HomeMy WebLinkAbout9.c. MEMO Award Contracts - Bid Package No. 1 + Alternates for PW & PD Campus\\rsm-file\common\city clerk\agenda items\approved items\9.c. memo award contracts - bid package no. 1 + alternates for pw & pd campus.docx
EXECUTIVE SUMMARY
City Council Meeting: March 21, 2023
AGENDA ITEM: Receive Bids & Award Contract for Bid
Package No. 1 – Public Works & Police
Campus
AGENDA SECTION:
New Business
PREPARED BY: Nick Egger, PE - Public Works Director
Mikael Dahlstrom – Chief of Police
Logan Martin – City Administrator
AGENDA NO. 9.c.
ATTACHMENTS: Resolution, Recommendation Letter & Bid
Tabulation Summary APPROVED BY: ELF
RECOMMENDED ACTIONS: Motion to Adopt a Resolution Receiving Bids and Awarding
Contracts for Bid Package No. 1, Including Alternate Bid Items, on the Public Works &
Police Campus Project
BACKGROUND
After posting an advertisement for bids for the first set of contracts on the Public Works & Police Campus
project, the City and its Construction Manager, Kraus Anderson, held a bid opening on March 9th.
Competition was impressive and bid prices on the six elements included in Bid Package No. 1 were very
favorable.
DISCUSSION
Bid Package No. 1 included bid prices for Concrete & Masonry, Precast Concrete Panel fabrication,
Structural Steel fabrication, Structural Steel installation, Earthwork & Underground Utilities, and Asphalt
Paving. The following six contractors were the lowest responsible bidders for each subsection of Bid
Package No. 1. All prices include bid alternate cost components where the bidder’s work scope would
include a portion of the alternate construction scope items (Salt Shed, Cold Storage Building, Additional
Bulk Material Bins, Underground Rainwater Cistern, Screen Wall, Sidewalk Snow Melt System, Electrical
Cord Reels, & Corridor Wainscoting).
WS # Work Scope Description Estimate
(Base)
Low Bid +
Alternates (where
price was
provided)
Low Bidder Name
BP #1 - Bid Date 3/9/23
3A Concrete & Masonry $ 4,560,049 $ 4,381,459.00 Hollenbeck & Nelson
3B Precast $ 4,083,398 $ 3,818,201.00 Molin Concrete
5A Structural Steel (Material) $ 2,991,010 $ 2,384,197.00 Construction Systems
5B Structural Steel (Install) $ 848,608 $ 607,000.00 Patriot Erectors
31A Earthwork & Utilities $ 2,406,839 $ 2,566,858.00 Belair Sitework Services
32A Asphalt Paving $ 1,498,502 $ 998,000.00 McNamara Contracting
Totals - BP#1 $ 16,388,406 $ 14,755,715.00
2
RECOMMENDATION
With the totality in Bid Package No. 1 of base bid prices plus the contractors’ prices for their components
of alternate items being approximately $1.6 Million below the estimate for the base items, it is Kraus
Anderson’s recommendation to proceed in awarding the contracts for all work scopes under Bid Package
No. 1, including the alternate items under each work scope.
Accordingly, staff recommends Council adoption of the attached resolution receiving the bids and
awarding all contracts, including alternate prices, to the lowest responsible contractors listed in the
summary table above, and listed in the attached recommendation letter from Kraus Anderson
Construction, for the Public Works & Police Campus Project, Project 2023-08.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2023-XX
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACTS
FOR WORK SCOPES UNDER BID PACKAGE NO. 1, INCLUDING ALTERNATE ITEMS,
FOR THE PUBLIC WORKS & POLICE CAMPUS PROJECT, CITY PROJECT 2023-08
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids for construction of work scopes covered under Bid Package No. 1 for the Public
Works & Police Campus Project, City Project 2023-08, are hereby received and tabulated.
