
HomeMy WebLinkAbout6.e. Authorize 2021 MS4 Scope of ServicesI:\City Clerk\Agenda Items\Approved Items\6.e. Authorize 2021 MS4 Scope of Services.docx City Council Meeting: May 4, 2021 E X E C U T I V E S U M M A R Y AGENDA ITEM: Authorize 2021 MS4 Scope of Services AGENDA SECTION: Consent PREPARED BY: Brian Erickson, Director of Public Works/City Engineer Jane Byron, Stormwater Specialist AGENDA NO. 6.e. ATTACHMENTS: 2021 MS4 Scope of Services APPROVED BY: LJM RECOMMENDED ACTION: Motion to Approve the 2021 Municipal Separate Storm Sewer System (MS4) Scope of Professional Services BACKGROUND Attached for City Council review is the proposed MS4 Scope of Services from WSB & Associates, Inc. This is the eighth year for which WSB has provided services to assist City staff with implementation and administration of the MS4 General Permit requirements. The 2021 Scope of Services includes tasks for general program management, Stormwater Pollution Prevention Plan (SWPPP) support and implementation, and stormwater quality and elevation monitoring. In addition, this year the City of Rosemount will be required to update the Part II application once the MPCA reissues the updated MS4 Permit. These tasks are essential components of the MS4 General Permit. The estimated fee of $32,618 for the proposed MS4 activities will be funded from the City’s Storm Water Utility Fund. On April 26, 2021, the Utility Commission reviewed the proposal and recommends City Council approval of the proposal. BACKGROUND Staff is requesting City Council approve the 2021 MS4 Scope of Professional Services. \\wsbgvfiles01.wsbeng.local\resources\Group Data\WATER RESOURCES\WR Proposal Folder\Rosemount\Water Monitoring Program\LTR PROP- berickson - Rosemount Annual MS4 Services_2021 3.4.2021.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM March 24, 2021 Mr. Brian Erickson, PE Director of Public Works / City Engineer City of Rosemount 2875 145th Street West Rosemount, MN 55068-4997 Re: Estimate of Professional Services Fee Program Support and Implementation for the City’s MS4 General Permit Dear Mr. Erickson: Attached for your review and approval is our proposed scope of services, fee, and schedule for program support and implementation for the City of Rosemount’s Municipal Separate Storm Sewer System (MS4) General Permit. WSB has worked closely with the City staff to update their MS4 program and bring the required program changes into compliance from 2014 through 20 20. Moving forward, we are proposing to complete the work as detailed in the attached scope to ensure that the City of Rosemount’s MS4 program remains in compliance in 2021. The estimated total Project Cost, including professional service fees and direct billing for monitoring line items, is estimated to be $32,618. If you agree with this proposal, please sign where indicated and return one copy to me. Please do not hesitate to contact me at 763-231-4845 with any questions. Sincerely, WSB Bill Alms, PE Water Resource Project Manager Attachment Cc: Kyle Blazek (WSB) ACCEPTED BY: City of Rosemount, MN Name Title Date City of Rosemount March 24, 2021 Page 2 \\wsbgvfiles01.wsbeng.local\resources\Group Data\WATER RESOURCES\WR Proposal Folder\Rosemount\Water Monitoring Program\LTR PROP- berickson - Rosemount Annual MS4 Services_2021 3.4.2021.docx SCOPE OF ENGINEERING SERVICES FOR PROGRAM SUPPORT AND IMPLEMENTATION FOR THE CITY’S MS4 GENERAL PERMIT CITY OF ROSEMOUNT PUBLIC WORKS ROSEMOUNT, MN SCOPE OF ENGINEERING SERVICES Task 1 – Project Management (Estimated Fee $1,200) Project management will be performed throughout the course of this project. The following subtasks are included as part of Project Management: 1.1 Regular project updates will be provided to the City outlining budget status, work completed to date, and project tasks remaining. 1.2 Attend project update meeting with City staff. This will include developing agendas, preparing handouts and graphics, and attending meeting. Deliverables: One (1) Meeting with City staff and Utility Commission to discuss final deliverables of Stormwater Pollution Prevention Program and Monitoring results. Task 2 – Stormwater Pollution Prevention Plan Support and Implementation (Estimated Fee $4,950 + $85-$91 per hour for Environmental Compliance Inspections) As part of this task, WSB will work with City staff to implement the annual requirements of the MS4 permit to ensure the City of Rosemount’s MS4 program remains in compliance. The implementation of these specific requirements has been divided into the following six subtasks: 2.1 General Program Support As part of this task, the WSB Environmental Compliance Project Manager will provide staff time in Rosemount as needed to assist staff with the implementation of the updated Stormwater Pollution Prevention Program (SWPPP), which was developed in Year 1. The WSB Environmental Compliance Project Manager will also provide a quarterly written summary to the City outlining the following items: • Tasks for staff members to complete as part of the program implementation. • Any updates from the MPCA, LMC, MCSC, and VRWJPO that may offer benefits or impacts to the City’s MS4 Permit Activities. 