HomeMy WebLinkAbout8.a. City Project Update EXECUTIVE SUMMARY Utility Commission Meeting: October 25, 2021 AGENDA SECTION: AGENDA ITEM: City Project Update Executive Director’s Report PREPARED BY: Brian Erickson, P.E. City Engineer AGENDA NO. 8.a. ATTACHMENTS: None APPROVED BY: BLE RECOMMENDED ACTION: None, informational only BACKGROUND The 2021 construction season is well underway and this year will again see a significant amount of work being done. The following list is the current and planned City of Rosemount projects. There are additional developments that are in early stages of the process and those will be added as appropriate. Changes since the last report are shown as strike out for deletions and underlined for additions as well as a bar along the left margin to indicate the changes. Minor grammatical corrections and updates will not be highlighted.  Autumn Path – Scope includes construction of utilities and paving from Bonaire Path north approximately 2,500 feet. Construction started in October 2020 with utility installation complete. Trail paving and sidewalk is completed. Contractor complete concrete repairs and paving is scheduled for the week of October 18. last week of September.  Bonaire Path – Scope includes construction of utilities and paving between Akron Avenue and Anderson Drive. Additionally, the installation of crossing arms at the Union Pacific Railroad intersection are in the scope of the project and planned as part of this project. Ultimately, the city will request that this intersection become a quiet zone (i.e. no train horns). Wear course and construction is anticipated to be completed in 2021; however, that will hinge on Union Pacific completing the necessary crossing work. Final design for rail improvements was approved by City Council at the February 4, 2020 meeting. Draft construction agreement was finally provided by UP on December 3, 2020. The final agreement for City Council approval was provided on April 5, 2021 and approved by Council on April 20, 2021. Actual construction work by UP is tentatively scheduled for spring 2022. Additional communication with both MnDOT and other Union Pacific staff is being done as well. Staff has been in contact with the Federal Railroad Administration regarding application for a quiet zone (QZ). Because of the design, the QZ application is expected to be approved.  Boulder Trail Extension – Scope includes the extension of Boulder Trail to MN Trunk Highway 3 across from Canada Circle. Utility extension as needed will also be part of this work. This will allow for future development in this area. Design proposal was C:\\Users\\jab\\AppData\\Local\\Temp\\8.a. City Project Update_691064\\8.a. City Project Update.docxG:\\MEETINGS\\UTILITY COMMISSION\\UC Items and Packets\\2021\\20211025\\8.a. City Project Update.docx accepted on April 21, 2021. Preliminary layout is complete and detailed design is 90% complete underway.  Connemara Trail Extension – Scope includes construction of utilities and paving from Akron Avenue east approximately 1,300 feet. Contract was awarded and work is being planned for 2021 due to the significant workload. Change order for additional work provides storm sewer interceptor extension, water main extension and additional paving into the Emerald Isle development was approved. Construction work is progressing with the trunk storm sewer completed. Contractor will finish remaining public utilities by early October. Paving will be in October.  Scannell Development Trunk Sanitary Sewer – Scope includes extension of trunk th sanitary sewer from 140 Street/MCES Lift Station to CSAH 42 on the east side of U.S. 52. This is an expansion of the existing collection system as shown in the Comprehensive Sanitary Sewer plan to allow future development. Design proposal was accepted on April 21, 2021. Design is underway some minor alignment adjustments are needed but final design will be complete this year.  Shannon Pond Outlet Feasibility Study – Scope includes reviewing potential routes for stormwater outlet at Shannon Pond. Because of the land locked location, establishing an outlet will be a significant undertaking. Initial study work was received in 2020. Information from this study will be used to establish future improvements necessary to reduce the potential for structure flooding. Staff and consultant are coordinating with additional authorities regarding some of the potential options provided in the study. Updates will be provided to the Utility Commission at future meetings as needed. The following list is the current and planned developer projects.  Amber Fields – Scope includes the development of approximately 435 acres of University of Minnesota, Outreach, Research and Education Park (UMore Park). This property is planned to have a mixture of single family, multi-family and commercial properties. It is located west of Dakota County Technical College (DCTC) and south of CSAH 42. Current comprehensive planning has accounted for this expansion of the utility systems. The preliminary plat was approved by City Council on September 7, 2021. Design discussions are underway for extension of utilities and roads. Tentative location for connection to the MCES interceptor has been discussed and being finalized. This is an expansion of the existing collection system as shown in the Comprehensive Plan. Developer is planning for mass grading this fall. st  Ardan Place 1 – Scope includes the construction of utilities and both public and private streets from Bonaire Path and Autumn Path as well 42 single family residential (SFR) of a planned 79 and 55 townhomes of a planned 137. Construction has been completed on utilities and base course of pavement is in place. th  Bella Vista 6 – Scope includes construction of utilities and paving from Aulden Avenue to the cul-de-sac approximately 850’ north east as well as 19 SFR lots of a planned total 158. In addition, there is a temporary sanitary sewer lift station that will be installed until trunk sewer is extended at a future date. Utilities and base course are in place and the lift station construction is complete with minor punch list items to 2 st be corrected. Wear course delayed until 2021 due to construction to the east of 131 Court. th  Bella Vista 7 – Scope includes construction of utilities and paving from a temporary connection to the Autumn Path extension (see above) west approximately 1500 feet as well as 26 SFR lots of a planned total 158. This is the final phase of this development. Wear course was installed will be installed in 2021. This will be the last report for this project. st  Caramore Crossing 1 – Scope includes construction of utilities and paving from Akron Avenue and from Bonaire Path as well as 82 SFR lots of a planned total 177. Utilities and base course of asphalt