HomeMy WebLinkAbout6.p. 2022 Storm Basin Maintenance, City Project 2022-04 Receive Bids and Award Contract EXECUTIVE SUMMARY City Council Meeting: January 4, 2022 AGENDA ITEM: 2022 Storm Basin Maintenance, City AGENDA SECTION: Project 2022-04: Receive Bids and Consent Award Contract PREPARED BY: Brian Erickson, PE, City Engineer AGENDA NO. 6.p. ATTACHMENTS: Resolution; Letter of Recommendation; Bid Summary; APPROVED BY: LJM Bid Tabulation; Location Map RECOMMENDED ACTIONS: Adopt a Resolution Receiving Bids and Awarding Contract for 2022 Storm Basin Maintenance Project, City Project 2022-04. BACKGROUND Per the NPDES MS4 General Permit administered by the Minnesota Pollution Control Agency (MPCA), the City is required to inspect every stormwater pond and outfall at least once per permit term and develop a method to assess the effectiveness of all stormwater ponds for preventing/capturing pollution. Inspections performed in 2014 and 2021 and subsequent modeling indicated that pond 1565 (Country Hills Sixth Addition) was operating at a low efficiency and maintenance was recommended. The project proposed to excavate 2,300 cubic yards of accumulated sediment from pond 1565. Approximately, 1,150 cubic yards of the sediment being removed have contaminant levels that require special disposal (e.g. not for use as fill in residential areas or disposal at a landfill). Phosphorus removal efficiency for this pond is expected to improve to 55% and suspended solids removal is expected to improve to 92% as a result of the project. Additional benefits of the project include removal of voluntary and encroaching trees for better inspection and maintenance access and increased flood storage capacity. COSTS & FUNDING A summary of the Bid Tabulation including the Engineer’s Estimate is shown in the following table. The low bid received is $99,785.00. This is $2,010 below the Engineer’s Opinion of Cost. Contactor Bid Amount Percentage Above Low Bid Engineer’s Opinion of Cost $101,795.00 2.0% Fitzgerald Excavating & Trucking, Inc. $99,785.00 N/A McNamara Contracting, Inc. $109,160.00 9.4% Winberg Companies $114,972.00 15.2% Ashwill Companies $144,019.00 44.3% Meyer Contracting, Inc. $145,467.59 45.8% C:\\Users\\jab\\AppData\\Local\\Temp\\6.p. 2022 Storm Basin Maintenance, City Project 2022-04 Receive Bids and Awa_704250\\6.p. 2022 Storm Basin Maintenance, City Project 2022-04 Receive Bids.docx US SiteWork $151,716.00 52.0% JACON, LLC $167,247.00 67.6% Max Steininger, Inc. $173,562.88 73.9% Urban Companies $203,735.00 104.2% Parkstone Contracting, LLC $241,645.00 142.2% This project will be funded using the Storm Water Utility, and the engineer’s estimate of probable project cost was $101,795.00. Stormwater System Improvement is a line item in the annual Storm Water Utility budget. SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Construction Start January 2022 Substantial Completion Winter 2022 Restoration Spring 2022 RECOMMENDATION Staff recommends Council adopt the attached resolution accepting bids, awarding the contract to Fitzgerald Excavating & Trucking, Inc. of Goodhue, MN for the 2022 Storm Basin Maintenance Project, City Project 2022-04. 