Loading...
HomeMy WebLinkAbout9.a. Approve Bray Hill PUD, Prelim Plat, and Final Plat EXECUTIVE SUMMARY Regular City Council Meeting: May 3, 2022 AGENDA ITEM: Request by Builders Lot Group, LLC for the Approval of a Planned Unit Development AGENDA SECTION: Master Development Plan with Rezoning and New Business Preliminary and Final Plats for Bray Hill PREPARED BY: Julia Hogan, Planner AGENDA NO. 9.a. ATTACHMENTS: Resolutions; Planned Unit Development Agreement; Subdivision Agreement; Site Location; Final Development Plans; Existing Conditions; Preliminary Plat; Final Plat; Storm Water Management Plan; Landscape Plan; APPROVED BY: LJM Tree Location Survey; Front Elevation Examples; Geotechnical Exploration Report; Dakota County Plat Commission Memo, Engineer’s Memo; Stormwater Management Review Memo; Parks and Recreation Memo. RECOMMENDED ACTION: The Planning Commission and Staff recommend the City Council adopt the following motions: 1. Motion to adopt a Resolution approving the Preliminary Plat for Bray Hill, subject to conditions. 2. Motion to adopt an Ordinance amending Ordinance B City of Rosemount Zoning Ordinance for Bray Hill to rezone the site from AG-Agricultural District to R2 PUD – Moderate Density Residential Planned Unit Development. 3. Motion to approve the Planned Unit Development Master Development Plan Agreement for Bray Hill and authorize the Mayor and City Clerk to enter into the agreement. 4. Motion to adopt a Resolution approving the Final Plat for Bray Hill, subject to conditions. 5. Motion to approve the Subdivision Agreement between the City of Rosemount and Builders Lot Group, LLC to construct Bray Hill. SUMMARY The City Council is being asked to consider an application from Builders Lot Group, LLC for a Planned Unit Development (PUD) Master Development Plan with Rezoning, Preliminary Plat, and Final Plat for Bray Hill. The proposed residential subdivision would create 49 single-family residential lots on 17.50- acres of land located to the south of Bonaire Path and East of Akron Avenue. A rezoning of the site is required because the property is currently zoned for agricultural use. To accommodate the requested number of residential lots the subject site would need to be rezoned to R2 PUD – Moderate Density Residential PUD. Bray Hill will be completed in one phase, which is why the applicant has asked for a PUD with rezoning, preliminary plat, and final plat at this time. The preliminary plat provides legal entitlement to a certain number of lots, but actual developable lots would not be created until a final plat is approved. Staff is recommending approval of the Planned Unit Development Master Development Plan with Rezoning, Preliminary Plat, and Final Plat for Bray Hill. Owners: Wayne and Sheila Groth Residential Developers: Builders Lot Group, LLC Preliminary Plat Acres: 17.50 Acres Met Council Net Acres: 17.50 Acres Residential Lots Created: 49 Lots Gross Density: 2.93 Units/Acre Net Density: 2.93 Units/Acre Comprehensive Plan Guiding: LDR-Low Density Residential Current Zoning: AG-Agricultural Requested Zoning: R2 PUD-Moderate Density Residential Planned Unit Development PLANNING COMMISSION ACTION The Planning Commission held a public hearing during its meeting on March 29, 2022 to review the requests and receive public comment. The Commission sought clarification on some of the specifics of the request such as the deviation from the City’s code to allow for 5-foot side yard setbacks within the development. Staff did explain that there were developments in nearby cities that were approved with reduced setback like this and that this lot is uniquely shaped, and the developer is trying to make best use of the land available. The Commission also inquired about the impervious surface calculations proposed with the development and questioning if some of these residential lots will have constraints because of the high impervious lot coverage just with the principal structure. Staff explained developers usually allow for a certain amount of impervious surface additions, such as a patio, and include that with their submittal when they apply for their building permits. The Commission brought up some concerns regarding the surrounding area, specifically about the neighboring railroad located to the south of the subject property and as well as how the added traffic volume from this potential development and other surrounding new developments would affect the roadways. Staff informed the Commission that the railroad crossing to the east is planned to be finished as a quiet zone, but there is no set date of when that will be completed. Staff also explained that the current nd traffic volumes for getting onto Highway 3 from Bonaire Path and 132 Street is averaging 54 cars per hour, but for a traffic light to be added at that intersection there would need to be 150 cars per hour from either roadway. With the Dunmore development finishing off soon and no further development to the west of that occurring the City’s engineering staff is not expecting that maximum volume to be met. MNDOT is conducting a Highway 3 corridor study that will be completed by late 2023 with a possibility of them looking at that stretch of roadway between Connemara and McAndrews. The Commission also had questions about plans to pave the portion of Bonaire Path that is ½ mile east of Akron Avenue to Blaine Avenue so that Blaine Ave could be a route for people to use. Staff explained that that is a possibility once development starts occurring south of County Road 42 and when more traffic starts to head north on Blaine Avenue it is something that can be looked at further. The Commission did not receive any comments during the public hearing or prior to the meeting. The Planning Commission voted unanimously to recommend approval of the requests. BACKGROUND The City received a request from Builders Lot Group, LLC to develop 49 single-family residential lots on a site south of Bonaire Path and East of Akron Ave. The site is situated directly south of the Flint Hills 2 thth Athletic Complex and directly north of the both the Greystone 4 Addition and Greystone 6 Addition subdivisions. The developer is requesting a rezoning of the site from AG-Agricultural to R2 PUD – Moderate Density Residential Planned Unit Development to accommodate the requested single-family th residential lots. This parcel was created with the platting of Greystone 5 Addition in 2017 since it was a part of the original parent parcel. The land was to continue being used for agricultural purposes until it became available for development. Currently on site there is an existing house and six buildings with several other out buildings and sheds. With the construction of this project those existing structures will be torn down. When the applicant originally came to staff with the proposed subdivision design there was one access point off Akron Ave and one off Bonaire Path. Dakota County had some concerns with having an access point to the subdivision off Akron because of the possibility of a school being developed on the land directly west of the subject site. The applicant worked with City staff to change the original layout of the subdivision to have both access points off of Bonaire path, which the City was supportive of. Dakota County was supportive of this as well, though they had concerns with the western access point being too close to the intersection of Akron Avenue and Bonaire Path since the County is looking to make improvements to that intersection in the future. The Dakota County Plat Commission did approve the preliminary and final plats for Bray Hill at its March 16, 2022 meeting. Along with the 49 single-family residential lots there are 4 outlots within the subdivision as well. The two outlots that make up the eastern point of the triangular shaped parcel will be used for a ponding and infiltration area and also as a potential future City well site. One outlot is located in the southern portion of the site which will act as a buffer between the future residential lots and the exiting railroad tracks. A trail will be located within the western portion of that outlot as well. The last outlot is located near the intersection of Akron Avenue and Bonaire Path and will be used for an entrance monument. ISSUE ANALYSIS Legal Authority Preliminary plat, rezoning and final plat requests are quasi-judicial decisions for the Planning Commission meaning that the Planning Commission is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance and Subdivision Ordinance are being followed. The Planned Unit Development Master Development Plan is a legislative decision because of the Code deviations being requested. Generally, of these applications meet the City’s established requirements they must be approved. Staff review of each application is provided below. General Subdivision Design The overall development is approximately 17.50 acres, with the single-family lots comprising 16.73 of the acres. Due to the smaller size and shape of the parcel the proposed 49-lot subdivision has two different type of lots within it. 35 of the proposed lots are 57’ in width and the remaining 14 lots are 52’ in width. The site is relatively flat and has historically been used for agricultural purposes. Currently on site there is a house and six existing buildings plus several out buildings and structures, which will be demolished prior to grading on site. The subdivision will be accessed via two public roads off Bonaire Path. All residential lots will be accessed by one of three streets within the subdivision. Street A is a loop street extending from Bonaire Path and 320 feet east of Akron Avenue. Street A extends south to the railroad tracks and parallels the tracks to the east and then curves north back towards Bonaire Path. Street B extends east to west between the loop of Street A and Street C is the cul-de-sac street which extends east from Street A. Planned Unit Development Master Development Plan with Rezoning The subject property is currently zoned AG-Agricultural and in order to facilitate approval of a plat with 3 urban density parcels, the applicant has requested zoning of R2 PUD – Moderate Density Residential PUD for the single-family lots. The property is currently guided for Low Density Residential land uses in the City’s Comprehensive Plan, which the R1- Low Density Residential and R2- Moderate Density Residential zoning districts are identified as appropriate zoning for this land category. Up to 2.5 units per acre are allowed within the R1 district and up to 6 units per acre are allowed within the R2 district. The proposed subdivision will have 2.93 units per acre which is just over the maximum allowed for the R1 zoning district and on the lower end of the R2 zoning district. Consistent with the City’s PUD ordinance, the developer is requesting deviations from certain zoning requirements. The deviations from the R2 zoning standards requested by the applicant include a reduction in the minimum lot size from 12,000 square feet to 7,000 square feet; reduction in the minimum lot width from 100 feet to 57 feet for 35 lots within the subdivision and 100 feet to 52 feet for 14 lots within the subdivision; reduction in the front yard setback from 30 feet to 25 feet; and reduction in the side yard setback from 10-ft to 5-ft. The applicant has also requested a maximum lot coverage of up to 48% for lots between 7,000 square feet and 8,999 square feet. Lots that are between 9,000 square feet and 10,999 square feet will have a lot coverage of up to 40% and lots that are 11,000 square feet and up will have a lot coverage of up to 35% which both meet the R2 impervious surface standard of 40%. Category Standard R-1 Caramore Crossing- Talamore Standard R-2 Bray Hill Zoning Freedom Farms Zoning Min. Lot Size 10,000 sq. ft. 7,500 sq. ft. (Interior) 5,842 sq. ft. 12,000 sq. ft. 7,000 sq. ft. 9,500 sq. ft. (Corner) Min. Lot 80-ft. 55 ft. (Interior) 45 ft. 100 ft. 52 ft. & 57 ft. Width 70 ft. (Corner) Min Front 30-ft. 25 ft. 25 ft. 30 ft. 25 ft. Yard Setback Min. Side 10 ft. 7.5 ft. 7.5 ft. 10 ft. 5 ft. Yard Setback Min. Rear 30-ft. 30 ft. 25 ft. 30 ft. 30 ft. Yard Setback Max. Lot 30% 30%, 40%, 50% 35% to 40% 40% *35% to 48% Coverage * 35% for lots>11,000 sf; 40% for lots 9,000-10,900 sf; 48% for lots<8,999 sf Preliminary Plat The applicant is requesting approval of a preliminary plat to allow for the development of 49 single-family residential lots. The plat also includes a series of outlots that will accommodate the proposed stormwater ponding and infiltration area (Outlot C), a proposed future City well site (Outlot D), a dedicated area in the northwest corner of the plat for an entrance monument (Outlot A), and a buffer of land between the platted lots and the railroad tracts to the south (Outlot B). The proposed 8-foot trail extension from the bituminous trail adjacent to Akron Avenue will cut through a portion of Outlot B. The development proposes to extend two public streets from Bonaire Path. The streets provide a loop through the development with a second street extending between the loop and a cul-de-sac street extending from the loop street. The street network will provide access to the 49 single-family residential lots. The developer has indicated that the full build-out of the site will occur in one phase. Street, Sidewalk System and Trails The proposed plat depicts the construction of three local residential streets within the subdivision. Street A is a loop street extending from Bonaire Path and 320 feet east of Akron Avenue. Street A extends south to 4 the railroad tracks and parallels the tracks to the east and then curves north back towards Bonaire Path. Street B extends east to west between the loop of Street A and Street C is the cul-de-sac street which extends east from Street A. The typical street design for this subdivision is a 32-foot wide street with 5 feet concrete sidewalks installed on one side of each of the streets. This typical design meets the City’s standards for a street that allows parking on both sides of the street. There is an 8-foot trail extension proposed off the current bituminous trail that is adjacent to Akron Avenue into the Bray Hill subdivision just north of the railroad tracks and will connect with Street A. A trail easement is required over the trail alignment, which is located in Outlot B within the proposed subdivision. Parks The City of Rosemount Parks and Recreation department has reviewed the proposed development and has provided review comments in the attached memorandum. A few of the comments within the memorandum include:  The sidewalk amenities appear to be designed in a manner that works toward the City’s goal of having a well-connected community.  Staff recommends that the grading plan along the south side of Bonaire Path be adjusted to allow for a benched area to be created for a future trail, which the trail will be built by the City.  The Parks and Recreation staff is recommending cash-in-lieu of land dedication for this subdivision in the amount of $166,600 (49 units x $3,400). Staff will provide the Planning Commission with a verbal update concerning the Park and Recreation Commission review of the plat. Staff is recommending compliance with the Park Director’s memorandum as a condition of approval. Landscaping and Tree Preservation A majority of the site is currently or was formerly used as agriculture and has very few trees on site. There are some trees currently located around the farmstead, near the north end of the property along Bonaire Path and as well as some along southern boundary of the property adjacent to the railroad tracks. Landscaping for the subdivision will be predominately trees planted on individual lots along with a more extensive planning plan for trees along Bonaire Path, Akron Avenue and along the railroad tracks located on the southern portion of the site. The City Code requires one tree per lot/frontage in residential subdivisions, which in this case results in 56 street trees (49 lots plus 7 corner lots). The overall number provided for tree planning is over the minimum requirements and does provide at least one tree for standard lots and two trees per corner lots. With the addition of the replacement trees, the total number of trees to be provided per the landscaping plan is 134 trees. Stormwater Management The developer is proposing to construct one pond with a permanent pool and infiltration area. Water will be routed to the pond through storm sewer, rear yard catch basins, and overland flow. The proposed storm sewer within Bray Hill consists of three storm sewer systems. The largest system extends within Street C, B, A and the rear yard area of Block 2. A second system extends within the lots along the south side of Bonaire Path, which must be extended across the length of the project and the roadside wale along Bonaire Path filled in. The third system extends parallel to the railroad property collecting rear yard runoff. The City Engineer and the City’s stormwater consultant have reviewed the plan and provided comments in the attached memorandum dated March 16, 2022. Utilities The proposed sanitary sewer system extends from an existing sanitary sewer stub from Akron Avenue. 5 Two 8-inch watermain extensions have been identified, one extends from an existing watermain stub off Akron Avenue and one watermain extension is proposed to be extended form the existing 16-inch watermain within Bonaire Path. This connection would require excavation into the recently constructed Bonaire Path though. Within the City Engineer memorandum, it was recommended to remove the proposed watermain extension out to Bonaire Path and to instead extend the watermain to the existing 16- inch watermain stub located east of the cul-de-sac on site. The proposed site plan did identify a site for a future municipal well. Prior to constructing a well at this location, the city needs to construct a test well to determine the water quality and quantity. Final Plat The applicant has submitted a final plat for the 49 single-family residential lot subdivision named Bray Hill. The final plat includes the designated residential lots along with four outlots that were a part of the preliminary plat. Easements identified within the City Engineers memorandum dated March 23, 2022 will require vacating in conjunction with the final plat. A trail easement is required over the prosed trail within Outlot B and as well as Drainage and Utility Easements within various lots in the subdivision, which can be found in the attached City Engineer memorandum. The final plat is consistent with the preliminary plat and staff recommends approval of the final plat following the recommendation of approval of the planned unit development master development plan with rezoning and the preliminary plat. CONCLUSION AND RECOMMENDATION The Planning Commission and staff are recommending approval of the requested Planned Unit Development (PUD) Master Development Plan with Rezoning from AG – Agricultural to R2 – Moderate Density Residential PUD, Preliminary Plat, and Final Plat for Bray Hill with the conditions listed. The recommendation is based on the information submitted by the applicant, findings made in this report and the conditions detailed in the attached memorandums. 