Loading...
HomeMy WebLinkAbout6.o. 2022 Pond Maintenance Project, City Project 2022-04, Final Acceptance and Authorization of Final Payment\\Rsm-File\Common\City Clerk\Agenda Items\Approved Items\6.O. 2022 Pond Maintenance Project, City Project 2022-04, Final Acceptance And Authorization Of Final Payment.Docx EXECUTIVE SUMMARY City Council Meeting: December 20, 2022 AGENDA ITEM: 2022 Pond Maintenance Project, City Project 2022-04, Final Acceptance and Authorization of Final Payment AGENDA SECTION: Consent PREPARED BY: Jane Byron, Stormwater Specialist AGENDA NO. 6.o. ATTACHMENTS: Resolution, Engineer’s Recommendation, Final Payment Request, Project Map APPROVED BY: LJM RECOMMENDED ACTIONS: Resolution to Accept the Improvements and Approve Final Payment for the 2022 Pond Maintenance Project, City Project 2022-04 BACKGROUND On January 4, 2022, City Council awarded a contract to Fitzgerald Excavating & Trucking, Inc. for the 2022 Pond Maintenance Project, City Project 2022-04. This project excavated 2,300 cubic yards of accumulated sediment from Pond 1565 (Daffodil Pond). Approximately 1,150 cubic yards of the sediment removed had contaminate levels that required disposal (i.e. fill use in industrial areas only or landfill disposal). Pond inspections and modeling had indicated the pond was operating at a low efficiency with regards to phosphorus and suspended solids removal. Excavation was completed in winter of 2022. Restoration of impacted areas was completed summer of 2022. Maintenance activities are complete, and the improvements are ready for final City acceptance. Fitzgerald Excavating & Trucking, Inc. has completed all improvements as designed by WSB and detailed in the contract. As a result, WSB has recommended acceptance and issuing the final payment for this work. The total construction cost was $97,002.00 or 2.8% less than the bid amount of $99,785 due to the actual quantities used in the work. The final payment is $7,658.30. Table below shows the final cost details. Engineer’s Estimate Bid Amount Final Cost Total $101,795.00 $99,785.00 $97,002.00 Over/(Under) Amount $ (4,793.00) $ (2,783.00) Over/(Under) Percent -4.7% -2.8% RECOMMENDATION Staff recommends that the City Council adopt the attached resolution accepting the improvements for perpetual maintenance and authorizing final payment to Fitzgerald Excavating & Trucking, Inc. for the Daffodil Pond Improvements, City Project 2022-04. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022 – XX A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR DAFFODIL POND IMPROVEMENTS CITY PROJECT 2022-04 WHEREAS, Fitzgerald Excavating & Trucking, Inc. has completed the required construction as per the scope of the contract, and; WHEREAS, the City received a concurrence from WSB that the work has been completed in accordance with the approved plans and specifications and finds the improvements acceptable; WHEREAS, the contractor has completed all necessary administrative requirements to close out the contract. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROSEMOUNT, MINNESOTA: 1. The improvements completed under said agreement are hereby accepted for perpetual maintenance and ownership. 2. Final payment to the contractor is authorized. ADOPTED this 20th day of December, 2022. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\019222-000\Admin\Construction Admin\Pay Vouchers\019222-000 LTR Voucher Final 111022.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 5 5 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M November 10, 2022 Mr. Jason Fitzgerald Fitzgerald Excavating & Trucking, Inc. 21432 350th Street Goodhue, MN 55027 Re: Pay Voucher 2 & Final 2022 Pond Cleanout Project City Project No. 2022-04 WSB Project No. 019222-000 Dear Mr. Fitzgerald: Please find enclosed Construction Pay Voucher No 2 (final) for the above-referenced project in the amount of $7,658.30. Please print and sign three voucher originals and return them to our office for processing with the City. Please note that the original signed vouchers must be accompanied by the following documents when submitting for final payment. 