2 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022 – 01 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR 2022 STORM BASIN MAINTENANCE, CITY PROJECT 2022-04. BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the 2022 Storm Basin Maintenance Project, City Project 2022-04, are hereby received and tabulated. 2. Based on the Total Bid, the bid of Fitzgerald Excavating & Trucking, Inc. of Goodhue, MN in the amount of $99,785.00 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. th ADOPTED this 4 day of January, 2022. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\019222-000\Admin\Construction Admin\Bidding\019222-000 LOR-122921.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM December 29, 2021 Honorable Mayor and City Council City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: 2022 Pond Cleanout Project City of Rosemount Project No. 2022-04 WSB Project No. 019222-000 Dear Mayor and Council Members: Bids were received for the above-referenced project on Wednesday, December 29, 2021, and were opened and read aloud. A total of 10 bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer’s Estimate was $101,795.00. The bid tabulation indicates the low bidder as Fitzgerald Excavating & Trucking, Inc., Goodhue, Minnesota, in the amount of $99,785.00. We recommend that the City consider these bids and award a contract to Fitzgerald Excavating & Trucking, Inc., based on the results of the bids received. Sincerely, WSB Bill Alms, PE Project Manager Enclosure cc: Jason Fitzgerald, Fitzgerald Excavating & Trucking, Inc. Erin Fasbender, City of Rosemount Kendra Fallon, WSB Tim Hanson, WSB mj 2022 Pond Cleanout Project City of Rosemount Project No. 2022-04 WSB Project No. 019222-000 Bid Opening: December 29, 2021 at 10:00 a.m. local time DENOTES CORRECTED FIGURE Contractor Bid Security (5%)Grand Total Bid 1 Fitzgerald Excavating & Trucking, Inc.X $99,785.00 2 McNamara Contracting, Inc.X $109,160.00 3 Winberg Companies, LLC X $114,972.00 4 Ashwill Companies X $144,019.00 5 Meyer Contracting, Inc.X $145,467.59 6 US SIteWork, Inc.X $151,716.00 7 Jacon, LLC X $167,247.00 8 Max Steininger, Inc.X $173,562.88 9 G Urban Companies, Inc.X $203,735.00 10 Parkstone Contracting, LLC X $241,645.00 Engineer's Opinion of Cost $101,795.00 BID TABULATION SUMMARY Bill Alms, PE Project Manager I hereby certify that this is a true and correct tabulation of the bids as received on December 29, 2021. K:\019222-000\Admin\Construction Admin\Bidding\019222-000 Bid Tab Summary-122921 Bid Tabulation 2022 Pond Cleanout Project City of Rosemount Project No. 2022-04 WSB Project No. 019222-000 Bid Opening: December 29, 2021 at 10:00 a.m. local time DENOTES CORRECTED FIGURE Line No.Material No.Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Pond Cleanout 1 2021.501 MOBILIZATION LS 1 $8,000.00 $8,000.00 $35,000.00 $35,000.00 $6,000.00 $6,000.00 $5,250.00 $5,250.00 $9,086.00 $9,086.00 2 2101.505 CLEARING ACRE 0.2 $8,000.00 $1,600.00 $5,000.00 $1,000.00 $15,000.00 $3,000.00 $9,800.00 $1,960.00 $20,000.00 $4,000.00 3 2101.505 GRUBBING ACRE 0.2 $8,000.00 $1,600.00 $5,000.00 $1,000.00 $10,000.00 $2,000.00 $9,800.00 $1,960.00 $20,000.00 $4,000.00 4 2106.607 EXCAVATION - CHANNEL AND POND (LV)CY 1150 $30.00 $34,500.00 $22.00 $25,300.00 $39.00 $44,850.00 $29.20 $33,580.00 $32.50 $37,375.00 5 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL)C Y 1150 $35.00 $40,250.00 $24.00 $27,600.00 $39.00 $44,850.00 $51.25 $58,937.50 $53.50 $61,525.00 6 2506.602 CLEAN OUT CATCH BASIN EACH 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $500.00 $500.00 $1,155.00 $1,155.00 $1,500.00 $1,500.00 7 2511.504 GEOTEXTILE FILTER TYPE 4 S Y 20 $5.00 $100.00 $6.00 $120.00 $5.75 $115.00 $34.00 $680.00 $4.00 $80.00 8 2511.507 RANDOM RIPRAP CLASS III C Y 10 $125.00 $1,250.00 $50.00 $500.00 $125.00 $1,250.00 $110.25 $1,102.50 $105.00 $1,050.00 9 2511.507 GRANULAR FILTER C Y 5 $50.00 $250.00 $20.00 $100.00 $80.00 $400.00 $124.00 $620.00 $55.00 $275.00 10 2573.502 STORM DRAIN INLET PROTECTION EACH 3 $150.00 $450.00 $150.00 $450.00 $190.00 $570.00 $178.00 $534.00 $250.00 $750.00 11 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER BIOROLL L F 20 $4.00 $80.00 $4.00 $80.00 $5.00 $100.00 $4.20 $84.00 $5.50 $110.00 12 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $1,250.00 $1,250.00 $1,000.00 $1,000.00 $1,400.00 $1,400.00 $2,142.00 $2,142.00 $1,275.00 $1,275.00 13 2575.504 ROLLED EROSION PREVENTION CATEGORY 20 S Y 220 $5.00 $1,100.00 $2.00 $440.00 $4.00 $880.00 $12.60 $2,772.00 $4.40 $968.00 14 2575.505 SEEDING ACRE 0.2 $8,000.00 $1,600.00 $2,000.00 $400.00 $1,000.00 $200.00 $3,900.00 $780.00 $8,250.00 $1,650.00 15 2575.508 SEED MIXTURE 21-111 LB 20 $10.00 $200.00 $3.00 $60.00 $25.00 $500.00 $22.00 $440.00 $5.50 $110.00 16 2575.508 SEED MIXTURE 25-151 LB 5 $8.00 $40.00 $5.00 $25.00 $10.00 $50.00 $39.00 $195.00 $11.00 $55.00 17 2575.508 SEED MIXTURE 33-261 LB 15 $35.00 $525.00 $14.00 $210.00 $33.00 $495.00 $32.00 $480.00 $44.00 $660.00 18 2106.601 DEWATERING LS 1 $8,000.00 $8,000.00 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $2,300.00 $2,300.00 $19,550.00 $19,550.00 Total Pond Cleanout $101,795.00 $99,785.00 $109,160.00 $114,972.00 $144,019.00 Ashwill CompaniesEngineer's Estimate Fitzgerald Excavating & Trucking, Inc.McNamara Contracting, Inc.Winberg Companies, LLC Bid Tabulation 2022 Pond