6 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022 - 50 A RESOLUTION APPROVING THE PRELIMINARY PLAT FOR BRAY HILL WHEREAS, the Community Development Department of the City of Rosemount received a request for Preliminary Plat approval from Builders Lot Group, LLC, concerning property legally described as: Lot 1, Block 1, Greystone 5th Addition, Dakota County, Minnesota WHEREAS, on March 29, 2022, the Planning Commission of the City of Rosemount held a public hearing and reviewed the Preliminary Plat for Bray Hill; and WHEREAS, on March 29, 2022, the Planning Commission recommended approval of the Preliminary Plat for Bray Hill, subject to conditions; and WHEREAS, on May 3, 2022, the City Council of the City of Rosemount reviewed the Planning Commission’s recommendations. NOW, THEREFORE, BE IT RESOLVED, the Council of the City of Rosemount hereby approves the Preliminary Plat for Bray Hill, subject to the following conditions: a.Approval of a Planned Unit Development Master Development Plan and rezoning the subject property and designating minimum lot requirements and setbacks. b.Conformance with all the requirements of the City Engineer as detailed in the attached memorandum dated March 23, 2022. c.Conformance with all requirements of the Parks and Recreation Director as detailed in the attached memorandum dated March 23, 2022. d.Compliance with the requirements of the Dakota County Plat Commission contained in the memorandum dated March 18, 2022. e.Incorporation of any easements necessary to accommodate drainage, ponding, trails, underpasses, conservation areas, streets and utilities. ADOPTED this 3rd day of May, 2022, by the City Council of the City of Rosemount. __________________________________________ William H. Droste, Mayor ATTEST: ___________________________________ Jessie Paque , Deputy City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022- 51 A RESOLUTION APPROVING THE PLANNED UNIT DEVELOPMENT (PUD) MASTER DEVELOPMENT PLAN WITH REZONING FOR BRAY HILL WHEREAS, the Community Development Department of the City of Rosemount received a request for a Planned Unit Development Master Development Plan with Rezoning from Builders Lot Group, LLC concerning property legally described as: Lot 1, Block 1, Greystone 5th Addition, Dakota County, Minnesota WHEREAS, on March 29, 2022 the Planning Commission of the City of Rosemount held a public hearing and reviewed the PUD Master Development Plan with Rezoning for Bray Hill; and WHEREAS, on March 29, 2022, the Planning Commission recommended approval of the PUD Master Development Plan with Rezoning or Bray Hill, subject to conditions; and WHEREAS, on May 3, 2022, the City Council of the City of Rosemount reviewed the Planning Commission’s recommendations. NOW, THEREFORE, BE IT RESOLVED, the Council of the City of Rosemount hereby approves the Planned Unit Development (PUD) Master Development Plan of Bray Hill and the Rezoning from AG – Agricultural to R2 PUD- Moderate Density Residential Planned Unit Development, subject to: a.Execution of a Planned Unit Development Agreement b.The front building elevation design shall include one of the following elements: i.Three and a half (3.5) feet of brick or stone wainscoting, excluding doors, windows or the wall behind the front porch; ii.A front porch with railing that extends at least 30% of the width of the front elevation, including the garage; iii.A side entry garage; iv.Or, no more than 70% lap siding, excluding doors and windows. c.A deviation from City Code Section 11-4-5 F.1. to reduce the lot minimum area of 12,000 to 7,000 square feet. d.A deviation from City Code Section 11-4-5 F.2. to reduce the minimum lot width from one hundred (100) feet to fifty-two (52) feet for fourteen (14) lots and from one hundred (100) feet to fifty-seven (57) feet for thirty-five (35) lots. e.A deviation from City Code Section 11-4-5 F.4. to reduce the front yard setback from thirty (30) feet to twenty-five (25) feet. f.A deviation from City Code Section 11-4-5 F.5. to reduce the side yard setback from ten (10) feet to five (5) feet. g.A deviation from City Code Section 11-4-5 F.9. to increase the maximum lot coverage from forty percent (40%) to forty eight percent (48%) for lots between 7,000 square feet and 8,999 square feet in size. h.Incorporation of the recommendations from the City Engineer in a review memorandum dated March 23, 2022, relative to drainage, grading, street design, easements, utilities, and the adjacent sidewalks. i.Three identified existing easements listed in the City Engineer’s memorandum must be vacated prior to the filing of the final plat. j.Conformance with all requirements of the Parks and Recreation Director as detailed in the attached memorandum dated March 23, 2022. k.Submission of a storm water pollution prevention plan prior to final approval of a final plat. l.National Pollutant Discharge Elimination System (NPDES) permit is required prior to the start of construction. m.Subdivision monuments shall be subject to sign permits and ordinance standards. n.The developer shall be responsible for all development fees as estimated by the City Engineer, including sanitary sewer trunk charges, water main trunk charges, and storm sewer trunk charges. o.Trees installed on individual lots shall be planted in the front yard in a location that does not interfere with curb stops or individual sewer or water connections. p.Maintenance of all trees planted within outlots shall be the responsibility of a private homeowner’s association; the applicant shall enter into an agreement with the City concerning said maintenance. q.Payment of a landscape surety in the amount of $110,550 ADOPTED this 3rd day of May, 2022, by the City Council of the City of Rosemount. __________________________________________ William H. Droste, Mayor ATTEST: ___________________________________ Jessie Paque, Deputy City Clerk 1 DECLARATION OF COVENANTS AND RESTRICTIONS BRAY HILL MASTER DEVELOPMENT PLAN PLANNED UNIT DEVELOPMENT AGREEMENT THIS DECLARATION made this ______ day of _________________, 20__, by Builders Lot Group, LLC (hereinafter referred to as the “Declarant”); WHEREAS, Declarant is the owner of the real property as described on Attachment One, attached hereto and hereby made a part hereof (hereinafter collectively referred to as the “Subject Property”); and WHEREAS, the Subject Property is subject to certain zoning and land use restrictions imposed by the City of Rosemount (hereinafter referred to as the “City”) in connection with the approval of an application for a master development plan planned unit development for a residential development on the Subject Property; and WHEREAS, the City has approved such development on the basis of the determination by the City Council of the City that such development is acceptable only by reason of the details of the development proposed and the unique land use characteristics of the proposed use of the Subject Property; and that but for the details of the development proposed and the unique land use characteristics of such proposed use, the master development plan planned unit development would not have been approved; and 2 WHEREAS, as a condition of approval of the master development plan planned unit development, the City has required the execution and filing of this Declaration of Covenants, Conditions and Restrictions (hereinafter the “Declaration”); and WHEREAS, to secure the benefits and advantages of approval of such planned unit development, Declarant desires to subject the Subject Property to the terms hereof. NOW, THEREFORE, the Declarant declares that the Subject Property is, and shall be, held, transferred, sold, conveyed and occupied subject to the covenants, conditions, and restrictions, hereinafter set forth. 1. The use and development of the Subject Property shall conform to the following documents, plans and drawings: a. City Resolution No. 2022-XX, Attachment 2 b. Final Development Plans (Sheets 1-18), Attachment 3 c. Existing Conditions (Sheets 1-2), Attachment 4 d. Preliminary Plat (Sheets 1-2), Attachment 5 e. Tree Location Survey, Attachment 6 f. Landscape Plan, Attachment 7 g. Final Plat (Sheets 1-3), Attachment 8 h. Trail Easement Exhibit, Attachment 9 i. Storm Sewer Design, Attachment 10 j. Storm Water Management Plan (Sheets 1-9), Attachment 11 k. Front Elevation Examples, Attachment 12 l. Geotechnical Exploration Report (Sheets 1-14), Attachment 13 3 All of which attachments are copies of original documents on file with the City and are made a part hereof. 2. Development and maintenance of structures and uses on the Subject Property shall conform to the following standards and requirements: a. Maintenance of the stormwater basin, infiltration basin and associated stormwater infrastructure necessary for the long term operation and function will be performed by the City. All other maintenance including but not limited to garbage collection, or landscape replacement or the like shall be the responsibility of the of the private property owners. All maintenance of the stormwater basin and infiltration basin shall be the responsibility of the City after the basins have been established. b. Maintenance and replacement of trees and landscaping other than that associated with the stormwater basin and infiltration basin described in standard a. shall be the responsibility of the adjoining homeowners’ association. c. The home design front elevation shall include a minimum of three and a half (3.5) feet of brick or stone wainscoting, excluding doors, windows or the wall behind the front porch; a front porch with railing that extends at least 30% of the width of the front elevation, including the garage; a side entry garage; or no more than 70% lap siding, excluding doors and windows. 3. The Subject Property may only be developed and used in accordance with Paragraphs 1 and 2 of this Declaration unless the owner first secures approval by the City Council of an amendment to the planned unit development plan or a rezoning to a zoning classification that permits such other development and use. 4 4. In connection with the approval of development of the Subject Property, the following deviations from City Zoning or Subdivision Code provisions were approved: a. Section 11-4-5 F. 1. R-1 Minimum Lot Area: The minimum lot area shall be 7,000 square feet. b. Section 11-4-5 F. 2. R-1 Minimum Lot Width: The minimum lot width shall be fifty-five (55) feet for fourteen (14) lots and fifty-seven (57) feet for thirty-five (35) lots. c. Section 11-4-5 F. 5. R-1 Minimum Side Yard Setback: The minimum side yard setback shall be 5 feet. d. Section 11-4-5 F.5. R-1 Minimum Lot Coverage: The maximum lot coverage shall be thirty-five percent (35%) for lots that are 11,000 square feet and up, forty percent (40%) for lots between 9,000 square feet and 10,999 square feet, and forty-eight percent (48%) for lots between 7,000 square feet and 8,999 square feet. In all other respects the use and development of the Subject Property shall conform to the requirements of the Paragraphs 1 and 2 of this Declaration and the City Code of Ordinances. 5. This Declaration of Covenants and Restrictions provides only the Subject Property only master development plan planned unit development approval. Prior to the improvement or development of the Subject Property, beyond the rough grading, a final development plan planned unit development approval pursuant to Zoning Code Section 11-10-6 C. 5. of the Subject Property is required and an addendum filed with County Recorder to this Declaration of Covenants and Restrictions. 6. The obligations and restrictions of this Declaration run with the land of the Subject Property and shall be enforceable against the Declarant, its successors and assigns, by the City of Rosemount acting through its City Council. This Declaration may be amended from time to time by 5 a written amendment executed by the City and the owner or owners of the lot or lots to be affected by said amendment. IN WITNESS WHEREOF, the undersigned as duly authorized agents, officers or representatives of Declarant have hereunto set their hands and seals as of the day and year first above written. DECLARANT Builders Lot Group, LLC. By Its STATE OF MINNESOTA ) ) ss. COUNTY OF __________ ) The foregoing instrument was acknowledged before me this ___ day of _________, 20___, by _____________________, the _________________, for and on behalf of _________________________, a ____________________, by and on behalf of said _______________________. _______________________________ Notary Public THIS INSTRUMENT WAS DRAFTED BY: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068 651-423-4411 Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx SUBDIVISION AGREEMENT Bray Hill AGREEMENT dated this ________ day of ________________________, 2022 by and between the CITY OF ROSEMOUNT, a Minnesota municipal corporation, (the "City"), and Builders Lot Group, LLC, a Minnesota limited liability company, (the "Developer"). 1. Request for Plat Approval. The Developer has asked the City to approve the subdivision of land and a plat of land to be known as Bray Hill, which land is legally described on ATTACHMENT ONE, attached hereto and hereby made a part hereof (hereinafter referred to as the “subject property”). 2. Conditions of Plat Approval. The City has approved the subdivision and the plat on the following conditions: a. Approval of a Planned Unit Development Master Development Plan with Rezoning. b. Execution of a Subdivision or Development Agreement to secure the public and private improvements. c. Incorporation of recommendations of the City Engineer concerning design and installation of public infrastructure and including grading, erosion control, streets and utilities. d. Incorporation of any easements necessary to accommodate drainage, ponding, trails, underpasses, conservation areas, streets and utilities. e. Compliance with the Dakota County Plat Commission requirements. f. Payment of all applicable fees including GIS, Park Dedication and other fees identified in the current fee schedule. g. Payment of $166,600 for Fee-In-Lieu of Park Dedication h. Provision of $44,220 for landscaping surety. 3. Phased Development. The City may refuse to approve final plats of subsequent additions of the plat if the Developer has breached this Agreement and the breach has not been remedied. Development of subsequent phases may not proceed until Subdivision Agreements for such phases are approved by the City. 4. Effect of Subdivision Approval. For two (2) years from the date of this Agreement, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Agreement to the contrary, to the full extent permitted by state law, the City may require compliance with any amendments to the City's Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx Comprehensive Guide Plan, official controls, platting or dedication requirements enacted after the date of this Agreement. 5. Development Plans. The subject property shall be developed in accordance with the following plans, specifications and contract documents, original copies of which are on file with the City Engineer. The plans and contract documents may be prepared, subject to City approval, after entering this Agreement, but before commencement of any work on the Subject Property. If the plans vary from the written terms of this Agreement, the written terms shall control. The plans are: Plan A - Plat Plan B - Soil Erosion Control Plan and Schedule Plan C - Drainage and Storm Water Runoff Plan Plan D - Plans and Specifications for Public Improvements Plan E - Grading Plan and House Pad Elevations Plan F - Street Lights Plan G - Landscape Improvements All Improvements, including Developer Improvements and City-Installed Public Infrastructure Improvements (if any) that lie within the public right-of-way or easements and are improvements listed in Minnesota Statutes, Section 429.021 (hereinafter Public Improvements) will be designed by the Developer and must be approved by the City Engineer. The Developer will prepare plans and specifications for Public Improvements which shall be approved by the City Engineer. Such approvals shall not be unreasonably withheld and the City shall approve or provide Developer with necessary revision comments within 30 calendar days of Developer submittal of Public Improvement plans and specifications. The City will perform all construction inspection for the Public Improvements, at the Developer’s expense. Construction inspection includes but is not limited to inspection, documentation, and monitoring. 6. Installation by Developer. The Developer shall install or cause to be installed and pay for the following, hereinafter referred to as the “Developer Improvements”: A. Surveying and staking B. Surface improvements (paved streets, sidewalks, trails, etc.) C. Water main improvements D. Sanitary sewer improvements E. Storm sewer improvements F. Setting of lot and block monuments G. Gas, electric, telephone, and cable lines H. Site grading I. Landscaping J. Streetlights K. Other items as necessary to complete the development as stipulated herein or in other agreements Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx 7. Time of Performance. The Developer shall install all required improvements, excepting the wear course of pavement, enumerated in Paragraph 6 that will serve the subject property by December 31, 2022, subject to delays due to inclement weather, casualty, labor strikes, material shortages, or other force majeure not within the Developer’s reasonable control. The pavement wear course shall be completed by December 31, 2023. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 8. City-Installed Public Infrastructure. The following improvements, hereinafter referred to as “City- Installed Public Infrastructure Improvements” (known as City Project 2022-08), shall be designed, inspected, surveyed and administered by the City, and installed in the Subject Property at Developer expense by a Contractor selected by the City through the public bidding process: A. None 9. [This Section Intentionally Left Blank] 10. Security for Developer Improvements. To guarantee compliance with the terms of this Agreement, payment of the costs of all Developer Improvements, and construction of all Developer Improvements (as noted in Paragraph 6), the Developer shall furnish the City with a cash deposit or irrevocable letter of credit from a local bank (“security”) in the amount of Two Million, Twenty-Seven Thousand, One Hundred Ten Dollars ($2,027,110). The amount of the security was calculated as follows: Refer to Exhibit A and Exhibit B for an explanation of each item. The bank and form of the letter of credit or other security shall be subject to the approval of the City Administrator. The letter of credit shall be automatically renewable until the City releases the developer from responsibility. The letter of credit shall secure compliance with all terms of this Agreement and all obligations of the Developer under it. The City may draw down on the letter of credit without notice if the obligations of the Developer have not been completed as required by this Agreement. In the event of a default under this Subdivision Agreement by the Developer, the City shall furnish the Developer with written notice by certified mail of Developers default(s) under the terms of this Subdivision Agreement. If the Developer does not remove said default(s) within two (2) weeks of receiving notice, the City may draw on the letter of credit and take such steps as it deems necessary to remedy the default. With City approval, the letter of credit may be reduced from time to time as financial obligations are paid and Developer Improvements and other Developer obligations are completed to the City’s requirements. 11. Grading Plan/Site Grading. Site grading shall be completed by the Developer at its cost and approved by the City Engineer. The completion of grading activities will need to be coordinated by the City in No.Item Cost 110%Calculation 1 Grading and Erosion Control 61,247$ 67,371$ $3500/ac x 17.499 acres. Minimum $25,000 2 Pond Restoration and Erosion Control Removal 25,000$ 27,500$ Minimum $25,000 3 Survey Monumentation 24,500$ 26,950$ $500/lot x 49 lots 4 Landscaping 40,200$ 44,220$ Per City Planner (134 trees x $300) 5 Street Lights 32,000$ 35,200$ $4000/light x 8 lights 6 Surface Improvements 508,965$ 636,206$ 125% 7 Water Main Improvements 284,680$ 355,850$ 125% 8 Sanitary Sewer Improvements 340,138$ 425,172$ 125% 9 Storm Sewer Improvements 326,913$ 408,641$ 125% Total 1,643,642$ 2,027,110$ Letter of Credit for Developer Improvements (due with signed agreement) Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx conjunction with the installation of utilities. Developer shall furnish the City Engineer satisfactory proof of payment for the site grading work and shall submit a certificate of survey of the development to the City as the site grading is completed by phase, with street and lot grades. If the installation of utilities by the City is occurring simultaneously with the grading, the utility contractor shall have preference over the grading activities. No substantial grading activities can be completed over installed utilities unless otherwise protected. All improvements to the lots and the final grading shall comply with the grading plan as submitted and shall be the responsibility of the Developer. 12. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the Subject Property to perform all work and inspections deemed appropriate by the City. Such license shall terminate as to all single-family residential lots within the subject property upon acceptance by the City of the public infrastructure improvements. 13. Erosion Control. Prior to site grading, and before any utility construction is commenced or building permits are issued, the erosion control plan, Plan B, shall be implemented, inspected and approved by the City. All areas disturbed by the excavation and backfilling operations shall be reseeded within 72 hours after the completion of the work in that area. Except as otherwise provided in the erosion control plan, seed shall be rye grass or other fast-growing seed suitable to the existing soil to provide a temporary ground cover as rapidly as possible. All seeded areas shall be mulched and disc-anchored as necessary for seed retention. All basement and/or foundation excavation spoil piles shall be kept completely off City right-of-way and shall be completely surrounded with an approved erosion control silt fence. Approved erosion control fencing shall be installed around the perimeter of each lot or at City-approved locations at the time of building permit issuance and remain in place until the lot is seeded or sodded. A 20-foot opening will be allowed on each lot for construction deliveries. The parties recognize that time is critical in controlling erosion. If development does not comply with the erosion control plan and schedule, or supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion. This right also applies to the required erosion control for basement and/or foundation excavation spoil piles. The City will attempt to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer’s or City’s rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay any costs. No development will be allowed, and no building permits will be issued unless the Subject Property is in full compliance with the erosion control requirements. 