HomeMy WebLinkAbout9.b. Request by Akron 42, LLC, for Approval of Preliminary and Final Plats and Rezoning of a portion of the site to develop a 212-unit multifamily community
EXECUTIVE SUMMARY
Regular City Council Meeting: November 15, 2022
AGENDA ITEM: Request by Akron 42, LLC, for approval of
Rezoning, Preliminary and Final Plats to
develop a multifamily community
AGENDA SECTION:
New Business
PREPARED BY: Julia Hogan, Planner AGENDA NO. 9.b
ATTACHMENTS: Ordinance; Resolution; Excerpt from the
October 25, 2022 Planning Commission
Meeting; Excerpt from the September 27,
2022 Planning Commission Meeting; Staff
Report from the September 27, 2022
Planning Commission Meeting; Site Location;
Final Plat; Updated Site Development Plans;
Updated Architectural Drawings; Traffic
Memorandum; City Engineer’s Memo Dated
September 14, 2022; Parks and Recreations
Director’s Memo dated October 19, 2022
APPROVED BY: LJM
RECOMMENDED ACTION:
1. Motion to adopt an Ordinance amending Ordinance B City of Rosemount Zoning
Ordinance for Prestwick Place 24th Addition to rezone the site from C4 PUD –
General Commercial Planned Unit Development to R4 – High Density Residential,
subject to Metropolitan Council approval of the Comprehensive Land Use Plan
change of the site from CC-Community Commercial to HDR-High Density
Residential.
2. Motion to adopt a Resolution approving the Preliminary and Final Plats for Prestwick
Place 24th Addition, subject to the conditions in the Resolution.
PLANNING COMMISSION MEETING 10-25-2022
The Planning Commission reopened the public hearing at their October 25, 2022 meeting to further
review the request submitted by Akron 42, LLC for rezoning of the site from C4 PUD – General
Commercial Planned Unit Development to R4 – High Density Residential, preliminary and final plats, and
site plan review for the development of a multifamily community. This item was previously tabled by the
Planning Commission at their September 27, 2022 meeting due to the Commission requesting additional
information from the applicant before further reviewing the project request. The applicant had submitted
the requested additional information which included: updated architectural drawings, updated landscaping
plan, and a traffic study. The applicant explained to the Commission that some updates from the
September 27th, 2022 meeting included adding additional screening around the pool area since the pool
could not be moved further north on site due to setback restrictions and reducing the southwestern
portion of the building to three stories in height so that it was more cohesive with the neighborhood
2
located to the west of the site.
The landowner, Akron 42, LLC, had a representative at the meeting who spoke to the Commission about
the site and explained the history of the area. The representative explained that the site was dedicated for
commercial use back in 2007 and had marketed the land for commercial use since that time and had lack
of commercial interest for the site. The representative also explained that since the reguiding of the
northern portion of the site to HDR - High Density Residential there has been renewed interest from
commercial users in the southern portion of the site that is still designated for commercial use.
The Planning Commission received public comments from residents during the reopened public hearing
portion. Some of the comments included concerns regarding traffic, public safety, potential over capacity
of the schools in the city, and security onsite. There were representatives from both the City and the
County at the meeting to speak on some of the concerns and questions that came up during discussion
between the commissioners and the public hearing. The Rosemount City Administrator answered
questions regarding public safety and school capacity within the city. The City’s Public Works Director
spoke on traffic concerns regarding city streets near the site while a representative from Dakota County
spoke on the traffic concerns surrounding Akron Ave and County Road 42.
The Commission expressed their appreciation to the applicant for listening to both the public and their
concerns on the previously submitted building/landscape plans and submitting updated ones to reflect
that. One adjustment the Commission was wanting to see from the applicant was the change in exterior
color of the building. The current dark coloring at the top of the proposed building, the Commission
explained, made the building look heavier and out of place with the surrounding area. The applicant agreed
to look at different color options for the exterior of the building.
The majority of the Planning Commission agreed that this project aligns with the reguiding of the site to
HDR - High Density Residential, meets the city zoning requirements for the high-density residential
zoning district and ultimately reflects the visioning exercise of this area that was completed back in 2021.
The Planning Commission voted 4-2 to recommend approval of the rezoning of the site from C4 PUD –
General Commercial Planned Unit Development to R4 – High Density Residential. The Commission then
voted 5-1 to recommend approval for the preliminary and final plats and 5-1 to approve the site plan
review for the proposed multifamily community.
Because site plan reviews are acted upon by the Planning Commission, the actions required of the City
Council related to the proposed development at this time are for a rezoning, preliminary and final plats.
BACKGROUND
The Planning Commission held a public hearing at their September 27, 2022 meeting to review the request
submitted by Akron 42, LLC for preliminary and final plats, site plan review, and rezoning to develop a
multifamily community on 7.97-acres west of Akron Avenue and north of 145th Street (County Road 42).
The Planning Commission voted to continue this item to the October 25, 2022 meeting to allow the
applicant and staff the opportunity to provide additional information and updated plans. The Commission
asked the applicant to provide the following: updated architectural drawings, updated landscaping plan,
and a traffic study. From staff, the Commission requested additional comments from the Parks and
Recreation department, which an additional memo was provided detailing the basis for how dedication of
land or fee-in-lieu is determined.
The applicant provided updated plans and architectural drawings showing the decrease in the southern
portion of the proposed apartment building from four stories in height to three stories prior to the
October Planning Commission meeting. This decrease also changed the number of proposed units that
will be within the apartment building. Originally, there were 225 units being proposed, but now the
applicant is proposing for there to be 212 units within the apartment building. The applicant has also
updated their landscape plan to meet the landscape requirement and as well as to add additional screening
3
to the pool and patio area on the western portion of the site.
As part of the visioning exercise for this area along County Road 42 and Akron Ave that was completed in
2021, city staff along with the Planning Commission, City Council and Port Authority agreed upon the
visioning for this area to be a mixture of higher density residential and commercial uses, with residential
development occurring in the northern portion of the parent parcel and the remaining area continuing to
be designated for commercial use.
ISSUE ANALYSIS – UPDATED INFORMATION
With the submission of updated information, staff will provide additional analysis as warranted below. For
further background information, please refer to the September 27, 2022 Planning Commission report.
Legal Authority
Preliminary and final plat approvals and rezonings, are quasi-judicial decisions for the City meaning that the
City is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance,
and Subdivision Ordinance are being followed. Generally, if these applications meet the City’s established
requirements they must be approved.
Building Deign
The applicant submitted updated architectural drawings showing the change in elevation in the southern
portion of the proposed building. The Planning Commission had some concerns regarding the look of the
long four-story building. The updated drawings now show that the southern portion of the building near
the intersection of Abbeyfield Ave and the proposed street that will go between Akron Ave and
Abbeyfield will be three stories in height. This has also decreased the number of units that will be within
the building to 212 units. The Planning Commission also asked the applicant to change the color of the
proposed exterior of the building from the proposed darker color shown in the architectural drawings to a
lighter color to make it more cohesive with the surrounding area.
Traffic
The applicant did submit a traffic memorandum which documented the anticipated site trip generation,
trip assignment, and the anticipated impact of the development on the surrounding roadways. It was
concluded from the findings that the AM peak hour is projected to generate 78 trips and the PM peak
hour is projected to generate 83 trips. The development is projected to generate 962 daily trips. Based on
future trip distribution and assignment, all roadways in the area are expected to remain at acceptable
capacity.
Dakota County’s Plat Commission reviewed this item at their September 28, 2022 meeting and approved
the preliminary and final plats for this item. The Plat Commission recommended an area traffic study to be
done to understand future traffic needs for the intersections at Connemara Trail and Akron Ave and the
restricted access location on Akron Ave between Connemara Trail and County Road 42.
The Planning Commission received public comments related to concerns with potential traffic on to
Ailesbury Ave with this new proposed apartment project. The City engineer explained at the September
27, 2022 meeting that the applicant’s plan for the entrance and exit to the site is further north of Ailesbury
Ave, which makes a better connection to Connemara Trail than Ailesbury Ave. The location of this road
between Akron Ave and Abbeyfield Ave has not changed and is still located north of Ailesbury Ave.
Parks and Open Space
One concern that arose during the September 27th Planning Commission meeting was issues surrounding
the potential for overcrowding at nearby parks and the need for additional parks with new developments,
like this project, coming in. The Parks and Recreation Director provided a memo describing the basis on
which the City requests land or cash-in-lieu of land dedication for the City’s park system. A map is
4
included in the memo showing the placement of existing and planned parks in the area and the proximity
of the subject parcel to those parks. Typical neighborhood parks such as Greystone Park and the future
Talamore Park have playgrounds that are approximately 5,000 square feet in area. The playground in
Ailesbury Park is over 10,000 square feet in area, making it one of the largest in the City’s park
system. The area is well served by parks, and the request for cash-in-lieu of land dedication is consistent
with the Parks Master Plan. The Planning Commission should note that park dedication, and the
determination as to whether land or not the City requires land or fee-in-lieu is the purview of the Parks
and Recreation Commission.
Landscaping
The original landscape plan was short by fourteen (14) trees. The landscape requirement for multi-family
buildings taller than three stories is 8 trees plus one per every two units, or a total of 113 trees based on
225 units. With the reduction in units proposed within the apartment building the new landscape
requirement would be 106 trees to be provided on site. The updated landscape plan shows 119 trees to be
provided throughout the site with additional screening around the outdoor patio and pool area. The
updated landscape plan now exceeds the City Code requirement for the property.
RECOMMENDATION
The Planning Commission and staff are recommending approval of rezoning of the northern portion of
the site from C4 PUD – General Commercial Planned Unit Development to R4- High Density Residential
and the preliminary and final plats to allow for the construction of a 212-unit apartment building on site.
This reco mmendation is based upon the updated plans that have been submitted by the applicant and as
well as the feedback received from the Planning Commission, public comments, and the information
provided by the applicant reviewed in this report.
City of Rosemount
Ordinance No. B-XXX
AN ORDINANCE AMENDING ORDINANCE B
CITY OF ROSEMOUNT ZONING ORDINANCE
Prestwick Place 24th Addition
THE CITY COUNCIL OF THE CITY OF ROSEMOUNT, MINNESOTA, ORDAINS AS
FOLLOWS:
Section 1. Ordinance B, adopted September 19, 1989, entitled “City of Rosemount Zoning
Ordinance,” is hereby amended to rezone property from C4 PUD – General Commercial Planned
Unit Development to R4 – High Density Residential within the City of Rosemount legally described
as follows:
Outlot I, Prestwick Place, Dakota County, Minnesota
Section 2. The Zoning Map of the City of Rosemount, referred to and described in said Ordinance
No. B as that certain map entitled “Zoning Map of the City of Rosemount,” shall not be republished
to show the aforesaid rezoning, but the Clerk shall appropriately mark the said zoning map on file in
the Clerk’s office for the purpose of indicating the rezoning hereinabove provided for in this
Ordinance and all of the notation references and other information shown thereon are hereby
incorporated by reference and made part of this Ordinance.
Section 3. This ordinance shall be effective immediately upon its passage and publication according
to law.
ENACTED AND ORDAINED into an Ordinance this 15th day of November, 2022.
CITY OF ROSEMOUNT
William H. Droste, Mayor
ATTEST:
______________________
Erin Fasbender, City Clerk
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2022 - XX
A RESOLUTION APPROVING THE PRELIMINARY PLAT
AND FINAL PLAT FOR PRESTWICK PLACE 24TH ADDITION
WHEREAS, the City of Rosemount received a request for Preliminary Plat and Final Plat approval from
Akron 42, LLC, concerning property legally described as:
Outlot I, Prestwick Place, Dakota County, Minnesota
WHEREAS, on September 27, 2022 the Planning Commission of the City of Rosemount held a public
hearing and reviewed the Preliminary and Final Plats for Prestwick Place 24th Addition, and tabled the
request to continue its review at a future meeting; and
WHEREAS, on October 25, 2022 the Planning Commission held a public hearing and recommended
approval of the Preliminary and Final Plats for Prestwick Place 24th Addition, subject to conditions; and
WHEREAS, on November 15, 2022 the City Council of the City of Rosemount reviewed the Planning
Commission’s recommendations.
NOW, THEREFORE, BE IT RESOLVED, the Council of the City of Rosemount hereby approves the
Preliminary Plat and Final Plat for Prestwick Place 24th Addition, subject to the following conditions:
a. Execution of a Subdivision Agreement.
b. Conformance with all requirements of the City Engineer as detailed in the attached
memorandum dated September 14, 2022.
c. Incorporation of any easements necessary to accommodate drainage, ponding, streets and
utilities.
d. Payment of all applicable fees including GIS, Park Dedication and other fees identified in the
current fee schedule.
e. Payment of landscaping surety equal to 110% of the landscaping
f. Payment of $530,000 for Fee-in-Lieu of Park Dedication.
g. Payment of trunk area charges in the amount of:
i. Sanitary Sewer Trunk Charges: $1,075/acre
ii. Watermain Trunk Charge: $6,500/acre
iii. Storm Sewer Trunk Charge: $6,865/acre
ADOPTED this 15th day of November, 2022, by the City Council of the City of Rosemount.
__________________________________________
William H. Droste, Mayor
ATTEST:
__________________________________
Erin Fasbender, City Clerk
EXCERPT FROM THE OCTOBER 25, 2022 PLANNING COMMISSION MEETING
MINUTES
6.a. Request by Akron 42, LLC, for Approval of Preliminary and Final Plats, Site Plan Review, and Rezoning of a
portion of the site to develop a 225-unit multi-family community. (22-76-SP, 22-78-FP, 22-79-PP, 22-80-RZ).
Senior Planner Nemcek gave a presentation and summary of the staff report for the Planning Commission. Staff
requested the public hearing be reopened from the hearing on September 27, 2022 due to a shortfall in the
number of letters that should have gone out initially notified residents of the public hearing. New letters have
since gone out to all appropriate property owners publicizing the public hearing taking place this evening.
Commissioner Rivera requested that staff explain what the term “re-guided” means. Senior Planner Nemcek
advised that the City has a comprehensive land use plan that is the overarching guide for development within the
City. Below that is the zoning ordinance and the zoning map. When land is “re-guided” it changes the land use
designation. Any future zoning must be consistent with the land use designation.
Commissioner Kenninger re-opened the public hearing from September 27, 2022 at 7:10 pm.
Public Comments:
Andy Bolling, Roers Companies, Applicant, 2 Carlson Parkway, Suite 400, Plymouth , stated their team attempted to
move the proposed pool to the northeastern side of the site but ran into setback issues that would have required a
variance. The team included a different screening type of the pool area instead.
Commissioner Reed stated that he has some concerns related to how the current plan compares to the original
visioning study. Reed requested that the applicant discuss what factors went into the design. Mr. Bolling stated
that it primarily came down to the zoning and units per acre.
Joe Jablonski, representing Akron 42, LLC, Landowner, 16305 36th Avenue W, Plymouth, advised that Lennar is a
part owner of the property. The property was marketed actively for the past 10 years. The property owner came to
the Planning Commission in July of 2021 requesting that the northern portion of the property be rezoned from
commercial to high-density residential. The Planning Commission approved the rezoning in July 2021. The
southern part of the property is still zoned as commercial.
Brooke Skin, 14363 Aldborough Avenue, discussed the proposed new schools for Rosemount. Ms. Skin stated that
she spoke with the Financial Director of the school and they currently do not have the funding for the two new
proposed schools.
Nick Labell, 14260 Ailesbury Court, questioned what the screening for the pools actually are. He requested to know
what material will be used. Mr. Labell requested that the developer explain what their security plan and how they
are calculating their market rate pricing as well.
Katie Nemitz, 14268 Alma Avenue, addressed the shortage of letters that the City sent out prior to the September
meeting. If the correct number of letters were initially sent out, she suspects there would have been a higher
number of attendees.
Kevin Z., 14301 Ailesbury Ave, discussed the traffic safety for the neighborhood and the transition plan from single
family to multi-family/apartment buildings. Kevin questioned the plan for the school district and new schools due
to the growing population in Rosemount. concerns.
Clay Maricle, 14388 Alma Avenue, stated that his neighborhood currently has 269 signatures of their petition to
oppose rezoning of the plat for high density purposes. Mr. Maricle r equested that the commission vote against the
rezoning.
Evan Cesar, 14300 Ailesbury Avenue, requested that the commission hold off on approving the rezoning until the
housing development along County Road 42 has started.
Idolly Olivia, 14277 Ailesbury Avenue, discussed the challenges of finding day care within Rosemount. Ms. Olivia
expressed concern for the safety issues that come with high density housing and requested to know what the plan
is.
Mike Polski, 14176 Ailesbury Avenue, stated concerns about increasing the population at the intersection of Akron
Avenue and Connemara Trail.
Sarah Sidwell, 14129 Abercorn Avenue, discussed concerns about safely accessing parks across Akron Avenue.
Kristina Powell, 14240 Ailesbury Court, discussed the commercial needs east of Highway 3 so that residents can
stay within Rosemount to get gas or go shopping.
Tina Angerer, 14276 Ailesbury Avenue, stated that Rosemount has a hometown feel and would like to see that feel
continue. Ms. Angerer requested that the commission consider more community space.
MOTION by Kenninger to close the public hearing.
Second by Reed.
Ayes: 6. Nays: 0. Motion Passes.
The public hearing closed at 7:43 pm.
Additional Comments:
Chair Kenninger summarized the questions stated and asked staff and the applicant for responses.
Senior Planner Nemcek stated the visioning study for the site and area are currently just a concept plan. An
application analysis has not been completed yet for the proposed project. The comprehensive plan identifies high
density residential as compatible with most uses except industrial land use. Care should be taken to provide
buffering, such as landscaping, distance, berms, etc.
Nemcek addressed the vacant land on the east side of Rosemount. The majority of the east side of Rosemount is
currently owned by Flint Hills Refinery. They have indicated that they would only allow industrial and business park
development on their land. The eastern side of Dakota County Technical College (DCTC) is guided for business park
and industrial uses. South of DCTC is contaminated. The area o f Dakota Aggregates is planned to be mined until
2040.
Community Development Director Kienberger added the Port Authority is aware of the commercial and high-
density acreage that resides in the City. The City is currently operating under the 2040 Land U se Plan as required
by the Metropolitan Council. The plan gets updated every 10 years based on active reviews and assessments.
Amendments can be granted within the Land Use Plan.
City Administrator Martin updated the commission and public that the City meets with the School District every 2-
3 months to discuss population growth in the City and share other updates. The school district intends to come to
tax payers for a bond referendum in Summer or Fall 2023. The school district currently owns lands at the
intersection of Bonaire Path and Akron Avenue and also looking at an additional property to acquire.
Mr. Martin addressed the concerns regarding the safety comments made. The Fire Department and Police
Department are both a part of the development review committee. City Council has agreed to hire 1 new police
officer every year as the population continues to grow. The Police Department is getting a new facility in 2024.
Lennar has been approaching the City for many years requesting to put housing on the parcel of topic. The
quadrant near DCTC is a high demand area for developers. The City has been protecting it to try and meet the
commercial needs of residents. Retail is anchored by a density provider. The proposed development will help
anchor retail interest to this quadrant. Life Time plans to join this quadrant in 2024.
Community Development Director Kienberger discussed the shortage of letters that were mailed out prior to the
original public hearing for the proposed developed. Staff has discussed adding additional feet as a best practice to
the required “x-amount” of feet from a proposed project. Senior Planner Nemcek added that residents can sign up
for email alerts for each city meeting.
Commissioner Kenninger addressed the concerns regarding childcare. Senior Planner Nemcek advised that child
care centers are permitted in commercial zoned areas and business park zoning district. Home day cares are a
permitted use in residential areas as well.
Public Works Director Egger spoke to the pedestrian improvements that were installed in the Akron Avenue area.
Improvements are made when there is concentrated usage in a particular area. Egger thanked the audience for
making staff aware that drivers are not acknowledging crosswalk signa ge and beacons. Law enforcement will be
made aware of this issue to continue enforcement action. Akron Avenue is under the jurisdiction of Dakota
County. The City does not have the ability to make improvements to Akron Avenue.
Erin LaBrie - County Engineer with Dakota County, stated that the County has been working with the City to review
proposed improvements for traffic impacts. Projects can be programmed if improvements are needed once a
proposed development has been approved.
Commissioner Reed questioned the buffer area west of the parcel, closest to the single-family homes. Senior
Planner Nemcek advised that the pipeline companies have concerns about fill within their easement areas. Buffers
are used for traffic and noise verse a residential use. Staff reviewed the landscaping plan for project. When the
trees are planted, the coniferous trees are 6 feet in height and the deciduous trees are 2 ½ caliper inches at the
base. Larger trees do not have the viability if they are transplanted.
Commissioner Thiagarajan questioned where the mechanical units would be on the proposed plan. Senior Planner
Nemcek stated that the code is written so that the units are not see at street level. In most cases, the units are
placed on the roof. Andy Bolling with Roers Companies and their architect discussed design aspects of the building.
Architects will review colors for lighter options to improve the scale perception of the building.
