HomeMy WebLinkAbout2.b. Rosemount National Guard Armory RemodelE X E C U T I V E S U M M A R Y
City Council Work Session Meeting: August 1, 2022
AG ENDA ITEM: Rosemount National Guard Armory
Remodel
AGENDA SECTION:
Discussion
PREPARED BY: Dan Schultz, Parks & Recreation Director AGENDA NO.: 2.b.
ATTACHMENTS: Armory Remodel Plans APPROVED BY: LJM
RECOMMENDED ACTION: None, discussion only.
ISSUE
The Minnesota Department of Military Affairs has engaged a design team to prepare for the
renovation of the Rosemount National Guard Armory. The project scope touches every surface and
system of the facility to bring the Armory into compliance with current National Guard standards, United
Facility Criteria (UFC), and State of Minnesota Accessibility and Energy Codes. The estimated budget for
the project is $25,000,000 – $29,735,000 depending what bid alternatives are included in the project.
The are several areas where the City will be impacted by the remodel. The following list includes the main
impacts:
•Decentralization of the HVAC and electrical services.
•Loss of classroom space.
•Loss of parking lot stalls in the west Arena lot (32 stalls) and east National Guard lot (40 stalls).
•Loss of City used storage space.
•Loss of north/south access road through the west parking lot.
Representatives from the NG recently sent staff information regarding what items the NG would like the
City to cost share.
ITEM COST
Separate HVAC System – Roof Top Units $1,159,070
Separate HVAC System – Chiller/Boiler $2,332,071
Separate HVAC System – Geothermal $2,752,634
$6,243,775
OPTIONAL ITEMS COST
Parks & Rec Office Remodel $170,865
Arena Elevator Modernization $378,961
Auditorium Improvements* $598,360*
$1,148,186
*As requested by Rosemount Community Band (Lighting, Lighting Controls, Seat Replacement, Stage
Modifications)
BACKGROUND
The Minnesota Department of Military Affairs has engaged the HGA team to design a complete
renovation of the Rosemount National Guard Armory. The two-level, 99,522 sq. ft. facility was
built in 1994 and is connected to the Rosemount Community Center and Ice Arena. Together
they reside on a 13-acre site with many shared amenities. While this facility contains the
traditional components found within standard Armories and Readiness Centers, it has many
unique features such as:
• Served as the Division Headquarters for the Minnesota National Guard until 2020.
• Hosts weekly training events in lieu of the typical monthly drill weekends.
• High occupancy – 50 full-time personnel with drill weekends seeing up to 250 soldiers.
• Home to the Minnesota National Guard Band’s equipment and practice spaces.
• Shares auditorium, classroom, gymnasium, and locker room space with the
Rosemount Community Center.
• Second only in size to the new Division Headquarters (Arden Hills Readiness Center).
The site work for the project includes select sidewalk replacement, improving stormwater drainage
away from the building, replacing the Military Vehicle Storage Compound (MVSC) lot and fencing,
ATFP modifications to the Privately Owned Vehicle (POV) lot and an incoming military
monument. The National Guard has included these items within the predesign site design as well as
integrated the following design concerns:
• Existing multiple Site Entry Points. Vehicles can access the site through various
locations, a concern for monitoring site traffic and pedestrian safety.
• Unsecured back of house entry where vehicles can approach the rear of the
Armory where visibility is limited.
• Failure to meet current ATFP conventional construction standoff distance (85’) for
unreinforced
masonry structures.
• Current vegetation and on grade units within the required 33’ unobstructed zone around the
facility.
• The site is served by a single stormwater pond southeast of the facility as well as a
depressed area at the northwest corner of the site. The capacity of these have been
verified and during the subsequent Schematic Design Phase our team will continue to
analyze compliance with current codes and Minnesota B3/SB2030.
• The current entry to the Armory is difficult to locate from the site entry.
• Utilities enter from the north near the ground placed chillers and generator, each outside
a secure fence line.
• Site signage and wayfinding improvement to identify the separate entries for the
Armory and Community Center.
• Minnesota B3/SB2030 requires major renovations projects to explore on-site photo-
voltaic energy production at grade or rooftop-mounted.
