HomeMy WebLinkAbout6.p. 2022 Storm Basin Maintenance, City Project 2022-04 Receive Bids and Award Contract
EXECUTIVE SUMMARY
City Council Meeting: January 4, 2022
AGENDA ITEM: 2022 Storm Basin Maintenance, City
AGENDA SECTION:
Project 2022-04: Receive Bids and
Consent
Award Contract
PREPARED BY: Brian Erickson, PE, City Engineer AGENDA NO. 6.p.
ATTACHMENTS: Resolution; Letter of
Recommendation; Bid Summary; APPROVED BY: LJM
Bid Tabulation; Location Map
RECOMMENDED ACTIONS: Adopt a Resolution Receiving Bids and Awarding Contract
for 2022 Storm Basin Maintenance Project, City Project 2022-04.
BACKGROUND
Per the NPDES MS4 General Permit administered by the Minnesota Pollution Control Agency
(MPCA), the City is required to inspect every stormwater pond and outfall at least once per permit
term and develop a method to assess the effectiveness of all stormwater ponds for
preventing/capturing pollution. Inspections performed in 2014 and 2021 and subsequent modeling
indicated that pond 1565 (Country Hills Sixth Addition) was operating at a low efficiency and
maintenance was recommended.
The project proposed to excavate 2,300 cubic yards of accumulated sediment from pond 1565.
Approximately, 1,150 cubic yards of the sediment being removed have contaminant levels that
require special disposal (e.g. not for use as fill in residential areas or disposal at a landfill).
Phosphorus removal efficiency for this pond is expected to improve to 55% and suspended solids
removal is expected to improve to 92% as a result of the project. Additional benefits of the project
include removal of voluntary and encroaching trees for better inspection and maintenance access
and increased flood storage capacity.
COSTS & FUNDING
A summary of the Bid Tabulation including the Engineer’s Estimate is shown in the following table.
The low bid received is $99,785.00. This is $2,010 below the Engineer’s Opinion of Cost.
Contactor Bid Amount Percentage Above
Low Bid
Engineer’s Opinion of Cost $101,795.00 2.0%
Fitzgerald Excavating & Trucking, Inc. $99,785.00 N/A
McNamara Contracting, Inc. $109,160.00 9.4%
Winberg Companies $114,972.00 15.2%
Ashwill Companies $144,019.00 44.3%
Meyer Contracting, Inc. $145,467.59 45.8%
C:\\Users\\jab\\AppData\\Local\\Temp\\6.p. 2022 Storm Basin Maintenance, City Project 2022-04 Receive Bids and Awa_704250\\6.p. 2022 Storm Basin Maintenance, City Project 2022-04 Receive
Bids.docx
US SiteWork $151,716.00 52.0%
JACON, LLC $167,247.00 67.6%
Max Steininger, Inc. $173,562.88 73.9%
Urban Companies $203,735.00 104.2%
Parkstone Contracting, LLC $241,645.00 142.2%
This project will be funded using the Storm Water Utility, and the engineer’s estimate of probable
project cost was $101,795.00. Stormwater System Improvement is a line item in the annual Storm
Water Utility budget.
SCHEDULE
Should the Council approve this resolution, the proposed project schedule is shown below.
Construction Start January 2022
Substantial Completion Winter 2022
Restoration Spring 2022
RECOMMENDATION
Staff recommends Council adopt the attached resolution accepting bids, awarding the contract to
Fitzgerald Excavating & Trucking, Inc. of Goodhue, MN for the 2022 Storm Basin Maintenance
Project, City Project 2022-04.
2
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2022 – 01
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR 2022 STORM BASIN MAINTENANCE, CITY PROJECT 2022-04.
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on construction of the 2022 Storm Basin Maintenance Project, City Project 2022-04,
are hereby received and tabulated.