Commissioner Rivera added that she went out to the proposed project area and advised that she could not
envision the proposed apartment buildings in the location.
Commissioners discussed their stance on the proposed project and how it will impact Rosemount as a whole.
MOTION by Powell to recommend City Council approve a Zoning Map amendment to rezone the site from
C4 PUD – Community Commercial Planned Unit Development to R4 – High Density Residential subject to
Metropolitan Council approval of the Comprehensive Land Use Plan change of the site from CC -
Community Commercial to HDR-High Density Residential.
Second by Reed.
Ayes: 4. Powell, Kenninger, Reed, Thiagarajan. Nays: 2. Rivera, Hebert. Motion Passed.
MOTION by Reed to recommend City Council approve the Site Plan Review for the proposed multifamily
community, subject to the following conditions:
a. Approval of rezoning of the site from C4 PUD – Community Commercial Planned Unit Development to
R4 – High Density Residential.
b. Approval of the Preliminary and Final Plats for the Roers apartment project.
c. Conformance with all requirements of the City Engineer as detailed in the attached memorandum
dated September 14, 2022.
d. Conformance with the conditions and standards within the Park and Recreation Directors
Memorandum dated September 19, 2022.
Second by Powell.
Ayes: 5. Kenninger, Reed, Hebert, Thiagarajan, Powell. Nays: 1. Rivera. Motion Passed.
MOTION by Kenninger to recommend City Council approve the Preliminary and Final Plats for the Roers
Apartment Project, subject to the following conditions:
a. Execution of a Subdivision Agreement.
b. Conformance with all requirements of the City Engineer as detailed in the attached memorandum
dated September 14, 2022.
c. Incorporation of any easements necessary to accommodate drainage, ponding, streets and utilities.
d. Payment of all applicable fees including GIS, Park Dedication, and other fees identified in the current
fee schedule.
e. Payment of a Landscaping Surety equal to 110% of the landscaping.
f. Payment of $562,500 for Fee-in-Lieu of Park Dedication.
g. Payment of trunk area charges in the amount of:
i. Sanitary Sewer Trunk Charge: $1,075/acre
ii. Watermain Trunk Charge: $6,500/acre
iii. Storm Sewer Trunk Charge: $6,865/acre
Second by Reed.
Ayes: 5. Kenninger, Reed, Hebert, Thiagarajan, Powell. Nays: 1. Rivera. Motion Passed.
EXCERPT FROM THE SEPTEMBER 27, 2022 PLANNING COMMISSION MEETING
MINUTES
5.b. Request by Akron 42, LLC for Approval of Preliminary and Final Plats, Site Plan Review, and Rezoning of a
portion of the site to develop a 225-unit multi-family community. (22-76-SP, 22-78-FP, 22-79-PP, 22-80-RZ)
Planner Hogan gave a presentation and summary of the staff report for the Planning Commission .
Commissioner Rivera clarified a similar application was brought before Planning Commission at a prior meeting
where the Planning Commission chose not to vote in favor and City Counc il voted in favor of it. Staff confirmed the
prior request was re-guiding the comprehensive plan and not rezoning. Also noted, this time there is an actual
developer and project proposed for this property.
Chair Kenninger informed all the comprehensive plan is helpful for developers to see the vision of what
development is desired in the area long term completed every ten years.
The public hearing opened at 8:52 pm.
Public Comments:
Andy Bolling, Roer Companies, Applicant, 2 Carlson Parkway, Suite 400, Plymouth, stated Lennar owns the
property and noted the parcel to the south will be commercial which Roer is not purchasing. The 225 -unit market
rate complex will be kept as close to county road 42 as possible and the parking will rema in behind the building.
The northern stormwater area will be maintained. Construction will take approximately 1 ½ years.
Kevin Zoch, 14301 Ailesbury Ave, stated that he’s concerned about the additional traffic this project would bring.
The apartments would disrupt neighboring views and noise levels will be raised. Also concerned about the notices
that were provided and stated the notices should have been issued further. Also voiced concerns about the
number of parks in the area. Mr. Zoch also noted he started a petition for this item and there are over 125
signatures.
Clayton Maricle, 14388 Alma Ave, stated that he highly disapproves placing low income housing units. Questioned
whether the city and developer receive any additional funds or tax incentives for high density housing or low-
income housing, i.e. federal/state grants.
Thomas Hellmann, 14242 Ailesbury Court, stated that Connemara Trail traffic will be highly in creased with this
proposed project.
Nicolas Labelle, 14260 Ailesbury Court, stated the height of a four-story or five-story building doesn’t fit in this
neighborhood. The pool and patio are right across from his yard, concerned about potential swearing and noise
and questioned if the pool patio could go towards the other side where the noise wouldn’t impact as many people .
Michael Sweeney, 14259 Alma Ave, stated that the closest park to the proposed development , Ailesbury Park, is
already busy and now proposing so many additional people in the area will make it even more busy. Also,
questioned the plans and renderings and the process of getting the area re-zoned.
Brooke Skinn, 14363 Aldborough Ave, stated that the sports or activities that are scheduled in the surrounding
park and with the cars parked on the street will cause additional safety concerns. She questioned whether the city
has the resources (i.e. fire, police, schools, etc.) to provide for this additional population .
Courtney Pennington, 14258 Ailesbury Court, questioned the plan for public safety and if the city has a plan in
place to hire additional officers. Also concerned about the future of the middle and high school as additional space
will be needed. Also wanted to know how to increase the public notice radius as the requirements for notices
should be further than 500 feet.
Evan Cesar, 14300 Ailesbury Ave, questioned where Lennar was this evening. Questioned the shortage on trees
and parking, but how both could be added.
James Arndt, 14245 Ailesbury Ave, asked the commissioners to listen to the citizens that currently live here rather
than the people who do not.
Allison Rothstein, 14237 Ailesbury Ave, stated that their neighborhood is currently safe, and their kids are their
main concern.
Dan Tong, 14358 Alma Ave, stated that there is concern about additional traffic driving through their
neighborhood.
Brian Ludvigson, 14312 Aldborough, stated he reviewed the comprehensive plan online and the plan stat es to
provide adequate transitions between uses of land. He believes having high density flowing into low density does
not meet that statement.
Kristina Powell, 14240 Ailesbury Court, stated that the increase in traffic and the safety of the neighborhood is
concerning.
Jessica Schwartz, 14185 Ailesbury Ave, stated that Rosemount currently doesn’t have enough police and fire to
support the additional people. Also stated the neighborhood is currently outnumbered by the number of children
to adults.
Brian Schwartz, 14185 Ailesbury Ave, stated that the potential crime increase is concerning. Crime statistics should
be discussed when reviewing potential projects.
Katie Nemitz, 14268 Alma Ave, inquired about how full the current apartment buildings in Rosemount are.
Kendra Eisenschenk, 14301 Ailesbury Ave, stated that it’s concerning that the City Council didn’t listen to the
Planning Commissions’ decision.
MOTION by Kenninger to close the public hearing.
Second by Thiagarajan.
Ayes: 7. Nays: 0. Motion Passes.
The public hearing closed at 9:34 pm.
Additional Comments:
Chair Kenninger summarized the questions stated and asked staff members for a response.
Chair Kenninger inquired how it’s determined how many police officers and fire fighters are on staff. Hogan stated
interdepartmental meetings are held to discuss upcoming projects and there were no concerns regarding this item.
Kienberger stated the metrics used to determine how many fire and police are needed as the city continues to
grow is not available tonight, however will be provided and discussed with City Council.
Hogan stated zoning change are made when a project comes forward.
The city communicates with the school district to know what’s forthcoming development wise in order to forecast
appropriately.
Crime statistics is an important piece that should be taken into consideration when the planning commission is
considering projects.
Nemcek confirmed this apartment complex will be market rate and in the past apartment complexes have
converted from income restricted to market rate housing once tax credits are received.
The city doesn’t receive any funding for this project. A developer could seek tax credits for workforce housing
complexes. However, in this scenario since it is market rate, there is no tax incentives for the developer.
Kenninger requested any residents who believes they should have received a public notice but did not, to bring
your address forth to city staff to verify whether a notice should have been sent.
Kenninger informed residents they can email city council members that the public notice radius should be further
increased from 500 feet including the reasoning why.
Any Ailesbury Park current concerns, i.e. parking, garbage, etc. should be addressed to Parks & Recreation Director
Dan Schultz.
The Parks & Recreation Department reviews the master park plan and no park fits within this plan and that is why
the park dedication fee was selected for this project.
City Engineer Erickson stated there should be less impact for traffic in this neighborhood as the entrance and exit
will flow into the collector streets, i.e. Akron Avenue, Connemara Trail and Abbeyfield Ave. Connemara Trail is built
to be a collector street to take on heavier traffic and that is why there are not driveways on Connemara Trail. The
residents’ concern is that people will use Ailesbury Avenue to cut across to Connemara Trail and Ailesbury Park.
However, staff confirmed the plan for the applicant’s entrance/exit is further north of Ailesbury Ave which mak es a
better connection to Connemara Trail.
Nemcek noted the staff reports that go to City Council for action do include residents’ public comments as well as
the minutes from the planning commission meeting.
The developer confirmed there is no funding assistance being received for this project. Also noted, once you build
at market rate, it is not allowed to go to income based and the current pool location is being considered to move
to the northeast area and include tree buffers. The developer also confirmed they will meet the tree requirements.
A market study confirmed a 300-unit site would fit the need for this area and stated there is a significant demand
for rentals in the south metro. Also noted, there is area to the north of the property that the developer would be
willing to deed to the city for a park if that is of interest.
Staff, Planning Commission and City Council reviewed this area in 2021 and determined this area to have adequate
transition of higher density to lower density and found this to be the vision for the area.
Commissioner Reed stated that because of the amount of the units involved in the proposed plan the need to
consider the schools, public safety and the master parks plan is necessary. Reed is not in favor of the proposed
plan.
Commissioner Rivera stated that the property should stay zoned for commercial projects as that is what is needed
in this area.
Commissioner Powell inquired about the steps if Planning Commission denies the request for re -zoning, what the
next steps would be if the current area is guided for high density.
Community Development Director Kienberger stated that an area is re-zoned to confine with a comprehensive
guide. Kienberger noted if the Planning Commission does not approve the zoning update, the applicant is able to
challenge this matter. Kienberger also noted the 60 -day rule; the 60-day rule requires governmental entities to
approve or deny a written request for certain actions within 60 days or the request is approved.
Commissioner Powell stated that he would like to see more information included, and specifically a traffic study.
A traffic study is not required per our city code; however, staff encourages developers to do a traffic study as well
as conduct a neighborhood meeting. Commercial generates a higher level of traffic during all hours versus
residential during certain hours and the current roads were built considering commercial.
Commissioner Thiagarajan inquired if the building could be able to be broken down instead of having one long, tall,
four story building. Chair Kenninger stated with trying to keep the parking in the back and the pipeline, smaller
buildings may not be an option. Also asked if there is a possibility to guide traffic away from residential streets and
Nemcek stated there is a traffic safety committee that addresses concerns, i.e. stop sign needed, speed studies,
etc.
The developer stated there is a possibility to bring the southwestern part of the building down to 3 -stories.
Chair Kenninger stated this proposal is a fair design and in line with the vision that staff, Planning Commission, City
Council and Port Authority has for the area especially with the comments the developer made to reconsider a few
design items, i.e. pool to northwestern side, lower to 3-stories in southwestern part, etc.
The comprehensive plan change to this area would have included a notification to residents identical to who was
notified for this project, a sign would also have been placed on the property.
MOTION by Kenninger to recommend the City Council approve a Zoning Map amendment to rezone the
site from C4 – Community Commercial Planned Unit Development to R4 – High Density Residential
subject to Metropolitan Council approval of the Comprehensive Land Use Plan change of the site from CC
– Community Commercial to HDR – High Density Residential.
Second by Powell.
Ayes: 3. Powell, Kenninger, Thiagarajan. Nays: 4. Marlow, Rivera, Reed, Hebert. Motion Failed.
MOTION by Reed to continue this until the plans are updated to reflect how the design better matches
the comprehensive plan from a transition standpoint, that the plans clarify parks & recreation coverage in
the area and traffic volumes are better analyzed at the October 25, 2022 Planning Commission Meeting.
Second by Kenninger.
Ayes: 5. Powell, Marlow, Kenninger, Reed, Thiagarajan. Nays: 2. Rivera, Hebert. Motion Passes.
E X E C U T I V E S U M M A R Y
Planning Commission Regular Meeting: September 27, 2022
Tentative City Council Meeting: October 18, 2022
AGENDA ITEM: 22-76-SP, 22-78-FP, 22-79 PP, 22-80-RZ
Request by Akron 42, LLC, for approval of
Preliminary and Final Plats, Site Plan
Review, and Rezoning of a portion of the site
to develop a 225-unit multifamily community.
AGENDA SECTION:
Public Hearing
PREPARED BY: Julia Hogan, Planner AGENDA NO. 5.b.
ATTACHMENTS: Site Location; Final Plat; Existing Conditions;
Demo Plan; Erosion and Sediment Control
Plan; Site Plan; Grading Plan; Utility Plan;
Construction Details; Landscape Plan;
Existing Drainage; Proposed Drainage;
Architectural Drawings; Lighting Plan;
Emissions Generated Description; City
Engineer’s Memo Dated September 14,
2022; Parks and Recreation Memo Dated
September 19, 2022
APPROVED BY: AK
RECOMMENDED ACTION:
1. Motion to recommend City Council approve the Preliminary and Final Plats for the
Rosemount Apartments, subject to the following conditions:
a. Execution of a Subdivision Agreement.
b. Conformance with all requirements of the City Engineer as detailed in the
attached memorandum dated September 14, 2022.
c. Incorporation of any easements necessa ry to accommodate drainage, ponding,
streets and utilities.
d. Payment of all applicable fees including GIS, Park Dedication, and other fees
identified in the current fee schedule.
e. Payment of a Landscaping Surety equal to 110% of the landscaping.
f. Payment of $562,500 for Fee-in-Lieu of Park Dedication.
g. Payment of trunk area charges in the amount of:
i. Sanitary Sewer Trunk Charge: $1,075/acre
ii. Watermain Trunk Charge: $6,500/acre
iii. Storm Sewer Trunk Charge: $6,865/acre
2. Motion to recommend City Council approve a Zoning Map amendment to rezone the
site from C4 PUD – Community Commercial Planned Unit Development to R4 –
High Density Residential subject to Metropolitan Council approval of the
Comprehensive Land Use Plan change of the site from CC-Community Commercial
to HDR-High Density Residential.
2
SUMMARY
Property Owner: Akron 42, LLC
Applicant: Akron 42, LLC & Roers Companies
Location: North of County Road 42 and west of Akron Avenue.
Site Area in Acres: 7.97 Acres
Approved Comprehensive
Plan Designation: HDR – High Density Residential (pending Met Council approval)
Current Zoning: C4 PUD – General Commercial Planned Unit Development
Residential Units: 225 Units
Gross Density (Res): 28.23 units/acre
Net Density (Res): 28.23 units/acre
Surrounding Land Uses: North: Low Density Residential/High Density Residential
East: Community Commercial
South: Community Commercial
West: Low Density Residential
The Planning Commission is being asked to consider a request by Akron 42, LLC and Roers Companies,
for approval of a Preliminary and Final Plat and a Rezoning of the northern portion of the site from C4
PUD – General Commercial Planned Unit Development to R4-High Density Residential to construct a
225-unit apartment building on a parcel of land owned by Akron 42, LLC. The site is located directly west
of Akron Avenue and north of County Road 42. T he proposed project will be a high-density residential
development with an overall density of 28.23 units per acre , which fits within the R4-High Density
Residential zoning category. The development will contain a mixture of studio, 1 -, 2-, and 3-bedroom
units. Community amenities include a swimming pool with a patio, a dog run area, pickleball court, and
additional amenities within the proposed apartment building.
The Final Plat submitted with this request shows the platting of two buildable lots and one outlot on the
19.18 parent parcel. The buildable lot in the northern portion of the site , which contains 7.97 acres, will be
where the proposed apartment project will be developed and the second buildable lot in the southeast area
of the site will be used for commercial use. The outlot in the southwestern portion of the site will be
designated for commercial use once developed. Staff is recommending approval of the request by the
applicants, subject to the conditions in the recommend action and the Engineer’s Memorandum dated
September 14, 2022.
BACKGROUND
The parent parcel of this project was platted with Prestwick Place which was approved by the City Council
in October of 2007. This parcel was part of additional land that was platted at the time as outlots for future
development, but it was not included in the Planned Unit Development Master Development Plan for
Prestwick Place. The Prestwick Place PUD designated the subject parcel (Outlot I) and another parcel to
the east to be used for commercial use. The plan described the specific types of commercial uses, as well as
the size of the buildings, that would be perm itted for the parcels. The changing retail environment had
made those expectations obsolete. A Major Amendment to the Prestwick Place PUD was requested by the
landowners so that the parcels would be removed from the scope of the Commercial Area Guidelines
contained within the approved 2007 Prestwick Place PUD agreement and essentially create a blank slate
for the two parcels. The City Council approved the Major Amendment to the Prestwick Place PUD at
their August 16th, 2022 meeting. Also approved at that meeting was a Comprehensive Plan Amendment to
change the designated land use of the northern 8.1 acres of the subject parent parcel from CC-Community
Commercial to HDR-High Density Residential. The vision for this parent parcel included a mix of
residential and commercial uses, with residential development occurring in the northern portion and the
remaining area continuing to be designated for commercial use.
3
ISSUE ANALYSIS
Legal Authority
Preliminary plat, rezoning and final plat requests are quasi-judicial decisions for the Planning Commission
meaning that the Planning Commission is acting as a judge to determine if the regulations within the
Comprehensive Plan, Zoning Ordinance and Subdivision Ordin ance are being followed. Generally, if the
final plat meets the ordinance requirements and is consistent with the preliminary plat, it must be
approved.
General Site Layout
The project area is proposed to contain a singular 225-unit apartment building with 286 surface parking
stalls and will contain a pickle ball court, dog run area, and pool and patio area on site as well. Sidewalks
are shown to be located around the parking lots and along the north and northwest sides of the apartment
complex. The proposed apartment complex will be four stories tall and will contain a mixture of studio, 1-
bedroom, 2-bedroom and 3-bedroom units throughout the building. There will be 158 parking stalls in the
underground parking area of the building.
The proposed sidewalks will provide access to the recreational amenities onsite. The site plan identifies
two driveway locations extending from the proposed street that will go between Akron Avenue and
Abbeyfield Avenue. The easterly access provides access to the building entrance and two surface parking
lots. The westerly access provides access to the garage parking area located under the apartment building.
This access is on the westerly end of the proposed street extending to the southeasterly corner of the
apartment building. The proposed street will provide access to both the commercial area designated in the
southern portion of the parent parcel and the apartment complex site located in the northern portion of
the parent parcel. A pipeline and pipeline easement extend diagonally across the northern portion of the
site. The apartment building footprint is adjacent t o and parallel to the pipeline easement.
Land Use and Zoning
The subject site was previously designated in the City’s Comprehensive Land Use Plan for Community
Commercial which typical uses include: retail, offices, personal services, restaurants, gas stations, and auto
oriented businesses not requiring outdoor storage. In August 2022, the property owner of the subject site
came forward to the City requesting a Comprehensive Guide Plan Amendment to change the designated
land use of the northern portion of the site from Community Commercial to High Density Residential.
The southern portion of the site will remain as Community Commercial. The City Council approved this
Comprehensive Land Use Plan Amendment and it is currently with the Metropolitan Council for their
review and approval.
High Density Residential uses include townhomes with six to twelve units per building, multiple story
apartment or condominium buildings, churches, elementary and secondary schools, private recreation
spaces maintained by the homeowner’s association and public parks.
The site is currently in the C4 PUD – General Commercial Planned Unit Development zoning district.
With the Comprehensive Land Use Plan Amendment being approved by the City Council the property
can be rezoned to a High-Density Residential zoning district. The applicant is requesting a rezoning of the
northern portion of the subject site to R4-High Density Residential. The proposed apartment building
project fits within the density range that is allowed for this zoning district which is 12 to 40 units per acre.
The table below compares the R4 zoning standards with those proposed by the applicant. The applicant is
not seeking any deviations from the City’s Code.
4
Category Required Rosemount Apartments
Min. Lot Area (sf) 22,500 square feet 347,347 square feet
Min. Lot Width 150 feet Approx. 469 feet
Min. Front Yard Setback 30 feet >30 feet
Min. Side Yard Setback 30 feet (principal structures)
10 feet (accessory structures)
30 feet (principal structures)
10 feet (accessory structures)
Min. Rear Yard Setback 30 feet 30 feet
Lot Coverage Maximum 75% 44.8%
Streets, Parking, and Sidewalk System
Access to the proposed site is from a proposed street that will connect between Akron Avenue and
Abbeyfield Avenue. Two driveway locations are identified on the site plan which will extend from the
proposed road. The easterly access will provide access to the building entrance and two surface parking
lots. The westerly access will provide access to the garage parking area located under the apartment
building. The proposed street will provide access to both the commercial area and the apartment complex.