14. Planting and Seeding. Landscaping shall be in accordance with Landscape Plans approved by the City Planner. 15. Clean up. The Developer shall clean streets of dirt and debris that has resulted from construction work by the Developer, its agents or assignees. The City will inspect the site on a weekly basis and determine whether it is necessary to take additional measures to clean dirt and debris from the streets. Costs for City inspection of onsite erosion and sediment control shall be at the Developer’s expense. After a 24- hour verbal or written notice to the Developer, the City will complete or contract to complete the clean- up at the Developer’s expense in accordance with the procedures specified in Paragraph 13. The Developer shall inspect and, if necessary, clean all catch basins, sumps, and ponding areas of erosion/siltation and restore to the original condition at the end of home construction within this development. All silt fence and other erosion control should be removed following the establishment of turf. These items are to be secured through the letter of credit as is noted in Exhibit A. Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx 16. Ownership of Improvements. Upon completion and City acceptance of the work and construction required by this Agreement, the Public Improvements lying within public rights-of-way and easements shall become City property without further notice or action unless the improvements are specifically identified herein as private infrastructure. 17. Warranty. The Developer warrants all work required to be performed by it against poor material and faulty workmanship for a period of two (2) years after its completion and acceptance by the City or such longer period as is specified in plans and specifications for Public Improvements. All trees, grass and sod shall be warranted to be alive, of good quality and disease free for twenty-four (24) months after planting. Vegetation surrounding ponds and/or wetlands shall be warranted to be alive, of good quality and weed free for three (3) years after planting. For each pond/wetland in the development, the developer shall provide to the City Engineer an inspection report by July 31 each year which includes the following: A. Date of inspection B. Name of person responsible for inspection C. Photos of the pond/wetland area confirming the vegetation is established as intended D. Maintenance plan describing the required maintenance activities and tentative schedule. 18. Responsibility for Costs. A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the Subject Property including, but not limited to, Soil and Water Conservation District charges, legal, planning, engineering and inspection expenses incurred in connection with approval and acceptance of the subdivision and the plat, the preparation of this Agreement and any amendments hereto, and all costs and expenses incurred by the City in monitoring and inspecting the development of the Subject Property. B. The Developer shall reimburse the City for costs incurred in the preparation and enforcement of this Agreement, including engineering and attorney’s fees. Upon request, the City shall provide invoices, in reasonable detail, as to any such fees. The estimated City fees of Two Hundred Forty Six Thousand, Two Hundred Eighty Three Dollars ($246,283) shall be deposited with the City at the time this Agreement is signed, and represent the following amounts: If the actual City fees exceed this estimate, the Developer shall pay the additional costs to the City within thirty (30) business days of the request. If actual City fees are lower than this estimate, any surplus funds will be returned to the developer when the project fund is reconciled and closed. C. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Agreement within thirty (30) business days after receipt. If the bills are not paid on time, the No.Item Cost Estimated Construction Cost 1,460,695$ 1 Engineering Fees 146,070$ 2 Attorney Fees 3,000$ 3 5% City Administrative Fees 73,035$ 4 Street Light Energy Cost 5,760$ 5 GIS Fees 2,940$ 6 Trail Fog Seal 889$ 7 Seal Coating 14,589$ Total 246,283$ $1.70/SY x 8582 SY Estimate 5% of Estimated Construction Cost 8 lights x 24 months x $30/month $60/unit X 49 units $0.35/SF x 2541 SF City Fees (due with signed agreement) Calculation Developer's Estimate (Lines 6 - 9 above) 10% of Estimated Construction Cost Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx City may halt development work and construction including, but not limited to, the issuance of building permits for lots that the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of six percent (6%) per year. D. The Developer shall pay all energy costs for street lights installed within the Subject Property for 24-months at a cost of $30/month/light. After that, the City will assume the energy costs. E. The Developer will pay the cost of sealcoating the public streets within the development at a cost of $1.70/SY. The sealcoating will be completed within three (3) years following wear course placement. F. The Developer will pay the cost of fog sealing the public trails within the development at a cost of $0.35/SF. The fog sealing will be completed within three (3) years following trail installation. 19. Indemnification. The Developer shall hold the City and its officers, agents and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat or subdivision approval and development of the Subject Property, except for any costs or expenses arising from the intentional acts or gross negligence of the City, it’s agents, employees or contractors. The Developer shall indemnify the City and its officers, agents and employees for all costs, damages or expenses that the City may pay or incur in consequence of such claims, including attorney’s fees. Notwithstanding any other provision in this Agreement to the contrary, Developer agrees that it will not be able to submit a claim for extra work or for monetary damages (for delay or otherwise), or request an extension of time to complete the work, for any reason arising out of or relating to: (1) the COVID- 19 pandemic; or (2) any national, state, or local declaration, resolution, or order relating to the COVID- 19 pandemic, unless such declaration, resolution or order prohibits work on the project. The contract completion date shall be extended for the period of the required stoppage in work but without any claim for delay damages. 20. Insurance. The Developer agrees to take out and maintain or cause to be taken out and maintained until six months after the City has accepted the Subdivision Improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer’s work or the work of its contractors or subcontractors. Liability limits shall not be less than $500,000 when the claim is one for death by wrongful act or omission or for any other claim and $2,000,000 for any number of claims arising out of a single occurrence, and twice said limits when the claim arises out of the release or threatened release of a hazardous substance. The City shall be named as an additional insured on the policy. The certificate of insurance shall provide that the City must be given the same advance written notice of the cancellation of the insurance as is afforded to the Developer. 21. Park and Utility Fees. The Developer agrees to pay fees, charges and assessments set forth in this Section prior to, or at the time of execution of this agreement by the City: A. Park dedication fees in the amount of $166,600 B. Storm Sewer Trunk Area Charges in the amount of $108,529 C. Sanitary Sewer Trunk Area Charges in the amount of $18,811 D. Watermain Trunk Area Charges in the amount of $67,478 Or other amounts for such fees as in effect at the time of plat approval. Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx 22. Service Charges. The Developer understands that builders will be required to pay for the Subject Property fees, charges and assessments in effect at the time of issuance of building permits. The rates for each of these items will be set according to the current rate structure at the time the building permit is received. The fees, charges, and assessments in effect as of the date of this agreement are: A. Metropolitan Council Environmental Services Availability Charges per SAC unit (current rate is $2,485). B. Storm Sewer Connection Charges per single family unit and per multiple family unit (single family currently at $770; multi-family currently at $290 per housing unit). C. Sanitary Sewer Availability Charges per SAC unit (currently at $1,200/SAC unit). D. Water Availability Charges per SAC unit (currently at $2,425/SAC unit for single family residential and multi-family residential). 23. Building Permits. No occupancy permits shall be issued until: A. The site grading is completed and approved by the City. B. All public utilities are tested, approved by the City Engineer, and in service. C. All curbing is installed and backfilled. D. The first lift of bituminous is in place and approved by the City. E. All building permit fees are paid in full. F. No early building permits will be issued without prior authorization from the City Building Official. The Developer, in executing this Agreement, assumes all liability and costs for damage or delays incurred by the City in the construction of Public Improvements caused by the Developer, its employees, contractors, subcontractors, material men or agents. No occupancy permits shall be issued until the public streets and utilities referred to in paragraph 6 and 8 are in and approved by the City (excluding the final wear course of bituminous), unless otherwise authorized in writing by the City Engineer. 24. Record Drawings. At project completion, Developer shall submit record drawings of all public and private infrastructure improvements in accordance with the City’s Engineering Guidelines. No securities will be fully released until all record drawings have been submitted and accepted by the City Engineer. 25. Developer’s Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than 48 hours in advance. This Agreement is a license for the City to act, and it shall not be necessary for the City to seek a court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, draw on the letter of credit or other security described in section 10, or levy the cost in whole or in part as a special assessment against the Subject Property. Developer waives its rights to notice of hearing and hearing on such assessments and its right to appeal such assessments pursuant to Minnesota Statutes, Section 429.081. 26. Miscellaneous. Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx A. The Developer represents to the City that the development of the Subject Property, the subdivision and the plat comply with all city, county, metropolitan, state and federal laws and regulations including, but not limited to: subdivision ordinances, zoning ordinances and environmental regulations. If the City determines that the subdivision, or the plat, or the development of the Subject Property does not comply, the City may, at its option, refuse to allow construction or development work on the Subject Property until the Developer does comply. Upon the City’s demand, the Developer shall cease work until there is compliance. B. Third parties shall have no recourse against the City under this Agreement. C. Breach of the terms of this Agreement by the Developer shall be grounds for denial of building permits, including lots sold to third parties. D. If any portion, section, subsection, sentence, clause, paragraph or phase of this Agreement is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Agreement. E. If building permits are issued prior to the completion and acceptance of Public Improvements, the Developer assumes all liability and costs resulting in delays in completion of Public Improvements and damage to Public Improvements caused by the City, the Developer, its contractors, subcontractors, material men, employees, agents or third parties. F. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City’s failure to promptly take legal action to enforce this Agreement shall not be a waiver or release. G. This Agreement shall run with the land and may be recorded against the title to the subject property. The Developer shall take such steps, including execution of amendments to this Agreement, as are necessary to effect the recording hereof. After the Developer has completed the work required of it under this Agreement, at the Developer’s request, the City will execute and deliver to the Developer a release. H. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to the City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. I. The Developer may not assign this Agreement without the written permission of the City Council. J. The Developer acknowledges that the City may issue additional requirements outside of the 2015 General Specifications and Standard Detail Plates for Street and Utility Construction or the 2008 Engineering Guidelines as the City is in the process of updating these documents. The review process may require additional time and expense due to this process, which shall be the Developer’s responsibility. The Developer shall not be billed for the time required for the City to update and approve their revisions to the 2015 General Specifications and Standard Details Plates for Street and Utility Construction or the 2008 Engineering Guidelines. Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx 27. Notices. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: Melvin Moore Builders Lot Group, LLC 9531 West 78th St, Suite 135 Eden Prairie, Minnesota 55344 Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by registered mail in care of the City Administrator at the following address: City Administrator Rosemount City Hall 2875 145th Street West Rosemount, Minnesota 55068 [Remainder of page intentionally left blank.] Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx IN WITNESS WHEREOF, the parties have hereunto set their hands the day and year first above written. CITY OF ROSEMOUNT BY: William H. Droste, Mayor BY: Jessie Paque, Deputy City Clerk STATE OF MINNESOTA ) ) SS COUNTY OF DAKOTA ) The foregoing instrument was acknowledged before me this _____ day of _____________________, 2022, by William H. Droste, Mayor, and Erin Fasbender, City Clerk, of the City of Rosemount, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. Notary Public Builders Lot Group, LLC BY: Melvin Moore, its Chief Manager STATE OF MINNESOTA ) ) SS COUNTY OF _____________) The foregoing instrument was acknowledged before me this ____ day of ______________________, 2022 by Melvin Moore, its Chief Manager, of Builders Lot Group, LLC, a Minnesota limited liability company, on behalf of said company. Notary Public Drafted By: City of Rosemount 2875 145th Street West Rosemount, MN 55068 Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx EXHIBIT A The following clarifies the various portions of the letter of credit for Developer Improvements that are outlined in the Subdivision Agreement: Grading & Erosion Control – A restoration and erosion control bond to ensure re-vegetation and erosion control ($3,500/acre). Note: The minimum surety amount is set at $25,000. Pond Restoration/Erosion Control Removal – A security to allow for cleaning of sedimentation ponds prior to City acceptance, and removal of any installed erosion control measures such as silt fence and wood fiber blanket following development of 75 percent of adjoining lots (estimated lump sum). Survey Monumentation – An amount equal to 110% of the cost to monument all lots within the development. Landscaping – An amount equal to 110% of the cost to complete the minimum required landscaping. If additional landscaping is planned, a surety for that cost is not required. Street Lighting – An amount equal to 110% of the cost to complete the minimum required lighting. If additional lighting is planned, a surety for that cost is not required ($4,000 per light has been used to calculate this cost). Bray Hill EXHIBIT B (Page 1 of 2) No. Item Cost 110% Calculation 1 Grading and Erosion Control 61,247$ 67,371$ $3500/ac x 17.499 acres. Minimum $25,000 2 Pond Restoration and Erosion Control Removal 25,000$ 27,500$ Minimum $25,000 3 Survey Monumentation 24,500$ 26,950$ $500/lot x 49 lots 4 Landscaping 40,200$ 44,220$ Per City Planner (134 trees x $300) 5 Street Lights 32,000$ 35,200$ $4000/light x 8 lights 6 Surface Improvements 508,965$ 636,206$ 125% 7 Water Main Improvements 284,680$ 355,850$ 125% 8 Sanitary Sewer Improvements 340,138$ 425,172$ 125% 9 Storm Sewer Improvements 326,913$ 408,641$ 125% Total 1,643,642$ 2,027,110$ No. Item Cost Estimated Construction Cost 1,460,695$ 1 Engineering Fees 146,070$ 2 Attorney Fees 3,000$ 3 5% City Administrative Fees 73,035$ 4 Street Light Energy Cost 5,760$ 5 GIS Fees 2,940$ 6 Trail Fog Seal 889$ 7 Seal Coating 14,589$ Total 246,283$ No. Item Cost 1 Storm Sewer Trunk Charge 108,529$ 2 Sanitary Sewer Trunk Charge 18,811$ 3 Water Trunk Charge 67,478$ 5 Park Dedication 166,600$ Total 361,418$ Estimate 5% of Estimated Construction Cost 8 lights x 24 months x $30/month $60/unit X 49 units $0.35/SF x 2541 SF 10% of Estimated Construction Cost Letter of Credit for Developer Improvements (due with signed agreement) City Fees (due with signed agreement) Calculation Developer's Estimate (Lines 6 - 9 above) $6500/acre x 17.499 acres = $113,774 minus credit for Outlot D ($46,296) = $67,478 $1.70/SY x 8582 SY Development Fees (due before signed plat is released) Calculation $6865/net developable acre x 15.809 acres $1075/acre x 17.499 acres Block Lots Units Block Lot Units SQ FT Acres 1 11 11 1 1 1 8,408 0.193 2 18 18 1 2 1 8,669 0.199 3 7 7 1 3 1 8,931 0.205 4 13 13 1 4 1 8,127 0.187 1 5 1 8,390 0.193 1 6 1 11,380 0.261 Total 49 49 1 7 1 12,729 0.292 1 8 1 8,556 0.196 Total Plat Area = 17.499 acres 1 9 1 8,560 0.197 Total Park Area = 0.000 acres 1 10 1 8,343 0.192 Future Plat Area = 0.000 acres 1 11 1 13,396 0.308 Developable Area * = 17.499 acres 2 1 1 9,746 0.224 Ponding to HWL = 1.690 acres 2 2 1 7,875 0.181 Net Developable Area =15.809 acres 2 3 1 7,649 0.176 2 4 1 7,862 0.180 * Excludes future plat and park areas (all outlots) 2 5 1 8,026 0.184 2 6 1 9,605 0.221 2 7 1 8,032 0.184 2 8 1 8,105 0.186 2 9 1 7,698 0.177 2 10 1 7,577 0.174 2 11 1 9,496 0.218 2 12 1 7,576 0.174 2 13 1 9,192 0.211 2 14 1 7,883 0.181 2 15 1 7,444 0.171 2 16 1 7,930 0.182 2 17 1 8,431 0.194 2 18 1 9,784 0.225 3 1 1 9,796 0.225 3 2 1 8,377 0.192 3 3 1 8,555 0.196 3 4 1 8,338 0.191 3 5 1 7,894 0.181 3 6 1 7,779 0.179 3 7 1 9,978 0.229 4 1 1 10,908 0.250 4 2 1 7,724 0.177 4 3 1 7,802 0.179 4 4 1 7,598 0.174 4 5 1 10,680 0.245 4 6 1 11,782 0.270 4 7 1 12,028 0.276 4 8 1 8,858 0.203 4 9 1 7,554 0.173 4 10 1 9,378 0.215 4 11 1 9,331 0.214 4 12 1 7,949 0.182 4 13 1 12,539 0.288 Outlot A 9,056 0.208 Outlot B 47,940 1.101 Outlot C 82,998 1.905 Outlot D 20,337 0.467 ROW 161,678 3.712 Total Boundary 762,257 17.499 Bray Hill EXHIBIT B (Page 2 of 2) Totals Bray Hill 04/2022 G:\ENGPROJ\2022-08 Bray Hill\Subdivision Agreement\Subdivision Agreement.docx ATTACHMENT ONE Bray Hill Final Plat 1OUTLOT D1234OUTLOTCOUTLOT B OUTLOT A234 567111098765432161234578910111213141516171812345678910111213136THSTREET W.ARROWHEADWAYBONAIREPATH E.BONAIREPATH E.OUTLOT B136THCIRCLE W.NORTH9ICINITY 0APSEC. 22 TWP. 115 RN*. 19CITY O) ROSE0OUNT DA.OTA COUNTY0INNESOTA1 INCH 80 )EET)RU WKH SXUSRVHV RI WKLV VXUYH\ WKHQRUWK OLQH RI WKH OLQH RI LRW 1 BORFN 1*REYSTONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD. LV DVVXPHG WR EHDU N89ƒ32 20E .BRAY HILL080160.NOW ALL PERSONS BY THESE PRESENTS TKDW BXLOGHUV LRW*URXS LLC D 0LQQHVRWD OLPLWHG OLDELOLW\ FRPSDQ\ RZQHU RIWKH IROORZLQJ GHVFULEHG SURSHUW\LRW 1 BORFN 1 *REYSTONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD.HDV FDXVHG WKH VDPH WR EH VXUYH\HG DQG SODWWHG DV BRAYHILL DQG GRHV KHUHE\ GHGLFDWH WR WKH SXEOLF WKH ZD\V DQGHDVHPHQWV IRU GUDLQDJH DQG XWLOLW\ SXUSRVHV DV FUHDWHG E\WKLV SODW.IQ ZLWQHVV ZKHUHRI VDLG BXLOGHUV LRW *URXS LLC D0LQQHVRWD OLPLWHG OLDELOLW\ FRPSDQ\ KDV FDXVHG WKHVHSUHVHQWV WR EH VLJQHG WKLV BBBBBBBBBBB GD\ RIBBBBBBBBBBBBBBBBBBBBB  20BBBBBB.SI*NEDB\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 0HOYLQ 0RRUH FKLHI PDQDJHUSTATE O) BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBCOUNTY O) BBBBBBBBBBBBBBBBBBBBBBBBBBBBBTKLV LQVWUXPHQW ZDV DFNQRZOHGJHG EHIRUH PH WKLVBBBBBBBBB GD\ RI BBBBBBBBBBBBBBBBBBBBBB  20BBBBBB  E\0HOYLQ 0RRUH FKLHI PDQDJHU BXLOGHUV LRW *URXS LLC D0LQQHVRWD OLPLWHG OLDELOLW\ FRPSDQ\ RQ EHKDOI RI WKH OLPLWHGOLDELOLW\ FRPSDQ\.BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBNRWDU\ PXEOLFBBBBBBBBBBBBBBBBBBBBBBCRXQW\.0\ CRPPLVVLRQ E[SLUHVBBBBBBBBBBBBBBBBBBBBBBBBCOUNTY BOARD COUNTY O) DA.OTA STATE O) 0INNESOTAWH GR KHUHE\ FHUWLI\ WKDW RQ WKH 20VW GD\ RI -XO\ 2021 WKH BRDUG RICRPPLVVLRQHUV RI DDNRWD CRXQW\ 0LQQHVRWD DSSURYHG WKLV SODW RIBRAY HILL DQG VDLG SODW LV LQ FRPSOLDQFH ZLWK WKH SURYLVLRQV RI0LQQHVRWD SWDWXWHV SHFWLRQ 505.03 SXEG. 2 DQG SXUVXDQW WR WKHDDNRWD CRXQW\ CRQWLJXRXV PODW OUGLQDQFH.B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBCKDLU DDNRWD CRXQW\ BRDUG.AWWHVWBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDDNRWD CRXQW\ TUHDVXUHU  AXGLWRU.DEPART0ENT O) PROPERTY TA;ATION AND RECORDS COUNTY O)DA.OTA STATE O) 0INNESOTAPXUVXDQW WR 0LQQHVRWD SWDWXWHV SHFWLRQ 505.021 SXEG. 9 WD[HVSD\DEOH LQ WKH \HDU 20BBBB RQ WKH ODQG KHUHLQEHIRUH GHVFULEHG KDYHEHHQ SDLG. AOVR SXUVXDQW WR 0LQQHVRWD SWDWXWHV SHFWLRQ 272.12WKHUH DUH QR GHOLQTXHQW WD[HV DQG WUDQVIHU HQWHUHG WKLV BBBBBBBBBBGD\ RI BBBBBBBBBBBBBBBBBBBB  20BBBBBB\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBAP\ A. .RHWKH DLUHFWRUDHSDUWPHQW RI PURSHUW\ TD[DWLRQ DQG RHFRUGVCOUNTY RECORDER COUNTY O) DA.OTASTATE O) 0INNESOTAI KHUHE\ FHUWLI\ WKDW WKLV SODW BRAY HILL ZDV ILOHG LQ WKH RIILFH RI WKHCRXQW\ RHFRUGHU IRU SXEOLF UHFRUG RQ WKLV BBBBBBBBBBB GD\ RIBBBBBBBBBBBBBBBBB  20BBBBB  DW BBBBBBBBBB R FORFN BBBBB .0. DQG ZDVGXO\ ILOHG LQ BRRN BBBBBBBBBB RI PODWV PDJH BBBBBBBBBBBB DV DRFXPHQWNR. BBBBBBBBBBBBBBBBBBBBB .B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB AP\ A. .RHWKH CRXQW\ RHFRUGHU1010ARE SHOWN AS THUSDRAINA*E AND UTILITY EASE0ENTS NOT TO SCALE 5.00BEIN* 10 )EET IN WIDTH AND AD-OININ*STREET LINES AND BEIN* 5.00 )EET INWIDTH AND AD-OININ* LOT LINES ANDOUTLOT LINES UNLESS OTHERWISE SHOWNON THE PLAT.LE*ENDDENOTES )OUND 12 INCH IRON PIPE WITHNO CAP UNLESS OTHERWISE NOTED. SEEINSET SHEETS.DENOTES 12 INCH ; 14 INCH IRON PIPE SETAND 0AR.ED WITH 0INNESOTA LICENSENO. 