Cleanout Project City of Rosemount Project No. 2022-04 WSB Project No. 019222-000 Bid Opening: December 29, 2021 at 10:00 a.m. local time DENOTES CORRECTED FIGURE Line No.Material No.Item Units Quantity Unit Price Total Price Pond Cleanout 1 2021.501 MOBILIZATION LS 1 $8,000.00 $8,000.00 2 2101.505 CLEARING ACRE 0.2 $8,000.00 $1,600.00 3 2101.505 GRUBBING ACRE 0.2 $8,000.00 $1,600.00 4 2106.607 EXCAVATION - CHANNEL AND POND (LV)CY 1150 $30.00 $34,500.00 5 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL)C Y 1150 $35.00 $40,250.00 6 2506.602 CLEAN OUT CATCH BASIN EACH 1 $1,000.00 $1,000.00 7 2511.504 GEOTEXTILE FILTER TYPE 4 S Y 20 $5.00 $100.00 8 2511.507 RANDOM RIPRAP CLASS III C Y 10 $125.00 $1,250.00 9 2511.507 GRANULAR FILTER C Y 5 $50.00 $250.00 10 2573.502 STORM DRAIN INLET PROTECTION EACH 3 $150.00 $450.00 11 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER BIOROLL L F 20 $4.00 $80.00 12 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $1,250.00 $1,250.00 13 2575.504 ROLLED EROSION PREVENTION CATEGORY 20 S Y 220 $5.00 $1,100.00 14 2575.505 SEEDING ACRE 0.2 $8,000.00 $1,600.00 15 2575.508 SEED MIXTURE 21-111 LB 20 $10.00 $200.00 16 2575.508 SEED MIXTURE 25-151 LB 5 $8.00 $40.00 17 2575.508 SEED MIXTURE 33-261 LB 15 $35.00 $525.00 18 2106.601 DEWATERING LS 1 $8,000.00 $8,000.00 Total Pond Cleanout $101,795.00 Engineer's Estimate Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price $7,000.00 $7,000.00 $4,015.00 $4,015.00 $44,937.50 $44,937.50 $50,000.00 $50,000.00 $30,000.00 $6,000.00 $8,190.00 $1,638.00 $48,300.00 $9,660.00 $32,106.57 $6,421.31 $20,000.00 $4,000.00 $8,190.00 $1,638.00 $48,300.00 $9,660.00 $21,404.39 $4,280.88 $29.96 $34,454.00 $35.00 $40,250.00 $25.50 $29,325.00 $25.11 $28,876.50 $62.21 $71,541.50 $75.00 $86,250.00 $31.50 $36,225.00 $56.03 $64,434.50 $2,312.52 $2,312.52 $1,755.00 $1,755.00 $3,850.00 $3,850.00 $2,688.65 $2,688.65 $5.49 $109.80 $19.50 $390.00 $40.00 $800.00 $13.52 $270.40 $159.39 $1,593.90 $194.00 $1,940.00 $195.00 $1,950.00 $145.06 $1,450.60 $173.87 $869.35 $206.00 $1,030.00 $300.00 $1,500.00 $90.79 $453.95 $200.00 $600.00 $360.00 $1,080.00 $375.00 $1,125.00 $236.73 $710.19 $6.00 $120.00 $20.50 $410.00 $6.90 $138.00 $4.28 $85.60 $3,203.47 $3,203.47 $2,380.00 $2,380.00 $1,925.00 $1,925.00 $1,809.45 $1,809.45 $2.75 $605.00 $4.20 $924.00 $3.30 $726.00 $5.00 $1,100.00 $10,000.00 $2,000.00 $2,295.00 $459.00 $11,700.00 $2,340.00 $12,000.00 $2,400.00 $0.78 $15.60 $4.60 $92.00 $0.90 $18.00 $4.28 $85.60 $6.75 $33.75 $15.50 $77.50 $7.75 $38.75 $6.42 $32.10 $30.58 $458.70 $41.50 $622.50 $35.25 $528.75 $64.21 $963.15 $10,550.00 $10,550.00 $6,765.00 $6,765.00 $22,500.00 $22,500.00 $7,500.00 $7,500.00 $145,467.59 $151,716.00 $167,247.00 $173,562.88 Meyer Contracting, Inc.US SiteWork, Inc.Jacon, LLC Max Steininger, Inc. Bid Tabulation 2022 Pond Cleanout Project