HomeMy WebLinkAbout4.c. City of Rosemount Comprehensive Plan Amendments for portions of the Rich Valley Golf Course Property
EXECUTIVE SUMMARY
Planning Commission Regular Meeting: July 27, 2021
Tentative City Council Meeting: August 17, 2021
AGENDA ITEM: Case 21-37-CPA City of Rosemount
Comprehensive Plan Amendments for portions
of the Rich Valley Golf Course Property
AGENDA SECTION:
Public Hearing
PREPARED BY: Kyle Klatt, Senior Planner AGENDA NO. 4.c.
ATTACHMENTS: Site Location Map; Comprehensive Plan
Amendment Map, AUAR Development
Scenario Map
APPROVED BY: AK
RECOMMENDED ACTION: Staff recommends the Planning Commission make the
following motion:
Motion to recommend approval of amendments to the 2040 Rosemont Comprehensive
Plan to change the future land use guidance for 63 acres immediately north of 145th Street
East (County State Aid Highway 42) and east of Conley Avenue from RC – Regional
Commercial to BP – Business Park, subject to the following condition:
1) Approval of the Comprehensive Plan Amendment by the Metropolitan Council.
SUMMARY
The Planning Commission is being asked to consider amendments to the Future Land Use Map (Map 3.4
2040 Future Land Use) in the Comprehensive Guide Plan to change the future land use classification of
approximately 63 acres located directly north of 145th Street East (County Highway 42) and east of Conley
Avenue from RC – Regional Commercial to BP – Business Park. The site is presently home to the Rich
Valley Golf Course, which currently occupies 160 acres on the east side of Rosemount. The amendments
will facilitate future redevelopment of the property into a business park by Scannell Properties, which has
recently entered into an agreement to purchase the property from the current owners (the Rahn Family
Limited Partnership). A future land use map amendment is needed because the proposed uses on the
property, office/warehouse and a larger distribution center, are not consistent with the City’s Regional
Commercial guidance.
As noted with some other recent Plan amendments, staff does not typically encourage processing
Comprehensive Plan Amendments separate from a specific project coming before the City. In other
words, the City usually provides the appropriate land use designation and rezoning at the time of project
site plan approval. However, due to time required to process a land use amendment, including a 60-day
adjacent community comment period, staff is recommending that City proceed with the proposed plan
amendments now to allow implementation at the same time as any required platting and zoning approvals.
The developer has indicated that the user of the north portion of the property intends to move forward
with a project, and would like to begin grading the site later this year. The additional 60-120 days required
for adjacent community and Met Council review would push the project back into the winter if the
amendments were processed with the other land use applications. There are still numerous approvals
needed to move any project forward, including an environmental review that is in process, and the
Comprehensive Plan amendment must be approved by the Met Council before the City may take any final
action on land use and final plat for the project.
2
BACKGROUND
Applicant: City of Rosemount
Location: 3855 145 Street East; Parcel Numbers 340300009010,
340300030010 and 340300025010 (Rich Valley Golf Course)
Size: 63 acres
Existing Comp Plan Designation: RC – Regional Commercial
Proposed Comp Plan Designation: BP – Business Park
Existing Zoning: AG - Agriculture
Proposed Zoning No Change Proposed (potential future application rezone to LI –
Light Industrial and BP – Business Park or PUD)
Scannell Properties is proposing to redevelop the Rich Valley Golf Course into a 160-acre business park,
with a larger distribution user in the northern portion of the property and a mix of office and warehouse
uses on the remainder of the site. Overall, their plan calls for a 540,000 square foot distribution center
along with 1.6 million square feet of the office/warehouse buildings on the southern portion of the
property and along the Highway 42 frontage. The size and scope of the proposed development exceeds
the threshold for a mandatory environmental review, and the developer has chosen to prepare an
Alternative Urban Areawide Review (AUAR) to address the environmental review requirements for the
site. The AUAR requires a minimum of two development scenarios to be studied as part of the review,
and the document uses the City’s current land use guidance for the property along with the developer’s
generalized development plan for the two options to be considered. The AUAR process will likely be
completed in the next few weeks, which will clear the way for the developer to proceed with the necessary
land use applications.