2. The bid of Hollenbeck & Nelson, Inc., of Coon Rapids, MN in the amount of $4,381,459 for
the Concrete & Masonry elements of the Public Works & Police Campus Project, in
accordance with the plans, specifications, and advertisement for bids, is the lowest responsible
bid and is hereby accepted.
3. The bid of Molin Concrete Products of Lino Lakes, MN in the amount of $3,818,201 for the
Precast Concrete Panel element of the Public Works & Police Campus Project, in accordance
with the plans, specifications, and advertisement for bids, is the lowest responsible bid and is
hereby accepted.
4. The bid of Construction Systems, Inc., of Maple Plain, MN in the amount of $2,384,197 for
the Structural Steel Fabrication elements of the Public Works & Police Campus Project, in
accordance with the plans, specifications, and advertisement for bids, is the lowest responsible
bid and is hereby accepted.
5. The bid of Patriot Erectors, Inc. of Loretto, MN in the amount of $607,000 for the
Installation and Erection of Structural Steel elements of the Public Works & Police Campus
Project, in accordance with the plans, specifications, and advertisement for bids, is the lowest
responsible bid and is hereby accepted.
6. The bid of Belair Sitework Services of New Brighton, MN in the amount of $2,566,858 for the
Site Earthwork and Underground Utility Installation elements of the Public Works & Police
Campus Project, in accordance with the plans, specifications, and advertisement for bids, is the
lowest responsible bid and is hereby accepted.
7. The bid of McNamara Contracting, Inc. of Rosemount, MN in the amount of $998,000 for
the Asphalt Paving element of the Public Works & Police Campus Project, in accordance with
the plans, specifications, and advertisement for bids, is the lowest responsible bid and is
hereby accepted.
8. The Administrator and Clerk are hereby authorized and directed to affix their signatures on all
contracts approved herein on behalf of the City of Rosemount.
9. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits
made with their bids, except that the deposit of the successful bidder and the next two lowest
bidders shall be retained until a contract has been executed.
ADOPTED this 21st day of March, 2023.
Jeffery D. Weisensel, Mayor
ATTEST:
Erin Fasbender, City Clerk
Kraus-Anderson Construction Company
501 South Eighth Street, Minneapolis, MN 55404
Office 612-332-7281 | www.krausanderson.com | Fax 612-332-0217
Building enduring relationships and strong communities
March 14, 2023
Mr. Logan Martin
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
RE:Rosemount Police & Public Works Campus – Bid Package #1
Contract Award Recommendation
Dear Mr. Martin:
This letter is concerning the contract awards for the Rosemount Police & Public Works Campus –
Bid Package #1. Bids were received on March 9, 2023 and are summarized on the attached bid
tabulation sheets. Listed below is the lowest responsible bidder and their base bid amount for
purposes of contract award.
Work Scope Contractor, City, State Bid Amount
WS 03-A Concrete & Masonry Hollenback & Nelson, Inc.
Coon Rapids, MN
Base Bid
Alternate No. 1:
Alternate No. 2:
Alternate No. 3:
Alternate No. 4:
Alternate No. 5:
Alternate No. 6:
Alternate No. 7:
Alternate No. 8:
Total Contract Amount:
$3,983,559.00
$0.00
$196,000.00
$172,000.00
$0.00
$23,000.00
$6,900.00
$0.00
$0.00
$4,381,459.00
WS 03-B Structural Precast Molin Concrete Products
Lino Lakes, MN
Base Bid
Alternate No. 1:
Alternate No. 2:
Alternate No. 3:
Alternate No. 4:
Alternate No. 5:
Alternate No. 6:
Alternate No. 7:
Alternate No. 8:
Total Contract Amount:
$3,668,160.00
$0.00
$0.00
$0.00
$0.00
$150,041.00
$0.00
$0.00
$0.00
$3,818,201.00
WS 05-A Structural Steel –
Material Only
Construction Systems, Inc.
