Loading...
HomeMy WebLinkAbout6.f. Professional Services Contract for Design of Bonaire Path Trail Segment 1 (Bacardi Avenue – Autumn Path section) EXECUTIVE SUMMARY City Council Regular Meeting: December 6, 2022 AGENDA ITEM: Professional Services Contract for Design AGENDA SECTION: of Bonaire Path Trail Segment 1 (Bacardi Consent Avenue – Autumn Path section) PREPARED BY: Dan Schultz, Parks and Recreation Director AGENDA NO. 6.f. ATTACHMENTS: Concept Plan APPROVED BY: LJM RECOMMENDED ACTION: Motion to recommend the City Council approve entering into a professional services agreement with ISG in the amount of $71,100 to create construction plans and specifications for a trail segment along Bonaire Path from Bacardi Avenue to the Autumn Path BACKGROUND ISG has submitted a proposal to provide the necessary professional services to move us to a point so that we can bid the trail segment 1 along Bonaire Path. The services that ISG would provide include a topographical survey, wetland delineation, public engagement, design development, construction documents and permitting. The initial trail design will be based off concept C (using the third lane for a trail) that was shared with the City Council at a recent work session. Staff understands that there was also support to fill a small portion of the wetland and use concept A, but after discussing the project with the design team we feel we should try to use the third lane between the ponds for the trail and not impact the wetlands if at all possible. In 2022, the City of Rosemount received a Statewide Health Improvement Partnership (SHIP) Grant to conduct a feasibility study for installing a trail along a small section of Bonaire Path (Bacardi Ave to Auburn Path). The Meadows Park section is a difficult area to install a trail due to the wetlands on both sides of the road. The feasibility study developed three options for installing a trail in the wetlands section on Bonaire Path near Meadows Park and east of this area. Option A would fill a portion of the wetland and build the trail adjacent to the road. Option B would have an elevated boardwalk constructed through the wetland and connect to a trail that would go east, and finally Option C would reconfigure the street and re-establish a narrower road with a new curb line that would allow for a paved trail to be on the south side of Bonaire Path. RECOMMENDATION Staff is recommending City Council approve entering into a professional services agreement with ISG in the amount of $71,100 to create construction plans and specifications for trail segment 1 along Bonaire Path from Bacardi Avenue to Autumn Path. Concept Plan 2