EXECUTIVE SUMMARY
City Council Meeting: September 20, 2022
AGENDA ITEM: 120th Street Drainage Improvements, City
Project 2022-11: Receive Quotes and
Authorize Work
AGENDA SECTION:
Consent
PREPARED BY: Nick Egger, PE, Public Works Director AGENDA NO. 6.k.
ATTACHMENTS: Letter of Recommendation; Quote
Tabulation; Location Map APPROVED BY: LJM
RECOMMENDED ACTIONS: Accept Quotes and Authorize Work for 120th Street
Drainage Improvements Project, City Project 2022-11.
BACKGROUND
120th Street W marks portions of the northern and southern boundaries for the cities of Rosemount
and Eagan respectively. The westernmost portion of this road is gravel and contains a dead-end,
stopping from the border with Apple Valley by about ½ mile. The road also borders Dakota
County’s Lebanon Hills Regional Park in Eagan to the north. In 2019, water from an unnamed
adjacent public lake began encroaching on the road and there was concern access to homes and
county maintenance facilities to the west could be cut off temporarily due to flooding if heavy rains
persisted. To reduce the risk of future flooding of the roadway, the City began pursuing installation
of outlets for the basin jointly with the City of Eagan, Dakota County, and Vermillion River
Watershed Joint Powers Organization.
The project proposes to install 2 pipes under 120th Street W, and two culverts under two private
driveways to route excess water west and north into Lebanon Hills Regional Park. Public Waters
Works Permits from the Minnesota Department of Natural Resources were required to work below
the Ordinary High-Water Elevations of the public lakes that flank the road, and the City is working
with affected residents to get permanent drainage and utility easements for the driveway culverts.
The City of Eagan will be reimbursing the City of Rosemount for a portion of the costs associated
with constructing the pipes under 120th St W in accordance with a long-standing agreement between
the cities for maintenance of the road.
COSTS & FUNDING
The City requested quotes from four contractors for installation of the proposed improvements and
received quotes from two companies. A tabulated summary of the quotes received, including the
Engineer’s Estimate is shown in the following table. The lowest quote submitted was for
$131,050.00 by McNamara Contracting. This cost is unfortunately $13,095.00 above the Engineer’s
Opinion of Cost, but a continued sign of challenging and ever-changing construction cost market in
which we are competing for contractors. Staff still recommends proceeding with the work despite
the escalated costs, as there are no guarantees it would not go higher if we postponed the work.
2
Summary of Quotes
Contactor Quote
Amount
Percentage Above
Lowest Quote
Engineer’s Opinion of Cost $117,955.00 -10.0%
McNamara Contracting, Inc. $131,050.00 NA
Bituminous Roadways, Inc. $145,421.50 11.0%
Funding
This project will be funded using the Storm Water Utility, and the engineer’s estimate of probable
project cost was $117,955.00. Stormwater System Improvement is a line item in the annual Storm
Water Utility budget. The City of Eagan will reimburse the City approximately $29,850.50 per the
terms of a mutual agreement for the maintenance of 120th St.
SCHEDULE
Should the Council approve this resolution, the proposed project schedule is shown below.
Construction Start October 2022
Substantial Completion November 30, 2022
Final Completion June 16, 2023
RECOMMENDATION
Staff recommends Council accept quotes and authorize work for the 120th Street Drainage
Improvements Project, City Project 2022-11.
K:\018245-000\Admin\Construction Admin\Bidding\018245-000 LOR 091222.docx018245-000 LOR 091222
7
0
1
X
E
N
I
A
A
V
E
N
U
E
S
|
S
U
I
T
E
3
0
0
|
M
I
N
N
E
A
P
O
L
I
S
,
M
N
|
55
4
1
6
|
7
6
3
.
5
4
1
.
4
8
0
0
|
W
S
B
E
N
G
.
C
O
M
September 13, 2022
Honorable Mayor and City Council
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Re: 120th Street Drainage Improvements
City of Rosemount Project No. 2022-11
WSB Project No. 018245-000
Dear Mayor and Council Members:
Quotes were received for the above-referenced project on Friday, August 12, 2022. A total of 2
quotes were received. The quotes were checked for mathematical accuracy and tabulated and
there are no errors made on the Proposal Form. The Engineer’s Estimate was $117,955.00. The
bid tabulation indicates the low bidder as McNamara Contracting, Inc. in Rosemount, MN, in the
amount of $131,050.00.
