HomeMy WebLinkAbout6.f. Request by Frana Companies, Inc. for Approval of the Final Plat for the Frana Manufacturing Facility EXECUTIVE SUMMARY Regular City Council Meeting: September 6, 2022 AGENDA ITEM: Request by Frana Companies, Inc., for AGENDA SECTION: Approval of the Final Plat for the Frana Consent Manufacturing Facility. PREPARED BY: Julia Hogan, Planner AGENDA NO. 6.f. ATTACHMENTS: Resolution; Site Location; Final Plat; Site Survey; Preliminary Plat; Removals Plan; Site Plan; Grading Plan; Utility Plan; Civil Details; Updated Landscape Plan; Architectural Site Plan & Signage Plan; Floor Plan; Exterior APPROVED BY: LJM Elevations; Perspective Views; Site Photometric Plan; Night Lighting Renderings; Engineer’s Memo dated June 14, 2022; Parks and Recreation Memo dated July 20, 2022; Fire Marshall’s Memo dated July 22, 2022. RECOMMENDED ACTION: 1. Motion to adopt a resolution approving the Final Plat for Frana Companies, Inc., subject to conditions. SUMMARY Applicant: Frana Companies, Inc. Property Owners: CAR NAV FIVE Location: 15902 Robert Trail South Site Area in Acres: 13.66 Acres Comp Plan Des.: BP-Business Park Current Zoning: LI-PUD-Light Industrial Planned Unit Development The Planning Commission is being asked to consider a request by Frana Companies, Inc., for approval of a Final Plat which will allow for the construction of a manufacturing facility in the Rosemount Business Park Zoning District. The facility will be comprised of a 61,050 square foot manufacturing facility consisting of 56,732 square feet of manufacturing space and 4,318 square feet of office space, 83,000 square feet of outdoor storage, and an area for employee and visitor parking. This Final Plat comes after the approval of a Preliminary Plat, Rezoning, Planned Unit Development Master Development Plan and a Conditional Use Permit. These items were seen in front of the Planning Commission at their July 26, 2022, regular meeting and recommended for approval by the Commission. The City Council approved these items at their August 16, 2022, regular meeting. Staff is recommending approval of the request, subject to the conditions listed in the recommended action. PLANNING COMMISSION ACTION The Planning Commission reviewed this request at its meeting on August 23, 2022. The Commission voted unanimously, as part of its consent agenda, to recommend the City Council approve the request. BACKGROUND The site of the proposed manufacturing facility and office space historically has been utilized for agricultural purposes and has never been constructed upon. The project site currently is made up of two separate parcels, one containing 6.38 acres and the other containing 12.90 acres. The eastern parcel that contains the 12.90 acres contains quite a bit of road right of way land along Highway 3 and goes down to the parcel to the east adjacent to County Road 46. The project site though will only contain the 6.38 acres of the western parcel and 7.28 acres of the western parcel. The applicant is requesting a final plat to combine the two lots into a single parcel. The two subject parcels were previously zoned GI-General Industrial, along with its surrounding parcels to the south and east. It was guided for Community Commercial, but with its proximity to Highway 3 and as well as the railroad the City decided to go forward with re guiding this site and the surrounding parcels to BP – Business Park to allow for additional types of businesses to utilize them. Light Industrial is an allowed zoning district within the designation of BP to a limited extent as well. Since the applicant is proposing outdoor storage as a component of the project, a rezoning of the site to LI-Light Industrial is required due to the fact outdoor storage is a conditional use in the LI zoning district while it is not permitted in the BP zoning district. ISSUE ANAYLSIS Legal Authority. This application is a Quasi-Judicial action. The final plat application is Quasi-Judicial because the City has a set of standards and requirements for reviewing this type of application that is described in detail below. Generally, if the final plat meets the ordinance requirements and is consistent with the preliminary plat, it must be approved. Plat The site is comprised of two parcels adjacent to and in between South Roberts Trail (Highway 3) and Canada Circle, north of County Road 46. The principal structure will be located on the current eastern parcel, the outdoor storage will be located in the middle of the two parcels and the entrance to the site and the stormwater ponding will be located on the western current parcel. The applicant is requesting approval of a final plat that would combine the two subject parcels into a single lot for the construction of the proposed manufacturing facility and outdoor storage. The proposed final plat meets all the dimensional standards of the LI-Light Industrial zoning district. Land Use and Zoning The subject property is guided for BP-Business Park and it is now zoned L1 PUD – Light Industrial Planned Unit Development after the approval of the rezone by the City Council at their August 16, 2022 meeting. The subject property is subject to all the standards of the LI-Light Industrial zoning district and as well as the standards contained within the PUD. The Frana manufacturing facility PUD contained several deviations from the base standards of the LI zoning district including the following: 1. Section 11-4-15-1 F. Lot and Building Requirements: The required front yard setback from a Principle Arterial ROW is decreased form sixty (60) feet to forty (40) feet. 2. Section 11-6-1 H. Off Street Parking Required: Fewer parking stalls than required by the city code may be provided so long as a parking shortage does not occur. In the case of a parking shortage, the property owner will work with staff to add additional parking onsite. 3. Section 11-5-2 C.h. Supplementary Yard Regulations: An eight (8) foot tall security fence that will be chain linked with security slats shall be installed on the site. Site Layout The principal structure on the site will be an office/manufacturing facility 61,285 square feet in area. The new facility will comprise of 4,557 square feet of office space and 56,728 square feet of manufacturing space. The outdoor storage will consist of mostly units of lumber and covered lumber racks. The storage 2 area is located to the west of the principal building on site. To the west of the outdoor storage area is where the stormwater ponding area is located, which is east of Canada Circle and directly north of the access driveway to the site. The employee parking area is located to the east of the facility and to the west of Highway 3 and will comprise of 54 parking stalls. Extensive screening between the parking area and the front of the facility to Highway 3 includes a mixed variety of landscaping all along the eastern portion of the site and northern portion of the site along Canada Circle. The applicant is requesting to use an 8’ fence along the northern, western, and southern perimeters of the site. The northeast corner of the site, which will be facing Canada Circle and Highway 3, will consist of an 8’ decorative opaque fence that is comparable to the materials of the principal structure. The remaining fence around the perimeter of the site will consist of an 8’ chain link fence with privacy slats and colored to match the building. This type of fencing is only permitted in the GI district, but staff is supportive of its use in the development due to the nature of the use and the fact it will not be near any public right of ways. A unique feature of this project is the potential for a railroad spur extension near the southwest portion of the site near the driveway access. Though there are no immediate plans to build the spur, it is a possibility for the site in the future. Exterior Building Materials The principal building will be constructed with various materials due to the east portion being office space and the west portion containing the manufacturing area. The office portion on the east side of the building will feature an upgraded face brick and natural limestone façade with aluminum storefront windows and prefinished metal sunscreen canopies. The remaining areas of the building will have neutral colored metal panels with limestone accent walls at either end. The manufacturing portion of the building will have perimeter clerestory windows for daylighting the interiors. The building will be approximately 21-feet high to the eaves and 28-feet high to the ridgeline, which meets the City Code requirement for building height within the LI zoning district. Landscaping The landscaping plan provided by the applicant shows extensive planting along the east side of the property, which is adjacent to Highway 3, and where the office and parking area is and as well as the north part adjacent to Canada Circle and around the stormwater ponding area. One tree per 3,000 feet of land area is required. This includes trees at the boulevard spaced at fifty-foot intervals. Based on a site area of 594,948 square feet, a total of 198 trees are required. The landscape plan contains the required 198 trees throughout the site. The City Code also requires one foundation planting per ten linear feet of building perimeter. In this case, that equals 116 foundation plantings. The landscape plan does identify that it will provide the 116 foundation plantings. The Code also requires that the outdoor storage area be included in the calculations of the perimeter area. The landscape plan was updated to reflect the outdoor storage perimeter area requirement which added an additional 137 foundation plantings for a total of 253 foundation plantings to be planted on site. Finally, the Code requires a minimum of 5% of the parking area to be landscaped with islands and peninsulas. Based on a parking area of 15,750 square feet a total of 787 square feet of landscaped area shall be provided. The landscape plan meets the screening requirements of the code for parking and loading areas. No significant trees were identified in areas contained within the demolition plan, and therefore no replacement trees are required as part of the landscaping plan. Access and Parking Truck and car access into the site will be from a gated driveway from the south end of Canada Circle as no 3 access is permitted from Highway 3 to the site. Access and egress to the site will be from Highway 3 to Canada Circle and then into the site. The Canada Circle and Highway 3 intersection will also have Boulder Avenue as a fourth leg of the intersection. Employee and visitor parking will be located on the east side of the facility which is on the opposite end of the access point to the site. The parking ratio required by the City Code is 1 stall/300 square feet gross for manufacturing business and 1 stall/200 square feet for office, which would make it a total of 211 stalls needed. The applicant is proposing to provide 54 parking stalls. The applicant stated in their narrative that due to their low employee density and their facility not being open to the public the required parking stalls are not needed for the site. Frana Companies plans on running one shift to start over the next few years with intentions of adding a second shift later on. With a total of 30 employees the applicant finds the 54 parking stalls to be sufficient for the site and that there is room on site for parking expansion if needed in the future. The proposed parking area features landscaping that meets the requirements of the City Code. A deviation to the code within the Planned Unit Development Master Development Plan to allow for fewer parking stalls than required will be implemented. The Planning Commission added a condition with the approval of the Planned Unit Development Master Development Plan that additional parking will need to be added if parking shortages on site occur. A possible additional access point to the site will be from a potential railroad spur track that would be located in the southwestern portion of the site near the main entrance driveway that would lead to the outdoor storage area. No special city approvals are required for the extension of the rail spur, although it is reviewed as part of the grading permit. Site Lighting The applicant has provided a site lighting plan and accompanying photometric plan showing that the site lighting will not exceed 0.5 lumens at any residential property line or 1.0 lumen at any non-residential property lines. The applicant is proposing 20’ light poles throughout the site, which meets the City Code requirement for lighting height within the LI-Light Industrial zoning district. LED Wall pack lights are proposed on the site as well. Lighting is proposed around the principle building, which will illuminate the employee parking area and as well as lighting along the outdoor storage area. Signs Signs are generally approved administratively, but the applicant did provide plans that showed two proposed signs for the site. A free-standing sign near the entrance at Canada Circle and a wall sign on the front of the proposed manufacturing building. The location of the free-standing sign must be placed 10 feet back from the front property line. A sign permit application must be submitted and reviewed for compliance with the Code, and any issues will be addressed during that process. Utilities Municipal sewer and water exist within Canada Circle. Sanitary sewer to the site extends from an existing 6-inch service located in the northwest corner of the plat extending from Canada Circle. The sewer service is proposed to extend south within the plat to the building. Water will be serviced to the site by an 8-inch watermain stub located in the northwest corner of the plat, which is adjacent to the sanitary sewer stub. The watermain will need to be looped back to the watermain (hydrant) located in the Canada Circle cul-de- sac for water flow and quality purposes. Stormwater will be handled on site with a stormwater basin in the western portion of the site. CONCLUSION AND RECOMMENDATION The Planning Commission and staff are recommending approval of the final plat based on the information provided by the applicant and reviewed in this report, subject to the conditions listed in the recommended action. 4 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022-115 A RESOLUTION APPROVING THE FINAL PLAT FOR BMR WHEREAS, the Community Development Department of the City of Rosemount received a request for Final Plat approval from Frana Companies, Inc., concerning property legally described as: That part of the South Half of the Southwest Quarter of Section 32, Township 115, Range 19, Dakota County, Minnesota, described as follows: Commencing at the intersection of the south line of said South Half of the Southwest Quarter and the easterly right of way line of State Trunk Highway No. 3 as now established by MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY PLAT NO. 19-77, according to the recorded plat thereof, Dakota County, Minnesota; thence East (assuming bearing) along the south line thereof 1033.85 feet, thence North 0 degrees 32 minutes 00 seconds East, 508.41 feet to the point of beginning of the land to be described thence continuing North 0 degrees 32 minutes 00 seconds East 390.95 feet; thence on a bearing of West, 580.96 feet to the easterly right of way line of said State Highway No. 3; thence southwesterly along said easterly highway right of way line along a nontangential curve which is concave to the southeast, central angle of 16 degrees 27 minutes 44 seconds, radius of 1357.39 feet, a distance of 390.00 feet; thence South 23 degrees 59 minutes 51 seconds West along said easterly right of way line 68.03 feet, thence on a bearing of East, 812.26 feet to the point of beginning. And That Part of the South Half of the Southwest Quarter of Section 32, Township 155, Range 19, Dakota County, Minnesota, which lies easterly and northerly of the following described line: Commencing at the intersection of the south line of said South Half of the Southwest Quarter and the easterly right of way line of State Trunk Highway No. 3 as now established by MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY PLAT NO. 19-77, according to the recorded plat thereof, Dakota County, Minnesota; thence East (assuming bearing) along the south line thereof 1530.84 feet to the point of beginning of the line to be described; thence North 0 degrees 48 minutes 38 seconds East, 508.44 feet; thence on a bearing of West 499.45 feet; thence North 0 degrees 32 minutes 00 seconds East, 812.42 feet to the north line of said South Half of the Southwest Quarter and said line there terminating. Except. Parcel 9 on Dakota County Road Right-of-Way Map No. 258 and Parcel 5A on Dakota County Road Right- of-Way Map No. 259, including all right of access to Minnesota Trunk Highway 3 from the adjacent parcel to the east as shown on the right of way maps. And Except. That part of the South Half of the Southwest Quarter of Section 32, Township 115, Range 19, Dakota County, Minnesota, lying easterly of Parcel 9 as shown on Dakota County Road Right-of -Way Map No. 258 and also easterly and northerly of Parcel 5A as shown on Dakota County Road Right of Way Map No. 259B. WHEREAS, on August 23rd, 2022, the Planning Commission of the City of Rosemount reviewed the Final Plat for BMR; and WHEREAS, on August 23rd, 2022, the Planning Commission recommended approval of the Final Plat for BMR, subject to conditions; and WHEREAS, on September 6th, 2022, the City Council of the City of Rosemount reviewed the Planning Commission’s recommendation and the Final Plat for BMR. NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of Rosemount hereby approves the Final Plat for BMR, subject to the following conditions: 1. Execution of a Subdivision Agreement. 2. Adherence with the conditions of the Preliminary Plat, Final Plat and Master Development Plan approvals for BMR. 3. Conformance with all requirements of the City Engineer’s memorandum dated June 14, 2022, including compliance with the updated stormwater related requirements. 4. Applicant will continue to work with City staff to adjust easements where necessary on the final plat document. 5. Drainage and utility easement with storm sewer infrastructure, except ponding or infiltration areas, may contain fences, but shall be required to include gates to provide truck access; shall prohibit sheds or other accessory structures; and shall prohibit landscaping that would impede drainage. 6. Compliance with the conditions and standards within the Park and Recreation Director’s memorandum dated July 20, 2022. 7. Payment of all applicable fees including GIS, Park Dedication and other fees identified in the current fee schedule. 8. Incorporation of any easements necessary to accommodate drainage, ponding, trials, underpasses, conservation areas, streets and utilities. 9. Provision of $148,830 for landscaping surety. 10. Provision of $68,250 for Fee-In-Lieu of Park Dedication. ADOPTED this 6th day of September 2022, by the City Council of the City of Rosemount. __________________________________________ William H. Droste, Mayor ATTEST: ___________________________________ Erin Fasbender, City Clerk SITE Width Varies S89°40'23"W 499.45N89°40'49"E 812.50 S2 3 ° 3 8 ' 3 4 " W 68 . 0 3 38 9 . 7 2 Δ= 1 6 ° 2 7 ' 0 1 " R= 1 3 5 7 . 3 9 S89°40'23"W 581.57 N0 0 ° 1 2 ' 2 3 " E 3 6 1 . 4 2 N89°34'04"E 129.63 65.48 Δ=13°43'45" R=273.25 S68 ° 0 2 ' 0 3 " E 109 . 3 6 Point of Beginning S 2 4 ° 5 0 ' 2 1 " E 1 8 0 . 6 0 50 8 . 4 1 N0 0 ° 1 2 ' 2 3 " E N89°40'23"E 1033.85 Intersection of the E'ly Right of Way Line of Trunk Hwy No. 3 as Established by MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY PLAT NO. 19-77 and the S Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 (East) (N 0 0 ° 3 2 ' 0 0 " E ) N0 0 ° 1 2 ' 2 3 " E 3 9 0 . 9 5 (N 0 0 ° 3 2 ' 0 0 " E ) (West 580.96) (3 9 0 . 