Per the City Engineers memorandum, access and circulation within the parking lot areas appear to be
adequate.
Pedestrian facilities are identified on the site plan to be adjacent to the proposed street extending form
Akron Avenue to Abbeyfield Avenue. Sidewalks are shown to be placed around the parking lots and along
the north/northwest sides of the apartment building. These sidewalks will provide access to recreational
amenities that will be on site.
The applicant will be providing 444 parking stalls on site. 158 parking stalls will be provided as
underground parking below the apartment building and 286 parking stalls will be provided as surface
parking. The minimum parking requirements stated within the City’s Code is two stalls per unit for
multiple dwellings. Since the proposed apartment building will have 225-units 450 parking stalls would be
required. Staff finds that the 444 parking stalls that are proposed for the site is an adequate amount due to
the amount of studio and 1-bedroom apartment units that are proposed within the apartment building.
Building Massing and Materials
The applicant provided architectural plans, including elevations, that indicate that the proposed building
meets the standards for the R4-High Density Residential zoning district requirements, particularly as it
relates to massing and variety of materials. The proposed materials used include: utility brick, architectural
panels, and lap siding. The applicant has provided examples of the colors and materials with their
submittal, which are included in the attachments. The proposed apartment building will be four-stories tall,
which is the maximum stories allowed in the R4 zoning district and it can not exceed 48 feet in height. The
proposed building’s maximum height is 47.6-feet, which is below that maximum 48 feet allowed per the
City’s Code.
The unit mix for the project is shown in the table below. There will be a mixture of the different unit
types throughout each level of the proposed apartment building.
Type Number of Units Home Size
Studio 78 (35%) Varies
1-Bedroom 68 (30%) 753-798 sf
2-Bedroom 63 (28%) Varies
3-Bedroom 16 (7%) 1,533 sf
5
Landscaping and Parks
The landscaping plan provided by the applicant shows a total of 100 trees being provided. The R4 zoning
standard for landscaping requires 8 trees plus one tree per two units in the case of structures over three
stories in height. That calculates to a total of 120 trees, a shortfall of 20 trees. The applicant is aware of this
shortfall and has agreed to add the additional required plantings to the landscape plan.
Trees are shown on the landscape plan throughout the site within the open areas and along publ ic right of
way. The parking areas are landscaped using trees and shrubs in accordance with the requirements of the
City Code to provide screening. The proposed pickle ball court and proposed dog run area in the
northwest portion of the site will also rece ive landscaping around them. The foundation plants required
for the site per the City Code is 1 foundation planting for every 10 liner fee t of building perimeter, which
the landscape plan identifies as 2,105 linear feet. That would result in 211 foundation plantings that are
required. The landscape plan currently does not identify the number foundation plantings that will be
provided, but this will need to be updated to show that it meets the required number of plantings.
The Rosemount Parks and Recreatio n Department reviewed the plans for the proposed development, and
because the City is not looking to acquire parkland in this development it is recommending that the City
collect cash-in-lieu of land dedication. This amount totals $562,500 (225 high densit y units x $2,500 per
unit).
Site Lighting
The site will be lit with both wall and pole-mounted lights. Pole-mounted lights will be a mixture of 12
feet, 16 feet or 25 feet tall and oriented inward into the site. The applicant has provided a photometric
study that shows the plan to be within limits of the City Code.
Utilities
The sanitary sewer service to the apartment project is proposed to extend form an MCES facility located
on the east side of Akron Avenue. The utility plan identifies the sanitary sewer extending across Akron
Avenue and along the proposed street alignment to the westerly driveway. Sewer service to the apartment
building extends to the central portion of the building from just east of the easterly driveway. An existing
sanitary sewer stub into the parent parcel is located off of Abbeyfield Avenue at the Ailesbury Court
intersection. This sanitary sewer can provide sewer service to the westerly portion of the future
development area. The easterly portion of the commercial property can be provided sewer service from
the proposed sewer extension as well.
One storm sewer system is proposed for the apartment building site. This storm sewer line extends along
the south curb line of the main parking lot to the northeast corner of the southerly parking lot. This storm
sewer extends around the northern portion of the apar tment building to the proposed ponding area
located in the northwest corner of the site. This storm sewer will be privately maintained.
Engineer’s Review
The City’s Engineer has provided a memorandum containing comments related to the plans provided.
Notable comments include: street width that accommodates 3 lanes of traffic must be provided, the
proposed pavement section needs to include 2 feet of select granular borrow, the high point of the street
should not be above a 932 elevation and the centerline radii of the street must be 340 feet or greater. Also
stated in the memo was an existing storm sewer stub extending form Abbeyfield Avenue will need to be
permanently truncated if it is not utilized and an existing interceptor storm sewer extending from
Abbeyfield Avenue will need to be extended to the proposed ponding area. The surface water
management plan for the preliminary plat is under review and comments included with that review shall be
incorporated in the project design.
6
CONCLUSION AND RECOMMENDATION
Staff is recommending approval of the Preliminary and Final Plat and rezoning of the northern portion of
the site from C4-General Commercial to R4-High Density Residential to allow for the construction of a
225-unit apartment building on site. This recommendation is based on information provided by the
application and reviewed within this report.
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
0
-
C
O
V
E
R
S
H
E
E
T
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
6
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
NORTH
VICINITY
N.T.S.
SITE
ROSEMOUNT, COUNTY, MN
1.CONTRACTOR SHALL CONFIRM THAT THE EXISTING CONDITIONS FOR THE SITE MATCH
WHAT IS SHOWN ON THE DRAWINGS INCLUDED PRIOR TO CONSTRUCTION.
2.IF REPRODUCED, THE SCALES SHOWN ON THESE PLANS ARE BASED ON A 30x42 SHEET.
3.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR
UTILITY SERVICES COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING
POSSESSION AND THE FINAL CONNECTION OF SERVICES.
4.ALL GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES,
AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS.
NOTES:
LANDSCAPE ARCHITECT
KIMLEY-HORN AND ASSOCIATES, INC.
TELEPHONE: (651) 645-4197
CONTACT: MITCHELL COOKAS, PLA, ASLA
GEOTECHNICAL ENGINEER
TERRACON CONSULTANTS, INC.
TELEPHONE: (651) 770-1500
PROJECT TEAM:
SURVEYOR
EGAN, FIELD & NOWAK, INC.
TELEPHONE: (612) 466-3300
CONTACT: ERIC ROESER
ENGINEER
KIMLEY-HORN AND ASSOCIATES, INC.
PREPARED BY: ALAN L. CATCHPOOL, PE
767 EUSTIS STREET, SUITE 100
ST. PAUL, MN 55114
TELEPHONE (651) 645-4197
OWNER / DEVELOPER
ROERS COMPANIES
2 CARLSON PARKWAY, SUITE 400,
PLYMOUTH, MN 55447
TELEPHONE: (763) 285-8808
ROSEMOUNT APARTMENTS
SECTION 27, TOWNSHIP 115, RANGE 19
FOR
SITE DEVELOPMENT PLANS
Know what'sbelow.
before you dig.Call
ARCHITECT
KAAS WILSON
TELEPHONE: (612) 879-6000
CONTACT: DAVE MORCK
SITE BENCHMARKS:
(LOCATIONS SHOWN ON SURVEY)
SBM #1 TOP OF MINNESOTA DEPARTMENT OF TRANSPORTATION GEODETIC MONUMENT "1906 N
5" GSID STATION #85847
ELEVATION=933.06 FEET (NAVD 88)
SBM #2 TOP OF NUT LOCATED APPROXIMATELY 250 FEET SOUTH OF INTERSECTION OF
CONNEMARA TRAIL WEST AND ABBEYFIELD AVENUE
ELEVATION=X931.57 FEET (NAVD 88)
SBM #3 TOP OF NUT LOCATED IN THE NORTHWEST QUADRANT OF COUNTY ROAD NO. 73 AND
C.S.A.H. NO 42
ELEVATION=936.17 FEET (NAVD 88)
BENCHMARKS
C000
CO
V
E
R
S
H
E
E
T
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
RO
E
R
S
CO
M
P
A
N
I
E
S
DRAWING INDEX
SHEET NO.SHEET TITLE
C000 COVER SHEET
C100 GENERAL NOTES
V100 EXISTING CONDITIONS
V101 EXISTING CONDITIONS
V102 EXISTING CONDITIONS
C200 DEMO PLAN
C300 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1
C301 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2
C400 SITE PLAN
C500 GRADING PLAN
C600 UTILITY PLAN
C700 CONSTRUCTION DETAILS
L100 LANDSCAPE PLAN
L101 LANDSCAPE DETAILS
EX-1 EXISTING DRAINAGE
EX-2 PROPOSED DRAINAGE
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
1
-
G
E
N
E
R
A
L
N
O
T
E
S
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
7
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
GENERAL CONSTRUCTION NOTES
1.THE CONTRACTOR AND SUBCONTRACTORS SHALL OBTAIN A COPY OF THE MN DEPARTMENT OF
TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" (LATEST EDITION) AND BECOME
FAMILIAR WITH THE CONTENTS PRIOR TO COMMENCING WORK, AND, UNLESS OTHERWISE NOTED, ALL
WORK SHALL CONFORM AS APPLICABLE TO THESE STANDARDS AND SPECIFICATIONS.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING ALL MATERIAL AND LABOR TO CONSTRUCT
THE FACILITY AS SHOWN AND DESCRIBED IN THE CONSTRUCTION DOCUMENTS IN ACCORDANCE WITH THE
APPROPRIATE APPROVING AUTHORITIES, SPECIFICATIONS AND REQUIREMENTS. CONTRACTOR SHALL
CLEAR AND GRUB ALL AREAS UNLESS OTHERWISE INDICATED, REMOVING TREES, STUMPS, ROOTS, MUCK,
EXISTING PAVEMENT AND ALL OTHER DELETERIOUS MATERIAL.
3.THE EXISTING SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS QUALITY LEVEL "D" UNLESS OTHERWISE
NOTED. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ACSE 38/02,
ENTITLED STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF SUBSURFACE QUALITY DATA
BY THE FHA. EXISTING UTILITIES SHOWN ARE LOCATED ACCORDING TO THE INFORMATION AVAILABLE TO
THE ENGINEER AT THE TIME OF THE TOPOGRAPHIC SURVEY AND HAVE NOT BEEN INDEPENDENTLY
VERIFIED BY THE OWNER OR THE ENGINEER. GUARANTEE IS NOT MADE THAT ALL EXISTING
UNDERGROUND UTILITIES ARE SHOWN OR THAT THE LOCATION OF THOSE SHOWN ARE ENTIRELY
ACCURATE. FINDING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES IS THE CONTRACTOR'S
RESPONSIBILITY AND SHALL BE DONE BEFORE COMMENCING ANY WORK IN THE VICINITY. FURTHERMORE,
THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES DUE TO THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
THE OWNER OR ENGINEER WILL ASSUME NO LIABILITY FOR ANY DAMAGES SUSTAINED OR COST INCURRED
BECAUSE OF THE OPERATIONS IN THE VICINITY OF EXISTING UTILITIES OR STRUCTURES, NOR FOR
TEMPORARY BRACING AND SHORING OF SAME. IF IT IS NECESSARY TO SHORE, BRACE, SWING OR
RELOCATE A UTILITY, THE UTILITY COMPANY OR DEPARTMENT AFFECTED SHALL BE CONTACTED AND
THEIR PERMISSION OBTAINED REGARDING THE METHOD TO USE FOR SUCH WORK.
4.IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES WHICH MAY
HAVE BURIED OR AERIAL UTILITIES WITHIN OR NEAR THE CONSTRUCTION AREA BEFORE COMMENCING
WORK. THE CONTRACTOR SHALL PROVIDE 48 HOURS MINIMUM NOTICE TO ALL UTILITY COMPANIES
PRIOR TO BEGINNING CONSTRUCTION.
5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED CONSTRUCTION PERMITS AND
BONDS IF REQUIRED PRIOR TO CONSTRUCTION.
6.THE CONTRACTOR SHALL HAVE AVAILABLE AT THE JOB SITE AT ALL TIMES ONE COPY OF THE
CONSTRUCTION DOCUMENTS INCLUDING PLANS, SPECIFICATIONS, GEOTECHNICAL REPORT AND SPECIAL
CONDITIONS AND COPIES OF ANY REQUIRED CONSTRUCTION PERMITS.
7.ANY DISCREPANCIES ON THE DRAWINGS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE
OWNER AND ENGINEER BEFORE COMMENCING WORK. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN
ARE TO BE MADE WITHOUT PRIOR APPROVAL OF THE OWNER AND NOTIFICATION TO THE ENGINEER.
8.ALL COPIES OF COMPACTION, CONCRETE AND OTHER REQUIRED TEST RESULTS ARE TO BE SENT TO THE
OWNER DIRECTLY FROM THE TESTING AGENCY.
9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING AND MAINTAINING AS-BUILT INFORMATION
WHICH SHALL BE RECORDED AS CONSTRUCTION PROGRESSES OR AT THE COMPLETION OF APPROPRIATE
CONSTRUCTION INTERVALS AND SHALL BE RESPONSIBLE FOR PROVIDING AS-BUILT DRAWINGS TO THE
OWNER FOR THE PURPOSE OF CERTIFICATION TO JURISDICTIONAL AGENCIES AS REQUIRED. ALL AS-BUILT
DATA SHALL BE COLLECTED BY A STATE OF MN PROFESSIONAL LAND SURVEYOR WHOSE SERVICES ARE
ENGAGED BY THE CONTRACTOR.
10.ANY WELLS DISCOVERED ON SITE THAT WILL HAVE NO USE MUST BE PLUGGED BY A LICENSED WELL
DRILLING CONTRACTOR IN A MANNER APPROVED BY ALL JURISDICTIONAL AGENCIES. CONTRACTOR SHALL
BE RESPONSIBLE FOR OBTAINING ANY WELL ABANDONMENT PERMITS REQUIRED.
11.ANY WELL DISCOVERED DURING EARTH MOVING OR EXCAVATION SHALL BE REPORTED TO THE
APPROPRIATE JURISDICTIONAL AGENCIES WITHIN 24 HOURS AFTER DISCOVERY IS MADE.
12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT THE PROPOSED IMPROVEMENTS SHOWN
ON THE PLANS DO NOT CONFLICT WITH ANY KNOWN EXISTING OR OTHER PROPOSED IMPROVEMENTS. IF
ANY CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE OWNER PRIOR TO INSTALLATION
OF ANY PORTION OF THE SITE WORK THAT WOULD BE AFFECTED. FAILURE TO NOTIFY OWNER OF AN
IDENTIFIABLE CONFLICT PRIOR TO PROCEEDING WITH INSTALLATION RELIEVES OWNER OF ANY
OBLIGATION TO PAY FOR A RELATED CHANGE ORDER.
13.SHOULD CONTRACTOR ENCOUNTER ANY DEBRIS LADEN SOIL, STRUCTURES NOT IDENTIFIED IN THE
DOCUMENTS, OR OTHER SOURCE OF POTENTIAL CONTAMINATION, THEY SHALL IMMEDIATELY CONTACT
THE ENGINEER AND OWNER.
EROSION CONTROL MAINTENANCE
ALL MEASURES STATED ON THE EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER
POLLUTION PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION AS REQUIRED BY ALL
JURISDICTIONS UNTIL NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF
THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A CERTIFIED
PERSON AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A 0.5" RAINFALL
EVENT, AND CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING:
INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF
UNDERMINING, OR DETERIORATION.
1.ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS
SHOULD BE FERTILIZED, WATERED AND RESEEDED AS NEEDED. FOR MAINTENANCE REQUIREMENTS
REFER TO THE STANDARD SPECIFICATIONS.
2.SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED. SEDIMENT SHALL BE
REMOVED FROM THE SILT FENCES WHEN IT REACHES ONE-THIRD THE HEIGHT OF THE SILT FENCE.
3.THE CONSTRUCTION ENTRANCE(S) SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING
OF THE CONSTRUCTION ENTRANCES AS CONDITIONS DEMAND.
4.THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR
PARKING AND STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS
CONDITIONS DEMAND.
5.ALL MAINTENANCE OPERATIONS SHALL BE DONE IN A TIMELY MANNER BUT IN NO CASE LATER THAN 2
CALENDAR DAYS FOLLOWING THE INSPECTION.
TYPICAL OWNER/ENGINEER OBSERVATIONS
CONTRACTOR SHALL NOTIFY OWNER AND/OR ENGINEER 48 HOURS IN ADVANCE OF THE
FOLLOWING ACTIVITIES:
- PRE-CONSTRUCTION MEETING, SUBGRADE PREPARATION, BASE INSTALLATION
ASPHALT INSTALLATION, UNDERGROUND PIPING AND UTILITIES INSTALLATION,
INSTALLATION OF STRUCTURES, CHECK VALVES, HYDRANTS, METERS, ETC., SIDEWALK
INSTALLATION, CONNECTIONS TO WATER AND SEWER MAINS, TESTS OF UTILITIES
EROSION CONTROL NOTES
1.THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS COMPRISED OF THE EROSION CONTROL
PLAN, THE STANDARD DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN THE SPECIFICATIONS
OF THE SWPPP, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS.
2.ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION
SHALL OBTAIN A COPY OF THE STORM WATER POLLUTION PREVENTION PLAN AND THE STATE OF MN
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME
FAMILIAR WITH THEIR CONTENTS.
3.BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL
REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT
ADDITIONAL CONTROLS AS DIRECTED BY THE PERMITTING AGENCY OR OWNER.
4.SITE ENTRY AND EXIT LOCATIONS SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT THE
TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC ROADWAYS. ALL SEDIMENT SPILLED, DROPPED,
WASHED, OR TRACKED ON A PUBLIC ROADWAY MUST BE REMOVED IMMEDIATELY. WHEN WASHING IS
REQUIRED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO A PUBLIC ROADWAY, IT SHALL BE DONE IN
AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. ALL
FINES IMPOSED FOR DISCHARGING SEDIMENT ONTO PUBLIC AREAS SHALL BE PAID BY THE CONTRACTOR.
5.TEMPORARY SEEDING OR OTHER APPROVED METHODS OF STABILIZATION SHALL BE INITIATED WITHIN 7
DAYS OF THE LAST DISTURBANCE ON ANY AREA OF THE SITE.
6.THE CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY
THE GENERAL PERMIT.
7.CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL
ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND
AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES.
8.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE
DETAINED AND PROPERLY TREATED OR DISPOSED.
9.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON
SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS.
10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON SITE. THE USE OF MOTOR OILS AND
OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
11.RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED
CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF
WIND OR STORM WATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
12.ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THE PLAN SHALL BE INITIATED AS
SOON AS IS PRACTICABLE.
13.ALL STAGING AREAS, STOCKPILES, SPOILS, ETC. SHALL BE LOCATED SUCH THAT THEY WILL NOT
ADVERSELY AFFECT STORM WATER QUALITY. OTHERWISE, COVERING OR ENCIRCLING THESE AREAS WITH
SOME PROTECTIVE MEASURE WILL BE NECESSARY.
14.CONTRACTOR SHALL BE RESPONSIBLE FOR RE-ESTABLISHING ANY EROSION CONTROL DEVICE WHICH
THEY DISTURB. EACH CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DEFICIENCIES
IN THE ESTABLISHED EROSION CONTROL MEASURES THAT MAY LEAD TO UNAUTHORIZED DISCHARGE OR
STORM WATER POLLUTION, SEDIMENTATION, OR OTHER POLLUTANTS. UNAUTHORIZED POLLUTANTS
INCLUDE (BUT ARE NOT LIMITED TO) EXCESS CONCRETE DUMPING OR CONCRETE RESIDUE, PAINTS,
SOLVENTS, GREASES, FUEL AND LUBRICANT OIL, PESTICIDES, AND ANY SOLID WASTE MATERIALS.
15.EROSION CONTROL DEVICES SHOWN ON THESE PLANS SHALL BE INSTALLED PRIOR TO THE START OF
LAND-DISTURBING ACTIVITIES ON THE PROJECT.
16.ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH THE APPROVED PLANS AND
SPECIFICATIONS FOR THIS PROJECT. CHANGES ARE TO BE APPROVED BEFORE CONSTRUCTION BY THE
DESIGN ENGINEER AND THE CITY OF ROSEMOUNT ENGINEERING DIVISION.
17.IF THE EROSION CONTROL PLAN AS APPROVED CANNOT CONTROL EROSION AND OFF-SITE
SEDIMENTATION FROM THE PROJECT, THE EROSION CONTROL PLAN WILL HAVE TO BE REVISED AND/OR
ADDITIONAL EROSION CONTROL DEVICES WILL BE REQUIRED ON SITE. ANY REVISIONS TO THE EROSION
CONTROL PLAN MADE BY THE CONTRACTOR MUST BE APPROVED BY THE ENGINEER.
PAVING AND STRIPING NOTES
1.ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN JURISDICTION'S RIGHT-OF-WAY
SHALL BE IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION)
OR MN/DOT SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY LOCAL OR COUNTY
REGULATIONS.
2.ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D) AND CITY STANDARDS.