25718 0ONU0ENTS TO BE SET WITHINONE YEAR A)TER RECORDIN* O) THE PLAT DENOTES RESTRICTED ACCESS TO DA.OTACOUNTY PER THE DA.OTA COUNTYCONTI*UOUS PLAT ORDINANCENO 0ONU0ENT SY0BOL SHOWN AT ANYSTATUTE RE4UIRED LOCATION INDICATESA PLAT 0ONU0ENT THAT WILL BE SETWITHIN ONE YEAR )RO0 THE RECORDIN*DATE O) THIS PLAT. SAID 0ONU0ENTSSHALL BE 12 INCH [ 14 INCH IRON PIPES0AR.ED BY R.L.S. NO. 25718.INSET ASEE SHEET 2O) 3 SHEETSLAND SUR9EYIN* INC.CORNERSTONESHEET 1 O) 3 SHEETSI DDQLHO L. TKXUPHV GR KHUHE\ FHUWLI\ WKDW WKLV SODW ZDVSUHSDUHG E\ PH RU XQGHU P\ GLUHFW VXSHUYLVLRQ WKDW I DPD GXO\ LLFHQVHG LDQG SXUYH\RU LQ WKH SWDWH RI 0LQQHVRWDWKDW WKLV SODW LV D FRUUHFW UHSUHVHQWDWLRQ RI WKH ERXQGDU\VXUYH\ WKDW DOO PDWKHPDWLFDO GDWD DQG ODEHOV DUH FRUUHFWO\GHVLJQDWHG RQ WKLV SODW WKDW DOO PRQXPHQWV GHSLFWHG RQWKLV SODW KDYH EHHQ RU ZLOO EH FRUUHFWO\ VHW ZLWKLQ RQH\HDU WKDW DOO ZDWHU ERXQGDULHV DQG ZHW ODQGV DV GHILQHGLQ 0LQQHVRWD SWDWXWHV SHFWLRQ 505.01 SXEG. 3 DV RI WKHGDWH RI WKLV FHUWLILFDWH DUH VKRZQ DQG ODEHOHG RQ WKLV SODWDQG DOO SXEOLF ZD\V DUH VKRZQ DQG ODEHOHG RQ WKLV SODW.DDWHG WKLV BBBBBBBBBBB GD\ RI BBBBBBBBBBBBBBB  20BBBBB .BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDDQLHO L. TKXUPHV LLFHQVHG LDQG SXUYH\RU0LQQHVRWD LLFHQVH NR. 25718STATE O) 0INNESOTACOUNTY O) WASHIN*TONTKLV LQVWUXPHQW ZDV DFNQRZOHGJHG EHIRUH PH WKLVBBBBBBBBBBB GD\ RI BBBBBBBBBBBBBBB  20BBBBBB E\ DDQLHO L.TKXUPHV D LLFHQVHG LDQG SXUYH\RU.BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBNRWDU\ PXEOLFBBBBBBBBBBBBBBBBBBBBBBBCRXQW\.0\ CRPPLVVLRQ E[SLUHVBBBBBBBBBBBBBBBBBBBBBBBBPLANNIN* CO00ISSION ROSE0OUNT 0INNESOTAASSURYHG E\ WKH PODQQLQJ CRPPLVVLRQ RI WKH CLW\ RIRRVHPRXQW 0LQQHVRWD WKLV BBBBBBBBBB GD\ RIBBBBBBBBBBBBB 20BBBB .B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB CKDLUB\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB SHFUHWDU\CITY COUNCIL ROSE0OUNT 0INNESOTATKLV SODW RI BRAY HILL ZDV DSSURYHG DQG DFFHSWHGE\ WKH CLW\ CRXQFLO RI WKH CLW\ RI RRVHPRXQW0LQQHVRWD DW D UHJXODU PHHWLQJ WKHUHRI KHOG WKLVBBBBBBBBBB GD\ RI BBBBBBBBBBBBB 20BBBB  DQG LV LQFRPSOLDQFH ZLWK WKH SURYLVLRQV RI 0LQQHVRWDSWDWXWHV SHFWLRQ 505.03 SXEG. 2.B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB  0D\RUAWWHVW BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB  CLW\COHUNCOUNTY SUR9EYOR COUNTY O) DA.OTA STATE O)0INNESOTAI KHUHE\ FHUWLI\ WKDW LQ DFFRUGDQFH ZLWK 0LQQHVRWDSWDWXWHV SHFWLRQ 505.021 SXEG 11 WKLV SODW KDVEHHQ UHYLHZHG DQG DSSURYHG WKLV BBBBBBBBBBBBB GD\RI BBBBBBBBBBBBBBBBB  20BBBBBBB.B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB TRGG B. TROOHIVRQ DDNRWD CRXQW\ SXUYH\RUINSET BSEE SHEET 3O) 3 SHEETS 123OUTLOT B OUTLOTA S89ƒ12 49W707.316.451123OUTLOT B OUTLOTA 2345671110987654321612345789101112131415161718BONAIRE PATH E.SEEDETAILA136THSTREET W.ARROWHEADWAY136THCIRCLE W.NORTH1 INCH 40 )EET)RU WKH SXUSRVHV RI WKLV VXUYH\ WKHQRUWK OLQH RI WKH OLQH RI LRW 1 BORFN 1*REYSTONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD. LV DVVXPHG WR EHDU N89ƒ32 20E .BRAY HILL040801010ARE SHOWN AS THUSDRAINA*E AND UTILITY EASE0ENTS NOT TO SCALE 5.00BEIN* 10 )EET IN WIDTH AND AD-OININ*STREET LINES AND BEIN* 5.00 )EET INWIDTH AND AD-OININ* LOT LINES ANDOUTLOT LINES UNLESS OTHERWISE SHOWNON THE PLAT.LE*ENDDENOTES )OUND 12 INCH IRON PIPE WITHNO CAP UNLESS OTHERWISE NOTED. SEEINSET SHEETS.DENOTES 12 INCH ; 14 INCH IRON PIPE SETAND 0AR.ED WITH 0INNESOTA LICENSENO. 25718 0ONU0ENTS TO BE SET WITHINONE YEAR A)TER RECORDIN* O) THE PLAT DENOTES RESTRICTED ACCESS TO DA.OTACOUNTY PER THE DA.OTA COUNTYCONTI*UOUS PLAT ORDINANCENO 0ONU0ENT SY0BOL SHOWN AT ANYSTATUTE RE4UIRED LOCATION INDICATESA PLAT 0ONU0ENT THAT WILL BE SETWITHIN ONE YEAR )RO0 THE RECORDIN*DATE O) THIS PLAT. SAID 0ONU0ENTSSHALL BE 12 INCH [ 14 INCH IRON PIPES0AR.ED BY R.L.S. NO. 25718.LAND SUR9EYIN* INC.CORNERSTONESHEET 2 O) 3 SHEETSINSET Aʽ 2ƒ39 13R 11419.00L 528.86S89ƒ12 49W707.31BONAIRE PATH E.STREET ADETAIL A OUTLOTD4OUTLOTC689ƒ21 45W117.73ʽ 2ƒ30 17R 11540.00L 504.48ʽ 2ƒ39 13R 11419.00L 528.8649.53BONAIREPATH E.OUTLOTD4OUTLOTC12345678910111213BONAIREPATH E.ARROWHEAD WAY 136THCIRCLE W.NORTH1 INCH 40 )EET)RU WKH SXUSRVHV RI WKLV VXUYH\ WKHQRUWK OLQH RI WKH OLQH RI LRW 1 BORFN 1*REY6TONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD. LV DVVXPHG WR EHDU N89ƒ32 20E .BRAY HILL040801010ARE 6HOWN A6 THU6DRAINA*E AND UTILITY EA6E0ENT6 NOT TO 6CALE 5.00BEIN* 10 )EET IN WIDTH AND AD-OININ*6TREET LINE6 AND BEIN* 5.00 )EET INWIDTH AND AD-OININ* LOT LINE6 ANDOUTLOT LINE6 UNLE66 OTHERWI6E 6HOWNON THE PLAT.LE*ENDDENOTE6 )OUND 12 INCH IRON PIPE WITHNO CAP UNLE66 OTHERWI6E NOTED. 6EEIN6ET 6HEET6.DENOTE6 12 INCH ; 14 INCH IRON PIPE 6ETAND 0AR.ED WITH 0INNE6OTA LICEN6ENO. 25718 0ONU0ENT6 TO BE 6ET WITHINONE YEAR A)TER RECORDIN* O) THE PLAT NO 0ONU0ENT 6Y0BOL 6HOWN AT ANY6TATUTE RE4UIRED LOCATION INDICATE6A PLAT 0ONU0ENT THAT WILL BE 6ETWITHIN ONE YEAR )RO0 THE RECORDIN*DATE O) THI6 PLAT. 6AID 0ONU0ENT66HALL BE 12 INCH [ 14 INCH IRON PIPE60AR.ED BY R.L.6. NO. 25718.LAND 6UR9EYIN* INC.CORNER6TONE6HEET 3 O) 3 6HEET6IN6ET B LEGAL DESCRIPTION:The following Legal Description is as shown on the Assure Title,LLC as agent for Alliant National Title Insurance Company TitleCommitment No. 7732-1-1 GREYSTONE, dated November 30th,2021.Lot 1, Block 1, Greystone 5th Addition, Dakota County, MinnesotaTITLE NOTES:0NORTH50100The following survey related items appear on the Assure Title, LLCas agent for Alliant National Title Insurance Company TitleCommitment No. 7732-1-1 GREYSTONE, dated November 30th,2021.3.Easements for utility and drainage purposes, as shown on therecorded plat. (AS SHOWN ON THE SURVEY)4.Easements for right of way over the part of the property in question,as contained in Document Number 2600994. (AS SHOWN ON THESURVEY)5.Easements for Highway, utility and drainage purposes, over the partof the property in question, as contained in Document Number3302202. (AS SHOWN ON THE SURVEY)6.Easement in favor of Northern States Power Company, as containedin Book 51 of Miscellaneous, page 90.LEGEND:UNDERGROUND ELECTRICUNDERGROUND CABLE TVUNDERGROUND FIBER OPTICUNDERGROUND TELEPHONEOVERHEAD UTILITYUNDERGROUND GASSANITARY SEWERSTORM SEWERWATERMAINFENCECURB [TYPICAL]CONCRETE SURFACEBITUMINOUS SURFACEFOUND MONUMENTSET 1/2" IRON PIPEMARKED RLS NO. 25718CABLE TV PEDESTALAIR CONDITIONERELECTRIC MANHOLEELECTRIC METERELECTRIC PEDESTALELECTRIC TRANSFORMERLIGHT POLEGUY WIREPOWER POLEGAS MANHOLEGAS METERTELEPHONE MANHOLETELEPHONE PEDESTALSANITARY CLEANOUTSANITARY MANHOLECATCH BASINSTORM DRAINFLARED END SECTIONSTORM MANHOLEFIRE DEPT. CONNECTIONHYDRANTCURB STOPWATER WELLWATER MANHOLEWATER METERPOST INDICATOR VALVEWATER VALVEBOLLARDFLAG POLEMAIL BOXTRAFFIC SIGNUNKNOWN MANHOLESOIL BORINGTRAFFIC SIGNALCONIFEROUS TREEDECIDUOUS TREENO WETLAND DELINEATION WAS PROVIDED THATWOULD SHOW POTENTIAL WETLANDS ON THISPARCEL.WETLAND NOTES:PRELIM INARY PID#34-31004-01-010BLG22003SURVBLG03EXISITINGCONDITIONSCOUNTY/CITY:REVISIONS:PROJECT LOCATION:LAND SURVEYING, INC.CORNERSTONESuite #2001970 Northwestern Ave.Stillwater, MN 55082Phone 651.275.8969dan@cssurvey.netDATEREVISIONPROJECT NO.FILE NAME1102BONAIRE PATH E.CITY OF ROSEMOUNTDAKOTACOUNTYBRAYHILLCONTACT:Melvin MooreBuilders Lot Group, LLC9531 West 78th StreetSuite 135Eden Prairie, MN 55344952-314-7130BENCHMARKSELEVATIONS BASED ON BENCHMARKS SHOWN ON AS-BUILTCONSTRUCTION PLANS FROM WSB, DATED 10-30-2009.PROJECT BENCH MARKS SHOWN GRAPHICALLY.UNDERGROUND UTILITIES NOTES:THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELDSURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NOGUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCHUTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYORFURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWNARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THATTHEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATIONAVAILABLE. THIS SURVEY HAS NOT PHYSICALLY LOCATED THE UNDERGROUNDUTILITIES. GOPHER STATE ONE CALL LOCATE TICKET NUMBER(S) 173480932.SOME MAPS WERE RECEIVED, WHILE OTHER UTILITIES DID NOT RESPOND TOTHE LOCATE REQUEST. ADDITIONAL UTILITIES OF WHICH WE ARE UNAWAREMAY EXIST.CALL BEFORE YOU DIG!TWIN CITY AREA:TOLL FREE:1-800-252-1166651-454-0002Gopher State One Call1.BEARINGS ARE BASED ON THE DAKOTA COUNTY COORDINATESYSTEM NAD 1983. BEARING ARE THE SAME AS SHOWN ON THERECORDED PLAT.2.UNDERGROUND UTILITIES SHOWN PER GOPHER ONE LOCATESAND AS-BUILTS PLANS PROVIDED BY THE CITY OF ROSEMOUNTPUBLIC WORKS DEPARTMENT.3.THERE MAY SOME UNDERGROUND UTILITIES, GAS, ELECTRIC, ETC.NOT SHOWN OR LOCATED.SURVEY NOTES:AREA:TOTAL AREA AS SHOWN = 762,257 SQ.FT.INCLUDING 14,340 SQ.FT. OF ROADWAY EASEMENT.THERE ARE 0 VISIBLE PARKING STALLS DESIGNATED ON THISPARCEL INCLUDING 0 HANDICAP STALLS.EXISTING PARKING:THIS PROPERTY LIES WITHIN ZONE X, AREAS DETERMINED TO BEOUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN AS SHOWN ONFEMA FLOOD INSURANCE RATE MAP NUMBER 27037C0115EHAVING AN EFFECTIVE DATE OF DECEMBER 2ND 2011.IMPRINTED PANEL.FLOOD INFORMATION:CERTIFICATION:To: Assure Title, LLC, Alliant National Title Insurance Company, BuildersLot Group, LLC:This is to certify that this map or plat and the survey on which it is basedwere made in accordance with the 2021 Minimum Standard DetailRequirements for ALTA/NSPS Land Title Surveys, jointly established andadopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 7, 8, 9, 11, 16,18, and 19 of Table A thereof. The field work was completed on December20th, 2017.CORNERSTONE LAND SURVEYING, INC.Dated: 12-20-17Revised: 1-14-18By :____________________________Daniel L. ThurmesMinnesota License No. 25718The Assure Title, LLC as agent for Alliant National Title InsuranceCompany Title Commitment No. 7732-1-1 GREYSTONE, dated November30th, 2021, as listed on this survey was relied upon for matters of record.Other easements may exist that were not shown in this commitment andare not shown on this survey.8. SUBSTANTIAL FEATURES OBSERVED IN THE PROCESS OF CONDUCTING THEFIELDWORK ARE SHOWN ON THE SURVEY.16. THERE IS NO OBSERVABLE EVIDENCE OF RECENT EARTH MOVING WORKAND BUILDING CONSTRUCTION ON THE SUBJECT PROPERTY.18. NO MARKERS OF WETLANDS DELINEATED BY A QUALIFIED SPECIALISTWERE OBSERVED IN THE PROCESS OF CONDUCTING THE FIELDWORK. EDGEOF WATER/ICE IS SHOWN ON SURVEY.19. PLOTTABLE OFFSITE EASEMENTS OR SERVITUDES ARE SHOWN ON THESURVEY.TABLE A NOTES:3456SHEET 1 OF 2 SHEETSSEE SHEET 2 OF 2 SHEETS 3333556661-14-22PRELIMINARY ISSUE2-8-22 PRE PLAT ISSUE4-11-22 REVISED CITY COMMENTS 0NORTH50100LEGEND:UNDERGROUND ELECTRICUNDERGROUND CABLE TVUNDERGROUND FIBER OPTICUNDERGROUND TELEPHONEOVERHEAD UTILITYUNDERGROUND GASSANITARY SEWERSTORM SEWERWATERMAINFENCECURB [TYPICAL]CONCRETE SURFACEBITUMINOUS SURFACEFOUND MONUMENTSET 1/2" IRON PIPEMARKED RLS NO. 25718CABLE TV PEDESTALAIR CONDITIONERELECTRIC MANHOLEELECTRIC METERELECTRIC PEDESTALELECTRIC TRANSFORMERLIGHT POLEGUY WIREPOWER POLEGAS MANHOLEGAS METERTELEPHONE MANHOLETELEPHONE PEDESTALSANITARY CLEANOUTSANITARY MANHOLECATCH BASINSTORM DRAINFLARED END SECTIONSTORM MANHOLEFIRE DEPT. CONNECTIONHYDRANTCURB STOPWATER WELLWATER MANHOLEWATER METERPOST INDICATOR VALVEWATER VALVEBOLLARDFLAG POLEMAIL BOXTRAFFIC SIGNUNKNOWN MANHOLESOIL BORINGTRAFFIC SIGNALCONIFEROUS TREEDECIDUOUS TREEPID#34-31004-01-010BLG22003SURVBLG03EXISITINGCONDITIONSCOUNTY/CITY:REVISIONS:PROJECT LOCATION:LAND SURVEYING, INC.CORNERSTONESuite #2001970 Northwestern Ave.Stillwater, MN 55082Phone 651.275.8969dan@cssurvey.netDATEREVISIONPROJECT NO.FILE NAME1102BONAIRE PATH E.CITY OF ROSEMOUNTDAKOTACOUNTY1-14-22PRELIMINARY ISSUECERTIFICATION:I hereby certify that this plan was prepared byme, or under my direct supervision, and that I ama duly Licensed Land Surveyor under the laws ofthe state of Minnesota.Daniel L. Thurmes Registration Number: 25718Date:__________________1-3-22BRAYHILLCONTACT:Melvin MooreBuilders Lot Group, LLC9531 West 78th StreetSuite 135Eden Prairie, MN 55344952-314-7130CALL BEFORE YOU DIG!TWIN CITY AREA:TOLL FREE:1-800-252-1166651-454-0002Gopher State One CallSHEET 2 OF 2 SHEETS33354SEE SHEET 2 OF 2 SHEETS 2-8-22 PRE PLAT ISSUE4-11-22 REVISED CITY COMMENTS OUTLOT D4OUTLOTC712345678910111213689ƒ21 45W117.73ʽ 2ƒ30 17R 11540.00L 504.48ʽ 2ƒ39 13R 11419.00L 528.8649.53BONAIREPATH E.OUTLOTB136THCIRCLE W.LE*AL DE6CRIPTIONTKH IROORZLQJ LHJDO DHVFULSWLRQ LV DV VKRZQ RQ WKH AVVXUH TLWOHLLC DV DJHQW IRU AOOLDQW NDWLRQDO TLWOH IQVXUDQFH CRPSDQ\ TLWOHCRPPLWPHQW NR. 773211 *RE<6TONE GDWHG NRYHPEHU 30WK2021.LRW 1 BORFN 1 *UH\VWRQH 5WK AGGLWLRQ DDNRWD CRXQW\ 0LQQHVRWDTITLE NOTE60NORTH50100TKH IROORZLQJ VXUYH\ UHODWHG LWHPV DSSHDU RQ WKH AVVXUH TLWOH LLCDV DJHQW IRU AOOLDQW NDWLRQDO TLWOH IQVXUDQFH CRPSDQ\ TLWOHCRPPLWPHQW NR. 773211 *RE<6TONE GDWHG NRYHPEHU 30WK2021.3.EDVHPHQWV IRU XWLOLW\ DQG GUDLQDJH SXUSRVHV DV VKRZQ RQ WKHUHFRUGHG SODW. A6 6HOWN ON THE 6UR9E< 4.EDVHPHQWV IRU ULJKW RI ZD\ RYHU WKH SDUW RI WKH SURSHUW\ LQ TXHVWLRQDV FRQWDLQHG LQ DRFXPHQW NXPEHU 2600994. A6 6HOWN ON THE6UR9E< 5.EDVHPHQWV IRU HLJKZD\ XWLOLW\ DQG GUDLQDJH SXUSRVHV RYHU WKH SDUWRI WKH SURSHUW\ LQ TXHVWLRQ DV FRQWDLQHG LQ DRFXPHQW NXPEHU3302202. A6 6HOWN ON THE 6UR9E< 6.EDVHPHQW LQ IDYRU RI NRUWKHUQ 6WDWHV PRZHU CRPSDQ\ DV FRQWDLQHGLQ BRRN 51 RI 0LVFHOODQHRXV SDJH 90.LE*ENDUNDER*ROUND ELECTRICUNDER*ROUND CABLE T9UNDER*ROUND )IBER OPTICUNDER*ROUND TELEPHONEO9ERHEAD UTILIT<UNDER*ROUND *A66ANITAR< 6EWER6TOR0 6EWERWATER0AIN)ENCECURB >T<PICAL@CONCRETE 6UR)ACEBITU0INOU6 6UR)ACE)OUND 0ONU0ENT6ET 12 IRON PIPE0AR.ED RL6 NO. 25718CABLE T9 PEDE6TALAIR CONDITIONERELECTRIC 0ANHOLEELECTRIC 0ETERELECTRIC PEDE6TALELECTRIC TRAN6)OR0ERLI*HT POLE*U< WIREPOWER POLE*A6 0ANHOLE*A6 0ETERTELEPHONE 0ANHOLETELEPHONE PEDE6TAL6ANITAR< CLEANOUT6ANITAR< 0ANHOLECATCH BA6IN6TOR0 DRAIN)LARED END 6ECTION6TOR0 0ANHOLE)IRE DEPT. CONNECTIONH<DRANTCURB 6TOPWATER WELLWATER 0ANHOLEWATER 0ETERPO6T INDICATOR 9AL9EWATER 9AL9EBOLLARD)LA* POLE0AIL BO;TRA))IC 6I*NUN.NOWN 0ANHOLE6OIL BORIN*TRA))IC 6I*NALCONI)EROU6 TREEDECIDUOU6 TREENO WETLAND DELINEATION WA6 PRO9IDED THATWOULD 6HOW POTENTIAL WETLAND6 ON THI6PARCEL.WETLAND NOTE6PID343100401010BL*220036UR9BL*03PRELI0INAR<PLATCOUNT<CIT<RE9I6ION6PRO-ECT LOCATIONLAND 6UR9E<IN* INC.CORNER6TONE6XLWH 2001970 NRUWKZHVWHUQ AYH.6WLOOZDWHU 0N 55082PKRQH 651.275.8969GDQ#FVVXUYH\.QHWDATERE9I6IONPRO-ECT NO.)ILE NA0E1102BONAIRE PATH E.CIT< O) RO6E0OUNTDA.OTACOUNT<BRA<HILLCONTACT0HOYLQ 0RRUHBXLOGHUV LRW *URXS LLC9531 WHVW 78WK 6WUHHW6XLWH 135EGHQ PUDLULH 0N 553449523147130BENCH0AR.6ELE9ATION6 BA6ED ON BENCH0AR.6 6HOWN ON A6BUILTCON6TRUCTION PLAN6 )RO0 W6B DATED 10302009.PRO-ECT BENCH 0AR.6 6HOWN *RAPHICALL<.UNDER*ROUND UTILITIE6 NOTE6THE UNDER*ROUND UTILITIE6 6HOWN HA9E BEEN LOCATED )RO0 )IELD6UR9E< IN)OR0ATION AND E;I6TIN* DRAWIN*6. THE 6UR9E<OR 0A.E6 NO*UARANTEE THAT THE UNDER*ROUND UTILITIE6 6HOWN CO0PRI6E ALL 6UCHUTILITIE6 IN THE AREA EITHER IN 6ER9ICE OR ABANDONED. THE 6UR9E<OR)URTHER DOE6 NOT WARRANT THAT THE UNDER*ROUND UTILITIE6 6HOWNARE IN THE E;ACT LOCATION INDICATED ALTHOU*H HE DOE6 CERTI)< THATTHE< ARE LOCATED A6 ACCURATEL< A6 PO66IBLE )RO0 THE IN)OR0ATIONA9AILABLE. THI6 6UR9E< HA6 NOT PH<6ICALL< LOCATED THE UNDER*ROUNDUTILITIE6. *OPHER 6TATE ONE CALL LOCATE TIC.ET NU0BER 6 173480932.6O0E 0AP6 WERE RECEI9ED WHILE OTHER UTILITIE6 DID NOT RE6POND TOTHE LOCATE RE4UE6T. ADDITIONAL UTILITIE6 O) WHICH WE ARE UNAWARE0A< E;I6T.CALL BE)ORE <OU DI*TWIN CIT< AREATOLL )REE180025211666514540002*RSKHU 6WDWH OQH CDOO1.BEARIN*6 ARE BA6ED ON THE DA.OTA COUNT< COORDINATE 6<6TE0NAD 1983. BEARIN* ARE THE 6A0E A6 6HOWN ON THE RECORDED PLAT.2.UNDER*ROUND UTILITIE6 6HOWN PER *OPHER ONE LOCATE6 ANDA6BUILT6 PLAN6 PRO9IDED B< THE CIT< O) RO6E0OUNT PUBLIC WOR.6DEPART0ENT.3.THERE 0A< 6O0E UNDER*ROUND UTILITIE6 *A6 ELECTRIC ETC. NOT6HOWN OR LOCATED.6UR9E< NOTE6AREATOTAL AREA A6 6HOWN 762257 64.)T.INCLUDIN* 14340 64.)T. O) ROADWA< EA6E0ENT.THI6 PROPERT< LIE6 WITHIN =ONE ; AREA6 DETER0INED TO BEOUT6IDE THE 0.2 ANNUAL CHANCE )LOODPLAIN A6 6HOWN ON)E0A )LOOD IN6URANCE RATE 0AP NU0BER 27037C0115EHA9IN* AN E))ECTI9E DATE O) DECE0BER 2ND 2011.I0PRINTED PANEL.)LOOD IN)OR0ATION6HEET 1 O) 2 6HEET66EE 6HEET 2 O) 2 6HEET6 PRELI0INAR< PLATCERTI)ICATIONI KHUHE\ FHUWLI\ WKDW WKLV SODQ ZDV SUHSDUHG E\PH RU XQGHU P\ GLUHFW VXSHUYLVLRQ DQG WKDW I DPD GXO\ LLFHQVHG LDQG 6XUYH\RU XQGHU WKH ODZV RIWKH VWDWH RI 0LQQHVRWD.DDQLHO L. TKXUPHV RHJLVWUDWLRQ NXPEHU 25718DDWHBBBBBBBBBBBBBBBBBBPROPO6ED PUD BUILDIN* 6ETBAC.6)RONT 25 )EETCORNER LOT )RO0 6TREET 15 )EET6IDE *ARA*E 5 )EET6IDE HOU6E 7 )EETREAR 30 )EETA.RON 50 )EETBONAIRE PATH E. 30 )EETAREAAREABLOCK 1BLOCK 4LOT 18,408LOT 110,908LOT 28,669LOT 27,724LOT 38,931LOT 37,802LOT 48,127LOT 47,598LOT 58,390LOT 510,680LOT 611,380LOT 611,782LOT 712,729LOT 712,028LOT 88,556LOT 88,858LOT 98,560LOT 97,554LOT 108,343LOT 109,378LOT 1113,396LOT 119,331LOT 127,949BLOCK 2LOT 1312,539LOT 19,746LOT 27,875LOT 37,649OUTLOTLOT 47,862A9,056LOT 58,026B47,940LOT 69,605C82,995LOT 78,032D20,340LOT 88,105LOT 97,698R/WLOT 107,577EXISTINGR/W14,340LOT 119,496PROPOSED147,338LOT 127,576TOTAL161,678LOT 139,192LOT 147,883LOT 157,444SQ. FT.ACRESLOT 167,930BLOCK 1105,4892.42LOT 178,431BLOCK 2149,9113.44LOT 189,784BLOCK 360,7171.39BLOCK 4124,1312.85BLOCK 3TOTAL BLOCKS440,24810.11LOT 19,796OUTLOTS A-D160,331LOT 28,377R-W161,678LOT 38,555TOTAL762,257LOT 48,338LOT 57,894LOT 67,779LOT 79,978PROPO6ED EA6E0ENT 9ACATION6THE )OLLOWIN* E;I6TIN* EA6E0ENT6 ARE TO BE 9ACATED.1.AOO WKRVH SDUWLFXODU GUDLQDJH DQG XWLOLW\ HDVHPHQWV HPEUDFHG ZLWKLQ LRW 1BORFN 1 DV GHGLFDWHG RQ WKH SODW RI *RE<6TONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD.2.AOO WKRVH SDUWLFXODU GUDLQDJH DQG XWLOLW\ HDVHPHQWV HPEUDFHG ZLWKLQ LRW 1BORFN 1 *RE<6TONE 5TH ADDITION DDNRWD CRXQW\ 0LQQHVRWD GHVFULEHGLQ DRFXPHQW NR. 2600994.3.AOO WKRVH SDUWLFXODU URDGZD\ GUDLQDJH DQG XWLOLW\ HDVHPHQWV HPEUDFHGZLWKLQ LRW 1 BORFN 1 *RE<6TONE 5TH ADDITION DDNRWD CRXQW\0LQQHVRWD GHVFULEHG LQ DRFXPHQW NR. 3302202.PROPO6ED RETAINED AREAO) TRAN60I66ION LINEEA6E0ENT PER BOO. 51PA*E 90.129212822 PRE PLAT I66UE4922 RE9I6ED CIT< CO00ENT6EA6E0ENTTO BE9ACATEDEA6E0ENTTO BE9ACATED41222 6TREET NA0E642022 OUTLOT D EA6E0ENT6 11234OUTLOTBOUTLOT A 234567111098765432161234578910111213141516171812345678910111213ʽ 2ƒ39 13R 11419.00L 528.86S89ƒ12 49W707.316.45 136TH STREET W.ARROWHEAD WAYBONAIREPATH E.OUTLOTB136THCIRCLE W.0NORTH50100LE*ENDUNDER*ROUND ELECTRICUNDER*ROUND CABLE T9UNDER*ROUND )IBER OPTICUNDER*ROUND TELEPHONEO9ERHEAD UTILITYUNDER*ROUND *ASSANITARY SEWERSTOR0 SEWERWATER0AIN)ENCECURB >TYPICAL@CONCRETE SUR)ACEBITU0INOUS SUR)ACE)OUND 0ONU0ENTSET 12 IRON PIPE0AR.ED RLS NO. 25718CABLE T9 PEDESTALAIR CONDITIONERELECTRIC 0ANHOLEELECTRIC 0ETERELECTRIC PEDESTALELECTRIC TRANS)OR0ERLI*HT POLE*UY WIREPOWER POLE*AS 0ANHOLE*AS 0ETERTELEPHONE 0ANHOLETELEPHONE PEDESTALSANITARY CLEANOUTSANITARY 0ANHOLECATCH BASINSTOR0 DRAIN)LARED END SECTIONSTOR0 0ANHOLE)IRE DEPT. CONNECTIONHYDRANTCURB STOPWATER WELLWATER 0ANHOLEWATER 0ETERPOST INDICATOR 9AL9EWATER 9AL9EBOLLARD)LA* POLE0AIL BO;TRA))IC SI*NUN.NOWN 0ANHOLESOIL BORIN*TRA))IC SI*NALCONI)EROUS TREEDECIDUOUS TREEPID343100401010BL*22003SUR9BL*03PRELI0INARYPLATCOUNTYCITYRE9ISIONSPRO-ECT LOCATIONLAND SUR9EYIN* INC.CORNERSTONESXLWH 2001970 NRUWKZHVWHUQ AYH.SWLOOZDWHU 0N 55082PKRQH 651.275.8969GDQ#FVVXUYH\.QHWDATERE9ISIONPRO-ECT NO.)ILE NA0E1102BONAIRE PATH E.CITY O) ROSE0OUNTDA.OTACOUNTYBRAYHILLCONTACT0HOYLQ 0RRUHBXLOGHUV LRW *URXS LLC9531 WHVW 78WK SWUHHWSXLWH 135EGHQ PUDLULH 0N 553449523147130SHEET 2 O) 2 SHEETSSEE SHEET 1 O) 2 SHEETS PRELI0INARY PLATCERTI)ICATIONI KHUHE\ FHUWLI\ WKDW WKLV SODQ ZDV SUHSDUHG E\PH RU XQGHU P\ GLUHFW VXSHUYLVLRQ DQG WKDW I DPD GXO\ LLFHQVHG LDQG SXUYH\RU XQGHU WKH ODZV RIWKH VWDWH RI 0LQQHVRWD.DDQLHO L. TKXUPHV RHJLVWUDWLRQ NXPEHU 25718DDWHBBBBBBBBBBBBBBBBBB12921EASE0ENTTO BE9ACATED2822 PRE PLAT ISSUE4922 RE9ISED CITY CO00ENTSEASE0ENTTO BE9ACATEDEASE0ENTTO BE9ACATED12 SIDE TRAILEASE0ENT BYSEPARATEDOCUE0NT41222 STREET NA0ES42022 OUTLOT D EASE0ENTS 0NORTH80160PID#34-31004-01-010BLG22003SURVBLG03TREELOCATIONCOUNTY/CITY:REVISIONS:PROJECT LOCATION:LAND SURVEYING, INC.CORNERSTONESuite #2001970 Northwestern Ave.Stillwater, MN 55082Phone 651.275.8969dan@cssurvey.netDATEREVISIONPROJECT NO.FILE NAME1102BONAIRE PATH E.CITY OF ROSEMOUNTDAKOTACOUNTYBRAYHILLCONTACT:Melvin MooreBuilders Lot Group, LLC9531 West 78th StreetSuite 135Eden Prairie, MN 55344952-314-7130ROSEMOUNT TREE DEFINITIONS HARDWOOD DECIDUOUS TREE: Includes ironwood, catalpa, oak,maple (hard),walnut, ash, hickory, birch, black cherry, hackberry, locust andbasswood. SOFTWOOD DECIDUOUS TREE: Includes cottonwood,poplars/aspen, box elder, willow, silver maple and elm.SIGNIFICANT TREE: A healthy deciduous hardwood treemeasuring a minimum of six (6) caliper inches in diameter, ahealthy softwood deciduous tree measuring a minimum oftwelve (12) caliper inches, or a healthy coniferous tree measuringa minimum of twelve feet (12') in height.HERITAGE TREE: A healthy hardwood deciduous tree measuringequal to or greater than twenty seven inches (27") in diameter ora healthy coniferous evergreen tree greater than fifty feet (50') inheight.A 2x in the notes denotes a tree with 2-stems and theirrespective si]es.DENOTES TREES AS IDENTIFIED AND LOCATED BY:Mark RehderPresident & CEORehder Forestry Consultingwww.rehderforestryconsulting .com612-760-3519TREES:2-8-22 PRE PLAT ISSUE4-9-22 REVISED CITY COMMENTS 1 2 4 5 6 7 8 9 10 11 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10987 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 910 11 12 13 3 #4 #5 #6 #7 #8 #9 #10 #12 #13 #14#15 #16 #17#18 #19 #20 #1 #2 #3 #11AKRON AVE. (CO. RD. NO. 73)UNION P A CI FI C R AI L R O A D BONAIRE PATH E. UNION P A CI FI C R AI L R O A D 136th Street West Arrowh e a d W a y 136th Circle West c 1OFBRAY HILL ROSEMOUNT, MINNESOTA BUILDERS LOT GROUP2-16-2022 JLT JLT Name Reg. No.Date Revisions Date Designed Drawn 2022 Pioneer Engineering, P.A. Mendota Heights, MN 55120 2422 Enterprise Drive (651) 681-1914 Fax: 681-9488www.pioneereng.com LANDSCAPE ARCHITECTSLAND SURVEYORSLAND PLANNERSCIVIL ENGINEERS 4-12-22 I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota 44763 Jennifer L. Thompson 1LANDSCAPE PLAN4-12-2022 city comments 1OUTLOT D1234OUTLOTCOUTLOT B OUTLOT A234 567111098765432161234578910111213141516171812345678910111213136THSTREET W.ARROWHEADWAYBONAIREPATH E.BONAIREPATH E.OUTLOT B136THCIRCLE W.NORTH9ICINITY 0APSEC. 