Loading...
HomeMy WebLinkAbout6.e. UMore Ballfield Project - Change Order #1 EXECUTIVE SUMMARY City Council Regular Meeting: November 1, 2021 AGENDA ITEM: UMore Ballfield Project - Change Order #1 AGENDA SECTION: Consent PREPARED BY: Dan Schultz, Parks and Recreation Director AGENDA NO. 6.e. ATTACHMENTS: Change Order #1 and Letter from Project Architect APPROVED BY: LJM RECOMMENDED ACTION: Motion to approve Change Order #1 for the UMore Ballfield Project. BACKGROUND In the spring of 2021, the City Council awarded a bid for the second phase of the UMore Ballfield Project. The project is coming to the end but during the construction of the project a few changes have been needed that have resulted in staff requesting the City Council consider approving change order #1. The total amount of the change order #1 is $57,358.85. Please see the attached change order form and architect letter for further details. The largest portion of the change order is for the addition of a batting cage at Shannon Park. A donation from RAAA is funding one half of the batting cage project and it is recommended that the City cover the remainder of the cost. The portion of the batting cage project that the City would cover is a new trail to the batting cage making it accessible. RECOMMENDATION Staff is recommending the City Council approve Change Order #1 for the UMore Ballfield Project. 10/07/2021 "K:\016257-000\Admin\Construction Admin\Change Orders\016257-000 Change Order #1 Cover Letter.docx" October 13, 2021 Mr. Tom Schuster, Parks Supervisor Rosemount Community Center 13885 South Robert Trail Rosemount, MN 55068 Re: UMore Ballfields Phase II – Change Order #1 Mr. Schuster, Attached you will find Change Order #1 for the aforementioned project which has been signed by WSB and the Contractor and is ready for formal execution by the City. Please review and, if acceptable to you, sign and date the Owner section of the Change Order form. Once processed, please keep for your records and return a copy for WSB and Friedges (scanned document is fine). The following bulleted list provides a summary of Change Order #1: • Item 1 through 4 relates to adjustments to the extents of the sidewalk connections due to the location of where the proposed sidewalk matches with the existing sidewalk control joints on the north end of the project. • Items 5 and 6 include modifications to the existing parking stalls of phase 1 to be compliant with the latest ADA compliance requirements. • Item 7 – 12 account for work related to the addition of fencing located on field #3 along the first base foul line. • Item 13 relates to modifications in reducing the diameter of the top rail. • Item 14 accounts for modifying installation of erosion control blanket in lieu of straw mulch in the medians of the parking lot. • Items 15 accounts for all work associated with the batting cage at Shannon Park. Let me know if you have any questions or wish to discuss further. Sincerely, WSB Steven Foss Project Manager Attachments: Change Order #21 Supporting Documents CC: Justin Friedges, Friedges Landscaping, Inc.