3.CONTRACTOR SHALL FURNISH ALL PAVEMENT MARKINGS FOR FIRE LANES, ROADWAY LANES, PARKING
STALLS, ACCESSIBLE PARKING SYMBOLS, ACCESS AISLES, STOP BARS AND SIGNS, AND MISCELLANEOUS
STRIPING WITHIN THE PARKING LOT AS SHOWN ON THE PLANS.
4.ALL EXPANSION JOINTS SHALL EXTEND THROUGH THE CURB.
5.THE MINIMUM LENGTH OF OFFSET JOINTS AT RADIUS POINTS SHALL BE 2 FEET.
6.ALL JOINTS, INCLUDING EXPANSION JOINTS WITH REMOVABLE TACK STRIPS, SHALL BE SEALED WITH JOINT
SEALANT.
7.THE MATERIALS AND PROPERTIES OF ALL CONCRETE SHALL MEET THE APPLICABLE REQUIREMENTS IN
THE A.C.I. (AMERICAN CONCRETE INSTITUTE) MANUAL OF CONCRETE PRACTICE.
8.CONTRACTOR SHALL APPLY A SECOND COATING OVER ALL PAVEMENT MARKINGS PRIOR TO ACCEPTANCE
BY OWNER FOLLOWED BY A COAT OF GLASS BEADS AS APPLICABLE PER THE PROJECT DOCUMENTS.
9.ANY EXISTING PAVEMENT, CURBS AND/OR SIDEWALKS DAMAGED OR REMOVED WILL BE REPAIRED BY THE
CONTRACTOR AT HIS EXPENSE TO THE SATISFACTION OF THE ENGINEER AND OWNER.
10.BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY SUITABLE ACCESSIBLE ROUTES (PER A.D.A).
GRADING FOR ALL SIDEWALKS AND ACCESSIBLE ROUTES INCLUDING CROSSING DRIVEWAYS SHALL
CONFORM TO CURRENT ADA STATE/NATIONAL STANDARDS. IN NO CASE SHALL ACCESSIBLE RAMP SLOPES
EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPES EXCEED 2% . IN NO
CASE SHALL LONGITUDINAL SIDEWALK SLOPES EXCEED 5%. IN NO CASE SHALL ACCESSIBLE PARKING
STALLS OR AISLES EXCEED 2% (1.5% TARGET) IN ALL DIRECTIONS. SIDEWALK ACCESS TO EXTERNAL
BUILDING DOORS AND GATES SHALL BE ADA COMPLIANT. CONTRACTOR SHALL NOTIFY ENGINEER
IMMEDIATELY IF ADA CRITERIA CANNOT BE MET IN ANY LOCATION PRIOR TO PAVING. NO CONTRACTOR
CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A COMPLIANCE ISSUES.
11.MAXIMUM JOINT SPACING IS TWICE THE DEPTH OF THE CONCRETE PAVEMENT IN FEET.
GRADING AND DRAINAGE NOTES
1.GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY THE SUITABILITY OF ALL EXISTING AND
PROPOSED SITE CONDITIONS INCLUDING GRADES AND DIMENSIONS BEFORE START OF CONSTRUCTION.
THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES.
2.THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL ADJUST BMP'S AS
NECESSARY AND REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS
STAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS.
3.CONTRACTOR SHALL ENSURE THERE IS POSITIVE DRAINAGE FROM THE PROPOSED BUILDINGS SO THAT
SURFACE RUNOFF WILL DRAIN BY GRAVITY TO NEW OR EXISTING DRAINAGE OUTLETS. CONTRACTOR
SHALL ENSURE NO PONDING OCCURS IN PAVED AREAS AND SHALL NOTIFY ENGINEER IF ANY GRADING
DISCREPANCIES ARE FOUND IN THE EXISTING AND PROPOSED GRADES PRIOR TO PLACEMENT OF
PAVEMENT OR UTILITIES.
4.CONTRACTOR SHALL PROTECT ALL MANHOLE COVERS, VALVE COVERS, VAULT LIDS, FIRE HYDRANTS,
POWER POLES, GUY WIRES, AND TELEPHONE BOXES THAT ARE TO REMAIN IN PLACE AND UNDISTURBED
DURING CONSTRUCTION. EXISTING CASTINGS AND STRUCTURES TO REMAIN SHALL BE ADJUSTED TO
MATCH THE PROPOSED FINISHED GRADES.
5.BACKFILL FOR UTILITY LINES SHALL BE PLACED PER DETAILS, STANDARDS, AND SPECIFICATIONS SO THAT
THE UTILITY WILL BE STABLE. WHERE UTILITY LINES CROSS THE PARKING LOT, THE TOP 6 INCHES SHALL
BE COMPACTED SIMILARLY TO THE REMAINDER OF THE LOT. UTILITY DITCHES SHALL BE VISUALLY
INSPECTED DURING THE EXCAVATION PROCESS TO ENSURE THAT UNDESIRABLE FILL IS NOT USED.
6.CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT OF 4" OF TOPSOIL AT COMPLETION
OF WORK. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL BE
REGRADED AND SODDED.
7.AFTER PLACEMENT OF SUBGRADE AND PRIOR TO PLACEMENT OF PAVEMENT, CONTRACTOR SHALL TEST
AND OBSERVE PAVEMENT AREAS FOR EVIDENCE OF PONDING. ALL AREAS SHALL ADEQUATELY DRAIN
TOWARDS THE INTENDED STRUCTURE TO CONVEY STORM RUNOFF. CONTRACTOR SHALL IMMEDIATELY
NOTIFY OWNER AND ENGINEER IF ANY DISCREPANCIES ARE DISCOVERED.
8.WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE CONTRACTOR SHALL
SAW CUT FULL DEPTH FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT WITH THE SAME
TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS INDICATED.
9.THE CONTRACTOR SHALL INSTALL PROTECTION OVER ALL DRAINAGE STRUCTURES FOR THE DURATION OF
CONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL DRAINAGE STRUCTURES
SHALL BE CLEANED OF DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDE
POSITIVE DRAINAGE FLOWS.
10.IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE REQUIRED PERMITS.
THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE DESIGN ENGINEER PRIOR TO ANY
EXCAVATION.
11.FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL JURISDICTIONAL
AGENCY OR TO MN/DOT STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE
JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL
GOVERN.
12.ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. THE AREAS
SHALL THEN BE SODDED OR SEEDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED, WATERED AND
MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR
ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT
NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SODDED OR SEEDED AND MULCHED
AS SHOWN ON THE LANDSCAPING PLAN.
13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING AND
SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER
SUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL COMPLY WITH ALL GOVERNING
REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.
14.SOD, WHERE CALLED FOR, MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 48 HOURS
OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION,
SEDIMENTATION OR TURBID DISCHARGES.
15.THE CONTRACTOR SHALL ENSURE THAT LANDSCAPE ISLAND PLANTING AREAS AND OTHER PLANTING
AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE CONTRACTOR SHALL
ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON THE SITE TO BE PLANTED
AND PROPERLY DISPOSED OF IN A LEGAL MANNER.
16.THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER MANUFACTURER'S
RECOMMENDATIONS AND MN/DOT SPECIFICATION.
17.ALL CONCRETE/ASPHALT SHALL BE INSTALLED PER GEOTECH REPORT, CITY OF ROSEMOUNT AND MN/DOT
SPECIFICATIONS.
18.SPOT ELEVATIONS ARE TO FLOWLINE OF CURB UNLESS OTHERWISE NOTED.
19.LIMITS OF CONSTRUCTION ARE TO THE PROPERTY LINE UNLESS OTHERWISE SPECIFIED ON THE PLAN.
20.IMMEDIATELY REPORT TO THE OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONS
AND CONSTRUCTION DOCUMENTS.
21.THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES, AND SHALL
REPAIR ALL DAMAGE TO EXISTING UTILITIES THAT OCCUR DURING CONSTRUCTION WITHOUT
COMPENSATION.
22.BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE.
23.ALL PROPOSED GRADES ONSITE SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE INDICATED ON THE PLANS.
ANY SLOPES STEEPER THAN 4:1 REQUIRE EROSION AND SEDIMENT CONTROL BLANKET.
24.ADHERE TO ALL TERMS AND CONDITIONS AS NECESSARY IN THE GENERAL N.P.D.E.S. PERMIT AND
STORMWATER POLLUTION PREVENTION PLAN FOR STORMWATER DISCHARGE ASSOCIATED WITH
CONSTRUCTION ACTIVITIES.
25.ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS
GRADE.
26.CONTRACTOR SHALL ENSURE MINIMUM GRADES ARE MET WITHIN PAVED AREAS, 1.2% FOR ASPHALT
PAVING AND 0.6% FOR CONCRETE PAVING.
WATER STORM SEWER & SANITARY SEWER NOTES
1.THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES, GRAVITY SEWER LINES,
AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON THESE PLANS. THE CONTRACTOR
SHALL FURNISH ALL NECESSARY MATERIALS, EQUIPMENT, MACHINERY, TOOLS, MEANS OF
TRANSPORTATION AND LABOR NECESSARY TO COMPLETE THE WORK IN FULL AND COMPLETE
ACCORDANCE WITH THE SHOWN, DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE
CONTRACT DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE
CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE
MOST STRINGENT SHALL GOVERN.
2.ALL EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL
COMPLY WITH ALL REQUIREMENTS FOR UTILITY LOCATION AND COORDINATION IN ACCORDANCE WITH THE
NOTES CONTAINED IN THE GENERAL CONSTRUCTION SECTION OF THIS SHEET.
3.THE CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN KIND, UNLESS SHOWN OTHERWISE.
4.DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE MANUFACTURER'S
SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND FITTINGS WITH A WATERTIGHT PLUG
WHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES
WIPED CLEAN AND DRY AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE
PLUMB AND LOCATED ACCORDING TO THE PLANS.
5.ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S
RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR LINING IN ANY D.I.
PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR IMPERFECTIONS
WHICH, IN THE OPINION OF THE ENGINEER OR OWNER, RENDERS IT UNFIT FOR USE, SHALL NOT BE USED.
ANY PIPE NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM
THE JOB SITE, AND SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.
6.WATER FOR FIRE FIGHTING SHALL BE MADE AVAILABLE FOR USE BY THE CONTRACTOR PRIOR TO
COMBUSTIBLES BEING BROUGHT ON SITE.
7.ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING SHALL BE
COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'S
SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY
REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
8.UNDERGROUND LINES SHALL BE SURVEYED BY A STATE OF MN PROFESSIONAL LAND SURVEYOR PRIOR
TO BACK FILLING.
9.CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED BY THE
SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MAY INCLUDE, BUT MAY NOT
BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION INSPECTION AND A MANDREL TEST ON
GRAVITY SEWER. A COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE UTILITY PROVIDER, OWNER
AND JURISDICTIONAL AGENCY AS REQUIRED.
10.CONTRACTOR SHALL PROVIDE FOR A MINIMUM HORIZONTAL CLEARANCE OF 10' AND A VERTICAL
CLEARANCE OF 18" BETWEEN WATER AND SANITARY SEWER MANHOLES AND LINES.
11.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE
CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY
TO RETURN IT TO EXISTING CONDITIONS OR BETTER.
12.ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS
WATERTIGHT UNLESS OTHERWISE STATED BY CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS.
13.UNLESS OTHERWISE STATED IN CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS, ALL STORM
SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC
BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL
BE LABELED "STORM SEWER". EXISTING CASTINGS AND STRUCTURES WITHIN PROJECT LIMITS SHALL BE
ADJUSTED TO MEET THESE CONDITIONS AND THE PROPOSED FINISHED GRADE.
14.TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE
CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT
EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A
REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW.
15.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO
SAME.
16.ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR FROM INVERT IN TO INVERT
OUT.
17.ROOF DRAINS SHALL BE CONNECTED TO STORM SEWER BY PREFABRICATED WYES OR AT STORM
STRUCTURES. ROOF DRAINS AND TRUCK WELL DRAIN SHALL RUN AT A MINIMUM 1% SLOPE, UNLESS
NOTED OTHERWISE, AND TIE IN AT THE CENTERLINE OF THE STORM MAIN.
18.ALL ROOF AND SANITARY SEWER DRAINS SHALL BE INSULATED IF 7' OF COVER CANNOT BE PROVIDED.
19.THE CONTRACTOR SHALL PROTECT EXISTING UNDERGROUND UTILITIES AND APPURTENANCES THAT ARE
TO REMAIN FROM DAMAGE DURING CONSTRUCTION OPERATIONS.
20.THE LOCATION OF EXISTING UTILITIES, STORM DRAINAGE STRUCTURES AND OTHER ABOVE AND
BELOW-GRADE IMPROVEMENTS ARE APPROXIMATE AS SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY
TO DETERMINE THE EXACT LOCATION, SIZE AND INVERT ELEVATIONS OF EACH PRIOR TO THE START OF
CONSTRUCTION.
21.A MINIMUM OF 5' SEPARATION IS REQUIRED BETWEEN UTILITIES AND TREES UNLESS A ROOT BARRIER IS
UTILIZED.
22.GAS, PHONE AND ELECTRIC SERVICES SHOWN FOR INFORMATIONAL PURPOSES ONLY. DRY UTILITY
COMPANIES MAY ALTER THE DESIGN LAYOUT DURING THEIR REVIEW. CONTRACTOR TO COORDINATE
FINAL DESIGN AND INSTALLATION WITH UTILITY COMPANIES.
23.COORDINATE UTILITY INSTALLATION WITH IRRIGATION DESIGN AND INSTALLATION.
24.ALL DIMENSIONS ARE TO FLOW LINE OF CURB UNLESS OTHERWISE NOTED. PERIMETER WALL DIMENSIONS
ARE TO INSIDE WALL FACE. REFERENCE ARCHITECTURAL PLANS FOR EXACT WALL WIDTH AND
SPECIFICATIONS.
25.REFERENCE ARCHITECTURAL PLANS (BY OTHERS). FOR EXACT BUILDING DIMENSIONS, AND MATERIALS
SPECIFICATIONS.
26.REFERENCE M.E.P. PLANS (BY OTHERS) FOR MECHANICAL EQUIPMENT DIMENSIONS AND SPECIFICATIONS.
27.CONTRACTOR SHALL REFERENCE STRUCTURAL PLANS (BY OTHERS) FOR MECHANICAL EQUIPMENT
DIMENSIONS AND PAD PREPARATION SPECIFICATIONS.
28.CONTRACTOR SHALL REFERENCE M.E.P PLANS (BY OTHERS) FOR LIGHT POLE WIRING.
THIRD PARTY TEST REPORTS REQUIRED
TEST REPORTS REQUIRED FOR CLOSE OUT INCLUDE, BUT ARE NOT LIMITED TO:
·DENSITY TEST REPORTS
·BACTERIOLOGICAL TESTS OF WATER SYSTEM
·PRESSURE TEST OF WATER/SEWER
·LEAK TESTS ON SEWER SYSTEM AND GREASE TRAPS
·ANY OTHER TESTING REQUIRED BY THE AGENCY/MUNICIPALITY
REFER TO GEOTECHNICAL REPORT NO. MP225127
TERRACON CONSULTANTS, INC.
MINNEAPOLIS, MN 55441
DATED AUGUST 30TH, 2022
C100
GE
N
E
R
A
L
N
O
T
E
S
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
A
K
R
O
N
RO
E
R
S
CO
M
P
A
N
I
E
S
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
1
-
G
E
N
E
R
A
L
N
O
T
E
S
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
7
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
V100
EX
I
S
T
I
N
G
CO
N
D
I
T
I
O
N
S
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
A
K
R
O
N
RO
E
R
S
CO
M
P
A
N
I
E
S
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
1
-
G
E
N
E
R
A
L
N
O
T
E
S
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
7
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
V101
EX
I
S
T
I
N
G
CO
N
D
I
T
I
O
N
S
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
A
K
R
O
N
RO
E
R
S
CO
M
P
A
N
I
E
S
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
1
-
G
E
N
E
R
A
L
N
O
T
E
S
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
7
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
V102
EX
I
S
T
I
N
G
CO
N
D
I
T
I
O
N
S
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
A
K
R
O
N
RO
E
R
S
CO
M
P
A
N
I
E
S
923
924
925
930
935
924
926
927
928
929
931
932
933
934
936
93
4
9
3
7
9
2
5
92
2
92
2
92
3
92
4
92
6
92
7
92
8
92
9
92
5
93
0
93
5
924
9
2
6
9
2
7
9
2
8
92
9
93
1
9
3
2
9
3
3
9
3
4
936
9
3
7
9
3
8
923
93593
1
932 933 934 936 937 938 939
1.96%
4.0
6
%
3.
0
8
%
3.66
%
2.
6
9
%
2.
9
1
%
2.15%
2
.
8
9
%
5
.
2
7
%
4
.
1
9
%
17.94%
1.
1
9
%
2.11%
3.9
9
%
21
.
3
4
%
5.90%
6
.
0
0
%
7
.
3
4
%
6.
9
0
%
1.02%
3.1
5
%
1.4
5
%
2
.
5
3
%
2.67
%
5.3
0
%
PROTECT EXISTING
SANITARY STUB IN PLACE
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
2
-
D
E
M
O
P
L
A
N
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
7
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
LIMITS OF CONSTRUCTION
REMOVE BITUMINOUS SURFACE
REMOVE CONCRETE SURFACE
REMOVE BUILDING
REMOVE TREE
REMOVE CONCRETE CURB & GUTTER
REMOVE UTILITY LINES
PROPERTY LINE
EXISTING OVERHEAD POWER LINE
EXISTING CHAINLINK FENCE
EXISTING J-BARRIER
EXISTING RETAINING WALL
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING WATERMAIN
EXISTING GAS MAIN
EXISTING UNDERGROUND TELEPHONE
EXISTING UNDERGROUND CABLE
EXISTING CONTOUR
EXISTING SIGN
EXISTING FLARED END SECTION
EXISTING STORM MANHOLE
EXISTING STORM CATCHBASIN
EXISTING GAS METER
EXISTING POST INDICATOR VALVE
EXISTING WELL
EXISTING AUTOMATIC SPRINKLER
EXISTING ROOF DRAIN
EXISTING GATE VALVE
EXISTING HYDRANT
EXISTING METAL COVER
EXISTING ELECTRICAL METER
EXISTING AIR CONDITIONER
EXISTING TELEPHONE MANHOLE
EXISTING CABLE BOX
EXISTING GUY WIRE
EXISTING POWER POLE
EXISTING LIGHT POLE
EXISTING TREE
CLEARING & GRUBBING
FILL & ABANDON UTILITY LINES
EXISTING TREE LINE
EXISTING CURB & GUTTER
LEGEND
FULL DEPTH SAWCUT
Know what'sbelow.
before you dig.Call
LIMITS OF CONSTRUCTION
REMOVE BITUMINOUS SURFACE
REMOVE CONCRETE SURFACE
REMOVE BUILDING
REMOVE TREE
REMOVE CONCRETE CURB & GUTTER
REMOVE UTILITY LINES
PROPERTY LINE
EXISTING OVERHEAD POWER LINE
EXISTING CHAINLINK FENCE
EXISTING J-BARRIER
EXISTING RETAINING WALL
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING WATERMAIN
EXISTING GAS MAIN
EXISTING UNDERGROUND TELEPHONE
EXISTING UNDERGROUND CABLE
EXISTING CONTOUR
EXISTING SIGN
EXISTING FLARED END SECTION
EXISTING STORM MANHOLE
EXISTING STORM CATCHBASIN
EXISTING GAS METER
EXISTING POST INDICATOR VALVE
EXISTING WELL
EXISTING AUTOMATIC SPRINKLER
EXISTING ROOF DRAIN
EXISTING GATE VALVE
EXISTING HYDRANT
EXISTING METAL COVER
EXISTING ELECTRICAL METER
EXISTING AIR CONDITIONER
EXISTING TELEPHONE MANHOLE
EXISTING CABLE BOX
EXISTING GUY WIRE
EXISTING POWER POLE
EXISTING LIGHT POLE
EXISTING TREE
CLEARING & GRUBBING
FILL & ABANDON UTILITY LINES
EXISTING TREE LINE
EXISTING CURB & GUTTER
LEGEND
FULL DEPTH SAWCUT
1.THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL, AND DISPOSAL (IN A LOCATION
APPROVED BY ALL GOVERNING AUTHORITIES) ALL STRUCTURES, PADS, WALLS, FLUMES,
FOUNDATIONS, PARKING, DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC. SUCH THAT THE
IMPROVEMENTS ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE
UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL
MATERIAL PER THE PROJECT DOCUMENTS.
2.THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE
DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS
REQUIRED FOR DEMOLITION AND DISPOSAL. CONTRACTOR SHALL PROVIDE COPIES OF THE PERMIT
AND RECEIPTS OF DISPOSAL OF MATERIALS TO THE OWNER AND OWNERS REPRESENTATIVE.
3.THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO ADJACENT PROPERTIES AT ALL TIMES.
UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE CONSTRUCTION
MANAGER AND COORDINATION WITH THE ADJACENT PROPERTIES AND/OR THE CITY.