22 TWP. 115 RN*. 19CITY O) ROSE0OUNT DA.OTA COUNTY0INNESOTA1 INCH 80 )EET)RU WKH SXUSRVHV RI WKLV VXUYH\ WKHQRUWK OLQH RI WKH OLQH RI LRW 1 BORFN 1*REYSTONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD. LV DVVXPHG WR EHDU N89ƒ32 20E .BRAY HILL080160.NOW ALL PERSONS BY THESE PRESENTS TKDW BXLOGHUV LRW*URXS LLC D 0LQQHVRWD OLPLWHG OLDELOLW\ FRPSDQ\ RZQHU RIWKH IROORZLQJ GHVFULEHG SURSHUW\LRW 1 BORFN 1 *REYSTONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD.HDV FDXVHG WKH VDPH WR EH VXUYH\HG DQG SODWWHG DV BRAYHILL DQG GRHV KHUHE\ GHGLFDWH WR WKH SXEOLF WKH ZD\V DQGHDVHPHQWV IRU GUDLQDJH DQG XWLOLW\ SXUSRVHV DV FUHDWHG E\WKLV SODW.IQ ZLWQHVV ZKHUHRI VDLG BXLOGHUV LRW *URXS LLC D0LQQHVRWD OLPLWHG OLDELOLW\ FRPSDQ\ KDV FDXVHG WKHVHSUHVHQWV WR EH VLJQHG WKLV BBBBBBBBBBB GD\ RIBBBBBBBBBBBBBBBBBBBBB  20BBBBBB.SI*NEDB\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 0HOYLQ 0RRUH FKLHI PDQDJHUSTATE O) BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBCOUNTY O) BBBBBBBBBBBBBBBBBBBBBBBBBBBBBTKLV LQVWUXPHQW ZDV DFNQRZOHGJHG EHIRUH PH WKLVBBBBBBBBB GD\ RI BBBBBBBBBBBBBBBBBBBBBB  20BBBBBB  E\0HOYLQ 0RRUH FKLHI PDQDJHU BXLOGHUV LRW *URXS LLC D0LQQHVRWD OLPLWHG OLDELOLW\ FRPSDQ\ RQ EHKDOI RI WKH OLPLWHGOLDELOLW\ FRPSDQ\.BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBNRWDU\ PXEOLFBBBBBBBBBBBBBBBBBBBBBBCRXQW\.0\ CRPPLVVLRQ E[SLUHVBBBBBBBBBBBBBBBBBBBBBBBBCOUNTY BOARD COUNTY O) DA.OTA STATE O) 0INNESOTAWH GR KHUHE\ FHUWLI\ WKDW RQ WKH 20VW GD\ RI -XO\ 2021 WKH BRDUG RICRPPLVVLRQHUV RI DDNRWD CRXQW\ 0LQQHVRWD DSSURYHG WKLV SODW RIBRAY HILL DQG VDLG SODW LV LQ FRPSOLDQFH ZLWK WKH SURYLVLRQV RI0LQQHVRWD SWDWXWHV SHFWLRQ 505.03 SXEG. 2 DQG SXUVXDQW WR WKHDDNRWD CRXQW\ CRQWLJXRXV PODW OUGLQDQFH.B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBCKDLU DDNRWD CRXQW\ BRDUG.AWWHVWBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDDNRWD CRXQW\ TUHDVXUHU  AXGLWRU.DEPART0ENT O) PROPERTY TA;ATION AND RECORDS COUNTY O)DA.OTA STATE O) 0INNESOTAPXUVXDQW WR 0LQQHVRWD SWDWXWHV SHFWLRQ 505.021 SXEG. 9 WD[HVSD\DEOH LQ WKH \HDU 20BBBB RQ WKH ODQG KHUHLQEHIRUH GHVFULEHG KDYHEHHQ SDLG. AOVR SXUVXDQW WR 0LQQHVRWD SWDWXWHV SHFWLRQ 272.12WKHUH DUH QR GHOLQTXHQW WD[HV DQG WUDQVIHU HQWHUHG WKLV BBBBBBBBBBGD\ RI BBBBBBBBBBBBBBBBBBBB  20BBBBBB\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBAP\ A. .RHWKH DLUHFWRUDHSDUWPHQW RI PURSHUW\ TD[DWLRQ DQG RHFRUGVCOUNTY RECORDER COUNTY O) DA.OTASTATE O) 0INNESOTAI KHUHE\ FHUWLI\ WKDW WKLV SODW BRAY HILL ZDV ILOHG LQ WKH RIILFH RI WKHCRXQW\ RHFRUGHU IRU SXEOLF UHFRUG RQ WKLV BBBBBBBBBBB GD\ RIBBBBBBBBBBBBBBBBB  20BBBBB  DW BBBBBBBBBB R FORFN BBBBB .0. DQG ZDVGXO\ ILOHG LQ BRRN BBBBBBBBBB RI PODWV PDJH BBBBBBBBBBBB DV DRFXPHQWNR. BBBBBBBBBBBBBBBBBBBBB .B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB AP\ A. .RHWKH CRXQW\ RHFRUGHU1010ARE SHOWN AS THUSDRAINA*E AND UTILITY EASE0ENTS NOT TO SCALE 5.00BEIN* 10 )EET IN WIDTH AND AD-OININ*STREET LINES AND BEIN* 5.00 )EET INWIDTH AND AD-OININ* LOT LINES ANDOUTLOT LINES UNLESS OTHERWISE SHOWNON THE PLAT.LE*ENDDENOTES )OUND 12 INCH IRON PIPE WITHNO CAP UNLESS OTHERWISE NOTED. SEEINSET SHEETS.DENOTES 12 INCH ; 14 INCH IRON PIPE SETAND 0AR.ED WITH 0INNESOTA LICENSENO. 25718 0ONU0ENTS TO BE SET WITHINONE YEAR A)TER RECORDIN* O) THE PLAT DENOTES RESTRICTED ACCESS TO DA.OTACOUNTY PER THE DA.OTA COUNTYCONTI*UOUS PLAT ORDINANCENO 0ONU0ENT SY0BOL SHOWN AT ANYSTATUTE RE4UIRED LOCATION INDICATESA PLAT 0ONU0ENT THAT WILL BE SETWITHIN ONE YEAR )RO0 THE RECORDIN*DATE O) THIS PLAT. SAID 0ONU0ENTSSHALL BE 12 INCH [ 14 INCH IRON PIPES0AR.ED BY R.L.S. NO. 25718.INSET ASEE SHEET 2O) 3 SHEETSLAND SUR9EYIN* INC.CORNERSTONESHEET 1 O) 3 SHEETSI DDQLHO L. TKXUPHV GR KHUHE\ FHUWLI\ WKDW WKLV SODW ZDVSUHSDUHG E\ PH RU XQGHU P\ GLUHFW VXSHUYLVLRQ WKDW I DPD GXO\ LLFHQVHG LDQG SXUYH\RU LQ WKH SWDWH RI 0LQQHVRWDWKDW WKLV SODW LV D FRUUHFW UHSUHVHQWDWLRQ RI WKH ERXQGDU\VXUYH\ WKDW DOO PDWKHPDWLFDO GDWD DQG ODEHOV DUH FRUUHFWO\GHVLJQDWHG RQ WKLV SODW WKDW DOO PRQXPHQWV GHSLFWHG RQWKLV SODW KDYH EHHQ RU ZLOO EH FRUUHFWO\ VHW ZLWKLQ RQH\HDU WKDW DOO ZDWHU ERXQGDULHV DQG ZHW ODQGV DV GHILQHGLQ 0LQQHVRWD SWDWXWHV SHFWLRQ 505.01 SXEG. 3 DV RI WKHGDWH RI WKLV FHUWLILFDWH DUH VKRZQ DQG ODEHOHG RQ WKLV SODWDQG DOO SXEOLF ZD\V DUH VKRZQ DQG ODEHOHG RQ WKLV SODW.DDWHG WKLV BBBBBBBBBBB GD\ RI BBBBBBBBBBBBBBB  20BBBBB .BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBDDQLHO L. TKXUPHV LLFHQVHG LDQG SXUYH\RU0LQQHVRWD LLFHQVH NR. 25718STATE O) 0INNESOTACOUNTY O) WASHIN*TONTKLV LQVWUXPHQW ZDV DFNQRZOHGJHG EHIRUH PH WKLVBBBBBBBBBBB GD\ RI BBBBBBBBBBBBBBB  20BBBBBB E\ DDQLHO L.TKXUPHV D LLFHQVHG LDQG SXUYH\RU.BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBNRWDU\ PXEOLFBBBBBBBBBBBBBBBBBBBBBBBCRXQW\.0\ CRPPLVVLRQ E[SLUHVBBBBBBBBBBBBBBBBBBBBBBBBPLANNIN* CO00ISSION ROSE0OUNT 0INNESOTAASSURYHG E\ WKH PODQQLQJ CRPPLVVLRQ RI WKH CLW\ RIRRVHPRXQW 0LQQHVRWD WKLV BBBBBBBBBB GD\ RIBBBBBBBBBBBBB 20BBBB .B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB CKDLUB\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB SHFUHWDU\CITY COUNCIL ROSE0OUNT 0INNESOTATKLV SODW RI BRAY HILL ZDV DSSURYHG DQG DFFHSWHGE\ WKH CLW\ CRXQFLO RI WKH CLW\ RI RRVHPRXQW0LQQHVRWD DW D UHJXODU PHHWLQJ WKHUHRI KHOG WKLVBBBBBBBBBB GD\ RI BBBBBBBBBBBBB 20BBBB  DQG LV LQFRPSOLDQFH ZLWK WKH SURYLVLRQV RI 0LQQHVRWDSWDWXWHV SHFWLRQ 505.03 SXEG. 2.B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB  0D\RUAWWHVW BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB  CLW\COHUNCOUNTY SUR9EYOR COUNTY O) DA.OTA STATE O)0INNESOTAI KHUHE\ FHUWLI\ WKDW LQ DFFRUGDQFH ZLWK 0LQQHVRWDSWDWXWHV SHFWLRQ 505.021 SXEG 11 WKLV SODW KDVEHHQ UHYLHZHG DQG DSSURYHG WKLV BBBBBBBBBBBBB GD\RI BBBBBBBBBBBBBBBBB  20BBBBBBB.B\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB TRGG B. TROOHIVRQ DDNRWD CRXQW\ SXUYH\RUINSET BSEE SHEET 3O) 3 SHEETS 123OUTLOT B OUTLOTA S89ƒ12 49W707.316.451123OUTLOT B OUTLOTA 2345671110987654321612345789101112131415161718BONAIRE PATH E.SEEDETAILA136THSTREET W.ARROWHEADWAY136THCIRCLE W.NORTH1 INCH 40 )EET)RU WKH SXUSRVHV RI WKLV VXUYH\ WKHQRUWK OLQH RI WKH OLQH RI LRW 1 BORFN 1*REYSTONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD. LV DVVXPHG WR EHDU N89ƒ32 20E .BRAY HILL040801010ARE SHOWN AS THUSDRAINA*E AND UTILITY EASE0ENTS NOT TO SCALE 5.00BEIN* 10 )EET IN WIDTH AND AD-OININ*STREET LINES AND BEIN* 5.00 )EET INWIDTH AND AD-OININ* LOT LINES ANDOUTLOT LINES UNLESS OTHERWISE SHOWNON THE PLAT.LE*ENDDENOTES )OUND 12 INCH IRON PIPE WITHNO CAP UNLESS OTHERWISE NOTED. SEEINSET SHEETS.DENOTES 12 INCH ; 14 INCH IRON PIPE SETAND 0AR.ED WITH 0INNESOTA LICENSENO. 25718 0ONU0ENTS TO BE SET WITHINONE YEAR A)TER RECORDIN* O) THE PLAT DENOTES RESTRICTED ACCESS TO DA.OTACOUNTY PER THE DA.OTA COUNTYCONTI*UOUS PLAT ORDINANCENO 0ONU0ENT SY0BOL SHOWN AT ANYSTATUTE RE4UIRED LOCATION INDICATESA PLAT 0ONU0ENT THAT WILL BE SETWITHIN ONE YEAR )RO0 THE RECORDIN*DATE O) THIS PLAT. SAID 0ONU0ENTSSHALL BE 12 INCH [ 14 INCH IRON PIPES0AR.ED BY R.L.S. NO. 25718.LAND SUR9EYIN* INC.CORNERSTONESHEET 2 O) 3 SHEETSINSET Aʽ 2ƒ39 13R 11419.00L 528.86S89ƒ12 49W707.31BONAIRE PATH E.STREET ADETAIL A OUTLOTD4OUTLOTC689ƒ21 45W117.73ʽ 2ƒ30 17R 11540.00L 504.48ʽ 2ƒ39 13R 11419.00L 528.8649.53BONAIREPATH E.OUTLOTD4OUTLOTC12345678910111213BONAIREPATH E.ARROWHEAD WAY 136THCIRCLE W.NORTH1 INCH 40 )EET)RU WKH SXUSRVHV RI WKLV VXUYH\ WKHQRUWK OLQH RI WKH OLQH RI LRW 1 BORFN 1*REY6TONE 5TH ADDITION DDNRWDCRXQW\ 0LQQHVRWD. LV DVVXPHG WR EHDU N89ƒ32 20E .BRAY HILL040801010ARE 6HOWN A6 THU6DRAINA*E AND UTILITY EA6E0ENT6 NOT TO 6CALE 5.00BEIN* 10 )EET IN WIDTH AND AD-OININ*6TREET LINE6 AND BEIN* 5.00 )EET INWIDTH AND AD-OININ* LOT LINE6 ANDOUTLOT LINE6 UNLE66 OTHERWI6E 6HOWNON THE PLAT.LE*ENDDENOTE6 )OUND 12 INCH IRON PIPE WITHNO CAP UNLE66 OTHERWI6E NOTED. 6EEIN6ET 6HEET6.DENOTE6 12 INCH ; 14 INCH IRON PIPE 6ETAND 0AR.ED WITH 0INNE6OTA LICEN6ENO. 25718 0ONU0ENT6 TO BE 6ET WITHINONE YEAR A)TER RECORDIN* O) THE PLAT NO 0ONU0ENT 6Y0BOL 6HOWN AT ANY6TATUTE RE4UIRED LOCATION INDICATE6A PLAT 0ONU0ENT THAT WILL BE 6ETWITHIN ONE YEAR )RO0 THE RECORDIN*DATE O) THI6 PLAT. 6AID 0ONU0ENT66HALL BE 12 INCH [ 14 INCH IRON PIPE60AR.ED BY R.L.6. NO. 25718.LAND 6UR9EYIN* INC.CORNER6TONE6HEET 3 O) 3 6HEET6IN6ET B AKRON AVE. (CO. RD. NO. 73)UNION P A CI FI C R AI L R O A D BONAIRE PATH E. UNION P A CI FI C R AI L R O A DX X((963.1))BF 956.5FBTF 964.8GF 964.5X X((963.6))BF 957.0FBTF 965.3GF 965.0X X((964.9))BF 958.3FBTF 966.6GF 966.3X X((966.6))BF 960.0FBTF 968.3GF 968.0GF 970.7LOLO 965.7((964.3))X XTF 971.0BF 962.7GF 974.2WOBF 966.2((964.8))X XTF 974.5GF 974.8WOBF 966.8((965.4))X XTF 975.1GF 975.2WOBF 967.2((965.8))X XTF 975.5GF 974.6WOBF 966.6((965.2))X XTF 974.9GF 974 .1WOBF 966 .1 ((964 .7) )X XTF 974 .4GF 973 .7WO/SLOBF 965 .7((964.3))X XTF 974 .0 GF 971 . 0 WO BF 963 . 0 ((961. 6 ) ) X X TF 971 . 3 GF 969 . 8 WO BF 961 . 8 ((960. 4 ) ) X X TF 970 . 1 GF 968 . 2 WO BF 960 . 2 ((958. 8 ) ) X X TF 968 . 5 GF 965. 5 WO BF 957. 5 ((956.1 ) ) X X TF 965. 8 GF 962. 5 WO/SLO BF 954. 5 ((953.1 ) ) X X TF 962. 8 X X((948.9))BF 942.3FB¹TF 950.6GF 949.3X X((949.4))BF 942.8FBTF 951.1GF 950.8GF 953.6 LO¹ LO 949.6 ((948.2))X X TF 954.9 BF 946.6 GF 955.5 LO¹ LO 951.5 ((950.1))X X TF 956.8 BF 948.5 GF 957.8 LO¹ LO 953.8 ((952.4))X X TF 959.1 BF 950.8 GF 960.3 LO¹ LO 956.3 ((954.9))X X TF 961.6 BF 953.3 GF 956.2LOLO 951.2((949.8))X XTF 956.5BF 948.2GF 967.9WOBF 959.9((958.5))X XTF 968.2GF 969.7WOBF 961.7((960.3))X XTF 970.0GF 972.3WOBF 964.3((962.9))X XTF 972.6GF 974.3WOBF 966.3((964.9))X XTF 974.6GF 974.8WOBF 966.8((965.4))X XTF 975.1GF 974.8LOLO 969.8((968.4))X XTF 975.1BF 966.8GF 963.6 LO¹ LO 959.6 ((958.2)) X X TF 964.9 BF 956.6 GF 960.7 LO¹ LO 956.7 ((955.3)) X X TF 962.0 BF 953.7 GF 958.3 LO¹ LO 954.3 ((952.9)) X X TF 959.6 BF 951.3 GF 955.5 LO¹ LO 951.5 ((950.1)) X X TF 956.8 BF 948.5 GF 952.9 LO¹ LO 948.9 ((947.5)) X X TF 954.2 BF 945.9 GF 950.3 LO¹ LO 946.3 ((944.9)) X X TF 951.6 BF 943.3 GF 948.4 LO¹ LO 944.4 ((943.0)) X X TF 949.7 BF 941.4 GF 946.5 WO BF 938.5 ((937.1)) X X TF 946.8 GF 946.2 WO BF 938.2 ((936.8)) X X TF 946.5 GF 946.2 WO BF 938.2 ((936.8)) X X TF 946.5 GF 946.5 WO/SLO BF 938.5 (937.8) X X TF 946.8 50' PAD GF 9 4 7 . 5 W O BF 9 3 9 . 5 ((9 3 8 . 1 ) ) X X TF 9 4 7 . 8 65' P A D GF 948 .0WOBF 940 .0 ( (938 .6 ) )X XTF 948 .365' PADGF 948.0WOBF 940.0((938.6))X XTF 948.365' PADGF 9 4 7. 7 LO LO 9 4 2. 7 (942. 0) X X TF 9 4 8. 0 BF 9 3 9. 7 50' P A D GF 947.4 LO¹ LO 943.4 (942.7) X X TF 948.7 BF 940.4 50' PAD GF 947.3 LO¹ LO 943.3 ((941.9))X X TF 948.6 BF 940.3X X((946.5))BF 939.9FBTF 948.2GF 947.9GF 951.0LOLO 946.0((944.6))X XTF 951.3BF 943.0GF 953.4WO¹BF 946.4((945.0))X XTF 954.71 1 2 4 5 6 7 8 9 10 11 1 6 5 4 3 2 1 18 17 16 15 14 13 12 11 10987 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 910 11 12 13 2 2 2 3 3 4 4 4OUTLOT AOUTLO T B OUTLOT C POND 1 NWL:931.5 HWL:936.5 136T H S T W A R R O W H E A D W A Y 1 3 6 T H C I R W NWL HWL INV:926.0 265 LF 6" SOLID WALL CORRUGATED HDPE NWL HWL 116 115 109 110 108 210 209 208 118 114 107 123 207 122 113 121 106 120 102 112 117 104 119 105 103 111 403 302 206 CB-1 CB-1A 204 402 203 101 201 401 13 12 11 2 10 1 3 7 6110 4 9 8 6 50+001+002+003+004+005+006+007+00 8+00 9+00 10+00 11+00 12+0013+0014+0015+0016+0016+95.035+48.53 1+00 2+00 3+00 4+00 5+00 3+11.51 1+00 2+00 0+001+00 2+00 3+003+17.75 202 205 301 953.1 946.5 949.3 960.0 954.7 930.8 931.2 937.0 931.5 937.6 939.9 Catchment - 209 DA: 0.59 AC TOC: 0.0 MIN C:0.60 Catchment - 210 DA: 0.50 AC TOC: 15.0 MIN C:0.40 Catchment - 208 DA: 0.16 AC TOC: 15.0 MIN C:0.60 Catchment - 205 DA: 0.23 AC TOC: 15.0 MIN C:0.25 Catchment - 119 DA: 0.56 AC TOC: 15.0 MIN C:0.60 Catchment - 107 DA: 0.18 AC TOC: 15.0 MIN C:0.60 Catchment - 106 DA: 0.29 AC TOC: 15.0 MIN C:0.60 Catchment - 105 DA: 0.19 AC TOC: 15.0 MIN C:0.60 Catchment - 110 DA: 0.57 AC TOC: 15.0 MIN C:0.60 Catchment - 109 DA: 0.54 AC TOC: 15.0 MIN C:0.60 Catchment - 108 DA: 0.07 AC TOC: 15.0 MIN C:0.60 Catchment - 122 DA: 0.79 AC TOC: 15.0 MIN C:0.25 Catchment - 121 DA: 0.53 AC TOC: 15.0 MIN C:0.25 Catchment - 120 DA: 0.77 AC TOC: 15.0 MIN C:0.25 Catchment - 116 DA: 0.48 AC TOC: 15.0 MIN C:0.60 Catchment - 115 DA: 0.42 AC TOC: 15.0 MIN C:0.60 Catchment - 114 DA: 0.43 AC TOC: 15.0 MIN C:0.60 Catchment - 118 DA: 0.17 AC TOC: 15.0 MIN C:0.60 Catchment - 112 DA: 0.37 AC TOC: 15.0 MIN C:0.60 Catchment - 117 DA: 0.43 AC TOC: 15.0 MIN C:0.60 Catchment - 204 DA: 0.31 AC TOC: 15.0 MIN C:0.60 Catchment - 203 DA: 0.16 AC TOC: 15.0 MIN C:0.60 Catchment - 111 DA: 0.71 AC TOC: 15.0 MIN C:0.60 Catchment - 103 DA: 0.65 AC TOC: 15.0 MIN C:0.60 Catchment - 403 DA: 0.67 AC TOC: 15.0 MIN C:0.25 Catchment - 402 DA: 0.31 AC TOC: 15.0 MIN C:0.25 Catchment - 123 DA: 0.25 AC TOC: 15.0 MIN C:0.60 Catchment - 206 DA: 0.25 AC TOC: 900.0 MIN C:0.60 Catchment - 207 DA: 0.24 AC TOC: 900.0 MIN C:0.60 1. REMOVE & SALVAGE 18" FES 2. PLUG PIPE 3. REUSE AS FES 503 1.REMOVE WEST CB 2.PLUG 24" PIPE 1.REMOVE EAST CB 2.CONNECT CBMH 501 OVER EX. 24" PIPE STORM SEWER DESIGN 18219 70th Pl N, Maple Grove MN 55311 763.360.1307 | nate@aterraland.com A3A5+:ER=0*E:TERRASUBMITTALS & REVISIONS Date DescriptionRev.By PLAN DATE: SHEET REV.PAGE # CHECKED: DRAWN: PROJECT #: 02/23/2022 ROSEMOUNT, MN BRAY HILL NRH DS - 2022-001 BUILDERS LOT GROUP, LLC NOT FOR CONSTRUCTION 02/24/22 NRH CITY SUBMITTAL 1 LICENSE NO:DATE: I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. XX/XX/202247982 Nathan R. Herman 04/15/22 NRH CITY SUBMITTAL 2 SCALE IN FEET 0 10050 N REVISED 04/11/2022 0 50 NORTH License. No. DANIEL L. THURMES Date 4-11-22 I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly licensed Land Surveyor under the laws of the State of Minnesota. 25718 CERTIFICATION: An easement for Trail purposes 12.00 feet in width over and across that part of Outlot B, BRAY HILL, Dakota County, Minnesota, the centerline of said easement is described as follows: COMMENCING at the southwest corner of said Outlot B; thence on an assumed bearing of North 00 degrees 05 minutes 05 seconds East along the west line of said Outlot B a distance of 74.31 feet to the point of BEGINNING at the centerline to be described; thence southeasterly 30.44 feet along a non-tangential curve concave to the south having a radius of 100.00 feet a central angle of 17 degrees 26 minutes 29 seconds and chord which bears South 81 degrees 16 minutes 45 seconds East; thence easterly 73.70 feet along a reverse curve concave to the north having a radius of 100.00 feet and a central angle of 42 degrees 13 minutes 35 seconds; thence North 65 degrees 12 minutes 54 seconds East a distance of 151.74 feet; thence northeasterly 18.05 feet along a non-tangential curve concave to the northwest having a radius of 20.00 feet and a central angle of 51 degrees 42 minutes 42 seconds and a chord which bears North 42 degrees 06 minutes 35 seconds East to the northwesterly line of said Outlot B and said line there terminating. The side lines of said easement are to be extended by their full width to terminate on the west and northwesterly lines of said Outlot B. LAND SURVEYING, INC CORNERSTONE EXHIBIT __ Suite #200 1970 Northwestern Ave. Stillwater, MN 55082 Phone 651.275.8969 dan@cssurvey .net TRAIL EASEMENT OVER OUTLOT B SOUTHWEST CORNER OF OUTLOT BWEST LINE OFOUTLOT BSE'LY LI N E O F OUTLO T B NW'LY LI N E OF OU T L O T B 12' WI D E T R AI L E A S E M E N T Bray hill, Rosemount - CONCEPTUAL FRONT ELEVATION EXAMPLES 40’ 4nd 45’ wide Two-Story with 2 & 3-CAR Garage – lot widths: 52’ and 57’ 40’ and 45’ wide rambler and 1.5-story with 2 & 3-CAR Garage – lot widths: 52’ and 57’ Note: These are form & function representations only - exterior colors and architectural elements will vary. March 11, 2022 HGTS Project Number: 21-1320 Mr. Dwayne Sikich Builders Lot Group, LLC 9531 West 78th Street, Suite 135 Eden Prairie, MN 55344 Re: Geotechnical Exploration Report, Proposed Bray Hill Residential Development, Rosemount, Minnesota Dear Mr. Sikich: We have completed the geotechnical exploration report for the proposed residential development in Rosemount, Minnesota. A brief summary of our results and recommendations is presented below. Specific details regarding our procedures, results and recommendations follow in the attached geotechnical exploration report. Eleven soil borings were completed for this project that encountered about 1 to 5 feet of clayey topsoil underlain by both clayey and sandy glacial outwash and glacial till deposits that extended to the termination depths of the soil borings. Groundwater was not encountered in the borings while drilling and sampling or after removing the augers from the boreholes. The vegetation and topsoil are not suitable for foundation support and will need to be removed from within the proposed building and oversize areas. If the new homes will include a basement level, the removal of some or all of these soils will likely be incidental to construction. It is our opinion that the underlying native soils are suitable for foundation support and with the building pads prepared as recommended it is our opinion that the foundations for the proposed building can be designed for a net allowable soil bearing capacity up to 2,000 pounds per square foot. Thank you for the opportunity to assist you on this project. If you have any questions or need additional information, please contact Paul Gionfriddo at 612-271-8185. Sincerely, Haugo GeoTechnical Services Nic Alfonso, G.I.T. Paul Gionfriddo, P.E. Project Geologist Senior Engineer GEOTECHNICAL EXPLORATION REPORT PROJECT: Proposed Bray Hill Residential Development SE Quadrant Akron Avenue & Bonaire Path East Rosemount, Minnesota 55424 PREPARED FOR: Builders Lot Group, LLC 9531 West 78th Street, Suite 135 Eden Prairie, MN 55344 PREPARED BY: Haugo GeoTechnical Services 2825 Cedar Avenue South Minneapolis, Minnesota 55407 Haugo GeoTechnical Services Project: 21-1320 March 11, 2022 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. Paul Gionfriddo, P.E. Senior Engineer License Number: 23093 Table of Contents 1.0 INTRODUCTION 1 1.1 Project Description 1 1.2 Purpose 1 1.3 Site Description 1 1.4 Scope of Services 1 1.5 Documents Provided 1 1.6 Locations and Elevations 2 2.0 FIELD PROCEDURES 2 3.0 RESULTS 3 3.1 Soil Conditions 3 3.2 Groundwater 3 3.3 Laboratory Testing 3 3.4 OSHA Soil Classification 4 4.0 DISCUSSION AND RECOMMENDATIONS 4 4.1 Proposed Construction 4 4.2 Discussion 5 4.3 Site Grading Recommendations 6 4.4 Dewatering 7 4.5 Interior Slabs 7 4.6 Below Grade Walls 8 4.7 Exterior Slabs 8 4.8 Site Grading and Drainage 9 4.9 Utilities 9 4.10 Bituminous Pavements 10 4.11 Materials and Compaction 11 4.12 Stormwater Ponds/Infiltration Basins 11 5.0 CONSTRUCTION CONSIDERATIONS 12 5.1 Excavation 12 5.2 Observations 12 5.3 Backfill and Fills 12 5.4 Testing 12 5.5 Winter Construction 12 6.0 PROCEDURES 13 6.1 Soil Classification 13 6.2 Groundwater Observations 13 7.0 GENERAL 13 7.1 Subsurface Variations 13 7.2 Review of Design 13 7.3 Groundwater Fluctuations 14 7.4 Use of Report 14 7.5 Level of Care 14 APPENDIX Boring Location Sketch and GPS Boring Locations, Figure 1 Soil Boring Logs, SB-10 thru SB-14 and SB-16 thru SB-21 Descriptive Terminology 1 1.0 INTRODUCTION 1.1 Project Description Builders Lot Group, LLC is proposing to construct the Bray hill residential development in Rosemount, Minnesota and retained Haugo GeoTechnical Services (HGTS) to perform a geotechnical exploration to evaluate the suitability of site soil conditions to support the proposed development. We understand the project will include preparing lots and house pads for 49 single-family homes along with the associated streets, underground utilities and stormwater pond. 1.2 Purpose The purpose of this geotechnical exploration was to characterize subsurface soil and groundwater conditions and provide recommendations for site grading and foundation design and construction. 