0 0 ) (1 6 ° 2 7 ' 4 4 " ) (S 2 3 ° 5 9 ' 5 1 " W ) (East 812.26) 5 7 2 . 1 8 Δ = 2 4 ° 1 4 ' 4 3 " R = 1 3 5 2 . 1 6 S Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 N89°40'23"E 1530.84 N0 0 ° 2 8 ' 5 1 " E 5 0 8 . 4 4 (N 0 0 ° 4 8 ' 3 8 " E ) (East) (West) N0 0 ° 1 2 ' 2 3 " E 8 1 2 . 3 8 (N 0 0 ° 3 2 ' 0 0 " E 8 1 2 . 4 2 ) N Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 W'ly Line of Parcel 9 per DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO. 258 S Line of Parcel 9 per DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO. 258 S Line of Dakota Co. Road DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO. 258 & the N Line of DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO. 259 & 259B E ' l y L i n e o f P a r c e l 9 p e r D A K O T A C O U N T Y R O A D R I G H T O F W A Y M A P N O . 2 5 8 E L i n e o f P a r c e l 5 A p e r DA K O T A C O U N T Y R O A D RI G H T O F W A Y MA P N O . 2 5 9 & 2 5 9 B Point of Beginning Described Line Described Line Described Line(N 0 0 ° 3 2 ' 0 0 " E ) E'l y L i n e o f S t a t e T r u n k H i g h w a y N o . 3 pe r M I N N E S O T A D E P A R T M E N T O F TR A N S P O R T A T I O N R I G H T O F W A Y P L A T N O . 1 9 - 7 7 & D A K O T A C O U N T Y R O A D RIG H T O F W A Y M A P N O . 2 5 8 A c c e s s C o n t r o l P e r D A K O T A C O U N T Y R O A D R I G H T O F W A Y M A P N O . 2 5 8 N89°40'23"E 821.50 S 1/4 Corner of Sec. 32, Twp. 115, Rng. 19 SW Corner of Sec. 32, Twp. 115, Rng. 19 N89°40'23"E 1817.70 Found 1/2 Inch Open Iron Pipe BLOCK 1 LOT 1 Δ= 2 ° 3 8 ' 0 8 " 62. 4 4 N19°0 2 ' 5 5 " W 40.65 N0 0 ° 2 8 ' 2 4 " E 3 1 0 . 8 5 123.63 N89°41'44"E 286.50 Drainage & Utility Easement Width V a r i e s W L i n e o f P a r c e l 5 A p e r DA K O T A C O U N T Y R O A D RI G H T O F W A Y MA P N O . 2 5 9 & 2 5 9 B FRANA MANUFACTURING PLANT KNOW ALL PERSONS BY THESE PRESENTS: That BMR Holding Company LLC, a Minnesota limited liability company, fee owner of the following described property situated in the County of Dakota, St ate of Minnesota, to wit: That part of the South Half of the Southwest Quarter of Section 32, Township 115, Range 19, Dakota County, Minnesota, described as follows: Commencing at the intersection of the south line of said South Half of the Southwest Quarter and the easterly right of way line of State Trunk Highway No. 3 as now established by MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY PLAT NO. 19-77, according to the recorded plat thereof, Dakota County, Minnesota; thence East (assumed bearing) along the south line thereof 1033.85 feet, thence North 0 degrees 32 minutes 00 seconds East, 508.41 feet to the point of beginning of the land to be described; thence continuing North 0 degrees 32 minutes 00 seconds East, 390.95 feet; thence on a bearing of West, 580.96 feet to the easterly right of way line of said State Highway No. 3; thence southwesterly along said easterly highway right of way line along a nontangential curve which is concave to the southeast, central angle of 16 degrees 27 minutes 44 seconds, radius of 1357.39 feet, a distance of 390.00 feet; thence South 23 degrees 59 minutes 51 seconds West along said easterly right of way line 68.03 feet, thence on a bearing of East, 812.26 feet to the point of beginning. AND That part of the South Half of the Southwest Quarter of Section 32, Township 115, Range 19, Dakota County, Minnesota, which lies easterly and northerly of the following described line: Commencing at the intersection of the south line of said South Half of the Southwest Quarter and the easterly right of way line of State Trunk Highway No. 3 as now established by MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY PLAT NO. 19-77, according to the recorded plat thereof, Dakota County, Minnesota; thence East (assumed bearing) along the south line thereof 1530.84 feet to the point of beginning of the line to be described; thence North 0 degrees 48 minutes 38 seconds East, 508.44 feet; thence on a bearing of West 499.45 feet; thence North 0 degrees 32 minutes 00 seconds East, 812.42 feet to the north line of said South Half of the Southwest Quarter and said line there terminating. EXCEPT Parcel 9 on Dakota County Road Right-Of-Way Map No. 258 and Parcel 5A on Dakota County Road Right-Of-Way Map No. 259, including all right of access to Minnesota Trunk Highway 3 from the adjacent parcel to the east as shown on the right of way maps. AND EXCEPT That part of the South Half of the Southwest Quarter of Section 32, Township 115, Range 19, Dakota County, Minnesota, lying easterly of Parcel 9 as shown on Dakota County Road Right of Way Map No. 258 and also easterly and northerly of Parcel 5A as shown on Dakota County Road Right of Way Map No. 259B. Has caused the same to be surveyed and platted as FRANA MANUFACTURING PLANT and does hereby dedicate to the public, for public use, the drainage and utility easements as created by this plat. In witness whereof said BMR Holding Company LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this day of , 20 . BMR HOLDING COMPANY LLC By: Its STATE OF , COUNTY OF The forgoing instrument was acknowledged before me this day of , 20 , By:, of BMR Holding Company LLC, a Minnesota limited liability company, on behalf of the company. My Commission Expires: Notary Public, Signature Notary Public, Printed Name Notary Public County, Denotes a Cast Iron Monument. Bearings are based on the south line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 having an assumed bearing of N 89°40'23" E. Denotes a Found 1/2 Inch Iron Pipe With Cap No. 8625 (Unless Otherwise Shown) Denotes a 1/2 inch by 14 inch Rebar Marked "RLS 44565" Denotes Access Control per DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO. 258 Denotes Record Dimensions per Description( ) N 160408004080 SCALE IN FEET SURVEYORS CERTIFICATE I Rory L. Synstelien, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of the surveyor's certification are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this day of , 20 . Rory L. Synstelien, Land Surveyor Minnesota License No. 44565 STATE OF MINNESOTA, COUNTY OF This instrument was acknowledged before me this day of , 20 , by Rory L. Synstelien, a Licensed Land Surveyor. My Commission Expires: Notary Public, Signature Notary Public, Printed Name Notary Public County, CITY COUNCIL OF ROSEMOUNT, COUNTY OF DAKOTA, STATE OF MINNESOTA This plat was approved by the City Council of Rosemount, Minnesota at a regular meeting thereof held this day of , 20 , and hereby certifies compliance with all the requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By:, Mayor By: , City Clerk COUNTY SURVEYOR, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this day of , 20 . By Todd B. Tollefson, Dakota County Surveyor DEPARTMENT OF PROPERTY TAXATION AND RECORDS, COUNTY OF DAKOTA, STATE OF MINNESOTA Pursuant to Minnesota Statutes, Section 505.021, Subdivision 9, taxes payable in the year on real estate hereinbefore described, have been paid. Also pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfers entered on this day of , 20 . By Amy A. Koethe, Director, Department of Property Taxes and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of FRANA MANUFACTURING PLANT was filed in the office of the County Recorder for public record on this day of , 20 , at o'clock M. and was duly filed in Book of Plats, Page , as Document Number . By Amy A. Koethe, County Recorder VICINITY MAP SEC. 32 - T115 - R19 DAKOTA COUNTY, MINNESOTAN NOT TO SCALE Being 5 feet in width and adjoining lot lines, unless otherwise indicated, and being 10 feet in width and adjoining right of way lines unless otherwise indicated, as shown on this plat. DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: NOT TO SCALE 10 5 5 10 F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION C0.0 TITLE SHEET .. .. .. .. .. .. FRANA PRODUCTION FACILITY ROSEMOUNT, MINNESOTA SHEET INDEX SHEET NUMBER SHEET TITLE C0.0 TITLE SHEET SITE LOCATIONSITE LOCATION MAP N SITE SURVEYV1.0 UTILITY PLANC4.0 ISSUED FOR: REVISED ZONING SUBMITTAL DEVELOPER / PROPERTY OWNER: ENGINEER / LANDSCAPE ARCHITECT: CIVIL SITE GROUP 5000 GLENWOOD AVE GOLDEN VALLEY, MN 55422 CONTACT: XXXXXX 612-615-0060 SURVEYOR: GEOTECHNICAL ENGINEER: SWPPP - EXISTING CONDITIONSSW1.0 GRADING PLANC3.0 C5.0 C5.1 L1.0 CIVIL DETAILS LANDSCAPE PLAN SWPPP - PROPOSED CONDITIONSSW1.1 SWPPP - DETAILSSW1.2 C2.0 SITE PLAN SWPPP - NARRATIVESW1.3 CIVIL DETAILS C1.0 REMOVALS PLAN C5.2 CIVIL DETAILS Know what's below. before you dig.Call R SWPPP - ATTACHMENTSSW1.4 SWPPP - ATTACHMENTSSW1.5 GZA GEOENVIRONMENTAL, INC. 17975 WEST SARAH LANE, #100 BROOKFIELD, WI 53045 CONTACT: AUBREY DUNSHEE 562-754-2560 L1.1 LANDSCAPE PLAN NOTES & DETAILS ARCHITECT: EDWARD FARR ARCHITECTS, INC 7710 GOLDEN TRIANGLE DRIVE EDEN PRAIRIE, MN 55344 CONTACT: EDWARD FARR E.FARR@EDFARRARCH.COM 952-943-9660 CIVIL SITE GROUP 5000 GLENWOOD AVE GOLDEN VALLEY, MN 55422 CONTACT: RORY SYNSTELIEN 612-615-0060 FRANA COMPANIES, INC. 633 2ND AVE. S, HOPKINS, MN 55343 CONTACT: BRANDON GESS BGESS@FRANA.COM 651-214-2096 PRELIMINARY PLATV2.0 PID: 340321070024 Address: 15902 Robert Trail S Bituminous Driveway Chain Link Fence R O B E R T T R A I L S O U T H ( A P u b l i c R / W ) (A P u b l i c R / W ) PID: 340321070019 Address: Unassigned PID: 340321070014 Address: 15640 Canada Cir Owner: Michael S Murgic PID: 340321073012 Address: 15938 Canada Cir Owner: NGL Supply Terminal Company LLC PID: 340321070025 Address: Unassigned Owner: Dovestone LLC NO BUILDINGS NO BUILDINGS S89°40'23"W 499.45N89°40'49"E 812.50 S2 3 ° 3 8 ' 3 4 " W 68 . 0 3 38 9 . 7 2 Δ= 1 6 ° 2 7 ' 0 1 " R= 1 3 5 7 . 3 9 S89°40'23"W 581.57 N0 0 ° 1 2 ' 2 3 " E 3 6 1 . 4 2 N89°34'04"E 129.63 65.48 Δ=13°43'45" R=273.25 S68 ° 0 2 ' 0 3 " E 109 . 3 6 [A] Gravel Crosses Property Line 12" DIP SMH (Loc. Per Record) Rim = 957.3 +/- (Rec.) Inv= 926.7 +/- (Rec.) SMH (Loc. Per Record) Rim = 952.1 +/- (Rec.) Inv= 927.5 +/- (Rec.) 8 " P V C ( R e c ) 8 " P V C ( R e c ) 30 " R C P ( R e c ) 15 " R C P ( R e c ) 15" R C P ( R e c ) 15 " R C P 3 0 " R C P ( R e c ) 3 6 " R C P ( R e c ) 48" R C P (R e c ) 24" R C P ( R e c ) 21" RCP (Rec) 18" RCP (Rec) 18" R C P ( R e c ) 8" P V C 12" D I P 12" D I P CAN A D A C I R C L E 12" CIP 12" DIP (Rec) 1 2 " D I P ( R e c ) 1 2 " D I P ( R e c ) [12] Drainage and Utility Easement Per Document No. 1944201 [6] Communication Easement Per Document No. 476645 [12] Drainage and Utility Easement Per Document No. 1944201 Point of Beginning of Parcel 1 S 2 4 ° 5 0 ' 2 1 " E 1 8 0 . 6 0 1 2 " D I P 1 0 " D I P ( R e c ) SMH (Loc. Per Record) Inv= 914.91 (Rec.) SMH (Loc. Per Record) Inv= 916.13 S (Rec.) Inv=915.96 W (Rec.) 6" PVC San. Stub (Per Record) Inv= 938.14 (Rec.) 10" D I P S a n . S t u b ( P e r R e c o r d ) Inv= 9 1 5 . 9 4 ( R e c . ) SMH (Loc. Per Record) Inv= 927.46 SW (Rec.) Inv=912.09 NE/NW (Rec.) 8" P V C 6" PVC San. Stub (Per Record) Inv= 931.50 (Rec.) 12" D I P 12" D I P 12" DIP 12" D I P 4 8 " R C P ( R e c ) 15 " R C P ( R e c ) N0 0 ° 1 2 ' 2 3 " E 3 9 0 . 9 5 (N 0 0 ° 3 2 ' 0 0 " E ) (West 580.96) (3 9 0 . 0 0 ) (1 6 ° 2 7 ' 4 4 " ) (S 2 3 ° 5 9 ' 5 1 " W ) (East 812.26) 5 7 2 . 1 8 Δ = 2 4 ° 1 4 ' 4 3 " R = 1 3 5 2 . 1 6 (West) N0 0 ° 1 2 ' 2 3 " E 8 1 2 . 3 8 (N 0 0 ° 3 2 ' 0 0 " E 8 1 2 . 4 2 ) N Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 W Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 S Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 Described Line (Parcel 2) Described Line (Parcel 2)(N 0 0 ° 3 2 ' 0 0 " E ) E Line of State Trunk Highway No. 3 per MNDOT R.O.W. Plat No. 19-77 & Dakota Co. Dakota Co. Road R.O.W. Map No. 258 (ST A T E T R U N K H W Y . N O . 3 ) [7] Access Control Per Dakota Co. Dakota Co. Road R.O.W. Map No. 258 [7] Gravel Underground Gas Line Per Found Gas Pipeline Warning Signs. Line Not Marked at Time of Survey 8" D.I.P Wat. Serv. Plug (Per Rec.) CONSTRUCTION LIMITS REMOVE EXISTING CURB AND GUTTER, TYP. NO EXISTING BUILDINGS ON SITE / CLEAR AND GRUB SITE EXITING GRAVEL AND FENCE WILL BE REMOVED BY OTHERS BEFORE CONSTRUCTION STARTS LOCATE EXISTING UNDERGROUND WELLS ON SITE. CAP AND ABANDON PER MPCA REQUIREMENTS PROTECT EXISTING SIGNS REMOVE EXISTING SIGNS REMOVALS LEGEND: F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 0 1" = 50'-0" 50'-0"25'-0" N REVISION SUMMARY DATE DESCRIPTION C1.0 REMOVALS PLAN .. .. .. .. .. .. Know what's below. before you dig.Call R EX. 1' CONTOUR ELEVATION INTERVAL REMOVE CURB AND GUTTER. IF IN RIGHT-OF-WAY, COORDINATE WITH LOCAL GOVERNING UNIT. REMOVAL NOTES: SEE SWPPP ON SHEETS SW1.0 - SW1.5 EROSION CONTROL NOTES: DL TREE PROTECTION N T S 25' DRIPLINE WIDTH FURNISH A AND INSTALL TEMPORARY FENCE AT THE TREE'S DRIP LINE OR CONSTRUCTION LIMITS AS SHOWN ON PLAN, PRIOR TO ANY CONSTRUCTION. WHERE POSSIBLE PLACE FENCE 25' BEYOND DRIP LINE. PLACE TREE PROTECTION SIGN ON POSTS, ONE PER INDIVIDUAL TREE (FACING CONSTRUCTION ACTIVITY), OR ONE EVERY 100' LF ALONG A GROVE OR MULTI-TREE PROTECTION AREA. POSTS AND FENCING EXTEND FENCE 25' BEYOND DRIPLINE WHERE POSSIBLE TREE PROTECTION SIGN, TYP. TREE DRIPLINE, OR CONSTRUCTION LIMITS 1 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.SEE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) PLAN FOR CONSTRUCTION STORM WATER MANAGEMENT PLAN. 3.REMOVAL OF MATERIALS NOTED ON THE DRAWINGS SHALL BE IN ACCORDANCE WITH MNDOT, STATE AND LOCAL REGULATIONS. 4.REMOVAL OF PRIVATE UTILITIES SHALL BE COORDINATED WITH UTILITY OWNER PRIOR TO CONSTRUCTION ACTIVITIES. 5.EXISTING PAVEMENTS SHALL BE SAWCUT IN LOCATIONS AS SHOWN ON THE DRAWINGS OR THE NEAREST JOINT FOR PROPOSED PAVEMENT CONNECTIONS. 6.REMOVED MATERIALS SHALL BE DISPOSED OF TO A LEGAL OFF-SITE LOCATION AND IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. 7.ABANDON, REMOVAL, CONNECTION, AND PROTECTION NOTES SHOWN ON THE DRAWINGS ARE APPROXIMATE. COORDINATE WITH PROPOSED PLANS. 8.EXISTING ON-SITE FEATURES NOT NOTED FOR REMOVAL SHALL BE PROTECTED THROUGHOUT THE DURATION OF THE CONTRACT. 9.PROPERTY LINES SHALL BE CONSIDERED GENERAL CONSTRUCTION LIMITS UNLESS OTHERWISE NOTED ON THE DRAWINGS. WORK WITHIN THE GENERAL CONSTRUCTION LIMITS SHALL INCLUDE STAGING, DEMOLITION AND CLEAN-UP OPERATIONS AS WELL AS CONSTRUCTION SHOWN ON THE DRAWINGS. 10.MINOR WORK OUTSIDE OF THE GENERAL CONSTRUCTION LIMITS SHALL BE ALLOWED AS SHOWN ON THE PLAN AND PER CITY REQUIREMENTS. FOR ANY WORK ON ADJACENT PRIVATE PROPERTY, THE CONTRACTOR SHALL OBTAIN WRITTEN PERMISSION FROM THE ADJACENT PROPERTY OWNER PRIOR TO ANY WORK. 11.DAMAGE BEYOND THE PROPERTY LIMITS CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED IN A MANNER APPROVED BY THE ENGINEER/LANDSCAPE ARCHITECT OR IN ACCORDANCE WITH THE CITY. 12.PROPOSED WORK (BUILDING AND CIVIL) SHALL NOT DISTURB EXISTING UTILITIES UNLESS OTHERWISE SHOWN ON THE DRAWINGS AND APPROVED BY THE CITY PRIOR TO CONSTRUCTION. 13.SITE SECURITY MAY BE NECESSARY AND PROVIDED IN A MANNER TO PROHIBIT VANDALISM, AND THEFT, DURING AND AFTER NORMAL WORK HOURS, THROUGHOUT THE DURATION OF THE CONTRACT. SECURITY MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY. 14.VEHICULAR ACCESS TO THE SITE SHALL BE MAINTAINED FOR DELIVERY AND INSPECTION ACCESS DURING NORMAL OPERATING HOURS. AT NO POINT THROUGHOUT THE DURATION OF THE CONTRACT SHALL CIRCULATION OF ADJACENT STREETS BE BLOCKED WITHOUT APPROVAL BY THE CITY PRIOR TO CONSTRUCTION ACTIVITIES. 15.ALL TRAFFIC CONTROLS SHALL BE PROVIDED AND ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD) AND THE CITY. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, SIGNAGE, BARRICADES, FLASHERS, AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL REMAIN OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY. 16.SHORING FOR BUILDING EXCAVATION MAY BE USED AT THE DISCRETION OF THE CONTRACTOR AND AS APPROVED BY THE OWNERS REPRESENTATIVE AND THE CITY PRIOR TO CONSTRUCTION ACTIVITIES. 17.STAGING, DEMOLITION, AND CLEAN-UP AREAS SHALL BE WITHIN THE PROPERTY LIMITS AS SHOWN ON THE DRAWINGS AND MAINTAINED IN A MANNER AS REQUIRED BY THE CITY. 18.ALL EXISTING SITE TRAFFIC/REGULATORY SIGNAGE TO BE INVENTORIED AND IF REMOVED FOR CONSTRUCTION SHALL BE RETURNED TO LGU. 19.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. PID: 340321070024 Address: 15902 Robert Trail S Bituminous Driveway Chain Link Fence R O B E R T T R A I L S O U T H ( A P u b l i c R / W ) (A P u b l i c R / W ) PID: 340321070019 Address: Unassigned PID: 340321070014 Address: 15640 Canada Cir Owner: Michael S Murgic PID: 340321073012 Address: 15938 Canada Cir Owner: NGL Supply Terminal Company LLC PID: 340321070025 Address: Unassigned Owner: Dovestone LLC NO BUILDINGS NO BUILDINGS S89°40'23"W 499.45N89°40'49"E 812.50 S2 3 ° 3 8 ' 3 4 " W 68 . 0 3 38 9 . 7 2 Δ= 1 6 ° 2 7 ' 0 1 " R= 1 3 5 7 . 3 9 S89°40'23"W 581.57 N0 0 ° 1 2 ' 2 3 " E 3 6 1 . 4 2 N89°34'04"E 129.63 65.48 Δ=13°43'45" R=273.25 S68 ° 0 2 ' 0 3 " E 109 . 3 6 8" P V C 12" DIP SMH (Loc. Per Record) Rim = 957.3 +/- (Rec.) Inv= 926.7 +/- (Rec.) SMH (Loc. Per Record) Rim = 952.1 +/- (Rec.) Inv= 927.5 +/- (Rec.) 8 " P V C ( R e c ) 8 " P V C ( R e c ) 30 " R C P ( R e c ) 15 " R C P ( R e c ) 15" R C P ( R e c ) 15 " R C P 3 0 " R C P ( R e c ) 3 6 " R C P ( R e c ) 48" R C P (R e c ) 24" R C P ( R e c ) 21" RCP (Rec) 18" RCP (Rec) 18" R C P ( R e c ) 8" P V C 12" D I P 12" D I P CAN A D A C I R C L E 12" CIP 12" DIP (Rec) 1 2 " D I P ( R e c ) 1 2 " D I P ( R e c ) [12] Drainage and Utility Easement Per Document No. 1944201 [6] Communication Easement Per Document No. 476645 [12] Drainage and Utility Easement Per Document No. 1944201 Point of Beginning of Parcel 1 S 2 4 ° 5 0 ' 2 1 " E 1 8 0 . 6 0 1 2 " D I P 1 0 " D I P ( R e c ) SMH (Loc. Per Record) Inv= 914.91 (Rec.) SMH (Loc. Per Record) Inv= 916.13 S (Rec.) Inv=915.96 W (Rec.) 6" PVC San. Stub (Per Record) Inv= 938.14 (Rec.) 10" D I P S a n . S t u b ( P e r R e c o r d ) Inv= 9 1 5 . 9 4 ( R e c . ) SMH (Loc. Per Record) Inv= 927.46 SW (Rec.) Inv=912.09 NE/NW (Rec.) 8" P V C 6" PVC San. Stub (Per Record) Inv= 931.50 (Rec.) 12" D I P 12" D I P 12" DIP 12" D I P 4 8 " R C P ( R e c ) 15 " R C P ( R e c ) N0 0 ° 1 2 ' 2 3 " E 3 9 0 . 9 5 (N 0 0 ° 3 2 ' 0 0 " E ) (West 580.96) (3 9 0 . 0 0 ) (1 6 ° 2 7 ' 4 4 " ) (S 2 3 ° 5 9 ' 5 1 " W ) (East 812.26) 5 7 2 . 1 8 Δ = 2 4 ° 1 4 ' 4 3 " R = 1 3 5 2 . 1 6 (West) N0 0 ° 1 2 ' 2 3 " E 8 1 2 . 3 8 (N 0 0 ° 3 2 ' 0 0 " E 8 1 2 . 4 2 ) N Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 W Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 S Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 Described Line (Parcel 2) Described Line (Parcel 2)(N 0 0 ° 3 2 ' 0 0 " E ) E Line of State Trunk Highway No. 3 per MNDOT R.O.W. Plat No. 19-77 & Dakota Co. Dakota Co. Road R.O.W. Map No. 258 (ST A T E T R U N K H W Y . N O . 3 ) [7] Access Control Per Dakota Co. Dakota Co. Road R.O.W. Map No. 258 [7] Underground Gas Line Per Found Gas Pipeline Warning Signs. Line Not Marked at Time of Survey 8" D.I.P Wat. Serv. Plug (Per Rec.) A31 A33 A32 A34 UT I L I T Y R O O M :$ R ( + O U 6 (      6 ) O) ) I & (     6 ) 2 0 ' P A R K I N G S E T B A C K 4 0 ' B U I L D I N G S E T B A C K 20' PARKING SETBACK 20' P A R K I N G S E T B A C K 40' B U I L D I N G S E T B A C K 40' BUILDING SETBACK 60 . 0 ' 75.6' 21 . 0 ' OUTDOOR CONC. PATIO (APPROX 300 SF) BIT. PVMT., TYP 97 . 0 ' BIT. PVMT., TYP CONC. SLAB (APPROX 49,087 SF) OUTDOOR FORKLIFT PICKUP LOADING 218.1' CONC. WALK, TYP 25 . 9 ' 24 . 0 ' R 2 0 . 0 ' 24.0'19.0' 27 27 31.4'16.6' 16 . 0 ' PARKING: 54 TOTAL SPACES INCL 3 HC SPACES 2 0 ' P A R K I N G S E T B A C K 4 0 ' B U I L D I N G S E T B A C K FUTURE PAVEMENT AREA APPROX POND AREA ROLLING GATE 8' FENCE (TYP) 8' FENCE (TYP) ROLLING GATE 64 . 8 ' R20.0' R20 . 0 ' R1 0 0 . 0 ' R6 0 . 0 ' FUTUTRE RAIL SPUR WITH FUTURE PAVEMENT BIT. PVMT., TYP ABOVE GROUND INFILTRATION BASIN AND WET POND WET POND BOT = 938.00 WET POND NWL = 942.00 INFILTRATION BOT = 942.00 10 YR HWL = 945.03 100 YR HWL = 946.14 SNOWMELT HWL = 943.18 EOF=947.23 B612 CURB AND GUTTER TYP. 3' CURB TAPER B612 CURB AND GUTTER TYP. 30 . 