4.THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE
REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE
UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY
COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR
SERVICES. THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES.
5.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THE PLAN HAVE BEEN DETERMINED FROM THE
BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY
DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR LOCATIONS OF
EXISTING UTILITIES WITHIN ALL AREAS OF PROPOSED WORK.
6.ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT
LOCATION, OR AS ANY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND
PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY
COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES
BEFORE PRECEDING WITH THE WORK.
7.ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC, AND/OR GAS LINES NEEDING TO BE REMOVED
OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME
SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS
NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE
ATTENTION TO EXISTING UTILITIES WITHIN ANY ROAD RIGHT-OF-WAY DURING CONSTRUCTION.
8.CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES,
ETC. (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY THE
CONSTRUCTION MANAGER. MAINTENANCE OF TRAFFIC CONTROL SHALL BE COORDINATED IN
ACCORDANCE WITH ROSEMOUNT, DAKOTA COUNTY AND MN/DOT.
9.CONTRACTOR SHALL MAINTAIN ACCESS TO ALL ADJACENT PROPERTIES DURING CONSTRUCTION, AND
SHALL NOTIFY ALL PROPERTIES IF ACCESS WILL BE INTERRUPTED OR ALTERED AT ANY TIME DURING
CONSTRUCTION.
10.PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED.
11.CONTRACTOR MAY LIMIT SAW-CUT AND PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS
REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF
THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL
AND REPAIR.
12.THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE CITY
WATER DEPARTMENT TO PLAN PROPOSED IMPROVEMENTS AND TO ENSURE ADEQUATE FIRE
PROTECTION IS CONSTANTLY AVAILABLE TO THE SITE THROUGHOUT THIS SPECIFIC WORK AND
THROUGH ALL PHASES OF CONSTRUCTION. CONTRACTOR WILL BE RESPONSIBLE FOR
ARRANGING/PROVIDING ANY REQUIRED WATER MAIN SHUT OFFS WITH THE CITY OF ROSEMOUNT
DURING CONSTRUCTION. ANY COSTS ASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR AND NO EXTRA COMPENSATION WILL BE PROVIDED.
13.REFER TO SURVEY FOR ALL EXISTING INVERT AND RIM ELEVATIONS.
14.ALL UTILITIES SHOWN ARE EXISTING UTILITIES.
15.IN THE EVENT A WELL IS FOUND, THE CONTRACTOR SHALL CONTACT THE ENGINEER AND OWNER
IMMEDIATELY. ALL WELLS SHALL BE SEALED BY A LICENSED WELL CONTRACTOR IN ACCORDANCE
WITH ALL STATE OF MN REQUIREMENTS.
16.IN THE EVENT THAT UNKNOWN CONTAINERS OR TANKS ARE ENCOUNTERED, THE CONTRACTOR SHALL
CONTACT THE OWNER AND/OR OWNERS REPRESENTATIVE IMMEDIATELY. ALL CONTAINERS SHALL BE
DISPOSED OF AT A PERMITTED LANDFILL PER THE PROJECT DOCUMENTS.
17.CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY EXISTING DRAINTILE IS ENCOUNTERED ON SITE.
NO ACTIVE DRAINTILE SHALL BE REMOVED WITHOUT APPROVAL FROM THE ENGINEER.
DEMOLITION PLAN NOTES
C200
DE
M
O
P
L
A
N
RO
E
R
S
CO
M
P
A
N
I
E
S
NORTH
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
923
924
925
930
935
924
926
927
928
929
931
932
933
934
936
93
4
9
3
7
9
2
5
92
2
92
2
92
3
92
4
92
6
92
7
92
8
92
9
92
5
93
0
93
5
924
926
9
2
7
9
2
8
92
9
93
1
9
3
2
9
3
3
9
3
4
936
9
3
7
9
3
8
923
93593
1
932 933 934 936 937 938 939
1.96%
4.0
6
%
3.
0
8
%
3.66
%
2.
6
9
%
2.
9
1
%
2.15%
2
.
8
9
%
5
.
2
7
%
4
.
1
9
%
17.94%
1.
1
9
%
2.11%
2.12%
21
.
3
4
%
5.90%
2.43
%
6
.
0
0
%
7
.
3
4
%
6.
9
0
%
1.02%
3.1
5
%
1.4
5
%
2
.
5
3
%
2.67%
5.3
0
%
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
3
-
E
R
O
S
P
H
1
P
L
A
N
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
8
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
NORTH
EROSION CONTROL PLAN NOTES
1.ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALL BE
INSTALLED PRIOR TO CONSTRUCTION.
2.THE CONTRACTOR SHALL CONSTRUCT DRAINAGE BASINS PRIOR TO SITE GRADING.
3.THE CONTRACTOR SHALL INSTALL CATCH BASIN EROSION CONTROL MEASURES.
4.WITHIN TWO WEEKS (14 DAYS) OF SITE GRADING, ALL DISTURBED AREAS SHALL BE
STABILIZED WITH SEED, SOD, OR ROCK BASE. REFER TO LANDSCAPE PLANS FOR
MATERIALS.
5.ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN
ACCORDANCE WITH CITY, STATE, AND WATERSHED DISTRICT PERMITS.
6.THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING
THE REMOVAL OF SILT IN FRONT OF SILT FENCES DURING THE DURATION OF THE
CONSTRUCTION.
7.ANY EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY THE
CONTRACTOR.
8.REMOVAL ALL EROSION CONTROL MEASURES AFTER VEGETATION IS ESTABLISHED.
9.THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO
EXISTING STREETS AND PAVED AREAS AND SHALL SWEEP ADJACENT STREETS AS
NECESSARY IN ACCORDANCE WITH CITY REQUIREMENTS.
10.IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL APPLY WATER
FROM A TANK TRUCK TO ALL CONSTRUCTION AREAS.
UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER,
PARKING, LAYDOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, FUEL
AND MATERIAL STORAGE CONTAINERS, SOLID WASTE CONTAINERS, ETC.,
IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN
LOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS.
BMP AND EROSION CONTROL INSTALLATION SEQUENCE SHALL BE AS FOLLOWS:
1.INSTALL INLET PROTECTION AT EXISTING STORMWATER CULVERTS.
2.CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE (1), CONCRETE WASHOUT
PIT (1) AND INSTALL SILT FENCE.
3.PREPARE TEMPORARY PARKING AND STORAGE AREA.
4.CONSTRUCT AND STABILIZE DIVERSIONS AND TEMPORARY SEDIMENT TRAPS.
5.PERFORM CLEARING AND GRUBBING OF THE SITE. PERFORM MASS GRADING.
ROUGH GRADE TO ESTABLISH PROPOSED DRAINAGE PATTERNS.
6.START CONSTRUCTION OF THE BUILDING PAD AND STRUCTURES.
7.TEMPORARILY SEED WITH PURE LIVE SEED, THROUGHOUT CONSTRUCTION,
DISTURBED AREAS THAT WILL BE INACTIVE FOR 14 DAYS OR MORE OR AS
REQUIRED BY NPDES AND/OR CITY OF ROSEMOUNT GRADING PERMIT.
SEQUENCE OF CONSTRUCTION:
ROCK ENTRANCE
INLET PROTECTION
SILT FENCE
LIMITS OF DISTURBANCE
SAFETY FENCE
BIOROLL
LEGEND
EROSION CONTROL BLANKET
Know what'sbelow.
before you dig.Call
C300
ER
O
S
I
O
N
A
N
D
SE
D
I
M
E
N
T
C
O
N
T
R
O
L
PL
A
N
-
P
H
A
S
E
1
RO
E
R
S
CO
M
P
A
N
I
E
S
TEMPORARY SEDIMENTATION BASIN
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
920
925
921
921
922923924
926927928
930
9
3
5
931 932 933 934 936 937
935
931
932
933
934
9
2
5
92492
6
9
2
6
925
930
926
927
928
929
931
930
920
925
930
919921
922
923
924
92
6
927
92
8
929
931
93
2
93
3
93
4
0.00%
30
.
0
0
%
0.00%
0.00%
4.
9
7
%
4
.
7
0
%
13.
7
7
%
19
.
4
3
%
1.25%
2
.
2
2
%
1.27%
1.25%
4.33%
4.1
3
%
3.99
%
5.1
5
%
33
.
3
3
%
33.47
%
1.86
%
7
.
2
7
%
0.
7
9
%
1
.
9
6
%
2
.
5
2
%
923
924
925
930
935
924
926
927
928
929
931
932
933
934
936
93
4
9
3
7
9
2
5
92
2
92
2
92
3
92
4
92
6
92
7
92
8
92
9
92
5
93
0
93
5
924
9
2
6
9
2
7
9
2
8
92
9
93
1
9
3
2
9
3
3
9
3
4
936
9
3
7
9
3
8
923
93593
1
932 933 934 936 937 938 939
1.96%
4.0
6
%
3.
0
8
%
3.66
%
2.
6
9
%
2.
9
1
%
2.15%
2
.
8
9
%
5
.
2
7
%
4
.
1
9
%
17.94%
1.
1
9
%
2.11%
2.12%
21
.
3
4
%
5.90%
2.43
%
6
.
0
0
%
7
.
3
4
%
6.
9
0
%
1.02%
3.1
5
%
1.4
5
%
2
.
5
3
%
2.67
%
5.3
0
%
2
9
.
8
6
%
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
3
-
E
R
O
S
P
H
2
P
L
A
N
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
9
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
NORTH
Know what'sbelow.
before you dig.Call
UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING,
LAYDOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, FUEL AND MATERIAL
STORAGE CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE
THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR
THROUGHOUT THE CONSTRUCTION PROCESS.
BMP AND EROSION CONTROL INSTALLATION SEQUENCE SHALL BE AS FOLLOWS:
1.TEMPORARILY SEED, THROUGHOUT CONSTRUCTION, DENUDED AREAS THAT WILL
BE INACTIVE FOR 7 DAYS OR MORE.
2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, UNDERGROUND SYSTEM,
CURBS AND GUTTERS.
3.INSTALL APPROPRIATE INLET PROTECTION AT ALL STORM SEWER STRUCTURES AS
EACH INLET STRUCTURE IS INSTALLED.
4.PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO
FINAL GRADE.
5.PREPARE SITE FOR PAVING.
6.PAVE SITE AND INSTALL STRIPING.
7.INSTALL APPROPRIATE INLET PROTECTION DEVICES FOR PAVED AREAS AS WORK
PROGRESSES.
8.COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL
AREAS.
9.OBTAIN CONCURRENCE WITH THE CIVIL ENGINEERING CONSULTANT THAT THE
SITE HAS BEEN FULLY STABILIZED THEN:
1.REMOVE ALL REMAINING TEMPORARY EROSION ADN SEDIMENT CONTROL
DEVICES
2.STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF BMPS.
SEQUENCE OF CONSTRUCTION:
ROCK ENTRANCE
INLET PROTECTION
SILT FENCE
LIMITS OF DISTURBANCE
SAFETY FENCE
BIOROLL
LEGEND
EROSION CONTROL BLANKET
EROSION CONTROL PLAN NOTES
1.ALL PERIMETER SILT FENCE AND ROCK CONSTRUCTION ENTRANCES SHALL BE
INSTALLED PRIOR TO CONSTRUCTION.
2.THE CONTRACTOR SHALL CONSTRUCT DRAINAGE BASINS PRIOR TO SITE GRADING.
3.THE CONTRACTOR SHALL INSTALL CATCH BASIN EROSION CONTROL MEASURES.
4.WITHIN TWO WEEKS (14 DAYS) OF SITE GRADING, ALL DISTURBED AREAS SHALL BE
STABILIZED WITH SEED, SOD, OR ROCK BASE. REFER TO LANDSCAPE PLANS FOR
MATERIALS.
5.ALL EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN
ACCORDANCE WITH CITY, STATE, AND WATERSHED DISTRICT PERMITS.
6.THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES, INCLUDING
THE REMOVAL OF SILT IN FRONT OF SILT FENCES DURING THE DURATION OF THE
CONSTRUCTION.
7.ANY EXCESS SEDIMENT IN PROPOSED BASINS SHALL BE REMOVED BY THE
CONTRACTOR.
8.REMOVAL ALL EROSION CONTROL MEASURES AFTER VEGETATION IS ESTABLISHED.
9.THE CONTRACTOR SHALL REMOVE ALL SOILS AND SEDIMENT TRACKED ONTO
EXISTING STREETS AND PAVED AREAS AND SHALL SWEEP ADJACENT STREETS AS
NECESSARY IN ACCORDANCE WITH CITY REQUIREMENTS.
10.IF BLOWING DUST BECOMES A NUISANCE, THE CONTRACTOR SHALL APPLY WATER
FROM A TANK TRUCK TO ALL CONSTRUCTION AREAS.
C301
ER
O
S
I
O
N
A
N
D
SE
D
I
M
E
N
T
C
O
N
T
R
O
L
PL
A
N
-
P
H
A
S
E
2
RO
E
R
S
CO
M
P
A
N
I
E
S
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
A
K
R
O
N
A
V
E
N
U
E
C O N N E M A R A T R A I L W E S T
A B B
E
Y
F
I
E
L
D
A
V
E
N
U
E
C
O
U
N
T
Y
R
O
A
D
N
O
.
7
3
C
O
U
N
T
Y
R
O
A
D
N
O
.
7
3
PRO
P
O
S
E
D
B
U
I
L
D
I
N
G
56,9
5
0
S
.
F
.
FFE
=
9
3
1
.
0
0
BFE
:
9
2
1
.
0
0
9.00
'
1
4
.
0
0
'
26.
0
0
'
1
8
.
0
0
'
2
6
.
0
0
'
4
0
.
0
0
'
2
4
.
0
0
'
4
0
.
0
0
'
2
6
.
0
0
'
1
8
.
0
0
'
20.00'
30.00'
10
.
0
0
'
10' SIDE/REAR PARKING SETBACK
10' SIDE/REAR BUILDING SETBACK
1
8
.
0
0
'
2
6
.
0
0
'
1
8
.
0
0
'
6
.
0
0
'
20' RIGHT OF WAY PARKING SETBACK
30' FRONT YARD BUILDING SETBACK
6
0
.
0
0
'
60' GAS
EASEMENT
PATIO SPACE
POOL
PICKLEBALL COURT
6
.
0
0
'
COMPACT PARKING STALLS
1
6
.
0
0
'
DOGRUN
LOADING/DROP-OFF
30' LANDSCAPE BUFFER
FUTURE DEVELOPMENT
BY OTHERS
PROPOSED STREET
BMP-1
10' SIDE/REAR PARKING SETBACK
10' SIDE/REAR BUILDING SETBACK
30' LANDSCAPE BUFFER
65.0
0
'
4
0
.
0
0
'
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
4
-
S
I
T
E
P
L
A
N
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
4
9
a
m
©
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
Know what'sbelow.
before you dig.Call
R
NORTH
PROPOSED CURB AND GUTTER
PROPERTY LINE
PROPOSED FENCE
SETBACK LINE
RETAINING WALL
PROPOSED STANDARD DUTY ASPHALT
PROPOSED CONCRETE PAVEMENT
PROPOSED STORMWATER MANAGEMENT AREA
PROPOSED CONCRETE SIDEWALK
LEGEND
PROPOSED HEAVY DUTY ASPHALT
PROPOSED ARTIFICIAL TURF
DRAINAGE AND UTILITY EASEMENT
KEYNOTE LEGEND
B612 CURB & GUTTER (TYP.)
TRANSITION CURB
FLAT CURB
6" CONCRETE FILLED PIPE BOLLARD
MATCH EXISTING EDGE OF PAVEMENT/ CURB & GUTTER
ACCESSIBLE PARKING AREA SEE DETAIL
AREA STRIPED WITH 4" SYSL @ 45° 2' O.C.
COMMERCIAL DRIVEWAY APRON SEE DETAIL
LANDSCAPE AREA - SEE LANDSCAPE PLANS
A
B
C
D
E
F
G
H
I
J
SITE PLAN NOTES
1.ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY/COUNTY
REGULATIONS AND CODES AND O.S.H.A. STANDARDS.
2.CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT
LOCATIONS AND DIMENSIONS OF VESTIBULES, SLOPE PAVING, SIDEWALKS,
EXIT PORCHES, TRUCK DOCKS, PRECISE BUILDING DIMENSIONS AND EXACT
BUILDING UTILITY ENTRANCE LOCATIONS.
3.ALL INNER CURBED RADII ARE TO BE 3' AND OUTER CURBED RADII ARE TO
BE 10' UNLESS OTHERWISE NOTED. STRIPED RADII ARE TO BE 5'.
4.ALL DIMENSIONS AND RADII ARE TO THE FACE OF CURB UNLESS
OTHERWISE NOTED.
5.EXISTING STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE
ABANDONED, REMOVED OR RELOCATED AS NECESSARY. ALL COST SHALL
BE INCLUDED IN BASE BID.
6.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, (UNLESS
OTHERWISE NOTED ON PLANS) INCLUDING BUT NOT LIMITED TO, ALL
UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS & POLES, ETC. AS
REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING
AUTHORITIES REQUIREMENTS AND PROJECT SITE WORK SPECIFICATIONS
AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE
BID.
7.SITE BOUNDARY, TOPOGRAPHY, UTILITY AND ROAD INFORMATION TAKEN
FROM A SURVEY BY EFN, DATED 08/22/2022.
KIMLEY-HORN ASSUMES NO LIABILITY FOR ANY ERRORS, INACCURACIES,
OR OMISSIONS CONTAINED THEREIN.
8.PYLON / MONUMENT SIGNS SHALL BE CONSTRUCTED BY OTHERS. SIGNS
ARE SHOWN FOR GRAPHICAL & INFORMATIONAL PURPOSES ONLY.
CONTRACTOR TO VERIFY SIZE, LOCATION AND ANY REQUIRED PERMITS
NECESSARY FOR THE CONSTRUCTION OF THE PYLON / MONUMENT SIGN.
9.CONTRACTOR SHALL REFERENCE ARCH / MEP PLANS FOR SITE LIGHTING
AND ELECTRICAL PLAN.
10.NO PROPOSED LANDSCAPING SUCH AS TREES OR SHRUBS, ABOVE AND
UNDERGROUND STRUCTURES, OR OTHER OBSTRUCTIONS SHALL BE
LOCATED WITHIN EXISTING OR PROPOSED UTILITY EASEMENTS AND
RIGHTS OF WAY UNLESS SPECIFICALLY NOTED ON PLANS OTHERWISE.
11.REFERENCE ARCHITECTURAL PLANS FOR DUMPSTER ENCLOSURE DETAILS.
12.REFER TO FINAL PLAT OR ALTA SURVEY FOR EXACT LOT AND PROPERTY
BOUNDARY DIMENSIONS.
13.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT.
14.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT.
15.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS
OTHERWISE INDICATED.
PROPERTY SUMMARY
ROSEMOUNT APARTMENTS
TOTAL PROPERTY AREA 347,347 SF (7.97 AC)
RIGHT OF WAY DEDICATION X,XXX SF (X.X AC)
PROPOSED IMPERVIOUS AREA 155,727 SF (3.58 AC)
PROPOSED PERVIOUS AREA 191,620 SF (4.39 AC)
TOTAL DISTURBED AREA 347,347 SF (7.97 AC)
ZONING SUMMARY
EXISTING ZONING C4 / PUD
PARKING SETBACKS SIDE/REAR = 10'
RIGHT OF WAY = 20'
BUILDING SETBACKS
FRONT = 30'
SIDE = 10'
REAR = 10
RIGHT OF WAY = 24'
BUILDING DATA SUMMARY
AREAS
BUILDING AREA 56,950 SF
PERCENT OF TOTAL PROPERTY AREA 16.40%
PARKING
PROPOSED SURFACE PARKING 270 SPACES
ADA STALLS REQUIRED / PROVIDED 7 STALLS / 10 STALLS
C400
SI
T
E
P
L
A
N
RO
E
R
S
CO
M
P
A
N
I
E
S
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
ITE
M
9
A
K
R
O
N
A
V
E
N
U
E
C O N N E M A R A T R A I L W E S T
A B B
E
Y
F
I
E
L
D
A
V
E
N
U
E
C
O
U
N
T
Y
R
O
A
D
N
O
.
7
3
C
O
U
N
T
Y
R
O
A
D
N
O
.
7
3
PRO
P
O
S
E
D
B
U
I
L
D
I
N
G
56,9
5
0
S
.
F
.
FFE
=
9
3
1
.
0
0
BFE
:
9
2
1
.
0
0
0.
8
%
1
.
3
%
2
.
0
%
1
.
3
%
6
.
5
%
1
1
.
0
%
5.9%
4.8
%
2.4%
5.3
%
7
.
4
%
5.0%
5.5%
4.7%
3
.
8
%
3.
4
%
2
.
2
%
1.2%
1.2%
1.2%
1.3%
1.2%
1.3%
1.2%
2
.
2
%
2
.
2
%
2
.
2
%
2
.
2
%
2
.
2
%
2
.
2
%
2
.
1
%
1.2%
1.9%
3.
4
%
5
.
