Loading...
HomeMy WebLinkAbout6.h. Connemara Trail Extension Project, City Project 2018-09 Final Acceptance & Authorization of Final Payment Closeout\\rsm-file\Common\City Clerk\Agenda Items\Approved Items\6.h. Connemara Trail Extension Project, City Project 2018-09 Final Acceptance & Authorization of Final Payment.docx EXECUTIVE SUMMARY City Council Meeting: November 15, 2022 AGENDA ITEM: Connemara Trail Extension Project, City Project 2018-09 Final Acceptance and Authorization of Final Payment AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer AGENDA NO. 6.h. ATTACHMENTS: Resolution, Engineer’s Recommendation, Final Payment Request, Project Map APPROVED BY: LJM RECOMMENDED ACTION: Resolution to Approve Final Payment to A-1 Excavating, Inc. for the Connemara Trail Extension Project, City Project 2018-09 and Accepting the Improvements for Perpetual Maintenance BACKGROUND On March 17, 2020, City Council awarded a contract to A-1 Excavating, Inc. for the Connemara Trail Extension Project, City Project 2018-09. This project constructed Connemara Trail from Akron Ave east approximately 1,550 feet east. The project also included the extension of the stormwater trunk interceptor line to the east along with water and sewer main. With the development of the Emerald Isle subdivision, staff coordinated with the developer to extend Connemara to the intersection with Aspen Avenue and the extension of the stormwater trunk interceptor to avoid future utility crossings. This decision took advantage of the contractor’s low bid price for the interceptor. This resulted in Change Order 1 awarded June 15, 2021 in the amount of $389,736. A-1 Excavating has completed all the improvements as designed by WSB and Associates (WSB) and detailed in the contract. As a result, WSB has recommended acceptance of the work and issuing the final payment. There are two change orders to this contract which resulted in an increase of $425,366.25. Based on the final quantities the total construction cost is $2,105,142.09. This amount is $122,312.84 or 6.2% or above the bid amount plus change orders of $1,982,829.25. The final payment amount is $83,035.24. The table below shows the final construction cost details. RECOMMENDATION Staff recommends that the City Council adopt the attached resolution accepting the improvements for perpetual maintenance and authorizing final payment to A-1 Excavating, Inc. for the Connemara Trail Engineer's Estimate Bid Amount Final Cost Original Design 1,839,494.00$ 1,557,463.00$ 1,692,392.38$ Change Orders NA 425,366.25$ 412,749.71$ Total 1,839,494.00$ 1,982,829.25$ 2,105,142.09$ Over/(Under) Amount 265,648.09$ 122,312.84$ Over/(Under) Percentage 14.4%6.2% 2 Extension Project, City Project 2018-09. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022 – XX A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR CONNEMARA TRAIL EXTENSION CITY PROJECT 2018-09 WHEREAS, A-1 Excavating, Inc. has completed the required construction as per the scope of the contract, and; WHEREAS, the City received a concurrence from WSB and Associates that the work has been completed in accordance with the approved plans and specifications and finds the improvements acceptable; WHEREAS, the contractor has completed all necessary administrative requirements to close out the contract. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROSEMOUNT, MINNESOTA: 1. The improvements completed under said agreement are hereby accepted for perpetual maintenance and ownership. 2. Final payment to the contractor is authorized. ADOPTED this 15th day of November, 2022. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\011518-000\Admin\Construction Admin\Pay Vouchers\Final - Project close out\2022.11.04 - Memo - Connemara Trail Extension - Project Closeout.docx 5 4 0 G A T E W A Y B L V D | B U R N S V I L L E , M N | 55 3 3 7 | 9 5 2 . 7 3 7 . 4 6 6 0 | W S B E N G . C O M Memorandum To: Brian Erickson, PE, City Engineer City of Rosemount From: Tim Hanson PE, Sr Project Manager Date: November 04, 2022 Re: Connemara Trail Extension Street and Utility Construction City Project No. 2018-09 WSB Project No. 011518-000 The City of Rosemount is in the process of closing out and accepting the street and utility improvements for Connemara Trail Extension, Street and Utility Construction Project. The improvements consisted of sanitary sewer extension, trunk watermain extension, storm sewer improvements, interceptor storm sewer improvements and street construction of Connemara Trail between Akron Avenue and Aspen Avenue. The minor collector street improvement extends east from Akron Avenue through the Prestwick Place preliminary plat. The improvements were designed by WSB and Associates and inspected by WSB in accordance with the City’s Standard Specifications and Engineering Guidelines. The public improvements were constructed by A-1 Excavating from July 2021 to June 2022. WSB recommends approval and acceptance of the street and utility improvements. Please contact me at thanson@wsbeng.com or 612-219-2553 with any comments or questions. Sincerely, WSB Timothy C. Hanson, PE Sr Project Manger Connemara Trail Extension Final Pay Voucher 7 Page 2 of 7 Payment Summary No. Up Through Date Work Certified Per Voucher Amount Retained Per Voucher Amount Paid Per Voucher 1 09/14/2021 $334,469.31 $16,723.47 $317,745.84 2 09/30/2021 $1,094,847.56 $54,742.37 $1,040,105.19 3 10/31/2021 $322,516.46 $16,125.83 $306,390.63 4 11/29/2021 $192,755.51 $9,637.77 $183,117.74 5 01/07/2022 $26,627.30 $1,331.37 $25,295.93 6 08/04/2022 $92,158.20 ($57,293.32) $149,451.52 7 10/21/2022 $41,767.75 ($41,267.49) $83,035.24 Funding Category Name Work Certified To Date Less Amount Retained Less Previous Payments Amount Paid This Voucher Total Amount Paid To Date Connemara Trail Extension $2,105,142.09 $0.00 $2,022,106.85 $83,035.24 $2,105,142.09 Accounting Number Funding Source Amount Paid This Voucher Revised Contract Amount Funds Encumbered To Date Paid Contractor To Date Connemara Trail Extension Local $83,035.24 $1,982,829.25 $1,557,463.00 $2,105,142.09 Contract Item Status Line No. Item Description Unit Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date 1 2021.501 /00010 MOBILIZATION LS $54,600.00 1 0 $0.00 1 $54,600.00 2 2104.502 SALVAGE TYPE III BARRICADE EACH $100.00 2 0 $0.00 6 $600.00 3 2104.502 REMOVE TYPE III BARRICADE EACH $100.00 1 0 $0.00 1 $100.00 4 2104.503 /00325 REMOVE CONCRETE CURB L F $5.00 60 0 $0.00 374 $1,870.00 5 2104.503 /00195 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F $5.00 20 0 $0.00 27 $135.00 6 2104.503 /00205 SAWING BIT PAVEMENT (FULL DEPTH) L F $3.00 120 0 $0.00 226 $678.00 7 2104.504 /00120 REMOVE BITUMINOUS PAVEMENT S Y $4.00 110 0 $0.00 620 $2,480.00 8 2104.518 /00100 REMOVE BITUMINOUS WALK S F $1.00 200 0 $0.00 350 $350.00 9 2104.518 /00140 REMOVE CONCRETE WALK S F $1.00 100 0 $0.00 229 $229.00 10 2106.507 /004 EXCAVATION - COMMON (P) C Y $4.00 3400 0 $0.00 3400 $13,600.00 11 2106.507 /005 EXCAVATION - SUBGRADE (P) C Y $3.00 2260 0 $0.00 6260 $18,780.00 12 2106.507 /00080 SELECT GRANULAR EMBANKMENT (CV) C Y $4.00 7830 0 $0.00 7830 $31,320.00 13 2106.507 /00130 COMMON EMBANKMENT (CV) C Y $5.00 26600 0 $0.00 44100 $220,500.00 Connemara Trail Extension Final Pay Voucher 7 Page 3 of 7 Contract Item Status Line No. Item Description Unit Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date 14 2112.519 /00010 SUBGRADE PREPARATION RDST $500.00 15 0 $0.00 15 $7,500.00 15 2211.509 /00080 AGGREGATE BASE CLASS 5 MOD TON $12.00 3750 0 $0.00 3770.97 $45,251.64 16 2357.506 /00010 BITUMINOUS MATERIAL FOR TACK COAT GAL $3.15 900 0 $0.00 1040 $3,276.00 17 2360.504 /MSS01 TYPE SP 9.5 WEAR CRS MIX (2,B) 2.0" THICK S Y $9.60 1400 0 $0.00 1382 $13,267.20 18 2360.509 /22300 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON $66.00 2260 0 $0.00 2360.77 $155,810.82 19 2360.509 /22305 TYPE SP 12.5 NON WEAR COURSE MIX (2,C) TON $63.00 1130 0 $0.00 1059.81 $66,768.03 20 2505.601 /M8617 UTILITY COORDINATION L S $200.00 1 0 $0.00 1 $200.00 21 2521.518 /00060 6" CONCRETE WALK S F $5.30 8250 0 $0.00 9675 $51,277.50 22 2531.503 /02315 CONCRETE CURB & GUTTER DESIGN B618 L F $15.40 3530 0 $0.00 3964 $61,045.60 23 2531.618 /00010 TRUNCATED DOMES S F $60.00 124 0 $0.00 182 $10,920.00 24 2531.601 ADA COMPLIANCE SUPERVISOR L S $500.00 1 0 $0.00 1 $500.00 25 2545.503 /01103 4" NON-METALLIC CONDUIT L F $8.00 500 0 $0.00 390 $3,120.00 26 2563.601 /00010 TRAFFIC CONTROL LS $3,000.00 1 0 $0.00 1 $3,000.00 27 2563.602 TYPE III BARRICADE (TEMPORARY) EACH $400.00 4 0 $0.00 4 $1,600.00 28 2564.502 /00140 INSTALL SIGN PANEL TYPE SPECIAL EACH $300.00 1 0 $0.00 1 $300.00 29 2564.518 /00130 SIGN PANELS TYPE C S F $32.00 46.75 0 $0.00 46.75 $1,496.00 30 2564.502 INSTALL SALVAGED TYPE III BARRICADE EACH $200.00 6 0 $0.00 6 $1,200.00 31 2573.501 /00025 STABILIZED CONSTRUCTION EXIT LS $700.00 1 0 $0.00 1 $700.00 32 2573.503 /00023 SILT FENCE, TYPE MS L F $1.50 4600 0 $0.00 4949.7 $7,424.55 33 2573.503 /00061 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F $3.00 1000 459 $1,377.00 519 $1,557.00 34 2575.504 /00073 EROSION CONTROL BLANKETS CATEGORY 3N S Y $1.50 1000 0 $0.00 1583 $2,374.50 35 2575.604 /LKVL01 HYDROMULCH S Y $1.00 24000 0 $0.00 24000 $24,000.00 36 2582.503 /10104 4" SOLID LINE PAINT L F $0.30 3000 0 $0.00 2847 $854.10 Connemara Trail Extension Final Pay Voucher 7 Page 4 of 7 Contract Item Status Line No. Item Description Unit Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date 37 2582.503 /10112 12" SOLID LINE PAINT L F $8.00 40 0 $0.00 25 $200.00 38 2582.503 /10404 4" DBLE SOLID LINE PAINT L F $0.50 1360 0 $0.00 1335 $667.50 39 2582.518 /01000 PAVT