HomeMy WebLinkAbout6.i. Connemara Trail Trunk Storm Sewer Final Acceptance & Authorization of Final Payment\\rsm-file\common\city clerk\agenda items\approved items\6.i. connemara trail trunk storm sewer final acceptance & authorization of final payment.docx
EXECUTIVE SUMMARY
City Council Meeting: October 4, 2022
AGENDA ITEM: Connemara Trail Trunk Storm Sewer, City
Project 2021-06 Final Acceptance and
Authorization of Final Payment
AGENDA SECTION:
Consent
PREPARED BY: Brian Erickson, PE, City Engineer AGENDA NO. 6.i.
ATTACHMENTS: Resolution, Engineer’s
Recommendation, Final Payment
Application
APPROVED BY: LJM
RECOMMENDED ACTIONS: Resolution to Approve Final Payment to Ryan Contracting
Company for Connemara Trail Trunk Storm Sewer, City Project 2021-06 and Accepting the
Improvements for Perpetual Maintenance
BACKGROUND
At their September 21, 2021 meeting, City Council awarded the Connemara Trail Trunk Storm Sewer, City
Project 2021-06 to Ryan Contracting Co. of Elko, Minnesota in the amount of $592,228.00. This project
consisted of extending the existing trunk storm sewer across the Emerald Isle development and into parcel
to the east formerly owned by the Bester family.
The initial scope of the project constructed approximately 840 feet of 54” diameter storm sewer
approximately 40’ below the planned finish grade of Connemara Trail. This depth resulted in a substantial
amount of earth work. Prior to construction start, staff coordinated an easement agreement with the
property owner to the east which allowed the trunk line to be extended approximately 85’. This extension
allowed the Emerald Isle developer to extend Connemara Trail to their eastern property line. The
additional pipe was paid as part of the bid prices and did not result in a contract modification. The
additional cost was $52,264 which resulted in a final contract cost of $644,492.00.
At this time, Ryan Contracting Company has completed all the improvements as detailed in the contract
and WSB and Associates has recommended acceptance and issuing the final payment for this work. Based
on final quantities, the cost of the work is $643,476.00 which is or 0.16% below the awarded amount plus
the change order of $644,492.00. The final payment is $26,050.52.
RECOMMENDATION
Staff recommends that the City Council adopt the attached resolution accepting the improvements and
authorizing final payment to Ryan Contracting Co. for the Connemara Trail Trunk Storm Sewer, City
Project 2021-06.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2022 – XX
A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT
FOR CONNEMARA TRAIL TRUNK STORM SEWER,
PROJECT 2021-06
WHEREAS, Ryan Contracting Co. has completed the required construction as per the scope of the
contract, and;
WHEREAS, the City received a concurrence from WSB and Associates that the work has been
completed in accordance with the approved plans and specifications and finds the improvements
acceptable;
WHEREAS, the contractor has completed all necessary administrative requirements to close out the
contract.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ROSEMOUNT, MINNESOTA:
1. The improvements completed under said agreement are hereby accepted for perpetual
maintenance and ownership.
2. Final payment to the contractor is authorized.
ADOPTED this 4th day of October, 2022.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
5
4
0
G
A
T
E
W
A
Y
B
L
V
D
|
B
U
R
N
S
V
I
L
L
E
,
M
N
|
55
3
3
7
|
9
5
2
.
7
3
7
.
4
6
6
0
|
W
S
B
E
N
G
.
C
O
M
K:\018074-000\Admin\Construction Admin\Pay Vouchers\Project Closeout\018074-000 LOR Final payment Connemara Trail Trunk Storm Sewer Ext. 2022.09.28
.docx
September 28, 2022
Honorable Mayor and City Council
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Re: Connemara Trail Trunk Storm Sewer Extension
City of Rosemount Project No. 2021-06
WSB Project No. 018074-000
Dear Mayor and Council Members:
Ryan Contracting Company, Elko New Market, MN, has completed the construction of the
interceptor storm sewer extension within Connemara Trail adjacent to the Emerald Ise residential
development. The original contract amount was $592,228.00. Change Order No. 1 in the
amount of $52,264.00 extended the interceptor storm sewer into the proposed Talamore
residential development reducing future impacts and costs. The final contract amount is
$643,467.00.
Ryan Contracting has submitted a two-year maintenance bond, IC-134 forms and lien waivers for
the work completed.
We recommend that the City make final payment to Ryan Contracting in the amount of
$26,050.52 and accept the improvements for perpetual maintenance.
Sincerely,
WSB
Timothy Hanson, PE
Senior Project Manager
Enclosure
TH/tmw
Connemara Trail Trunk Storm
Sewer Extension
Final Pay Voucher 3
Page 1 of 3
Client: City of Rosemount Contractor: Ryan Contracting Company
2875 145th Street West PO Box 246
Rosemount, MN 55068-4941 Elko, MN 55020-0246
Contract Amount Funds Encumbered
Original Contract $592,228.00 Original $592,228.00
Contract Changes $52,264.00 Additional N/A
Revised Contract $644,492.00 Total $592,228.00
Work Certified To Date
Base Bid Items $643,476.00
Contract Changes $0.00
Material On Hand $0.00
Total $643,476.00
Work Certified
This Voucher
Work Certified
To Date
Less Amount
Retained
Less Previous
Payments
Amount Paid
This Voucher
Total Amount
Paid To Date
$13,450.00 $643,476.00 $0.00 $617,425.48 $26,050.52 $643,476.00
Percent Retained: 0% Percent Complete: 99.84%
FINAL PAY VOUCHER
I hereby certify that a Final Examination has been made of the noted Contract, that the Contract has been completed, that the entire
amount of Work Shown in this Final Voucher has been performed and the Total Value of the Work Performed in accordance with, a nd
pursuant to, the terms of the Contract is as shown in this Final Voucher.