We recommend that the City consider these quotes and award a contract to McNamara
Contracting, Inc. based on the results of the quotes received.
Sincerely,
WSB
Bill Alms, PE
Project Manager
Enclosure
cc: Mike McNamara, McNamara Contracting, Inc
Nick Egger, City of Rosemount
Jane Byron, City of Rosemount
Brian Erickson, City of Rosemount
Kendra Fallon, WSB
mj
Bid Tabulation
120th Street Drainage Improvements
City of Rosemount Project No. 2022-11
WSB Project No. 018245-000
Bid Opening: August 12, 2022 at 10:00 AM local time
DENOTES CORRECTED FIGURE
Line No.Item #Item Description Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price
Schedule A - 120th Street Drainage Improvements
1 2021.501 MOBILIZATION LS 1 7,500.00$ 7,500.00$ $7,500.00 $7,500.00 $2,850.00 $2,850.00
2 2104.502 REMOVE DRAINAGE STRUCTURE EACH 4 700.00$ 2,800.00$ $1,000.00 $4,000.00 $650.00 $2,600.00
3 2104.503 REMOVE SEWER PIPE (STORM)L F 56 25.00$ 1,400.00$ $42.00 $2,352.00 $16.00 $896.00
4 2105.504 GEOTEXTILE FILTER TYPE 4 S Y 12 10.00$ 120.00$ $3.50 $42.00 $5.00 $60.00
5 2105.507 COMMON EXCAVATION C Y 31 25.00$ 775.00$ $55.00 $1,705.00 $48.00 $1,488.00
6 2106.507 SELECT GRANULAR EMBANKMENT (CV)C Y 44 30.00$ 1,320.00$ $71.00 $3,124.00 $51.00 $2,244.00
7 2211.507 AGGREGATE BASE (CV) CLASS 5 MODIFIED C Y 30 40.00$ 1,200.00$ $66.00 $1,980.00 $82.00 $2,460.00
8 2501.502 15" RC PIPE APRON EACH 4 6,000.00$ 24,000.00$ $6,200.00 $24,800.00 $10,000.00 $40,000.00
9 2503.503 15" RC PIPE SEWER DES 3006 CL V L F 86 120.00$ 10,320.00$ $125.00 $10,750.00 $151.00 $12,986.00
10 2511.507 RANDOM RIPRAP CLASS III C Y 14 125.00$ 1,750.00$ $132.00 $1,848.00 $174.00 $2,436.00
11 2573.503 FLOTATION SILT CURTAIN TYPE STILL WATER L F 100 25.00$ 2,500.00$ $16.00 $1,600.00 $18.00 $1,800.00
Schedule A - Total $53,685.00 $59,701.00 $69,820.00
Schedule B - Driveway Culvert Improvements
12 2021.501 MOBILIZATION LS 1 7,500.00$ 7,500.00$ $7,500.00 $7,500.00 $2,850.00 $2,850.00
13 2101.501 CLEARING AND GRUBBING L S 1 7,500.00$ 7,500.00$ $5,200.00 $5,200.00 $2,145.00 $2,145.00
14 2104.502 REMOVE DRAINAGE STRUCTURE EACH 2 700.00$ 1,400.00$ $1,000.00 $2,000.00 $650.00 $1,300.00
15 2104.503 REMOVE SEWER PIPE (STORM)L F 47 25.00$ 1,175.00$ $42.00 $1,974.00 $16.00 $752.00
16 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 40 12.00$ 480.00$ $25.00 $1,000.00 $27.00 $1,080.00
17 2105.504 GEOTEXTILE FILTER TYPE 4 S Y 12 10.00$ 120.00$ $3.50 $42.00 $5.00 $60.00
18 2105.507 COMMON EXCAVATION C Y 19 25.00$ 475.00$ $55.00 $1,045.00 $48.00 $912.00
19 2106.507 SELECT GRANULAR EMBANKMENT (CV)C Y 46 30.00$ 1,380.00$ $71.00 $3,266.00 $51.00 $2,346.00
20 2211.507 AGGREGATE BASE (CV) CLASS 5 MODIFIED C Y 10 40.00$ 400.00$ $66.00 $660.00 $82.00 $820.00
21 2360.504 TYPE SP 9.5 WEAR CRS MIX (2,B) 3.0" THICK S Y 40 60.00$ 2,400.00$ $105.00 $4,200.00 $82.50 $3,300.00
22 2501.502 15" RC PIPE APRON EACH 4 6,000.00$ 24,000.00$ $6,200.00 $24,800.00 $10,000.00 $40,000.00
23 2503.503 15" RC PIPE SEWER DES 3006 CL V L F 95 120.00$ 11,400.00$ $125.00 $11,875.00 $151.00 $14,345.00
24 2511.507 RANDOM RIPRAP CLASS III C Y 6 125.00$ 750.00$ $132.00 $792.00 $158.00 $948.00
25 2573.503 FLOTATION SILT CURTAIN TYPE STILL WATER L F 100 25.00$ 2,500.00$ $16.00 $1,600.00 $18.00 $1,800.00
26 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 350 2.00$ 700.00$ $7.50 $2,625.00 $6.60 $2,310.00
27 2575.505 SEEDING ACRE 0.2 8,000.00$ 1,600.00$ $10,000.00 $2,000.00 $1,645.00 $329.00
28 2575.502 SEED MIXTURE 34-261 L B 7 70.00$ 490.00$ $110.00 $770.00 $43.50 $304.50
Schedule B - Total $64,270.00 $71,349.00 $75,601.50
Engineer's Estimate McNamara Contracing, Inc Bituminous Roadways, Inc.
