Loading...
HomeMy WebLinkAbout6.q. Approve Proposal for Engineering Services Related to the 2023 Neighborhood Infrastructure Improvement Project, CP 2023-04\\rsm-file\Common\City Clerk\Agenda Items\Approved Items\6.q. Approve Proposal for Engineering Services Related to the 2023 Neighborhood Infrastructure Improvement Project, CP 2023-04.docx EXECUTIVE SUMMARY City Council Regular Meeting: December 20, 2022 AGENDA ITEM: Approve Proposal for Engineering Services Related to the 2023 Neighborhood Infrastructure Improvement Project, City Project 2023- 04 AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, City Engineer AGENDA NO. 6.q. ATTACHMENTS: Resolution; Proposal; Map APPROVED BY: LJM RECOMMENDED ACTION: Motion to: 1. Approve Proposal for Engineering Services for the 2023 Neighborhood Infrastructure Improvement Project, City Project 2023-04; and 2. Adopt a Resolution Authorizing the Preparation of a Feasibility Report for the 2023 Neighborhood Infrastructure Improvement Project, City Project 2023-04 BACKGROUND The 2023 Neighborhood Infrastructure Improvement Project, City Project 2023-04, was included as part of the 2022-2032 Capital Improvement Plan. The streets identified for this improvement through the City’s pavement management evaluation are shown in the attached map. The project is proposed to fully reconstruct the roadways and install city utilities to the Jay Simons subdivision. WSB and Associates, Inc. has provided a proposal to perform the design work on this project. Some of the design effort began late in 2021 and early 2022; however, due to issues with right of way locations it was decided to delay the work to allow time for to coordinate the required easements. WSB is familiar with the area as well as the required design effort. The proposal in the amount of $175,138 provides the necessary engineering services to complete preliminary design, final design, bidding and construction administration of the 2023 Neighborhood Infrastructure Improvement Project. WSB’s proposal provides the necessary expertise to successfully complete this project. The project scope provides for a full depth reconstruction of: • Bacardi Avenue West between the edge of pavement and 1000’ north • 128th Street West between Bacardi Avenue West and Bengal Avenue West • 130th Way between Bengal Avenue and 130th Street West • Bengal Avenue between 128th Street West and 130th Street West • 130th Street West between 130th Way and western plat boundary This area was recently added to the Municipal Urban Service Area as part of the 2040 Comprehensive Plan. Thus, extending water and sewer service to this area can be accomplished. It should be noted that these extensions are necessary as there are residences in this area that have septic systems which are failing. As part of this project, utility services would be stubbed to the right of way for each property, but the actual connection to the residence would need to be accomplished and paid for by the resident, and would have to be completed in a timely manner after the service stub has been provided. 2 The attached resolution orders preparation of a feasibility report which is a necessary step under the Minnesota Statutes Chapter 429. This chapter specifies the actions that must be taken in order to assess property owners for all or a portion of the cost of local improvements. The feasibility report will provide information regarding whether the proposed improvements are necessary, cost-effective and feasible. The following information will be included in the report: • Existing conditions with detailed information on the existing materials • Proposed improvements • Detailed cost estimates and proposed funding sources • Estimated assessments COSTS & FUNDING The design and construction costs for the 2023 Neighborhood Infrastructure Improvement Project, City Project 2023-04, are budgeted in the 2023-2032 CIP in the amount of $1,505,000. The street improvements will be funded by the Street Fund and assessment of abutting properties. The utility work would be funded by the respective Utility Funds and Core Funds as appropriate. A detailed cost and funding estimate will be prepared as part of the Feasibility Report. RECCOMENDATION Staff recommends Council accept the proposal for engineering services from WSB and adopt a resolution to authorize preparation of a feasibility report for the 2023 Neighborhood Infrastructure Improvement Project, City Project 2023-04. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2022 – XX A RESOLUTION AUTHORIZING THE PREPARATION OF A FEASIBLITY REPORT FOR THE 2023 NEIGHBORHOOD INFRASTRUCTURE IMPROVEMENT PROJECT CITY PROJECT 2023-04 WHEREAS, it is proposed to improve the following streets with a full depth reconstruction providing water, sewer and surface improvements: • Bacardi Avenue West between the edge of pavement and 128th Street West • 128th Street West between Bacardi Avenue West and Bengal Avenue West • 130th Way between Bengal Avenue and 130th Street West • Bengal Avenue between 128th Street West and 130th Street West, and; WHEREAS, it is proposed to assess the benefited property for all or a portion of the cost of the improvement, pursuant to Minnesota Statues, Chapter 429. NOW THEREFORE BE IT RESOLVED, that the proposed improvement, called 2023 Neighborhood Infrastructure Improvement Project (City Project 2023-04), be referred to the City Engineer for study and that the City Engineer is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is necessary, cost effective and feasible; whether it should best be made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for the affected parcels. ADOPTED this 20th day of December, 2022. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk G:\.Clients All\Rosemount\Proposals\2023 SIP\2022-10-26 - Proposal - Rosemount 2023 Final.docx 1 7 8 E 9 T H S T R E E T | S U I T E 2 0 0 | S A I N T P A U L , M N | 5 5 1 0 1 | 6 5 1 . 2 8 6 . 8 4 5 0 | W S B E N G . C O M October 26, 2022 Mr. Brian Erickson City Engineer City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: 2023 Street Improvement Project Work Plan – Engineering Services Dear Mr. Erickson: As requested, the following work plan outlines the remaining scope of services and associated engineering fee necessary to complete the 2023 Street Improvement Project. See attached map. PROJECT UNDERSTANDING The 2023 Street Improvement Project consists of a portion of work originally identified in the 2022 Street Improvement Project, but were delayed until 2023 due to complexities and questions about the scope of the project. The areas covered under the 2023 SIP include: • Bacardi Avenue – Pavement end to 1000-ft north – Extension of Sanitary Sewer, watermain, streets and trail • 128th Street W – Bengal Ave to Bacardi Ave – Extension of Sanitary Sewer, watermain and streets • 130th Way – 130th St to Bengal Ave – Extension of Sanitary Sewer, watermain and streets • Bengal Avenue – 130th St to 128th St – Extension of Sanitary sewer, watermain and streets • 130th Street – Westerly plat boundary to 130th Way – Extension of Sanitary sewer, watermain and streets – necessary to provide utilities to the south end of Bengal Avenue. For the 2023 Street Improvement Project, WSB & Associates, Inc. (WSB) will work with City staff in the preparation of the feasibility study and then will design, bid, provide construction administration and observation, and geotechnical and material testing services for the project in accordance with Rosemount’s General Specifications, and Engineering Guidelines. Bacardi Avenue is a designated State Aid Street and will be designed in accordance with State Aid standards in order for the improvements to be funded from the City’s State Aid construction account. Bacardi Avenue will be reconstructed to an urban street section extending the existing street section north for 1000-feet. Based on direction from the City and a desire to reduce impacts to adjacent properties, a curbed section will also be maintained along Bengal Ave, from 130th St, and 128th St. The benefiting properties for the improvements will be specially assessed per City Policy and Minnesota State Statute 429. Mr. Brian Erickson October 26, 2022 Page 2 G:\.Clients All\Rosemount\Proposals\2023 SIP\2022-10-26 - Proposal - Rosemount 2023 Final.docx SCOPE OF SERVICES The tasks described below have been developed to provide the necessary engineering services to design the project consistent with City and MnDOT State Aid standards and expectations. Task 1: Feasibility Report WSB will complete the feasibility report for the 2023 Street Improvement Project, including, but not limited to: • Existing conditions • Proposed improvements • Geotechnical evaluation findings (Subtask 2.2 – see below) • Estimated Cost and quantity breakdown • Project funding • Proposed assessment roll and calculation • Conclusions • Recommendation and feasibility • Photographs, drawings, and figures • Project Schedule The feasibility report will be prepared in accordance with Minnesota State Statute 429 and City Assessment Policy and will be delivered to the City within one month of authorization in an electronic format only. Task 2: Preparation of Plans and Specifications WSB will prepare plans and specifications for the 202 3 Street Improvement Project, including, but not limited to the following subtasks: Subtask 1: Survey (Completed with 2022 SIP) WSB has provided survey for preparation of design documents. This work may include topographic survey, utility elevations and locations . No