MSSG PAINT S F $6.00 60 0 $0.00 61.8 $370.80 40 2451.609 /00040 GRANULAR FOUNDATION AND/OR BEDDING TON $0.01 100 0 $0.00 0 $0.00 41 2503.602 /00300 CONNECT TO EXISTING SANITARY SEWER EACH $5,700.00 1 0 $0.00 1 $5,700.00 42 2503.511 /99838 10" PVC PIPE SEWER SDR 26 L F $98.00 74 19 $1,862.00 51 $4,998.00 43 2503.603 /M8623 8" PVC PIPE SEWER - SDR 26 L F $86.00 571 0 $0.00 575 $49,450.00 44 2503.603 /M8879 TELEVISE SANITARY SEWER L F $1.00 645 -38 ($38.00) 607 $607.00 45 2506.602 /10000 CASTING ASSEMBLY (SANITARY) EACH $707.00 3 0 $0.00 3 $2,121.00 46 2506.603 /001010 CONSTRUCT 48" DIA SANITARY MANHOLE L F $288.00 71 3.3 $950.40 80.3 $23,126.40 47 2104.502 /02090 SALVAGE HYDRANT EACH $400.00 1 0 $0.00 1 $400.00 48 2104.503 /00270 REMOVE WATER MAIN L F $15.00 20 0 $0.00 20 $300.00 49 2451.609 /00040 GRANULAR FOUNDATION AND/OR BEDDING TON $0.01 100 0 $0.00 0 $0.00 50 2504.602 /00010 CONNECT TO EXISTING WATER MAIN EACH $1,307.00 2 0 $0.00 3 $3,921.00 51 2504.602 /M9500 HYDRANT ASSEMBLY EACH $4,149.00 3 0 $0.00 3 $12,447.00 52 2504.602 /00023 INSTALL HYDRANT EACH $600.00 1 0 $0.00 1 $600.00 53 2504.602 /00806 6" GATE VALVE & BOX EACH $1,356.00 5 0 $0.00 3 $4,068.00 54 2504.602 /00808 8" GATE VALVE & BOX EACH $1,804.00 2 0 $0.00 3 $5,412.00 55 2504.602 /00812 12" GATE VALVE & BOX EACH $2,998.00 2 0 $0.00 1 $2,998.00 56 2504.603 /01062 6" WATERMAIN DUCTILE IRON CL 52 L F $38.00 100 0 $0.00 100 $3,800.00 57 2504.603 /01082 8" WATERMAIN DUCTILE IRON CL 52 L F $46.00 190 0 $0.00 217 $9,982.00 58 2504.603 /01122 12" WATERMAIN DUCTILE IRON CL 52 L F $62.00 1550 0 $0.00 1537 $95,294.00 Connemara Trail Extension Final Pay Voucher 7 Page 5 of 7 Contract Item Status Line No. Item Description Unit Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date 59 2504.604 /01100 4" POLYSTYRENE INSULATION S Y $40.00 40 0 $0.00 0 $0.00 60 2504.608 /00020 DUCTILE IRON FITTINGS LB $5.00 1195 0 $0.00 2185 $10,925.00 61 2104.503 /00285 REMOVE SEWER PIPE (STORM) L F $14.00 110 0 $0.00 106 $1,484.00 62 2501.502 /05024 24" RC PIPE APRON EACH $2,089.00 1 0 $0.00 1 $2,089.00 63 2501.602 /60024 TRASH GUARD FOR 24" PIPE APRON EACH $1,244.00 1 0 $0.00 1 $1,244.00 64 2503.503 /19155 15" RC PIPE SEWER DES 3006 CL V L F $48.00 589 42.5 $2,040.00 608.5 $29,208.00 65 2503.503 /19183 18" RC PIPE SEWER DES 3006 CL III L F $50.00 40 0 $0.00 38 $1,900.00 66 2503.503 /19213 21" RC PIPE SEWER DES 3006 CL III L F $51.00 422 0 $0.00 423 $21,573.00 67 2503.503 /19243 24" RC PIPE SEWER DES 3006 CL III L F $59.00 224 0 $0.00 219 $12,921.00 68 2503.602 /00250 CONSTRUCT BULKHEAD EACH $400.00 3 0 $0.00 3 $1,200.00 69 2506.502 /06000 CASTING ASSEMBLY EACH $747.00 7 0 $0.00 7 $5,229.00 70 2506.502 /06020 ADJUST FRAME & RING CASTING EACH $250.00 5 0 $0.00 6 $1,500.00 71 2506.501 /M01 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 L F $434.00 15 0.8 $347.20 15.5 $6,727.00 72 2506.501 /M02 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 L F $598.00 34 -2.8 ($1,674.40) 35.7 $21,348.60 73 2506.602 /06200 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH $700.00 4 0 $0.00 5 $3,500.00 74 2506.602 /12568 CONST DRAINAGE STRUCTURE DESIGN SPEC (2'X3') EACH $1,737.00 5 0 $0.00 6 $10,422.00 75 2511.507 RANDOM RIPRAP CLASS