EXECUTIVE SUMMARY
City Council Regular Meeting: August 2, 2021
AGENDA ITEM: Approve Proposal for Engineering
Services Related to the 2022 Street
Improvement Project, City Project 2022-
01
AGENDA SECTION:
Consent
PREPARED BY: Brian Erickson, PE, Director of Public
Works/City Engineer AGENDA NO. 6.j.
ATTACHMENTS: Resolution; Map APPROVED BY: LJM
RECOMMENDED ACTION: Motion to:
1. Approve Proposal for Engineering Services for the 2022 Street Improvement Project,
City Project 2022-01; and
2. Adopt a Resolution Authorizing the Preparation of a Feasibility Report for the 2022
Street Improvement Project, City Project 2022-01
BACKGROUND
The 2022 Street Improvement Project, City Project 2022-01, was included as part of the 2020-2029 Capital
Improvement Plan. The streets identified for this improvement through the City’s pavement management
evaluation are shown in the attached map. The project is proposed to consist of two distinctly different
types of work; a full depth reconstruction with utility work and a pavement rehabilitation.
DISCUSSION
The City Engineer selected a proposal from WSB and Associates, Inc. to perform the design work on this
project. WSB, is familiar with the area as that firm prepared plans and specifications for numerous recent
Rosemount projects. The proposal in the amount of $213,922 provides the necessary engineering services
to complete preliminary design, final design, bidding and construction administration of the 2022 Street
Improvement Project. WSB’s proposal provides the necessary expertise to successfully complete this
project.
The project scope provides for a full depth reconstruction of:
• Bacardi Avenue West between the edge of pavement and 128th Street West
• 128th Street West between Bacardi Avenue West and Bengal Avenue West
• 130th Way between Bengal Avenue and 130th Street West
• Bengal Avenue between 128th Street West and 130th Street West
This area was recently added to the Municipal Urban Service Area as part of the 2040 Comprehensive
Plan. Thus, extending water and sewer service to this area can be accomplished. It should be noted that
these extensions are necessary as there are residences in this area that have septic systems that are starting
to fail. As part of this project, utility services would be stubbed to the right of way for each property, but
the actual connection to the residence would need to be paid by the resident.
2
The secondary project scope provides a pavement rehabilitation in the form of either a mill and overlay or
reclamation on the following streets:
• Biscayne Avenue West between 130th Street West and the end of pavement, approximately 2,670
feet
• 126th Street West between Biscayne Avenue West and Bacardi Avenue West
• Danbury Way between McAndrews Road (CSAH 38) and the City Limit
• Chinchilla Avenue between McAndrews Road (CSAH 38) and the southern cul-de-sac
• 127th Court West between Chinchilla Avenue and the cul-de-sac
This would provide a new road surface for the residences abutting the street. No change to the current
rural section is proposed. In addition, it is possible that this portion of the project will be a bid alternate to
control costs.
The attached resolution orders preparation of a feasibility report which is a necessary step under the
Minnesota Statutes Chapter 429. This chapter specifies the actions that must be taken in order to assess
property owners for all or a portion of the cost of local improvements. The feasibility report will provide
information regarding whether the proposed improvements are necessary, cost-effective and feasible. The
report will also look at opportunities to split the project into two phases of construction to allow flexibility
in funding. The following information will be included in the report:
• Existing conditions with detailed information on the existing materials
• Proposed improvements
• Detailed cost estimates and proposed funding sources
• Estimated assessments
COSTS & FUNDING
The design and construction costs for the 2022 Street Improvement Project, City Project 2022-01, are
budgeted in the 2020-2029 CIP in the amount of $2,125,000. The street improvements will be funded by
the Street Fund and assessment of abutting properties. The utility work would be funded by the respective
Utility Funds and Core Funds as appropriate. A detailed cost and funding estimate will be prepared as part
of the Feasibility Report.
RECCOMENDATION
Staff recommends Council accept the proposal for engineering services from WSB and adopt a resolution
to authorize preparation of a feasibility report for the 2022 Street Improvement Project, City Project 2022-
01.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2021 – 57
A RESOLUTION AUTHORIZING THE PREPARATION
OF A FEASIBLITY REPORT FOR THE
2022 STREET IMPROVEMENT PROJECT
CITY PROJECT 2022-01
WHEREAS, it is proposed to improve the following streets with a full depth reconstruction
providing water, sewer and surface improvements:
• Bacardi Avenue West between the edge of pavement and 128th Street West
• 128th Street West between Bacardi Avenue West and Bengal Avenue West
• 130th Way between Bengal Avenue and 130th Street West
• Bengal Avenue between 128th Street West and 130th Street West, and;
WHEREAS, it is proposed to improve the following streets with a pavement rehabilitation:
• Biscayne Avenue West between 130th Street West and the end of pavement, approximately
2,670 feet
• 126th Street West between Biscayne Avenue West and Bacardi Avenue West
• Danbury Way between McAndrews Road (CSAH 38) and the City Limit
• Chinchilla Avenue between McAndrews Road (CSAH 38) and the southern cul-de-sac
• 127th Court West between Chinchilla Avenue and the cul-de-sac, and;
WHEREAS, it is proposed to assess the benefited property for all or a portion of the cost of the
improvement, pursuant to Minnesota Statues, Chapter 429.
NOW THEREFORE BE IT RESOLVED, that the proposed improvement, called 2022 Street
Improvement Project (City Project 2022-01), be referred to the City Engineer for study and that the
City Engineer is instructed to report to the Council with all convenient speed advising the Council in
a preliminary way as to whether the proposed improvement is necessary, cost effective and feasible;
whether it should best be made as proposed or in connection with some other improvement; the
estimated cost of the improvement as recommended; and a description of the methodology used to
calculate individual assessments for the affected parcels.
ADOPTED this 2nd day of August, 2021.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
(CSAH 38)M C A N D R E W S R D W
E
V
ERMOORPKWYDODD BLVDBISCAYNE AVEDODD BLVDDODD BLVDS ROBERT TRL (STH 3)(STH 3)BACARDI AVEEVERMOOR S ROBERT TRSHANNONPKWYPKWYThis imagery is copyrighted and licensed by Nearmap US Inc, which retains ownership of the imagery. It is being provided by Dakota County under the terms ofthat license. Under that license, Dakota County is allowed to provide access to the “Offline Copy Add-On for Government”, on which this image services isbased, at 6-inch resolution, six months after the capture date, provided the user acknowledges that the imagery will be used in their normal course of businessand must not be resold or distributed for the purpose of direct commercial benefit or gain. By accessing this imagery, the user acknowledges these terms andaffirms compliance. https://gisimg.co.dakota.mn.us/mrsid/base_aerialphotography_2020_sprg/Nearmap_DakotaCounty_SIGNED.pdf
Path: T:\Project\Engineering\Derick\2022 CIP.mxd PDF: I:\GIS\Map_Library\Engineering\ConstructionProjects\2019 Construction Projects.pdf
2022 Street Reconstruction Project 4/23/2021
Bengel Avenue128th Street130th Way
Biscayne Avenue
Danbury Way
Chinchilla Avenue 127th Ct W
Reclaim
126th Street W
Reclaim Bid Alternate Gravel to Pavement5,430 feet
Full Depth Reconstruction w/ Watermain & Sanitary 3,310 feet
3,276 feet 1,953 feet