EXECUTIVE SUMMARY
City Council Regular Meeting: August 1, 2022
AGENDA ITEM: Great River Energy Relocation
Agreement for Auburn Avenue
AGENDA SECTION:
Consent
PREPARED BY: Brian Erickson, PE, City Engineer AGENDA NO. 6.e.
ATTACHMENTS: Agreement APPROVED BY: LJM
RECOMMENDED ACTION: Motion to Approve a relocation agreement with Great River
Energy to relocate a transmission line pole to allow construction of Auburn Avenue.
BACKGROUND
The construction of Auburn Avenue as part of the Amber Fields development requires the relocation of
one of the Great River Energy (GRE) transmission line poles out of the road right of way. Since the pole
is located within an easement that GRE had with the University of Minnesota (the previous property
owner), the relocation cost is a developer expense.
Early in the development for the design of Auburn Avenue it was noted that the existing transmission line
pole owned by GRE would need to be relocated. At that time the City of Rosemount started coordination
with GRE with the understanding that any relocation costs would be borne by the developer. Now that
the preliminary engineering is completed, GRE has provided a Relocation Agreement that requires
approval.
The estimated cost for the relocation is $85,791 which is reimbursable. Thus, if the actual cost is less,
GRE will refund the difference. Similarly, if the cost is more, GRE wsill request additional funds to cover
that cost. This cost would be paid from the funding provided for Amber Fields 1st Subdivision.
The city attorney has reviewed the agreement and had one comment regarding the signature page which
has been corrected.
RECOMMENDATION
Staff recommends that the City Council approve the relocation agreement Great River Energy.
RELOCATION AGREEMENT
The City of Rosemount (“City”), a political subdivision of the State of Minnesota and
GREAT RIVER ENERGY, agree to the following facts, terms and conditions regarding
the described project:
The City prepared plans and specifications to issue a contract, for the construction of a
road project being identified as Project No. 220-0078, an extension of Auburn Avenue on
the south side of CSAH 42 in the City of Rosemount (“the project”); and
1. Certain transmission line facilities (DA-BK) owned and operated by GREAT
RIVER ENERGY (“the facilities”) are currently located in part on private
property and within the limits of the project where GREAT RIVER ENERGY
has property rights; and
2. The City and GREAT RIVER ENERGY have determined that the facilities
owned and operated by GREAT RIVER ENERGY need to be relocated.
GREAT RIVER ENERGY has requested reimbursement of the actual cost it
incurs in relocating GREAT RIVER ENERGY’S facilities and the City agrees
to reimburse GREAT RIVER ENERGY for all associated costs.
NOW, THEREFORE, IT IS AGREED:
ARTICLE 1 - APPLICABLE LAWS, POLICIES AND PROCEDURES
THIS AGREEMENT is made in accordance with applicable federal, state and
local laws and ordinances, and any other applicable laws or regulations, including any
supplements or amendments thereto, and are made a part hereof by reference with the
same force and effect as though fully set forth herein.
ARTICLE 2 – PLANS
RELOCATION PLANS will be provided by GREAT RIVER ENERGY to the
City as soon as they are 100% complete, indicating the facilities involved and the
location of new facilities, as related to the project.
City of Rosemount
Project No. 220-0078
GRE Project No. 209360
ARTICLE 3 – ESTIMATE
ACTUAL COST BASIS, the estimated cost of the reimbursable work that will be
performed by GREAT RIVER ENERGY is $ 85,791.00. This estimate of cost requires
the City to pay an advance payment deposit of 100% of the estimated cost to GREAT
RIVER ENERGY and is required prior to any construction work starting. The breakdown
of estimated cost for the work to be completed and to be paid is as follows:
Labor $46,189
Material $15,916
Vehicle & Other $ 2,786
Cosulting/Contracting $ 5,000
Heavy Equipment $15,900
ESTIMATE TOTAL $85,791
TOTAL DUE WITH AGREEMENT $85,791
ARTICLE 4 – RELOCATION
All work to relocate the facilities will be coordinated to accommodate the
contractor’s base work operations within reason, which GREAT RIVER ENERGY and
the City have reviewed and agreed to:
PERMITS. The scope of GREAT RIVER ENERGY’S relocation project
may require GREAT RIVER ENERGY to acquire permits from the City,
County, MnDOT, Corp of Engineers and/or Minnesota DNR. GREAT
RIVER ENERGY will provide one copy of any permit application that is
required for the project, including copies of the “proposed” sketches
associated with each permit application associated with this project before
GREAT RIVER ENERGY begins relocating its facilities.