RECOMMENDATION
This item is on the agenda for discussion purposes only.
DEPARTMENT LEGEND
HQ 1/34 BATTALION
C BEB
D BEB
CPT
BAND
RSP
SHARED
COMMONS
SUPPORT
NIC/CITY
CIRCULATION
AUDITORIUM
223A
RSP OPEN
OFFICE
229
CO D OPEN
OFFICE
236
CPT OPEN
OFFICE
277
HHC OPEN
OFFICE
256
REHERSAL
208
OFFICE
275
COMMONS
264
MECH
207
OPEN
TO
BELOW
RECORDING
STUDIO
206
CLASSROOM
202
BULKY
INSTRUMENT
STORAGE
214
INSTRUMENT
STORAGE
213
STUDIO
212
STUDIO
211
MEN
215
WOMEN
216
MUSIC
LIBRARY
209
RESTROOM
203
PRACTICE
210A
PRACTICE
210B
PRACTICE
210F
PRACTICE
210G
PRACTICE
210C
PRACTICE
210D
PRACTICE
210E
A/V
222
STAGE
223B
AUDITORIUM
STORAGE
224
FAMILY
READINESS
202
OFFICE
230
RETENTION
226
OFFICE
227
RAPIDS
228
BAND
OPEN
OFFICE
231
OFFICE
231A
OFFICE
232
HHC
ORDERLY
233
OFFICE
234OFFICE
235
TELECOMM
265
MOTHER'S
266
CONFERENCE
267
CO C OPEN
OFFICE
274
OFFICE
276
CPT
SERVER
279
OFFICE
280
OFFICE
278
ELEC
271
MECH
272
LANGUAGE
LAB
273
MAIL
268BMEN
270
WOMEN
269
OFFICE
237
OFFICE
238
S6
240
TRAINING
239
S4 PO
241
S4 NCOIC
PO
242
S3 PO
259
S3 NCOIC
PO
258
S2 PO
257
OPS SGM
260
PBO PO
262
CONFERENCE
254
CONFERENCE
253
CONFERENCE
252
S1 PO
245
S1 NCOIC
PO
244
SJA
243
CHAPLAIN
251
CSM
246
COMMANDER
PO
247
XO PO
249
CONFERENCE
248
VESTIBULE
250
52 SEATS
MOVABLE TABLES
(8) S1
SOLDIERS
(8) S4
SOLDIERS(8) S1 FTS (8) S4 FTS
(8) S3 FTS
ROOF BELOW
AUDITORIUM
STORAGE
225
JAN
204
NEW
CANOPY
EXTENSION
FEATURE
ELEMENT
IN FLOOR
DISPLAYJAN
263
BREAK/VEND
268A
COMM/ELEC
205 SLOPE DOWN 1:12SLOPE DOWN 1:12SLOPE DOWN 1:12SLOPE DOWN 1:12KITCHENETTE
255
VESTIBULE
200
LOBBY
201
ROOF BELOW
ICE SHEET BELOW
CC LOBBY
BANQUET HALL
VESTIBULE
261
STAIR A
ST-02-A ELEV
E-02
CIRCULATION
292
STAIR C
ST-02-C
STAIR B
ST-02-B
CIRCULATION
291
CIRCULATION
290
CIRCULATION
293
AREA
'A'AREA
'B'
AREA
'C'
NIC
1/16" = 1'-0"
0476-074-00
JULY 1, 2022
UPPER LEVEL
DEPARTMENT PLAN
ROSEMOUNT ARMORY
ROOM SCHEDULE - UPPER LEVEL
ROOM
NUMBER ROOM NAME
AREA
(NET SF)
200 VESTIBULE 286 SF
201 LOBBY 3,270 SF
202 CLASSROOM 1,215 SF
202 FAMILY READINESS 393 SF
203 RESTROOM 71 SF
204 JAN 154 SF
205 COMM/ELEC 150 SF
206 RECORDING STUDIO 250 SF
207 MECH 336 SF
208 REHERSAL 1,371 SF
209 MUSIC LIBRARY 278 SF
210A PRACTICE 178 SF