0 ' 28 . 0 ' 20 . 0 ' BIT. PVMT., TYP CONCRETE APRON PER CITY STANDARDS CONSTRUCTION LIMITS 20.0' 72.0' 46 . 9 ' 49 . 9 ' 24 . 0 ' R 5 0 . 0 ' R 5 0 . 0 ' 27 . 7 ' 20 . 0 ' 20.0' 96 . 5 ' 3' BERM (TYP) 3' BERM (TYP) 3' BERM (TYP) 9°30'0 " 100.0 R 6 0 4 . 1 EOF PATH POND ACCESS ROUTES, GRADING PER SPEC D&U EASEMENT FUTURE PAVED STORAGE AREA (INCLUDED IN STORMWATER CALCULATIONS F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 24904 Patrick J. Sarver LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION C2.0 SITE PLAN .. .. .. .. .. .. SITE AREA TABLE:SITE LAYOUT NOTES: SITE PLAN LEGEND: TRAFFIC DIRECTIONAL ARROW PAVEMENT MARKINGS SIGN AND POST ASSEMBLY. SHOP DRAWINGS REQUIRED. HC = ACCESSIBLE SIGN NP = NO PARKING FIRE LANE ST = STOP CP = COMPACT CAR PARKING ONLY 0 1" = 50'-0" 50'-0"25'-0" N Know what's below. before you dig.Call R PROPERTY LINE CURB AND GUTTER-SEE NOTES (T.O.) TIP OUT GUTTER WHERE APPLICABLE-SEE PLAN LIGHT DUTY BITUMINOUS PAVEMENT (IF APPLICABLE). SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE & WEAR COURSE DEPTH, SEE DEATIL. HEAVY DUTY BITUMINOUS PAVEMENT (IF APPLICABLE). SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE & WEAR COURSE DEPTH, SEE DETAIL. CONSTRUCTION LIMITS TO PERVIOUS PAVEMENT (IF APPLICABLE) - CONCRETE PAVER PERVIOUS SYSTEM. INCLUDE ALL BASE MATERIAL AND APPURTENANCES AS SPECIFIED PER MANUFACTURER SPECIFICATIONS & INSTRUCTIONS. MAKE: BELGARD, OR EQUIVILANT MODEL: AQUASTONE, OR EQUIVILANT COLOR: T.B.D. - PROVIDE SAMPLES, SHOP DRAWINGS & PRODUCT DATA REQUIRED PRIOR TO CONSTRUCTION. SPECIALTY PAVEMENT (IF APPLICABLE) - PROVIDE BID FOR THE FOLLOWING OPTIONS, INCLUDE VARIATIONS OF BASE MATERIAL AND OTHER NECESSARY COMPONENTS. 1. STAMPED & COLORED CONCRETE 2. CONCRETE PAVERS MAKERS, COLORS, MODELS, & PATTERN TO BE INCLUDED IN SHOP DRAWING SUBMITTAL PRIOR TO CONSTRUCTION. ACCESSIBILITY ARROW (IF APPLICABLE) DO NOT PAINT. 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.CONTRACTOR SHALL VERIFY LOCATIONS AND LAYOUT OF ALL SITE ELEMENTS PRIOR TO BEGINNING CONSTRUCTION, INCLUDING BUT NOT LIMITED TO, LOCATIONS OF EXISTING AND PROPOSED PROPERTY LINES, EASEMENTS, SETBACKS, UTILITIES, BUILDINGS AND PAVEMENTS. CONTRACTOR IS RESPONSIBLE FOR FINAL LOCATIONS OF ALL ELEMENTS FOR THE SITE. ANY REVISIONS REQUIRED AFTER COMMENCEMENT OF CONSTRUCTION, DUE TO LOCATIONAL ADJUSTMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO OWNER. ADJUSTMENTS TO THE LAYOUT SHALL BE APPROVED BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF MATERIALS. STAKE LAYOUT FOR APPROVAL. 3.THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, INCLUDING A RIGHT-OF-WAY AND STREET OPENING PERMIT. 4.THE CONTRACTOR SHALL VERIFY RECOMMENDATIONS NOTED IN THE GEO TECHNICAL REPORT PRIOR TO INSTALLATION OF SITE IMPROVEMENT MATERIALS. 5.CONTRACTOR SHALL FIELD VERIFY COORDINATES AND LOCATION DIMENSIONS & ELEVATIONS OF THE BUILDING AND STAKE FOR REVIEW AND APPROVAL BY THE OWNERS REPRESENTATIVE PRIOR TO INSTALLATION OF FOOTING MATERIALS. 6.LOCATIONS OF STRUCTURES, ROADWAY PAVEMENTS, CURBS AND GUTTERS, BOLLARDS, AND WALKS ARE APPROXIMATE AND SHALL BE STAKED IN THE FIELD, PRIOR TO INSTALLATION, FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT. 7.CURB DIMENSIONS SHOWN ARE TO FACE OF CURB. BUILDING DIMENSIONS ARE TO FACE OF CONCRETE FOUNDATION. LOCATION OF BUILDING IS TO BUILDING FOUNDATION AND SHALL BE AS SHOWN ON THE DRAWINGS. 8.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OR SAMPLES AS SPECIFIED FOR REVIEW AND APPROVAL BY THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO FABRICATION FOR ALL PREFABRICATED SITE IMPROVEMENT MATERIALS SUCH AS, BUT NOT LIMITED TO THE FOLLOWING, FURNISHINGS, PAVEMENTS, WALLS, RAILINGS, BENCHES, FLAGPOLES, LANDING PADS FOR CURB RAMPS, AND LIGHT AND POLES. THE OWNER RESERVES THE RIGHT TO REJECT INSTALLED MATERIALS NOT PREVIOUSLY APPROVED. 9.PEDESTRIAN CURB RAMPS SHALL BE CONSTRUCTED WITH TRUNCATED DOME LANDING AREAS IN ACCORDANCE WITH A.D.A. REQUIREMENTS-SEE DETAIL. 10.CROSSWALK STRIPING SHALL BE 24" WIDE WHITE PAINTED LINE, SPACED 48" ON CENTER PERPENDICULAR TO THE FLOW OF TRAFFIC. WIDTH OF CROSSWALK SHALL BE 5' WIDE. ALL OTHER PAVEMENT MARKINGS SHALL BE WHITE IN COLOR UNLESS OTHERWISE NOTED OR REQUIRED BY ADA OR LOCAL GOVERNING BODIES. 11.SEE SITE PLAN FOR CURB AND GUTTER TYPE. TAPER BETWEEN CURB TYPES-SEE DETAIL. 12.ALL CURB RADII ARE MINIMUM 3' UNLESS OTHERWISE NOTED. 13.CONTRACTOR SHALL REFER TO FINAL PLAT FOR LOT BOUNDARIES, NUMBERS, AREAS AND DIMENSIONS PRIOR TO SITE IMPROVEMENTS. 14.FIELD VERIFY ALL EXISTING SITE CONDITIONS, DIMENSIONS. 15.PARKING IS TO BE SET PARALLEL OR PERPENDICULAR TO EXISTING BUILDING UNLESS NOTED OTHERWISE. 16.ALL PARKING LOT PAINT STRIPPING TO BE WHITE, 4" WIDE TYP. 17.BITUMINOUS PAVING TO BE "LIGHT DUTY" UNLESS OTHERWISE NOTED. SEE DETAIL SHEETS FOR PAVEMENT SECTIONS. 18.ALL TREES THAT ARE TO REMAIN ARE TO BE PROTECTED FROM DAMAGE WITH A CONSTRUCTION FENCE AT THE DRIP LINE. SEE LANDSCAPE DOCUMENTS. CONCRETE PAVEMENT (IF APPLICABLE) AS SPECIFIED (PAD OR WALK) SEE GEOTECHNICAL REPORT FOR AGGREGATE BASE & CONCRETE DEPTHS, WITHIN ROW SEE CITY DETAIL, WITHIN PRIVATE PROPERTY SEE CSG DETAIL PID: 340321070024 Address: 15902 Robert Trail S Bituminous Driveway Chain Link Fence R O B E R T T R A I L S O U T H ( A P u b l i c R / W ) (A P u b l i c R / W ) PID: 340321070019 Address: Unassigned PID: 340321070014 Address: 15640 Canada Cir Owner: Michael S Murgic PID: 340321073012 Address: 15938 Canada Cir Owner: NGL Supply Terminal Company LLC PID: 340321070025 Address: Unassigned Owner: Dovestone LLC NO BUILDINGS NO BUILDINGS S89°40'23"W 499.45N89°40'49"E 812.50 S2 3 ° 3 8 ' 3 4 " W 68 . 0 3 38 9 . 7 2 Δ= 1 6 ° 2 7 ' 0 1 " R= 1 3 5 7 . 3 9 S89°40'23"W 581.57 N0 0 ° 1 2 ' 2 3 " E 3 6 1 . 4 2 N89°34'04"E 129.63 65.48 Δ=13°43'45" R=273.25 S68 ° 0 2 ' 0 3 " E 109 . 3 6 12" DIP SMH (Loc. Per Record) Rim = 957.3 +/- (Rec.) Inv= 926.7 +/- (Rec.) SMH (Loc. Per Record) Rim = 952.1 +/- (Rec.) Inv= 927.5 +/- (Rec.) 8 " P V C ( R e c ) 8 " P V C ( R e c ) 30 " R C P ( R e c ) 15 " R C P ( R e c ) 15" R C P ( R e c ) 15 " R C P 3 0 " R C P ( R e c ) 3 6 " R C P ( R e c ) 48" R C P (R e c ) 24" R C P ( R e c ) 21" RCP (Rec) 18" RCP (Rec) 18" R C P ( R e c ) 8" P V C 12" D I P 12" D I P CAN A D A C I R C L E 12" CIP 12" DIP (Rec) 1 2 " D I P ( R e c ) 1 2 " D I P ( R e c ) [12] Drainage and Utility Easement Per Document No. 1944201 [6] Communication Easement Per Document No. 476645 [12] Drainage and Utility Easement Per Document No. 1944201 Point of Beginning of Parcel 1 S 2 4 ° 5 0 ' 2 1 " E 1 8 0 . 6 0 1 2 " D I P 1 0 " D I P ( R e c ) SMH (Loc. Per Record) Inv= 914.91 (Rec.) SMH (Loc. Per Record) Inv= 916.13 S (Rec.) Inv=915.96 W (Rec.) 6" PVC San. Stub (Per Record) Inv= 938.14 (Rec.) 10" D I P S a n . S t u b ( P e r R e c o r d ) Inv= 9 1 5 . 9 4 ( R e c . ) SMH (Loc. Per Record) Inv= 927.46 SW (Rec.) Inv=912.09 NE/NW (Rec.) 8" P V C 6" PVC San. Stub (Per Record) Inv= 931.50 (Rec.) 12" D I P 12" D I P 12" DIP 12" D I P 4 8 " R C P ( R e c ) 15 " R C P ( R e c ) N0 0 ° 1 2 ' 2 3 " E 3 9 0 . 9 5 (N 0 0 ° 3 2 ' 0 0 " E ) (West 580.96) (3 9 0 . 0 0 ) (1 6 ° 2 7 ' 4 4 " ) (S 2 3 ° 5 9 ' 5 1 " W ) (East 812.26) 5 7 2 . 1 8 Δ = 2 4 ° 1 4 ' 4 3 " R = 1 3 5 2 . 1 6 (West) N0 0 ° 1 2 ' 2 3 " E 8 1 2 . 3 8 (N 0 0 ° 3 2 ' 0 0 " E 8 1 2 . 4 2 ) N Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 W Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 S Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 Described Line (Parcel 2) Described Line (Parcel 2)(N 0 0 ° 3 2 ' 0 0 " E ) E Line of State Trunk Highway No. 3 per MNDOT R.O.W. Plat No. 19-77 & Dakota Co. Dakota Co. Road R.O.W. Map No. 258 (ST A T E T R U N K H W Y . N O . 3 ) [7] Access Control Per Dakota Co. Dakota Co. Road R.O.W. Map No. 258 [7] Underground Gas Line Per Found Gas Pipeline Warning Signs. Line Not Marked at Time of Survey 8" D.I.P Wat. Serv. Plug (Per Rec.) A31 A33 A32 A34 UT I L I T Y R O O M :$ R ( + O U 6 (      6 ) O) ) I & (     6 ) ABOVE GROUND INFILTRATION BASIN AND WET POND WET POND BOT = 938.00 WET POND NWL = 942.00 INFILTRATION BOT = 942.00 10 YR HWL = 945.03 100 YR HWL = 946.14 SNOWMELT HWL = 943.18 EOF=947.23 CONSTRUCTION LIMITS GZ-5 GZ-3 GZ-1 GZ-2 GZ-6 GZ-4 F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 24904 Patrick J. Sarver LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION C3.0 GRADING PLAN .. .. .. .. .. .. GENERAL GRADING NOTES: 1.0' CONTOUR ELEVATION INTERVAL GRADING PLAN LEGEND: SPOT GRADE ELEVATION GUTTER SPOT GRADE ELEVATION TOP OF CURB SPOT GRADE ELEVATION BOTTOM OF STAIRS/TOP OF STAIRS SEE SWPPP ON SHEETS SW1.0 - SW1.5 EROSION CONTROL NOTES: 0 1" = 50'-0" 50'-0"25'-0" N Know what's below. before you dig.Call R EX. 1' CONTOUR ELEVATION INTERVAL SPOT GRADE ELEVATION (GUTTER/FLOW LINE UNLESS OTHERWISE NOTED) CURB AND GUTTER (T.O = TIP OUT) EMERGENCY OVERFLOW EOF=1135.52 TO SPOT GRADE ELEVATION MATCH EXISTING GRADE BREAK - HIGH POINTS 1.CONTRACTOR SHALL VERIFY ALL BUILDING ELEVATIONS, (FFE, LFE, GFE), PRIOR TO CONSTRUCTION BY CROSS CHECKING WITH ARCHITECTURAL, STRUCTURAL AND CIVIL ELEVATIONS FOR EQUIVALENT "100" ELEVATIONS. THIS MUST BE DONE PRIOR TO EXCAVATION AND INSTALLATION OF ANY FOOTING MATERIALS. VERIFICATION OF THIS COORDINATION SHALL BE CONFIRMED IN WRITING BY CIVIL, SURVEYOR, ARCHITECTURAL, STRUCTURAL AND CONTRACTOR PRIOR TO CONSTRUCTION. 2.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 3.SEE SITE PLAN FOR HORIZONTAL LAYOUT & GENERAL GRADING NOTES. 4.THE CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION (INCLUDING BUT NOT LIMITED TO SITE PREPARATION, SOIL CORRECTION, EXCAVATION, EMBANKMENT, ETC.) IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER. 5.ANY ELEMENTS OF AN EARTH RETENTION SYSTEM AND RELATED EXCAVATIONS THAT FALL WITHIN THE PUBLIC RIGHT OF WAY WILL REQUIRE A “RIGHT OF WAY EXCAVATION PERMIT”. CONTRACTOR IS RESPONSIBLE FOR AQUIRING THIS PERMIT PRIOR TO CONSTRUCTION IF APPLICABLE 6.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 3.GRADING AND EXCAVATION ACTIVITIES SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT REQUIREMENTS & PERMIT REQUIREMENTS OF THE CITY. 4.PROPOSED SPOT GRADES ARE FLOW-LINE FINISHED GRADE ELEVATIONS, UNLESS OTHERWISE NOTED. 5.GRADES OF WALKS SHALL BE INSTALLED WITH 5% MAX. LONGITUDINAL SLOPE AND 1% MIN. AND 2% MAX. CROSS SLOPE, UNLESS OTHERWISE NOTED. 6.PROPOSED SLOPES SHALL NOT EXCEED 3:1 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. MAXIMUM SLOPES IN MAINTAINED AREAS IS 4:1 7.PROPOSED RETAINING WALLS, FREESTANDING WALLS, OR COMBINATION OF WALL TYPES GREATER THAN 4' IN HEIGHT SHALL BE DESIGNED AND ENGINEERED BY A REGISTERED RETAINING WALL ENGINEER. DESIGN DRAWINGS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. 8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF GRADE STAKES THROUGHOUT THE DURATION OF CONSTRUCTION TO ESTABLISH PROPER GRADES. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR A FINAL FIELD CHECK OF FINISHED GRADES ACCEPTABLE TO THE ENGINEER/LANDSCAPE ARCHITECT PRIOR TO TOPSOIL AND SODDING ACTIVITIES. 9.IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, THE CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE. 10.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE. THE CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. THE CONTRACTOR SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 6 INCHES. 11.FINISHED GRADING SHALL BE COMPLETED. THE CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE BEEN FINISH GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED BY TRAFFIC OR ERODED BY WATER OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK. 12.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL WILL BE REQUIRED ON THE STREET AND/OR PARKING AREA SUBGRADE. THE CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. THE SOILS ENGINEER SHALL DETERMINE WHICH SECTIONS OF THE STREET OR PARKING AREA ARE UNSTABLE. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. NO TEST ROLL SHALL OCCUR WITHIN 10' OF ANY UNDERGROUND STORM RETENTION/DETENTION SYSTEMS. 13. TOLERANCES 13.1.THE BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR 0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. 13.2.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE. 13.3.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER. 13.4.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS. 14.MAINTENANCE 14.1.THE CONTRACTOR SHALL PROTECT NEWLY GRADED AREAS FROM TRAFFIC AND EROSION, AND KEEP AREA FREE OF TRASH AND DEBRIS. 14.2.CONTRACTOR SHALL REPAIR AND REESTABLISH GRADES IN SETTLED, ERODED AND RUTTED AREAS TO SPECIFIED TOLERANCES. DURING THE CONSTRUCTION, IF REQUIRED, AND DURING THE WARRANTY PERIOD, ERODED AREAS WHERE TURF IS TO BE ESTABLISHED SHALL BE RESEEDED AND MULCHED. 14.3.WHERE COMPLETED COMPACTED AREAS ARE DISTURBED BY SUBSEQUENT CONSTRUCTION OPERATIONS OR ADVERSE WEATHER, CONTRACTOR SHALL SCARIFY, SURFACE, RESHAPE, AND COMPACT TO REQUIRED DENSITY PRIOR TO FURTHER CONSTRUCTION. ST-X SOIL BORING - POINTS Bituminous Driveway Chain Link Fence S89°40'23"W 499.45N89°40'49"E 812.50 S2 3 ° 3 8 ' 3 4 " W 68 . 0 3 38 9 . 7 2 Δ= 1 6 ° 2 7 ' 0 1 " R= 1 3 5 7 . 3 9 S89°40'23"W 581.57 N0 0 ° 1 2 ' 2 3 " E 3 6 1 . 4 2 N89°34'04"E 129.63 65.48 Δ=13°43'45" R=273.25 S68 ° 0 2 ' 0 3 " E 109 . 3 6 8 " P V C 8" P V C 12" DIP SMH (Loc. Per Record) Rim = 957.3 +/- (Rec.) Inv= 926.7 +/- (Rec.) SMH (Loc. Per Record) Rim = 952.1 +/- (Rec.) Inv= 927.5 +/- (Rec.) 8 " P V C ( R e c ) 8 " P V C ( R e c ) 30 " R C P ( R e c ) 15 " R C P ( R e c ) 15" R C P ( R e c ) 3 0 " R C P ( R e c ) 3 6 " R C P ( R e c ) 48" R C P (R e c ) 24" R C P ( R e c ) 21" RCP (Rec) 18" RCP (Rec) 18" R C P ( R e c ) 8" P V C 12" D I P 12" D I P 12" CIP 12" DIP (Rec) 1 2 " D I P ( R e c ) 1 2 " D I P ( R e c ) [12] Drainage and Utility Easement Per Document No. 1944201 [6] Communication Easement Per Document No. 476645 [12] Drainage and Utility Easement Per Document No. 1944201 S 2 4 ° 5 0 ' 2 1 " E 1 8 0 . 6 0 1 2 " D I P 1 0 " D I P ( R e c ) SMH (Loc. Per Record) Inv= 914.91 (Rec.) SMH (Loc. Per Record) Inv= 916.13 S (Rec.) Inv=915.96 W (Rec.) 6" PVC San. Stub (Per Record) Inv= 938.14 (Rec.) 10" D I P S a n . S t u b ( P e r R e c o r d ) Inv= 9 1 5 . 9 4 ( R e c . ) SMH (Loc. Per Record) Inv= 927.46 SW (Rec.) Inv=912.09 NE/NW (Rec.) 8" P V C 6" PVC San. Stub (Per Record) Inv= 931.50 (Rec.) 12" D I P 12" D I P 12" DIP 12" D I P 4 8 " R C P ( R e c ) 15 " R C P ( R e c ) Underground Gas Line Per Found Gas Pipeline Warning Signs. Line Not Marked at Time of Survey 8" D.I.P Wat. Serv. Plug (Per Rec.) A31 A33 A32 A34 UT I L I T Y R O O M :$ R ( + O U 6 (      6 ) O) ) I & (     6 ) ABOVE GROUND INFILTRATION BASIN AND WET POND WET POND BOT = 938.00 WET POND NWL = 942.00 INFILTRATION BOT = 942.00 10 YR HWL = 945.03 100 YR HWL = 946.14 SNOWMELT HWL = 943.18 EOF=947.23 CONSTRUCTION LIMITS HDS 2 SCICLONE SC-5-V OR EQUAL GRATE=948.75 IE=941.95 SUMP=935.95 INSTALLED PER MANUFACTURER HDS 1 SCICLONE SC-5-V OR EQUAL RIM=949.25 IE=942.25 SUMP=936.25 INSTALLED PER MANUFACTURER STUB SANITARY TO 5' FROM BUILDING IE @ STUB= COORD. W/MECH'L CONNECT TO EXISTING 8" STUB 285 LF 6" PVC SDR 26 SANITARY SERVICE @ 4.94% AND TRACER WIRE MAKE CONNECTION TO EXISTING SANITARY SEWER EX IE=938.14 (FIELD VERIFY) 1" DIP WATER SERVICE AND VALVE, STUB TO WITHIN 5' FROM BUILDING, COORD. W/MECH'L PROPOSED GATE VALVE AND VALVE BOX 1" DIP WATER SERVICE CLEANOUT CB 13 RIM=958.17 IE(8")=949.76 IE(18")=948.93 IE(24")=948.43 CB 14 RIM=953.37 IE=948.97 CB 22 GRATE=955.79 IE=947.17 CB 23 RIM=954.85 IE(18")=948.93 IE(24")=948.43 SANMH 1A RE=956.80 IE IN= IE OUT=940.09 CB 24 RIM=956.03 IE=950.43 CB 15 RIM=955.44 IE=950.50 339 LF 24" HDPE STORM @ 1.00% 251 LF 24" HDPE STORM @ 0.50% 301 LF 18" HDPE STORM @ 0.50% 100 LF 24" HDPE STORM @ 0.75%324 LF 24" HDPE STORM @ 0.75% 188 LF 18" HDPE STORM @ 0.50% 306 LF 18" HDPE STORM @ 0.50% FES 1 IE=941.50 DS 11 12 LF 4" PVC SEE DETAIL SHT C5.0 DS 12 12 LF 4" PVC SEE DETAIL SHT C5.0 DS 13 12 LF 4" PVC SEE DETAIL SHT C5.0 DS 14 10 LF 4" PVC SEE DETAIL SHT C5.0 DS 22 9 LF 4" PVC SEE DETAIL SHT C5.0 DS 32 29 LF 4" PVC SEE DETAIL SHT C5.0 DS 31 87 LF 4" PVC SEE DETAIL SHT C5.0 406 LF 6" PVC @ 0.50% 76 LF 6" PVC @ 0.50% 86 LF 6" PVC @ 0.50% 57 LF 6" PVC @ 0.50% 40 LF 8" PVC @ 0.50% DS 23 10 LF 4" PVC SEE DETAIL SHT C5.0 122 LF 6" PVC @ 0.50% FES 2 IE=941.50 140 LF 24" HDPE STORM @ 0.75% CB 11 RIM=947.86 IE=943.30 CB 12 RIM=955.20 IE=947.17 240 LF 24" HDPE STORM @ 0.75% 45 LF 24" HDPE STORM @ 1.00% 183 LF 24" HDPE STORM @ 1.00% CB 21 GRATE=949.00 IE=943.78 OBSERVATION WELL SEE DETAIL SHT. 5.1 LOCATION APPROX. FES 4 IE=941.50 FES 3 IE=941.50 OCS 1 GATED BASIN OUTLET RIM=946.30 18" @ ELEV=942.50 SEE DETAIL MAKE WET TAP CONNECTION TO EXISTING WATER MAIN, COORD. WITH CITY 8" DIP WATER SERVICE HYD & GV, TYP. HYD & GV, TYP. 8" DIP WATER SERVICE 8" DIP WATER SERVICE Bituminous Driveway 12" DIP (Rec) [6] Communication Easement Per Document No. 476645 Underground Gas Line Per Found Gas Pipeline Warning Signs. Line Not Marked at Time of Survey 8" D.I.P Wat. Serv. Plug (Per Rec.) ABOVE GROUND INFILTRATION BASIN AND WET POND WET POND BOT = 938.00 WET POND NWL = 942.00 INFILTRATION BOT = 942.00 10 YR HWL = 945.03 100 YR HWL = 946.14 SNOWMELT HWL = 943.18 EOF=947.23 CONSTRUCTION LIMITS CONNECT TO EXISTING 8" STUB 1" DIP WATER SERVICE AND VALVE, STUB TO WITHIN 5' FROM BUILDING, COORD. W/MECH'L PROPOSED GATE VALVE AND VALVE BOX 1" DIP WATER SERVICE MAKE WET TAP CONNECTION TO EXISTING WATER MAIN, COORD. WITH CITY 8" DIP WATER SERVICE HYD & GV, TYP. HYD & GV, TYP. 8" DIP WATER SERVICE 8" DIP WATER SERVICE HYDRANT NW OF BUILDING HYDRANT SW OF BUILDING COMMANDER-SERIES FIRE TRUCK TURN AROUND DEMONSTRATION 0 1" = 100'-0" 100'-0"50'-0" F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION C4.0 UTILITY PLAN .. .. .. .. .. .. GENERAL UTILITY NOTES: UTILITY LEGEND: 0 1" = 50'-0" 50'-0"25'-0" N Know what's below. before you dig.Call R CATCH BASIN GATE VALVE AND VALVE BOX SANITARY SEWER STORM SEWER WATER MAIN PROPOSED FIRE HYDRANT MANHOLE FES AND RIP RAP 1. SEE SITE PLAN FOR HORIZONTAL DIMENSIONS AND LAYOUT. 2. CONTRACTOR SHALL FIELD VERIFY LOCATION AND ELEVATION OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER OF DISCREPANCIES OR VARIATIONS FROM THE PLANS. 3. ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 4. UTILITY INSTALLATION SHALL CONFORM TO THE CURRENT EDITION OF "STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION" AND "SANITARY SEWER AND STORM SEWER INSTALLATION" AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), AND SHALL CONFORM WITH THE REQUIREMENTS OF THE CITY AND THE PROJECT SPECIFICATIONS. 5. CASTINGS SHALL BE SALVAGED FROM STRUCTURE REMOVALS AND RE-USED OR PLACED AT THE DIRECTION OF THE OWNER. 6. ALL WATER PIPE SHALL BE CLASS 52 DUCTILE IRON PIPE (DIP) AWWA C151, ASME B16.4, AWWA C110, AWWA C153 UNLESS OTHERWISE NOTED. 7. ALL SANITARY SEWER SHALL BE SDR 26 POLYVINYL CHLORIDE (PVC) ASTM D3034 & F679, OR SCH 40 ASTM D1785, 2665, ASTM F794, 1866) UNLESS OTHERWISE NOTED. 8. ALL STORM SEWER PIPE SHALL BE HDPE ASTM F714 & F2306 WITH ASTM D3212 SPEC FITTINGS UNLESS OTHERWISE NOTED. 9. PIPE LENGTHS SHOWN ARE FROM CENTER TO CENTER OF STRUCTURE OR TO END OF FLARED END SECTION. 10. UTILITIES ON THE PLAN ARE SHOWN TO WITHIN 5' OF THE BUILDING FOOTPRINT. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR THE FINAL CONNECTION TO BUILDING LINES. COORDINATE WITH ARCHITECTURAL AND MECHANICAL PLANS. 11. CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS IN GUTTERS SHALL BE SUMPED 0.15 FEET PER DETAILS. RIM ELEVATIONS SHOWN ON THIS PLAN DO NOT REFLECT SUMPED ELEVATIONS. 12. ALL FIRE HYDRANTS SHALL BE LOCATED 5 FEET BEHIND BACK OF CURB UNLESS OTHERWISE NOTED. 13. HYDRANT TYPE, VALVE, AND CONNECTION SHALL BE IN ACCORDANCE WITH CITY REQUIREMENTS. HYDRANT EXTENSIONS ARE INCIDENTAL. 14. A MINIMUM OF 8 FEET OF COVER IS REQUIRED OVER ALL WATERMAIN, UNLESS OTHERWISE NOTED. EXTRA DEPTH MAY BE REQUIRED TO MAINTAIN A MINIMUM OF 18" VERTICAL SEPARATION TO SANITARY OR STORM SEWER LINES. EXTRA DEPTH WATERMAIN IS INCIDENTAL. 