1
%
13.4%
23
.
4
%
9.
0
%
2
.
0
%
9.2
%
2
9
.
9
%
30
.
0
%
2
8
.
5
%
28.1
%
2.9%
3.6%
3.
9
%
4
.
7
%
1.
3
%
1.8
%
2.
0
%
D
D
STRM 302
RE:932.54
IE:922.14 SW
IE:922.14 NW
STRM 301
RE:930.59
IE:921.35 SE
IE:921.35 W
STR -12
COORDINATE WITH MEP
IE:927.00 E
STRM 303
RE:925.86
IE:923.77 NW
FES 300
RE:923.16
IE:921.00 E
158 LF - 24" STORM
@ 0.50%
70 LF - 24" STORM
@ 0.50%
20 LF - 12" STORM
@ 0.82%
MAINTAIN 18"
MINIMUM SEPARATION
BETWEEN STORM AND
GAS LINE, UNLESS
STATED OTHERWISE
BY MID AMERICA
9
3
5
9
3
1
9
3
2
9
3
3
934
936
925
921
921
922
923
924
926
927
928
929
920
925
930
917918919
921
921
922923924
926927928929
931932933934
925
93
0
924
926
92
7
92
8
92
9
935
931 932 933
934
93
1
93
1
93
0
92
8
928
92
8
928
929
OCS 101
RE:926.20
IE:911.50 W
50 LF - 12" HDPE
@ 2.00%CORE DRILL INTO EXISTING
STORM SEWER, FIELD VERIFY
EXISTING CONDITIONS
D
318 LF - 18" STORM
@ 0.82%
G:30.18
G:30.11
G:30.09
G:30.09
G:29.96
G:29.90
G:29.82
G:28.88
G:29.35
G:29.56
G:29.59
G:29.67
G:29.54
G:31.66
G:31.82
G:29.86
G:29.54
G:29.50
G:29.45
G:29.28
G:27.57
G:25.86
G:26.11
G:26.33
G:26.39
G:26.62
G:29.41
G:29.94
G:29.95
G:30.01
G:30.63
G:28.76
G:28.76
G:28.49
G:28.45
G:29.03
G:29.20
G:29.20
G:29.14
G:29.56
G:29.63
G:29.63
G:29.53
G:29.43
G:29.41
G:29.53
G:29.44
G:30.18
G:29.98
G:29.99
G:30.00
G:30.18
G:30.18
G:27.11
G:27.07
G:27.60
G:27.78
G:27.78
G:27.71
G:27.34
G:27.34
G:29.65G:29.67
29.84
29.85
29.86
29.87
29.89
29.92
29.91
29.91
29.91
29.92
29.93
G:29.55
G:29.63
G:29.42
G:29.52
G:29.39
G:29.40
G:29.52
G:29.63
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.13
T/G:30.01
T/G:29.53
T/G:29.65
T/G:29.67
T/G:29.63
30.36
30.82
30.71
30.56
30.55
30.59
32.54
19.63
19.63
19.59
19.59
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
T/G:30.18
29.88
24.1524.15
27.5927.85
29.45
29.47
29.50
28.40 28.61
104 LF - 12" STORM
@ 0.28%
BMP-1
2
.
7
%
D
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
5
-
G
R
A
D
I
N
G
P
L
A
N
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
5
0
a
m
©
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
NORTH
GRADING PLAN NOTES
1.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE
CITY OF ROSEMOUNT, SPECIFICATIONS AND BUILDING PERMIT
REQUIREMENTS.
2.CONTRACTOR TO CALL GOPHER STATE CALL ONE @
1-800-252-1166 AT LEAST TWO WORKING DAYS PRIOR TO
EXCAVATION/CONSTRUCTION FOR UTILITY LOCATIONS.
3.STORM SEWER PIPE SHALL BE AS FOLLOWS:
RCP PER ASTM C-76
HDPE: 0" - 10" PER AASHTO M-252
HDPE: 12" OR GREATER PER ASTM F-2306
PVC SCH. 40 PER ASTM D-1785
STORM SEWER FITTINGS SHALL BE AS FOLLOWS:
RCP PER ASTM C-76, JOINTS PER ASTM C-361, C-990, AND
C-443
HDPE PER ASTM 3212
PVC PER ASTM D-3034, JOINTS PER ASTM D-3212
4.CONTRACTOR TO FIELD VERIFY THE LOCATIONS AND
ELEVATIONS OR EXISTING UTILITIES AND TOPOGRAPHIC
FEATURES PRIOR TO THE START OF SITE GRADING. THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE PROJECT
ENGINEER OF ANY DISCREPANCIES OR VARIATIONS.
5.SUBGRADE EXCAVATION SHALL BE BACKFILLED IMMEDIATELY
AFTER EXCAVATION TO HELP OFFSET ANY STABILITY PROBLEMS
DUE TO WATER SEEPAGE OR STEEP SLOPES. WHEN PLACING
NEW SURFACE MATERIAL ADJACENT TO EXISTING PAVEMENT,
THE EXCAVATION SHALL BE BACKFILLED PROMPTLY TO AVOID
UNDERMINING OF EXISTING PAVEMENT.
6.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HORIZONTAL
AND VERTICAL CONTROL.
7.CONTRACTOR SHALL EXCAVATE DRAINAGE TRENCHES TO
FOLLOW PROPOSED STORM SEWER ALIGNMENTS.
8.GRADES SHOWN ARE FINISHED GRADES. CONTRACTOR SHALL
ROUGH GRADE TO SUBGRADE ELEVATION AND LEAVE STREET
READY FOR SUBBASE.
9.ALL EXCESS MATERIAL, BITUMINOUS SURFACING, CONCRETE
ITEMS, ANY ABANDONED UTILITY ITEMS, AND OTHER UNSTABLE
MATERIALS SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND SHALL BE DISPOSED OF OFF THE
CONSTRUCTION SITE.
10.REFER TO THE UTILITY PLAN FOR SANITARY SEWER MAIN,
WATER MAIN SERVICE LAYOUT AND ELEVATIONS AND CASTING /
STRUCTURE NOTATION.
11.CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION OF
PAVEMENTS AND CURB AND GUTTER WITH SMOOTH UNIFORM
SLOPES TO PROVIDE POSITIVE DRAINAGE.
12.INSTALL A MINIMUM OF 4" CLASS 5 AGGREGATE BASE UNDER
CURB AND GUTTER AND CONCRETE SIDEWALKS.
13.UPON COMPLETION OF EXCAVATION AND FILLING,
CONTRACTOR SHALL RESTORE ALL STREETS AND DISTURBED
AREAS ON SITE. ALL DISTURBED AREAS SHALL BE
RE-VEGETATED WITH A MINIMUM OF 4" OF TOPSOIL.
14.ALL SPOT ELEVATIONS/CONTOURS ARE TO GUTTER / FLOW LINE
UNLESS OTHERWISE NOTED.
15.GRADING FOR ALL SIDEWALKS AND ACCESSIBLE ROUTES
INCLUDING CROSSING DRIVEWAYS SHALL CONFORM TO
CURRENT ADA STATE/NATIONAL STANDARDS. IN NO CASE
SHALL ACCESSIBLE RAMP SLOPES EXCEED 1 VERTICAL TO 12
HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPES
EXCEED 2% . IN NO CASE SHALL LONGITUDINAL SIDEWALK
SLOPES EXCEED 5%. IN NO CASE SHALL ACCESSIBLE PARKING
STALLS OR AISLES EXCEED 2% (1.5% TARGET) IN ALL
DIRECTIONS. SIDEWALK ACCESS TO EXTERNAL BUILDING
DOORS AND GATES SHALL BE ADA COMPLIANT. CONTRACTOR
SHALL NOTIFY ENGINEER IMMEDIATELY IF ADA CRITERIA
CANNOT BE MET IN ANY LOCATION PRIOR TO PAVING. NO
CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A
COMPLIANCE ISSUES.
16.MAINTAIN A MINIMUM OF 0.5% GUTTER SLOPE TOWARDS LOW
POINTS.
17.CONTRACTOR TO PROVIDE 3" INSULATION BY 5' WIDE
CENTERED ON STORM PIPE IF LESS THAN 4' OF COVER IN
PAVEMENT AREAS AND LESS THAN 3' OF COVER IN LANDSCAPE
AREAS.
18.ROOF DRAIN INVERT CONNECTIONS AT THE BUILDING SHALL BE
AT ELEVATION <XXX.XX> OR LOWER UNLESS NOTED
OTHERWISE. REFERENCE MEP PLANS FOR ROOF DRAIN
CONNECTION.
19.ALL STORM SEWER CONNECTIONS SHALL BE GASKETED AND
WATER TIGHT INCLUDING MANHOLE CONNECTIONS.
20.ALL STORM SEWER PIPE SHALL BE AIR TESTED IN ACCORDANCE
WITH THE CURRENT PLUMBING CODE.
21.MAINTAIN A MINIMUM OF 1.25% SLOPE IN BITUMINOUS
PAVEMENT AREAS, 0.5% SLOPE IN CONCRETE PAVEMENT
AREAS.
22.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND
CONSTRUCT "INFALL CURB" WHERE PAVEMENT DRAINS
TOWARD GUTTER, AND "OUTFALL" CURB WHERE PAVEMENT
DRAINS AWAY FROM GUTTER.
23.ROOF DRAIN TO BE CONNECTED TO STORM SEWER AND
CONVEYED TO STORMWATER BASIN
PROPOSED STORM SEWER
PROPERTY LINE
EXISTING CONTOUR
PROPOSED CONTOUR925
PROPOSED SPOT ELEVATION100.00
LEGEND
PROPOSED HIGH POINT ELEVATION HP:0.0
PROPOSED LOW POINT ELEVATION
PROPOSED GUTTER ELEVATION
PROPOSED TOP OF CURB ELEVATION
PROPOSED FLUSH PAVEMENT ELEVATION
LP:0.0
G:0.00
T:0.00
PROPOSED EMERGENCY OVERFLOW ELEVATION
T/G:0.0
EOF:0.0
0.0%PROPOSED DRAINAGE DIRECTION
0.00%PROPOSED ADA SLOPE
ME:0.0 MATCH EXISTING ELEVATION
PROPOSED STORM MANHOLE (SOLID CASTING)
PROPOSED STORM MANHOLE (ROUND INLET CASTING)
PROPOSED STORM MANHOLE/ CATCH BASIN (CURB INLET CASTING)
PROPOSED STORM SEWER CLENOUT
PROPOSED RIPRAP
PROPOSED FLARED END SECTION
CO
D
PROPOSED RIDGE LINE
PROPOSED SWALE
PROPOSED TOP/BOTTOM OF WALL ELEVATION TW:0.0
BW:0.0
Know what'sbelow.
before you dig.Call
R
C500
GR
A
D
I
N
G
PL
A
N
RO
E
R
S
CO
M
P
A
N
I
E
S
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
MAINTAIN MINIMUM 18" SEPARATION
BETWEEN STORM SEWER AND GAS MAIN.
TOP OF STORM PIPE ~923.5
BOTTOM OF GAS MAIN ~926.5
74 L
F
-
1
2
"
D
I
P
74 LF - 12
"
D
I
P
82 LF - 12" DIP
28
L
F
-
1
2
"
D
I
P
80 L
F
-
1
2
"
D
I
P
80 LF - 12
"
D
I
P
78 LF - 12" DIP
94 LF -
1
2
"
D
I
P
9
4
L
F
-
1
2
"
D
I
P
3
8
L
F
-
1
2
"
D
I
P
1
3
4
L
F
-
6
"
D
I
P
TIE INTO EXISTING MCES
INTERCEPTOR STRUCTURE,
FIELD VERIFY EXISTING CROWN
AND NOTIFY ENGIEER
TIE INTO EXISTING 15" STUB
WITH 12" REDUCER
12" X 12" TEE
INTO EXISTING
WATERMAIN
930
935
931
932
933
934
930
931
932
92
0
92
5
925
93
0
93
0
92
1
92
2
92
3
92
4
924
92
6
926
92
7
92
7
92
8
92
8
92
9
92
9
93
1
930
927
928
929
93
2
93
3
9
3
4
9
3
0
9
3
5
9
3
1
932
9
3
3
934
9
3
6
9
3
7
938
925 925
926
926
927
927
930
930
929
930
930
931
932
933SSWR107
RE:929.98
IE:915.58 E
SSWR106
RE:932.76
IE:915.18 W
IE:915.08 E
SSWR105
RE:934.27
IE:914.70 W
IE:914.60 NE
SSWR104
RE:935.78
IE:914.23 SW
IE:914.13 NE
SSWR103
RE:933.03
IE:913.40 SW
IE:913.30 NE
SSWR102
RE:928.90
IE:912.90 SW
IE:913.40 W
IE:912.80 E
SSWR101
RE:924.72
IE:912.40 W
IE:912.30 E
SSWR100
IE:910.86 W
79 LF - 8" PVC
@ 0.50%
75 LF - 8" PVC
@ 0.50%
145 LF - 8" PVC
@ 0.50%
80 LF - 8" PVC
@ 0.50%
288 LF - 8" PVC
@ 0.50%
80 LF - 8" PVC
@ 0.50%
75 LF - 8" PVC
@ 0.50%
SSWR103A
COORDINATE WITH MEP
IE:916.95 E
12" 11.25° BEND
12" 22.5° BEND
12" 11.25° BEND
12" 11.25° BEND
12" 22.5° BEND
12" 11.25° BEND12" 11.25° BEND
12" 22.5° BEND
12" 11.25° BEND
16 LF - 6" PVC
@ 2.00%
12" X 6" TEE
CO
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
6
-
U
T
I
L
I
T
Y
P
L
A
N
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
5
1
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
UTILITY PLAN NOTES
1.ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE
INSTALLATION OF PROPOSED UTILITIES.
2.SANITARY SEWER PIPE SHALL BE AS FOLLOWS:
8" PVC SDR35 PER ASTM D-3034, FOR PIPES LESS THAN 12' DEEP
8" PVC SDR26 PER ASTM D-3034, FOR PIPES MORE THAN 12' DEEP
6" PVC SCHEDULE 40 PER ASTM D-1785
DUCTILE IRON PIPE PER AWWA C150
3.WATER LINES SHALL BE AS FOLLOWS:
6" AND LARGER, PVC C-900 PER ASTM D 2241
CLASS 200 UNDER COUNTY ROADS, OTHERWISE CLASS 150
4" AND LARGER DUCTILE IRON PIPE PER AWWA C150
SMALLER THAN 3" PIPING SHALL BE COPPER TUBE TYPE "K" PER
ANSI 816.22 OR PVC, 200 P.S.I., PER ASTM D1784 AND D2241.
4.MINIMUM TRENCH WIDTH SHALL BE 2 FEET.
5.ALL WATER JOINTS ARE TO BE MECHANICAL JOINTS WITH RESTRAINTS
SUCH AS THRUST BLOCKING, WITH STAINLESS STEEL OR COBALT BLUE
BOLTS, OR AS INDICATED IN THE CITY SPECIFICATIONS AND PROJECT
DOCUMENTS.
6.ALL UTILITIES SHOULD BE KEPT TEN (10') APART (PARALLEL) OR WHEN
CROSSING 18" VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO
OUTSIDE EDGE OF PIPE OR STRUCTURE).
7.CONTRACTOR SHALL MAINTAIN A MINIMUM OF 7'-6" COVER ON ALL
WATERLINES.
8.IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES,
SANITARY LINES, STORM LINES AND GAS LINES, OR ANY OBSTRUCTION
(EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE SCH. 40 OR
C900 WITH MECHANICAL JOINTS AT LEAST 10 FEET ON EITHER SIDE OF
THE CENTER LINE OF THE CROSSING. THE WATER LINE SHALL HAVE
MECHANICAL JOINTS WITH APPROPRIATE FASTENERS AS REQUIRED TO
PROVIDE A MINIMUM OF 18" VERTICAL SEPARATION. MEETING
REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50).
9.LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND
APPROVED BEFORE BACKFILLING.
10.TOPS OF MANHOLES SHALL BE RAISED AS NECESSARY TO BE FLUSH
WITH PROPOSED PAVEMENT ELEVATIONS, AND TO BE ONE FOOT ABOVE
FINISHED GROUND ELEVATIONS, IN GREEN AREAS, WITH WATERTIGHT
LIDS.
11.ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY
COMPRESSION STRENGTH AT 3000 P.S.I.
12.EXISTING UTILITIES SHALL BE VERIFIED IN FIELD PRIOR TO
INSTALLATION OF ANY NEW LINES.
13.REFER TO INTERIOR PLUMBING DRAWINGS FOR TIE-IN OF ALL UTILITIES.
14.CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE
SPECIFICATIONS OF THE CITY OF ROSEMOUNT AND/OR STATE OF MN
WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND
SEWER LINES.
15.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION
AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS
IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND
WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE
INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE.
THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES
AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT
FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT
WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
16.CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPECTIONS
AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY
SERVICE COMPANIES.
17.CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR
INSTALLATION REQUIREMENTS AND SPECIFICATIONS.
18.CONTRACTOR SHALL REFERENCE ARCH / MEP PLANS FOR SITE
LIGHTING AND ELECTRICAL PLAN.
19.BACKFLOW DEVICES (DDCV AND PRZ ASSEMBLIES) AND METERS ARE
LOCATED IN THE INTERIOR OF THE BUILDING. REF. ARCH / MEP PLANS.
20.ALL ONSITE WATERMAINS AND SANITARY SEWERS SHALL BE PRIVATELY
OWNED AND MAINTAINED.
21.ALL WATERMAIN STUBOUTS SHALL BE MECHANICALLY RESTRAINED
WITH REACTION BLOCKING.
NORTH
SANITARY SEWER MANHOLE
SANITARY SEWER
WATERMAIN
GATE VALVE
HYDRANT
TEE
REDUCER
UNDERGROUND ELECTRIC
TELEPHONE
GAS MAIN
STORM SEWER
LEGEND
CO SANITARY CLEANOUTCO
EXISTING PROPOSED
Know what'sbelow.
before you dig.Call
C600
UT
I
L
I
T
Y
PL
A
N
RO
E
R
S
CO
M
P
A
N
I
E
S
COORDINATE
WATER CONNECTION
WITH MEP,
WATER TO BE 7.5'
BELOW GRADE
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
***NOTE:ALL UTILITY CONNECTIONS TO BE COORDINATED WITH
MEP/ARCH. ROOF DRAIN LOCATIONS TBD AND TO BE
CONNECTED TO BMP-2 AND BMP-1 VIA STORM SYSTEM
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
r
o
e
r
s
c
o
m
p
a
n
i
e
s
\
r
o
s
e
m
o
u
n
t
a
p
a
r
t
m
e
n
t
s
-
a
k
r
o
n
a
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
p
l
a
n
s
h
e
e
t
s
\
C
6
-
U
T
I
L
I
T
Y
D
E
T
A
I
L
S
.
d
w
g
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
0
:
5
1
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
C700
CO
N
S
T
R
U
C
T
I
O
N
DE
T
A
I
L
S
RO
E
R
S
CO
M
P
A
N
I
E
S
N.T.S.
STANDARD SIGN POST3
36"
72"
U-CHANNEL
MUTCD STANDARD SIGN
(SIZE, SHAPE AND
COLORS). SEE SIGN CHART.
STANDARD
STALL ADA STALL
ACCESS
ISLE ADA STALL
STANDARD
STALL
6"
TRANSITION
PAVEMENT TO FLUSH
WITH SIDEWALK
INTEGRAL
SIDEWALK CURB
SEE DETAIL
ACCESSIBLE
PARKING SIGN
WITH BOLLARD
SEE DETAIL
2'
STRIPING - 4"
TRAFFIC WHITE
INTEGRAL
SIDEWALK CURB
SEE DETAIL
INTEGRAL
SIDEWALK CURB
SEE DETAIL
(2% MAX.)
PLAN VIEW OF ADA PARKING
SECTION A-A
SECTION B-B
B
B
AA
N.T.S.
ADA PARKING LAYOUT WITH INTEGRAL CURB8
N.T.S.
CONCRETE SIDEWALK AND HEAVY CONCRETE6
NO PARKING SIGN
(STANDARD SIGN POST), SEE
DETAIL
N.T.S.
STOP SIGN1
N.T.S.
ACCESSIBLE AISLE NO PARKING SIGN5
NO PARKING
TRAFFIC FLOW ARROW
N.T.S.
N.T.S.
DIRECTIONAL PAVEMENT MARKING9
24"
WIDTH OF LANE
STOP BAR
N.T.S.
1
/
2
"
6"
12"
60
"
-
6
6
"
'
18
"
ACCESSIBLE PARKING SIGNAGE
N.T.S.
WHITE SYMBOL ON BLUE BACKGOUND
LEGEND & BORDER: WHITE
BACKGROUND: BLUE
NOTES:
1.ALL LETTERS ARE 1" AERIES "C" PER MUTCD.
2.SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING GRADE) BLUE
BACKGROUND WITH WHITE REFLECTORIZED LEGEND AND BORDER.
