Loading...
HomeMy WebLinkAbout7.a. FHR Solar FlyerFLINT HILLS Pine Bend Refinery resources° SOLAR PROJECT DIRECTUSE of''w 45 SOLAR INSTALLATION At least 120,000+ PANELS :: LOCATED ON ABOUT 5 O ACRES OF M.Mmm Under optimal conditions, will supp►Y of the %.► REFINERY'S POWER NEEDS IN TH POLLINATOR- �6 friend�y NATIVE HABITAT 0 In combination with the COMBINED HEAT & POWER SYSTEM, up to 7 0%0F will be generated from highly efficient on -site ENERGY SOURCES