15. A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS REQUIRED FOR ALL UTILITIES, UNLESS OTHERWISE NOTED. 16. ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND COORDINATED WITH THE CITY PRIOR TO CONSTRUCTION. 17.CONNECTIONS TO EXISTING STRUCTURES SHALL BE CORE-DRILLED. 18. COORDINATE LOCATIONS AND SIZES OF SERVICE CONNECTIONS WITH THE MECHANICAL DRAWINGS. 19. COORDINATE INSTALLATION AND SCHEDULING OF THE INSTALLATION OF UTILITIES WITH ADJACENT CONTRACTORS AND CITY STAFF. 20. ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY. ALL PAVEMENT CONNECTIONS SHALL BE SAWCUT. ALL TRAFFIC CONTROLS SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD) AND THE CITY. THIS SHALL INCLUDE BUT NOT BE LIMITED TO SIGNAGE, BARRICADES, FLASHERS, AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. NO ROAD CLOSURES SHALL BE PERMITTED WITHOUT APPROVAL BY THE CITY. 21. ALL STRUCTURES, PUBLIC AND PRIVATE, SHALL BE ADJUSTED TO PROPOSED GRADES WHERE REQUIRED. THE REQUIREMENTS OF ALL OWNERS MUST BE COMPLIED WITH. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING. 22. CONTRACTOR SHALL COORDINATE ALL WORK WITH PRIVATE UTILITY COMPANIES. 23. CONTRACTOR SHALL COORDINATE CONNECTION OF IRRIGATION SERVICE TO UTILITIES. COORDINATE THE INSTALLATION OF IRRIGATION SLEEVES NECESSARY AS TO NOT IMPACT INSTALLATION OF UTILITIES. 24. CONTRACTOR SHALL MAINTAIN AS-BUILT PLANS THROUGHOUT CONSTRUCTION AND SUBMIT THESE PLANS TO ENGINEER UPON COMPLETION OF WORK. 25.ALL JOINTS AND CONNECTIONS IN STORM SEWER SYSTEM SHALL BE GASTIGHT OR WATERTIGHT. APPROVED RESILIENT RUBBER JOINTS MUST BE USED TO MAKE WATERTIGHT CONNECTIONS TO MANHOLES, CATCHBASINS, OR OTHER STRUCTURES. 26.ALL PORTIONS OF THE STORM SEWER SYSTEM LOCATED WITHIN 10 FEET OF THE BUILDING OR WATER SERVICE LINE MUST BE TESTED IN ACCORDANCE WITH MN RULES, CHAPTER 4714, SECTION 1109.0. 27.FOR ALL SITES LOCATED IN CLAY SOIL AREAS, DRAIN TILE MUST BE INSTALLED AT ALL LOW POINT CATCH BASINS 25' IN EACH DIRECTION. SEE PLAN AND DETAIL. INSTALL LOW POINT DRAIN TILE PER PLANS AND GEOTECHNICAL REPORT RECOMMENDATIONS AND REQUIREMENTS. F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION C5.0 CIVIL DETAILS .. .. .. .. .. .. 6" 8"12" 13 1 / 2 " 6" 1/2" RADIUS FINISHED GRADE 3" RADIUS CORNERS 1:3 BATTER SLOPE GUTTER 3/4"/1' NOTES: 1. INSTALL CONSTRUCTION JOINTS AT 10'-0" O.C. +/- 2. BASE DEPTH DEPENDANT UPON SOIL CONDITIONS CLASS V AGGREGATE SUBBASE-SEE BITUMINOUS PAVEMENT DETAIL (6" MIN.) FINISHED GRADE 0.5% SLOPE-CONSTRUCT WITH REVERSE SLOPE GUTTER (T.O. GUTTER) WHERE THE PAVEMENT SLOPES AWAY FROM CURB. SEE PLAN N T S B-612 CONCRETE CURB AND GUTTER 7" 3 7" 20" FINISHED GRADE SLOPE GUTTER 3/4"/1' NOTES: 1. INSTALL CONSTRUCTION JOINTS AT 10'-0" O.C. +/- 2. BASE DEPTH DEPENDANT UPON SOIL CONDITIONS CONTINUOUS SLOPE CONCRETE CURB AND GUTTER PAVEMENT MATERIALS SEE DETAIL 6" 6" RIBBON CURB N T S4 FINISHED GRADE TOOLED CONTROL JOINT SEE DETAIL (TYP.) LIGHT BROOM FINISH PERPENDICULAR TO TRAFFIC WITH 3" WIDE SMOOTH TROWELLED EDGE 5" CONCRETE AS SPECIFIED 6" CLASS 5 AGGREGATE BASE COMPACTED SUBGRADE NOTES: 1. INSTALLATION SHALL BE CERTIFIED AND IN ACCORDANCE TO AN ON-SITE A.C.I. TECHNICIAN AS SPECIFIED. 2. SEE GEO-TECHNICAL RECOMMENDATIONS FOR GROSS WEIGHT REQUIREMENTS. 3. SEE LAYOUT DRAWINGS FOR LIMITS OF WALKS. 4. SEE CONCRETE JOINT DETAIL FOR REQUIREMENTS. 5. 1/2" WIDE EXPANSION JOINT AND SEALANT AT ALL CURBS. W1.6 X W1.6 WIRE MESH AND CHAIRS AS SPECIFIED CONCRETE WALK/PAD 3" 2" THIS OCCURS ONLY WHERE MULCH MEETS EDGE OF WALK LEAVE TOP OF MULCH DOWN 1" FROM TOP OF WALK N T S (PRIVATE PROPERTY)6 8" AS REQUIRED CONCRETE THRUST BLOCK WATERMAIN GATE VALVE REFER TO DRAWINGS FOR SIZES VALVE BOX FINISH GRADE COVER SHALL BE STAMPED WITH "WATER" GATE VALVE BOX N T S ADJUST TOP TO 1/2" BELOW FINISHED PAVEMENT GRADE OR 1" BELOW FINISHED TURF GRADE. SET SO AS TO PROVIDE 12" OF UPWARD ADJUSTMENT. 10 BEND CROSS TEE45° BEND WYE NOTES: 1. CONCRETE THRUST BLOCKING TO BE POURED AGAINST UNDISTURBED EARTH. 2. KEEP CONCRETE CLEAR OF JOINT AND ACCESSORIES. 3. IF NOT SHOWN ON PLANS, REQUIRED BEARING AT FITTING SHALL BE AS INDICATED ABOVE, ADJUSTED IF NECESSARY, TO CONFORM TO THE TEST PRESSURE(S) AND ALLOWABLE SOIL BEARING STRESS(ES). 4. BEARING AREAS AND SPECIAL BLOCKING DETAILS SHOWN ON PLANS TAKE PRECEDENCE OVER BEARING AREAS AND BLOCKING DETAILS SHOWN THIS STANDARD DETAIL. 5. ABOVE BEARING AREAS BASED ON TEST PRESSURE OF 150 P.S.I. AND AN ALLOWABLE SOIL BEARING STRESS OF 2000 POUNDS PER SQUARE FOOT. TO COMPUTE BEARING AREAS FOR DIFFERENT TEST PRESSURES AND SOIL BEARING STRESSES, USE THE FOLLOWING EQUATION: BEARING AREA = (TEST PRESSURE/150) X (200/SOIL BEARING STRESS) X (TABLE VALUE). PLUGGED CROSS PLUGGED CROSS EACH AREA IS 1/2 OF TABULATED AREA PLUGGED TEE PLUG OR CAP 1/4" PLYWOOD OVER FACE OF BOLTSA1 A2 NOMINAL FITTING SIZE (INCHES) TYE, WYE, PLUG, OR CAP 90° BEND, PLUGGED CROSS TEE PLUGGED ON RUN A1 A2 45° BEND 22.5° BEND 11.25° BEND 4 1.0 1.4 1.9 1.4 1.0 -- 6 2.1 3.0 4.3 3.0 1.6 1.0 - 10 5.9 8.4 11.8 8.4 4.6 2.6 1.2 12 8.5 12.0 17.0 12.0 6.6 3.4 1.7 14 11.5 16.3 23.0 16.3 8.9 4.6 2.3 16 15.0 21.3 30.0 21.3 11.6 6.0 3.0 18 19.0 27.0 38.0 27.0 14.6 7.6 3.6 20 23.5 33.3 47.0 33.3 18.1 9.4 4.7 24 34.0 48.0 68.0 48.0 26.2 13.6 6.8 6 3.8 5.3 7.6 5.4 2.9 1.5 1.0 THRUST BLOCK N T S8 6" PR O V I D E I N S U L A T I O N P E R P L A N F I E L D V E R I F Y D E P T H 6" 4" 6" ( M I N . ) NOTES: 1. INSULATION BOARD TO BE CLOSED CELL. EXTRUDED POLYSTYRENE FOAM MEETING ASTM 578, TYPE VI, 40PSI COMPRESSING STRENGTH (ASTM D1621) 0.1%MAX. WATER ABSORPTION (ASTM C272). 2. BACKFILL MATERIAL AROUND INSULATION MUST BE FINE SAND FREE FROM ROOT, ORGANIC MATERIAL, OR OTHER INJURIOUS MATERIALS. 3. OVERLAP ALL INSULATION BOARD JOINTS. UTILITY PIPE INSULATION DETAIL N T S 1'-6" (MIN) PIPE BEDDING MATERIAL BACKFILL MATERIAL FINE SAND (FA7) MIN. 2' WIDE BY 4" THICK INSULATION BOARD (USE 2-2" THICK BOARDS). MASTIC ALL JOINTS EXTEND INSULATION BOARD DOWN SIDES TO 7.5' DEPTH. FINISH GRADE DIA DIA + 3' UTILITY PIPE 11 EXTEND POST PAST TOP OF POST 10 DEGREE SLOPE 1 INCH SILICONE RUBBER OR ASPHALTIC CAULKING COMPOUND FILL ANNULAR SPACE TO 1 INCH FROM TOP WITH SILICA SAND CONCRETE FOOTING AS SPECIFIED 6" 3' - 6 " 2' - 6 " 60 " - 6 6 " FR O M P A V E M E N T T O BO T T O M O F S I G N 1/ 2 " MATERIAL VARIES-SEE PLAN METAL SIGN ACCORDING TO MN STATE CODE NOTE: 1. SIGN SHALL BE AS SPECIFIED. 2. VERIFY POST PAINT C0LOR WITH LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. ACCESSIBLE SIGN AND POST N T S 1'-6" 6" O.D. GALVANIZED STEEL PIPE PAINTED WITH 1 COAT OF APPROPRIATE PRIMER AND TWO COATS SIGN ENAMEL. FILL ANNULAR SPACE WITH GROUT. COVER WITH YELLOW "IDEAL SHIELD" PLASTIC COVER. GREEN POWDER COATED STEEL SQUARE POST AS SPECIFIED 1/4" METAL PLATE WELDED TO BOTTOM OF 6” PIPE GALVANIZED STEEL FASTENER (TYP. OF 2) 10 7. 5 ' M I N I M U M 2.0' FINISH GRADE TRAFFIC FLANGE 2" ABOVE GRADE HYDRANT, HEIGHT VARIES REFER TO DETAIL 7. 5 ' M I N . C O V E R 6" GATE VALVE MECH. JOINTS 6" D.I.P. LEAD TEE 2-3/4" TIE RODS8" CONCRETE THRUST BLOCKS 4" x 4" THRUST BLOCK 4" x 4" VERTICAL BLOCK 1 CU. YD. GRAVEL 3/4"+ COVER WITH POLYETHLENE HYDRANT MARKER FIRE HYDRANT N T S 8 C5.0 7 512" 2'-0" 1'-0"CONCRETE VALLEY GUTTER MIN. 6" AGGREGATE BASE COURSE TO BE PLACED BY PAVING CONTRACTOR 1 1 1'-0" TYP.VALLEY GUTTER N T S 7" 5 HEAVY DUTY BITUMINOUS PAVEMENT 8" CLASS 5 AGGREGATE SUBBASE (MNDOT 3138) 2" BASE COURSE (MNDOT 2360 - SPNWB330B) TACK COAT (MNDOT 2357) 2" WEAR COURSE (MNDOT 2360 - SPWEA340B) COMPACTED SUBGRADE (100% OF STANDARD PROCTOR MAXIMUM DRY DENSITY) N T S1 NOTE: SECTION IS FOR BIDDING PURPOSES ONLY. REFER TO GEOTECH FOR FINAL PAVEMENT SECTION. LIGHT DUTY BITUMINOUS PAVEMENT 6" CLASS 5 AGGREGATE SUBBASE (MNDOT 3138) 2" BASE COURSE (MNDOT 2360 - SPNWB330B) TACK COAT (MNDOT 2357) 1.5" WEAR COURSE (MNDOT 2360 - SPWEA340B) COMPACTED SUBGRADE (100% OF STANDARD PROCTOR MAXIMUM DRY DENSITY) N T S NOTE: SECTION IS FOR BIDDING PURPOSES ONLY. REFER TO GEOTECH FOR FINAL PAVEMENT SECTION. 2 DOWNSPOUT TO PIPE CONNECTION N T S VA R I E S 12" 8" 6" TYP BUILDING DOWNSPOUT REFER TO ARCH'L EXTEND DOWNSPOUT AND POINT DOWN OVER CENTER OF GRATE 8"X8" NYLOPLAST RECTANGULAR, LOCKING, DUCTILE IRON GRATE, OR APPROVED EQUIVALENT COMPACTED SOIL 8" GRATE TO 4" PIPE INLINE DRAIN ADAPTER 4" PVC SEWER RISER PIPE (LENGTH AS REQUIRED) CONCRETE COLLAR ON COMPACTED BACK FILL 4" PVC LONG RADIUS 1 4 BEND SEWER ELBOW 4" PVC SEWER PIPE CRUSHED AND COMPACTED STONE SLOPE TO DRAINSLOPE TO DRAIN 12 F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION C5.1 CIVIL DETAILS .. .. .. .. .. .. PIPE BEDDING - RCP & DIP N T S4 PIPE BEDDING - PVC N T S5 TYPICAL SECTION VIEW 4:1 GRADE MAX NURP TREATMENT VOLUME 4:1 GRADE MAX EOF FLOW PATH OVER ROAD TYPE IV GEOTEXTILE FABRIC SEE SW1.1 FOR COVERAGE ABOVE GROUND INFILTRATION BASIN AND WET POND N T S 1 3:1 GRADE MAX NWL INFILTRATION BENCH NATIVE SOILS 12"-18" AMENDED SOIL TO REDUCE INFILTRATION RATES TO APPROX. 2 IN/HR 100-YR 24-HR HWL GATED BASIN OUTLET IN OVERFLOW STRUCTURE PER CITY STANDARDS 3:1 GRADE MAX F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION C5.2 CIVIL DETAILS .. .. .. .. .. .. PID: 340321070024 Address: 15902 Robert Trail S Bituminous Driveway Chain Link Fence R O B E R T T R A I L S O U T H ( A P u b l i c R / W ) (A P u b l i c R / W ) PID: 340321070019 Address: Unassigned PID: 340321070014 Address: 15640 Canada Cir Owner: Michael S Murgic PID: 340321073012 Address: 15938 Canada Cir Owner: NGL Supply Terminal Company LLC PID: 340321070025 Address: Unassigned Owner: Dovestone LLC NO BUILDINGS NO BUILDINGS S89°40'23"W 499.45N89°40'49"E 812.50 S2 3 ° 3 8 ' 3 4 " W 68 . 0 3 38 9 . 7 2 Δ= 1 6 ° 2 7 ' 0 1 " R= 1 3 5 7 . 3 9 S89°40'23"W 581.57 N0 0 ° 1 2 ' 2 3 " E 3 6 1 . 4 2 N89°34'04"E 129.63 65.48 Δ=13°43'45" R=273.25 S68 ° 0 2 ' 0 3 " E 109 . 3 6 12" DIP SMH (Loc. Per Record) Rim = 957.3 +/- (Rec.) Inv= 926.7 +/- (Rec.) SMH (Loc. Per Record) Rim = 952.1 +/- (Rec.) Inv= 927.5 +/- (Rec.) 8 " P V C ( R e c ) 8" P V C ( R e c ) 30 " R C P ( R e c ) 15 " R C P ( R e c ) 15" R C P ( R e c ) 3 0 " R C P ( R e c ) 3 6 " R C P ( R e c ) 48" R C P (R e c ) 24" R C P ( R e c ) 21" RCP (Rec) 18" RCP (Rec) 18" R C P ( R e c ) 8" P V C 12" D I P 12" DI P CAN A D A C I R C L E 12" CIP 12" DIP (Rec) 12 " D I P ( R e c ) 12 " D I P ( R e c ) [12] Drainage and Utility Easement Per Document No. 1944201 [6] Communication Easement Per Document No. 476645 [12] Drainage and Utility Easement Per Document No. 1944201 Point of Beginning of Parcel 1 S 2 4 ° 5 0 ' 2 1 " E 1 8 0 . 6 0 1 2 " D I P 1 0 " D I P ( R e c ) SMH (Loc. Per Record) Inv= 914.91 (Rec.) SMH (Loc. Per Record) Inv= 916.13 S (Rec.) Inv=915.96 W (Rec.) 6" PVC San. Stub (Per Record) Inv= 938.14 (Rec.) 10" D I P S a n . S t u b ( P e r R e c o r d ) Inv= 9 1 5 . 9 4 ( R e c . ) SMH (Loc. Per Record) Inv= 927.46 SW (Rec.) Inv=912.09 NE/NW (Rec.) 8" P V C 6" PVC San. Stub (Per Record) Inv= 931.50 (Rec.) 12" D I P 12" D I P 12" DIP 12" D I P 15 " R C P ( R e c ) N0 0 ° 1 2 ' 2 3 " E 3 9 0 . 9 5 (N 0 0 ° 3 2 ' 0 0 " E ) (West 580.96) (39 0 . 0 0 ) (16 ° 2 7 ' 4 4 " ) (S 2 3 ° 5 9 ' 5 1 " W ) (East 812.26) 5 7 2 . 1 8 Δ = 2 4 ° 1 4 ' 4 3 " R = 1 3 5 2 . 1 6 (West) N0 0 ° 1 2 ' 2 3 " E 8 1 2 . 3 8 (N 0 0 ° 3 2 ' 0 0 " E 8 1 2 . 4 2 ) N Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 W Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 S Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 Described Line (Parcel 2) Described Line (Parcel 2) (N 0 0 ° 3 2 ' 0 0 " E ) E Line of State Trunk Highway No. 3 per MNDOT R.O.W. Plat No. 19-77 & Dakota Co. Dakota Co. Road R.O.W. Map No. 258 (ST A T E T R U N K H W Y . N O . 3 ) [7] Access Control Per Dakota Co. Dakota Co. Road R.O.W. Map No. 258 [7] Underground Gas Line Per Found Gas Pipeline Warning Signs. Line Not Marked at Time of Survey 8" D.I.P Wat. Serv. Plug (Per Rec.) CONSTRUCTION LIMITS 3 - AN 5 - BL 6 - SH 5 - EK 6 - BL 6 - UP 15 - AC 10 - BF 2 - QE2 3 - QE2 3 - AN 3 - CV 2 - AN 2 - AN 2 - CA3 1 - CA3 1 - CV 1 - CV 1 - CA3 1 - CA3 1 - CA3 1 - CA3 1 - CA3 1 - CA3 1 - CA3 5 - AN 2 - CA3 1 - CV 1 - CV 1 - CV 1 - AS 2 - CV 2 - CA31 - CV 1 - QE2 1 - AS2 - QE2 2 - QB 3 - AS 3 - QB 3 - AS 3 - QB 2 - AS 3 - QB TREES QTY COMMON / BOTANICAL NAME CONT NATIVE PLANTS POLLINATOR FRIENDLY AN 15 Northwood Red Maple / Acer rubrum `Northwood`2.5" Cal. B&B NATIVE CULTIVAR Y AS 10 Sugar Maple / Acer saccharum 2.5" CAL. B&B NATIVE Y SH 6 Skyline Thornless Honey Locust / Gleditsia triacanthos inermis `Skycole` TM 2.5" Cal. B&B NATIVE CULTIVAR N EK 5 Espresso Kentucky Coffeetree / Gymnocladus dioica `Espresso`2.5" Cal. B&B NATIVE CULTIVAR N QB 11 Swamp White Oak / Quercus bicolor 2.5" Cal. B&B NATIVE Y QE2 8 Northern Pin Oak / Quercus ellipsoidalis 2.5" Cal. B&B NATIVE BL 11 Boulevard Linden / Tilia americana `Boulevard`2.5" Cal. B&B NATIVE CULTIVAR Y UP 6 American Elm / Ulmus americana `Princeton`2.5" Cal. B&B NATIVE CULTIVAR Y EVERGREEN TREES QTY COMMON / BOTANICAL NAME CONT NATIVE PLANTS POLLINATOR FRIENDLY BF 10 Balsam Fir / Abies balsamea 6` B&B NATIVE AC 15 White Fir / Abies concolor 6` B&B NOT NATIVE ORNAMENTAL TREES QTY COMMON / BOTANICAL NAME CONT NATIVE PLANTS POLLINATOR FRIENDLY CA3 14 American Hornbeam / Carpinus caroliniana 2" Cal. B&B NATIVE Y CV 11 Thornless Cockspur Hawthorn / Crataegus crus-galli inermis TM 1.5" Cal. B&B NATIVE Y SHRUBS QTY COMMON / BOTANICAL NAME SIZE NATIVE PLANTS POLLINATOR FRIENDLY AA 9 Regent Serviceberry / Amelanchier alnifolia `Regent`#5 CONT NATIVE CULTIVAR Y AB2 54 Low Scape Hedger Black Chokeberry / Aronia melanocarpa 'UCONNAM166' TM #5 CONT NATIVE CULTIVAR Y CM 19 Muskingham Gray Dogwood / Cornus racemosa `Muskingham`#2 CONT NATIVE CULTIVAR Y CB 13 Firedance Dogwood / Cornus sericea `Bailadeline` TM #5 CONT NATIVE CULTIVAR Y FF 18 Gold Cluster Forsythia / Forsythia x intermedia `Courtaneur` TM #2 CONT NOT NATIVE Y HA 18 Annabelle Hydrangea / Hydrangea arborescens `Annabelle`#5 CONT NOT NATIVE Y HG2 48 Gemo St. Johnswort / Hypericum kalmianum `Gemo`#2 CONT NATIVE CULTIVAR Y PR 20 Raspberry Lemonade Ninebark / Physocarpus opulifolius 'ZLEYel2' TM #5 CONT NATIVE CULTIVAR Y SS 8 Sem Ash Leaf Spirea / Sorbaria sorbifolia `Sem`#5 CONT NOT NATIVE Y TT 29 Taunton`s Yew / Taxus x media `Tauntonii`#5 CONT NOT NATIVE N VB 10 Bailey's Compact Cranberrybush / Viburnum trilobum 'Bailey Compact'#5 CONT NATIVE CULTIVAR Y GRASSES QTY COMMON / BOTANICAL NAME SIZE NATIVE PLANTS POLLINATOR FRIENDLY BB 9 Blonde Ambition Blue Grama / Bouteloua gracilis `Blonde Ambition`#1 CONT NATIVE CULTIVAR Y PLANT SCHEDULE GROUND COVERS COMMON / BOTANICAL NAME SIZE Shooting Star Dry Short Parairie Mix / Dry Short Prairie Seed Mix Shooting Star Native Seed: Dry Short Prairie Seed Mix.Seed Mix Lower Basin Native Seed Mix MNDOT 34-262 WET PRAIRIE, PER MNDOT SEEDING MANUAL SPECIFICATIONS (2014) Seed Mix Rock Maintanence Strip / Rock Maintanence Strip 1" River rock over filter fabric, include edging as shown & needed. See detail. Mulch Blue Grass Based / Sod Commercial grade, locally grown, "Big Roll" preferred Sod Turf Seed Low Grow Mix Seed Mix PLANT SCHEDULE REVISION SUMMARY DATE DESCRIPTION L1.0 LANDSCAPE PLAN .. .. .. .. .. .. F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 24904 Patrick J. Sarver LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 0 1" = 50'-0" 50'-0"25'-0" N Know what's below. before you dig.Call R LEGEND EDGING LANDSCAPE NOTES: 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.WHERE SHOWN, SHRUB & PERENNIAL BEDS SHALL BE MULCHED WITH 4" DEPTH (MINIMUM AFTER INSTALLATION AND/OR TOP DRESSING OPERATIONS) OF SHREDDED CEDAR MULCH. 3.ALL TREES SHALL BE MULCHED WITH SHREDDED CEDAR MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ALL MULCH SHALL BE KEPT WITHIN A MINIMUM OF 2" FROM TREE TRUNK. 4.IF SHOWN ON PLAN, RANDOM SIZED LIMESTONE BOULDERS COLOR AND SIZE TO COMPLIMENT NEW LANDSCAPING. OWNER TO APPROVE BOULDER SAMPLES PRIOR TO INSTALLATION. 5.PLANT MATERIALS SHALL CONFORM WITH THE AMERICAN ASSOCIATION OF NURSERYMEN STANDARDS AND SHALL BE OF HARDY STOCK, FREE FROM DISEASE, DAMAGE AND DISFIGURATION. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING PLUMPNESS OF PLANT MATERIAL FOR DURATION OF ACCEPTANCE PERIOD. 6.UPON DISCOVERY OF A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS SHOWN ON THE SCHEDULE AND THE QUANTITY SHOWN ON THE PLAN, THE PLAN SHALL GOVERN. 7.CONDITION OF VEGETATION SHALL BE MONITORED BY THE LANDSCAPE ARCHITECT THROUGHOUT THE DURATION OF THE CONTRACT. LANDSCAPE MATERIALS PART OF THE CONTRACT SHALL BE WARRANTED FOR ONE (1) FULL GROWING SEASONS FROM SUBSTANTIAL COMPLETION DATE. 8.ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL RECEIVE 6" LAYER TOPSOIL AND SOD AS SPECIFIED UNLESS OTHERWISE NOTED ON THE DRAWINGS. 9.COORDINATE LOCATION OF VEGETATION WITH UNDERGROUND AND OVERHEAD UTILITIES, LIGHTING FIXTURES, DOORS AND WINDOWS. CONTRACTOR SHALL STAKE IN THE FIELD FINAL LOCATION OF TREES AND SHRUBS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 10.ALL PLANT MATERIALS SHALL BE WATERED AND MAINTAINED UNTIL ACCEPTANCE. 11.REPAIR AT NO COST TO OWNER ALL DAMAGE RESULTING FROM LANDSCAPE CONTRACTOR'S ACTIVITIES. 12.SWEEP AND MAINTAIN ALL PAVED SURFACES FREE OF DEBRIS GENERATED FROM LANDSCAPE CONTRACTOR'S ACTIVITIES. 13.PROVIDE SITE WIDE IRRIGATION SYSTEM DESIGN AND INSTALLATION. SYSTEM SHALL BE FULLY PROGRAMMABLE AND CAPABLE OF ALTERNATE DATE WATERING. THE SYSTEM SHALL PROVIDE HEAD TO HEAD OR DRIP COVERAGE AND BE CAPABLE OF DELIVERING ONE INCH OF PRECIPITATION PER WEEK. SYSTEM SHALL EXTEND INTO THE PUBLIC RIGHT-OF-WAY TO THE EDGE OF PAVEMENT/BACK OF CURB. 14.CONTRACTOR SHALL SECURE APPROVAL OF PROPOSED IRRIGATION SYSTEM INLCUDING PRICING FROM OWNER, PRIOR TO INSTALLATION. LANDSCAPE REQUIREMENTS 1.ENTIRE SITE SHALL BE FULLY IRRIGATED. THE CONTRACTOR SHALL SUBMIT IRRIGATION SHOP DRAWINGS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 2.SEE MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS FOR IRRIGATION WATER, METER, AND POWER CONNECTIONS. 3.CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND/ABOVE GROUND FACILITIES PRIOR TO ANY EXCAVATION/INSTALLATION. ANY DAMAGE TO UNDERGROUND/ABOVE GROUND FACILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COSTS ASSOCIATED WITH CORRECTING DAMAGES SHALL BE BORNE ENTIRELY BY THE CONTRACTOR. 4.SERVICE EQUIPMENT AND INSTALLATION SHALL BE PER LOCAL UTILITY COMPANY STANDARDS AND SHALL BE PER NATIONAL AND LOCAL CODES. EXACT LOCATION OF SERVICE EQUIPMENT SHALL BE COORDINATED WITH THE LANDSCAPE ARCHITECT OR EQUIVALENT AT THE JOB SITE. 5.CONTRACTOR SHALL COORDINATE WITH LOCAL UTILITY COMPANY FOR THE PROPOSED ELECTRICAL SERVICE AND METERING FACILITIES. 6.IRRIGATION WATER LINE CONNECTION SIZE IS 1-12" AT BUILDING. VERIFY WITH MECHANICAL PLANS.COVAGE. 7.ALL MAIN LINES SHALL BE 18" BELOW FINISHED GRADE. 8.ALL LATERAL LINES SHALL BE 12" BELLOW FINISHED GRADE. 9.ALL EXPOSED PVC RISERS, IF ANY, SHALL BE GRAY IN COLOR. 10.CONTRACTOR SHALL LAY ALL SLEEVES AND CONDUIT AT 2'-0" BELOW THE FINISHED GRADE OF THE TOP OF PAVEMENT. EXTEND SLEEVES TO 2'-0" BEYOND PAVEMENT. 11.CONTRACTOR SHALL MARK THE LOCATION OF ALL SLEEVES AND CONDUIT WITH THE SLEEVING MATERIAL "ELLED" TO 2'-0" ABOVE FINISHED GRADE AND CAPPED. 12.FABRICATE ALL PIPE TO MANUFACTURE'S SPECIFICATIONS WITH CLEAN AND SQUARE CUT JOINTS. USE QUALITY GRADE PRIMER AND SOLVENT CEMENT FORMULATED FOR INTENDED TYPE OF CONNECTION. 13.BACKFILL ALL TRENCHES WITH SOIL FREE OF SHARP OBJECTS AND DEBRIS. 14.ALL VALVE BOXES AND COVERS SHALL BE BLACK IN COLOR. 15.GROUP VALVE BOXES TOGETHER FOR EASE WHEN SERVICE IS REQUIRED. LOCATE IN PLANT BED AREAS WHENEVER POSSIBLE. 16.IRRIGATION CONTROLLER LOCATION SHALL BE VERIFIED ON-SITE WITH OWNER'S REPRESENTATIVE. 17.CONTROL WIRES: 14 GAUGE DIRECT BURIAL, SOLID COPPER IRRIGATION WIRE. RUN UNDER MAIN LINE. USE MOISTURE-PROOF SPLICES AND SPLICE ONLY AT VALVES OR PULL BOXES. RUN SEPARATE HOT AND COMMON WIRE TO EACH VALVE AND ONE (1) SPARE WIRE AND GROUND TO FURTHEST VALVE FROM CONTROLLER. LABEL OR COLOR CODE ALL WIRES. 