EXECUTIVE SUMMARY
City Council Meeting: September 21, 2021
AGENDA ITEM: Accept Bids and Award Contract for
Connemara Trail Trunk Storm Sewer,
Project 2021-06
AGENDA SECTION:
Consent
PREPARED BY: Brian Erickson, PE, City Engineer AGENDA NO. 6.h.
ATTACHMENTS: Resolution; Bid Tabulation; Letter of
Recommendation; Project Layout APPROVED BY: LJM
RECOMMENDED ACTIONS: Adopt a Resolution Accepting Bids and Awarding the
Contract for the Connemara Trail Trunk Storm Sewer, Project 2021-06.
BACKGROUND
With the extension of Connemara Trail (City Project 2018-09), along with the current Emerald Isle
development east of Akron Avenue, the extension of the trunk storm line along the Connemara corridor
at this time is appropriate. This project will install only the trunk line, future street and utility construction
will be performed as development progresses.
DISCUSSION
Rosemount’s Comprehensive Surface Water Management Plan anticipates extending a trunk storm sewer
line to the east in order to address the need for an outlet in the case of back to back 100-year storms. That
trunk has been extended as development occurred in the Prestwick Place development west of Akron
Avenue. With the extension of Connemara Trail, an additional segment is being constructed this summer
extending the trunk approximately 1,800 feet. Since the award of the Connemara Trail project, additional
development further east (Emerald Isle) is occurring and the extension of this trunk line to the eastern
property line of Emerald Isle will allow the developer to continue with additional phases. It should be
noted that because of the regional nature of this improvement the cost is paid by the City from the Storm
Sewer Core Fund.
This trunk is a 54-inch diameter, 40 foot deep main that is best constructed at this time due to the
significant amount of excavation required. The contractor will only be required to stabilize the surface
since future street and utility work will be completed as development progresses. The funding for this
work will come from the Storm Sewer Core Fund (Fund 607) which currently has a cash on hand balance
of $2,561,919.
2
The estimated total project cost for this work is detailed in the table below based on the low bid.
Bids were opened on August 31, 2021 and there were 13 bids received and Ryan Contracting Co. was the
lowest responsive bid. The following table shows the bidders and bids along with the Engineer’s Estimate.
The 3 lowest bids were within $51,488 or 8.7% of each other. The bids were greatly influenced by pipe
installation costs and Ryan Contracting’s bid was the second lowest for that line item.
Currently, access to the area is limited due to the construction of Connemara Trail and the Emerald Isle
development. However, the Connemara Trail project is progressing well and should be nearing the eastern
limit of construction within the next few weeks. At that point, construction can easily commence and
continue to move eastward.
SCHEDULE
Should City Council approve this project, the proposed project schedule is shown below.
- Approve Plans and Specifications and Authorize Ad for Bid August 2, 2021
- Bid Opening August 31, 2021
- Award Contract September 21, 2021
- Construction Start September 2021
- Substantial Completion Fall 2021
RECOMMENDATION
Staff recommends Council adoption of the attached resolution accepting the bids and awarding the
contract for the Connemara Trail Trunk Storm Sewer, Project 2021-06.
Bidder Bid Amount
Engineer's Estimate 520,608.00$
Ryan Contracting Co.592,228.00$
Northwest Asphalt, Inc.623,492.15$
Kuechle Underground, Inc.643,716.00$
A-1 Excavating, Inc.684,486.00$
RL Larson Excavating, Inc.697,365.00$
S.M. Hentges & Sons, Inc.729,547.60$
Geislinger & Sons 742,289.00$
Park Construction Company 767,013.30$
Minger Construction Co. Inc.785,870.00$
Meyer Contracting, Inc.823,012.18$
Eureka Construction Inc.857,108.00$
New Look Contracting, Inc.895,134.00$
Northland Gradging and Excavating 1,390,000.00$
Bid Results
Item Estimate Low Bid
Storm Trunk 520,608$ 592,228$
Contingency (5%)26,030$ 29,611$
Construction Total 546,638$ 621,839$
Indirect Costs (10%)54,664$ 62,184$
Total Project Cost 601,302$ 684,023$
TOTAL PROJECT COST ESTIMATE
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2021 – 75
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR CONNEMARA TRAIL TRUNK STORM SEWER,
CITY PROJECT 2021-06
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids for construction of the Connemara Trail Trunk Storm Sewer Project, City Project
2021-01, are hereby received and tabulated.
2. The bid of Ryan Contracting Company in the amount of $592,228.00 for the construction of
said improvements is in accordance with the plans and specifications and advertisement for
bids, and is the lowest responsible bid and shall be and hereby is accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits
made with their bids, except that the deposit of the successful bidder and the next two lowest
bidders shall be retained until a contract has been executed.
ADOPTED this 21st day of September, 2021.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
Connemara Trail Trunk Storm Sewer Extension
City of Rosemount Project No. 2018-09
WSB Project No. 018074-000
Bid Opening: August 31, 2021 10:00 a.m. local time
DENOTES CORRECTED FIGURE
Contractor Bid Security (5%)Grand Total Bid
1 Ryan Contracting Co.X $592,228.00
2 Northwest Asphalt, Inc.X $623,492.15
3 Kuechle Underground Inc.X $643,716.00
4 A-1 Excavating Inc.X $684,486.00
5 RL Larson Excavating Inc. X $697,365.00
6 S.M. Hentges & Sons, Inc.X $729,547.60
7 Geislinger & Sons X $742,289.00
8 Park Construction Company X $767,013.30
9 Minger Construction Co. Inc.X $785,870.00
10 Meyer Contracting Inc. X $832,012.18
11 Eureka Construction, Inc.X $857,108.00
12 New Look Contracting, Inc.X $895,134.00
13 Northland Grading & Excavating X $1,390,000.00
Engineer's Opinion of Cost $520,608.00
BID TABULATION SUMMARY
Timothy C. Hanson, PE Project Manager
I hereby certify that this is a true and correct tabulation of the bids as received on August 31, 2021.
K:\018074-000\Admin\Construction Admin\Bidding\Bid Tab Summary
540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM
K:\018074-000\Admin\Construction Admin\Bidding\018074-000 LOR Connemara Trail Trunk Storm Sewer Ext. 8312021.docx
August 31, 2021
Honorable Mayor and City Council
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Re: Connemara Trail Trunk Storm Sewer Extension
City of Rosemount Project No. 2018-09
WSB Project No. 018074-000
Dear Mayor and Council Members:
Bids were received electronically for the above-referenced project on Tuesday, August 31, 2021,
and were opened and read aloud at an online bid opening meeting. A total of 13 bids were
received. The bids were checked for mathematical accuracy and tabulated and there are no
errors made on the Proposal Form. The Engineer’s Estimate was $520,608.00. The bid
tabulation indicates the low bidder as Ryan Contracting Company, Elko New Market, MN, in the
amount of $592,228.00.
We recommend that the City consider these bids and award a contract to Ryan Contracting
Company, based on the results of the bids received.
Sincerely,
WSB
Timothy Hanson, PE
Senior Project Manager
Enclosure
TH/tmw
>>>>>>
>>
>>
>>>>
>>
>>
>>
>>
>>
>>
>>
>>
>>