Bid Tabulation
120th Street Drainage Improvements
City of Rosemount Project No. 2022-11
WSB Project No. 018245-000
Bid Opening: August 12, 2022 at 10:00 AM local time
DENOTES CORRECTED FIGURE
Line No.Item #Item Description Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price
Engineer's Estimate McNamara Contracing, Inc Bituminous Roadways, Inc.
$117,955.00 $131,050.00 $145,421.50
I hereby certify that this is an exact reproduction of bids received.
Certified By:
License No. 54301
Date: August 16, 2022
Total Base Bid
SCALE IN FEET
0 200 400
K:
\
0
1
8
2
4
5
-
0
0
0
\
C
a
d
\
P
l
a
n
\
0
1
8
2
4
5
-
0
0
0
-
C
-
T
I
T
L
E
S
H
E
E
T
.
d
w
g
7/
2
9
/
2
0
2
2
7
:
5
7
:
1
1
A
M
N
120TH STREET DRAINAGE IMPROVEMENTS
CITY OF ROSEMOUNT
PROJECT LOCATION MAP
COUNTY:DAKOTA
PROJECT LOCATION
THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THE
GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA."
GOPHER ONE CALL TICKET NUMBER: 211401715
APPROVED BYSHEET NO.DATE
PLAN REVISIONS
ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES
WILL BE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT.
THIS PLAN SET CONTAINS 6 SHEETS
I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
LICENSE NUMBER:DATE:07/29/2022 54301
WILLIAM C. ALMS, P.E.
SHEET
6
OF
WSB PROJ. NO. 018245-000
PROJECT
LOCATION
(SITE 1)
1
THIS PLAN SET HAS BEEN PREPARED FOR:
CITY OF ROSEMOUNT
2875 145TH STREET WEST
ROSEMOUNT, MN 55068-4997
(651) 423-4411
A CALL TO GOPHER STATE ONE (651-454-0002)
IS REQUIRED A MINIMUM OF 48 HOURS PRIOR
TO PERFORMING ANY EXCAVATION.
EXCAVATION NOTICE SYSTEM
PLAN SET INDEX
GOVERNING SPECIFICATIONS
UTILITY INFORMATION
THE 2015 CITY OF ROSEMOUNT GENERAL SPECIFICATIONS & STANDARD DETAIL
PLATES FOR STREET AND UTILITY CONSTRUCTION AND THE 2018 EDITION OF
THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD
SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN.
ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF
THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING
THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE
LAYOUTS.
Sheet List Table
SHEET
NUMBER SHEET TITLE
1 TITLE SHEET
2 EXISTING CONDITIONS PLAN (SITES 1, 2, & 3)
3 STORM SEWER PLAN (SITE 1)
5 - 6 MISCELLANEOUS DETAILS
CITY PROJ. NO. 2022-11
BRIAN ERICKSON, P.E. - DIRECTOR OF PUBLIC WORKS / CITY ENGINEER DATE
PROJECT
LOCATION
(SITE 2)
PROJECT
LOCATION
(SITE 3)
4 STORM SEWER PLAN (SITES 2 & 3)