additional budget for this task is included with the proposal as the work was already completed under the 2022 SIP budget. Subtask 2: Geotechnical Evaluation WSB will conduct a Geotechnical Evaluation which will include soil borings and summary report complete with professional recommendations for pavement cross - section design. Six boring locations were determined based on previous conversations with City staff. This task will also include Gopher State One Calls, an on-site meeting to review the roadway and mark locations for drilling, as well as a documentation of the findings in a forensic report. Depending on what the borings reveal, additional bores can be completed to ensure a firm understanding of what exists underneath the surface. Subtask 3: Public Meeting WSB will work with City staff to prepare presentation materials and be in attendance for one neighborhood meeting and for the public hearing at a City Council meeting. Mr. Brian Erickson October 26, 2022 Page 3 G:\.Clients All\Rosemount\Proposals\2023 SIP\2022-10-26 - Proposal - Rosemount 2023 Final.docx WSB will be available to discuss and answer questions from city staff, City Council, and residents. Subtask 4: Design WSB will provide design services for the utility extension and street reconstruction in the 2023 SIP. The specifications developed for the project manual will adhere to both the MnDOT 2020 Specifications for Construction and the City of Rosemount General Specifications and Standard Detail Plates for Street and Utility Construction. At least one review and comment period are anticipated. Design services will include: • Design and preparation of the project plans and specifications consistent with City, MnDOT, ADA, and local regulatory standards. • The project plans will be generally organized as follows: • Title Sheet • General Layout • SEQ • Removals • Street & Utility Plan and Profiles • Erosion control • Calculate project quantities and prepare the project Bid Form. • Prepare an Engineer’s Opinion of Probable Cost on the final design. • Perform quality control reviews regularly throughout the duration of the design. • Attend one project meeting with City staff and design team (WSB staff) members as necessary. • 90 percent Submittal: Draft plan set for review and comment • 100 percent Submittal: Final survey, geotechnical analysis, plan set, and specifications will provide as electronic in both drafting file and pdf in full and half sizes. The final plans will be provided in three (3) half size, one (1) full size final plan sets and four (4) specifications for your files. Deliverables shall be submitted prior to February 17, 2023. Subtask 5: Private Utility Coordination WSB will complete Gopher State One Calls requests for private utility maps within the project areas and distribute project plans and coordinate with priv ate utility companies to minimize and mitigate utility conflicts. If any agreements or permits are required from private utility companies, WSB will assist with in securing these agreements. Subtask 6: Bidding The WSB project team will complete all necessary work to bid the project, including: • The preparation of an advertisement for bids. • Publishing the advertisement for bids in both the Dakota County Tribune and Finance & Commerce. • Uploading the project plans and specifications for electronic purchase. • Delivery of hard copy plans and specifications to the City for sale at City Offices. • Responding to contractor bidding questions. • Issuing addenda as needed. • Attendance at the bid opening or electronic bidding Mr. Brian Erickson October 26, 2022 Page 4 G:\.Clients All\Rosemount\Proposals\2023 SIP\2022-10-26 - Proposal - Rosemount 2023 Final.docx • Preparation of a bid tabulation and a bid summary. • Preparation of a letter of recommendation regarding the bid award. • Preparation of contract documents and the Notice of Award to the contractor once authorized by the City Council. Subtask 7: Assessment Roll As a part of the final project cost calculations, WSB will provide the Final Assessment Roll and corresponding calculations based on the as -bid unit prices for the project. Task 3: Construction Observation and Administration WSB will provide construction observation and administration ser vices for the 2023 Street Improvement Project, including, but not limited to the following tasks: Subtask 1: Construction Observation and Administration WSB will provide Construction Observation and Contract Administration services through construction of the project and final project closeout. This will include: • Preparation of materials for and attendance at the preconstruction meeting for the project. • Construction observation for a twelve (16)-week construction schedule. • Attendance at sixteen (16) weekly