Maple Plain, MN
Base Bid
Alternate No. 1:
Alternate No. 2:
Alternate No. 3:
Alternate No. 4:
Alternate No. 5:
Alternate No. 6:
Alternate No. 7:
Alternate No. 8:
Total Contract Amount:
$2,384,197.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,384,197.00
WS 05-B Structural Steel –
Erection
Patriot Erectors, Inc.
Loretto, MN
Base Bid
Alternate No. 1:
Alternate No. 2:
Alternate No. 3:
Alternate No. 4:
Alternate No. 5:
Alternate No. 6:
Alternate No. 7:
Alternate No. 8:
Total Contract Amount:
$607,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$607,000.00
WS 31-A Site Clearing and
Earthwork
Belair Sitework Services
New Brighton, MN
Base Bid
Alternate No. 1:
Alternate No. 2:
Alternate No. 3:
Alternate No. 4:
Alternate No. 5:
Alternate No. 6:
Alternate No. 7:
Alternate No. 8:
Total Contract Amount:
$2,517,421.00
$15,393.00
$24,082.00
$5,377.00
$4,585.00
$0.00
$0.00
$0.00
$0.00
$2,566,858.00
WS 32-A Asphalt Paving McNamara Contracting, Inc.
Rosemount, MN
Base Bid
Alternate No. 1:
Alternate No. 2:
Alternate No. 3:
Alternate No. 4:
Alternate No. 5:
Alternate No. 6:
Alternate No. 7:
Alternate No. 8:
Total Contract Amount:
$998,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$998,000.00
The total amount of the base bids and alternates is $14,755,715.00 which is within a
reasonable variance from our cost estimates.
If you have any questions regarding this information, please do not hesitate to contact me at
612-859-1697.
Very truly yours,
KRAUS-ANDERSON® CONSTRUCTION COMPANY
Ken Francois
Project Manager
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 03-A: Concrete & Masonry
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
Hollenback &
Nelson, Inc. Axel H. Ohman, Inc.
Northland Concrete
and Masonry
Company, LLC
B & D Associates,
LLC
Kelleher
Construction
Steenberg-Watrud
Construction, LLC
BID SECURITY Bid Bond Bid Bond Bid Bond Bid Bond Bid Bond Bid Bond
ADDENDA REC'D.1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4
BASE BID $3,983,559.00 $4,004,316.00 $4,361,700.00 $4,586,400.00 $4,837,000.00 $4,858,745.00
Alternate No. 1: Salt
Storage Building $0.00 $116,000.00 $165,750.00 $12,000.00 $97,000.00 $59,389.00
Alternate No. 2: Cold
Storage Building $196,000.00 $203,000.00 $222,395.00 $154,600.00 $196,000.00 $191,485.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $172,000.00 $206,000.00 $191,415.00 $269,800.00 $172,000.00 $198,605.00
Alternate No. 4:
Underground Storm
Retention System $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 5:
Architectural Precast
Screen Wall $23,000.00 $44,000.00 $47,510.00 $0.00 $43,000.00 $28,685.00
Alternate No. 6:
Snowmelt System $6,900.00 $62,000.00 $49,485.00 $79,300.00 $13,000.00 $7,000.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ROSEMOUNT POLICE AND
PUBLIC WORKS CAMPUS - BP #1
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 03-A: Concrete & Masonry
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
Gresser Companies
BID SECURITY Bid Bond
ADDENDA REC'D.1,2,3,4
BASE BID $5,341,000.00
Alternate No. 1: Salt
Storage Building $0.00
Alternate No. 2: Cold
Storage Building $206,000.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $169,900.00
Alternate No. 4:
Underground Storm
Retention System $0.00
Alternate No. 5:
Architectural Precast
Screen Wall $35,000.00
Alternate No. 6:
Snowmelt System $19,200.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00
ROSEMOUNT POLICE AND
PUBLIC WORKS CAMPUS - BP #1
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 03-B: Structural Precast
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
Molin Concrete
Products
Wells Concrete
Products Co. dba
Wells Concrete
Taracon Precast,
LLC
BID SECURITY Bid Bond Bid Bond Bid Bond
ADDENDA REC'D.1,2,3,4 1,2,3,4 1,2,3,4
BASE BID $3,668,160.00 $4,494,475.00 $5,154,232.00
Alternate No. 1: Salt
Storage Building $0.00 $0.00 $0.00
Alternate No. 2: Cold
Storage Building $0.00 $0.00 $0.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $0.00 $0.00 $0.00
Alternate No. 4:
Underground Storm
Retention System $0.00 $0.00 $0.00
Alternate No. 5:
Architectural Precast
Screen Wall $150,041.00 $238,265.00 $235,905.00
Alternate No. 6:
Snowmelt System $0.00 $0.00 $0.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00 $0.00 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00 $0.00 $0.00
ROSEMOUNT POLICE AND
PUBLIC WORKS CAMPUS - BP #1
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 05-A: Structural Steel - Material Only
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
Construction
Systems, Inc.