ABANDONED FACILITIES. GREAT RIVER ENERGY will remove
those existing facilities and materials which need to be removed because
of project requirements and there shall be no “abandoned facilities”.
City of Rosemount
Project No. 220-0078
GRE Project No. 209360
ARTICLE 5 - TIME SCHEDULING
STARTING DATE. GREAT RIVER ENERGY will relocate in the late
summer/early fall of 2022 and construction by the City began in the late spring/early
summer of 2022. If GREAT RIVER ENERGY’S relocation is not complete by the late
fall of 2022, GREAT RIVER ENERGY will coordinate with the City. All work to
relocate the facilities will coordinate with the contractor’s base work operations, which
GREAT RIVER ENERGY and the City have reviewed and agreed to.
COORDINATION. In the event that GREAT RIVER ENERGY’S construction
is not complete by late fall of 2022, GREAT RIVER ENERGY will coordinate all
relocation work with the City and the contractor’s operations manager regarding this
project, if needed. GREAT RIVER ENERGY will relocate its transmission lines in
coordination with the City’s construction, line strikes or unforeseen delays in delivery of
necessary materials, or other unforeseen contingencies, or because of GREAT RIVER
ENERGY’S need to transfer electrical energy without interruption.
If the City requires GREAT RIVER ENERGY to relocate or adjust its electric
transmission line for any reason in the future, the City will reimburse GREAT RIVER
ENERGY for its costs where the transmission lines are located within GREAT RIVER
ENERGY’s easements and inside road right of way per this relocation.
ARTICLE 6 – PAYMENT
ACTUAL COST BASIS. The City will pay the actual costs of such construction.
Such actual costs shall include the wages (including fringe benefits) of all employees of
GREAT RIVER ENERGY devoting time toward design, engineering, construction,
administration, or any other activity associated with said project; costs of any necessary
right of way; overhead costs associated with surveying, construction and other operations
in the field (including but not limited to charges for mileage, equipment rental or cost,
etc.); and material cost for all items associated with said construction. The City agrees
that said costs include overhead charges based on material and labor costs associated with
said project.
Upon execution of the Relocation Agreement, the City will pay, in advance, $85,791.00
to GREAT RIVER ENERGY, representing 100% of the estimated cost for relocating
GREAT RIVER ENERGY’S facilities. If there are any increases anticipated outside the
original scope of work, GREAT RIVER ENERGY will notify the City in advance before
conducting any additional work not included in the original scope of work and shall
amend this Agreement as needed.
City of Rosemount
Project No. 220-0078
GRE Project No. 209360
Upon completion of the relocation project, GREAT RIVER ENERGY will furnish the
City with one original invoice supported by an itemized statement of costs for relocating
said GREAT RIVER ENERGY facilities. The City will pay GREAT RIVER ENERGY
any excess of the actual costs over the estimate prepared by GREAT RIVER ENERGY,
subject to the notification requirement above. Should the initial estimate deposit exceed
the cost, any overpayment will be refunded to the City along with interest accrued from
the day the deposit was received to the day the overpayment amount is refunded.
ARTICLE 7. – INDEMNIFICATION
GREAT RIVER ENERGY agree it will defend, indemnify and hold harmless the
City, its officers and employees against any and all liability, loss, cost and damages
which the City, its officers or employees may hereinafter sustain, incur or be required to
pay arising out of the negligent or willful acts or omissions of GREAT RIVER ENERGY
out of GREAT RIVER ENERGY’S performance or failure to adequately perform its
obligations pursuant to this contract.
Subject to exceptions and limitations provided by law, including but not limited to
those contained in Minnesota Statutes, Chapter 466 the City agrees it will defend,
indemnify and hold harmless GREAT RIVER ENERGY, its officers and employees
against any and all liability, loss, cost and damages which GREAT RIVER ENERGY, its
officers or employees may hereinafter sustain, incur or be required to pay arising out of
the negligent or willful acts or omissions of the City or its contractor and out of the City
or its contractor’s performance or failure to adequately perform obligations pursuant to
this contract.
IN WITNESS WHEREOF, GREAT RIVER ENERGY and the City have caused these
presents to be executed by its duly authorized officers.
GREAT RIVER ENERGY
By: ____________________________
Willam H. Droste
Its: Mayor
Date: __________________________
CITY OF ROSEMOUNT
By: ____________________________
Daniel Lesher
Its: Manager, Transmission Permitting
and Land Rights.
Date: __________________________
By: ____________________________
Erin Fasbender
Its: City Clerk
Date: __________________________