3.FINE NOTIFICATION SIGN SHALL HAVE A REFLECTORIZED (ENGINEERING
GRADE) WITH WHITE LEGEND AND BORDER.
4.CONTRACTOR SHALL VERIFY FINE AMOUNT.
5.ONE(1) SIGN REQUIRED FOR EACH PARKING SPACE.
6.INSTALLED HEIGHT OF SIGN SHALL BE IN ACCORDANCE WITH SECTION 24-23
OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND
STATE OF MINNESOTA ACCESSIBILITY CODE.
7.ALL ACCESSIBLE FEATURES TO BE IN STRICT ACCORDANCE WITH A.D.A
STANDARDS AND LOCAL LAWS.
8.WHERE PROVIDED, THE BOTTOM OF "VAN ACCESSIBLE" SIGN SHALL BE
BETWEEN 60"-66" FROM THE PARKING SURFACE.
K-1479 12"x6" PLAQUE TYPICAL AT ALL VAN
ACCESSIBLE PARKING SPACES
PARKING
VEHICLE ID
REQUIRED
UP TO $200 FINE
FOR VIOLATION
N.T.S.
ACCESSIBLE PARKING SIGNAGE4
ACCESSIBLE PARKING SYMBOL
N.T.S.
N.T.S.
STANDARD DUTY ASPHALT2
N.T.S.
TYPICAL ISOLATION JOINT10
WI
D
T
H
PE
R
P
L
A
N
N.T.S.
DO NOT ENTER SING (R5-1)11
2" WEAR COURSE (SPWEA440F)
8" AGGREGATE BASE
COMPACT SUBGRADE PER
GEOTECHNICAL REPORT
2" NON-WEAR COURSE (SPNWB330F)
TACK COAT
1.5" WEAR COURSE (SPWEB330F)
6" AGGREGATE BASE
COMPACT SUBGRADE PER
GEOTECHNICAL REPORT
2" NON-WEAR COURSE (SPWEB340F)
TACK COAT
HEAVY DUTY CONCRETE
6" CONCRETE PAVEMENT
(4,000 PSI CONCRETE WITH CONTINUOUS
#4 REBAR 18" OC, EACH WAY)
6" AGGREGATE BASE
APPROVED SUBGRADE
N.T.S.
HEAVY DUTY ASPHALT12
N.T.S.
ACCESIBLE PARKING BOLLARD SIGN MOUNTING7
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
LANDSCAPE KEYNOTESLANDSCAPE LEGEND
EXISTING DECIDUOUS TREE (TYP.)
EXISTING CONIFEROUS TREE (TYP.)
EXISTING SHRUB (TYP.)
EDGER (TYP.)
APPROXIMATE LIMITS OF SOD / IRRIGATION,
SOD ALL DISTURBED AREAS (TYP.)
SEED/ SOD EDGE (TYP.)
SHRUB / PERENNIAL LANDSCAPE BED (TYP.)
A
LANDSCAPE KEYNOTES
EDGER (TYP.)
DOUBLE SHREDDED HARDWOOD MULCH (TYP.)
ROCK MULCH (TYP.)
SOD (TYP.)
A
B
C
D
PRO
P
O
S
E
D
B
U
I
L
D
I
N
G
56,9
5
0
S
.
F
.
FFE
=
9
3
1
.
0
0
BFE
:
9
2
1
.
0
0
A
K
R
O
N
A
V
E
N
U
E
C O N N E M A R A T R A I L W E S T
A B B
E
Y
F
I
E
L
D
A
V
E
N
U
E
C
O
U
N
T
Y
R
O
A
D
N
O
.
7
3
C
O
U
N
T
Y
R
O
A
D
N
O
.
7
3
60' GAS EASEMENT
PATIO SPACE
POOL
6
0
.
0
0
'
PROPOSED PICKLEBALL COURT
PROPOSED DOGRUN
B
B
B
B
B
B
B
B
B
B
B
B
A
A
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
33-261
D
CONIFEROUS TREE CODE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE
BHS 6 PICEA GLAUCA `DENSATA`BLACK HILLS SPRUCE B & B 6` HT.
ERC 3 JUNIPERUS VIRGINIANA EASTERN RED CEDAR B & B 6` HT.
NWS 6 PICEA ABIES NORWAY SPRUCE B & B 6` HT.
SCP 6 PINUS SYLVESTRIS SCOTCH PINE B & B 6` HT.
WHC 3 THUJA OCCIDENTALIS `WHITE CEDAR`WHITE CEDAR B & B 6` HT.
WHP 3 PINUS STROBUS WHITE PINE B & B 6` HT.
ORNAMENTAL TREE CODE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE
ALS 8 AMELANCHIER X GRANDIFLORA `AUTUMN BRILLANCE`AUTUMN BRILLANCE SERVICEBERRY CLUMP B & B 6` MULTI-TRUNK
IRW 6 OSTRYA VIRGINIANA IRONWOOD B & B 1.5" CAL.
PRC 8 MALUS IOENSIS `PRAIRIE ROSE`PRAIRIE ROSE CRABAPPLE B & B 1.5" CAL.
RVB 6 BETULA NIGRA RIVER BIRCH MULTI-TRUNK B & B 6` MULTI-TRUNK
OVERSTORY TREE CODE QTY BOTANICAL NAME COMMON NAME CONT CAL/SIZE
BOL 8 TILIA AMERICANA `BOULEVARD`BOULEVARD LINDEN B & B 2.5" CAL.
HCK 8 CELTIS OCCIDENTALIS COMMON HACKBERRY B & B 2.5" CAL.
IHL 8 GLEDITSIA TRIACANTHOS VAR. INERMIS `IMPERIAL`IMPERIAL HONEYLOCUST B & B 2.5" CAL.
KCY 8 GYMNOCLADUS DIOICA `ESPRESSO`ESPRESSO KENTUCKY COFFEETREE B & B 2.5" CAL.
PRE 8 ULMUS AMERICANA `PRINCETON`AMERICAN ELM B & B 2.5" CAL.
QXB 13 QUERCUS X BIMUNDORUM 'JFS-KW1QX' TM STREETSPIRE OAK B & B 2.5" CAL.
SGM 8 ACER X FREEMANII `SIENNA`SIENNA GLEN MAPLE B & B 2.5" CAL.
SWO 3 QUERCUS BICOLOR SWAMP WHITE OAK B & B 2.5" CAL.
PLANT SCHEDULE
SEEDING KEYNOTES
SEED WITH MNDOT 22-112: FIVE-YEAR STABILIZATION SEED MIX (TYP.)
SEED WITH MNDOT 25-131: LOW MAINTENANCE TURF SEED MIX (TYP.)
SEED WITH MNDOT 33-261: STORMWATER SOUTH & WEST SEED MIX (TYP.)
SEED WITH MNDOT 33-262: DRY SWALE/ POND SEED MIX (TYP.)
22-112
25-131
33-261
22-112
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
R
o
e
r
s
C
o
m
p
a
n
i
e
s
\
R
o
s
e
m
o
u
n
t
A
p
a
r
t
m
e
n
t
s
-
A
k
r
o
n
A
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
P
l
a
n
S
h
e
e
t
s
\
L
1
-
L
A
N
D
S
C
A
P
E
P
L
A
N
.
D
W
G
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
1
:
1
0
a
m
©
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
TREES REQUIRED:114 TREES = 1 TREES / 2 UNITS
227 / 2
TREES PROVIDED:119 TREES
FOUNDATION PLANTINGS REQUIRED:211 PLANTINGS = 1 PLANTING / 10 L.F. OF BUILDING PERIMETER
2,105 L.F. / 10
FOUNDATION PLANTING PROVIDED:XX PLANTINGS
*OVER 3-STORY BUILDING REQUIREMENTS: SPACING MUST INCLUDE TREES AT THE BOULEVARD AT 50' INTERVALS
LANDSCAPE SUMMARY
L100
LA
N
D
S
C
A
P
E
PL
A
N
RO
E
R
S
CO
M
P
A
N
I
E
S
NORTH
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
Th
i
s
d
o
c
u
m
e
n
t
,
t
o
g
e
t
h
e
r
w
i
t
h
t
h
e
c
o
n
c
e
p
t
s
a
n
d
d
e
s
i
g
n
s
p
r
e
s
e
n
t
e
d
h
e
r
e
i
n
,
a
s
a
n
i
n
s
t
r
u
m
e
n
t
o
f
s
e
r
v
i
c
e
,
i
s
i
n
t
e
n
d
e
d
o
n
l
y
f
o
r
t
h
e
s
p
e
c
i
f
i
c
p
u
r
p
o
s
e
a
n
d
c
l
i
e
n
t
f
o
r
w
h
i
c
h
i
t
w
a
s
p
r
e
p
a
r
e
d
.
R
e
u
s
e
o
f
a
n
d
i
m
p
r
o
p
e
r
r
e
l
i
a
n
c
e
o
n
t
h
i
s
d
o
c
u
m
e
n
t
w
i
t
h
o
u
t
w
r
i
t
t
e
n
a
u
t
h
o
r
i
z
a
t
i
o
n
a
n
d
a
d
a
p
t
a
t
i
o
n
b
y
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
s
h
a
l
l
b
e
w
i
t
h
o
u
t
l
i
a
b
i
l
i
t
y
t
o
K
i
m
l
e
y
-
H
o
r
n
a
n
d
A
s
s
o
c
i
a
t
e
s
,
I
n
c
.
2022 KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114
PHONE: 651-645-4197
WWW.KIMLEY-HORN.COM
K:
\
T
W
C
_
L
D
E
V
\
R
o
e
r
s
C
o
m
p
a
n
i
e
s
\
R
o
s
e
m
o
u
n
t
A
p
a
r
t
m
e
n
t
s
-
A
k
r
o
n
A
v
e
\
3
D
e
s
i
g
n
\
C
A
D
\
P
l
a
n
S
h
e
e
t
s
\
L
1
-
L
A
N
D
S
C
A
P
E
D
E
T
A
I
L
S
.
D
W
G
O
c
t
o
b
e
r
1
9
,
2
0
2
2
-
1
1
:
1
0
a
m
PR
E
L
I
M
I
N
A
R
Y
-
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
NO
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
Date
Project Number
1301 American Blvd E.
Suite 100
Bloomington, MN 55425
tel: (612) 879-6000
fax: (612) 879-6666
www.kaaswilson.com
Ow
n
e
r
:
Pr
o
j
e
c
t
:
DOUBLE SHREDDED HARDWOOD MULCH
NOTES:
2X ROOT BALL WIDTH
SOD
4" TOPSOIL
PREPARED PLANTING BED AND
BACKFILL SOIL
(THOROUGHLY LOOSENED)
NOTES:
1.SCARIFY SIDES AND BOTTOM OF HOLE.
2.PROCEED WITH CORRECTIVE PRUNING OF TOP AND ROOT.
3.REMOVE CONTAINER AND SCORE OUTSIDE OF SOIL MASS TO REDIRECT
AND PREVENT CIRCLING FIBROUS ROOTS. REMOVE OR CORRECT STEM
GIRDLING ROOTS.
4.PLUMB AND BACKFILL WITH PLANTING SOIL.
5.WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL
VOIDS.
6.BACK FILL VOIDS AND WATER SECOND TIME.
7.PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS
SOIL MOISTURE IS EXCESSIVE.
8.MIX IN 3-4" OF ORGANIC COMPOST.
1.SCARIFY SIDES AND BOTTOM OF HOLE.
2.PROCEED WITH CORRECTIVE PRUNING.
3.SET PLANT ON UNDISTURBED NATIVE SOIL OR
THOROUGHLY COMPACTED PLANTING SOIL.
INSTALL PLANT SO THE ROOT FLARE IS AT OR UP
TO 2" ABOVE THE FINISHED GRADE WITH BURLAP
AND WIRE BASKET, (IF USED), INTACT.
4.SLIT REMAINING TREATED BURLAP AT 6"
INTERVALS.
5.BACKFILL TO WITHIN APPROXIMATELY 12" OF THE
TOP OF THE ROOTBALL, THEN WATER PLANT.
REMOVE THE TOP 1/3 OF THE BASKET OR THE TOP
TWO HORIZONTAL RINGS WHICHEVER IS
GREATER. REMOVE ALL BURLAP AND NAILS FROM
THE TOP 1/3 OF THE BALL. REMOVE ALL TWINE.
REMOVE OR CORRECT STEM GIRDLING ROOTS.
6.PLUMB AND BACKFILL WITH PLANTING SOIL.
7.WATER THOROUGHLY WITHIN 2 HOURS TO
SETTLE PLANTS AND FILL VOIDS.
8.BACK FILL VOIDS AND WATER SECOND TIME.
9.PLACE MULCH WITHIN 48 HOURS OF THE SECOND
WATERING UNLESS SOIL MOISTURE IS EXCESSIVE.
10.FINAL LOCATION OF TREE TO BE APPROVED BY
OWNER.
PLANTING SOIL
ON CENTER SPACING
AS STATED ON PLAN.
EXTEND HOLE EXCAVATION WIDTH
A MINIMUM OF 6" BEYOND
THE PLANTS ROOT SYSTEM.
FINISHED GRADE
EDGER, AS SPECIFIED
TREE PLANTING DETAIL
SCALE: N.T.S.L1011 SHRUB / PERENNIAL PLANTING DETAIL
SCALE: N.T.S.L1012
1/
2
"
FINISHED GRADE AT LAWN,
1/2" BELOW TOP OF DIVIDER.
LAWN SIDE
"BLACK DIAMOND" EDGING BY
VALEEY VIEW SPECIALTIES CO.
USE 20 FT. LENGTHS. USE
KNURLED CONNECTOR AT SPLICES,
USE CORNER, TEE, VEE, OR WIDE
ANBLE CONNECTORS AT ANGLE
10" X 7/8" METAL ANCHOR
STAKES AT 48" O.C., AND AT
CHANGES.
EACH END.
PLASTIC DIVIDER:
FINISHED GRADE AT
SHRUBS/ PERENNIALS, 1" BELOW TOP
OF DIVIDER.
PLANTING BED
1"
POLY EDGER DETAIL
SCALE: N.T.S.L1013
1.CONTRACTOR SHALL CONTACT COMMON GROUND ALLIANCE AT 811 OR CALL811.COM TO
VERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY PLANTS
OR LANDSCAPE MATERIAL.
2.ACTUAL LOCATION OF PLANT MATERIAL IS SUBJECT TO FIELD AND SITE CONDITIONS.
3.NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEEN
COMPLETED IN THE IMMEDIATE AREA.
4.ALL SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO
SUBMISSION OF ANY BID AND/OR QUOTE BY THE LANDSCAPE CONTRACTOR.
5.CONTRACTOR SHALL PROVIDE TWO YEAR GUARANTEE OF ALL PLANT MATERIALS. THE
GUARANTEE BEGINS ON THE DATE OF THE LANDSCAPE ARCHITECT'S OR OWNER'S WRITTEN
ACCEPTANCE OF THE INITIAL PLANTING. REPLACEMENT PLANT MATERIAL SHALL HAVE A ONE
YEAR GUARANTEE COMMENCING UPON PLANTING.
6.ALL PLANTS TO BE SPECIMEN GRADE, MINNESOTA-GROWN AND/OR HARDY. SPECIMEN GRADE
SHALL ADHERE TO, BUT IS NOT LIMITED BY, THE FOLLOWING STANDARDS:
ALL PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, SCARS, ETC.
ALL PLANTS SHALL BE FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES.
ALL PLANTS SHALL BE FREE FROM BROKEN OR DEAD BRANCHES.
ALL PLANTS SHALL HAVE HEAVY, HEALTHY BRANCHING AND LEAFING.
CONIFEROUS TREES SHALL HAVE AN ESTABLISHED MAIN LEADER AND A HEIGHT TO WIDTH
RATIO OF NO LESS THAN 5:3.
7.PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOST
CURRENT VERSION) REQUIREMENTS FOR SIZE AND TYPE SPECIFIED.
8.PLANTS TO BE INSTALLED AS PER MNLA & ANSI STANDARD PLANTING PRACTICES.
9.PLANTS SHALL BE IMMEDIATELY PLANTED UPON ARRIVAL AT SITE. PROPERLY HEEL-IN
MATERIALS IF NECESSARY; TEMPORARY ONLY.
10.PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLARE IS LOCATED AT THE
TOP OF THE BALLED & BURLAP TREE. IF THIS IS NOT THE CASE, SOIL SHALL BE REMOVED
DOWN TO THE ROOT COLLAR/ROOT FLARE. WHEN THE BALLED & BURLAP TREE IS PLANTED,
THE ROOT COLLAR/ROOT FLARE SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE.
11.OPEN TOP OF BURLAP ON BB MATERIALS; REMOVE POT ON POTTED PLANTS; SPLIT AND
BREAK APART PEAT POTS.
12.PRUNE PLANTS AS NECESSARY - PER STANDARD NURSERY PRACTICE AND TO CORRECT
POOR BRANCHING OF EXISTING AND PROPOSED TREES.
13.WRAP ALL SMOOTH-BARKED TREES - FASTEN TOP AND BOTTOM. REMOVE BY APRIL 1ST.
14.STAKING OF TREES AS REQUIRED; REPOSITION, PLUMB AND STAKE IF NOT PLUMB AFTER ONE
YEAR.
15.THE NEED FOR SOIL AMENDMENTS SHALL BE DETERMINED UPON SITE SOIL CONDITIONS
PRIOR TO PLANTING. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT FOR
THE NEED OF ANY SOIL AMENDMENTS.
16.BACKFILL SOIL AND TOPSOIL TO ADHERE TO MN/DOT STANDARD SPECIFICATION 3877 (SELECT
TOPSOIL BORROW) AND TO BE EXISTING TOP SOIL FROM SITE FREE OF ROOTS, ROCKS
LARGER THAN ONE INCH, SUBSOIL DEBRIS, AND LARGE WEEDS UNLESS SPECIFIED
OTHERWISE. MINIMUM 4" DEPTH TOPSOIL FOR ALL LAWN GRASS AREAS AND 12" DEPTH
TOPSOIL FOR TREE, SHRUBS, AND PERENNIALS.
17.MULCH TO BE AT ALL TREE, SHRUB, PERENNIAL, AND MAINTENANCE AREAS. TREE AND SHRUB
PLANTING BEDS SHALL HAVE 4" DEPTH OF DOUBLE SHREDDED HARDWOOD MULCH. DOUBLE
SHREDDED HARDWOOD MULCH TO BE USED AROUND ALL PLANTS WITHIN TURF AREAS.
PERENNIAL AND ORNAMENTAL GRASS BEDS SHALL HAVE 2" DEPTH DOUBLE SHREDDED
HARDWOOD MULCH. MULCH TO BE FREE OF DELETERIOUS MATERIAL AND NATURAL IN
COLOR, OR APPROVED EQUAL. ROCK MULCH TO BE RIVER ROCK, 1 1/2" DIAMETER, AT
MINIMUM 3" DEPTH, OR APPROVED EQUAL. ROCK MULCH TO BE ON COMMERCIAL GRADE
FILTER FABRIC, BY TYPAR, OR APPROVED EQUAL WITH NO EXPOSURE. MULCH AND FABRIC TO
BE APPROVED BY OWNER PRIOR TO INSTALLATION. MULCH TO MATCH EXISTING CONDITIONS
(WHERE APPLICABLE).
18.EDGING TO BE COMMERCIAL GRADE VALLEY-VIEW BLACK DIAMOND (OR EQUAL) POLY EDGING
OR SPADED EDGE, AS INDICATED. POLY EDGING SHALL BE PLACED WITH SMOOTH CURVES
AND STAKED WITH METAL SPIKES NO GREATER THAN 4 FOOT ON CENTER WITH BASE OF TOP
BEAD AT GRADE, FOR MOWERS TO CUT ABOVE WITHOUT DAMAGE. UTILIZE CURBS AND
SIDEWALKS FOR EDGING WHERE POSSIBLE. SPADED EDGE TO PROVIDE V-SHAPED DEPTH
AND WIDTH TO CREATE SEPARATION BETWEEN MULCH AND GRASS. INDIVIDUAL TREE, SHRUB,
OR RAIN-GARDEN BEDS TO BE SPADED EDGE, UNLESS NOTED OTHERWISE. EDGING TO
MATCH EXISTING CONDITIONS (WHERE APPLICABLE).
19.ALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. PARKING
LOT ISLANDS TO BE SODDED WITH SHREDDED HARDWOOD MULCH AROUND ALL TREES AND
SHRUBS. SOD TO BE STANDARD MINNESOTA GROWN AND HARDY BLUEGRASS MIX, FREE OF
LAWN WEEDS. ALL TOPSOIL AREAS TO BE RAKED TO REMOVE DEBRIS AND ENSURE
DRAINAGE. SLOPES OF 3:1 OR GREATER SHALL BE STAKED. SEED AS SPECIFIED AND PER
MN/DOT SPECIFICATIONS. IF NOT INDICATED ON LANDSCAPE PLAN, SEE EROSION CONTROL
PLAN.