2. Based on the Total Bid, the bid of Fitzgerald Excavating & Trucking, Inc. of Goodhue, MN in
the amount of $99,785.00 for the construction of said improvements is in accordance with the
plans and specifications and advertisement for bids and is the lowest responsible bid and shall
be and hereby is accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits
made with their bids, except that the deposit of the successful bidder and the next two lowest
bidders shall be retained until a contract has been executed.
th
ADOPTED this 4 day of January, 2022.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
K:\019222-000\Admin\Construction Admin\Bidding\019222-000 LOR-122921.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM December 29, 2021
Honorable Mayor and City Council
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Re: 2022 Pond Cleanout Project
City of Rosemount Project No. 2022-04
WSB Project No. 019222-000
Dear Mayor and Council Members:
Bids were received for the above-referenced project on Wednesday, December 29, 2021, and
were opened and read aloud. A total of 10 bids were received. The bids were checked for
mathematical accuracy and tabulated. The Engineer’s Estimate was $101,795.00. The bid
tabulation indicates the low bidder as Fitzgerald Excavating & Trucking, Inc., Goodhue,
Minnesota, in the amount of $99,785.00.
We recommend that the City consider these bids and award a contract to Fitzgerald Excavating &
Trucking, Inc., based on the results of the bids received.
Sincerely,
WSB
Bill Alms, PE
Project Manager
Enclosure
cc: Jason Fitzgerald, Fitzgerald Excavating & Trucking, Inc.
Erin Fasbender, City of Rosemount
Kendra Fallon, WSB
Tim Hanson, WSB
mj
2022 Pond Cleanout Project
City of Rosemount Project No. 2022-04
WSB Project No. 019222-000
Bid Opening: December 29, 2021 at 10:00 a.m. local time
DENOTES CORRECTED FIGURE
Contractor Bid Security (5%)Grand Total Bid
1 Fitzgerald Excavating & Trucking, Inc.X $99,785.00
2 McNamara Contracting, Inc.X $109,160.00
3 Winberg Companies, LLC X $114,972.00
4 Ashwill Companies X $144,019.00
5 Meyer Contracting, Inc.X $145,467.59
6 US SIteWork, Inc.X $151,716.00
7 Jacon, LLC X $167,247.00
8 Max Steininger, Inc.X $173,562.88
9 G Urban Companies, Inc.X $203,735.00
10 Parkstone Contracting, LLC X $241,645.00
Engineer's Opinion of Cost $101,795.00
BID TABULATION SUMMARY
Bill Alms, PE Project Manager
I hereby certify that this is a true and correct tabulation of the bids as received on December 29, 2021.
K:\019222-000\Admin\Construction Admin\Bidding\019222-000 Bid Tab Summary-122921
Bid Tabulation
2022 Pond Cleanout Project
City of Rosemount Project No. 2022-04
WSB Project No. 019222-000
Bid Opening: December 29, 2021 at 10:00 a.m. local time
DENOTES CORRECTED FIGURE
Line No.Material No.Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
Pond Cleanout
1 2021.501 MOBILIZATION LS 1 $8,000.00 $8,000.00 $35,000.00 $35,000.00 $6,000.00 $6,000.00 $5,250.00 $5,250.00 $9,086.00 $9,086.00
2 2101.505 CLEARING ACRE 0.2 $8,000.00 $1,600.00 $5,000.00 $1,000.00 $15,000.00 $3,000.00 $9,800.00 $1,960.00 $20,000.00 $4,000.00
3 2101.505 GRUBBING ACRE 0.2 $8,000.00 $1,600.00 $5,000.00 $1,000.00 $10,000.00 $2,000.00 $9,800.00 $1,960.00 $20,000.00 $4,000.00