1.3 Site Description The project site is located at 1102 Bonaire Path East in Rosemount, Minnesota. At the time of our exploration, the project site was used for agricultural purposes and a farmstead existed at the approximate center of the property. The site topography was relatively flat in the western portion of the property and sloped downward to the northeast in the eastern portion of the property. The elevations at the soil boring locations ranged from about 929 ½ to 962 feet above mean sea level (MSL). 1.4 Scope of Services Our services were performed in accordance with the Haugo GeoTechnical Services proposal 21-1320 dated December 29, 2021. Our scope of services was performed under the terms of our General Conditions and limited to the following tasks:  Completing twelve (12) standard penetration test soil borings and extending each to nominal depths of 20 feet.  Sealing the borings in accordance with Minnesota Department of Health requirements.  Obtaining GPS coordinates and ground surface elevations at the soil boring locations.  Visually/manually classifying samples recovered from the soil borings.  Performing laboratory tests on selected samples.  Preparing soil boring logs describing the materials encountered and the results of groundwater level measurements.  Preparing an engineering report describing current soil and groundwater conditions and providing recommendations for foundation design and construction. One soil boring, SB-15, was accessible to our drill rig and because of that it was not completed. 2 1.5 Documents Provided We were provided “Bray Hill - PUD Concept Plan #8” (Concept Plan) prepared by Builders Lot Group, LLC and dated January 15, 2022. Based on the concept plan the proposed development will include lots for about 49 single family homes along with the associated streets, green areas and stormwater management areas. Other than the Concept Plan, specific architectural, structural or civil plans were not available at the time of this geotechnical evaluation. HGTS completed a Phase I environmental Site Assessment (Phase I ESA) in conjunction with this report the result of which were presented in our report dated February 8, 2022 under HGTS project number 21-1319. Briefly, the project site was historically used for agricultural and residential (farmstead) purposes from at least 1937, and possibly earlier, to the present day. Several structures were located within the farmstead area of the property that included a house, garage, shed, barn, Quonset shed, three pole barns and eight silos/farm bins. Two above ground tanks were observed on the property as well as a well for potable water and a septic system. Please refer to the Phase I ESA report for specific details. 1.6 Locations and Elevations The soil boring locations were selected and staked in the field by Builders Lot Group and/or members of their design team. The approximate location of the soil borings is shown on the Concept Plan described in Section 1.5. GPS coordinates and ground surface elevations at the soil boring locations were also provided by Builders Lot Group and/or members of their design team. 2.0 FIELD PROCEDURES Eight (8) standard penetration test borings were advanced on February 23rd and 27th, 2022 by HGTS with a rotary drilling rig, using continuous flight augers to advance the boreholes. Representative samples were obtained from the borings, using the split-barrel sampling procedures in general accordance with ASTM Specification D-1586. In the split-barrel sampling procedure, a 2-inch O.D. split-barrel spoon is driven into the ground with a 140- pound hammer falling 30 inches. The number of blows required to drive the sampling spoon the last 12 inches of an 18-inch penetration is recorded as the standard penetration resistance value, or "N" value. The results of the standard penetration tests are indicated on the boring logs. The samples were sealed in containers and provided to HGTS for testing and soil classification. A field log of each boring was prepared by HGTS. The logs contain visual classifications of the soil materials encountered during drilling, as well as the driller's interpretation of the subsurface conditions between samples and water observation notes. The final boring logs included with this report represents an interpretation of the field logs and include modifications based on visual/manual method observation of the samples. 3 The soil boring logs, general terminology for soil description and identification, and classification of soils for engineering purposes are also included in the appendix. The soil boring log identify and describe the materials encountered, the relative density or consistency based on the Standard Penetration resistance (N-value, “blows per foot”) and groundwater observations. The strata changes were inferred from the changes in the samples and auger cuttings. The depths shown as changes between strata are only approximate. The changes are likely transitions, variations can occur beyond the location of the boring. 3.0 RESULTS 3.1 Soil Conditions At the surface, the soil borings encountered about 1 to 5 ½ feet of clayey topsoil composed of; silty clayey sand, silty clay, sandy lean clay or silty clayey sand that was black in color and contained some roots and gravel. Below the topsoil, the soil boring encountered a variety of sandy and clayey glacial outwash and glacial till deposits that extended to the termination depths of the borings. These soils were composed of; poorly graded sand, poorly graded sand with silt, clayey sand, sandy lean clay, lean clay and silty clay. Penetration resistance values (N-Values), shown as blows per foot (bpf) on the boring log, within the sandy soils (poorly graded sand, poorly graded sand with silt, clayey sand) ranged from 7 bpf to 28 bpf with most of the N-Values greater than 10 bpf. These values indicate that the sandy soil had a loose to medium dense relative density but were mostly medium dense. The clayey soils (sandy lean clay, lean clay and silty clay) had N-Values ranging from 5 bpf to 62 bpf indicating a rather soft to hard consistency. 3.2 Groundwater Groundwater was not encountered in the soil borings while drilling and sampling or after removing the augers from the boreholes. Water levels were measured on the dates as noted on the boring logs and the period of water level observations was relatively short. Groundwater monitoring wells or piezometers would be required to more accurately determine water levels. Seasonal and annual fluctuations in the groundwater levels should be expected. 3.3 Laboratory Testing Laboratory moisture content and percent passing the number 200 sieve (P-200) tests were performed on selected samples recovered from the soil boring. Laboratory test results are summarized in Table 1 and are also shown on the boring logs adjacent to the sample tested. 4 Table 1. Summary of Laboratory Tests Boring Number Sample Number Depth (feet) Moisture Content (%) * P-200 Content (%) * SB-10 SS-11 5 2 ½ - SB-11 SS-26 2 ½ 13 - SB-12 SS-4 7 ½ 14 ½ - SB-13 SS-34 2 ½ 11 - SB-14 SS-42 2 ½ 13 - SB-16 SS-18 2 ½ 10 - SB-18 SS-50 2 ½ 8 33 ½ SB-18 SS-51 6 2 5 ½ SB-19 SS-59 5 4 3 ½ SB-20 SS-68 7 ½ 6 ½ 11 SB-21 SS-74 2 ½ 15 76 ½ SB-21 SS-76 7 ½ 1 3 *Moisture content values rounded to the nearest ½ percent. 3.4 OSHA Soil Classification Below the topsoil the borings encountered both sandy and clayey soils including; poorly graded sand, poorly graded sand with silt, silty sand, clayey sand, sandy lean clay, lean clay and silty clay. The soils identified as poorly graded sand, poorly graded sand with silt, silty sand and clayey sand generally meets the ASTM classifications SP, SP-SM, SM and SC, respectively, and will generally be Type C soil under Department of Labor Occupational Safety and Health Administration (OSHA) guidelines. The sandy lean clay, lean clay and silty clay generally meet the ASTM Classification of CL and CL-ML and will generally be Type B soil under OSHA guidelines. An OSHA-approved qualified person should review the soil classification in the field. Excavations must comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P, “Excavations and Trenches.” This document states excavation safety is the responsibility of the contractor. The project specifications should reference these OSHA requirements. 4.0 DISCUSSION AND RECOMMENDATIONS 4.1 Proposed Construction We understand the project will include preparing lots and house pads for 49 single-family homes along with the associated streets, underground utilities and stormwater pond(s). We were not provided any information regarding the future homes and for the purposes of this evaluation we anticipate the new homes will include one or two stories above grade and will have Lookout, Walkout or Full basement style foundations. We anticipate below grade construction consisting of cast-in-place concrete or masonry block foundation walls supported on concrete spread footings. The above grade construction will likely consist of wood framing, a pitched roof and asphalt shingles. 5 Based on the assumed construction we estimate wall loadings will range from about 2 to 3 kips (2,000 to 3,000 pounds) per lineal foot and column loads, if any will be less than 75 kips (75,000 pounds). We further assume that homes will be constructed at or near existing site grades so that cuts and fills for permanent grade changes will be about 5 feet or less. If the proposed loads exceed these values or if the design or location of the proposed development changes, we should be informed. Additional analyses and revised recommendations may be necessary. 4.2 Discussion A farmstead existed on the project site at the time of our exploration which we understand will be removed/demolished to make way for the new home. The farmstead contained several structures that included a house, garage, shed, barn, Quonset shed, three pole barns and eight silos/farm bins. We recommend that all remnants of the structures including footings, foundation walls, floor slabs and underground utilities be removed from within the proposed building, pavement, utility and oversize areas and properly disposed of off-site. Two above ground tanks were also observed on the property as well as a well for potable water and a septic system. If the tanks cannot or will not be used or reused, we recommend the tanks and their contents be removed and properly disposed of off-site in accordance with applicable rules and regulations. Likewise, if the well and septic system cannot or will not be used or reused, we recommend they be removed and /or sealed in accordance with applicable rules and regulations. The vegetation and topsoil and are not suitable for foundation support and will need to be removed from within the proposed building, roadway, utility and oversize areas and replaced as needed with suitable compacted engineered fill. It is our opinion that the underlying glacial outwash and glacial till soils are generally suitable for foundation support. Groundwater was not encountered in the soil borings while drilling and sampling or after removing the augers from the boreholes. We do not anticipate that groundwater will be encountered during construction and do not anticipate that dewatering will be required. The following sections provide recommendations for site grading and foundation design and construction. 6 4.3 Site Grading Recommendations Excavation We recommend that all remnants of the existing structures including foundations, foundation walls, floor slabs, and underground utilities be removed from within the proposed building, roadway, utility and oversize areas and be properly disposed of off-site. We recommend that all vegetation, topsoil and any soft or otherwise unsuitable materials, if encountered, be removed from below the proposed building, roadway, utility and oversize areas. Table 2 below summarizes the anticipated excavation depths at the soil boring locations. Excavation depths may vary and could be deeper. Table 2. Anticipated Excavation Depths Boring Number Measured Surface Elevation (feet) Anticipated Excavation Depth (feet)* Anticipated Excavation Elevation (feet)* SB-10 961.5 1 960 ½ SB-11 962.0 1 961 SB-12 961.2 1 960 SB-13 960.6 1 959 ½ SB-14 958.1 1 957 SB-16 935.4 1 934 ½ SB-17 937.5 5 932 ½ SB-18 936.9 Pond - SB-19 933.1 Pond - SB-20 929.5 Pond - SB-21 935.7 Pond - * = Excavation depths and elevations were rounded to nearest ½ foot. Oversizing In areas where the excavations extend below the proposed footing elevations, the excavations require oversizing. We recommend the perimeter of the excavation be extended a foot outside the proposed footprint for every foot below footing grade (1H:1V oversizing). The purpose of the oversizing is to provide lateral support of the foundation. Fill Material Fill required to attain site grades may consist of any debris-free, non-organic mineral soil. Except we recommend that fill or backfill placed in wet excavations or within 2 feet of the groundwater table, if encountered, consist of granular soil (sand) with less than 5 percent passing the number 200 sieve and at least 50 percent retained on the number 40 sieve. The on-site native soils appear to be generally suitable for reuse as structural fill or backfill provided they are free of organic matter or other deleterious materials. If these soils will be used or reused as fill or backfill, some moisture conditioning (drying or wetting) of the soil could be required to meet the recommend compaction levels. Topsoil or soils that are black in color are not suitable for reuse as structural fill or backfill. 7 Backfilling We recommend that backfill placed to attain site grades be compacted to a minimum of 95 percent of its standard Proctor density (ASTM D 698). Granular fill classified as SP or SP-SM should be placed within 65 percent to 105 percent of its optimum moisture content as determined by the standard Proctor. Other fill soils should be placed within 3 percentage points above and 1 percentage point below its optimum moisture content as determined by the standard Proctor. All fill should be placed in thin lifts and be compacted with a large self-propelled vibratory compactor operating in vibratory mode. Foundations We recommend the perimeter footings bear a minimum of 42 inches below the exterior grade for frost protection. Interior footings may be placed immediately below the slab provided construction does not occur during below freezing weather conditions. Foundation elements in unheated areas (i.e., deck or porch footings) should bear at least 5 feet below exterior grade for frost protection. We anticipate the foundations and floor slabs will bear on compacted engineered fill over native glacial till clayey soils. With the building pad prepared as recommended, it is our opinion the footings can be designed for a net allowable bearing pressure up to 2,000 pounds per square foot (psf). We anticipate total and differential settlement of the foundations will be less than 1 inch and ½ inch, respectively, across a 30-foot span. 4.4 Dewatering Groundwater was not encountered in the soil borings. We do not anticipate that groundwater will be encountered during construction and do not anticipate that dewatering will be required. 4.5 Interior Slabs The anticipated floor subgrade will consist of compacted sandy or clayey engineered fill or sandy or clayey native soils. It is our opinion a modulus of subgrade reaction, k, of 100 pounds per square inch of deflection (psi) may be used to design the floor. If floor coverings or coatings less permeable than the concrete slab will be used, we recommend that a vapor retarder or vapor barrier be placed immediately beneath the slab. Some contractors prefer to bury the vapor barrier or vapor retarder beneath a layer of sand to reduce curling and shrinkage, but this practice often traps water between the slab and vapor retarder or barrier. Regardless of where the vapor retarder or vapor barrier is placed, we recommend consulting the floor covering manufacturer regarding the appropriate type, use and installation of the vapor retarder or vapor barrier to preserve the warranty. We recommend following all state and local building codes with regards to a radon mitigation plan beneath interior slabs. 8 4.6 Below Grade Walls We anticipate that the homes will have partial or full depth basements. We recommend general waterproofing of the below grade walls. We recommend either placing drainage composite against the backs of the exterior walls or backfilling adjacent to the walls with sand having less than 50 percent of the particles by weight passing the #40 sieve and less than 5 percent of the particles by weight passing the #200 sieve. The sand backfill should be placed within 2 feet horizontally of the wall. We recommend the balance of the backfill for the walls consist of sand however the sand may contain up to 20 percent of the particles by weight passing the #200 sieve. We recommend installing drain tile behind the below grade walls, adjacent to the wall footing and below the slab elevation. Preferably the drain tile should consist of perforated pipe embedded in gravel. A geotextile filter fabric should encase the pipe and gravel. The drain tile should be routed to a storm sewer, sump pump or other suitable disposal site. Foundation walls or below grade (basement) walls will have lateral loads from the surrounding soil transmitted to them. Active earth pressures can be used to design the below grade walls if the walls are allowed to rotate slightly. If wall rotation cannot be tolerated, then below grade wall design should be based on at-rest earth pressures. It is our opinion that the estimated soil parameters presented in Table 3, be used for below grade wall design. These estimated soil parameters are based on the assumptions that the walls are drained, there are no surcharge loads within a horizontal distance equal to the height of the wall and the backfill is level. Table 3. Soil Parameters Soil Type Estimated Unit Weight (pcf) Estimated Friction Angle (degrees) At-Rest Pressure (pcf) Active Soil Pressure (pcf) Passive Soil Pressure (pcf) Sand (SP & SP-SM) 120 32 55 35 390 Other Soils (CL, CL-ML, SC, SM) 135 28 70 50 375 Resistance to lateral earth pressures will be provided by passive resistance against the wall footings and by sliding resistance along the bottom of the wall footings. We recommend a sliding coefficient of 0.35. This value does not include a factor of safety. 4.7 Exterior Slabs Exterior slabs (patios, sidewalks, etc.) will likely be underlain clayey soils which are considered moderately to highly frost susceptible. If these soils become saturated and freeze, frost heave may occur. This heave can be a nuisance in front of doors and at other critical grade areas. One way to help reduce the potential for heaving is to remove the frost- susceptible soils below the slabs down to bottom of footing grades and replace them with non- 9 frost-susceptible backfill consisting of sand having less than 5 percent of the particles by weight passing the number 200 sieve. If this approach is used and the excavation bottoms terminate in non-free draining granular soil, we recommend a drain tile be installed along the bottom outer edges of the excavation to collect and remove any water that may accumulate within the sand. The bottom of the excavation should be graded away from the building. If the banks of the excavations to remove the frost-susceptible soils are not sloped, abrupt transitions between the frost-susceptible and non-frost-susceptible backfill will exist along which unfavorable amounts of differential heaving may occur. Such transitions could exist between exterior slabs and sidewalks, between exterior slabs and pavements and along the slabs themselves if the excavations are confined to only the building entrances. To address this issue, we recommend sloping the excavations to remove frost-susceptible soils at a minimum 3:1 (horizontal:vertical) gradient. An alternative method of reducing frost heave is to place a minimum of 2 inches of extruded polystyrene foam insulation beneath the slabs and extending it about 4 feet beyond the slabs. The insulation will reduce frost penetration into the underlying soil and reduce heave. Six to twelve inches of granular soil is typically placed over the insulation to protect it during construction. Another alternative for reducing frost heave is to support the slabs on frost depth footings. A void space of at least 4 inches should be provided between the slab and the underlying soil to allow the soil to heave without affecting the slabs. 4.8 Site Grading and Drainage We recommend the site be graded to provide positive run-off away from the proposed house. We recommend landscaped areas be sloped a minimum of 6 inches within 10 feet of the building and slabs be sloped a minimum of 2 inches. In addition, we recommend downspouts with long splash blocks or extensions. We recommend the lowest floor grades be constructed to meet City of Rosemount requirements with respect to groundwater separation distances. In the absence of city requirements, we recommend maintaining at least a 4-foot separation between the lowest floor slab and the observed groundwater levels and at least a 2-foot separation between the lowest floor slab and the 100-year flood level of nearby wetlands, storm water ponds or other surface water features. 