City of Rosemount Project No. 2022-04 WSB Project No. 019222-000 Bid Opening: December 29, 2021 at 10:00 a.m. local time DENOTES CORRECTED FIGURE Line No.Material No.Item Units Quantity Unit Price Total Price Pond Cleanout 1 2021.501 MOBILIZATION LS 1 $8,000.00 $8,000.00 2 2101.505 CLEARING ACRE 0.2 $8,000.00 $1,600.00 3 2101.505 GRUBBING ACRE 0.2 $8,000.00 $1,600.00 4 2106.607 EXCAVATION - CHANNEL AND POND (LV)CY 1150 $30.00 $34,500.00 5 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL)C Y 1150 $35.00 $40,250.00 6 2506.602 CLEAN OUT CATCH BASIN EACH 1 $1,000.00 $1,000.00 7 2511.504 GEOTEXTILE FILTER TYPE 4 S Y 20 $5.00 $100.00 8 2511.507 RANDOM RIPRAP CLASS III C Y 10 $125.00 $1,250.00 9 2511.507 GRANULAR FILTER C Y 5 $50.00 $250.00 10 2573.502 STORM DRAIN INLET PROTECTION EACH 3 $150.00 $450.00 11 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER BIOROLL L F 20 $4.00 $80.00 12 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $1,250.00 $1,250.00 13 2575.504 ROLLED EROSION PREVENTION CATEGORY 20 S Y 220 $5.00 $1,100.00 14 2575.505 SEEDING ACRE 0.2 $8,000.00 $1,600.00 15 2575.508 SEED MIXTURE 21-111 LB 20 $10.00 $200.00 16 2575.508 SEED MIXTURE 25-151 LB 5 $8.00 $40.00 17 2575.508 SEED MIXTURE 33-261 LB 15 $35.00 $525.00 18 2106.601 DEWATERING LS 1 $8,000.00 $8,000.00 Total Pond Cleanout $101,795.00 I hereby certify that this is an exact reproduction of bids received. Certified By: License No. 54301 Date: December 29, 2021 Engineer's Estimate Unit Price Total Price Unit Price Total Price $10,000.00 $10,000.00 $55,000.00 $55,000.00 $15,000.00 $3,000.00 $30,000.00 $6,000.00 $15,000.00 $3,000.00 $30,000.00 $6,000.00 $45.00 $51,750.00 $69.00 $79,350.00 $80.00 $92,000.00 $69.00 $79,350.00 $1,000.00 $1,000.00 $2,500.00 $2,500.00 $100.00 $2,000.00 $20.00 $400.00 $125.00 $1,250.00 $175.00 $1,750.00 $125.00 $625.00 $175.00 $875.00 $400.00 $1,200.00 $200.00 $600.00 $25.00 $500.00 $10.00 $200.00 $2,500.00 $2,500.00 $3,000.00 $3,000.00 $5.00 $1,100.00 $5.00 $1,100.00 $15,000.00 $3,000.00 $10,000.00 $2,000.00 $1.00 $20.00 $3.00 $60.00 $8.00 $40.00 $12.00 $60.00 $50.00 $750.00 $60.00 $900.00 $30,000.00 $30,000.00 $2,500.00 $2,500.00 $203,735.00 $241,645.00 Parkstone Contracting, LLCG Urban Companies, Inc. K:\019222-000\Cad\Plan\019222-000-C-TITL-PLAN.dwg 12/20/2021 12:54:34 PM2022 POND MAINTENANCE PROJECT CITY OF ROSEMOUNT PROJECT LOCATION MAP F G EXISTING PLAN SYMBOLS PROPERTY LINES/RIGHT-OF-WAY UTILITY EASEMENT TREE LINE SIGN DECIDUOUS TREE SHRUB CONIFEROUS TREE EXISTING UTILITY SYMBOLS FIBER OPTIC LINE GAS LINE COMMUNICATIONS PEDESTAL POWER POLE ELECTRIC BOX CATCH BASIN STORM APRON CCOMMUNICATION LINE EELECTRIC POWER LINE ||WATER MAIN > >> SANITARY SEWER STORM SEWER GATE VALVE HYDRANT SANITARY SEWER MANHOLE STORM SEWER MANHOLE COUNTY:DAKOTA PROJECT LOCATION THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." APPROVED