4 2106.607 EXCAVATION - CHANNEL AND POND (LV)CY 1150 $30.00 $34,500.00 $22.00 $25,300.00 $39.00 $44,850.00 $29.20 $33,580.00 $32.50 $37,375.00
5 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL)C Y 1150 $35.00 $40,250.00 $24.00 $27,600.00 $39.00 $44,850.00 $51.25 $58,937.50 $53.50 $61,525.00
6 2506.602 CLEAN OUT CATCH BASIN EACH 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $500.00 $500.00 $1,155.00 $1,155.00 $1,500.00 $1,500.00
7 2511.504 GEOTEXTILE FILTER TYPE 4 S Y 20 $5.00 $100.00 $6.00 $120.00 $5.75 $115.00 $34.00 $680.00 $4.00 $80.00
8 2511.507 RANDOM RIPRAP CLASS III C Y 10 $125.00 $1,250.00 $50.00 $500.00 $125.00 $1,250.00 $110.25 $1,102.50 $105.00 $1,050.00
9 2511.507 GRANULAR FILTER C Y 5 $50.00 $250.00 $20.00 $100.00 $80.00 $400.00 $124.00 $620.00 $55.00 $275.00
10 2573.502 STORM DRAIN INLET PROTECTION EACH 3 $150.00 $450.00 $150.00 $450.00 $190.00 $570.00 $178.00 $534.00 $250.00 $750.00
11 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER BIOROLL L F 20 $4.00 $80.00 $4.00 $80.00 $5.00 $100.00 $4.20 $84.00 $5.50 $110.00
12 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $1,250.00 $1,250.00 $1,000.00 $1,000.00 $1,400.00 $1,400.00 $2,142.00 $2,142.00 $1,275.00 $1,275.00
13 2575.504 ROLLED EROSION PREVENTION CATEGORY 20 S Y 220 $5.00 $1,100.00 $2.00 $440.00 $4.00 $880.00 $12.60 $2,772.00 $4.40 $968.00
14 2575.505 SEEDING ACRE 0.2 $8,000.00 $1,600.00 $2,000.00 $400.00 $1,000.00 $200.00 $3,900.00 $780.00 $8,250.00 $1,650.00
15 2575.508 SEED MIXTURE 21-111 LB 20 $10.00 $200.00 $3.00 $60.00 $25.00 $500.00 $22.00 $440.00 $5.50 $110.00
16 2575.508 SEED MIXTURE 25-151 LB 5 $8.00 $40.00 $5.00 $25.00 $10.00 $50.00 $39.00 $195.00 $11.00 $55.00
17 2575.508 SEED MIXTURE 33-261 LB 15 $35.00 $525.00 $14.00 $210.00 $33.00 $495.00 $32.00 $480.00 $44.00 $660.00
18 2106.601 DEWATERING LS 1 $8,000.00 $8,000.00 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $2,300.00 $2,300.00 $19,550.00 $19,550.00
Total Pond Cleanout $101,795.00 $99,785.00 $109,160.00 $114,972.00 $144,019.00
Ashwill CompaniesEngineer's Estimate
Fitzgerald Excavating &
Trucking, Inc.McNamara Contracting, Inc.Winberg Companies, LLC
Bid Tabulation
2022 Pond Cleanout Project
City of Rosemount Project No. 2022-04
WSB Project No. 019222-000
Bid Opening: December 29, 2021 at 10:00 a.m. local time
DENOTES CORRECTED FIGURE
Line No.Material No.Item Units Quantity Unit Price Total Price
Pond Cleanout
1 2021.501 MOBILIZATION LS 1 $8,000.00 $8,000.00
2 2101.505 CLEARING ACRE 0.2 $8,000.00 $1,600.00
3 2101.505 GRUBBING ACRE 0.2 $8,000.00 $1,600.00
4 2106.607 EXCAVATION - CHANNEL AND POND (LV)CY 1150 $30.00 $34,500.00
5 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL)C Y 1150 $35.00 $40,250.00
6 2506.602 CLEAN OUT CATCH BASIN EACH 1 $1,000.00 $1,000.00
7 2511.504 GEOTEXTILE FILTER TYPE 4 S Y 20 $5.00 $100.00
8 2511.507 RANDOM RIPRAP CLASS III C Y 10 $125.00 $1,250.00
9 2511.507 GRANULAR FILTER C Y 5 $50.00 $250.00
10 2573.502 STORM DRAIN INLET PROTECTION EACH 3 $150.00 $450.00
11 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER BIOROLL L F 20 $4.00 $80.00
12 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $1,250.00 $1,250.00