2.2 Bathometric Pond Inspections This task consists of inspecting/surveying six (6) ponds consistent with the SWAMP inspection prioritization. The SWAMP application will be updated to reflect the inspection results. Findings from the inspections will be used to develop maintenance recommendations. If inspections indicate maintenance is necessary, a pond review memo may be needed to identify the extent of maintenance. An additional scope can be provided to generate pond maintenance design memos for those basins identified as requiring maintenance based on inspection results. City of Rosemount March 24, 2021 Page 3 \\wsbgvfiles01.wsbeng.local\resources\Group Data\WATER RESOURCES\WR Proposal Folder\Rosemount\Water Monitoring Program\LTR PROP- berickson - Rosemount Annual MS4 Services_2021 3.4.2021.docx 2.3 Environmental Compliance Inspections: WSB will provide an Environmental Compliance Specialist to complete weekly environmental compliance inspections for new grading permits issued for development projects within the City. This Specialist will manage the inspection and forward any results to the project owners, any pertinent construction professionals, and the City of Rosemount upon request. The inspection will be visual and documented for NPDES and City Ordinance (Title 10, Chapter 1, Section 12: Erosion and Sediment Control) compliance purposes. WSB will prepare an inspection report detailing the inspection results. The compliance deficiencies will be documented with photographs and site plan map locations to indicate any deficiencies. All reports will be provided to the owner(s) within 24 hours of inspection completion. WSB will complete the above tasks for an hourly cost of $85-$91 per hour, including mileage to and from the project site. The cost associated with this task has traditionally been a pass-through cost to the development projects. Deliverables: Four (4) quarterly General Program Support Meetings with City staff, assistance to City staff with Annual Report, six (6) bathometric pond survey maps uploaded into SWAMP, and copies of weekly inspection reports from the environmental compliance inspections for selected developments and projects. Task 3 – Additional MS4 Program Services – Water Quality Monitoring Program (Total Estimated Fee: $20,450, Sample Testing Cost + Equipment Purchase: $6,018) This water quality monitoring program is included as an additional MS4 program service because it will be used to fulfill multiple program requirements in minimum control measures (MCMs) 5 and 6 related to inspection, long-term operation, and maintenance of infiltration BMPs. The water quality monitoring program provides the City with empirical data that will assist with: • Guiding upcoming Watershed and City Stormwater Plan Updates and discussions with observed runoff volumes and infiltration and evaporation rates. • Identifying potential areas to receive regional volume reduction credit through stormwater reuse applications. • Validating pond treatment efficiencies from the SWAMP program with sampled Total Suspended Solids and Total Phosphorus concentrations. • Supporting conclusions in the City’s Non-Degradation Study with observed infiltration and evaporation data. • Creating a baseline for discharge volumes and pollutant loading assumptions of possible future TMDLs in the Vermillion River and Mississippi River. • Assessing winter pollutant concentration associated with snowmelt runoff. As part of this task, WSB will evaluate stormwater runoff volume reduction and pollutant removal performance of selected basins. WSB will discuss priority basins for conducting monitoring activities with City staff. The monitoring equipment purchased by the City in 2014 and 2016 will be utilized in 2021, as well as a new rain gauge to be purchased in 2021. At the conclusion of the monitoring period, the 2021 data will be processed, and an annual report will be prepared that summarized the results of the monitoring activities which will include the following: City of Rosemount March 24, 2021 Page 4 \\wsbgvfiles01.wsbeng.local\resources\Group Data\WATER RESOURCES\WR Proposal Folder\Rosemount\Water Monitoring Program\LTR PROP- berickson - Rosemount Annual MS4 Services_2021 3.4.2021.docx 3.1 Collect Surface Water Elevation and Rainfall Data The objective of this task is to monitor stormwater runoff volume reduction capabilities through infiltration and evaporation, within selected basins in the City. WSB will install continuous surface water level loggers to provide hourly water elevations during the monitoring period. Water level data will be used to develop evaporation and infiltration rates and rainfall to runoff ratios. Additionally, WSB will install two (2) continuous rainfall gauges within the City which will provide the date, duration, and intensity of each rainfall event. The proposed basins for monitor activities are identified in Figure 1. The components of this task include: • Install eleven (11) continuous surface level loggers within selected basins and perform monitoring from Late-May through October. • Install two (2) continuous rainfall gauges. • Complete monthly maintenance and data downloads to ensure proper operation. 