BYSHEET NO.DATE PLAN REVISIONS ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT. THIS PLAN SET CONTAINS 3 SHEETS I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. LICENSE NUMBER:DATE:12/20/2021 54301 WILLIAM C. ALMS, P.E. SHEET 3 OF CLIENT PROJ. NO. 2022-04 WSB PROJ. NO. 019222-000 PROJECT LOCATION BASIN 1565 1 THIS PLAN SET HAS BEEN PREPARED FOR: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068-4997 651.423.4411 A CALL TO GOPHER STATE ONE (651-454-0002) IS REQUIRED A MINIMUM OF 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION. EXCAVATION NOTICE SYSTEM PLAN SET INDEX GOVERNING SPECIFICATIONS UTILITY INFORMATION THE 2020 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. E ST S N SCALE IN FEET 0 H: 800 1600 SHEET NO.DESCRIPTION 1 TITLE SHEET 2 MISCELLANEOUS DETAILS 3 GRADING AND EROSION CONTROL PLANS DATE: BRIAN ERICKSON, P.E. CITY ENGINEER CONNEMARA T R A I L S ROBERT TRAILSHANNON PARKWAYDODD B O U L E V A R DDANUBE LNDANBURY PATH145TH STREET W >>>>>>>>>>>>>>>> >> >>>>>>>>>>>>>>>>>>>>>>>>ST ST ST FM FM FM FM>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>S S S S S SS S S S S |||||||||| |||||||||||||||||||||| | | ||||||||||||||||||||||||||| ||| | | | ||||||||||||||||EX.24" RCPEX.33" RCP104909.38spot105909.38spot106909.38spot107909.38spot108909.38spot110909.38spot111909.38spot112909.38spot113909.38spot114909.38spot115909.38spot116909.38spot117909.38spot118909.38spot119909.38spot120909.38spot121909.38spot122909.38spot123909.38spot124908.98spot125908.88spot126908.68spot127908.58spot128908.68spot129908.78spot130908.98spot131908.88spot132908.68spot133908.78spot134908.08spot135908.18spot136908.28spot137907.78spot138909.38spot139909.38spot8"7" 8" 11"7" 8" 11" 15" 13" 18"15" 14" 14"17" SB SB SB SB910915920909911912913914916917918919921922 915 920 925 93 0 935 9 4 0 9 4 5 916 917 918 919 92 1 922 923 924 926 927 928 929 93 1 93 2 93 3 9 3 4 9 3 6 9 3 7 9 3 8 9 3 9 9 4 1 9 42 943 9 4 4 9209259 30 9359199219229239249269279289 2 9 9 3 19329 3 3 9 3 4 936937938939910915920925930909 911912913914916917918919921922923924926927928929 915 920 916 917918 919 921 922915916917918920 915 9 2 0 9 25 930 9 1 6 917 9 1 8 9 1 9 921 9229239 2 4 9269 27 928 929912 91 3 914 912913914920 9259 3 0 935905906907908909 K:\019222-000\Cad\Plan\019222-000-C-GRAD-PLAN.dwg 12/20/2021 12:55:12 PM3 AS SHOWN KF WCAGMD N SCALE IN FEET 0 H: 30 60 LOCATION SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET OF WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONCLIENT PROJECT NO.2022 POND MAINTENANCE PROJECTCITY OF ROSEMOUNT019222-000 2022-04 WILLIAM C. ALMS, P.E.5430112/20/213 GRADING AND EROSION CONTROL PLANS BASIN 1565 LEGEND APPROX. CONSTRUCTION LIMITS EXISTING CONTOUR (MAJOR)1019 EXISTING CONTOUR (MINOR)1019 PROPOSED CONTOUR (MAJOR)1019 PROPOSED CONTOUR (MINOR)1019 