13 2575.504 ROLLED EROSION PREVENTION CATEGORY 20 S Y 220 $5.00 $1,100.00
14 2575.505 SEEDING ACRE 0.2 $8,000.00 $1,600.00
15 2575.508 SEED MIXTURE 21-111 LB 20 $10.00 $200.00
16 2575.508 SEED MIXTURE 25-151 LB 5 $8.00 $40.00
17 2575.508 SEED MIXTURE 33-261 LB 15 $35.00 $525.00
18 2106.601 DEWATERING LS 1 $8,000.00 $8,000.00
Total Pond Cleanout $101,795.00
Engineer's Estimate
Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
$7,000.00 $7,000.00 $4,015.00 $4,015.00 $44,937.50 $44,937.50 $50,000.00 $50,000.00
$30,000.00 $6,000.00 $8,190.00 $1,638.00 $48,300.00 $9,660.00 $32,106.57 $6,421.31
$20,000.00 $4,000.00 $8,190.00 $1,638.00 $48,300.00 $9,660.00 $21,404.39 $4,280.88
$29.96 $34,454.00 $35.00 $40,250.00 $25.50 $29,325.00 $25.11 $28,876.50
$62.21 $71,541.50 $75.00 $86,250.00 $31.50 $36,225.00 $56.03 $64,434.50
$2,312.52 $2,312.52 $1,755.00 $1,755.00 $3,850.00 $3,850.00 $2,688.65 $2,688.65
$5.49 $109.80 $19.50 $390.00 $40.00 $800.00 $13.52 $270.40
$159.39 $1,593.90 $194.00 $1,940.00 $195.00 $1,950.00 $145.06 $1,450.60
$173.87 $869.35 $206.00 $1,030.00 $300.00 $1,500.00 $90.79 $453.95
$200.00 $600.00 $360.00 $1,080.00 $375.00 $1,125.00 $236.73 $710.19
$6.00 $120.00 $20.50 $410.00 $6.90 $138.00 $4.28 $85.60
$3,203.47 $3,203.47 $2,380.00 $2,380.00 $1,925.00 $1,925.00 $1,809.45 $1,809.45
$2.75 $605.00 $4.20 $924.00 $3.30 $726.00 $5.00 $1,100.00
$10,000.00 $2,000.00 $2,295.00 $459.00 $11,700.00 $2,340.00 $12,000.00 $2,400.00
$0.78 $15.60 $4.60 $92.00 $0.90 $18.00 $4.28 $85.60
$6.75 $33.75 $15.50 $77.50 $7.75 $38.75 $6.42 $32.10
$30.58 $458.70 $41.50 $622.50 $35.25 $528.75 $64.21 $963.15
$10,550.00 $10,550.00 $6,765.00 $6,765.00 $22,500.00 $22,500.00 $7,500.00 $7,500.00
$145,467.59 $151,716.00 $167,247.00 $173,562.88
Meyer Contracting, Inc.US SiteWork, Inc.Jacon, LLC Max Steininger, Inc.
Bid Tabulation
2022 Pond Cleanout Project
City of Rosemount Project No. 2022-04
WSB Project No. 019222-000
Bid Opening: December 29, 2021 at 10:00 a.m. local time
DENOTES CORRECTED FIGURE
Line No.Material No.Item Units Quantity Unit Price Total Price
Pond Cleanout
1 2021.501 MOBILIZATION LS 1 $8,000.00 $8,000.00
2 2101.505 CLEARING ACRE 0.2 $8,000.00 $1,600.00
3 2101.505 GRUBBING ACRE 0.2 $8,000.00 $1,600.00
4 2106.607 EXCAVATION - CHANNEL AND POND (LV)CY 1150 $30.00 $34,500.00
5 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL)C Y 1150 $35.00 $40,250.00
6 2506.602 CLEAN OUT CATCH BASIN EACH 1 $1,000.00 $1,000.00
7 2511.504 GEOTEXTILE FILTER TYPE 4 S Y 20 $5.00 $100.00
8 2511.507 RANDOM RIPRAP CLASS III C Y 10 $125.00 $1,250.00
9 2511.507 GRANULAR FILTER C Y 5 $50.00 $250.00
10 2573.502 STORM DRAIN INLET PROTECTION EACH 3 $150.00 $450.00
11 2573.503 SEDIMENT CONTROL LOG TYPE WOOD FIBER BIOROLL L F 20 $4.00 $80.00
12 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $1,250.00 $1,250.00
13 2575.504 ROLLED EROSION PREVENTION CATEGORY 20 S Y 220 $5.00 $1,100.00
14 2575.505 SEEDING ACRE 0.2 $8,000.00 $1,600.00
15 2575.508 SEED MIXTURE 21-111 LB 20 $10.00 $200.00
16 2575.508 SEED MIXTURE 25-151 LB 5 $8.00 $40.00
17 2575.508 SEED MIXTURE 33-261 LB 15 $35.00 $525.00
18 2106.601 DEWATERING LS 1 $8,000.00 $8,000.00
Total Pond Cleanout $101,795.00
I hereby certify that this is an exact reproduction of bids received.