The City’s 2040 Land Use Plan identifies a large area near the State Highway 52 and County Highway 42
interchange for future development as a regional commercial center. The size of the planned commercial
area is currently around 328 acres, with most of the area guided for commercial use located south of
Highway 42. The property north of the golf course (and most of the golf course itself) is guided for light
industrial uses and transitions into the heavy industrial and waste management uses in this part of the City.
The developer does not believe there is a market for commercial uses in this area, and is proposing to
develop the entirety of the site as a business park. If approved, the City will still have over 270 acres
guided for regional commercial uses near the highway interchange. Please note that the proposed
distribution use would require light industrial zoning, which is consistent with the LI – Light Industrial
land use classification already in place on the northern portion of the golf course property. The other
proposed uses are all consistent with the BP and LI classification. Staff has requested that the developer
reserve a small area near the Conley Avenue and 145th Street intersection for a commercial site, which is a
permitted activity for key nodes within a business park area.
The Planning Commission is required to conduct a public hearing prior to making a recommendation on
the proposed Comprehensive Plan Amendments, and mailed notice has been sent to all property owners
within 1,320 feet of the subject parcels. Notice has been published in the local paper and posted on the
City’s web site for anyone wishing to comment on the changes. As the Commission may be aware,
surrounding governmental agencies have 60 days to comment and then the application is forwarded to the
Metropolitan Council for approval. A comprehensive plan amendment cannot be put into effect until the
Metropolitan Council grants approval.
COMPREHENSIVE PLAN AMENDMENT
The proposed amendment has been published as reflected in the attached maps. The overall impacts of
the change on the City’s utility, transportation, and surface water management plans are expected to be
minor since the size, number of employees, and traffic generated by the proposed distribution facility and
3
office and warehouse uses will generally be consistent with the types of uses and impacts that could be
found in a commercial area. In addition, over 60% of the site is already guided for Light Industrial uses,
which will not be changing with the proposed amendment. Because of the site’s proximity to an arterial
highway and major collector road and size of the proposed buildings and uses, the applicant will need to
work with the City, County, and potentially state to identify and plan for the anticipated traffic impacts.
These impacts are expected to be similar to a development consistent with either the current or proposed
future land uses on the property, and the AUAR includes a detailed traffic study for the proposed
development scenario. The site is located with the City’s 2030 MUSA, and the proposed development
would extend a trunk sewer line through the property from the area north of 140th Street to Highway 42.
The amendment will be subject to review and approval by the Met Council.
CONCLUSION AND RECOMMENDATION
Staff recommends approval of a comprehensive plan amendment for the southern portion of the Rich
Valley Golf Course property as described in the preceding report.
LOCATION MAP
Logo Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal
document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
Map Scale
1 inch = 708 feet
7/20/2021
140TH ST E
CONLEY AVE
ROSEMOUNT
MINNESOTA
7/23/2021
T:\Project\CommDev\LandUse\LandUseChanges_matt.aprx I:\GIS\Map_Library\CommDev\LandUse\ProposedAmendments\07232021.pdf
Proposed Land Use Amendment
0 710 1,420355 Feet
140TH ST E
CONLEY AVEAG Agriculture
RC Regional Commercial
LDR Low Density Residential
MDR Medium Density Residential
HDR High Density Residential
PI Public/Institutional
BP Business Park
LI Light Industrial
GI General Industrial
WM Waste Management
AG Agriculture
DT Downtown
NC Neighborhood Commercial
RC Regional Commercial
CC Community Commercial
AGR Agricultural Research
RR Rural Residential
LDR Low Density Residential
TR Transitional Residential
MDR Medium Density Residential
HDR High Density Residential
PI Public/Institutional
PO Existing Parks/Open Space
BP Business Park
LI Light Industrial
GI General Industrial
WM Waste Management
MUSA
2030
2040
Existing Land Use Plan Proposed Land Use Plan
Rich Valley Golf Club Redevelopment AUAR 7 June 2021
Figure 3: Development Scenario 1: Scannell Max Build
Rich Valley Golf Club Redevelopment AUAR 8 June 2021
Figure 4: Development Scenario 2: Rosemount 2040 Comprehensive Plan