EXISTING STORM STRUCTUREST EXISTING STORM SEWER PIPE>> INLET PROTECTION RIP RAP ACCESS ROUTE WITH STABILIZED CONSTRUCTION ENTRANCE WITH BIOROLL AT DOWNSTREAM END SEED MIX 25-151 (120 LB/AC) AND FERTILIZER TYPE 3 (350 LB/AC) RESTORATION ABOVE NWL (909.2) SEED MIX 33-261 (35 LB/AC) AND FERTILIZER TYPE 4 (150 LB/AC) SILT FENCESF SOIL BORING LOCATIONSB BASIN 1565 NWL 909.2 DAFFODIL PATHDANUBE LANEDANU B E C I R C L E DAISY CT 1.RESTORE ALL POND EDGES AND WOODED AREAS WITH TYPE 33-261 SEED (35 LBS/AC) AND FERTILIZER TYPE 4 (150 LBS/ACRE). CATEGORY 20 ROLLED EROSION PREVENTION PRODUCT SHALL BE INSTALLED ALONG POND EDGES, BUFFERS, AND NON-MOWABLE SLOPES AS DIRECTED BY THE ENGINEER IN THE FIELD. 2.ALL SOILS DISTURBED DURING CONSTRUCTION ACTIVITIES WILL BE STABILIZED FOLLOWING SEED MIXES, FERTILIZER, AND STABILIZING COVER OUTLINED WITHIN THESE PLANS. 3.IN THE EVENT THAT RESTORATION CANNOT BE IMPLEMENTED WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY IN THE DISTURBED AREA HAS CEASED, TEMPORARY EROSION STABILIZATION BMPS (I.E. HYDROMULCH 3884.B.2) MUST BE SCHEDULED TO OCCUR WITHIN THAT 7 DAY TIME FRAME. 4.CONTRACTOR RESPONSIBLE FOR THE DAMAGE TO STREETS, CONCRETE CURB AND GUTTER, SIDEWALKS, LAWN IRRIGATION SYSTEMS AND TRAIL. 5.DAILY STREET SWEEPING REQUIRED DURING HAULING OPERATIONS. 6.ALL STOCKPILES MUST HAVE DOWN GRADIENT PERIMETER SEDIMENT CONTROL IMPLEMENTED AND MAINTAINED AT ALL TIMES. STOCKPILES TO RECEIVE TEMPORARY STABILIZATION IF UNWORKED FOR 7 DAYS 7.DEWATERING/DEICING TO TAKE PLACE PRIOR TO EXCAVATION. ICE IS TO BE STOCKPILED ON SITE AND PUT BACK IN POND FOLLOWING THE EXCAVATION. DEWATERING PLANS MUST BE SUBMITTED AND APPROVED BY THE PROJECT ENGINEER 10 DAYS PRIOR TO PUMPING. PLANS MUST INCLUDE OPERATIONS FOR PREVENTING THE DISCHARGE OF TURBID WATER, AND MUST INCLUDE METHODS FOR CONTROLLING EROSION AND SCOUR. 8.CONTRACTOR SHALL PERFORM ALL DEWATERING AND EXCAVATION ONSITE AND OFF OF ROADWAY, AND LOAD AND HAUL OUT USING ACCESS ROUTE. 9.CONTRACTOR TO GRADE AROUND EXISTING STORM SEWER STRUCTURES AS DIRECTED BY THE ENGINEER. 10.CONTRACTOR TO COORDINATE ACCESS LIMITS WITH THE ENGINEER IN THE FIELD. 11.EXISTING POND CONTOURS DEVELOPED FROM PRE-DESIGN SURVEY. CONTRACTOR SHALL REMOVE TREES AS NEEDED TO ACCESS SITE AND AS APPROVED BY ENGINEER. 12.MANAGEMENT LEVEL 2 INDICATES THAT SEDIMENT IS REGULATED MATERIAL SUITABLE FOR INDUSTRIAL REUSE. GENERAL CONSTRUCTION NOTES PROTECT EXISTING SIDEWALK INSTALL 10 CY CL III RIPRAP AND 20 SY GEOTEXTILE FABRIC AT FES PROTECT EXISTING MAILBOX REMOVE 1150 CY OF MANAGEMENT LEVEL 1 SEDIMENT WEST OF LINE REMOVE 1150 CY OF MANAGEMENT LEVEL 2 SEDIMENT EAST OF LINE MATERIAL EAST OF THIS LINE TO BE DISPOSED OF ACCORDING TO LOCAL AND STATE LAW. NO RESTRICTIONS ON EXCAVATED MATERIAL WEST OF LINE. CONTRACTOR TO REMOVE SEDIMENT FROM SUMP PROTECT EXISTING TREES PROTECT EXISTING TREE