American Structural
Metals, Inc.
Ted Mannstedt &
Son, Inc.
BID SECURITY Bid Bond Bid Bond Bid Bond
ADDENDA REC'D.1,2,3,4 1,2,3,4 1,2,3,4
BASE BID $2,384,197.00 $2,425,000.00 $2,832,000.00
Alternate No. 1: Salt
Storage Building $0.00 $0.00 $0.00
Alternate No. 2: Cold
Storage Building $0.00 $0.00 $0.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $0.00 $0.00 $0.00
Alternate No. 4:
Underground Storm
Retention System $0.00 $0.00 $0.00
Alternate No. 5:
Architectural Precast
Screen Wall $0.00 $0.00 $0.00
Alternate No. 6:
Snowmelt System $0.00 $0.00 $0.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00 $0.00 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00 $0.00 $0.00
ROSEMOUNT POLICE AND
PUBLIC WORKS CAMPUS - BP #1
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 05-B: Structural Steel - Erection
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
Patriot Erectors, Inc.
Red Cedar Steel
Erectors, Inc.
South Central
Erectors, Inc. Sowles Company
Industrial
Construction
Specialists, LLC Amerect, Inc.
BID SECURITY Bid Bond Bid Bond Bid Bond No Bid Bond Bid Bond
ADDENDA REC'D.1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4
BASE BID $607,000.00 $725,190.00 $888,500.00 $897,900.00 $989,488.00 $1,083,250.00
Alternate No. 1: Salt
Storage Building $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 2: Cold
Storage Building $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 4:
Underground Storm
Retention System $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 5:
Architectural Precast
Screen Wall $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 6:
Snowmelt System $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ROSEMOUNT POLICE AND
PUBLIC WORKS CAMPUS - BP #1
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 05-B: Structural Steel - Erection
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
Spartan Steel
Erectors, Inc.
BID SECURITY Bid Bond
ADDENDA REC'D.1,2,3,4
BASE BID $1,087,000.00
Alternate No. 1: Salt
Storage Building $0.00
Alternate No. 2: Cold
Storage Building $0.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $0.00
Alternate No. 4:
Underground Storm
Retention System $0.00
Alternate No. 5:
Architectural Precast
Screen Wall $0.00
Alternate No. 6:
Snowmelt System $0.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00
ROSEMOUNT POLICE AND
PUBLIC WORKS CAMPUS - BP #1
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 31-A: Site Clearing, Earthwork and Utilities
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
Belair Builders, Inc.
dba Belair Sitework
Services
Albrightson
Excavating, Inc.
Park Construction
Company
S.M. Hentges &
Sons, Inc.
Rachel Contracting,
LLC Max Steininger, Inc.