20.PROVIDE IRRIGATION TO ALL PLANTED AREAS ON SITE. IRRIGATION SYSTEM TO BE
DESIGN/BUILD BY LANDSCAPE CONTRACTOR. LANDSCAPE CONTRACTOR TO PROVIDE SHOP
DRAWINGS TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION OF
IRRIGATION SYSTEM. CONTRACTOR TO PROVIDE OPERATION MANUALS, AS-BUILT PLANS, AND
NORMAL PROGRAMMING. SYSTEM SHALL BE WINTERIZED AND HAVE SPRING STARTUP
DURING FIRST YEAR OF OPERATION. SYSTEM SHALL HAVE ONE-YEAR WARRANTY ON ALL
PARTS AND LABOR. ALL INFORMATION ABOUT INSTALLATION AND SCHEDULING CAN BE
OBTAINED FROM THE GENERAL CONTRACTOR. SYSTEM SHALL INCLUDE A RAIN SENSOR AND
APPROPRIATE TECHNOLOGY.
21.CONTRACTOR SHALL PROVIDE NECESSARY WATERING OF PLANT MATERIALS UNTIL THE
PLANT IS FULLY ESTABLISHED OR IRRIGATION SYSTEM IS OPERATIONAL. OWNER WILL NOT
PROVIDE WATER FOR CONTRACTOR.
22.REPAIR, REPLACE, OR PROVIDE SOD/SEED AS REQUIRED FOR ANY ROADWAY BOULEVARD
AREAS ADJACENT TO THE SITE DISTURBED DURING CONSTRUCTION.
23.REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO OWNER.
24.RAIN GARDEN NOTE: PROVIDE AND INSTALL EROSION CONTROL BLANKET AT RAIN GARDEN
AREA SIDE SLOPES AFTER ALL PLANTING HAVE BEEN INSTALLED. BLANKET TO BE ONE
SEASON GEOJUTE, MN/DOT CATEGORY 2 (STRAW 1S, WOOD FIBER 1S), OR APPROVED EQUAL.
BLANKET TO BE OVERLAPPED BY 4" AND ANCHORED BY SOD STAPLES. PLACE BLANKET
PERPENDICULAR TO THE SLOPE. TRENCH IN EDGES OF BLANKET AREA TO PREVENT UNDER
MINING. PROVIDE SILT FENCE AT TOP OF SLOPE AS NEEDED. SHREDDED HARDWOOD MULCH
TO MATCH OTHER PROJECT PLANTING MULCH. PLACE 4" DEPTH OF MULCH AT ALL PLANTING
AND EROSION CONTROL BLANKET AREA (NO FILTER FABRIC). SEE RAIN GARDEN DETAIL FOR
FURTHER INFORMATION. RAIN GARDEN TO PROVIDE PROPER INFILTRATION AND DRAINAGE
REQUIREMENTS PER ENGINEERS APPROVAL.
25.MAINTAIN TREES, SHRUBS, AND OTHER PLANTS UNTIL PROJECT COMPLETION, BUT IN NO
CASE, LESS THAN FOLLOWING PERIOD; 1 YEAR AFTER PROJECT COMPLETION. MAINTAIN
TREES, SHRUBS, AND OTHER PLANTS BY PRUNING, CULTIVATING, AND WEEDING AS REQUIRED
FOR HEALTHY GROWTH. RESTORE PLANTING SAUCERS. TIGHTEN AND REPAIR STAKE AND
GUY SUPPORTS AND RESET TREES AND SHRUBS TO PROPER GRADES OR VERTICAL POSITION
AS REQUIRED. RESTORE OR REPLACE DAMAGED WRAPPINGS. SPRAY AS REQUIRED TO KEEP
TREES AND SHRUBS FREE OF INSECTS AND DISEASE. REPLENISH MULCH TO THE REQUIRED
DEPTH. MAINTAIN LAWNS FOR 45 DAYS AFTER INSTALLING SOD INCLUDING MOWING WHEN
SOD RECITES 4” IN HEIGHT. WEED PLANTING BEDS AND MULCH SAUCERS AT MINIMUM ONCE A
MONTH DURING THE GROWING SEASON. PROVIDE A MONTHLY REPORT TO THE OWNER ON
WEEDING AND OTHER MAINTENANCE RESPONSIBILITIES.
26.SEE ELECTRICAL PLANS FOR SITE LIGHTING.
27.OWNER AND ARCHITECT TO CONFIRM SITE FURNISHINGS SUCH AS BENCHES, TABLES AND
CHAIRS, AND TRASH/RECYCLING RECEPTACLES.
LANDSCAPE NOTES
L101
LA
N
D
S
C
A
P
E
DE
T
A
I
L
S
RO
E
R
S
CO
M
P
A
N
I
E
S
RO
S
E
M
O
U
N
T
AP
A
R
T
M
E
N
T
S
-
AK
R
O
N
A
V
E
1 BUILDING ENTRANCE
2 GARAGE ENTRANCE
3 COMMUNITY PATIO
4 COURTYARD AMENITY
5 STORMWATER RETENTION
6 DOG RUN
7 ROOFTOP DECK
8 PLAZA BELOW
9 POOL
10 PICKLE BALL
SITE PLAN KEY
Proposed Impervious Area:
3.58 Acres
4 S T O R Y
2 2
2 5
7
4 3
4 2
4 2
3 7
3 7
1 1
2 9
3 S T O R Y
1
9
10
7
6
5
4
2
CONNEMARA TRAIL W
CO
U
N
T
Y
R
O
A
D
N
O
7
3
A B B E Y F I E L D A V EPROPOSED STREETProposed P e r v i o u s A r e a :
4 .3 9 A c r e s
0
kaas wilson architects
100'200'
Rosemount Akron ApartmentsSITE PLAN
2.0 Akron Avenue, Rosemount, MN 03/12/20 22041
1" = 100'-0"1 Site Plan
kaas wilson architects
Rosemount Akron ApartmentsPERSPECTIVE - VIEW 1
2.1 Akron Avenue, Rosemount, MN 08/24/22 22041
AILESBURY AVE CORNER
APPROX. 330'-0" AWAY FROM BUILDING1
kaas wilson architects
Rosemount Akron ApartmentsPERSPECTIVE - VIEW 2
2.2 Akron Avenue, Rosemount, MN 08/24/22 22041
BUILDING -SW CORNER
2
kaas wilson architects
Rosemount Akron ApartmentsPERSPECTIVE - VIEW 3
2.3 Akron Avenue, Rosemount, MN 08/24/22 22041
AILESBURY COURT
APPROX. 260'-0" AWAY FROM BUILDING3
kaas wilson architects
Rosemount Akron ApartmentsPERSPECTIVE - VIEW 4
2.4 Akron Avenue, Rosemount, MN 10/20/22 22041
CONNEMARA TRAIL WEST CORNER
APPROX. 460'-0" AWAY FROM BUILDING
4
kimley-horn.com 767 Eustis Street, Suite 100, St. Paul, MN 55114 651-645-4197
MEMORANDUM
To: City of Rosemount
From: Jacob Rojer, P.E., PTOE
Date: October 19, 2022
Subject: Akron & 42 Rosemount Apartments – Traffic Memorandum
Akron Avenue, Rosemount, MN
INTRODUCTION
Kimley-Horn and Associates has been contracted by Roers Companies to prepare a traffic memorandum
for the +/- 8-acre property located on the southwest corner of CSAH 73 (Akron Avenue) & Connemara Trail
in Rosemount, MN. The proposed apartments would occupy the north 8 acres of the full parcel. Future
development on the south side of the proposed street through the site would be developed by others.
This memorandum documents the anticipated site trip generation, trip assignment, and the anticipated
impact of the development on the surrounding roadways.
PROPOSED DEVELOPMENT & SITE ACCESS
The proposed 8-acre development is anticipated to include an apartment building with 212 residential units.
Access to the development is planned to be along a connecting roadway between Akron Avenue and
Abbeyfield Avenue. The connection at Abbeyfield Avenue will be full access while the connection at Akron
Avenue currently provides ¾ access to the site.
TRIP GENERATION
In order to calculate site trips anticipated to be generated by the proposed development, data was
referenced from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition. The
Trip Generation Manual provides peak hour trip rates and inbound-outbound percentages. As previously
stated, the proposed development is anticipated to include an apartment building with 212 residential units.
Table 2 summarizes the Daily, AM, & PM peak hour trip generation estimates. The AM peak hour is
projected to generate 78 trips (18 entering and 60 exiting) and the PM peak hour is projected to generate
83 trips (50 entering and 33 exiting). The development is projected to generate 962 daily trips.
Table 1 – Site Trip Generation
Land Use Description ITE Size Daily AM Peak Hour PM Peak Hour
In Out Total In Out Total
Multi-family Housing
(Mid-Rise) 221 212 Dwelling
Units 962 18 60 78 50 33 83
TRIP DISTRIBUTION AND ASSIGNMENT
The site trips were distributed to adjacent roadways based on the current traffic patterns in the area, a
general assessment of the major regional roadways surrounding the study area.
Page 2
kimley-horn.com 767 Eustis Street, Suite 100, St. Paul, MN 55114 651-645-4197
The following global trip distribution was applied to all trips generated by the Residential land uses:
60% west on CSAH 42
30% east on CSAH 42
5% west on Connemara Trail W
5% north on CSAH 73 (Akron Avenue)
The AM and PM peak hour trips were then assigned to the surrounding roadway network using the site
distributions listed above. Exhibit 1 provides the site trip assignment to the roadway network.
PLANNING LEVEL ROADWAY CAPACITY
Current AADTs in the area surrounding the proposed apartment building are 18,300 vehicles per day (vpd)
on CSAH 42, 2,750 vpd on Akron Avenue, and 700 vpd on Abbeyfield Avenue. Ailesbury Avenue does not
have historic traffic data available.
The Highway Capacity Manual (HCM), 6th Edition provides a Level of Service (LOS) estimate based on
roadway characteristics and the Average Annual Daily Traffic (AADT). LOS ranges from A to F, with LOS
A as the highest (best traffic flow and least delay), LOS E as saturated or at-capacity conditions, and LOS
F as the lowest (oversaturated conditions). CSAH 42 is a four-lane divided rural roadway, Akron Avenue is
a two-lane divided urban roadway, Abbeyfield Avenue is a two-lane undivided roadway, and Aliesbury
Avenue is a neighborhood road. Table 3 shows the expected LOS based on the AADT and roadway type.
Exhibit 1 shows the anticipated daily trips generated by the development that will utilize the adjacent
roadways in the area. Based on future trip distribution and assignment, all roadways in the area are
expected to remain at acceptable capacity. While there is not a known AADT for Aliesbury Avenue, it is
expected to have minimal additional traffic based on projected distribution patterns.
Table 3 – Planning Level Roadway Capacity
Facility Type Planning Level Daily
Capacity Ranges (AADT)
Under Capacity Approaching
Capacity
Over
Capacity
LOS A B C D E F
V/C 0.2 0.4 0.6 0.85 1.0 >1.0
Two-lane undivided
urban 8,000-10,000 2,000 4,000 6,000 8,500 10,000 >10,000
Two-lane divided
urban 14,000-17,000 3,400 6,800 10,200 14,450 17,000 >17,000
Four-lane divided
rural 35,000-38,000 7,600 15,200 22,800 32,300 38,000 >38,000
CONCLUSION
The proposed site is anticipated to include a 212-unit apartment building. The AM peak hour is projected
to generate 78 trips (18 entering and 60 exiting) and the PM peak hour is projected to generate 83 trips (50
entering and 33 exiting). The development is projected to generate 962 daily trips. Based on future trip
distribution and assignment, all roadways in the area are expected to remain at acceptable capacity. While
there is not a known AADT for Aliesbury Avenue, it is expected to have minimal additional traffic based on
projected distribution patterns.
NOT TO SCALE
N
CSAH 42 (145th Street)CS
A
H
7
3
(
A
k
r
o
n
A
v
e
n
u
e
)
A
i
l
e
s
b
u
r
y
A
v
e
n
u
e
A b beyfield
Avenue
*100 vpd
*3
7
5
v
p
d
*5
0
v
p
d
*52
5
v
p
d
*7
5
v
p
d
*600 vpd
*300 vpd
*
5
0
v
p
d
*2
5
v
p
d
* Est. Additional Daily Traffic
C
o
n
n
e
m
a
r
a
T
r
a
i
l
EXHIBIT 1
TRIP DISTRIBUTION
LEGEND
Proposed Site
Global Distribution
In [Out] Site Traffic Distribution
Proposed Access Road
X%
XX% [XX%]
5%
5%
5%
[5%]
55
%
[5
0
%
]
5%
50%
[5
0
%
]
[10%]
10% 10%
25%[3
0
%
]
5%
[1
0
%
]
5%
35
%
[40%]
5%
[5
%
]
[5
%
]
5%
[50%]
[10%]
55
%
60%
30%
K:\021290-000\Admin\Docs\2022.09.13 - Site Plan Review.docx
Memorandum
To: Anthony Nemcek, Senior Planner
CC: Stacy Bodsberg, Planning & Personnel Secretary
Brian Erickson, City Engineer
From: Tim Hanson PE, WSB Engineering Consultant
Date: September 14, 2022
Re: Rosemount Apartments
Preliminary Site Plan Review
Preliminary Grading Plan Review
Preliminary Utility Plan Review
WSB File Number 021290-000
SUBMITTAL:
Roers Company has submitted a site plan for the development of the northerly portion of Outlot I,
Prestwick Place. The proposed project develops a 225-unit apartment building with 286 surface
parking stalls. The plans submitted were prepared by Kimley-Horn of St. Paul, MN. Review
comments were generated from the Site Plan Submittal not dated, received on 09.01.2022. The
submittal included the following:
▪ Existing Conditions
▪ Site Plan
▪ Grading Plan
▪ Utility Plan
▪ Landscape Plan
EXISTING CONDITIONS
Rosemount Apartments is in the northwest quadrant of County State Aid Highway 42 and Akron
Avenue, south of Connemara Trail and east of Abbeyfield Avenue. The parent parcel will be
subdivided with the northerly portion proposed for development and the southerly portion
adjacent to CSAH 42 for future development. The parent parcel is 18.88 acres.in size and is
currently utilized for agricultural purposes. Rosemount Apartments is roughly one half of the
parent parcel in size.
Rosemount Apartments will create a single lot and an outlot. The replating of Outlot I, Prestwick
Place will require the vacation of existing drainage and utility easements platted with Prestwick
Place.
1. Vacate existing drainage and utility easements within the platted lot.
SITE PLAN
The proposed site plan identifies the development of 225-unit Apartment building in one structure.
Access to the site is from a proposed street extending between Akron Avenue and Abbeyfield
Avenue. The apartment site identifies two driveway locations extending from the proposed street.
Anthony Nemcek
September 14, 2022
Page 2
K:\021290-000\Admin\Docs\2022.09.13 - Site Plan Review.docx
The easterly access provides access to the building entrance and two surface parking lots. The
westerly access provides access to the garage parking area located under the apartment
building. This access is on the westerly end of the proposed street extending to the southeasterly
corner of the apartment building.
The street width and driveway widths are not identified in the preliminary plans. The proposed
street will provide access to both the commercial area and the apartment complex. Allowing for
driveway accesses that are not aligned, the street width needs to provide for 2 thru lanes and a
continuous left turn lane.
The proposed surface parking stalls are identified to be 9-feet-wide and 18-feet deep with bumper
overhang and 20-feet-deep for head-to-head parking stalls. Access and circulation within the
parking lots appears to be adequate.
Pedestrian facilities are identified adjacent to the proposed street extending from Akron Avenue
to Abbeyfield Avenue. Sidewalks are also identified around the parking lots and the along the
north and northwest sides of the apartment building. These sidewalks provide access to
recreational amenities identified on site.
A pipeline and pipeline easement extends diagonally across the northern portion of the site. The
building footprint is adjacent to and parallel to the pipeline easement. The grading plan identifies
significant fills and cuts over the pipeline alignment. The developer needs to verify the ability to
change the grade over the pipeline.
2. Provide a street width that accommodates 3 lanes of traffic.
3. The proposed pavement section needs to include 2 feet of select granular borrow.
The development Fees are indicated below based on the 2022 Schedule of Rates and Fees.
The lot is subject to these fees.
▪ Sanitary Sewer Trunk Charge: $1,075/acre
▪ Watermain Trunk Charge: $6,500/acre
▪ Storm Sewer Trunk Charge: $6,865/acre
GRADING AND DRAINAGE
The proposed grading plan directs runoff away from the building. The southeasterly side of the
building has its runoff flow south to the southerly curb line of the parking lots where it is collected
by storm sewer. The west side of the building has its runoff flow by overland flow to the
northwest to the proposed ponding area. No grading is identified south of the proposed east -west
street. The street grades match the existing topography. The high point in the street should be at
or below 932 elevation. This is anticipating the commercial area will be graded relatively flat.
4. The high point of the street should not be above a 932 elevation.
5. The centerline radii of the street must be 340 feet or greater.
SANITARY SEWER AND WATERMAIN – UTILITY PLAN
Sanitary sewer service to Rosemount Apartments is proposed to extend from an MCES facility
located on the east side of Akron Avenue. The utility plan identifies the sanitary sewer extending
across Akron Avenue and along the proposed street alignment to the westerly driveway. Sewer
service to the apartment building extends to the central portion of the building from just east of the
easterly driveway. An existing sanitary sewer stub into the parent parcel is located off of
Abbeyfield Avenue at the Ailsebury Court intersection. This sanitary sewer can provide sewer
service to the westerly portion of the future development area. The easterly portion of the
commercial property can be provided sewer service from the proposed sewer extension.
Anthony Nemcek
September 14, 2022
Page 3
K:\021290-000\Admin\Docs\2022.09.13 - Site Plan Review.docx
There is an existing eight-inch watermain stub located at the Akron Avenue intersection with the
proposed street. This watermain stub is proposed to be extended into the site along the proposed
street alignment The watermain will be extended as a 12-inch trunk main and connect to a 12-
inch watermain located within Abbeyfield Avenue. Domestic and fire flows will be obtained from
the watermain extension.
6. Location of hydrants and valves will be detail reviewed with the construction plans.
STORM SEWER
One storm sewer system is proposed for the apartment building site. This storm sewer line
extends along the south curb line of the main parking lot to the northeast corner of the southerly
parking lot. This storm sewer extends around the northern portion of the apartment building to
the proposed ponding area located in the northwest corner of the site. T his storm sewer will be
privately maintained. Storm sewer design and layout will be reviewed with the Surface Water
Management plan submittal.
7. Detail review of the storm sewer system and design will be completed with the
construction plans for the site.
8. An existing storm sewer stub extending from Abbeyfield Avenue will need to be
permanently truncated if it is not utilized.
9. An existing 6-inch drain tile extends from the storm sewer in Akron Avenue to the low
area north of the proposed street intersection with Akron Avenue. This drain tile needs to
be truncated at the catchbasin.
10. An existing interceptor storm sewer extending from Abbeyfield Avenue will need to be
extended to the proposed ponding area.
11. The preliminary plans do not identify how runoff from the proposed street will be collected
or managed.
SURFACE WATER MANAGEMENT
The proposed Surface Water Management plan for the preliminary plat is under reviewed.
Comments included in the Surface Water Management plan review shall be incorporated in the
project design.
LANDSCAPE PLAN
A Landscape plan was not submitted for review. Landscaping needs to be located so it does not
conflict with infrastructure. Tree plantings should allow space for access and maintenance of
proposed infrastructure.
GENERAL
Infrastructure design shall be completed in accordance with the City of Rosemount’s Engineering
Guidelines and Standards. Infrastructure construction shall be completed in accordance with the
latest edition of the City’s General Specifications and Standard Detail Plates for Street and Utility
Construction.
M E M O R A N D U M
To: Planning Commission
Adam Kienberger, Community Development Director
Anthony Nemcek, Senior Planner
Julia Hogan, Planner
From: Dan Schultz, Parks and Recreation Director
Date: October 19, 2022
Subject: Park Development in the area of Akron Avenue and Connemara Trail
The Parks and Recreation Department was recently asked to provide input on the parks and recreation
opportunities in the area of Akron Avenue and Connemara Trail where new apartment complex projects
are being discussed.
The City’s Parks, Trail and Open Space Plan includes a framework that are based on national standards
and with a strong influence of local needs and conditions. As such, this framework should be used as a
guide and should be adjusted based on community needs, trends, etc. It is assumed that residents, land
developers, city staff, commissions and officials will use the masterplan and knowledge of local conditions
as they face decisions about parks, trails or open space.
The City’s framework calls for typical neighborhood park to have a service area radius of an average of a
½ mile.
The Shafer Richardson project is in close proximity to two existing City parks, a future City park and a
future school site. The listings below show how close the proposed Shafer Richardson project site is to
these areas. Please also see the attached map.
Ailesbury Park .32 miles
Greystone Park .54 miles
Future School .63 miles
Future Talamore Park .72 miles
The Roers project is also in close proximity to two existing City parks, a future City park and a future
school site. The listings below show how close the proposed Roers project site is located to these areas.
Please also see the attached map.
Ailesbury Park .14 miles
Greystone Park .74 miles
Future School .68 miles
Future Talamore Park .73 miles
Please let me know if you have any questions about this memo.
Area Map