210B PRACTICE 93 SF
210C PRACTICE 71 SF
210D PRACTICE 68 SF
210E PRACTICE 71 SF
210F PRACTICE 108 SF
210G PRACTICE 66 SF
211 STUDIO 503 SF
212 STUDIO 529 SF
213 INSTRUMENT STORAGE 606 SF
214 BULKY INSTRUMENT STORAGE 1,027 SF
215 MEN 247 SF
216 WOMEN 247 SF
222 A/V 89 SF
223A AUDITORIUM 3,822 SF
223B STAGE 364 SF
224 AUDITORIUM STORAGE 231 SF
225 AUDITORIUM STORAGE 246 SF
226 RETENTION 438 SF
227 OFFICE 121 SF
228 RAPIDS 163 SF
229 RSP OPEN OFFICE 501 SF
230 OFFICE 114 SF
231 BAND OPEN OFFICE 367 SF
231A OFFICE 107 SF
232 OFFICE 112 SF
233 HHC ORDERLY 837 SF
234 OFFICE 110 SF
235 OFFICE 114 SF
236 CO D OPEN OFFICE 1,410 SF
237 OFFICE 113 SF
238 OFFICE 113 SF
239 TRAINING 1,030 SF
240 S6 372 SF
241 S4 PO 108 SF
242 S4 NCOIC PO 110 SF
243 SJA 104 SF
244 S1 NCOIC PO 104 SF
245 S1 PO 108 SF
246 CSM 173 SF
247 COMMANDER PO 228 SF
248 CONFERENCE 308 SF
249 XO PO 167 SF
250 VESTIBULE 68 SF
251 CHAPLAIN 112 SF
252 CONFERENCE 479 SF
253 CONFERENCE 479 SF
254 CONFERENCE 411 SF
255 KITCHENETTE 84 SF
256 HHC OPEN OFFICE 6,277 SF
257 S2 PO 128 SF
258 S3 NCOIC PO 128 SF
259 S3 PO 126 SF
260 OPS SGM 124 SF
261 VESTIBULE 51 SF
262 PBO PO 120 SF
263 JAN 60 SF
264 COMMONS 1,047 SF
265 TELECOMM 83 SF
266 MOTHER'S 85 SF
267 CONFERENCE 264 SF
268A BREAK/VEND 457 SF
268B MAIL 195 SF
269 WOMEN 269 SF
270 MEN 269 SF
271 ELEC 107 SF
272 MECH 398 SF
273 LANGUAGE LAB 916 SF
274 CO C OPEN OFFICE 1,446 SF
275 OFFICE 121 SF
276 OFFICE 121 SF
277 CPT OPEN OFFICE 2,874 SF
278 OFFICE 121 SF
279 CPT SERVER 90 SF
280 OFFICE 121 SF
290 CIRCULATION 1,376 SF
291 CIRCULATION 960 SF
292 CIRCULATION 1,228 SF
293 CIRCULATION 87 SF
E-02 ELEV 52 SF
ST-02-A STAIR A 89 SF
ST-02-B STAIR B 155 SF
ST-02-C STAIR C 152 SF
TOTAL NSF 45,498 SF
0 8'32'16'
TOTAL GSF (UPPER LEVEL) 50,083 SF
DEPARTMENT LEGEND
HQ 1/34 BATTALION
C BEB
D BEB
CPT
BAND
RSP
SECURE
SHARED
OTHER
SUPPORT
NIC/CITY
CIRCULATION
HEATED
STORAGE
131
OCIE
LOCKERS
120B
OCIE
LOCKERS
120A
OCIE
LOCKERS
120C
HEATED
STORAGE
127
ASSEMBLY
HALL
101A
ELEC
126
PARKS &
REC
OFFICE
105
SCIF
121SCIF
SERVER
123
SCIF
VESTIBULE
122
NOC
125
J6
COMSEC
124
OCIE
LOCKERS
120D
MECH
129
MULTI-PURPOSE
TRAINING
101B
PARKS &
REC
OFFICE
106
PARKS &
REC OPEN
