Loading...
HomeMy WebLinkAbout6.k. 120th Street Drainage Improvements, City Project 2022-11 Receive Quotes and Authorize Work\\rsm-file\Common\City Clerk\Agenda Items\Approved Items\6.k. 120th Street Drainage Improvements, City Project 2022-11 Receive Quotes and Authorize Work.docx EXECUTIVE SUMMARY City Council Meeting: September 20, 2022 AGENDA ITEM: 120th Street Drainage Improvements, City Project 2022-11: Receive Quotes and Authorize Work AGENDA SECTION: Consent PREPARED BY: Nick Egger, PE, Public Works Director AGENDA NO. 6.k. ATTACHMENTS: Letter of Recommendation; Quote Tabulation; Location Map APPROVED BY: LJM RECOMMENDED ACTIONS: Accept Quotes and Authorize Work for 120th Street Drainage Improvements Project, City Project 2022-11. BACKGROUND 120th Street W marks portions of the northern and southern boundaries for the cities of Rosemount and Eagan respectively. The westernmost portion of this road is gravel and contains a dead-end, stopping from the border with Apple Valley by about ½ mile. The road also borders Dakota County’s Lebanon Hills Regional Park in Eagan to the north. In 2019, water from an unnamed adjacent public lake began encroaching on the road and there was concern access to homes and county maintenance facilities to the west could be cut off temporarily due to flooding if heavy rains persisted. To reduce the risk of future flooding of the roadway, the City began pursuing installation of outlets for the basin jointly with the City of Eagan, Dakota County, and Vermillion River Watershed Joint Powers Organization. The project proposes to install 2 pipes under 120th Street W, and two culverts under two private driveways to route excess water west and north into Lebanon Hills Regional Park. Public Waters Works Permits from the Minnesota Department of Natural Resources were required to work below the Ordinary High-Water Elevations of the public lakes that flank the road, and the City is working with affected residents to get permanent drainage and utility easements for the driveway culverts. The City of Eagan will be reimbursing the City of Rosemount for a portion of the costs associated with constructing the pipes under 120th St W in accordance with a long-standing agreement between the cities for maintenance of the road. COSTS & FUNDING The City requested quotes from four contractors for installation of the proposed improvements and received quotes from two companies. A tabulated summary of the quotes received, including the Engineer’s Estimate is shown in the following table. The lowest quote submitted was for $131,050.00 by McNamara Contracting. This cost is unfortunately $13,095.00 above the Engineer’s Opinion of Cost, but a continued sign of challenging and ever-changing construction cost market in which we are competing for contractors. Staff still recommends proceeding with the work despite the escalated costs, as there are no guarantees it would not go higher if we postponed the work. 2 Summary of Quotes Contactor Quote Amount Percentage Above Lowest Quote Engineer’s Opinion of Cost $117,955.00 -10.0% McNamara Contracting, Inc. $131,050.00 NA Bituminous Roadways, Inc. $145,421.50 11.0% Funding This project will be funded using the Storm Water Utility, and the engineer’s estimate of probable project cost was $117,955.00. Stormwater System Improvement is a line item in the annual Storm Water Utility budget. The City of Eagan will reimburse the City approximately $29,850.50 per the terms of a mutual agreement for the maintenance of 120th St. SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Construction Start October 2022 Substantial Completion November 30, 2022 Final Completion June 16, 2023 RECOMMENDATION Staff recommends Council accept quotes and authorize work for the 120th Street Drainage Improvements Project, City Project 2022-11. K:\018245-000\Admin\Construction Admin\Bidding\018245-000 LOR 091222.docx018245-000 LOR 091222 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 55 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M September 13, 2022 Honorable Mayor and City Council City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: 120th Street Drainage Improvements City of Rosemount Project No. 2022-11 WSB Project No. 018245-000 Dear Mayor and Council Members: Quotes were received for the above-referenced project on Friday, August 12, 2022. A total of 2 quotes were received. The quotes were checked for mathematical accuracy and tabulated and there are no errors made on the Proposal Form. The Engineer’s Estimate was $117,955.00. The bid tabulation indicates the low bidder as McNamara Contracting, Inc. in Rosemount, MN, in the amount of $131,050.00. We recommend that the City consider these quotes and award a contract to McNamara Contracting, Inc. based on the results of the quotes received. Sincerely, WSB Bill Alms, PE Project Manager Enclosure cc: Mike McNamara, McNamara Contracting, Inc Nick Egger, City of Rosemount Jane Byron, City of Rosemount Brian Erickson, City of Rosemount Kendra Fallon, WSB mj Bid Tabulation 120th Street Drainage Improvements City of Rosemount Project No. 2022-11 WSB Project No. 018245-000 Bid Opening: August 12, 2022 at 10:00 AM local time DENOTES CORRECTED FIGURE Line No.Item #Item Description Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Schedule A - 120th Street Drainage Improvements 1 2021.501 MOBILIZATION LS 1 7,500.00$ 7,500.00$ $7,500.00 $7,500.00 $2,850.00 $2,850.00 2 2104.502 REMOVE DRAINAGE STRUCTURE EACH 4 700.00$ 2,800.00$ $1,000.00 $4,000.00 $650.00 $2,600.00 3 2104.503 REMOVE SEWER PIPE (STORM)L F 56 25.00$ 1,400.00$ $42.00 $2,352.00 $16.00 $896.00 4 2105.504 GEOTEXTILE FILTER TYPE 4 S Y 12 10.00$ 120.00$ $3.50 $42.00 $5.00 $60.00 5 2105.507 COMMON EXCAVATION C Y 31 25.00$ 775.00$ $55.00 $1,705.00 $48.00 $1,488.00 6 2106.507 SELECT GRANULAR EMBANKMENT (CV)C Y 44 30.00$ 1,320.00$ $71.00 $3,124.00 $51.00 $2,244.00 7 2211.507 AGGREGATE BASE (CV) CLASS 5 MODIFIED C Y 30 40.00$ 1,200.00$ $66.00 $1,980.00 $82.00 $2,460.00 8 2501.502 15" RC PIPE APRON EACH 4 6,000.00$ 24,000.00$ $6,200.00 $24,800.00 $10,000.00 $40,000.00 9 2503.503 15" RC PIPE SEWER DES 3006 CL V L F 86 120.00$ 10,320.00$ $125.00 $10,750.00 $151.00 $12,986.00 10 2511.507 RANDOM RIPRAP CLASS III C Y 14 125.00$ 1,750.00$ $132.00 $1,848.00 $174.00 $2,436.00 11 2573.503 FLOTATION SILT CURTAIN TYPE STILL WATER L F 100 25.00$ 2,500.00$ $16.00 $1,600.00 $18.00 $1,800.00 Schedule A - Total $53,685.00 $59,701.00 $69,820.00 Schedule B - Driveway Culvert Improvements 12 2021.501 MOBILIZATION LS 1 7,500.00$ 7,500.00$ $7,500.00 $7,500.00 $2,850.00 $2,850.00 13 2101.501 CLEARING AND GRUBBING L S 1 7,500.00$ 7,500.00$ $5,200.00 $5,200.00 $2,145.00 $2,145.00 14 2104.502 REMOVE DRAINAGE STRUCTURE EACH 2 700.00$ 1,400.00$ $1,000.00 $2,000.00 $650.00 $1,300.00 15 2104.503 REMOVE SEWER PIPE (STORM)L F 47 25.00$ 1,175.00$ $42.00 $1,974.00 $16.00 $752.00 16 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 40 12.00$ 480.00$ $25.00 $1,000.00 $27.00 $1,080.00 17 2105.504 GEOTEXTILE FILTER TYPE 4 S Y 12 10.00$ 120.00$ $3.50 $42.00 $5.00 $60.00 18 2105.507 COMMON EXCAVATION C Y 19 25.00$ 475.00$ $55.00 $1,045.00 $48.00 $912.00 19 2106.507 SELECT GRANULAR EMBANKMENT (CV)C Y 46 30.00$ 1,380.00$ $71.00 $3,266.00 $51.00 $2,346.00 20 2211.507 AGGREGATE BASE (CV) CLASS 5 MODIFIED C Y 10 40.00$ 400.00$ $66.00 $660.00 $82.00 $820.00 21 2360.504 TYPE SP 9.5 WEAR CRS MIX (2,B) 3.0" THICK S Y 40 60.00$ 2,400.00$ $105.00 $4,200.00 $82.50 $3,300.00 22 2501.502 15" RC PIPE APRON EACH 4 6,000.00$ 24,000.00$ $6,200.00 $24,800.00 $10,000.00 $40,000.00 23 2503.503 15" RC PIPE SEWER DES 3006 CL V L F 95 120.00$ 11,400.00$ $125.00 $11,875.00 $151.00 $14,345.00 24 2511.507 RANDOM RIPRAP CLASS III C Y 6 125.00$ 750.00$ $132.00 $792.00 $158.00 $948.00 25 2573.503 FLOTATION SILT CURTAIN TYPE STILL WATER L F 100 25.00$ 2,500.00$ $16.00 $1,600.00 $18.00 $1,800.00 26 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 350 2.00$ 700.00$ $7.50 $2,625.00 $6.60 $2,310.00 27 2575.505 SEEDING ACRE 0.2 8,000.00$ 1,600.00$ $10,000.00 $2,000.00 $1,645.00 $329.00 28 2575.502 SEED MIXTURE 34-261 L B 7 70.00$ 490.00$ $110.00 $770.00 $43.50 $304.50 Schedule B - Total $64,270.00 $71,349.00 $75,601.50 Engineer's Estimate McNamara Contracing, Inc Bituminous Roadways, Inc. Bid Tabulation 120th Street Drainage Improvements City of Rosemount Project No. 2022-11 WSB Project No. 018245-000 Bid Opening: August 12, 2022 at 10:00 AM local time DENOTES CORRECTED FIGURE Line No.Item #Item Description Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Engineer's Estimate McNamara Contracing, Inc Bituminous Roadways, Inc. $117,955.00 $131,050.00 $145,421.50 I hereby certify that this is an exact reproduction of bids received. Certified By: License No. 54301 Date: August 16, 2022 Total Base Bid SCALE IN FEET 0 200 400 K: \ 0 1 8 2 4 5 - 0 0 0 \ C a d \ P l a n \ 0 1 8 2 4 5 - 0 0 0 - C - T I T L E S H E E T . d w g 7/ 2 9 / 2 0 2 2 7 : 5 7 : 1 1 A M N 120TH STREET DRAINAGE IMPROVEMENTS CITY OF ROSEMOUNT PROJECT LOCATION MAP COUNTY:DAKOTA PROJECT LOCATION THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." GOPHER ONE CALL TICKET NUMBER: 211401715 APPROVED BYSHEET NO.DATE PLAN REVISIONS ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT. THIS PLAN SET CONTAINS 6 SHEETS I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. LICENSE NUMBER:DATE:07/29/2022 54301 WILLIAM C. ALMS, P.E. SHEET 6 OF WSB PROJ. NO. 018245-000 PROJECT LOCATION (SITE 1) 1 THIS PLAN SET HAS BEEN PREPARED FOR: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068-4997 (651) 423-4411 A CALL TO GOPHER STATE ONE (651-454-0002) IS REQUIRED A MINIMUM OF 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION. EXCAVATION NOTICE SYSTEM PLAN SET INDEX GOVERNING SPECIFICATIONS UTILITY INFORMATION THE 2015 CITY OF ROSEMOUNT GENERAL SPECIFICATIONS & STANDARD DETAIL PLATES FOR STREET AND UTILITY CONSTRUCTION AND THE 2018 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. Sheet List Table SHEET NUMBER SHEET TITLE 1 TITLE SHEET 2 EXISTING CONDITIONS PLAN (SITES 1, 2, & 3) 3 STORM SEWER PLAN (SITE 1) 5 - 6 MISCELLANEOUS DETAILS CITY PROJ. NO. 2022-11 BRIAN ERICKSON, P.E. - DIRECTOR OF PUBLIC WORKS / CITY ENGINEER DATE PROJECT LOCATION (SITE 2) PROJECT LOCATION (SITE 3) 4 STORM SEWER PLAN (SITES 2 & 3)