18.AVOID OVER SPRAY ON BUILDINGS, PAVEMENT, WALLS AND ROADWAYS BY INDIVIDUALLY ADJUSTING RADIUS OR ARC ON SPRINKLER HEADS AND FLOW CONTROL ON AUTOMATIC VALVE. 19.ADJUST PRESSURE REGULATING VALVES FOR OPTIMUM PRESSURE ON SITE. 20.USE SCREENS ON ALL HEADS. 21.A SET OF AS-BUILT DRAWINGS SHALL BE MAINTAINED ON-SITE AT ALL TIMES IN AN UPDATED CONDITION. 22.ALL PIPE 3" AND OVER SHALL HAVE THRUST BLOCKING AT EACH TURN. 23.ALL AUTOMATIC REMOTE CONTROL VALVES WILL HAVE 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL UNDERNEATH VALVE AND VALVE BOX. GRAVEL SHALL EXTENT 3" BEYOND PERIMETER OF VALVE BOX. 24.THERE SHALL BE 3" MINIMUM SPACE BETWEEN BOTTOM OF VALVE BOX COVER AND TOP OF VALVE STRUCTURE. IRRIGATION NOTES: CONC. WALK, TYP B612 CURB AND GUTTER TYP. 3' BERM (TYP) 3 - HA 3 - HA 3 - HA 8 - SS 3 - HA 4 - AB2 4 - HG2 4 - HG2 9 - BB 23 - TT 6 - HG2 5 - PR 5 - FF 5 - CB 5 - PR 5 - FF 3 - CB INLET PROTECTION AT CATCH BASINS, TYP W Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 OUTDOOR CONC. PATIO (APPROX 300 SF) 24.0' 27 31.4'16.6' 16 . 0 ' PARKING: 54 TOTAL SPACES INCL 3 HC SPACES ROLLING GATE 3' BERM (TYP) 15 - AB2 11 - CM 3 - HA 6 - AB2 5 - HG2 4 - AB2 6 - TT 3 - HA 5 - PR 5 - HG2 5 - FF 5 - AB2 5 - CB 5 - PR 3 - FF 5 - HG2 5 - AB2 5 - HG2 5 - AB2 REVISION SUMMARY DATE DESCRIPTION L1.1 LANDSCAPE PLAN NOTES & DETAILS .. .. .. .. .. .. F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 24904 Patrick J. Sarver LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 FACE OF BUILDING, WALL, OR STRUCTURE MIN. 3" LAYER OF ROCK MULCH AS SPECIFIED. PROVIDE SAMPLE TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION FINISHED GRADE COMPACTED SUBGRADE WATER PERMEABLE GEOTEXTILE FABRIC AS SPECIFIED 18" - VERIFY W/ PLAN AGGREGATE MAINTANENCE STRIP N T S STAKED LANDSCAPE EDGER AS SPECIFIED, SEE MANUFACTURER'S INSTRUCTIONS AND SPECS. FOR INSTALLATION AND PLACEMENT SLOPE - MIN. 2%, MAX. 5:1 VERIFY W/ GRADING PLAN 1 Know what's below. before you dig.Call R PERENNIAL BED PLANTING N T S PLANT TOP OF ROOTBALL 1-2" ABOVE ABOVE SURROUNDING GRADE ROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TO ENSURE PROPER BACKFILL-TO-ROOT CONTACT SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED EXISTING GRADE ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT STEM BACKFILL AS PER SPECIFICATION DO NOT EXCAVATE BELOW ROOTBALL. SIZE VARIES SEE LANDSCAPE PLAN MODIFY EXCAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 4 DECIDUOUS & CONIFEROUS SHRUB PLANTING N T S PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE APPEARANCE (RETAIN NORMAL SHAPE FOR SPECIES) PLANT TOP OF ROOTBALL 1-2" ABOVE ABOVE SURROUNDING GRADE ROOTS AT OUTER EDGE OF ROOTBALL LOOSENED TO ENSURE PROPER BACKFILL-TO-ROOT CONTACT SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED EXISTING GRADE ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK BACKFILL AS PER SPECIFICATION DO NOT EXCAVATE BELOW ROOTBALL. THREE TIMES WIDTH OF ROOTBALL RULE OF THUMB - MODIFY EXCAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 3 THREE TIMES WIDTH OF ROOTBALL DECIDUOUS & CONIFEROUS TREE PLANTING N T S PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE APPEARANCE (RETAIN NORMAL TREE SHAPE) THREE 2"X4"X8' WOODEN STAKES, STAINED BROWN WITH TWO STRANDS OF WIRE TWISTED TOGETHER. STAKES SHALL BE PLACED AT 120° TO ONE ANOTHER. WIRE SHALL BE THREADED THROUGH NYLON STRAPPING WITH GROMMETS. ALTERNATE STABILIZING METHODS MAY BE PROPOSED BY CONTRACTOR. TRUNK FLARE JUNCTION: PLANT TREE 1"-2" ABOVE EXISTING GRADE MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK EXISTING GRADE CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. IF NON-BIODEGRADABLE, REMOVE COMPLETELY SLOPE SIDES OF HOLE OR VERTICAL SIDES AT EDGE OF PLANTING BED BACKFILL AS SPECIFIED COMPACT BOTTOM OF PIT, TYP. RULE OF THUMB - MODIFY EXCAVATION BASED ON LOCATION OF PLANT MATERIAL AND DESIGN OF BEDS OR OVERALL PLANT PLACEMENT 2 0 1" = 10'-0" 10'-0"5'-0" NFRONT ENTRANCE LANDSCAPE ENLARGEMENT1 DECIDUOUS & CONIFEROUS TREE PLANTING ON SLOPE N T S PRUNE AS FIELD DIRECTED BY THE LANDSCAPE ARCHITECT TO IMPROVE APPEARANCE (RETAIN NORMAL TREE SHAPE) STAKING REQUIRED - TWO 2"X4"X8' WOODEN STAKES, STAINED BROWN WITH TWO STRANDS OF WIRE TWISTED TOGETHER. STAKES SHALL BE PLACED AT OPPOSITE EACH OTHER - ONE UP HILL ONE DOWN HILL. WIRE SHALL BE THREADED THROUGH NYLON STRAPPING WITH GROMMETS. ALTERNATE STABILIZING METHODS MAY BE PROPOSED BY CONTRACTOR. TRUNK FLARE JUNCTION: PLANT TREE 1"-2" ABOVE EXISTING GRADE, ENSURE ROOT CROWN IS AT FINISH ELEV. MULCH TO OUTER EDGE OF SAUCER OR TO EDGE OF PLANTING BED, IF APPLICABLE. ROCK OR ORGANIC MULCH, SEE GENERAL LANDSCAPE NOTES AND PLAN NOTES FOR MULCH TYPE. KEEP MULCH MIN. 2" FROM PLANT TRUNK FINISH GRADE - 3:1 SLOPE SHOWN FOR REFERENCE, SEE GRADING & LANDSCAPE PLANS FOR PROPOSED SITE CONDITIONS. TREES SHALL NOT BE PLANTED ON SLOPES GREATER THAN 3:1. REMOVE WIRE BASKET IF PRESENT. CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOT BALL. IF NON-BIODEGRADABLE, REMOVE COMPLETELY VERTICAL SIDES OF PLANTING HOLE REQUIRED TO MINIMIZE SLOPE DISRUPTION BACKFILL AS SPECIFIED COMPACT BOTTOM OF PIT, TYP. RULE OF THUMB - MODIFY EXCAVATION BASED ON LOCATION OF PLANT MATERIAL, DESIGN OF BEDS OR OVERALL PLANT PLACEMENT, AND SLOPE. CONSTRUCT SOIL WATERING RING AROUND TREE ENSURE ROOT BALL "SHOULDER" IS COMPLETELY BURIED IN GROUND AND/OR NEW WATERING RING SOIL ROOT BALL + 12" PER SIDE 5 1.ENTIRE SITE SHALL BE FULLY IRRIGATED. THE CONTRACTOR SHALL SUBMIT IRRIGATION SHOP DRAWINGS FOR REVIEW AND APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 2.SEE MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS FOR IRRIGATION WATER, METER, AND POWER CONNECTIONS. 3.CONTRACTOR TO VERIFY LOCATION OF ALL UNDERGROUND/ABOVE GROUND FACILITIES PRIOR TO ANY EXCAVATION/INSTALLATION. ANY DAMAGE TO UNDERGROUND/ABOVE GROUND FACILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND COSTS ASSOCIATED WITH CORRECTING DAMAGES SHALL BE BORNE ENTIRELY BY THE CONTRACTOR. 4.SERVICE EQUIPMENT AND INSTALLATION SHALL BE PER LOCAL UTILITY COMPANY STANDARDS AND SHALL BE PER NATIONAL AND LOCAL CODES. EXACT LOCATION OF SERVICE EQUIPMENT SHALL BE COORDINATED WITH THE LANDSCAPE ARCHITECT OR EQUIVALENT AT THE JOB SITE. 5.CONTRACTOR SHALL COORDINATE WITH LOCAL UTILITY COMPANY FOR THE PROPOSED ELECTRICAL SERVICE AND METERING FACILITIES. 6.IRRIGATION WATER LINE CONNECTION SIZE IS 1-12" AT BUILDING. VERIFY WITH MECHANICAL PLANS.COVAGE. 7.ALL MAIN LINES SHALL BE 18" BELOW FINISHED GRADE. 8.ALL LATERAL LINES SHALL BE 12" BELLOW FINISHED GRADE. 9.ALL EXPOSED PVC RISERS, IF ANY, SHALL BE GRAY IN COLOR. 10.CONTRACTOR SHALL LAY ALL SLEEVES AND CONDUIT AT 2'-0" BELOW THE FINISHED GRADE OF THE TOP OF PAVEMENT. EXTEND SLEEVES TO 2'-0" BEYOND PAVEMENT. 11.CONTRACTOR SHALL MARK THE LOCATION OF ALL SLEEVES AND CONDUIT WITH THE SLEEVING MATERIAL "ELLED" TO 2'-0" ABOVE FINISHED GRADE AND CAPPED. 12.FABRICATE ALL PIPE TO MANUFACTURE'S SPECIFICATIONS WITH CLEAN AND SQUARE CUT JOINTS. USE QUALITY GRADE PRIMER AND SOLVENT CEMENT FORMULATED FOR INTENDED TYPE OF CONNECTION. 13.BACKFILL ALL TRENCHES WITH SOIL FREE OF SHARP OBJECTS AND DEBRIS. 14.ALL VALVE BOXES AND COVERS SHALL BE BLACK IN COLOR. 15.GROUP VALVE BOXES TOGETHER FOR EASE WHEN SERVICE IS REQUIRED. LOCATE IN PLANT BED AREAS WHENEVER POSSIBLE. 16.IRRIGATION CONTROLLER LOCATION SHALL BE VERIFIED ON-SITE WITH OWNER'S REPRESENTATIVE. 17.CONTROL WIRES: 14 GAUGE DIRECT BURIAL, SOLID COPPER IRRIGATION WIRE. RUN UNDER MAIN LINE. USE MOISTURE-PROOF SPLICES AND SPLICE ONLY AT VALVES OR PULL BOXES. RUN SEPARATE HOT AND COMMON WIRE TO EACH VALVE AND ONE (1) SPARE WIRE AND GROUND TO FURTHEST VALVE FROM CONTROLLER. LABEL OR COLOR CODE ALL WIRES. 18.AVOID OVER SPRAY ON BUILDINGS, PAVEMENT, WALLS AND ROADWAYS BY INDIVIDUALLY ADJUSTING RADIUS OR ARC ON SPRINKLER HEADS AND FLOW CONTROL ON AUTOMATIC VALVE. 19.ADJUST PRESSURE REGULATING VALVES FOR OPTIMUM PRESSURE ON SITE. 20.USE SCREENS ON ALL HEADS. 21.A SET OF AS-BUILT DRAWINGS SHALL BE MAINTAINED ON-SITE AT ALL TIMES IN AN UPDATED CONDITION. 22.ALL PIPE 3" AND OVER SHALL HAVE THRUST BLOCKING AT EACH TURN. 23.ALL AUTOMATIC REMOTE CONTROL VALVES WILL HAVE 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL UNDERNEATH VALVE AND VALVE BOX. GRAVEL SHALL EXTENT 3" BEYOND PERIMETER OF VALVE BOX. 24.THERE SHALL BE 3" MINIMUM SPACE BETWEEN BOTTOM OF VALVE BOX COVER AND TOP OF VALVE STRUCTURE. IRRIGATION NOTES: PID: 340321070024 Address: 15902 Robert Trail S Bituminous Driveway Chain Link Fence R O B E R T T R A I L S O U T H ( A P u b l i c R / W ) (A P u b l i c R / W ) PID: 340321070019 Address: Unassigned PID: 340321070014 Address: 15640 Canada Cir Owner: Michael S Murgic PID: 340321073012 Address: 15938 Canada Cir Owner: NGL Supply Terminal Company LLC PID: 340321070025 Address: Unassigned Owner: Dovestone LLC NO BUILDINGS NO BUILDINGS S89°40'23"W 499.45N89°40'49"E 812.50 S2 3 ° 3 8 ' 3 4 " W 68 . 0 3 38 9 . 7 2 Δ= 1 6 ° 2 7 ' 0 1 " R= 1 3 5 7 . 3 9 S89°40'23"W 581.57 N0 0 ° 1 2 ' 2 3 " E 3 6 1 . 4 2 N89°34'04"E 129.63 65.48 Δ=13°43'45" R=273.25 S68 ° 0 2 ' 0 3 " E 109 . 3 6 12" DIP SMH (Loc. Per Record) Rim = 957.3 +/- (Rec.) Inv= 926.7 +/- (Rec.) SMH (Loc. Per Record) Rim = 952.1 +/- (Rec.) Inv= 927.5 +/- (Rec.) 8 " P V C ( R e c ) 8 " P V C ( R e c ) 30 " R C P ( R e c ) 15 " R C P ( R e c ) 15" R C P ( R e c ) 15 " R C P 3 0 " R C P ( R e c ) 3 6 " R C P ( R e c ) 48" R C P (R e c ) 24" R C P ( R e c ) 21" RCP (Rec) 18" RCP (Rec) 18" R C P ( R e c ) 8" P V C 12" D I P 12" D I P CAN A D A C I R C L E 12" CIP 12" DIP (Rec) 1 2 " D I P ( R e c ) 1 2 " D I P ( R e c ) [12] Drainage and Utility Easement Per Document No. 1944201 [6] Communication Easement Per Document No. 476645 [12] Drainage and Utility Easement Per Document No. 1944201 Point of Beginning of Parcel 1 S 2 4 ° 5 0 ' 2 1 " E 1 8 0 . 6 0 1 2 " D I P 1 0 " D I P ( R e c ) SMH (Loc. Per Record) Inv= 914.91 (Rec.) SMH (Loc. Per Record) Inv= 916.13 S (Rec.) Inv=915.96 W (Rec.) 6" PVC San. Stub (Per Record) Inv= 938.14 (Rec.) 10" D I P S a n . S t u b ( P e r R e c o r d ) Inv= 9 1 5 . 9 4 ( R e c . ) SMH (Loc. Per Record) Inv= 927.46 SW (Rec.) Inv=912.09 NE/NW (Rec.) 8" P V C 6" PVC San. Stub (Per Record) Inv= 931.50 (Rec.) 12" D I P 12" D I P 12" DIP 12" D I P 4 8 " R C P ( R e c ) 15 " R C P ( R e c ) N0 0 ° 1 2 ' 2 3 " E 3 9 0 . 9 5 (N 0 0 ° 3 2 ' 0 0 " E ) (West 580.96) (3 9 0 . 0 0 ) (1 6 ° 2 7 ' 4 4 " ) (S 2 3 ° 5 9 ' 5 1 " W ) (East 812.26) 5 7 2 . 1 8 Δ = 2 4 ° 1 4 ' 4 3 " R = 1 3 5 2 . 1 6 (West) N0 0 ° 1 2 ' 2 3 " E 8 1 2 . 3 8 (N 0 0 ° 3 2 ' 0 0 " E 8 1 2 . 4 2 ) N Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 W Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 S Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 Described Line (Parcel 2) Described Line (Parcel 2)(N 0 0 ° 3 2 ' 0 0 " E ) E Line of State Trunk Highway No. 3 per MNDOT R.O.W. Plat No. 19-77 & Dakota Co. Dakota Co. Road R.O.W. Map No. 258 (ST A T E T R U N K H W Y . N O . 3 ) [7] Access Control Per Dakota Co. Dakota Co. Road R.O.W. Map No. 258 [7] Underground Gas Line Per Found Gas Pipeline Warning Signs. Line Not Marked at Time of Survey 8" D.I.P Wat. Serv. Plug (Per Rec.) CONSTRUCTION LIMITS CONSTRUCTION ENTRANCE SEE DETAIL SW1.2 INLET PROTECTION AT CATCH BASINS, SEE DETAIL SW1.2 INLET PROTECTION AT CATCH BASINS, SEE DETAIL SW1.2 PERIMETER EROSION CONTROL AT CONSTRUCTION LIMITS, SEE DETAIL SW1.2 PERIMETER EROSION CONTROL AT CONSTRUCTION LIMITS, SEE DETAIL SW1.2 CONTRACTOR TO PROVIDE INLET PROTECTION AT ALL DOWNSTREAM CATCH BASINS. SEDIMENT PROTECTION AT FES, TYP F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION SW1.0 SWPPP - EXISTING CONDITIONS .. .. .. .. .. .. 0 1" = 50'-0" 50'-0"25'-0" N SWPPP NOTES: Know what's below. before you dig.Call R LEGEND: EX. 1' CONTOUR ELEVATION INTERVAL INLET PROTECTION STABILIZED CONSTRUCTION ENTRANCE DRAINAGE ARROW 1.0' CONTOUR ELEVATION INTERVAL SILT FENCE / BIOROLL - GRADING LIMIT EROSION CONTROL BLANKET ALL SPECIFIED EROSION AND SEDIMENT CONTROL PRACTICES, AND MEASURES CONTAINED IN THIS SWPPP ARE THE MINIMUM REQUIREMENTS. ADDITIONAL PRACTICES MAY BE REQUIRED DURING THE COURSE OF CONSTRUCTION. 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.THIS PROJECT IS LESS THAN ONE ACRE AND WILL NOT REQUIRE AN MPCA NPDES PERMIT. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY EROSION CONTROL PERMITS REQUIRED BY THE CITY. 3.SEE SHEETS SW1.0 - SW1.3 FOR ALL EROSION CONTROL NOTES, DESCRIPTIONS, AND PRACTICES. 4.SEE GRADING PLAN FOR ADDITIONAL GRADING AND EROSION CONTROL NOTES. 5.CONTRACTOR IS RESPONSIBLE FOR SWPPP IMPLEMENTATION, INSPECTIONS, AND COMPLIANCE WITH NPDES PERMIT. PID: 340321070024 Address: 15902 Robert Trail S Bituminous Driveway Chain Link Fence R O B E R T T R A I L S O U T H ( A P u b l i c R / W ) (A P u b l i c R / W ) PID: 340321070019 Address: Unassigned PID: 340321070014 Address: 15640 Canada Cir Owner: Michael S Murgic PID: 340321073012 Address: 15938 Canada Cir Owner: NGL Supply Terminal Company LLC PID: 340321070025 Address: Unassigned Owner: Dovestone LLC NO BUILDINGS NO BUILDINGS S89°40'23"W 499.45N89°40'49"E 812.50 S2 3 ° 3 8 ' 3 4 " W 68 . 0 3 38 9 . 7 2 Δ= 1 6 ° 2 7 ' 0 1 " R= 1 3 5 7 . 3 9 S89°40'23"W 581.57 N0 0 ° 1 2 ' 2 3 " E 3 6 1 . 4 2 N89°34'04"E 129.63 65.48 Δ=13°43'45" R=273.25 S68 ° 0 2 ' 0 3 " E 109 . 3 6 8" P V C 12" DIP SMH (Loc. Per Record) Rim = 957.3 +/- (Rec.) Inv= 926.7 +/- (Rec.) SMH (Loc. Per Record) Rim = 952.1 +/- (Rec.) Inv= 927.5 +/- (Rec.) 8 " P V C ( R e c ) 8 " P V C ( R e c ) 8" P V C ( R e c ) 30 " R C P ( R e c ) 15 " R C P ( R e c ) 15" R C P ( R e c ) 15 " R C P 3 0 " R C P ( R e c ) 3 6 " R C P ( R e c ) 48" R C P (R e c ) 24" R C P ( R e c ) 21" RCP (Rec) 18" RCP (Rec) 18" R C P ( R e c ) 8" P V C 12" D I P 12" D I P CAN A D A C I R C L E 12" CIP 12" DIP (Rec) 12 " D I P ( R e c ) 12 " D I P ( R e c ) 1 2 " D I P ( R e c ) 1 2 " D I P ( R e c ) [12] Drainage and Utility Easement Per Document No. 1944201 [6] Communication Easement Per Document No. 476645 [12] Drainage and Utility Easement Per Document No. 1944201 Point of Beginning of Parcel 1 S 2 4 ° 5 0 ' 2 1 " E 1 8 0 . 6 0 1 2 " D I P 1 0 " D I P ( R e c ) SMH (Loc. Per Record) Inv= 914.91 (Rec.) SMH (Loc. Per Record) Inv= 916.13 S (Rec.) Inv=915.96 W (Rec.) 6" PVC San. Stub (Per Record) Inv= 938.14 (Rec.) 10" D I P S a n . S t u b ( P e r R e c o r d ) Inv= 9 1 5 . 9 4 ( R e c . ) SMH (Loc. Per Record) Inv= 927.46 SW (Rec.) Inv=912.09 NE/NW (Rec.) 8" P V C 6" PVC San. Stub (Per Record) Inv= 931.50 (Rec.) 12" D I P 12" D I P 12" DIP 12" D I P 4 8 " R C P ( R e c ) 15 " R C P ( R e c ) N0 0 ° 1 2 ' 2 3 " E 3 9 0 . 9 5 (N 0 0 ° 3 2 ' 0 0 " E ) (West 580.96) (3 9 0 . 0 0 ) (1 6 ° 2 7 ' 4 4 " ) (S 2 3 ° 5 9 ' 5 1 " W ) (East 812.26) 5 7 2 . 1 8 Δ = 2 4 ° 1 4 ' 4 3 " R = 1 3 5 2 . 1 6 (West) N0 0 ° 1 2 ' 2 3 " E 8 1 2 . 3 8 (N 0 0 ° 3 2 ' 0 0 " E 8 1 2 . 4 2 ) N Line of the S 1/2 of the SW 1/4 of Sec. 32, Twp. 115, Rng. 19 W Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 S Line of Parcel 9 per Dakota Co. Road R.O.W. Map No. 258 S Line of Dakota Co. Road R.O.W. Map No. 258 & the N Line of Dakota Co. Road R.O.W. Map Nos. 259 & 259B Described Line (Parcel 2) Described Line (Parcel 2)(N 0 0 ° 3 2 ' 0 0 " E ) E Line of State Trunk Highway No. 3 per MNDOT R.O.W. Plat No. 19-77 & Dakota Co. Dakota Co. Road R.O.W. Map No. 258 (ST A T E T R U N K H W Y . N O . 3 ) [7] Access Control Per Dakota Co. Dakota Co. Road R.O.W. Map No. 258 [7] Underground Gas Line Per Found Gas Pipeline Warning Signs. Line Not Marked at Time of Survey 8" D.I.P Wat. Serv. Plug (Per Rec.) A31 A33 A32 A34 ABOVE GROUND INFILTRATION BASIN AND WET POND WET POND BOT = 938.00 WET POND NWL = 942.00 INFILTRATION BOT = 942.00 10 YR HWL = 945.03 100 YR HWL = 946.14 SNOWMELT HWL = 943.18 EOF=947.23 CONSTRUCTION LIMITS CONSTRUCTION ENTRANCE SEE DETAIL SW1.2 INLET PROTECTION AT CATCH BASINS, SEE DETAIL SW1.2 INLET PROTECTION AT CATCH BASINS, SEE DETAIL SW1.2 INLET PROTECTION AT CATCH BASINS, TYP PERIMETER EROSION CONTROL AT CONSTRUCTION LIMITS, SEE DETAIL SW1.2 PERIMETER EROSION CONTROL AT CONSTRUCTION LIMITS, SEE DETAIL SW1.2 CONTRACTOR TO PROVIDE INLET PROTECTION AT ALL DOWNSTREAM CATCH BASINS. INLET PROTECTION AT CATCH BASINS, TYP INLET PROTECTION AT CATCH BASINS, TYP INLET PROTECTION AT CATCH BASINS, TYP INLET PROTECTION AT CATCH BASINS, TYP INLET PROTECTION AT CATCH BASINS, TYP INLET PROTECTION AT CATCH BASINS, TYP INLET PROTECTION AT CATCH BASINS, TYP INLET PROTECTION AT CATCH BASINS, TYP INLET PROTECTION AT CATCH BASINS, TYP SEDIMENT PROTECTION AT FES, TYP SEDIMENT PROTECTION AT FES, TYP SEDIMENT PROTECTION AT FES, TYP SEDIMENT PROTECTION AT FES, TYP SEDIMENT PROTECTION AT FES, TYP PLACE EROSION CONTROL BLANKET ON ALL SLOPES 4:1 OR STEEPER, TYP. (MNDOT CATEGORY 3) PLACE EROSION CONTROL BLANKET ON ALL SLOPES 4:1 OR STEEPER, TYP. (MNDOT CATEGORY 3) PLACE EROSION CONTROL BLANKET ON ALL SLOPES 4:1 OR STEEPER, TYP. (MNDOT CATEGORY 3) PLACE EROSION CONTROL BLANKET ON ALL SLOPES 4:1 OR STEEPER, TYP. (MNDOT CATEGORY 3) PLACE PERMANENT EROSION CONTROL BLANKET PER DETAIL SHT C5.1 F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION SW1.1 SWPPP - PROPOSED CONDITIONS .. .. .. .. .. .. 0 1" = 50'-0" 50'-0"25'-0" N Know what's below. before you dig.Call R 1. RESERVED FOR CITY SPECIFIC EROSION CONTROL NOTES. CITY OF PLYMOUTH EROSION CONTROL NOTES:SWPPP NOTES: LEGEND: EX. 1' CONTOUR ELEVATION INTERVAL INLET PROTECTION STABILIZED CONSTRUCTION ENTRANCE DRAINAGE ARROW 1.0' CONTOUR ELEVATION INTERVAL SILT FENCE / BIOROLL - GRADING LIMIT EROSION CONTROL BLANKET ALL SPECIFIED EROSION AND SEDIMENT CONTROL PRACTICES, AND MEASURES CONTAINED IN THIS SWPPP ARE THE MINIMUM REQUIREMENTS. ADDITIONAL PRACTICES MAY BE REQUIRED DURING THE COURSE OF CONSTRUCTION. 1.ALL EXISTING UTILITY LOCATIONS SHOWN ARE APPROXIMATE. CONTACT "GOPHER STATE ONE CALL" (651-454-0002 OR 800-252-1166) FOR UTILITY LOCATIONS, 48 HOURS PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE ANY UTILITIES THAT ARE DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.THIS PROJECT IS LESS THAN ONE ACRE AND WILL NOT REQUIRE AN MPCA NPDES PERMIT. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY EROSION CONTROL PERMITS REQUIRED BY THE CITY. 3.SEE SHEETS SW1.0 - SW1.3 FOR ALL EROSION CONTROL NOTES, DESCRIPTIONS, AND PRACTICES. 4.SEE GRADING PLAN FOR ADDITIONAL GRADING AND EROSION CONTROL NOTES. 5.CONTRACTOR IS RESPONSIBLE FOR SWPPP IMPLEMENTATION, INSPECTIONS, AND COMPLIANCE WITH NPDES PERMIT. F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION SW1.2 SWPPP - DETAILS .. .. .. .. .. .. FILTER FABRIC AS SPECIFIED EXISTING GROUND SURFACE DIRECTION OF FLOW WOODEN STAKES 1/2"X2"X16" MIN. PLACED 10' O.C. WHEN INSTALLED ON GROUND. IF INSTALLED ON PVMT. PROVIDE SANDBAGS BEHIND AND ON TOP AT MIN. 10' O.C. 8" M I N . SEDIMENT BIO-ROLL / COMPOST FILTER LOG N T S FILLER AS SPECIFIED NOTE: 1. COMPOST FILTER LOGS (BIO ROLLS) SHALL BE FILTREXX EROSION CONTROL SOXX OR APPROVED EQUAL. 2. COMPOST FILLER TO BE MADE FROM A COMPOST BLEND 30%-40% GRADE 2 (SPEC 3890) AND 60%-70% PARTIALLY DECOMPOSED WOOD CHIPS, PER MNDOT SPEC 3897. 3. FILTER FABRIC SHALL BE GEOTEXTILE KNITTED MATERIAL WITH MAX. OPENINGS OF 3/8". 4. IF MULTIPLE ROLLS NEEDED, OVERLAP BY MIN. 12" AT ENDS AND STAKE. 