Loading...
HomeMy WebLinkAbout6.z. Bella Vista 6th Addition, CP 2019-03, Accept Public Improvements EXECUTIVE SUMMARY \\rsm-file\Common\City Clerk\Agenda Items\Approved Items\6.z. Bella Vista 6th Addition, CP 2019-03, Accept Public Improvements.docx City Council Meeting: September 20, 2022 AGENDA ITEM: Bella Vista 6th Addition, City Project 2019- 03, Accept Public Improvements AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE (MN), City Engineer AGENDA NO. 6.z. ATTACHMENTS: Resolution, Acceptance Letter, Location Map APPROVED BY: LJM RECOMMENDED ACTION: Adopt Resolution to Accept Bella Vista 6th Addition, City Project 2019-03, Public Improvements for Perpetual Maintenance. BACKGROUND Public improvements installed as part of Bella Vista 6th Addition, City Project 2019-03, included streets, sanitary sewer, watermain, storm sewer and a temporary sanitary lift station. This subdivision was completed during the 2019 construction season, with the wear course paved in 2021. Staff has requested final documentation required for public acceptance including lien waivers, as-built record drawings and WSB & Associates, Inc., the City’s inspector for the project, submitted a letter on September 9, 2022 that indicates all work is in alignment with the specifications and standards, and recommends acceptance of the public improvements. RECOMMENDATION Upon City acceptance of the work, the public improvements constructed in Bella Vista 6th Addition, City Project 2019-03, shall become City property per the subdivision agreement. Staff recommends that City Council adopt the resolution accepting the improvements for perpetual maintenance. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022 – XX A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR BELLA VISTA 6TH ADDITION CITY PROJECT 2019-03 WHEREAS, the developer has requested City acceptance of the public improvements, and; WHEREAS, the City received a letter from WSB & Associates, Inc. confirming the public improvements were installed in accordance with the approved plans and specifications and finds the improvements acceptable, and; WHEREAS, the developer is preparing final close out documents to include warranty bonds, a final payment voucher, and as-built record drawings. BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota. The work completed under said agreement is hereby accepted for perpetual maintenance and ownership. ADOPTED this 20th day of September, 2022. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\013474-000\Admin\Construction Admin\Project close out\2022.09-09 - Memo - Bella Vista 6th Addition - Project Closeout.docx 5 4 0 G A T E W A Y B L V D | B U R N S V I L L E , M N | 55 3 3 7 | 9 5 2 . 7 3 7 . 4 6 6 0 | W S B E N G . C O M Memorandum To: Brian Erickson, PE, City Engineer City of Rosemount From: Tim Hanson PE, Sr Project Manager Date: September 9, 2022 Re: Bella Vista 6th Addition Street and Utility Construction City Project No. 2019-03 WSB Project No. 013474-000 The City of Rosemount is in the process of closing out and accepting the street and utility improvements for Bella Vista 6th Addition, Street and Utility Construction Project. The improvements consisted of sanitary sewer extension with a temporary pumping station, watermain extension, storm sewer improvements and street construction of 131st Court within Bella Vista 6th Addition single family residential subdivision. The 19-lot development was proposed by Lennar and designed by Westwood Professional Services, Inc. The improvements were designed by Westwood Professional Services and inspected by WSB in accordance with the City’s Standard Specifications and Engineering Guidelines. The public improvements were constructed by SR Weidema, Inc. from July 2019 to July 2021. WSB recommends approval and acceptance of the street and utility improvements. Please contact me at thanson@wsbeng.com or 612-219-2553 with any comments or questions. Sincerely, WSB Timothy C. Hanson, PE Sr Project Manger 9/9/2022 Bella Vista 6th Addition 1:0