1. IC134 form. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured (lien waivers). 3. Consent of Surety to Final Payment certification from the contractor’s surety. 4. Two-year maintenance bond (warranty start date to coincide with the date Council approves final payment). As stipulated in the specifications, once the project is approved by the City and final payment is made, the two-year warranty period will go into effect. Thank you for your prompt attention to this matter. Sincerely, WSB Bill Alms Project Manager Attachments cc: Jane Byron December 13, 2022 2022 Pond Cleanout Project Final Pay Voucher 2 Page 2 of 3 Payment Summary No. Up Through Date Work Certified Per Voucher Amount Retained Per Voucher Amount Paid Per Voucher 1 03/08/2022 $94,046.00 $4,702.30 $89,343.70 2 11/10/2022 $2,956.00 ($4,702.30) $7,658.30 Funding Category Name Work Certified To Date Less Amount Retained Less Previous Payments Amount Paid This Voucher Total Amount Paid To Date local $97,002.00 $0.00 $89,343.70 $7,658.30 $97,002.00 Accounting Number Funding Source Amount Paid This Voucher Revised Contract Amount Funds Encumbered To Date Paid Contractor To Date 1 Local $7,658.30 $99,785.00 $99,785.00 $97,002.00 Contract Item Status Line No. Item Description Unit Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date 1 2021.501 /00010 MOBILIZATION LS $35,000.00 1 0 $0.00 1 $35,000.00 2 2101.505 /00020 CLEARING ACRE $5,000.00 0.2 0 $0.00 0.2 $1,000.00 3 2101.505 /00030 GRUBBING ACRE $5,000.00 0.2 0 $0.00 0.2 $1,000.00 4 2106.607 EXCAVATION - CHANNEL AND POND (LV) CY $22.00 1150 0 $0.00 1258 $27,676.00 5 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL) C Y $24.00 1150 0 $0.00 1150 $27,600.00 6 2506.602 /06110 CLEAN OUT CATCH BASIN EACH $1,500.00 1 1 $1,500.00 1 $1,500.00 7 2511.504 /00014 GEOTEXTILE FILTER TYPE 4 S Y $6.00 20 0 $0.00 20 $120.00 8 2511.507 /00014 RANDOM RIPRAP CLASS III C Y $50.00 10 6.42 $321.00 16.42 $821.00 9 2511.507 /00022 GRANULAR FILTER C Y $20.00 5 0 $0.00 0 $0.00 10 2573.502 /00110 STORM DRAIN INLET PROTECTION EACH $150.00 3 0 $0.00 1 $150.00 11 2573.503 /LA01 SEDIMENT CONTROL LOG TYPE WOOD FIBER BIOROLL L F $4.00 20 0 $0.00 0 $0.00 12 2573.602 /WR01 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH $1,000.00 1 0 $0.00 1 $1,000.00 13 2575.504 /00320 ROLLED EROSION PREVENTION CATEGORY 20 S Y $2.00 220 220 $440.00 220 $440.00 14 2575.505 /00021 SEEDING ACRE $2,000.00 0.2 0.2 $400.00 0.2 $400.00 15 2575.508 /21111 SEED MIXTURE 21-111 LB $3.00 20 20 $60.00 20 $60.00 16 2575.508 /25151 SEED MIXTURE 25-151 LB $5.00 5 5 $25.00 5 $25.00 2022 Pond Cleanout Project Final Pay Voucher 2 Page 3 of 3 Contract Item Status Line No. Item Description Unit Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date 17 2575.508 /33261 SEED MIXTURE 33-261 LB $14.00 15 15 $210.00 15 $210.00 18 2106.601 /00015 DEWATERING LS $5,000.00 1 0 $0.00 0 $0.00 Bid Totals: $2,956.00 $97,002.00 Project Category Totals Category Amount This Voucher Amount To Date POND CLEANOUT $2,956.00 $97,002.00 Contract Change Item Status CC CC No. Line No. Item Description Units Unit Price Contract Quantity Quantity This Voucher Amount This Voucher Quantity To Date Amount To Date Contract Change Totals: Contract Change Totals No. Contract Change Description Amount This Voucher Amount To Date Material On Hand Additions Line No. Item Description Date Added Comments Material On Hand Balance Line No. Item Description Date Added Used Remaining 2022 Pond Maintenance Project DAN U B E C I R DA I S Y C T DAHLIA C T SHA N N O N P K W Y 133RD CT W DALT O N L N EVERM O O R P K W Y UPPER 135TH ST W 137TH ST W DRUM C L I F F E P A T H 136TH ST W DA N N E R P A T H SH A N N O N P K W Y DA N U B E L N DE L L W O O D W A Y S H A N N O N P K W Y D A N U B E L N DAFF O D I L P A T H EV E R M O O R P K W Y EVER M O O R P K W Y Shannon Park Innisfree Park 12/13/2022 2022 Pond Maintenance Project Parks City Boundary Parcels Street Names 1:0