OFFICE
103
PARKS &
REC CONF
107PARKS &
REC
STORAGE
100
MEDICAL
EXAM
117
MEDICAL
RR
118
JAN/
SUPPLY
128
KITCHEN
FOOD
PREP
110
KITCHEN
FOOD
STORAGE
109
KITCHEN
SCULLERY
108
VAULT
132
VAULT
144
OFFICE
130
HEATED
STORAGE
142
OFFICE
143
HEATED
STORAGE
140
RESTROOM
136
TABLE/
CHAIR
STORAGE
102
FITNESS
115
HEATED
STORAGE
146
VAULT
145
MAINT/
TRAINING
WORK BAY
141
OFFICE
147
VAULT
139
HEATED
STORAGE
137
VAULT
134
HEATED
STORAGE
133
OFFICE
135
OFFICE
138
WOMEN'S
LOCKERS
112
MEN'S
LOCKERS
114
MEN
113
WOMEN
111
ELEV
EQUIP
116
UNEXCAVATED
MEDICAL
119
UNEXCAVATED
UNEXCAVATED
CIRCULATION
191
ELEV
LOBBY
190
STAIR A
ST-01-A
ELEV
E-01
STAIR B
ST-01-B
STAIR C
ST-01-C
CIRCULATION
192
CIRCULATION
193
AREA
'A'AREA
'B'
AREA
'C'
NIC
1/16" = 1'-0"
0476-074-00
JULY 1, 2022
LOWER LEVEL
DEPARTMENT PLAN
ROSEMOUNT ARMORY
0 8'32'16'
ROOM SCHEDULE - LOWER LEVEL
ROOM
NUMBER ROOM NAME
AREA
(NET SF)
101A ASSEMBLY HALL 7,781 SF
101B MULTI-PURPOSE TRAINING 1,457 SF
102 TABLE/ CHAIR STORAGE 694 SF
108 KITCHEN SCULLERY 291 SF
109 KITCHEN FOOD STORAGE 160 SF
110 KITCHEN FOOD PREP 909 SF
111 WOMEN 343 SF
112 WOMEN'S LOCKERS 1,252 SF
113 MEN 344 SF
114 MEN'S LOCKERS 1,389 SF
115 FITNESS 1,102 SF
116 ELEV EQUIP 69 SF
117 MEDICAL EXAM 72 SF
118 MEDICAL RR 48 SF
119 MEDICAL 235 SF
120A OCIE LOCKERS 900 SF
120B OCIE LOCKERS 802 SF
120C OCIE LOCKERS 2,242 SF
120D OCIE LOCKERS 2,350 SF
121 SCIF 1,200 SF
122 SCIF VESTIBULE 48 SF
123 SCIF SERVER 184 SF
124 J6 COMSEC 521 SF
125 NOC 703 SF
126 ELEC 245 SF
127 HEATED STORAGE 694 SF
128 JAN/ SUPPLY 470 SF
129 MECH 1,203 SF
130 OFFICE 118 SF
131 HEATED STORAGE 196 SF
132 VAULT 678 SF
133 HEATED STORAGE 2,388 SF
134 VAULT 728 SF
135 OFFICE 112 SF
136 RESTROOM 59 SF
137 HEATED STORAGE 1,094 SF
138 OFFICE 112 SF
139 VAULT 600 SF
140 HEATED STORAGE 1,297 SF
141 MAINT/ TRAINING WORK BAY 727 SF
142 HEATED STORAGE 1,387 SF
143 OFFICE 112 SF
144 VAULT 597 SF
145 VAULT 600 SF
146 HEATED STORAGE 1,081 SF
147 OFFICE 112 SF
190 ELEV LOBBY 481 SF
191 CIRCULATION 1,565 SF
192 CIRCULATION 1,257 SF
193 CIRCULATION 1,503 SF
E-01 ELEV 52 SF
ST-01-A STAIR A 124 SF
ST-01-B STAIR B 132 SF
ST-01-C STAIR C 152 SF
TOTAL NSF 44,973 SF
TOTAL GSF (LOWER LEVEL) 48,873 SF