4.9 Utilities We anticipate that new utilities will be installed as part of this project. We further anticipate that new utilities will bear at depths ranging from about 7 to 10 feet below the ground surface. At these depths, we anticipate that the pipes will bear on compacted engineered fill or native glacial outwash or glacial till soils which in our opinion are suitable for pipe support. 10 We recommend that all vegetation, topsoil and any soft or otherwise unsuitable soil be removed from below the pipe invert elevations. We recommend bedding material be thoroughly compacted around the pipes. We recommend trench backfill above the pipes be compacted to a minimum of 95 percent beneath slabs and pavements, the exception being within 3 feet of the proposed pavement subgrade, where 100 percent of standard Proctor density is required. In landscaped areas, we recommend a minimum compaction of 90 percent. Groundwater was not encountered in the soil borings. We do not anticipate that groundwater will be encountered during utility construction and do not anticipate that dewatering will be required. 4.10 Bituminous Pavements General The City of Rosemount may have standard plates that dictate pavement design. If so, we recommend that the pavements be designed and constructed in accordance with the appropriate standard plates. The following paragraphs provide general pavement recommendations in the absence of city standard plates. Traffic We were not provided any information regarding traffic volumes, such as Average Annual Daily Traffic (AADT) or vehicle distribution. We anticipate the streets will be used predominantly by automobiles, light trucks, school busses, garbage trucks and delivery vans (FEDEX, UPS etc.). Based on the anticipated number of homes in the development and assumed traffic types we estimate the roadways will be subjected to maximum Equivalent Single Axle Loads (ESAL’s) of about 50,000 over a 20-year design life. This does not account for any future growth. Subgrade Preparation We recommend removing all vegetation, topsoil or other unsuitable materials from beneath the pavement subgrade. Prior to placing the aggregate base, we recommend compacting and/or test rolling the subgrade soils to identify soft, weak, loose, or unstable areas that may require additional subcuts. Backfill to attain pavement subgrade elevations can consist of any mineral soil provided it is free of organic material or other deleterious materials. We recommend placing and compacting fill and/or backfill as described in Section 4.3 except in paved areas where the upper 3 feet of fill and backfill should be compacted to a minimum of 100 percent of its standard Proctor maximum dry density. R-Value R-Value testing was beyond the scope of this project. Below the topsoil the soil borings encountered predominantly clayey soils composed of; clayey sand, sandy lean clay and silty clay corresponding to the ASTM Classifications of SC, CL and CL-ML. It is our opinion an assumed R-Value of 10 can be used for pavement design. Pavement Section Based on an estimated R-value of 10 and a maximum of 50,000 ESAL’s we recommend a pavement section consisting of a minimum of 4 inches of bituminous (2 inches of wear course and 2 inches of base course) underlain by a minimum of 9 inches of aggregate base. 11 4.11 Materials and Compaction We recommend specifying aggregate base meeting MN/DOT Class 5 aggregate base. We recommend the aggregate base be compacted to 100 percent of its maximum standard Proctor . We recommend that the bituminous wear and base courses meet the requirement of MN/DOT specification 2360. We recommend the bituminous pavements be compacted to at least 92% of the maximum theoretical density. We recommend specifying concrete that has a minimum 28-day compressive strength of 4,000 psi, and a modulus of rupture of at least 600 psi. We recommend Type I cement meeting the requirements of ASTM C150. We recommend specifying 5 to 7 percent entrained air for exposed concrete to provide resistance to freeze-thaw deterioration. We also recommend using a water/cement ratio of 0.45 or less for concrete exposed to deicers. 4.12 Stormwater Ponds/Infiltration Basins Based on the Concept Plan provided it appears the project will include constructing a storm water pond/infiltration basin on the east end of the site. We were not provided any information regarding site grades and or pond bottom elevations. Soil borings SB-18 thru SB- 21 were completed near or within the proposed stormwater pond and encountered clayey topsoil overlying clayey sand, lean clay, sand lean clay, poorly graded sand with silt and poorly graded sand. It is our opinion that the infiltration rates presented in Table 4, which were obtained from tables included in the “Minnesota Storm Water Manual”, can be used for stormwater pond/infiltration basin design. Table 4. Estimated Design Infiltration Rates Soil Description & ASTM Classification Hydrologic Soil Group Estimated Infiltration Rate (in/hr) Poorly Graded Sand and Poorly Graded Sand with Silt (SP & SP-SM) A 0.8 Silty Clayey Sand (SC-SM) D 0.06 Clayey Sand (SC) D 0.06 Silty Clay, Lean Clay & Sandy Lean Clay (CL) D 0.06 It should be noted that soil infiltration rates can vary due to; soil moisture content, soil compaction, the placement or introduction of fine-grained soils, topsoil or biofiltration media and changes or variations in local groundwater levels. These variations may result in additional construction costs and it is suggested that a contingency be provided for this purpose. Field tests (double ring infiltrometer) can be performed within the proposed infiltration basin area to verify infiltration rates of the in-situ soils. We would be pleased to provide these services if required or requested. 12 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Excavation Below the topsoil the borings encountered both sandy and clayey soils including; poorly graded sand, poorly graded sand with silt, silty sand, clayey sand, sandy lean clay, lean clay and silty clay. The soils identified as poorly graded sand, poorly graded sand with silt, silty sand and clayey sand generally meets the ASTM classifications SP, SP-SM, SM and SC, respectively, and will generally be Type C soil under Department of Labor Occupational Safety and Health Administration (OSHA) guidelines. The sandy lean clay, lean clay and silty clay generally meet the ASTM Classification of CL and CL-ML and will generally be Type B soil under OSHA guidelines. Temporary excavations in Type C soils should be constructed at a minimum of 1 ½ foot horizontal to every 1 foot vertical within excavations. Temporary excavations in Type B soils should be constructed at a minimum of 1 foot horizontal to every 1 foot vertical within excavations. Slopes constructed in this manner may still exhibit surface sloughing. If site constraints do not allow the construction of slopes with these dimensions, then temporary shoring may be required. 5.2 Observations A geotechnical engineer or a qualified engineering technician should observe the excavation subgrade to evaluate if the subgrade soils are similar to those encountered in the borings and adequate to support the proposed construction. 5.3 Backfill and Fills The on-site soils appear to be above and below their assumed optimum soil moisture content. Soils that will be excavated and used or reused as structural fill or backfill will likely require some moisture conditioning (wetting or drying) to meet the recommend compaction levels. We recommend moisture conditioning all soils that will be used as fill or backfill in accordance with Section 4.3 above. We recommend that fill and backfill be placed in lifts not exceeding 4 to 12 inches, depending on the size of the compactor and materials used. 5.4 Testing We recommend density tests of backfill and fills placed for the proposed foundations, streets and utilities. Samples of the proposed materials should be submitted to our laboratory prior to placement for evaluation of their suitability and to determine their optimum moisture content and maximum dry density (Standard Proctor). 5.5 Winter Construction If site grading and construction is anticipated to proceed during cold weather, all snow and ice should be removed from cut and fill areas prior to additional grading and placement of fill. No fill should be placed on frozen soil and no frozen soil should be used as fill or backfill. 13 Concrete delivered to the site should meet the temperature requirements of ASTM and/or ACI. Concrete should not be placed on frozen soil. Concrete should be protected from freezing until the necessary strength is obtained. Frost should not be permitted to penetrate below the footings. 6.0 PROCEDURES 6.1 Soil Classification The drill crew chief visually and manually classified the soils encountered in the borings in general accordance with ASTM D 2488, “Description and Identification of Soils (Visual- Manual Procedure).” Soil terminology notes are included in the Appendix. The samples were returned to our laboratory for review of the field classification by a soils engineer. Samples will be retained for a period of 30 days. 6.2 Groundwater Observations Immediately after taking the final samples in the bottom of the boring, the hole was checked for the presence of groundwater. Immediately after removing the augers from the borehole the hole was once again checked and the depth to water and cave-in depths were noted. 7.0 GENERAL 7.1 Subsurface Variations The analyses and recommendations presented in this report are based on data obtained from a limited number of soil borings. Variations can occur away from the boring, the nature of which may not become apparent until additional exploration work is completed, or construction is conducted. A reevaluation of the recommendations in this report should be made after performing on-site observations during construction to note the characteristics of any variations. The variations may result in additional foundation costs and it is suggested that a contingency be provided for this purpose. It is recommended that we be retained to perform the observation and testing program during construction to evaluate whether the design is as expected, if any design changes have affected the validity of our recommendations, and if our recommendations have been correctly interpreted and implemented in the designs, specifications and construction methods. This will allow correlation of the soil conditions encountered during construction to the soil borings and will provide continuity of professional responsibility. 7.2 Review of Design This report is based on the design of the proposed structures as related to us for preparation of this report. It is recommended that we be retained to review the geotechnical aspects of the design and specifications. With the review, we will evaluate whether any changes have affected the validity of the recommendations and whether our recommendations have been correctly interpreted and implemented in the design and specifications. 14 7.3 Groundwater Fluctuations We made water level measurements in the borings at the times and under the conditions stated on the boring log. The data was interpreted in the text of this report. The period of observation was relatively short and fluctuations in the groundwater level may occur due to rainfall, flooding, irrigation, spring thaw, drainage, and other seasonal and annual factors not evident at the time the observations were made. Design drawings and specifications and construction planning should recognize the possibility of fluctuations. 7.4 Use of Report This report is for the exclusive use of Builders Lot Group, LLC and their design team to use to design the proposed structures and prepare construction documents. In the absence of our written approval, we make no representation and assume no responsibility to other parties regarding this report. The data, analysis and recommendations may not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. 7.5 Level of Care Haugo GeoTechnical Services has used the degree of skill and care ordinarily exercised under similar circumstance by members of the profession currently practicing in this locality. No warranty expressed or implied is made. APPENDIX Silty Clayey Sand, trace Roots, dark brown, frozen. (Topsoil) (SP) Poorly Graded Sand, fine to coarse grained, with Gravel, brown, moist, loose to medium dense. (Glacial Outwash) (SP-SM) Poorly Graded Sand with Silt, fine grained, brown, moist, medium dense. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 9 SS 10 SS 11 SS 12 SS 13 SS 14 SS 15 SS 16 4-4-6 (10) 6-10-18 (28) 6-9-8 (17) 7-7-7 (14) 5-7-8 (15) 4-5-7 (12) 4-6-7 (13) 2.5 NOTES GROUND ELEVATION 961.5 ft MSL LOGGED BY NC DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS 750-2 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/23/22 COMPLETED 2/23/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-10 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clayey Sand, trace Roots, dark brown, frozen (Topsoil) (SC) Clayey Sand, fine to medium grained, brown, moist, loose. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 25 SS 26 SS 27 SS 28 SS 29 SS 30 SS 31 SS 32 100 33 56 67 89 100 78 100 5-5-3 (8) 4-9-10 (19) 6-10-12 (22) 6-10-10 (20) 8-9-12 (21) 7-7-12 (19) 4-5-8 (13) 13 NOTES GROUND ELEVATION 962 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 11 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-11 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clay, trace Roots, black, frozen. (Topsoil) (SP) Poorly Graded Sand, fine to medium grained, trace Gravel, moist, loose to medium dense. (Glacial Outwash) (CL) Sandy Lean Clay, trace Gravel, tan, wet, rather soft to medium. (Glacial Till) (CL-ML) Silty Clay with Sand, trace Gravel, tan and gray, wet, very stiff to hard. (Glacial Till) P-200 = 92.5% Bottom of borehole at 21.0 feet. AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 SS 8 3-4-5 (9) 3-6-13 (19) 3-3-3 (6) 3-2-3 (5) 8-10-12 (22) 9-9-9 (18) 12-22-40 (62) 14.5 NOTES GROUND ELEVATION 961.2 ft MSL LOGGED BY NC DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS 750-2 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/23/22 COMPLETED 2/23/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-12 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clay, trace Roots, dark brown, frozen. (Topsoil) (CL-ML) Silty Clay, brown, wet, very stiff. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 33 SS 34 SS 35 SS 36 SS 37 SS 38 SS 39 SS 40 100 61 39 28 78 83 78 89 3-14-15 (29) 3-6-8 (14) 4-8-10 (18) 3-4-7 (11) 3-4-9 (13) 4-5-8 (13) 5-5-7 (12) 11 NOTES GROUND ELEVATION 960.5 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 7 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-13 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clay, trace Roots, black, frozen. (Topsoil) (SC) Clayey Sand, fine to medium grained, trace Gravel, brown, moist, loose. (Glacial Outwash) (SP) Poorly Graded Sand, fine to medium grained, trace Gravel, brown, moist, loose to medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 41 SS 42 SS 43 SS 44 SS 45 SS 46 SS 47 SS 48 100 94 61 89 106 72 78 78 5-5-5 (10) 5-8-6 (14) 4-5-6 (11) 7-4-6 (10) 4-7-8 (15) 4-6-8 (14) 5-8-10 (18) 13 NOTES GROUND ELEVATION 958.1 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 10 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-14 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clay, trace Roots, black, frozen. (Topsoil) (SC) Clayey Sand, fine grained, brown, moist, medium dense. (Glacial Outwash) (SP) Poorly Graded Sand, fine to medium grained, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 17 SS 18 SS 19 SS 20 SS 21 SS 22 SS 23 SS 24 100 56 67 50 72 83 83 72 9-9-8 (17) 8-10-9 (19) 7-6-5 (11) 5-7-8 (15) 5-6-7 (13) 6-6-7 (13) 5-7-8 (15) 10 NOTES GROUND ELEVATION 935.4 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/23/22 COMPLETED 2/23/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 7 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-16 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Sandy Lean Clay, trace Gravel, black, frozen to 2 to 3 feet then wet. (Topsoil) (SC) Clayey Sand, fine to medium grained, trace Gravel, brown, moist, loose. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 81 SS 82 SS 83 SS 84 SS 85 SS 86 SS 87 SS 88 4-3-4 (7) 2-3-5 (8) 3-5-8 (13) 3-7-8 (15) 4-7-12 (19) 3-6-9 (15) 2-5-8 (13) NOTES GROUND ELEVATION 937.5 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY NG DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-17 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clayey Sand, trace Roots, dark brown, frozen. (Topsoil) (SC) Clayey Sand, fine to medium grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) P-200 = 33.5% (SP-SM) Poorly Graded Sand with Silt, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) P-200 = 5.5% Thin Sandy Lean Clay seam at about 7 1/2 feet Bottom of borehole at 21.0 feet. AU 49 SS 50 SS 51 SS 52 SS 53 SS 54 SS 55 SS 56 100 83 56 22 89 61 83 67 7-12-7 (19) 3-7-8 (15) 6-9-10 (19) 5-6-7 (13) 5-5-7 (12) 5-5-7 (12) 4-6-8 (14) 8 2 NOTES GROUND ELEVATION 936.9 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 13 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-18 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Silty Clay, trace Roots, black, frozen. (Topsoil) (CL) Lean Clay, brown, wet, rather soft. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, loose to medium dense. (Glacial Outwash) P-200 = 3.5% Bottom of borehole at 21.0 feet. AU 57 SS 58 SS 59 SS 60 SS 61 SS 62 SS 63 SS 64 100 50 56 78 100 83 106 72 4-2-3 (5) 3-5-5 (10) 5-5-7 (12) 5-6-7 (13) 3-4-6 (10) 2-5-6 (11) 4-6-7 (13) 4 NOTES GROUND ELEVATION 933.1 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 8 Feet. HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-19 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Sandy Lean Clay, trace Gravel, trace Roots, black, frozen to 2 to 3 feet then wet. (Topsoil) (SP-SM) Poorly Graded Sand w/ Silt, fine to coarse grained, trace Gravel, brown, moist, loose. (Glacial Outwash) P-200 = 11% (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, loose to medium dense (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 65 SS 66 SS 67 SS 68 SS 69 SS 70 SS 71 SS 72 100 50 28 44 83 78 100 78 3-3-3 (6) 3-5-5 (10) 2-4-3 (7) 3-3-4 (7) 3-5-5 (10) 3-4-5 (9) 3-5-7 (12) 6.5 NOTES GROUND ELEVATION 929.5 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY NG DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-20 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 Sandy Lean Clay, trace Gravel, trace Roots, black, frozen. (Topsoil/Fill) Sandy Lean Clay, trace Gravel, brown and black, moist. (Topsoil/Fill) P-200 = 76.5% (SP) Poorly Graded Sand, fine to medium grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) P-200 = 3% (SP-SM) Poorly Graded Sand with Silt, fine to medium grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 73 SS 74 SS 75 SS 76 SS 77 SS 78 SS 79 SS 80 100 56 72 83 5-6-9 (15) 3-8-11 (19) 6-8-11 (19) 8-10-11 (21) 7-9-13 (22) 6-10-12 (22) 5-10-12 (22) 15 1 NOTES GROUND ELEVATION 935.7 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY NG DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-21 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/11/22 07:05 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSilty Clayey Sand, trace Roots, dark brown, frozen. (Topsoil) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, loose to medium dense. (Glacial Outwash) (SP-SM) Poorly Graded Sand with Silt, fine grained, brown, moist, medium dense. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 9 SS 10 SS 11 SS 12 SS 13 SS 14 SS 15 SS 16 4-4-6 (10) 6-10-18 (28) 6-9-8 (17) 7-7-7 (14) 5-7-8 (15) 4-5-7 (12) 4-6-7 (13) NOTES GROUND ELEVATION 961.5 ft MSL LOGGED BY NC DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS 750-2 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/23/22 COMPLETED 2/23/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-10 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:44 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSilty Clayey Sand, trace Roots, dark brown, frozen (Topsoil) (SC) Clayey Sand, fine to medium grained, brown, moist, loose. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 25 SS 26 SS 27 SS 28 SS 29 SS 30 SS 31 SS 32 100 33 56 67 89 100 78 100 5-5-3 (8) 4-9-10 (19) 6-10-12 (22) 6-10-10 (20) 8-9-12 (21) 7-7-12 (19) 4-5-8 (13) NOTES GROUND ELEVATION 961.96 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 11 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-11 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:44 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSilty Clay, trace Roots, black, frozen. (Topsoil) (SP) Poorly Graded Sand, fine to medium grained, trace Gravel, moist, loose to medium dense. (Glacial Outwash) (CL) Sandy Lean Clay, trace Gravel, tan, wet, rather soft to medium. (Glacial Till) (CL-ML) Silty Clay, trace Gravel, tan and gray, wet, very stiff to hard. (Glacial Till) Bottom of borehole at 21.0 feet. AU 1 SS 2 SS 3 SS 4 SS 5 SS 6 SS 7 SS 8 3-4-5 (9) 3-6-13 (19) 3-3-3 (6) 3-2-3 (5) 8-10-12 (22) 9-9-9 (18) 12-22-40 (62) NOTES GROUND ELEVATION 961.2 ft MSL LOGGED BY NC DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS 750-2 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/23/22 COMPLETED 2/23/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-12 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:44 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSilty Clay, trace Roots, dark brown, frozen. (Topsoil) (CL-ML) Silty Clay, brown, wet, very stiff. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 33 SS 34 SS 35 SS 36 SS 37 SS 38 SS 39 SS 40 100 61 39 28 78 83 78 89 3-14-15 (29) 3-6-8 (14) 4-8-10 (18) 3-4-7 (11) 3-4-9 (13) 4-5-8 (13) 5-5-7 (12) NOTES GROUND ELEVATION 960.55 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 7 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-13 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:44 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSilty Clay, trace Roots, black, frozen. (Topsoil) (SC) Clayey Sand, fine to medium grained, trace Gravel, brown, moist, loose. (Glacial Outwash) (SP) Poorly Graded Sand, fine to medium grained, trace Gravel, brown, moist, loose to medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 41 SS 42 SS 43 SS 44 SS 45 SS 46 SS 47 SS 48 100 94 61 89 106 72 78 78 5-5-5 (10) 5-8-6 (14) 4-5-6 (11) 7-4-6 (10) 4-7-8 (15) 4-6-8 (14) 5-8-10 (18) NOTES GROUND ELEVATION 958.12 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 10 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-14 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:45 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSilty Clay, trace Roots, black, frozen. (Topsoil) (SC) Clayey Sand, fine grained, brown, moist, medium dense. (Glacial Outwash) (SP) Poorly Graded Sand, fine to medium grained, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 17 SS 18 SS 19 SS 20 SS 21 SS 22 SS 23 SS 24 100 56 67 50 72 83 83 72 9-9-8 (17) 8-10-9 (19) 7-6-5 (11) 5-7-8 (15) 5-6-7 (13) 6-6-7 (13) 5-7-8 (15) NOTES GROUND ELEVATION 935.44 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/23/22 COMPLETED 2/23/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 7 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-16 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:45 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSandy Lean Clay, trace Gravel, black, frozen to 2 to 3 feet then wet. (Topsoil) (SC) Clayey Sand, fine to medium grained, trace Gravel, brown, moist, loose. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 81 SS 82 SS 83 SS 84 SS 85 SS 86 SS 87 SS 88 4-3-4 (7) 2-3-5 (8) 3-5-8 (13) 3-7-8 (15) 4-7-12 (19) 3-6-9 (15) 2-5-8 (13) NOTES GROUND ELEVATION 937.5 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY NG DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-17 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:45 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSilty Clayey Sand, trace Roots, dark brown, frozen. (Topsoil) (SC) Clayey Sand, fine to medium grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Thin Sandy Lean Clay (CLS) seam at 7 1/2 feet Bottom of borehole at 21.0 feet. AU 49 SS 50 SS 51 SS 52 SS 53 SS 54 SS 55 SS 56 100 83 56 22 89 61 83 67 7-12-7 (19) 3-7-8 (15) 6-9-10 (19) 5-6-7 (13) 5-5-7 (12) 5-5-7 (12) 4-6-8 (14) NOTES GROUND ELEVATION 936.93 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 13 Feet HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-18 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:45 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSilty Clay, trace Roots, black, frozen. (Topsoil) (CL) Lean Clay, brown, wet, rather soft. (Glacial Outwash) (SP-SM) Poorly Graded Sand with Silt, fine to medium grained, trace Gravel, brown, moist, loose to medium dense. (Glacial Outwash) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 57 SS 58 SS 59 SS 60 SS 61 SS 62 SS 63 SS 64 100 50 56 78 100 83 106 72 4-2-3 (5) 3-5-5 (10) 5-5-7 (12) 5-6-7 (13) 3-4-6 (10) 2-5-6 (11) 4-6-7 (13) NOTES GROUND ELEVATION 933.12 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY JM DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered with Cave-In Depth of 8 Feet. HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-19 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:45 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSandy Lean Clay, trace Gravel, trace Roots, black, frozen to 2 to 3 feet then wet. (Topsoil) (SP) Poorly Graded Sand, fine to coarse grained, trace Gravel, brown, moist, loose to medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 65 SS 66 SS 67 SS 68 SS 69 SS 70 SS 71 SS 72 100 50 28 44 83 78 100 78 3-3-3 (6) 3-5-5 (10) 2-4-3 (7) 3-3-4 (7) 3-5-5 (10) 3-4-5 (9) 3-5-7 (12) NOTES GROUND ELEVATION 929.5 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY NG DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-20 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:45 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 DRAFTSubject to RevisionSandy Lean Clay, trace Gravel, trace Roots, black, wet. (Topsoil/FIll) Silty Sand, trace Gravel, brown and black, moist. (Fill) (SP) Poorly Graded Sand, fine to medium grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) (SP-SM) Poorly Graded Sand with Silt, fine to medium grained, trace Gravel, brown, moist, medium dense. (Glacial Outwash) Bottom of borehole at 21.0 feet. AU 73 SS 74 SS 75 SS 76 SS 77 SS 78 SS 79 SS 80 100 56 72 83 5-6-9 (15) 3-8-11 (19) 6-8-11 (19) 8-10-11 (21) 7-9-13 (22) 6-10-12 (22) 5-10-12 (22) NOTES GROUND ELEVATION 935.7 ft MSL LOGGED BY MS DRILLING METHOD Hollow Stem Auger/Split Spoon DRILLING CONTRACTOR HGTS - 750 GROUND WATER LEVELS: CHECKED BY NG DATE STARTED 2/27/22 COMPLETED 2/27/22 AT TIME OF DRILLING --- Not Encountered AT END OF DRILLING --- Not Encountered AFTER DRILLING --- Not Encountered HOLE SIZE 3 1/4 inches FINES CONTENT (%) 20 40 60 80 20 40 60 80 PL LLMC DEPTH(ft)0 5 10 15 20 GRAPHICLOGMATERIAL DESCRIPTION SAMPLE TYPENUMBERRECOVERY %(RQD)BLOWCOUNTS(N VALUE) SPT N VALUE 20 40 60 80 MOISTURE CONT.(%)NOTESPAGE 1 OF 1 BORING NUMBER SB-21 CLIENT Builers Lot Group PROJECT NUMBER 21-1320 PROJECT NAME Bray Hill PROJECT LOCATION Rosemount, MN GEOTECH BH PLOTS - GINT STD US LAB.GDT - 3/4/22 12:45 - C:\USERS\HGTS 3\DROPBOX (HGTS)\HAUGO GEOTECHNICAL SERVICES\GINT PROJECT BACKUP\PROJECTS\21-1320 BRAY HILL.GPJHaugo GeoTechnical Services 2825 Cedar Ave South Minneapolis, MN 55407 Telephone: 612-729-2959 Fax: 763-445-2238 K:\019959-000\Admin\Docs\2022.04.15 - Submittal\2022.04.21 - Review of 2022.04.15 Submittal.docx Memorandum To: Julia Hogan, Planner CC: Stacy Bodsberg, Planning & Personnel Secretary Brian Erickson, City Engineer From: Tim Hanson PE, WSB Engineering Consultant Date: April 21, 2022 Re: Bray Hill Final Development Plans Preliminary Plat Review Grading and Drainage Plan Review Utility Plan Review Street Plan Review Landscaping Plan Review WSB File Number 019959-000 SUBMITTAL: Builders Lot Group has submitted preliminary plat, final plat and final development plans for the development of Lot 1, Block 1, Greystone 5th Addition which lies south of Bonaire Path, east of Akron Avenue and north of the Canadian Pacific railroad and Greystone 6th Addition. The plans submitted were prepared by Aterra Land Services. Review comments were generated from plans dated 04.15.2022. The submittal included the following: ▪ Existing Conditions – ALTA Survey ▪ Preliminary Plat ▪ Bray Hill Final Development Plan o Title Sheet o Demolition Plan o Final Grading Plan o Final Sanitary Sewer and Watermain Plan o Final Storm Sewer Plan o Final Street Plan o Construction Details o Tree Inventory and Preservation Plan EXISTING CONDITIONS The ALTA Survey identifies the existing structures and encumbrances on the property. Three existing easements must be vacated with the filling of the final plat. • 3 – Existing 10-foot Drainage and Utility Easement extending around the perimeter of Lot 1, Block 1, Greystone 5th Addition. (Noted on plans to be vacated) • 4 – Existing Drainage and Utility Easement per Doc Number 2600994. (Noted on plans to be vacated) • 5 – Existing Roadway, Drainage and Utility Easement per Doc Number 3302202. (Noted on plans to be vacated.) Julia Hogan April 21, 2022 Page 2 K:\019959-000\Admin\Docs\2022.04.15 - Submittal\2022.04.21 - Review of 2022.04.15 Submittal.docx PRELIMINARY PLAT / FINAL PLAT • A Trail Easement is noted on the preliminary plat to be dedicated. Note – there is a typo on the preliminary plat identifying this easement. The development Fees are indicated below based on the 2022 Schedule of Rates and Fees. ▪ Sanitary Sewer Trunk Charge: $1,075/acre ▪ Watermain Trunk Charge: $6,500/acre ▪ Storm Sewer Trunk Charge: $6,865/acre DEMOLITION PLAN The demolition plan identifies the removal of all buildings and private utilities within the lot. • An existing fence on the property line with the Canadian Pacific Railroad needs to be removed. (This does not refer to the snow fence which is on the CP Railroad property.) • An existing water service extending from Bonaire Path must be removed. Remove the curb box standpipe. • An existing FES extending towards Lot 5, Block 4, from Bonaire Path must be removed and the area graded to drain to Bonaire Path. • Existing culvert structures on the south side of Bonaire Path at the east end of the infiltration basin must be removed/modified to accommodate the overflow piping system for the ponding area. GRADING AND DRAINAGE • The proposed trail near Akron Avenue includes a culvert under the trail with drainage to the south. Could the grading be adjusted, and the culvert eliminated with surface drainage extending across the trail. It appears to be a small drainage area which would cross the trail. • The lots adjacent to Bonaire Path need to have the rear yard area graded to drain to the street. The storm sewer system from the westerly extension of Street A must be extended to connect with the proposed storm sewer system at the easterly extension of Street A. • The proposed infiltration basin must be moved to the west to provide for 52 feet of separation between a future well head and the High-Water Level of the basin. • Drainage and utility easement lines must be shown on the grading plan. • Sheet C3.01 – STORMWATER BASIN NOTES: d – there is a typo “yardss” • Sheet C3.02 – The D & U easement on lot 2, block 2 incorporates a significant portion of the lot. Minimize the area which is incorporated in the D & U easement. SANITARY SEWER AND WATERMAIN – UTILITY PLAN • The sanitary sewer depth between manholes 2 & 3 is just short of 30 feet deep. A parallel sanitary sewer needs to be constructed in this area to provide service to the adjacent lots. MH 13 could be moved north to serve lot 6, block 1 & lot 4, block 2. • The sanitary sewer between manholes 1 & 2 is very deep and most likely will impact the adjacent lot pads. Construction/reconstruction of the lot pads may be necessary to avoid differential settlement. Julia Hogan April 21, 2022 Page 3 K:\019959-000\Admin\Docs\2022.04.15 - Submittal\2022.04.21 - Review of 2022.04.15 Submittal.docx • The proposed plan shows the existing sanitary stub at Akron Avenue as proposed. • Rosemount utilizes ductile iron pipe for watermain service. • Remove the proposed watermain extension out to Bonaire Path. Extend watermain to the existing 16-inch watermain stub located east of the cul-de-sac. • Relocate the proposed valve at station 2+10 on Street A to station 4+10. • Sheet C5.02 – Is it possible to extend sewer and water service to lot 1, block 3 from the sanitary sewer run between MH 3 and MH 7. This would be unique to the site. • Sheet C5.02 – The curb stop elevations for lot 11, block 2 and lot 4 block 4, appear to be off, please review. • Sheet C5.02 – The sanitary sewer service extension to lot 2, block 4 is deeper than other lots and will be very flat off the main, please review. • Sheet C5.01 – The watermain connection to the stub at Bonaire Path needs to include watermain extension of – 16-inch from the existing 16-inch pipe to 10-feet south of the power lines install a 16 X 16-inch tee, Plug the east side of the 16-inch tee and extend to the west as indicated on the plan. • The City is reviewing the ability to construct a well house on Outlot D. STORM SEWER • Connect the two storm sewer segments along the south side of Bonaire Avenue and place catchbasins in the rear yard areas. • Structure 303, and 102 must be sump structures. • Structure 106 is preferred to be in the curb line. • Storm sewer run between structure 123 to 107 should drop into 107 due to the angle, 0.4 drop. • FES 401 must discharge into the NURP basin. • Sheet 6.02 - Rip rap at FES must extend to the bottom of the pond. This will most likely require more riprap than what is indicated. • Sheet C6.02 - The storm sewer run from CBMH 120 to CBMH 106 should drop into structure CBMH 106 if possible. • Sheet C6.02 – There are two arrows on the leader line for the storm sewer length in the profile view for CB 111 to CBMH 103. • Sheet C6.02 – The salvage note for the existing 18-inch FES is not applicable as I believe structure 503 has been eliminated. Storm sewer design and layout will also be reviewed with the Surface Water Management review. SURFACE WATER MANAGEMENT The proposed Surface Water Management plan for the preliminary plat is currently being reviewed. Comments included in the Surface Water Management review shall be incorporated in the project design. STREETS, TRAILS, SIDEWALK AND STREETLIGHTS • The proposed vertical curves on Street A at station 0+60.00 and station 2+50.00 should be lengthened to 90 feet. • The curb radii at the Bonaire Path and Street A intersections should be 25 feet. • The dropped curb at the existing driveway entrance off Bonaire Path must be removed and replaced with B618 curb. • The proposed vertical curve on Street A at station 15+50.00 should be lengthened to 122 feet. • Pedestrian curb ramps are required at all pedestrian crossings of streets. Julia Hogan April 21, 2022 Page 4 K:\019959-000\Admin\Docs\2022.04.15 - Submittal\2022.04.21 - Review of 2022.04.15 Submittal.docx • The typical section for residential streets is constructed on 2 feet of select granular borrow. • The typical section for concrete sidewalks is constructed on 12 inches of select granular borrow. The project can utilize class 7 above the select granular borrow. • A streetlight must be added on the common lot line of Lots 13 & 14, Block 2. • Street intersections with Bonaire Path require an overhead light fixture, decorative lights can be utilized within the subdivision at 350 foot maximum spacing and intersections. To obtain the spacing requirements, streetlights will be needed along the lot line (extended across the street) of lots 17 & 18 block 2, the common lot line of lots 6 & 7, block 1, and the common lot line of lots 4 & 5 block 3. Street light locations need to alternate sides of the street. • Sheet C7.02 – Mid block pedestrian ramps require the main sidewalk to be lower than what is typical for the graded boulevard. Please note lowering of the boulevard grade 50 feet each side of a mid-block pedestrian ramp to the appropriate elevation for pedestrian ramp construction. • Drainage of the intersections, Bonaire and 136th Street and Arrowhead Way requires detailing of the elevations and grades to assure proper drainage. • What would the intersection look like if Arrowhead Way was adjusted at the Bonaire Path intersection such that the existing catchbasin were in the curb line. If acceptable to your design, take a look at shifting the street east slightly and possibly a small reduction in the curb radius on the west side. This is primarily to see what it would look like, not a requirement or a proposed design. • Sheets C7.01, C7.02, C7.03 – the centerline – centerline notes in the plan and profile views on these sheets refer to Street A, Street B and Street C. Since the streets are now named, the notes are not relevant. General Infrastructure design shall be completed in accordance with the City of Rosemount’s Engineering Guidelines and Standards. Infrastructure construction shall be completed in accordance with the latest edition of the City’s General Specifications and Standard Detail Plates for Street and Utility Construction. K:\019959-000\Admin\Docs\WR Review\019959-000 Bray Hill Stormwater Review Memo 20220316.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum To: Brian Erickson, City of Rosemount From: Bill Alms, PE Henry Meeker, EIT Date: March 16, 2022 Re: Bray Hill Plan Review WSB Project No. 019959-000 I have reviewed the documents provided by Aterra on 2/24/2022 for the Bray Hill development project. Documents reviewed include: Bray Hill Final Development Plans Date: February 24, 2022 Author: Aterra Bray Hill Stormwater Management Plan Date: February 24, 2022 Author: AE2S Bray Hill Lateral Storm Sewer Design Date: February 24, 2022 Author: Aterra Bray Hill Final Plat Date: February 24, 2022 Author: Cornerstone Applicant should provide responses to each comment. I offer the following comments below. Grading, Drainage, and Erosion Control Comments on Plan Set 1. General a. An NPDES permit will be required prior to the start of construction. b. A SWPPP will need to be included with the next submittal. c. Inlets are required every 300’ on streets to prevent runoff from flowing through intersections. d. Show sump elevations in plans. The final structure before outletting to a water basin requires a 3 foot sump. 2. Ponds and Wetlands a. Include the 10-day snowmelt HWL on plans. 3. Emergency Overflow Routes: a. No comments. 4. Retaining Walls: a. No comments. 5. Erosion Control: a. No comments 6. Grading: a. Provide the datum used for grading elevations. Stormwater Management Plan: 1. General Storm Sewer Design a. Increase the HydroCAD model timespan for the 10-day snowmelt event. 100 hours only captures a small portion of the rising limb of the storm curve. Brian Erickson March 17, 2022 Page 2 K:\019959-000\Admin\Docs\WR Review\019959-000 Bray Hill Stormwater Review Memo 20220316.docx b. Insulation is required where storm sewer crosses over watermain with 18” or less of vertical separation. See the crossing under the pipe connecting STMH 104 and CBMH 103. c. Connect the storm sewer south of Bonaire Path E along block 3 with one continuous pipe instead of swale flows. Back yard drainage of these lots can be collected with catchbasins along the run of pipe or routed to the street drainage on Bonaire path E. However, the capacity of this street drainage must be analyzed to show it can handle this extra runoff. d. Moving structure 113 south along street A is recommended to bring the pipe further into ROW. e. Route FES 401 to flow directly into dead storage of BMP. Flows are not permitting to run over infiltrating surface without pretreatment. f. Deconflict outlet from the site BMP. Connecting overflow pipe to one of the two culverts under Bonaire Path E is recommended. Again, demonstrate culvert has capacity for this modification. 2. Water Quantity a. No comments. 3. Rate/Volume Control a. Site soils are given as HSG B, per Rosemount engineering standards the infiltration rate should be taken as 0.15 in/hr, not the 1 in/hr used in modeling. Different infiltration rates will be considered (up to a maximum of 3.0 in/hr) by the City Engineer based on percolation tests or other pertinent information conducted by a professional soil scientist or Professional Engineer. 4. Freeboard a. No comments. 5. Water Quality a. Assuming 1 in/hr infiltration rates, the 100-yr HWL of 935.79 will not allow for the infiltration basin to draw down within 48 hours as required under NPDES design requirements. b. The proposed municipal well should be reviewed for appropriate MDH setbacks and freeboard from basin HWL. 6. Easements a. The D&U easement over the pipe between structure 102 and 101 must be widened to account for the pipe depth. Since the pipe is greater than 10’ deep, the easement must be wide enough to allow for 1:1 grading from the bottom of the pipe to ground surface. For instance, at its deepest portion, the pi pe invert is approximately 15’ below ground surface, requiring a 30’ D&U easement to allow for sloped access to the pipe. M E M O R A N D U M To: Adam Kienberger, Community Development Director Anthony Nemcek, Senior Planner Julia Hogan, Planner From: Dan Schultz, Parks and Recreation Director Date: March 23, 2022 Subject: Bray Hill Development The Parks and Recreation Department recently reviewed the plans for the Bray Hill Development and has the following comments: Local Trails and Sidewalks The sidewalk amenities appear to be designed in a manner that works toward the City’s goal of having a well-connected community. Staff does recommend that the grading plan along the south side of Bonaire Path be adjusted to allow for a benched area to be created for a future trail. The future trail will be built by the City. Parks Dedication Because the City is not looking to acquire parkland in this development, the parks dedication for this development would be cash in-lieu of land. The cash dedication for 49 low density units @ $3,400 per units would be $166,600. The Parks and Recreation Commission will review the preliminary plat on Monday, March 28,2022. Please let know if you have any questions about this memo.