are installed. nd  Caramore Crossing 2 – Scope includes construction of utilities and paving north of Aulden Avenue as well as 44 SFR lots of a planned total 177. Construction has begun. nd  Dunmore 2 – Scope includes construction of utilities and paving from Caffery Court as well as 25 SFR lots of a planned total 87. Wear course will be installed in 2021 with exact dates to be established. Contractor has completed repairs to the stormwater ponds. rd  Dunmore 3 – Scope includes construction of utilities and paving Cadogan Way as well as 32 SFR lots of a planned 87. This is the final phase of Dunmore. This was approved at the June 15 Council meeting. Preconstruction conference was held October 8. Developer plans to have utilities installed by the end of the construction season. st  Emerald Isle 1 – Scope includes construction of utilities and paving as well as 40 SFR lots of a planned total 151. Grading work and initial utility construction is complete. nd  Emerald Isle 2 – Scope includes construction of utilities and paving as well as 57 SFR lots of a planned total of 151. Possible extension of Connemara Trail and associated utilities are being considered. Utilities installed and street construction is underway. Base course has been installed and private utilities are being installed. nd  Harmony Parkview 2 – Scope includes construction of utilities and paving as well as 26 townhomes. Utilities will be city owned and the streets are private. Townhome construction is underway. Developer will finish paving the private streets this fall. nd  Harmony Villas 2 – Scope includes construction of utilities and paving as well as 26 townhomes. Utilities are city owned and the streets are private. Utility construction is complete. Site corrections and building construction is underway. Developer will finish paving the private streets this fall. rd  Meadow Ridge 3 – Scope includes construction of utilities, paving and a temporary sanitary sewer lift station as well as 28 SFR lots of a planned total 154. This project is complete for the season. Lift station correction is completed.needed since pumps were undersized. Final wear course will be paved in 2021. 3 th  Meadow Ridge 4 – Scope includes construction of utilities and paving as well as 63 SFR lots of a planned total 154. This is the final phase of this development. Utilities are installed and base course of street is complete. Developer is working on private utility installation.construction is underway.  Morrison (Downtown redevelopment) – Scope includes redevelopment of the area west of TH 3 in proximity to Shenanigans. Mixed commercial and apartments are planned for this area. Utility connections and minor corrections completed. Developer is currently working on building construction. th  Prestwick 20 – Scope includes construction of utilities and paving as well as 27 SFR lots. This is the final phase of this development on the west side of Akron Avenue. Wear course planned for 2021. st  Prestwick 21 – Scope includes construction of utilities and paving as well as 24 townhomes. Utilities will be city owned and the streets are private. Wear course planned for 2021. nd  Prestwick 22 – Scope includes construction of utilities and paving as well as 64 townhomes. Utilities will be city owned and the streets are private. Construction is underway and planned for completion this year, with wear course planned for 2021.  Rosemount Woods Expansion – Scope includes construction of 39 additional manufactured home sites as well as construction of private utility extensions for those sites. This project is currently under construction. Wear course paving on Brazil Avenue is complete for 2020. This is the last report for this project. The following is the list of Dakota County and MnDOT projects.  Roundabout Connemara Trail/Diamond Path – Scope preliminary engineering for the construction of a roundabout at this intersection. This project is planned for construction in 2022. Final design will proceed in 2022. summer 2021.  CSAH 42/CR 73 (Akron Ave) Signal – Scope calls for installation of a traffic signal at the intersection of CSAH 42 and CR 73 (Akron Ave) to address the increase in traffic at this intersection. Design includes an extension of water main south to service possible future development. City of Rosemount, Dakota County, Dakota County Technical College and the University of Minnesota continue to work in partnership to complete this project. Paving of Akron Ave south of CSAH 42 is complete and striping is planned for the week of October 18. Signal arms are installed and power is to be connected the week of October 18. Activation of the signals is planned for the week of October 25.Water main extension along Akron south of CSAH 42 is complete. Akron paving is planned for September 24 and 25. Installation of signal cross arms will be the week of September 27. No date for activation of the signal is set yet as the contractor is waiting on Xcel Energy.  CSAH 42 Visioning Study – This is a study that will look at nearly the entire length of CSAS 42 starting at the western county line (Burnsville) and ending at MN Trunk Highway 52. Future open houses and public engagement opportunities will be 4 promulgated as they are established. At this time most public engagement will be via on-line comments and updates. Initial recommendations regarding intersections and improvements are being formulated and discussed with the cities involved.  CSAH 46 Corridor Study and Preliminary Engineering – This is a study that will look at the section of CSAH 46 from Minnesota Trunk Highway 3 to CSAH 48 in Coates. The scope of work anticipated is right of way acquisition to support expanding the highway to a divided four-lane. This is a high priority project for Dakota County and since a portion of this is within Rosemount city limits a portion of the cost would be carried by the city. This study will assist with quantifying those costs. Initial survey work is completed.  Mississippi River Greenway – Scope includes the reconstruction of a portion of Pine Bend Trail to allow for the completion of the Dakota County trail connection from St. Paul to Hastings. This work will be funded by Dakota County. Additionally, the section of Pine Bend Trail between TH 55 and the reconstructed section will be reclaimed at city cost. This work is planned for 2022. Dakota County is in the process of securing agreements with the rail road to allow for the trail crossing.  TH 55 Safety Improvements – Scope includes improvements along Minnesota Trunk Highway 55 (TH 55) by adding a left turn lane to Doyle Path and increasing the truck acceleration lane at the rail road crossing. The Toward Zero Deaths (TZD) program is leading a working group for this project. The 30% design has been distributed for review. 5