Certified By:
License No. 54301
Date: December 29, 2021
Engineer's Estimate
Unit Price Total Price Unit Price Total Price
$10,000.00 $10,000.00 $55,000.00 $55,000.00
$15,000.00 $3,000.00 $30,000.00 $6,000.00
$15,000.00 $3,000.00 $30,000.00 $6,000.00
$45.00 $51,750.00 $69.00 $79,350.00
$80.00 $92,000.00 $69.00 $79,350.00
$1,000.00 $1,000.00 $2,500.00 $2,500.00
$100.00 $2,000.00 $20.00 $400.00
$125.00 $1,250.00 $175.00 $1,750.00
$125.00 $625.00 $175.00 $875.00
$400.00 $1,200.00 $200.00 $600.00
$25.00 $500.00 $10.00 $200.00
$2,500.00 $2,500.00 $3,000.00 $3,000.00
$5.00 $1,100.00 $5.00 $1,100.00
$15,000.00 $3,000.00 $10,000.00 $2,000.00
$1.00 $20.00 $3.00 $60.00
$8.00 $40.00 $12.00 $60.00
$50.00 $750.00 $60.00 $900.00
$30,000.00 $30,000.00 $2,500.00 $2,500.00
$203,735.00 $241,645.00
Parkstone Contracting, LLCG Urban Companies, Inc.
K:\019222-000\Cad\Plan\019222-000-C-TITL-PLAN.dwg 12/20/2021 12:54:34 PM2022 POND MAINTENANCE PROJECT
CITY OF ROSEMOUNT
PROJECT LOCATION MAP
F
G
EXISTING PLAN SYMBOLS
PROPERTY LINES/RIGHT-OF-WAY
UTILITY EASEMENT
TREE LINE
SIGN
DECIDUOUS TREE
SHRUB
CONIFEROUS TREE
EXISTING UTILITY SYMBOLS
FIBER OPTIC LINE
GAS LINE
COMMUNICATIONS PEDESTAL
POWER POLE
ELECTRIC BOX
CATCH BASIN
STORM APRON
CCOMMUNICATION LINE
EELECTRIC POWER LINE
||WATER MAIN
>
>>
SANITARY SEWER
STORM SEWER
GATE VALVE
HYDRANT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
COUNTY:DAKOTA
PROJECT LOCATION
THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THE
GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA."
APPROVED BYSHEET NO.DATE
PLAN REVISIONS
ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE
COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT.
THIS PLAN SET CONTAINS 3 SHEETS
I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
LICENSE NUMBER:DATE:12/20/2021 54301
WILLIAM C. ALMS, P.E.
SHEET
3
OF
CLIENT PROJ. NO. 2022-04
WSB PROJ. NO. 019222-000
PROJECT LOCATION
BASIN 1565
1
THIS PLAN SET HAS BEEN PREPARED FOR:
CITY OF ROSEMOUNT
2875 145TH STREET WEST
ROSEMOUNT, MN 55068-4997
651.423.4411
A CALL TO GOPHER STATE ONE (651-454-0002)
IS REQUIRED A MINIMUM OF 48 HOURS PRIOR
TO PERFORMING ANY EXCAVATION.
EXCAVATION NOTICE SYSTEM
PLAN SET INDEX
GOVERNING SPECIFICATIONS
UTILITY INFORMATION
THE 2020 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD
SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN.
ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE
MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE
LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS.