progress meetings with the contractor and City Staff. • Preparation of all pay vouchers and contract modifications. Subtask 2: Materials Testing WSB will provide materials testing services during construction as identified in the attached sub-proposal. The construction material testing cost is based on a reclaim and pave project and infrastructure construction as identified . Subtask 3: Construction Staking WSB will provide construction staking and survey for construction of the project. WSB assumes one-time staking for all required, any re-staking will be billed at a time and material hourly rate. Subtask 4: Private Utility Coordination WSB will coordinate with all utility companies in the project area identified with the Gopher State One Call ticket to minimize and mitigate private utility impacts throughout the project. Subtask 5: Contract Closeout WSB will provide all project closeout services for the project, including: • Production of the Final Pay Voucher for the project. • Requesting all necessary project closeout documentation (final lien waivers, IC134s and the maintenance bond) from the contractor. Mr. Brian Erickson October 26, 2022 Page 5 G:\.Clients All\Rosemount\Proposals\2023 SIP\2022-10-26 - Proposal - Rosemount 2023 Final.docx • Production of a letter of recommendation to the City Council regarding final acceptance and final payment. • Preparing all closeout paperwork and documents per State Aid requirements • The preparation of as-built drawings for the project. PROPOSED FEE We propose to conduct the work listed above on an hourly basis for an estimated total fee of $175,138. The estimated total, which excludes work already completed as a part of the 2022 SIP, and reflects only the remaining work associated with the 2023 SIP, is as follows: Tasks 1&2: Feasibility and Design $60,086.00 Tasks 3: Construction Observation and Administration $115,052.00 Total $175,138.00 We will review our progress weekly and will not exceed this amount without your prior approval should the scope of the project change. If the terms of this agreement are acceptable to the City, WSB will draft a Professional Services Agreement for the project for both parties to execute. Thank you for the opportunity to propose on this project. If you have any questions, please do not hesitate to contact me at 952-737-4675, or Jeff Pearson at 612-232-6382. Sincerely, WSB Monica Heil, PE Jeff Pearson, PE Vice President of Municipal Services Senior Project Manager Attachment – Project Budget Worksheet Task Description 1 1.1 Proposed Impovements 2 24 8 34 $4,872.00 1.2 Estimated cost and quantities 2 8 10 $1,368.00 1.3 Assessment roll 6 12 4 22 $2,956.00 1.4 Recommendation and feasibility 2 2 2 6 $902.00 1.5 Figures and exhibits 1 6 2 9 $1,264.00 1.6 Public Infromational Meeting 2 2 $344.00 Task 1 Total Estimated Hours and Fee 15 50 2 10 6 83 $11,706.00 2 2.1 GSOC & Data Collection 2 2 $256.00 2.2 Geotech Analysis & Boring Report LS $7,200.00 2.3 Public Meeting and preperation 2 2 2 2 8 $1,118.00 2.4a Design 14 18 48 96 34 2 212 $28,854.00 2.4b QA/QC and City Review 8 8 2 4 8 30 $4,988.00 2.5 Private Utility Coordination - Permits 1 4 4 2 11 $1,606.00 2.6 Bidding 2 2 6 10 $1,182.00 2.7 Assessments 8 8 8 24 $3,176.00 Task 2 Total Estimated Hours and Fee 35 44 52 96 42 20 8 297 $48,380.00 3 3.1a Project Management 48 8 56 $9,280.00 3.1b Construction Administration and Observation 8 16 448 32 504 $48,128.00 3.2 Material Testing LS $27,500.00 3.3 Construction Staking 110 12 122 $24,944.00 3.4 Private Utility Coordination 4 8 12 $1,240.00 3.5 Contract Closeout - As constructed drawings 2 2 6 8 2 8 28 $3,960.00 Task 3 Total Estimated Hours and Fee 50 22 6 118 14 16 464 32 722 $115,052.00 *The City of Rosemount will be responsible for all permit fees associated with the project (DOH, NPDES, MPCA) Total Estimated Hours 100 116 54 102 52 26 118 14 24 464 32 1102 $175,138.00 Average Hourly Billing Rate 172.00 128.00 162.00 104.00 182.00 97.00 208.00 172.00 192.00 91.00 102.00 Total Base Fee by Labor Classification $17,200.00 $14,848.00 $8,748.00 $10,608.00 $9,464.00 $2,522.00 $24,544.00 $2,408.00 $4,608.00 $42,224.00 $3,264.00 $175,138.00 Environmental Compliance CostTotal Hours Pete Helder Taylor Engstrom Survey Coordinator Water Resources Engineer Construction Specialist John Buchholz Construction Administration and Observation Craig AlbergKarla PedersonBill Alms Senior Project Manager Two Person Survey CrewProject Engineer Administrative Construction Coordinator Engineering Specialist, Technician Tim Cartony Engineering Tech Bill Berg Estimate of Cost City of Rosemount, Minnesota Professional Engineering Services 2022 Street Improvement Project City Project 2022-01 Katie Koscielak Plans and Specifications Jeff Pearson Feasibility Report