5. SILT SHALL BE REMOVED ONCE IT REACHES 80% OF THE HEIGHT OF THE ROLL OR AS DEEMED NECESSARY BY SITE CONTRACTOR TO MAINTAIN PROPER FUNCTION. FILL UPSTREAM BASE EDGE WITH 2" OF DIRT OR COMPOST TO EMBED ROLL. 4 F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION SW1.3 SWPPP - NARRATIVE .. .. .. .. .. .. OWNER INFORMATIONTRAINING SECTION 21 PARTY RESPONSIBLE FOR LONG TERM OPERATION AND MAINTENANCE OF PERMANENT STORM WATER MANAGEMENT SYSTEM PERMANENT STORMWATER MANAGEMENT IS NOT REQUIRED AS PART OF THIS PROJECT TO MEET NPDES PERMIT REQUIREMENTS. THE PROPERTY OWNER IS RESPONSIBLE FOR THE LONG TERM OPERATION AND MAINTENANCE OF THE PROPOSED STORMWATER SYSTEM. AREAS AND QUANTITIES: SWPPP CONTACT PERSON CONTRACTOR:SWPPP INSPECTOR TRAINING: ALL SWPPP INSPECTIONS MUST BE PERFORMED BY A PERSON THAT MEETS THE TRAINING REQUIREMENTS OF THE NPDES CONSTRUCTION SITE PERMIT. TRAINING CREDENTIALS SHALL BE PROVIDED BY THE CONTRACTOR AND KEPT ON SITE WITH THE SWPPP NOTE: QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL DETERMINE FOR THEMSELVES THE EXACT QUANTITIES FOR BIDDING AND CONSTRUCTION. PROJECT NARRATIVE: PROJECT IS A REDEVELOPMENT OF AN EXISTING ROW CROPS INTO A TRUSS PRODUCTION FACILITY. SITE AND LANDSCAPE IMPROVEMENTS WILL OCCUR. NATIVE BUFFER NARRATIVE: PRESERVING A 50' NATURAL BUFFER AROUND WATER BODIES IS NOT REQUIRED AS PART OF THIS PROJECT BECAUSE WATER BODIES ARE NOT LOCATED ON SITE. INFILTRATION NARRATIVE: INFILTRATION IS ACHIEVED ON THE INFILTRATION BENCH OF THE ON SITE BASIN. SOILS WILL BE AMENDED WHERE NECESSARY TO PREVENT INFILTRATION ABOVE 8.3 IN/HR. SOIL CONTAMINATION NARRATIVE: SOILS ONSITE HAVE NOT BEEN IDENTIFIED AS CONTAMINATED. AN MPCA SOILS ASSESSMENT WAS COMPLETED AND IT WAS DETERMINED THAT THIS SITE IS APPROPRIATE FOR INFILTRATION. SPECIAL TMDL BMP REQUIREMENTS SITE SPECIFIC (IF REQUIRED): THIS PROJECT IS WITHIN ONE MILE AND DISCHARGES TO BOTH MEDICINE LAKE AND NORTHWOOD LAKE - MEDICINE LAKE AND NORTHWOOD LAKE ARE IDENTIFIED AS IMPAIRED WATER BODIES PER THE MPCA'S 303(D) IMPAIRED WATERS LIST. MEDICINE LAKE AND NORTHWOOD LAKE ARE IMPAIRED FOR NUTRIENT EUTROPHICATION BIOLOGICAL INDICATORS. BECAUSE THESE WATERS ARE LOCATED WITHIN ONE MILE OF THE SITE, BMPS AS DEFINED IN THE NPDES PERMIT ITEMS 23.9 AND 23.10 APPLY. THESE ARE AS FOLLOWS: 1.DURING CONSTRUCTION: A.STABILIZATION OF ALL EXPOSED SOIL AREAS MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION BUT IN NO CASE COMPLETED LATER THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. B.TEMPORARY SEDIMENT BASIN REQUIREMENTS DESCRIBED IN SECTION 14. MUST BE USED FOR COMMON DRAINAGE LOCATIONS THAT SERVE AN AREA WITH FIVE (5) OR MORE ACRES DISTURBED AT ONE TIME. PERMANENT STABILIZATION NOTES SITE SPECIFIC: PERMANENT SEED MIX ·FOR THIS PROJECT ALL AREAS THAT ARE NOT TO BE SODDED OR LANDSCAPED SHALL RECEIVE A NATIVE PERMANENT SEED MIX. ··AREAS IN BUFFERS AND ADJACENT TO OR IN WET AREAS MNDOT SEED MIX 33-261 (STORMWATER SOUTH AND WEST) AT 35 LBS PER ACRE. ··DRY AREAS MNDOT SEED MIX 35-221 (DRY PRAIRIE GENERAL) AT 40 LBS PER ACRE. ·MAINTENANCE SHALL BE IN ACCORDANCE TO THE MNDOT SEEDING MANUAL. SUPPLEMENTARY SITE SPECIFIC EROSION CONTROL NOTES: THESE NOTES SUPERCEDE ANY GENERAL SWPPP NOTES. THIS PROJECT IS GREATER THAN 1.0 ACRES SO AN NPDES PERMIT IS REQUIRED AND NEEDS TO BE SUBMITTED TO THE MPCA. THE CONTRACTOR IS REQUIRED TO FOLLOW THE GUIDELINES IN THE NPDES PERMIT THROUGHOUT CONSTRUCTION. SWPPP ATTACHMENTS (ONLY APPLICABLE IF SITE IS 1 ACRE OR GREATER): CONTRACTOR SHALL OBTAIN A COPY OF THE FOLLOWING SWPPP ATTACHMENTS WHICH ARE A PART OF THE OVERALL SWPPP PACKAGE: ATTACHMENT A. CONSTRUCTION SWPPP TEMPLATE - SITE SPECIFIC SWPPP DOCUMENT ATTACHMENT B. CONSTRUCTION STORMWATER INSPECTION CHECKLIST ATTACHMENT C. MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEMS ATTACHMENT D: STORMWATER MANAGEMENT REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST. ATTACHMENT E: GEOTECHNICAL EVALUATION REPORT - ON FILE AT THE OFFICE OF PROJECT ENGINEER. AVAILABLE UPON REQUEST. DESIGN ENGINEER: MATTHEW R. PAVEK P.E. TRAINING COURSE: DESIGN OF SWPPP TRAINING ENTITY: UNIVERSITY OF MINNESOTA INSTRUCTOR: JOHN CHAPMAN DATES OF TRAINING COURSE: 5/15/2011 - 5/16/2011 TOTAL TRAINING HOURS: 12 RE-CERTIFICATION: 2/27/2020 (8 HOURS), EXP. 5/31/2023 THE CONTRACTOR AND ALL SUBCONTRACTORS INVOLVED WITH A CONSTRUCTION ACTIVITY THAT DISTURBS SITE SOIL OR WHO IMPLEMENT A POLLUTANT CONTROL MEASURE IDENTIFIED IN THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) MUST COMPLY WITH THE REQUIREMENTS OF THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT (DATED AUGUST 1, 2018 # MNR100001) AND ANY LOCAL GOVERNING AGENCY HAVING JURISDICTION CONCERNING EROSION AND SEDIMENTATION CONTROL. STORMWATER DISCHARGE DESIGN REQUIREMENTS SWPPP THE NATURE OF THIS PROJECT WILL BE CONSISTENT WITH WHAT IS REPRESENTED IN THIS SET OF CONSTRUCTION PLANS AND SPECIFICATIONS. SEE THE SWPPP PLAN SHEETS AND SWPPP NARRATIVE (ATTACHMENT A: CONSTRUCTION SWPPP TEMPLATE) FOR ADDITIONAL SITE SPECIFIC SWPPP INFORMATION. THE PLANS SHOW LOCATIONS AND TYPES OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL BMP'S. STANDARD DETAILS ARE ATTACHED TO THIS SWPPP DOCUMENT. THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES IS AS FOLLOWS: 1. INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE 2. INSTALLATION OF SILT FENCE AROUND SITE 3. INSTALL ORANGE CONSTRUCTION FENCING AROUND INFILTRATION AREAS 4. INSTALL INLET PROTECTION AT ALL ADJACENT AND DOWNSTREAM CATCH BASINS 5. CLEAR AND GRUB FOR TEMPORARY SEDIMENT BASIN / POND INSTALL 6. CONSTRUCT TEMPORARY SEDIMENT BASIN / POND (SECTION 14) 7. CLEAR AND GRUB REMAINDER OF SITE 8. STRIP AND STOCKPILE TOPSOIL 9. ROUGH GRADING OF SITE 10. STABILIZE DENUDED AREAS AND STOCKPILES 11. INSTALL SANITARY SEWER, WATER MAIN STORM SEWER AND SERVICES 12. INSTALL SILT FENCE / INLET PROTECTION AROUND CB'S 13. INSTALL STREET SECTION 14. INSTALL CURB AND GUTTER 15. BITUMINOUS ON STREETS 16. FINAL GRADE BOULEVARD, INSTALL SEED AND MULCH 17. REMOVE ACCUMULATED SEDIMENT FROM BASIN / POND 18. FINAL GRADE POND / INFILTRATION BASINS (DO NOT COMPACT SOILS IN INFILTRATION AREAS.) 19. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED BY EITHER SEED OR SOD/LANDSCAPING, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED BY THE REMOVAL. RECORDS RETENTION: THE SWPPP (ORIGINAL OR COPIES) INCLUDING, ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY THE PERMITTEE WHO HAS OPERATIONAL CONTROL OF THAT PORTION OF THE SITE. THE SWPPP CAN BE KEPT IN EITHER THE FIELD OFFICE OR IN AN ON SITE VEHICLE DURING NORMAL WORKING HOURS. ALL OWNER(S) MUST KEEP THE SWPPP, ALONG WITH THE FOLLOWING ADDITIONAL RECORDS, ON FILE FOR THREE (3) YEARS AFTER SUBMITTAL OF THE NOT AS OUTLINED IN SECTION 4. THIS DOES NOT INCLUDE ANY RECORDS AFTER SUBMITTAL OF THE NOT. 1.THE FINAL SWPPP; 2.ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT; 3.RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION (SEE SECTION 11, INSPECTIONS AND MAINTENANCE); 4.ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED, INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS REGARDING PERPETUAL MAINTENANCE; AND 5.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER MANAGEMENT SYSTEMS. SWPPP IMPLEMENTATION RESPONSIBILITIES: 1.THE OWNER AND CONTRACTOR ARE PERMITTEE(S) AS IDENTIFIED BY THE NPDES PERMIT. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ON-SITE IMPLEMENTATION OF THE SWPPP, INCLUDING THE ACTIVITIES OF ALL OF THE CONTRACTOR'S SUBCONTRACTORS. 3.CONTRACTOR SHALL PROVIDE A PERSON(S) KNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTION AND SEDIMENT CONTROL BMPS TO OVERSEE ALL INSTALLATION AND MAINTENANCE OF BMPS AND IMPLEMENTATION OF THE SWPPP. 4.CONTRACTOR SHALL PROVIDE PERSON(S) MEETING THE TRAINING REQUIREMENTS OF THE NPDES PERMIT TO CONDUCT INSPECTION AND MAINTENANCE OF ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS IN ACCORDANCE WITH THE REQUIREMENTS OF THE PERMIT. ONE OF THESE INDIVIDUAL(S) MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY MPCA. CONTRACTOR SHALL PROVIDE TRAINING DOCUMENTATION FOR THESE INDIVIDUAL(S) AS REQUIRED BY THE NPDES PERMIT. THIS TRAINING DOCUMENTATION SHALL BE RECORDED IN OR WITH THE SWPPP BEFORE THE START OF CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PROJECT HAVE BEEN DETERMINED. DOCUMENTATION SHALL INCLUDE: 4.1.NAMES OF THE PERSONNEL ASSOCIATED WITH THE PROJECT THAT ARE REQUIRED TO BE TRAINED PER SECTION 21 OF THE PERMIT. 4.2.DATES OF TRAINING AND NAME OF INSTRUCTOR AND ENTITY PROVIDING TRAINING. 4.3.CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING. 5.FOLLOWING FINAL STABILIZATION AND THE TERMINATION OF COVERAGE FOR THE NPDES PERMIT, THE OWNER IS EXPECTED TO FURNISH LONG TERM OPERATION AND MAINTENANCE (O & M) OF THE PERMANENT STORM WATER MANAGEMENT SYSTEM. CONSTRUCTION ACTIVITY REQUIREMENTS SWPPP AMENDMENTS (SECTION 6): 1.ONE OF THE INDIVIDUALS DESCRIBED IN ITEM 21.2.A OR ITEM 21.2.B OR ANOTHER QUALIFIED INDIVIDUAL MUST COMPLETE ALL SWPPP CHANGES. CHANGES INVOLVING THE USE OF A LESS STRINGENT BMP MUST INCLUDE A JUSTIFICATION DESCRIBING HOW THE REPLACEMENT BMP IS EFFECTIVE FOR THE SITE CHARACTERISTICS. 2.PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS HAVING A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER. 3.PERMITTEES MUST AMEND THE SWPPP TO INCLUDE ADDITIONAL OR MODIFIED BMPS AS NECESSARY TO CORRECT PROBLEMS IDENTIFIED OR ADDRESS SITUATIONS WHENEVER INSPECTIONS OR INVESTIGATIONS BY THE SITE OWNER OR OPERATOR, USEPA OR MPCA OFFICIALS INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER OR THE DISCHARGES ARE CAUSING WATER QUALITY STANDARD EXCEEDANCES (E.G., NUISANCE CONDITIONS AS DEFINED IN MINN. R. 7050.0210, SUBP. 2) OR THE SWPPP IS NOT CONSISTENT WITH THE OBJECTIVES OF A USEPA APPROVED TMDL. BMP SELECTION AND INSTALLATION (SECTION 7): 1.PERMITTEES MUST SELECT, INSTALL, AND MAINTAIN THE BMPS IDENTIFIED IN THE SWPPP AND IN THIS PERMIT IN AN APPROPRIATE AND FUNCTIONAL MANNER AND IN ACCORDANCE WITH RELEVANT MANUFACTURER SPECIFICATIONS AND ACCEPTED ENGINEERING PRACTICES. EROSION PREVENTION (SECTION 8): 1.BEFORE WORK BEGINS, PERMITTEES MUST DELINEATE THE LOCATION OF AREAS NOT TO BE DISTURBED. 2.PERMITTEES MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS OF THE PROJECT WITH STEEP SLOPES. WHEN STEEP SLOPES MUST BE DISTURBED, PERMITTEES MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES (E.G., SLOPE DRAINING AND TERRACING). 3.PERMITTEES MUST STABILIZE ALL EXPOSED SOIL AREAS, INCLUDING STOCKPILES. STABILIZATION MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION WHEN CONSTRUCTION ACTIVITY HAS PERMANENTLY OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. STABILIZATION MUST BE COMPLETED NO LATER THAN 14 CALENDAR DAYS AFTER THE CONSTRUCTION ACTIVITY HAS CEASED. STABILIZATION IS NOT REQUIRED ON CONSTRUCTED BASE COMPONENTS OF ROADS, PARKING LOTS AND SIMILAR SURFACES. STABILIZATION IS NOT REQUIRED ON TEMPORARY STOCKPILES WITHOUT SIGNIFICANT SILT, CLAY OR ORGANIC COMPONENTS (E.G., CLEAN AGGREGATE STOCKPILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES) BUT PERMITTEES MUST PROVIDE SEDIMENT CONTROLS AT THE BASE OF THE STOCKPILE. 4.FOR PUBLIC WATERS THAT THE MINNESOTA DNR HAS PROMULGATED "WORK IN WATER RESTRICTIONS" DURING SPECIFIED FISH SPAWNING TIME FRAMES, PERMITTEES MUST COMPLETE STABILIZATION OF ALL EXPOSED SOIL AREAS WITHIN 200 FEET OF THE WATER'S EDGE, AND THAT DRAIN TO THESE WATERS, WITHIN 24 HOURS DURING THE RESTRICTION PERIOD. 5.PERMITTEES MUST STABILIZE THE NORMAL WETTED PERIMETER OF THE LAST 200 LINEAR FEET OF TEMPORARY OR PERMANENT DRAINAGE DITCHES OR SWALES THAT DRAIN WATER FROM THE SITE WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY EDGE. PERMITTEES MUST COMPLETE STABILIZATION OF REMAINING PORTIONS OF TEMPORARY OR PERMANENT DITCHES OR SWALES WITHIN 14 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY EDGE AND CONSTRUCTION IN THAT PORTION OF THE DITCH TEMPORARILY OR PERMANENTLY CEASES. 6.TEMPORARY OR PERMANENT DITCHES OR SWALES BEING USED AS A SEDIMENT CONTAINMENT SYSTEM DURING CONSTRUCTION (WITH PROPERLY DESIGNED ROCK-DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.) DO NOT NEED TO BE STABILIZED. PERMITTEES MUST STABILIZE THESE AREAS WITHIN 24 HOURS AFTER THEIR USE AS A SEDIMENT CONTAINMENT SYSTEM CEASES 7.PERMITTEES MUST NOT USE MULCH, HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILAR EROSION PREVENTION PRACTICES WITHIN ANY PORTION OF THE NORMAL WETTED PERIMETER OF A TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE SECTION WITH A CONTINUOUS SLOPE OF GREATER THAN 2 PERCENT. 8.PERMITTEES MUST PROVIDE TEMPORARY OR PERMANENT ENERGY DISSIPATION AT ALL PIPE OUTLETS WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER OR PERMANENT STORMWATER TREATMENT SYSTEM. 9.PERMITTEES MUST NOT DISTURB MORE LAND (I.E., PHASING) THAN CAN BE EFFECTIVELY INSPECTED AND MAINTAINED IN ACCORDANCE WITH SECTION 11. SEDIMENT CONTROL (SECTION 9): 1.PERMITTEES MUST ESTABLISH SEDIMENT CONTROL BMPS ON ALL DOWNGRADIENT PERIMETERS OF THE SITE AND DOWNGRADIENT AREAS OF THE SITE THAT DRAIN TO ANY SURFACE WATER, INCLUDING CURB AND GUTTER SYSTEMS. PERMITTEES MUST LOCATE SEDIMENT CONTROL PRACTICES UPGRADIENT OF ANY BUFFER ZONES. PERMITTEES MUST INSTALL SEDIMENT CONTROL PRACTICES BEFORE ANY UPGRADIENT LAND-DISTURBING ACTIVITIES BEGIN AND MUST KEEP THE SEDIMENT CONTROL PRACTICES IN PLACE UNTIL THEY ESTABLISH PERMANENT COVER. 2.IF DOWNGRADIENT SEDIMENT CONTROLS ARE OVERLOADED, BASED ON FREQUENT FAILURE OR EXCESSIVE MAINTENANCE REQUIREMENTS, PERMITTEES MUST INSTALL ADDITIONAL UPGRADIENT SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE THE OVERLOADING AND AMEND THE SWPPP TO IDENTIFY THESE ADDITIONAL PRACTICES AS REQUIRED IN ITEM 6.3. 3.TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS DESIGNED AS PART OF A SEDIMENT CONTAINMENT SYSTEM (E.G., DITCHES WITH ROCK-CHECK DAMS) REQUIRE SEDIMENT CONTROL PRACTICES ONLY AS APPROPRIATE FOR SITE CONDITIONS. 4.A FLOATING SILT CURTAIN PLACED IN THE WATER IS NOT A SEDIMENT CONTROL BMP TO SATISFY ITEM 9.2 EXCEPT WHEN WORKING ON A SHORELINE OR BELOW THE WATERLINE. IMMEDIATELY AFTER THE SHORT TERM CONSTRUCTION ACTIVITY (E.G., INSTALLATION OF RIP RAP ALONG THE SHORELINE) IN THAT AREA IS COMPLETE, PERMITTEES MUST INSTALL AN UPLAND PERIMETER CONTROL PRACTICE IF EXPOSED SOILS STILL DRAIN TO A SURFACE WATER. 5.PERMITTEES MUST RE-INSTALL ALL SEDIMENT CONTROL PRACTICES ADJUSTED OR REMOVED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF VEHICLES, IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY IS COMPLETED. PERMITTEES MUST RE-INSTALL SEDIMENT CONTROL PRACTICES BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOT COMPLETE. 6.PERMITTEES MUST PROTECT ALL STORM DRAIN INLETS USING APPROPRIATE BMPS DURING CONSTRUCTION UNTIL THEY ESTABLISH PERMANENT COVER ON ALL AREAS WITH POTENTIAL FOR DISCHARGING TO THE INLET. 7.PERMITTEES MAY REMOVE INLET PROTECTION FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (E.G. STREET FLOODING/FREEZING) IS IDENTIFIED BY THE PERMITTEES OR THE JURISDICTIONAL AUTHORITY (E.G., CITY/COUNTY/TOWNSHIP/MINNESOTA DEPARTMENT OF TRANSPORTATION ENGINEER). PERMITTEES MUST DOCUMENT THE NEED FOR REMOVAL IN THE SWPPP. 8.PERMITTEES MUST PROVIDE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS AT THE BASE OF STOCKPILES ON THE DOWNGRADIENT PERIMETER. 9.PERMITTEES MUST LOCATE STOCKPILES OUTSIDE OF NATURAL BUFFERS OR SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS UNLESS THERE IS A BYPASS IN PLACE FOR THE STORMWATER. 10. PERMITTEES MUST INSTALL A VEHICLE TRACKING BMP TO MINIMIZE THE TRACK OUT OF SEDIMENT FROM THE CONSTRUCTION SITE OR ONTO PAVED ROADS WITHIN THE SITE. 11. PERMITTEES MUST USE STREET SWEEPING IF VEHICLE TRACKING BMPS ARE NOT ADEQUATE TO PREVENT SEDIMENT TRACKING ONTO THE STREET. 12. PERMITTEES MUST INSTALL TEMPORARY SEDIMENT BASINS AS REQUIRED IN SECTION 14. 13. IN ANY AREAS OF THE SITE WHERE FINAL VEGETATIVE STABILIZATION WILL OCCUR, PERMITTEES MUST RESTRICT VEHICLE AND EQUIPMENT USE TO MINIMIZE SOIL COMPACTION. 14. PERMITTEES MUST PRESERVE TOPSOIL ON THE SITE, UNLESS INFEASIBLE. 15. PERMITTEES MUST DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS UNLESS INFEASIBLE. 16. PERMITTEES MUST PRESERVE A 50 FOOT NATURAL BUFFER OR, IF A BUFFER IS INFEASIBLE ON THE SITE, PROVIDE REDUNDANT (DOUBLE) PERIMETER SEDIMENT CONTROLS WHEN A SURFACE WATER IS LOCATED WITHIN 50 FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER. PERMITTEES MUST INSTALL PERIMETER SEDIMENT CONTROLS AT LEAST 5 FEET APART UNLESS LIMITED BY LACK OF AVAILABLE SPACE. NATURAL BUFFERS ARE NOT REQUIRED ADJACENT TO ROAD DITCHES, JUDICIAL DITCHES, COUNTY DITCHES, STORMWATER CONVEYANCE CHANNELS, STORM DRAIN INLETS, AND SEDIMENT BASINS. IF PRESERVING THE BUFFER IS INFEASIBLE, PERMITTEES MUST DOCUMENT THE REASONS IN THE SWPPP. SHEET PILING IS A REDUNDANT PERIMETER CONTROL IF INSTALLED IN A MANNER THAT RETAINS ALL STORMWATER. 17. PERMITTEES MUST USE POLYMERS, FLOCCULANTS, OR OTHER SEDIMENTATION TREATMENT CHEMICALS IN ACCORDANCE WITH ACCEPTED ENGINEERING PRACTICES, DOSING SPECIFICATIONS AND SEDIMENT REMOVAL DESIGN SPECIFICATIONS PROVIDED BY THE MANUFACTURER OR SUPPLIER. THE PERMITTEES MUST USE CONVENTIONAL EROSION AND SEDIMENT CONTROLS PRIOR TO CHEMICAL ADDITION AND MUST DIRECT TREATED STORMWATER TO A SEDIMENT CONTROL SYSTEM FOR FILTRATION OR SETTLEMENT OF THE FLOC PRIOR TO DISCHARGE. DEWATERING AND BASIN DRAINING (SECTION 10): 1.PERMITTEES MUST DISCHARGE TURBID OR SEDIMENT-LADEN WATERS RELATED TO DEWATERING OR BASIN DRAINING (E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A TEMPORARY OR PERMANENT SEDIMENT BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. PERMITTEES MAY DEWATER TO SURFACE WATERS IF THEY VISUALLY CHECK TO ENSURE ADEQUATE TREATMENT HAS BEEN OBTAINED AND NUISANCE CONDITIONS (SEE MINN. R. 7050.0210, SUBP. 2) WILL NOT RESULT FROM THE DISCHARGE. IF PERMITTEES CANNOT DISCHARGE THE WATER TO A SEDIMENTATION BASIN PRIOR TO ENTERING A SURFACE WATER, PERMITTEES MUST TREAT IT WITH APPROPRIATE BMPS SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE SURFACE WATER OR DOWNSTREAM PROPERTIES. 2.IF PERMITTEES MUST DISCHARGE WATER CONTAINING OIL OR GREASE, THEY MUST USE AN OIL-WATER SEPARATOR OR SUITABLE FILTRATION DEVICE (E.G., CARTRIDGE FILTERS, ABSORBENTS PADS) PRIOR TO DISCHARGE. 3.PERMITTEES MUST DISCHARGE ALL WATER FROM DEWATERING OR BASIN-DRAINING ACTIVITIES IN A MANNER THAT DOES NOT CAUSE EROSION OR SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS OR INUNDATION OF WETLANDS IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS THAT CAUSES SIGNIFICANT ADVERSE IMPACT TO THE WETLAND. 4.IF PERMITTEES USE FILTERS WITH BACKWASH WATER, THEY MUST HAUL THE BACKWASH WATER AWAY FOR DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF THE TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER THAT DOES NOT CAUSE EROSION. INSPECTIONS AND MAINTENANCE (SECTION 11): 1.PERMITTEES MUST ENSURE A TRAINED PERSON, AS IDENTIFIED IN ITEM 21.2.B, WILL INSPECT THE ENTIRE CONSTRUCTION SITE AT LEAST ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 1/2 INCH IN 24 HOURS. 2.PERMITTEES MUST INSPECT AND MAINTAIN ALL PERMANENT STORMWATER TREATMENT BMPS. 3.PERMITTEES MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS AND POLLUTION PREVENTION MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS. PERMITTEES MUST REPAIR, REPLACE OR SUPPLEMENT ALL NONFUNCTIONAL BMPS WITH FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY UNLESS ANOTHER TIME FRAME IS SPECIFIED IN ITEM 11.5 OR 11.6. PERMITTEES MAY TAKE ADDITIONAL TIME IF FIELD CONDITIONS PREVENT ACCESS TO THE AREA. 4.DURING EACH INSPECTION, PERMITTEES MUST INSPECT SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS BUT NOT CURB AND GUTTER SYSTEMS, FOR EVIDENCE OF EROSION AND SEDIMENT DEPOSITION. PERMITTEES MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL RESULTS IN EXPOSED SOIL. PERMITTEES MUST COMPLETE REMOVAL AND STABILIZATION WITHIN SEVEN (7) CALENDAR DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS CONSTRAINTS. PERMITTEES MUST USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OF OBTAINING ACCESS. PERMITTEES ARE RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING ANY WORK IN SURFACE WATERS. 5.PERMITTEES MUST INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS, STREETS AND CURB AND GUTTER SYSTEMS WITHIN AND ADJACENT TO THE PROJECT FOR SEDIMENTATION FROM EROSION OR TRACKED SEDIMENT FROM VEHICLES. PERMITTEES MUST REMOVE SEDIMENT FROM ALL PAVED SURFACES WITHIN ONE (1) CALENDAR DAY OF DISCOVERY OR, IF APPLICABLE, WITHIN A SHORTER TIME TO AVOID A SAFETY HAZARD TO USERS OF PUBLIC STREETS. 