BID SECURITY Bid Bond Bid Bond Bid Bond Bid Bond Bid Bond Bid Bond
ADDENDA REC'D.1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4
BASE BID $2,517,421.00 $2,536,827.00 $2,552,360.00 $2,596,900.00 $2,599,892.00 $2,899,723.00
Unit Price No. 1:
Asphalt Paving and
Base $32.30 $0.00 $22.50 $0.00 $100.00 $0.00
Alternate No. 1: Salt
Storage Building $15,393.00 $7,600.00 $8,050.00 $6,500.00 $11,207.00 $39,000.00
Alternate No. 2: Cold
Storage Building $24,082.00 $14,946.00 $17,750.00 $9,400.00 $13,630.00 $44,000.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $5,377.00 $12,150.00 $15,020.00 $7,500.00 $12,542.00 $31,430.00
Alternate No. 4:
Underground Storm
Retention System $4,585.00 $8,900.00 $5,405.00 $0.00 $5,850.00 $0.00
Alternate No. 5:
Architectural Precast
Screen Wall $0.00 $9,439.00 $0.00 $6,300.00 $0.00 $15,650.00
Alternate No. 6:
Snowmelt System $0.00 $0.00 $0.00 $0.00 $0.00 $3,900.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ROSEMOUNT POLICE AND
PUBLIC WORKS CAMPUS - BP #1
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 31-A: Site Clearing, Earthwork and Utilities
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
Arnt Construction
Company, Inc.
Fehn Companies,
Inc. Veit & Company Peterson Companies
BID SECURITY Bid Bond Bid Bond Bid Bond Bid Bond
ADDENDA REC'D.1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4
BASE BID $2,919,650.00 $2,928,200.00 $2,950,137.00 $3,060,600.00
Unit Price No. 1:
Asphalt Paving and
Base $0.00 $0.00 $14.00 $0.00
Alternate No. 1: Salt
Storage Building $9,000.00 $11,400.00 $8,340.00 $8,315.00
Alternate No. 2: Cold
Storage Building $0.00 $37,900.00 $17,610.00 $24,923.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $0.00 $15,000.00 $13,510.00 $17,573.00
Alternate No. 4:
Underground Storm
Retention System $0.00 $0.00 $100,000.00 $8,613.00
Alternate No. 5:
Architectural Precast
Screen Wall $0.00 $0.00 $10,520.00 $10,522.00
Alternate No. 6:
Snowmelt System $0.00 $0.00 $0.00 $0.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00 $0.00 $0.00 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00 $0.00 $0.00 $0.00
ROSEMOUNT POLICE AND
PUBLIC WORKS CAMPUS - BP #1
BID TABULATIONS
March 9, 2023 at 2:00 PM
OWNER: City of Rosemount
ARCHITECT: BKV Group Work Scope 32-A: Asphalt Paving
BIDDER BIDDER BIDDER BIDDER BIDDER BIDDER
McNamara
Contracting, Inc.
OMG Midwest, Inc.
dba Minnesota
Paving & Materials
Park Construction
Company
Minnesota
Roadways Co.
Bituminous
Roadways, Inc.
T.A. Schifsky &
Sons, Inc.
BID SECURITY Bid Bond Bid Bond Bid Bond Bid Bond Bid Bond Bid Bond
ADDENDA REC'D.1,2,3,4 1,2,3,4 1,2,3,4 1,2,3,4 1,2 1,2,3,4
BASE BID $998,000.00 $1,021,200.00 $1,053,965.00 $1,090,000.00 $1,170,000.00 $1,565,651.00
Unit Price No. 1:
Asphalt Paving and
Base $0.00 $55.00 $0.00 $39.50 $42.00 $0.00
Alternate No. 1: Salt
Storage Building $0.00 $0.00 $21,380.00 $0.00 $0.00 $0.00
Alternate No. 2: Cold
Storage Building $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 3:
Granular Material
Storage Bins and
Enclosure $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 4:
Underground Storm
Retention System $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 5:
Architectural Precast
Screen Wall $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 6:
Snowmelt System $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 7:
Retractable Electrical
Cord Reels at Garage
1096 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Alternate No. 8: Police
Corridor Wall
Wainscot $0.00 $0.00 $0.00 $0.00 $0.00 $0.00