HomeMy WebLinkAbout6.p. 2022 Street Improvement Project, City Project 2022-01 Final Acceptance and Authorization of Final Payment EXECUTIVE SUMMARY City Council Meeting: December 20, 2022 AGENDA ITEM: 2022 Street Improvement Project, City Project 2022-01 Final Acceptance and Authorization of Final Payment AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, City Engineer AGENDA NO. 6.p. ATTACHMENTS: Resolution, Final Payment Request, Project Map APPROVED BY: LJM RECOMMENDED ACTIONS: Resolution to Approve Final Payment to McNamara Contracting, Inc. for the 2022 Street Improvement Project, City Project 2022-01 and Accepting the Improvements for Perpetual Maintenance BACKGROUND On April 19, 2022, City Council awarded a contract to McNamara Contracting, Inc. for the 2022 Street Improvement Project, City Project 2022-01. This project rehabilitated the following streets: • Biscayne Avenue West between 130th Street West and the end of pavement, approximately 2,670 feet north • 126th Street West between Biscayne Avenue West and Bacardi Avenue West • Danbury Way between McAndrews Road (CSAH 38) and the Rosemount City Limit • Chinchilla Avenue between McAndrews Road (CSAH 38) and the southern cul-de-sac • 127th Court West between Chinchilla Avenue and the cul-de-sac Construction was completed the summer of 2022 and restoration was completed by fall. At this point construction is complete and the improvements are ready for final city acceptance. DISCUSSION McNamara has completed all improvements as designed by WSB & Associates (WSB) and detailed in the contract. As a result, WSB has recommended acceptance and issuing the final payment for this work. There were no change orders to the contract. However, because of required soil corrections along 126th Street there was additional work completed within the contract resulting in an increased cost of $157,762 or 17.2% more than the bid amount. The final payment is $73,877.54. Table below shows the final cost. Engineer's Estimate Bid Amount Final Actual Cost Biscayne & 126th St 405,640.00$ 408,116.00$ 550,158.50$ Chinchilla & 127th St 247,363.00$ 243,286.00$ 218,790.00$ Danbury Way 274,706.00$ 266,336.00$ 306,551.56$ Total 927,709.00$ 917,738.00$ 1,075,500.06$ Over/(Under) Amount 147,791.06$ 157,762.06$ Over/(Under) Percentage 15.9%17.2% 2 RECOMMENDATION Staff recommends that the City Council adopt the attached resolution accepting the improvements for perpetual maintenance and authorizing final payment to McNamara Contracting, Inc. for the 2022 Street Improvement Project, City Project 2022-01. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022 – XX A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR 2022 STREET IMPROVEMENT PROJECT CITY PROJECT 2022-01 WHEREAS, McNamara Contracting, Inc. has completed the required construction as per the scope of the contract, and; WHEREAS, the City received a concurrence from WSB & Associates that the work has been completed in accordance with the approved plans and specifications and finds the improvements acceptable; WHEREAS, the contractor has completed all necessary administrative requirements to close out the contract. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROSEMOUNT, MINNESOTA: 1. The improvements completed under said agreement are hereby accepted for perpetual maintenance and ownership. 2. Final payment to the contractor is authorized. ADOPTED this 20th day of December, 2022. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk December 8, 2022 BENGALAVE 130TH ST W 130THWAY BAC A R D I A V E 1 2 8 T H ST W BISCAYNEAVE 126THSTW Doc u m e n t P a t h : K : \ 0 1 8 7 5 1 - 0 0 0 \ G I S \ M a p s \ 2 0 2 2 S t r e e t R e c o n P r o j e c t \ 2 0 2 2 S t r e e t R e c o n P r o j e c t P R O \ F i g u r e 2 _ P r o j e c t L o c a t i o n D a t e S a v e d : 8 / 2 5 / 2 0 2 1 ¯ 1 inch = 400 feet 0 400 FeetPavement Reclamation and Overlay Rosemount, MN 2022 Street Reconstruction Project Project Location Parcel Boundary MCANDREWSRD DA N U BE LN CHINCHILLAAVE EVERMOORPK W Y CAN A D A C T COBBLESTONECT D RUMCLIFFEWAY DA N U B E C T 131STST W COBBLESTONELN DRUMCLIFF E CI R DRUMCLIFFECT 127TH CT W CROLLY P A T H 120TH ST W C HINCHILLACT C H A R L S T O N WAY C O F F E E T R L SHANNONPKWY DANB U R Y W A Y Doc u m e n t P a t h : K : \ 0 1 8 7 5 1 - 0 0 0 \ G I S \ M a p s \ 2 0 2 2 S t r e e t R e c o n P r o j e c t \ 2 0 2 2 S t r e e t R e c o n P r o j e c t P R O \ F i g u r e 3 _ P r o j e c t L o c a t i o n D a t e S a v e d : 8 / 2 5 / 2 0 2 1 ¯ 1 inch = 750 feet 0 750 FeetPavement Reclamation and Overlay Rosemount, MN 2022 Street Reconstruction Project Project Location City Boundary Parcel Boundary DAN B U R Y W A Y