E
ST
S
N
SCALE IN FEET
0
H:
800 1600
SHEET NO.DESCRIPTION
1 TITLE SHEET
2 MISCELLANEOUS DETAILS
3 GRADING AND EROSION CONTROL PLANS
DATE:
BRIAN ERICKSON, P.E.
CITY ENGINEER
CONNEMARA
T
R
A
I
L
S ROBERT TRAILSHANNON PARKWAYDODD
B
O
U
L
E
V
A
R
DDANUBE LNDANBURY PATH145TH STREET W
>>>>>>>>>>>>>>>>
>>
>>>>>>>>>>>>>>>>>>>>>>>>ST
ST
ST
FM FM FM FM>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>S
S
S
S
S
SS
S
S
S
S
||||||||||
||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||
|||
|
|
|
||||||||||||||||EX.24" RCPEX.33" RCP104909.38spot105909.38spot106909.38spot107909.38spot108909.38spot110909.38spot111909.38spot112909.38spot113909.38spot114909.38spot115909.38spot116909.38spot117909.38spot118909.38spot119909.38spot120909.38spot121909.38spot122909.38spot123909.38spot124908.98spot125908.88spot126908.68spot127908.58spot128908.68spot129908.78spot130908.98spot131908.88spot132908.68spot133908.78spot134908.08spot135908.18spot136908.28spot137907.78spot138909.38spot139909.38spot8"7"
8"
11"7"
8"
11"
15"
13"
18"15"
14"
14"17"
SB
SB
SB
SB910915920909911912913914916917918919921922 915
920
925
93
0
935
9
4
0
9
4
5
916
917
918
919
92
1
922
923
924
926
927
928
929
93
1
93
2
93
3
9
3
4
9
3
6
9
3
7
9
3
8
9
3
9
9
4
1
9
42
943
9
4
4
9209259
30
9359199219229239249269279289
2
9
9
3
19329
3
3
9
3
4
936937938939910915920925930909
911912913914916917918919921922923924926927928929
915
920
916
917918
919
921
922915916917918920
915
9
2
0
9
25
930
9
1
6
917
9
1
8
9
1
9
921 9229239
2
4 9269
27
928 929912
91
3
914
912913914920 9259
3
0 935905906907908909
K:\019222-000\Cad\Plan\019222-000-C-GRAD-PLAN.dwg 12/20/2021 12:55:12 PM3
AS SHOWN KF
WCAGMD
N
SCALE IN FEET
0
H:
30 60
LOCATION
SCALE:
PLAN BY:
DESIGN BY:
CHECK BY:
SHEET
OF
WSB PROJECT NO.I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:REVISIONSNO.DATEDESCRIPTIONCLIENT PROJECT NO.2022 POND MAINTENANCE PROJECTCITY OF ROSEMOUNT019222-000
2022-04 WILLIAM C. ALMS, P.E.5430112/20/213
GRADING AND
EROSION
CONTROL PLANS
BASIN 1565
LEGEND
APPROX. CONSTRUCTION LIMITS
EXISTING CONTOUR (MAJOR)1019
EXISTING CONTOUR (MINOR)1019
PROPOSED CONTOUR (MAJOR)1019
PROPOSED CONTOUR (MINOR)1019
EXISTING STORM STRUCTUREST
EXISTING STORM SEWER PIPE>>
INLET PROTECTION
RIP RAP
ACCESS ROUTE WITH STABILIZED
CONSTRUCTION ENTRANCE WITH
BIOROLL AT DOWNSTREAM END
SEED MIX 25-151 (120 LB/AC) AND
FERTILIZER TYPE 3 (350 LB/AC)
RESTORATION ABOVE NWL (909.2)
SEED MIX 33-261 (35 LB/AC) AND
FERTILIZER TYPE 4 (150 LB/AC)
SILT FENCESF
SOIL BORING LOCATIONSB
BASIN 1565
NWL 909.2
DAFFODIL PATHDANUBE LANEDANU
B
E
C
I
R
C
L
E
DAISY
CT
1.RESTORE ALL POND EDGES AND WOODED AREAS WITH TYPE 33-261
SEED (35 LBS/AC) AND FERTILIZER TYPE 4 (150 LBS/ACRE). CATEGORY
20 ROLLED EROSION PREVENTION PRODUCT SHALL BE INSTALLED
ALONG POND EDGES, BUFFERS, AND NON-MOWABLE SLOPES AS
DIRECTED BY THE ENGINEER IN THE FIELD.