3.2 Collection of Water Quality Samples The objective of this task is to determine pollutant loading from watersheds with various land uses within the City. Pollutant Loading – As part of this task, WSB will collect water samples from ten (10) selected basins as part of routine data collection activities to determine pollutant concentrations. Sampling locations are identified in Figure 1. Water samples will be collected monthly, for an estimated nine (9) months. Two (2) sampling events will be completed during winter months of 2021 to assess snowmelt pollutant concentrations from the six (6) locations identified on Figure 1. The remaining seven (7) samples will be collected from May through October for all ten (10) locations. The samples will be analyzed for the following parameters for all events: • Total Phosphorus ($12) • Ortho – Phosphate ($11) • Total Suspended Solids ($12) • Chloride ($17) Specifically, for Location 9 (Wachter) samples will be collected from surface and bottom of the pond for all parameters listed below as well as temperature and DO profiling to be completed during these site visits. 3.3 Annual Reporting As part of this task, data collected during the monitoring period will be analyzed to determine interim infiltration and evaporation rates, rainfall to runoff ratios, reuse suitability assessment, and to identify if there are any changes that need to be made to the monitoring protocols. Deliverables: One (1) Technical Memorandum summarizing 2021 monitoring results including tables and figures. TIME SCHEDULE It is anticipated that the work outlined above will be completed from May 2021 through March 2022. City of Rosemount March 24, 2021 Page 5 \\wsbgvfiles01.wsbeng.local\resources\Group Data\WATER RESOURCES\WR Proposal Folder\Rosemount\Water Monitoring Program\LTR PROP- berickson - Rosemount Annual MS4 Services_2021 3.4.2021.docx TOTAL ESTIMATED ENGINEERING FEE This proposal outlines the work needed to complete the tasks associated with the City’s MS4 Program. The total estimated fee for the professional services for program support and implementation of the City’s MS4 General Permit, Task 1-3 described above is $32,618 which includes $26,600 in professional services and $6,018 in direct billing for monitoring program services. The table below details costs for each task described in this scope of services. Task No Description Estimated Fee Direct Billing Task 1 – Program Management 1.1 Monthly Project Updates $850 1.2 Final Deliverables Meeting $350 Subtotal for Task 1 $1,200 Task 2 – Stormwater Pollution Prevention Plan Support and Implementation 2.1 General Program Support $1,200 2.2 Bathometric Pond Inspections $3,750 2.3 Environmental Compliance Inspections TBD Subtotal for Task 2 $4,950 Task 3 - Additional MS4 Program Services – Water Quality Monitoring Program 3.1 Collect Surface Water Elevation and Rainfall Data $7,800 $500 3.2 Collection of Water Quality Samples $5,750 $5,518 3.3 Annual Reporting $6,900 Subtotal for Task 3 $20,450 $6,018 Total for Project $26,600 $6,018 GF GF Location #1 (BP-1408)Surface water monitoringWater Quality Sampling Location #2 (KL-1486)Surface water monitoringWater Quality Sampling Location #3 (KL-1589)Surface water monitoringWater Quality Sampling Location #4 (KL-1687)Surface water monitoringWater Quality Sampling Location #5 (KL-1716)Surface water monitoringWater Quality Sampling Location #6 (EP-578)Surface water monitoringWater Quality Sampling Location #7 (KL-1865)Surface water monitoringWater Quality Sampling Location #8 (WA-600)Surface water monitoringWater Quality Sampling Location #9 (WA-2443)Surface water monitoringWater Quality Sampling Location #10 (SP-614)Surface water monitoringWater Quality Sampling G±WX Birger Pond (BP-514)Water Quality Sampling Location #11 (WRV-1710)Surface water monitoring Only GF GF Location #1 (BP-1408)Surface water monitoringWater Quality Sampling Location #2 (KL-1486)Surface water monitoringWater Quality Sampling Location #3 (KL-1589)Surface water monitoringWater Quality Sampling Location #4 (KL-1687)Surface water monitoringWater Quality Sampling Location #5 (KL-1716)Surface water monitoringWater Quality Sampling Location #6 (EP-578)Surface water monitoringWater Quality Sampling Location #7 (KL-1865)Surface water monitoringWater Quality Sampling Location #8 (WA-600)Surface water monitoringWater Quality Sampling Location #9 (WA-2443)Surface water monitoringWater Quality Sampling Location #10 (SP-614)Surface water monitoringWater Quality Sampling G±WX Birger Pond (BP-514)Water Quality Sampling Location #11 (WRV-1710)Surface water monitoring OnlyFile: K:\011823-000\GIS\Maps\Pond Land Use Maps\2020 Monitoring Locations.mxd, 3/29/2021 1:09:09 PM2021Proposed Water Qualityand Quantity Monitoring Locations Legend GF Continious Rainfall Monitors 2011, 2014-2020 Monitored Ponds (10)Monitored Pond 2016-2020City Boundary This Evaporation and Infiltration MonitoringProgram has been developed to furtherestablish evaporation and infiltration thatoccur within the City. In addition, this studyis performed to verify the estimatedstormwater abstractions and runoff volumesthat were developed for the City'sNondegradation Plan. Ü 0 0.5 10.25 Miles Please note that the basins selected for monitorng have beenupdated from past monitoring efforts in order to provide a broaderrepresentation of evaporation and infiltration rates and runoff ratios