6.PERMITTEES MUST REPAIR, REPLACE OR SUPPLEMENT ALL PERIMETER CONTROL DEVICES WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE DEVICE. 7.PERMITTEES MUST DRAIN TEMPORARY AND PERMANENT SEDIMENTATION BASINS AND REMOVE THE SEDIMENT WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE VOLUME. 8.PERMITTEES MUST ENSURE THAT AT LEAST ONE INDIVIDUAL PRESENT ON THE SITE (OR AVAILABLE TO THE PROJECT SITE IN THREE (3) CALENDAR DAYS) IS TRAINED IN THE JOB DUTIES DESCRIBED IN ITEM 21.2.B. 9.PERMITTEES MAY ADJUST THE INSPECTION SCHEDULE DESCRIBED IN ITEM 11.2 AS FOLLOWS: a. INSPECTIONS OF AREAS WITH PERMANENT COVER CAN BE REDUCED TO ONCE PER MONTH, EVEN IF CONSTRUCTION ACTIVITY CONTINUES ON OTHER PORTIONS OF THE SITE; OR b.WHERE SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL AND NO CONSTRUCTION ACTIVITY IS OCCURRING ANYWHERE ON THE SITE, INSPECTIONS CAN BE REDUCED TO ONCE PER MONTH AND, AFTER 12 MONTHS, MAY BE SUSPENDED COMPLETELY UNTIL CONSTRUCTION ACTIVITY RESUMES. THE MPCA MAY REQUIRE INSPECTIONS TO RESUME IF CONDITIONS WARRANT; OR c.WHERE CONSTRUCTION ACTIVITY HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, INSPECTIONS MAY BE SUSPENDED. INSPECTIONS MUST RESUME WITHIN 24 HOURS OF RUNOFF OCCURRING, OR UPON RESUMING CONSTRUCTION, WHICHEVER COMES FIRST. 10. PERMITTEES MUST RECORD ALL INSPECTIONS AND MAINTENANCE ACTIVITIES WITHIN 24 HOURS OF BEING CONDUCTED AND THESE RECORDS MUST BE RETAINED WITH THE SWPPP. THESE RECORDS MUST INCLUDE: a.DATE AND TIME OF INSPECTIONS; AND b.NAME OF PERSONS CONDUCTING INSPECTIONS; AND c.ACCURATE FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARE NEEDED; AND d.CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE ACTIVITIES); AND e.DATE OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCHES IN 24 HOURS, AND THE AMOUNT OF RAINFALL FOR EACH EVENT. PERMITTEES MUST OBTAIN RAINFALL AMOUNTS BY EITHER A PROPERLY MAINTAINED RAIN GAUGE INSTALLED ONSITE, A WEATHER STATION THAT IS WITHIN ONE (1) MILE OF YOUR LOCATION, OR A WEATHER REPORTING SYSTEM THAT PROVIDES SITE SPECIFIC RAINFALL DATA FROM RADAR SUMMARIES; AND f.IF PERMITTEES OBSERVE A DISCHARGE DURING THE INSPECTION, THEY MUST RECORD AND SHOULD PHOTOGRAPH AND DESCRIBE THE LOCATION OF THE DISCHARGE (I.E., COLOR, ODOR, SETTLED OR SUSPENDED SOLIDS, OIL SHEEN, AND OTHER OBVIOUS INDICATORS OF POLLUTANTS); AND g.ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE DOCUMENTED AS REQUIRED IN SECTION 6 WITHIN SEVEN (7) CALENDAR DAYS. POLLUTION PREVENTION MANAGEMENT (SECTION 12): 1.PERMITTEES MUST PLACE BUILDING PRODUCTS AND LANDSCAPE MATERIALS UNDER COVER (E.G., PLASTIC SHEETING OR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. PERMITTEES ARE NOT REQUIRED TO COVER OR PROTECT PRODUCTS WHICH ARE EITHER NOT A SOURCE OF CONTAMINATION TO STORMWATER OR ARE DESIGNED TO BE EXPOSED TO STORMWATER. 2.PERMITTEES MUST PLACE PESTICIDES, FERTILIZERS AND TREATMENT CHEMICALS UNDER COVER (E.G., PLASTIC SHEETING OR TEMPORARY ROOFS) OR PROTECT THEM BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER. 3.PERMITTEES MUST STORE HAZARDOUS MATERIALS AND TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING COMPOUNDS, AND ACIDS) IN SEALED CONTAINERS TO PREVENT SPILLS, LEAKS OR OTHER DISCHARGE. STORAGE AND DISPOSAL OF HAZARDOUS WASTE MATERIALS MUST BE IN COMPLIANCE WITH MINN. R. CH. 7045 INCLUDING SECONDARY CONTAINMENT AS APPLICABLE. 4.PERMITTEES MUST PROPERLY STORE, COLLECT AND DISPOSE SOLID WASTE IN COMPLIANCE WITH MINN. R. CH. 7035. 5.PERMITTEES MUST POSITION PORTABLE TOILETS SO THEY ARE SECURE AND WILL NOT TIP OR BE KNOCKED OVER. PERMITTEES MUST PROPERLY DISPOSE SANITARY WASTE IN ACCORDANCE WITH MINN. R. CH. 7041. 6.PERMITTEES MUST TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR UNLOADED INCLUDING THE USE OF DRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. PERMITTEES MUST ENSURE ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. PERMITTEES MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN. STAT. 115.061, USING DRY CLEAN UP MEASURES WHERE POSSIBLE. 7.PERMITTEES MUST LIMIT VEHICLE EXTERIOR WASHING AND EQUIPMENT TO A DEFINED AREA OF THE SITE. PERMITTEES MUST CONTAIN RUNOFF FROM THE WASHING AREA IN A SEDIMENT BASIN OR OTHER SIMILARLY EFFECTIVE CONTROLS AND MUST DISPOSE WASTE FROM THE WASHING ACTIVITY PROPERLY. PERMITTEES MUST PROPERLY USE AND STORE SOAPS, DETERGENTS, OR SOLVENTS. 8.PERMITTEES MUST PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OPERATIONS (E.G., CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS) RELATED TO THE CONSTRUCTION ACTIVITY. PERMITTEES MUST PREVENT LIQUID AND SOLID WASHOUT WASTES FROM CONTACTING THE GROUND AND MUST DESIGN THE CONTAINMENT SO IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT OPERATIONS OR AREAS. PERMITTEES MUST PROPERLY DISPOSE LIQUID AND SOLID WASTES IN COMPLIANCE WITH MPCA RULES. PERMITTEES MUST INSTALL A SIGN INDICATING THE LOCATION OF THE WASHOUT FACILITY. PERMIT TERMINATION (SECTION 4 AND SECTION 13): 1.PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ALL TERMINATION CONDITIONS LISTED IN SECTION 13 ARE COMPLETE. 2.PERMITTEES MUST SUBMIT A NOT WITHIN 30 DAYS AFTER SELLING OR OTHERWISE LEGALLY TRANSFERRING THE ENTIRE SITE, INCLUDING PERMIT RESPONSIBILITY FOR ROADS (E.G., STREET SWEEPING) AND STORMWATER INFRASTRUCTURE FINAL CLEAN OUT, OR TRANSFERRING PORTIONS OF A SITE TO ANOTHER PARTY. THE PERMITTEES' COVERAGE UNDER THIS PERMIT TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF THE NOT. 3.PERMITTEES MUST COMPLETE ALL CONSTRUCTION ACTIVITY AND MUST INSTALL PERMANENT COVER OVER ALL AREAS PRIOR TO SUBMITTING THE NOT. VEGETATIVE COVER MUST CONSIST OF A UNIFORM PERENNIAL VEGETATION WITH A DENSITY OF 70 PERCENT OF ITS EXPECTED FINAL GROWTH. VEGETATION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA DICTATES NO VEGETATION, SUCH AS IMPERVIOUS SURFACES OR THE BASE OF A SAND FILTER. 4.PERMITTEES MUST CLEAN THE PERMANENT STORMWATER TREATMENT SYSTEM OF ANY ACCUMULATED SEDIMENT AND MUST ENSURE THE SYSTEM MEETS ALL APPLICABLE REQUIREMENTS IN SECTION 15 THROUGH 19 AND IS OPERATING AS DESIGNED. 5.PERMITTEES MUST REMOVE ALL SEDIMENT FROM CONVEYANCE SYSTEMS PRIOR TO SUBMITTING THE NOT. 6.PERMITTEES MUST REMOVE ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS PRIOR TO SUBMITTING THE NOT. PERMITTEES MAY LEAVE BMPS DESIGNED TO DECOMPOSE ON-SITE IN PLACE. 7.FOR RESIDENTIAL CONSTRUCTION ONLY, PERMIT COVERAGE TERMINATES ON INDIVIDUAL LOTS IF THE STRUCTURES ARE FINISHED AND TEMPORARY EROSION PREVENTION AND DOWNGRADIENT PERIMETER CONTROL IS COMPLETE, THE RESIDENCE SELLS TO THE HOMEOWNER, AND THE PERMITTEE DISTRIBUTES THE MPCA'S "HOMEOWNER FACT SHEET" TO THE HOMEOWNER. 8.FOR CONSTRUCTION PROJECTS ON AGRICULTURAL LAND (E.G., PIPELINES ACROSS CROPLAND), PERMITTEES MUST RETURN THE DISTURBED LAND TO ITS PRECONSTRUCTION AGRICULTURAL USE PRIOR TO SUBMITTING THE NOT. SEED NOTES: ALL SEED MIXES AND APPLICATION SHALL BE IN ACCORDANCE WITH THE MNDOT SEEDING MANUAL. GENERAL RECOMMENDATIONS: THE CONTRACTOR IS RESPONSIBLE TO SALVAGE AND PRESERVE EXISTING TOPSOIL NECESSARY FOR FINAL STABILIZATION AND TO ALSO MINIMIZE COMPACTION IN ALL LANDSCAPE AREAS. IMMEDIATELY BEFORE SEEDING THE SOIL SHALL BE TILLED TO A MINIMUM DEPTH OF 3 INCHES. TEMPORARY EROSION CONTROL SEEDING, MULCHING & BLANKET. SEED ·TEMPORARY SEED SHALL BE MNDOT SEED MIX 21-112 (WINTER WHEAT COVER CROP) FOR WINTER AND 21-111 (OATS COVER CROP) FOR SPRING/SUMMER APPLICATIONS. BOTH SEED MIXES SHALL BE APPLIED AT A SEEDING RATE OF 100 LBS/ACRE. MULCH ·IMMEDIATELY AFTER SEEDING, WITHIN 24 HOURS, MNDOT TYPE 1 MULCH SHOULD BE APPLIED TO PROTECT AND ENHANCE SEED GERMINATION. MULCH SHALL BE APPLIED AT 90% COVERAGE (2 TONS PER ACRE OF STRAW MULCH) SLOPES ·3:1 (HORIZ/VERT.) OR FLATTER MUCH SHALL BE COVERED WITH MULCH ·SLOPES STEEPER THAN 3:1 OR DITCH BOTTOMS SHALL BE COVERED WITH EROSION CONTROL BLANKET. ·SEE PLAN FOR MORE DETAILED DITCH AND STEEP SLOPE EROSION CONTROL TREATMENTS. FRANA COMPANIES, INC. 633 2ND AVE. S, HOPKINS, MN 55343 CONTACT: BRANDON GESS BGESS@FRANA.COM 651-214-2096 F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION SW1.4 SWPPP - ATTACHMENTS .. .. .. .. .. .. ATTACHMENT A: SITE SPECIFIC SWPPP DOCUMENT PROJECT NAME: FRANA PRODUCTION FACILITY PROJECT LOCATION (BRIEFLY DESCRIBE WHERE CONSTRUCTION ACTIVITY OCCURS. INCLUDE ADDRESS IF AVAILABLE.) ADDRESS: INTERSECTION OF SOUTH ROBERT TRAIL & CANADA CIRCLE CITY OR TOWNSHIP: ROSEMOUNT STATE: MN ZIP CODE: 55068 LATITUDE/LONGITUDE OF APPROXIMATE CENTROID OF PROJECT: 44.72077 N, -93.13476 E METHOD OF LAT/LONG COLLECTION (CIRCLE ONE): GPS ONLINE TOOL USGS TOPOGRAPHIC ALL CITIES WHERE CONSTRUCTION WILL OCCUR: ROSEMOUNT ALL COUNTIES WHERE CONSTRUCTION WILL OCCUR: DAKOTA ALL TOWNSHIPS WHERE CONSTRUCTION WILL OCCUR: ROSEMOUNT PROJECT SIZE (NUMBER OF ACRES TO BE DISTURBED): 15.2 PROJECT TYPE (CIRCLE ONE): RESIDENTIAL COMMERCIAL/INDUSTRIAL ROAD CONSTRUCTION RESIDENTIAL & RD CONSTRUCTION OTHER (DESCRIBE): CUMULATIVE IMPERVIOUS SURFACE (TO THE NEAREST TENTH ACRE) EXISTING AREA OF IMPERVIOUS SURFACE : 0.0 POST CONSTRUCTION AREA OF IMPERVIOUS SURFACE: 9.3 TOTAL NEW AREA OF IMPERVIOUS SURFACE: 9.3 RECEIVING WATERS WATER BODY ID NAME OF WATER BODY WATER BODY TYPE SPECIAL WATER? (Y/N) IMPARIED WATER (Y/N) . . . . . . . . . . . . . . . . . . . . DATES OF CONSTRUCTION CONSTRUCTION START DATE:09/22 ESTIMATED COMPLETION DATE:09/23 GENERAL CONSTRUCTION PROJECT INFORMATION DESCRIBE THE CONSTRUCTION ACTIVITY (WHAT WILL BE BUILT, GENERAL TIMELINE, ETC): TBD DESCRIBE SOIL TYPES FOUND AT THE PROJECT: TYPICALLY SANDY OR SILTY LOAM, HSG B SITE LOCATION MAP - ATTACH MAPS (U.S. GEOLOGIC SURVEY 7.5 MINUTE QUADRANGLE, NATIONAL WETLAND INVENTORY MAPS OR EQUIVALENT) SHOWING THE LOCATION AND TYPE OF ALL RECEIVING WATERS, INCLUDING WETLANDS, DRAINAGE DITCHES, STORMWATER PONDS, OR BASINS, ETC. THAT WILL RECEIVE RUNOFF FROM THE PROJECT. USE ARROWS SHOWING THE DIRECTION OF FLOW AND DISTANCE TO THE WATER BODY. SOILS INFORMATION MAP UNIT SYMBOL 301B LINDSTROM SILT LOAM, 1%-4% SLOPES MAP UNIT NAME 411A WAUKEGAN SILT LOAM, 0%-1% 411B WAUKEGAN SILT LOAM, 1%-6% GENERAL SITE INFORMATION (III.A) 1. DESCRIBE THE LOCATION AND TYPE OF ALL TEMPORARY AND PERMANENT EROSION PREVENTION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICIES (BMP'S). INCLUDE THE TIMING FOR INSTALLATION AND PROCEDURES USED TO ESTABLISH ADDITIONAL TEMPORARY BMP'S AS NECESSARY. (5.5) THE PROJECT IS PROTECTED BY HYDRODYNAMIC SEPARATORS, A NURP VOLUME POND, AND INFILTRATION BASIN BMP, SILT FENCE AND INLET PROTECTION DEVICES. THE SILT FENCE WILL BE INSTALLED AT THE DOWNHILL LOCATIONS OF THE SITE AND MONITORED AS NECESSARY. INLET PROTECTION DEVIDES WILL BE INSTALLED IN ALL CATCH BASINS ON THE SITE AND ANY OFF SITE THAT WILL RECEIVE STORMWATER RUNOFF FROM THIS SITE. AS THE PROJECT PROGRESSES ADDITIONAL BMP'S SUCH AS EROSION CONTROL BLANKET WILL BE UTILITZED. 2. ATTACH TO THIS SWPPP A TABLE WITH THE ANTICIPATED QUANTITIES FOR THE LIFE OF THE PROJECT FOR ALL EROSION PREVENTION AND SEDIMENT CONTROL BMP'S (5.7). SEE PAGE SW1.3 3. ATTACH TO THIS SWPPP A SITE MAP THAT INCLUDES THE FOLLOWING FEATURES (5.9): EXIST AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST-CONSTRUCTION STORMRWATER RUNOFF DRAINAGE AREAS LOCATED WITHIN THE PROJECT LIMITS. LOCATIONS OF IMPERVIOUS SURFACES AND SOIL TYPES. ·EXISTING AND FINAL GRADES, INCLUDING DIVIDING LINES AND DIRECTION OF FLOW FOR ALL PRE AND POST-CONSTRUCTION STORMWATER RUNOFF DRAINAGE AREAS LOCATED WITHIN PROJECT LIMITS. ·LOCATIONS OF AREAS NOT TO BE DISTURBED. ·LOCATION OF AREAS OF PHASED CONSTRUCTION. ·ALL SURFACE WATERS AND EXISTING WETLANDS WITHIN ONE MILE FROM THE PROJECT BOUNDARIES THAT WILL RECEIVE STORMWATER RUNOFF FROM THE SITE (IDENTIFIABLE ON MAPS SUCH AS USGS 7.5 MINUTE QUADRANGLE MAPS OR EQUIVALENT. WHERE SURFACE WATERS RECEIVING RUNOFF ASSOCIATED WITH CONSTRUCTION ACTIVITY WILL NOT FIT ON THE PLAN SHEET, THEY MUST BE IDENTIFIED WITH AN ARROW, INDICATING BOTH DIRECTION AND DISTANCE TO THE SURFACE WATER. ·METHODS TO BE USED FOR FINAL STABILIZATION OF ALL EXPOSED SOIL AREA 4. WERE STORMWATER MITIGATION MEASURES REQUIRED AS THE RESULT OF AN ENVIRONMENTAL, ARCHAEOLOGICAL, OR OTHER REQUIRED LOCAL, STATE OR FEDERAL REVIEW OF THE PROJECT? NO IF YES, DESCRIBE HOW THESE MEASURES WERE ADDRESSED IN THE SWPPP. (5.16) N/A 5. IS THE PROJECT LOCATED IN A KARST AREA SUCH THAT ADDITIONAL MEASURES WOULD BE NECESSARY TO PROJECT DRINKING WATER SUPPLY MANAGEMENT AREAS AS DESCRIBED IN MINN. R. CHAPTERS 7050 AND 7060? NO IF YES, DESCRIBE THE ADDITIONAL MEASURES TO BE USED. (SECTION 23) N/A 6. DOES THE SITE DISCHARGE TO A CALCEREOUS FEN LISTED IN MINN. R. 7050.0180, SUBP. 6.B? NO IF YES, A LETTER OF APPROVAL FROM THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES MUST BE OBTAINED PRIOR TO APPLICATION FOR THIS PERMIT. 7. DOES THE SITE DISCHARGE TO A WATER THAT IS LISTED AS IMPARED FOR THE FOLLOWING POLLUTANT(S) OR STRESSOR(S): PHOSPHORUS, TURBIDITY, DISSOLVED OXYGEN OR BIOTIC IMPAIRMENT? USE THE SPECIAL AND IMPAIRED WATERS SEARCH TOOL AT: WWW.PCA.STATE.MN.US/WATER/STORMWATER/STORMWATER-C.HTML NO IF NO, SKIP TO TRAINING DOES THE IMPAIRED WATER HAVE AN APPROVED TOTAL MAXIMUM DAILY LOADS (TMDL) WITH AN APPROVED WASTE LOAD ALLOCATION FOR CONSTRUCTION ACTIVITY? NA IF YES: A. LIST THE RECEIVING WATER, THE AREAS OF THE SITE DISCHARGING TO IT, AND THE POLLUTANT(S) IDENTIFIED IN THE TMDL. B. LIST THE BMP'S AND ANY OTHER SPECIFIC CONSTRUCTION STORMWATER RELATED IMPLEMENTATION ACTIVITIES IDENTIFIED IN THE TMDL. IF THE SITE HAS A DISCHARGE POINT WITHIN ONE MILE OF THE IMPAIRED WATER AND THE WATER FLOWS TO THE IMPAIRED WATER BUT NO SPECIFIC BMPS FOR CONSTRUCTION ARE IDENTIFIED IN THE TMDL, THE ADDITIONAL BMPS IN SECTION 23 MUST BE ADDED TO THE SWPPP AND IMPLEMENTED (15.19). THE ADDITIONAL BMPS ONLY APPLY TO THOSE PORTIONS OF THE PROJECT THAT DRAIN TO ONE OF THE IDENTIFIED DISCHARGE POINTS. N/A 8. IDENTIFY ADJACENT PUBLIC WATERS WHERE THE MINNESOTA DEPARTMENT OF NATURAL RESOURCES (DNR) HAS DECLARED “WORK IN WATER RESTRICTIONS” DURING FISH SPAWNING TIMEFRAMES N/A SELECTION OF A PERMANENT STORMWATER MANAGEMENT SYSTEM (SECTION 15) 1. WILL THE PROJECT CREATE A NEW CUMULATIVE IMPERVIOUS SURFACE GREATER THAN OR EQUAL TO ONE ACRE? YES IF YES, A WATER QUALITY VOLUME OF ONE INCH OF RUNOFF FROM THE CUMULATIVE NEW IMPERVIOUS SURFACES MUST BE RETAINED ON SITE (SEE 16.7 OF THE PERMIT) THROUGH INFILTRATION UNLESS PROHIBITED DUE TO ONE OF THE REASONS IN ITEMS 16.4 THROUGH 16.21. IF INFILTRATION IS PROHIBITED IDENTIFY OTHER METHOD OF OTHER VOLUME REDUCTION (E.G., FILTRATION SYSTEM, WET SEDIMENTATION BASIN, REGIONAL PONDING OR EQUIVALENT METHOD 2. DESCRIBE WHICH METHOD WILL BE USED TO TREAT RUNOFF FROM THE NEW IMPERVIOUS SURFACES CREATED BY THE PROJECT: INCLUDE ALL CALCULATIONS AND DESIGN INFORMATION FOR THE METHOD SELECTED. SEE SECTION 23 OF THE PERMIT FOR SPECIFIC REQUIREMENTS ASSOCIATED WITH EACH METHOD. INFILTRATION / REGIONAL PONDING CALCULATIONS ARE WITHIN THE SITE STORM WATER MANAGEMENT REPORT AND PART OF THIS SWPPP AS ATTACHMENT D. 3. IF IT IS NOT FEASIBLE TO MEET THE TREATMENT REQUIREMENT FOR THE WATER QUALITY VOLUME, DESCRIBE WHY. THIS CAN INCLUDE PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY PERMANENT STORMWATER MANAGEMENT PRACTICES. DESCRIBE WHAT OTHER TREATMENT, SUCH AS GRASSES SWALES, SMALLER PONDS, OR GRIT CHAMBERS, WILL BE IMPLEMENTED TO TREAT RUNOFF PRIOR TO DISCHARGE TO SURFACE WATERS. (15.8) SPECIFIED BMPS ONSITE MEET REQUIREMENT FOR WATER QUALITY VOLUME. 4. FOR PROJECTS THAT DISCHARGE TO TROUT STREAMS, INCLUDING TRIBUTARIES TO TROUT STREAMS, IDENTIFY METHOD OF INCORPORATING TEMPERATURE CONTROLS INTO THE PERMANENT STORMWATER MANAGEMENT SYSTEM. N/A EROSION PREVENTION PRACTICES (SECTION 8.1) DESCRIBE THE TYPES OF TEMPORARY EROSION PREVENTION BMP'S EXPECTED TO BE IMPLEMENTED ON THIS SITE DURING CONSTRUCITON: 1. DESCRIBE CONSTRUCTION PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, AND OTHER CONSTRUCTION PRACTICES TO MINIMIZE EROSION. DELINEATE AREAS NOT TO BE DISTURBED (E.G., WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) BEFORE WORK BEGINS. SILT FENCE WILL BE INSTALLED AT ATHE DOWNHILL LOCATIONS OF THE SITE. 2. DESCRIBE METHODS OF TEMPORARILY STABILIZING SOILS AND SOIL STOCKPILES (E.G., MULCHES, HYDRAULIC TACKIFIERS, EROSION BLANKETS, ETC.): TEMPORARY EROSION PROTECTION WILL BE SEED AND MULCH AND EROSION BLANKETS WHERE REQUIRED, WITH PERMANENT COVER BEING EITHER SOD OR LANDSCAPE FEATURES. 3. DESCRIBE METHODS OF DISSIPATING VELOCITY ALONG STORMWATER CONVEYANCE CHANNELS AND AT CHANNEL OUTLETS (E.G., CHECK DAMS, SEDIMENT TRAPS, RIP RAP, ETC.): SOD WILL BE UTILIZED ALONG CHANNELS AND RIP RAP AT CHANNEL. 4. DESCRIBE METHODS TO BE USED FOR STABILIZATION OF DITCH AND SWALE WETTED PERIMETERS (NOTE THAT MULCH, HYDRAULIC SOIL TACKIFIERS, HYDROMULCHES, ETC. ARE NOT ACCEPTABLE SOIL STABILIZATION METHODS FOR ANY PART OF A DRAINAGE DITCH OR SWALE) FINAL STABILIZATION OF SWALES WILL BE SOD 5. DESCRIBE METHODS TO BE USED FOR ENERGY DISSIPATION AT PIPE OUTLETS (E.G., RIP RAP, SPLASH PADS, GABIONS, ETC.) RIP RAP WILL BE UTILIZED AT PIPE OUTLETS 6. DESCRIBE METHODS TO BE USED TO PROMOTE INFILTRATION AND SEDIMENT REMOVAL ON THE SITE PRIOR TO OFFSITE DISCHARGE, UNLESS INFEASIBLE (E.G., DIRECT STORMWATER FLOW TO VEGETATED AREAS): DISCONNECTED IMPERVIOUS AREA AND INFILTRATION AREAS WILL BE UTILIZED 7. FOR DRAINAGE OR DIVERSION DITCHES, DESCRIBE PRACTICES TO STABILIZE THE NORMAL WETTED PERIMETER WITHIN 200 LINEAL FEET OF THE PROPERTY EDGE OR POINT OF DISCHARGE TO SURFACE WATER. THE LAST 200 LINEAL FEET MUST BE STABILIZED WITHIN 24 HOURS AFTER CONNECTING TO SURFACE WATERS AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED FOR ALL DISCHARGES TO SPECIAL, IMPAIRED OR “WORK IN WATER RESTRICTIONS”. ALL OTHER REMAINING PORTIONS OF THE TEMPORARY OR PERMANENT DITCHES OR SWALES WITHIN 14 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER, PROPERTY EDGE AND CONSTRUCTION IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED. N/A, NO DITCHES ON SITE 8. DESCRIBE ADDITIONAL EROSION PREVENTION MEASURES THAT WILL BE IMPLEMENTED AT THE SITE DURING CONSTRUCTION (E.G., CONSTRUCTION PHASING, MINIMIZING SOIL DISTURBANCE, VEGETATIVE BUFFERS, HORIZONTAL SLOPE GRADING, SLOPE DRAINING/TERRACING, ETC.): OTHER EROSION CONTROL PRACTICES INCLUDE BUT ARE NOT LIMITED TO; MINIMIZING SITE EXPOSURE WHEN POSSIBLE. 9. IF APPLICABLE, INCLUDE ADDITIONAL REQUIREMENTS IN APPENDIX A PART C.3 REGARDING MAINTAINING A 100-FOOT BUFFER ZONE OR INSTALLING REDUNDANT BMPS FOR PORTIONS OF THE SITE THAT DRAIN TO SPECIAL WATERS). N/A 10. IF APPLICABLE, DESCRIBE ADDITIONAL EROSION PREVENTION BMPS TO BE IMPLEMENTED AT THE SITE TO PROTECT PLANNED FILTRATION AREAS MINIMIZE SITE EXPOSURE IN AREAS ADJACENT TO FILTRATION AREAS. SEDIMENT CONTROL PRACTICIES (SECTION 9.1) DESCRIBE THE METHODS OF SEDIMENT CONTROL BMPS TO BE IMPLEMENTED AT THIS SITE DURING CONSTRUCTION TO MINIMIZE SEDIMENT IMPACTS TO SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS 1. DESCRIBE METHODS TO BE USED FOR DOWN GRADIENT PERIMETER CONTROL: SILT FENCE WILL BE INSTALLED AROUND THE ENTIRE PERIMETER OF THE SITE 2. DESCRIBE METHODS TO BE USED TO CONTAIN SOIL STOCKPILES: SEED AND MULCH AS WELL AS EROSION CONTROL BLANKETS WILL BE UTILIZED AS NECESSARY 3. DESCRIBE METHODS TO BE USED FOR STORM DRAIN INLET PROTECTION: SEE INLET PROTECTION DETAILS 4. DESCRIBE METHODS TO MINIMIZE VEHICLE TRACKING AT CONSTRUCTION EXITS AND STREET SWEEPING ACTIVITIES: THE PROJECT WILL UTILIZE A ROCK CONSTRUCTION ENTRANCE. 5. DESCRIBE METHODS, IF APPLICABLE, ADDITIONAL SEDIMENT CONTROLS (E.G., DIVERSION BERMS) TO BE INSTALLED TO KEEP RUNOFF AWAY FROM PLANNED INFILTRATION AREAS WHEN EXCAVATED PRIOR TO FINAL STABILIZATION OF THE CONTRIBUTING DRAINAGE AREA: SILT FENCE TO BE INSTALLED IMMEDIATELY AFTER GRADING TO PROTECT INFILTRATION AREAS. 6. DESCRIBE METHODS TO BE USED TO MINIMIZE SOIL COMPACTION AND PRESERVE TOP SOIL (UNLESS INFEASIBLE) AT THIS SITE: LIGHT TRACKED EQUIPMENT WILL BE USED, TOPSOIL WILL BE STRIPPED AND STOCKPILED 7. DESCRIBE PLANS TO PRESERVE A 50-FOOT NATURAL BUFFER BETWEEN THE PROJECT'S SOIL DISTURBANCE AND A SURFACE WATER OR PLANS FOR REDUNDANT SEDIMENT CONTROLS IF A BUFFER IS INFEASIBLE: DOUBLE ROW OF SILT FENCE WILL BE INSTALLED ALONG WETLAND. PROJECT WILL NOT DISTURB WITHIN 200 FEET OF WETLAND. 