2.ALL SOILS DISTURBED DURING CONSTRUCTION ACTIVITIES WILL BE
STABILIZED FOLLOWING SEED MIXES, FERTILIZER, AND STABILIZING
COVER OUTLINED WITHIN THESE PLANS.
3.IN THE EVENT THAT RESTORATION CANNOT BE IMPLEMENTED WITHIN
7 DAYS AFTER CONSTRUCTION ACTIVITY IN THE DISTURBED AREA HAS
CEASED, TEMPORARY EROSION STABILIZATION BMPS (I.E.
HYDROMULCH 3884.B.2) MUST BE SCHEDULED TO OCCUR WITHIN THAT
7 DAY TIME FRAME.
4.CONTRACTOR RESPONSIBLE FOR THE DAMAGE TO STREETS,
CONCRETE CURB AND GUTTER, SIDEWALKS, LAWN IRRIGATION
SYSTEMS AND TRAIL.
5.DAILY STREET SWEEPING REQUIRED DURING HAULING OPERATIONS.
6.ALL STOCKPILES MUST HAVE DOWN GRADIENT PERIMETER SEDIMENT
CONTROL IMPLEMENTED AND MAINTAINED AT ALL TIMES. STOCKPILES
TO RECEIVE TEMPORARY STABILIZATION IF UNWORKED FOR 7 DAYS
7.DEWATERING/DEICING TO TAKE PLACE PRIOR TO EXCAVATION. ICE IS
TO BE STOCKPILED ON SITE AND PUT BACK IN POND FOLLOWING THE
EXCAVATION. DEWATERING PLANS MUST BE SUBMITTED AND
APPROVED BY THE PROJECT ENGINEER 10 DAYS PRIOR TO PUMPING.
PLANS MUST INCLUDE OPERATIONS FOR PREVENTING THE
DISCHARGE OF TURBID WATER, AND MUST INCLUDE METHODS FOR
CONTROLLING EROSION AND SCOUR.
8.CONTRACTOR SHALL PERFORM ALL DEWATERING AND EXCAVATION
ONSITE AND OFF OF ROADWAY, AND LOAD AND HAUL OUT USING
ACCESS ROUTE.
9.CONTRACTOR TO GRADE AROUND EXISTING STORM SEWER
STRUCTURES AS DIRECTED BY THE ENGINEER.
10.CONTRACTOR TO COORDINATE ACCESS LIMITS WITH THE ENGINEER IN
THE FIELD.
11.EXISTING POND CONTOURS DEVELOPED FROM PRE-DESIGN SURVEY.
CONTRACTOR SHALL REMOVE TREES AS NEEDED TO ACCESS SITE
AND AS APPROVED BY ENGINEER.
12.MANAGEMENT LEVEL 2 INDICATES THAT SEDIMENT IS REGULATED
MATERIAL SUITABLE FOR INDUSTRIAL REUSE.
GENERAL CONSTRUCTION NOTES
PROTECT EXISTING
SIDEWALK
INSTALL 10 CY CL III RIPRAP
AND 20 SY GEOTEXTILE FABRIC
AT FES
PROTECT EXISTING
MAILBOX
REMOVE 1150 CY OF
MANAGEMENT LEVEL 1 SEDIMENT
WEST OF LINE
REMOVE 1150 CY OF
MANAGEMENT LEVEL 2 SEDIMENT
EAST OF LINE
MATERIAL EAST OF THIS LINE TO
BE DISPOSED OF ACCORDING TO
LOCAL AND STATE LAW. NO
RESTRICTIONS ON EXCAVATED
MATERIAL WEST OF LINE.
CONTRACTOR TO REMOVE
SEDIMENT FROM SUMP
PROTECT EXISTING TREES
PROTECT EXISTING TREE