Approved By WSB Approved By Ryan Contracting Company
Signature Signature
September 27, 2022
Date Date
Approved By City of Rosemount
Signature
Date
WSB Project No.: 018074-000
Client Project No.: 2021-06
State Project No.:
Federal Project No.:
CFO/Sec
9/27/22
Connemara Trail Trunk Storm
Sewer Extension
Final Pay Voucher 3
Page 2 of 3
Payment Summary
No. Up Through Date Work Certified
Per Voucher
Amount Retained
Per Voucher
Amount Paid
Per Voucher
1 11/29/2021 $524,560.50 $26,228.03 $498,332.47
2 12/13/2021 $105,465.50 ($13,627.51) $119,093.01
3 09/27/2022 $13,450.00 ($12,600.52) $26,050.52
Funding Category Name Work Certified
To Date
Less Amount
Retained
Less Previous
Payments
Amount Paid
This Voucher
Total Amount Paid
To Date
Connemara Trail
Extension $643,476.00 $0.00 $617,425.48 $26,050.52 $643,476.00
Accounting
Number Funding Source Amount Paid
This Voucher
Revised Contract
Amount
Funds
Encumbered
To Date
Paid Contractor
To Date
Connemara Trail
Extension Local $26,050.52 $644,492.00 $592,228.00 $643,476.00
Contract Item Status
Line
No. Item Description Unit Unit Price Contract
Quantity
Quantity
This
Voucher
Amount This
Voucher
Quantity
To Date Amount To Date
1 2021.501
/LA02 MOBILIZATION (5% MAXIMUM) LS $25,000.00 1 0 $0.00 1 $25,000.00
2 2104.502 SALVAGE PERMANENT BARRICADE EA $50.00 2 0 $0.00 0 $0.00
3 2106.507
/00080
SELECT GRANULAR EMBANKMENT
(CV) C Y $4.00 2700 2470 $9,880.00 2470 $9,880.00
4 2123.610
/00410
STREET SWEEPER (WITH PICKUP
BROOM) HOUR $85.00 3 0 $0.00 3 $255.00
5 2503.503
/19545 54" RC PIPE SEWER DES 3006 CL V L F $550.00 924 0 $0.00 934 $513,700.00
6 2503.602
/00320
CONNECT TO EXISTING STORM
SEWER EACH $15,000.00 1 0 $0.00 1 $15,000.00
7 2503.602
/00250 CONSTRUCT BULKHEAD EACH $500.00 1 0 $0.00 1 $500.00
8 2503.603
/20280 VIDEO TAPE PIPE SEWER L F $3.00 924 1190 $3,570.00 1190 $3,570.00
9 2506.502
/06000 CASTING ASSEMBLY EACH $1,000.00 3 0 $0.00 3 $3,000.00
10 2506.503
/WR04
CONSTRUCT DRAINAGE
STRUCTURE DESIGN 84-4020 LF $850.00 70 0 $0.00 68.85 $58,522.50
11 2506.503
/02420
CONST DRAINAGE STRUCTURE
DES 48-4020 L F $190.00 60 0 $0.00 60.15 $11,428.50
12 2554.503 INSTALL SALVAGED BARRICADE EA $200.00 2 0 $0.00 0 $0.00
13 2573.501
/00025 STABILIZED CONSTRUCTION EXIT LS $500.00 1 0 $0.00 0 $0.00
14 2573.503
/00023 SILT FENCE, TYPE MS L F $1.00 1600 0 $0.00 0 $0.00
15 2573.503
/00061
SEDIMENT CONTROL LOG TYPE
WOOD FIBER L F $2.00 200 0 $0.00 0 $0.00
Connemara Trail Trunk Storm
Sewer Extension
Final Pay Voucher 3
Page 3 of 3
Contract Item Status
Line
No. Item Description Unit Unit Price Contract
Quantity
Quantity
This
Voucher
Amount This
Voucher
Quantity
To Date Amount To Date
16 2574.508
/00011 FERTILIZER TYPE 1 LB $0.60 700 0 $0.00 0 $0.00
17 2575.505
/00021 SEEDING ACRE $400.00 5 0 $0.00 3 $1,200.00
18 2575.508
/22111 SEED MIXTURE 22-111 LB $2.00 110 0 $0.00 410 $820.00
19 2575.509
/00030 MULCH MATERIAL TYPE 3 TON $175.00 7 0 $0.00 0 $0.00
20 2575.509
/00010 MULCH MATERIAL TYPE 1 TON $100.00 12 0 $0.00 6 $600.00
Bid Totals: $13,450.00 $643,476.00
Project Category Totals
Category Amount This Voucher Amount To Date
Schedule A - Surface Improvements $13,450.00 $643,476.00
Contract Change Item Status
CC CC
No.
Line
No. Item Description Units Unit Price Contract
Quantity
Quantity
This
Voucher
Amount This
Voucher
Quantity
To Date Amount To Date
Contract Change Totals: $0.00 $0.00
Contract Change Totals
No. Contract
Change Description Amount This
Voucher
Amount To
Date
1 CO Trunk Storm Sewer Extension $0.00 $0.00
Material On Hand Additions
Line
No. Item Description Date Added Comments
Material On Hand Balance
Line
No. Item Description Date Added Used Remaining