8. DESCRIBE PLANS FOR USE OF SEDIMENTATION TREATMENT CHEMICALS (E.G., POLYMERS, FLOCCULANTS, ETC.) SEE PART 9.18 OF THE PERMIT: N/A 9. IS THE PROJECT REQUIRED TO INSTALL A TEMPORARY SEDIMENT BASIN DUE TO 10 OR MORE ACRES DRAINING TO A COMMON LOCATION OR 5 ACRES OR MORE IF THE SITE IS WITHIN 1 MILE OF A SPECIAL OR IMPAIRED WATER? YES IF YES, DESCRIBE (OR ATTACH PLANS ) SHOWING HOW THE BASIN WILL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH SECTION 14. PROPOSED FILTRATION BASINS WILL SERVE AS TEMPORARY SEDIMENTS BASINS THAT WILL THEN BE CONVERTED TO PERMANENT FILTRATIONS BASINS. DEWATERING AND BASIN DRAINING (SECTION 10.1) 1. WILL THE PROJECT INCLUDE DEWATERING OR BASIN DRAINING? NO IF YES, DESCRIBE MEASURES TO BE USED TO TREAT/DISPOSE OF TURBID OR SEDIMENT-LADEN WATER AND METHOD TO PREVENT EROSION OR SCOUR OF DISCHARGE POINTS (SEE 10.2 THROUGH 10.4 OF THE PERMIT): N/A 2. WILL THE PROJECT INCLUDE USE OF FILTERS FOR BACKWASH WATER? NO IF YES, DESCRIBE HOW FILTER BACKWASH WATER WILL BE MANAGED ON THE SITE OR PROPERLY DISPOSED (10.5): N/A ADDITIONAL BMP'S FOR SPECIAL WATERS AND DISCHARGES TO WETLANDS (SECTION 23.1) 1. SPECIAL WATERS. DOES YOUR PROJECT DISCHARGE TO SPECIAL WATERS? NO 2. IF PROXIMITY TO BEDROCK OR ROAD PROJECTS WHERE THE LACK OF RIGHT OF WAY PRECLUDES THE INSTALLATION OF ANY OF THE PERMANENT STORMWATER MANAGEMENT PRACTICES, THEN OTHER TREATMENT SUCH AS GRASSED SWALES, SMALLER PONDS, OR GRIT CHAMBERS IS REQUIRED PRIOR TO DISCHARGE TO SURFACE WATERS. DESCRIBE WHAT OTHER TREATMENT WILL BE PROVIDED. N/A 3. DESCRIBE EROSION AND SEDIMENT CONTROLS FOR EXPOSED SOIL AREAS WITH A CONTINUOUS POSITIVE SLOPE TO A SPECIAL WATERS, AND TEMPORARY SEDIMENT BASINS FOR AREAS THAT DRAIN FIVE OR MORE ACRES DISTURBED AT ONE TIME. N/A 4. DESCRIBE THE UNDISTURBED BUFFER ZONE TO BE USED (NOT LESS THAN 100 LINEAR FEET FROM THE SPECIAL WATER). N/A 5. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL ENSURE THAT THE PRE AND POST PROJECT RUNOFF RATE AND VOLUME FROM THE 1, AND 2-YEAR 24-HOUR PRECIPITATION EVENTS REMAINS THE SAME. N/A 6. DESCRIBE HOW THE PERMANENT STORMWATER MANAGEMENT SYSTEM WILL MINIMIZE ANY INCREASE IN THE TEMPERATURE OF TROUT STREAM RECEIVING WATERS RESULTING IN THE 1, AND 2-YEAR 24-HOUR PRECIPITATION EVENTS. N/A 7. WETLANDS. DOES YOUR PROJECT DISCHARGE STORMWATER WITH THE POTENTIAL FOR SIGNIFICANT ADVERSE IMPACTS TO A WETLAND (E.G., CONVERSION OF A NATURAL WETLAND TO A STORMWATER POND)? NO IF YES, DESCRIBE THE WETLAND MITIGATION SEQUENCE THAT WILL BE FOLLOWED IN ACCORDANCE WITH SECTION 22 OF THE PERMT. N/A INSPECTIONS AND MAINTENANCE (SECTION 11.1) DESCRIBE PROCEDURES TO ROUTINELY INSPECT THE CONSTRUCTION SITE: ·ONCE EVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND ·WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS, AND WITHIN (7) DAYS AFTER THAT INSPECTIONS MUST INCLUDE STABILIZED AREAS, EROSION PREVENTION,AND SEDIMENT CONTROL BMP'S AND INFILTRATION AREAS. INSPECTOR WILL FOLLOW REQUIREMENTS SPECIFIED ABOVE AND FILL OUT "ATTACHMENT B - CONSTRUCTION STORMWATER INSPECTION CHECKLIST" 1. DESCRIBE PRACTICES FOR STORAGE OF BUILDING PRODUCTS WITH A POTENTIAL TO LEACH POLLUTANTS TO MINIMIZE EXPOSURE TO STORMWATER: ALL BUILDING PRODUCTS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZE EXPOSURE 2. DESCRIBE PRACTICES FOR STORAGE OF PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICAL, AND LANDSCAPE MATERIALS: ALL LANDSCAPE TREATMENT CHEMICALS WILL BE SEALED AND STORED IN A MANNER TO MINIMIZED EXPOSURE 3. DESCRIBE PRACTICES FOR STORAGE AND DISPOSAL OF HAZARDOUS MATERIALS OR TOXIC WASTE (E.G., OIL, FUEL, HYDRAULIC FLUIDS, PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVE, ADDITIVES, CURING COMPOUNDS, AND ACIDS) ACCORDING TO MINN. R. CH. 7045, INCLUDING RESTRICTED ACCESS AND SECONDARY CONTAINMENT: ALL HAZARDOUS WASTE WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS. 4. DESCRIBE COLLECTION, STORAGE AND DISPOSAL OF SOLID WASTE IN COMPLIANCE WITH MINN. R. CH. 7035: ALL CONSTRUCTION DEBRIS AND SOLID WASTER WILL BE APPROPRIATELY DISPOSED OF OFF SITE ACCORDING TO LOCAL AND STATE LAWS 5. DESCRIBE MANAGEMENT OF PORTABLE TOILETS TO PREVENT TIPPING AND DISPOSAL OF SANITARY WASTES IN ACCORDANCE WITH MINN. R. CH. 7040: SANITARY AND SEPTIC SERVICES WILL BE PROVIDED TO WORKERS WITH PORTABLE FACILITIES MAINTAINED AS NEEDED BY THE PROVIDER. 6. DESCRIBE SPILL PREVENTION AND RESPONSE FOR FUELING AND EQUIPMENT OR VEHICLE MAINTENANCE: EMPLOYEES WILL BE TRAINED IN TECHNIQUES DESIGNED TO MINIMIZE SPILLS. VEHICLES AND EQUIPMENT SHALL BE CHECKED FOR LEAKS. 7. DESCRIBE CONTAINMENT AND DISPOSAL OF VEHICLE AND EQUIPMENT WASH WATER AND PROHIBITING ENGINE DEGREASING ON THE SITE: ALL CONSTRUCTION VEHICLES SHALL BE WASHED OFF SITE 8. DESCRIBE STORAGE AND DISPOSAL OF CONCRETE AND OTHER WASHOUT WASTES SO THAT WASTES DO NOT CONTACT THE GROUND: ALL CONCRETE WASHOUT SHALL OCCUR OFF SITE. FINAL STABILIZATION (25.22) 1. DESCRIBE METHOD OF FINAL STABILIZATION (PERMANENT COVER) OF ALL DISTURBED AREAS: FINAL STABILIZATION WILL BE ACCOMPLISHED WITH PAVEMENT, SOD AND LANDSCAPE MATERIALS. 2. DESCRIBE METHODS USED TO CLEAN ALL STORMWATER TREATMENT SYSTEMS AND STORMWATER CONVEYANCE SYSTEMS OF ACCUMULATED SEDIMENT (25.22): CLEANING OF STORMWATER TREATMENT SYSTEMS SHALL BE DONE BY HAND SUCH AS THE USE OF A SHOVEL. 3. DESCRIBE METHODS FOR REMOVING ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMP'S: REMOVAL OF TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMP'S CAN BE DONE BY HAND AND PROPERLY DISPOSED OF. F R A N A P R O D . F A C I L I T Y CA N A D A C I R C L E & S O U T H R O B E R T T R A I L , R O S E M O U N T , M N 5 5 0 6 8 63 3 2 N D A V E . S , H O P K I N S , M N 5 5 3 4 3 FR A N A C O M P A N I E S , I N C . PR O J E C T PR E L I M I N A R Y : NO T F O R CO N S T R U C T I O N ISSUE/SUBMITTAL SUMMARY DATE DESCRIPTION .. .. .. .. .. .. PROJECT NUMBER:22081 06/10/22 CITY RESUBMITTAL 06/28/22 REVISED ZONING SUBMITTAL 08/10/22 CITY RESUBMITTAL .. .. .. 05/27/22 CITY SUBMITTAL DRAWN BY:REVIEWED BY:EH,PS,MS PS .. .. .. .. .. .. .. COPYRIGHT CIVIL SITE GROUP INC.c 2022 44263 Matthew R. Pavek LICENSE NO.DATE I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. 08/10/22 Civil Engineering Surveying Landscape Architecture 5000 Glenwood Avenue Golden Valley, MN 55422 civilsitegroup.com 612-615-0060 REVISION SUMMARY DATE DESCRIPTION SW1.5 SWPPP - ATTACHMENTS .. .. .. .. .. .. ATTACHMENT B: SWPPP INSPECTION FORM ATTACHMENT C: MAINTENANCE PLAN FOR PERMANENT STORM WATER TREATMENT SYSTEM NOTE: THIS INSPECTION REPORT DOES NOT ADDRESS ALL ASPECTS OF THE NATIONAL APOLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM (NPDES/SDS) CONSTRUCTION STORMWATER PERMIT (PERMIT) ISSUED ON AUGUST 1, 2018. THE COMPLETION OF THIS CHECKLIST DOES NOT GUARANTEE THAT ALL PERMIT REQUIREMENTS ARE IN COMPLIANCE; IT IS THE RESPONSIBILITY OF THE PERMITTEE(S) TO READ AND UNDERSTAND THE PERMIT REQUIREMENTS. FACILITY INFORMATION SITE NAME: SITE ADDRESS: PERMIT NUMBER: CITY: STATE: ZIP CODE: INSPECTION INFORMATION INSPECTOR NAME: _______________________ PHONE NUMBER: _________________________ ORGANIZATION/COMPANY MAN: _____________________________________________________ DATE (MM/DD/YYYY): _____________________TIME: ____________ AM / PM IS THE INSPECTOR CERTIFIED IN SEDIMENT AND EROSION CONTROL AND IS IT DOCUMENTED IN THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP)? IS THIS INSPECTION ROUTINE OR IN RESPONSE TO A STORM EVENT: RAINFALL AMOUNT (IF APPLICABLE): ____________ IS SITE WITHIN ONE AERIAL MILE OF SPECIAL OR IMPAIRED WATER THAT CAN POTENTIALLY RECEIVE DISCHARGE FROM THE SITE? IF YES, FOLLOW SECTION 23 AND OTHER APPLICABLE PERMIT REQUIREMENTS NOTE: IF N/A IS SELECTED AT ANY TIME, SPECIFY WHY IN THE COMMENT AREA FOR THAT SECTION. EROSION CONTROL REQUIREMENT (SECTION 8.1) 1.ARE SOILS STABILIZED WHERE NO CONSTRUCTION ACTIVITY HAS OCCURRED FOR 14 DAYS (INCLUDING STOCKPILES)? (7 DAYS WHERE APPLICABLE, OR 24 HOURS DURING MINNESOTA DEPARTMENT OF NATURAL RESOURCES [DNR] FISH SPAWNING RESTRICTIONS) 2.HAS THE NEED TO DISTURB STEEP SLOPES BEEN MINIMIZED? 3.IF STEEP SLOPES ARE DISTURBED, ARE STABILIZATION PRACTICES DESIGNED FOR STEEP SLOPES USED? 4.ALL DITCHES/SWALES STABILIZED 200' BACK FROM POINT OF DISCHARGE OR PROPERTY EDGE WITHIN 24 HOURS? (MULCH, HYDROMULCH, TACKIFIER, OR SIMILAR BEST MANAGEMENT PRACTICES [BMPS] ARE NOT ACCEPTABLE IN DITCHES/SWALES IF THE SLOPE IS GREATER THAN 2%)ARE APPROPRIATE BMP'S INSTALLED PROTECTING INLETS/OUTLETS? 5.DO PIPE OUTLETS HAVE ENERGY DISSIPATION (WITHIN 24 HOURS OF CONNECTION)? 6.IS CONSTRUCTION PHASING BEING FOLLOWED IN ACCORDANCE WITH THE SWPPP? 7.ARE AREAS NOT TO BE DISTURBED MARKED OFF (FLAGS, SIGNS, ETC.)? COMMENTS: SEDIMENT CONTROL REQUIREMENTS (SECTION 9.1) 1.ARE PERIMETER SEDIMENT CONTROLS INSTALLED PROPERLY ON ALL DOWN GRADIENT PERIMETERS? 2.ARE APPROPRIATE BMPS INSTALLED PROTECTING INLETS, CATCH BASINS, AND CULVERT INLETS? 3.IS A 50 FOOT NATURAL BUFFER PRESERVED AROUND ALL SURFACE WATERS DURING CONSTRUCTION? 3.1.IF NO, HAVE REDUNDANT SEDIMENT CONTROLS BEEN INSTALLED? 4.DO ALL ERODIBLE STOCKPILES HAVE PERIMETER CONTROL IN PLACE? 5.IS THERE A TEMPORARY SEDIMENT BASIN ON SITE, AND IS IT BUILT AS REQUIRED IN SECTION 14 OF THE PERMIT? 6.IS SOIL COMPACTION BEING MINIMIZED WHERE NOT DESIGNED FOR COMPACTION? 7.IS TOPSOIL BEING PRESERVED UNLESS INFEASIBLE? 8.IF CHEMICAL FLOCCULANTS ARE USED, IS THERE A CHEMICAL FLOCCULANT PLAN IN PLACE? COMMENTS: DISCLOSURES: ·AFTER DISCOVERY, THE PERMIT REQUIRES MANY OF THE DEFICIENCIES THAT MAY BE FOUND ON SITE BE CORRECTED WITHIN A SPECIFIED PERIOD OF TIME. SEE PERMIT FOR MORE DETAILS. ·THE PERMITTEE(S) IS/ARE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS AS WELL AS EROSION PREVENTION AND SEDIMENT CONTROL BMPS UNTIL ANOTHER PERMITTEE HAS OBTAINED COVERAGE UNDER THIS PERMIT ACCORDING TO SECTION 3, OR THE PROJECT HAS MET THE TERMINATION CONDITIONS OF THE PERMIT AND A NOTICE OF TERMINATION HAS BEEN SUBMITTED TO THE MINNESOTA POLLUTION CONTROL AGENCY. Y N N/A Y N N/A 7 DAY RAIN Y N MAINTENANCE AND INSPECTIONS (SECTION 11) 1.ARE ALL PREVIOUSLY STABILIZED AREAS MAINTAINING GROUND COVER? 2.ARE PERIMETER CONTROLS MAINTAINED AND FUNCTIONING PROPERLY, SEDIMENT REMOVED WHEN ONE-HALF FULL? 3.ARE INLET PROTECTION DEVICES MAINTAINED AND ADEQUATELY PROTECTING INLETS? 4.ARE THE TEMPORARY SEDIMENT BASINS BEING MAINTAINED AND FUNCTIONING PROPERLY? 5.ARE VEHICLE TRACKING BMPS AT SITE EXISTS IN PLACE AND MAINTAINED AND FUNCTIONING PROPERLY? 6.IS ALL TRACKED SEDIMENT BEING REMOVED WITHIN 24 HOURS? 7.HAVE ALL SURFACE WATERS, DITCHES, CONVEYANCES, AND DISCHARGE POINTS BEEN INSPECTED? 8.WERE ANY DISCHARGES SEEN DURING THIS INSPECTION (I.E., SEDIMENT, TURBID WATER, OR OTHERWISE)? IF YES, RECORD THE LOCATION OF ALL POINTS OF DISCHARGE. PHOTOGRAPH AND DESCRIBE THE DISCHARGE (SIZE, COLOR, ODOR, FOAM, OIL SHEEN, TIME, ETC.). DESCRIBE HOW THE DISCHARGE WILL BE ADDRESSED. WAS THE DISCHARGE A SEDIMENT DELTA? IF YES, WILL THE DELTA BE RECOVERED WITHIN SEVEN DAYS AND IN ACCORDANCE WITH ITEM 11.5 OF THE PERMIT? COMMENTS: Y N N/A POLLUTION PREVENTION (SECTION 12) 1.ARE ALL CONSTRUCTION MATERIALS THAT CAN LEACH POLLUTANTS UNDER COVER OR PROTECTED? 2.ARE HAZARDOUS MATERIALS BEING PROPERLY STORED? 3.ARE APPROPRIATE BMPS BEING USED TO PREVENT DISCHARGES ASSOCIATED WITH FUELING AND MAINTENANCE OF EQUIPMENT OR VEHICLES? 4.ARE ALL SOLID WASTES BEING PROPERLY CONTAINED AND DISPOSED OF? 5.IS THERE A CONCRETE/OTHER MATERIAL WASHOUT AREA ON SITE AND IS IT BEING USED? 6.IS THE CONCRETE WASHOUT AREA MARKED WITH A SIGN? 7.ARE THE CONCRETE/OTHER MATERIAL WASHOUT AREAS PROPERLY MAINTAINED? COMMENTS: Y N N/A OTHER 1.IS A COPY OF THE SWPPP, INSPECTION RECORDS, AND TRAINING DOCUMENTATION LOCATED ON THE CONSTRUCTION SITE, OR CAN IT BE MADE AVAILABLE WITHIN 72 HOURS? 2.HAS THE SWPPP BEEN FOLLOWED AND IMPLEMENTED ON SITE, AND AMENDED AS NEEDED? 3.IS ANY DEWATERING OCCURRING ON SITE? IF YES, WHAT BMPS ARE BEING USED TO ENSURE THAT CLEAN WATER IS LEAVING THE SITE AND THE DISCHARGE IS NOT CAUSING EROSION OR SCOUR? 4.WILL A PERMANENT STORMWATER MANAGEMENT SYSTEM BE CREATED FOR THIS PROJECT IF REQUIRED AND IN ACCORDANCE WITH SECTION 15 OF THE PERMIT (IF ADDING AN ACRE OR MORE OF NEW IMPERVIOUS SURFACE)? IF YES, DESCRIBE: 5.IF INFILTRATION/FILTRATION SYSTEMS ARE BEING CONSTRUCTED, ARE THEY MARKED AND PROTECTED FROM COMPACTION AND SEDIMENTATION? 6.DESCRIPTION OF AREAS OF NON-COMPLIANCE NOTED DURING THE INSPECTION, REQUIRED CORRECTIVE ACTIONS, AND RECOMMENDED DATE OF COMPLETION OF CORRECTIVE ACTIONS: 7.PROPOSED AMENDMENTS TO THE SWPPP: 8.POTENTIOAL AREAS OF CUTURE CONCERN: 9.ADDITIONAL COMMENTS Y N N/A Y N K:\020681-000\Admin\Docs\2022.05.27 - Submittal\2022.06.14 - Preliminary Plat Review.docx Memorandum To: Anthony Nemcek, Senior Planner CC: Stacy Bodsberg, Planning & Personnel Secretary Brian Erickson, City Engineer From: Tim Hanson PE, WSB Engineering Consultant Date: June 14, 2022 Re: Frana Manufacturing Plant Preliminary Plat Preliminary Plat Submittal Review Grading and Drainage Plan Review Preliminary Utility Plan Review Landscaping Plan Review WSB File Number 020681-000 SUBMITTAL: BMR Holdings LLC has submitted a Preliminary Plat named Frana Manufacturing Plant for the development of two metes and bounds parcels. The plans submitted were prepared by Civil Site Group of Golden Valley, MN. Review comments were generated from the Preliminary Plat Submittal dated 05-27-2022. The submittal included the following: ▪ Existing Conditions – ALTA Survey ▪ Preliminary Plat ▪ Removals Plan ▪ Site Plan ▪ Grading Plan ▪ Utility Plan ▪ Landscape Plan EXISTING CONDITIONS Frana Manufacturing Plant is located adjacent to and between South Robert Trail (TH 3) and Canada Circle, north of CSAH 46. The parent parcel consists of land previously utilized for agricultural purposes. Frana Manufacturing Plant is 13.66 acres in size. PRELIMINARY PLAT The preliminary plat identifies one light industrial lot which will contain a single building, employee parking lot, outside storage and a ponding/infiltration area. Frana Manufacturing facility extends a gated driveway from the south end of Canada Circle as no access is permitted from TH 3 to the site. Access and egress to the site will be from TH 3 to Canada Circle and then into the site. The Canada Circle and TH 3 intersection also will have Boulder Avenue as the fourth leg of the intersection. Anthony Nemcek June 15, 2022 Page 2 K:\020681-000\Admin\Docs\2022.05.27 - Submittal\2022.06.14 - Preliminary Plat Review.docx The proposed building floor will be approximately 8 feet above TH 3 as it extends adjacent to the site. No pedestrian facilities are proposed with the plat . The development Fees are indicated below based on the 2022 Schedule of Rates and Fees. ▪ Sanitary Sewer Trunk Charge: $1,075/acre ▪ Watermain Trunk Charge: $6,500/acre ▪ Storm Sewer Trunk Charge: $6,865/acre GRADING AND DRAINAGE The proposed grading plan directs runoff away from the building in each direction. Most of the site drains to the west. Runoff from the east and north is collected by storm sewer and conveyed to the ponding area in the western portion of the plat. Two storm sewer systems are proposed. These systems will be private and must be maintained by the property owner. The pondin g area does not include an independent NURP cell for pretreatment of storm water runoff. The ponds emergency overflow is indicated on the plan to go north along Canada Circle, the actual overflow rout is to the south across the proposed driveway to a low area on the south side of the driveway. This area overtops to the south and east across the NGL Supply Terminal Company parcel. A retaining wall is proposed along the southerly plat line. The base of the wall elevations do not reflect the existing contours or elevations indicated in the ALTA survey. 1. The proposed contours in the southeast corner of the parcel do not reflect the existing contours adjacent to TH 3. 2. The proposed retaining wall appears to be located on the south property line. The wall needs to be moved north to allow for side yard drainage. 3. The emergency overflows for the catchbasins on the north and east side of the building extend over a long slope. Provided ample inlet capacity and pipe capacity to minimize overflow from occurring. SANITARY SEWER AND WATERMAIN – UTILITY PLAN Sanitary sewer service to Frana Manufacturing Plant extends from an existing 6-inch service located in the northwest corner of the plat extending from Canada Circle. The sewer service is proposed to extend south within the plat to the building. Sewer cleanouts will be required every 100 feet of pipe extension. There is an eight-inch watermain stub located in the northwest corner of the plat (adjacent to the sanitary sewer stub) this watermain stub can be extended into the site. The watermain needs to be looped back to the watermain (hydrant) located in the Canada Circle cul-de-sac for water flow and quality purposes. Domestic and fire flows will be obtained from th e watermain extension. 4. Locate a fire hydrant off the northwest and southwest corners of the building. 5. The turning radii for the City of Rosemount’s fire truck (Commander) must be place on the site plan to assure accessibility. STORM SEWER Storm sewer design and layout will be reviewed with the Surface Water Management plan submittal. 6. Detail review of the storm sewer system and design will be completed with the construction plans for the site. Anthony Nemcek June 15, 2022 Page 3 K:\020681-000\Admin\Docs\2022.05.27 - Submittal\2022.06.14 - Preliminary Plat Review.docx SURFACE WATER MANAGEMENT The proposed Surface Water Management plan for the preliminary plat is under reviewed. Comments included in the Surface Water Management plan review shall be incorporated in the project design. LANDSCAPE PLAN The Landscape plan was reviewed for conflicts with infrastructure. Tree plantings should allow space for access and maintenance of proposed infrastructure. GENERAL Infrastructure design shall be completed in accordance with the City of Rosemount’s Engineering Guidelines and Standards. Infrastructure construction shall be completed in accordance with the latest edition of the City’s General Specifications and Standard Detail Plates for Street and Utility Construction. M E M O R A N D U M To: Adam Kienberger, Community Development Director Anthony Nemcek, Senior Planner Julia Hogan, Planner From: Dan Schultz, Parks and Recreation Director Date: July 20, 2022 Subject: Frana Manufacturing Facility Development The Parks and Recreation Department recently reviewed the plans for the Frana Manufacturing Development. After reviewing the plans, the Parks and Recreation Department staff has the following comments: Parks Dedication The parks dedication requirement for an industrial development is either a 10% of the total property area as land dedication, a cash dedication in-lieu of land or combination of the two. Staff is recommending that the City collect cash in-lieu of land for the development that is currently being processed. The cash dedication for the 13.65 acre development $68,250 (1.365 acres x $50,000 per acre). Please let me know if you have any questions about this memo. M E M O R A N D U M To: Julia Hogan, City Planner Adam Kienberger, Community Development Director From: Rick Chase, Building Official/Fire Marshal Date: July 22, 2022 Subject: Frana Manufacturing facility The following comments are provided based on preliminary site plan review. • Fire hydrant required within 100’ of fire department connection. • Hydrants spacing required in accordance with the Minnesota State Fire Code. • Add turn radius fire apparatus Commander to site plan. Contact Fire Marshal for dimensions. • All access service doors around building required to be numbered. Sincerely, Rick Chase Building Official/Fire Marshal