III (GROUTED) C Y $100.00 50 0 $0.00 50 $5,000.00 76 2573.502 /00110 STORM DRAIN INLET PROTECTION EACH $100.00 12 0 $0.00 15 $1,500.00 77 2503.503 /19545 54" RC PIPE SEWER DES 3006 CL V L F $390.00 1735 0 $0.00 1751 $682,890.00 78 2503.602 /00320 CONNECT TO EXISTING STORM SEWER EACH $15,000.00 1 0 $0.00 1 $15,000.00 79 2503.602 /00250 CONSTRUCT BULKHEAD EACH $1,000.00 1 0 $0.00 1 $1,000.00 80 2506.502 /06000 CASTING ASSEMBLY EACH $747.00 6 0 $0.00 6 $4,482.00 Connemara Trail Extension Final Pay Voucher 7 Page 6 of 7 Contract Item Status Line No. Item Description Unit Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date 81 2506.503 /04220 CONST DRAINAGE STRUCTURE DES 84-4020 L F $678.00 110 0.7 $474.60 109.6 $74,308.80 Bid Totals: $5,338.80 $1,950,599.04 Project Category Totals Category Amount This Voucher Amount To Date SCHEDULE A - SURFACE IMPROVEMENTS $1,377.00 $809,923.24 SCHEDULE B - SANITARY SEWER IMPROVEMENTS $2,774.40 $86,002.40 SCHEDULE C - WATERMAIN IMPROVEMENTS $0.00 $150,147.00 SCHEDULE D - STORM SEWER IMPROVEMENTS $712.80 $126,845.60 SCHEDULE E - TRUNK STORM SEWER IMPROVEMENTS $474.60 $777,680.80 Contract Change Item Status CC CC No. Line No. Item Description Units Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date CO 1 82 2506.503 /02420 CONST DRAINAGE STRUCTURE DES 48-4020 L F $570.00 166 0.62 $353.40 141.7 $80,769.00 CO 1 83 2504.601 /00060 LOWER WATER MAIN LS $11,560.00 1 0 $0.00 1 $11,560.00 CO 1 84 2504.603 /01122 12" WATERMAIN DUCTILE IRON CL 52 L F $6.20 290 0 $0.00 290 $1,798.00 CO 1 85 2504.601 /00010 WATER MAIN SYSTEM LS $12,480.00 1 0 $0.00 1 $12,480.00 CO 1 86 2503.503 /20030 INSTALL PIPE SEWER L F $11.60 565 0 $0.00 565 $6,554.00 CO 1 87 2360.509 /24305 TYPE SP 12.5 NON WEAR COURSE MIX (4,C) TON $0.25 4200 1781.2 $445.30 4231.2 $1,057.80 CO 1 88 2016.601 /00060 HUMAN RESOURCE MANAGEMENT LS $2,200.00 1 0 $0.00 1 $2,200.00 CO 1 89 2016.601 /00010 CONTRACT MANAGEMENT LS $2,494.00 1 0 $0.00 1 $2,494.00 CO 2 90 2360.509 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON $25.00 1141.21 1141.21 $28,530.25 1141.21 $28,530.25 CO 2 91 2531.503 CONCRETE CURB & GUTTER DESIGN B618 LF $50.00 142 142 $7,100.00 142 $7,100.00 Contract Change Totals: $36,428.95 $154,543.05 Contract Change Totals No. Contract Change Description Amount This Voucher Amount To Date 1 CO Construct the storm sewer alignment as indicated on the revised plan sheets 10R THRU 12 B dated 4-5-2021. Construct the street extension of Connemara Trail as shown on plan sheet 12R and 12A. Construct the sanitary sewer extension as shown on 6R and 7R. Construct watermain extension as shown on sheet 8R and 8B. And extend a 15 inch storm sewer stub from MH 5406 as shown on plan sheet 12R. $798.70 $118,912.80 Connemara Trail Extension Final Pay Voucher 7 Page 7 of 7 Contract Change Totals No. Contract Change Description Amount This Voucher Amount To Date Contract time shall be adjusted to accommodate the construction schedule. 2 CO Complete damaged curb repairs and install bituminous wear course based on 2022 prices. $35,630.25 $35,630.25 Material On Hand Additions Line No. Item Description Date Added Comments Material On Hand Balance Line No. Item Description Date Added Used Remaining