HomeMy WebLinkAbout7.b. UMore Ballfields Park Building - Concept PlansE X E C U T I V E S U M M A R Y
Parks and Recreation Commission Meeting: April 24, 2023
AGENDA ITEM: UMore Ballfield Park Building – Concept
Plans
AGENDA SECTION:
New Business
PREPARED BY: Dan Schultz, Parks & Recreation Director AGENDA NO.
7 b.
ATTACHMENTS: Power Point APPROVED BY: dls
RECOMMENDED ACTION: None, update only.
ISSUE
As part of the UMore Ballfield Complex development, there are plans for a park building to support the
activities in the park and for the future pickle ball court complex that will be built just south of the
complex. Staff have been working with the Oertel Architects on developing a couple of concept plans for
the building. The building will include restrooms, mechanical space and a flex space that can be used to
serve concessions from. This building will function much like the park building at Erickson Park.
Included in the packet are the two concept plans that have been developed for the building. The early
estimate for either building is around $1,100,000. As we further develop a final concept plan, we can
tighten up the budget.
BACKGROUND
When the park project was originally developed, the City installed sewer and water pipes for future
connections. This summer the water and sewer services will be brought past the complex and will be
ready for us to hook into.
SUMMARY
Staff would like for the Commission to review and discuss the two concepts and provide direction to
staff regarding moving forward on a preferred design.
4
4
'
-
0
"
48'-
0
"
1 PLAN 1
UMORE PARK BUILDING 3/16" = 1'-0"ROSEMOUNT
DESIGN CONCEPTS
UMORE PARK BUILDING
PLAN 01
OVERALL SITE PLAN
44'-
0
"
4
8
'
-
0
"
1
PL
A
N
1
UM
O
R
E
P
A
R
K
B
U
I
L
D
I
N
G
3/
1
6
"
=
1
'
-
0
"
NORTH
4
4
'
-
0
"
48'-
0
"
1 PLAN 1
UMORE PARK BUILDING 3/16" = 1'-0"
TO PARKING
ENLARGED SITE PLAN
4
4
'
-
0
"
48'-
0
"
1 PLAN 1
UMORE PARK BUILDING 3/16" = 1'-0"
48’-
0
”
4
4
’
-
0
”
ROSEMOUNT
DESIGN CONCEPTS
UMORE PARK BUILDING
PLAN 01
WOMEN'S
MEN'S
FAMILY STORAGE
JAN.
MECH./ELEC.
FLEX
250 SF
250 SF
120 SF
110 SF
350 SF
1,390 SF BUILDING
FOOTPRINT
37
'
-
3
"
37'-4"
1 PLAN 1
UMORE PARK BUILDING 1/4" = 1'-0"
PLAN
NORTH
TRUE
NORTH
WOMEN'S
MEN'S
FAMILY STORAGE
JAN.
MECH./ELEC.
FLEX
250 SF
250 SF
120 SF
110 SF
350 SF
1,390 SF BUILDING
FOOTPRINT
37
'
-
3
"
37'-4"
1 PLAN 1
UMORE PARK BUILDING 1/4" = 1'-0"
1,390 SF BUILDING
FOOTPRINT
THIN VENEER
MASONRY
HALF-COURSE
MASONRY
VENEER
CHARCOAL
STANDING SEAM
METAL ROOF
DOUGLAS
FIR
4
4
'
-
0
"
48'-
0
"
2 PLAN 2
UMORE PARK BUILDING 3/16" = 1'-0"ROSEMOUNT
DESIGN CONCEPTS
UMORE PARK BUILDING
PLAN 02
OVERALL SITE PLAN
44'-
0
"
4
8
'
-
0
"
1
PL
A
N
1
UM
O
R
E
P
A
R
K
B
U
I
L
D
I
N
G
3/
1
6
"
=
1
'
-
0
"
4
4
'
-
0
"
48'-
0
"
2 PLAN 2
UMORE PARK BUILDING 3/16" = 1'-0"
TO PARKING
ENLARGED SITE PLAN
4
4
'
-
0
"
48'-
0
"
2 PLAN 2
UMORE PARK BUILDING 3/16" = 1'-0"
4
4
’
-
0
”
48’-
0
”
NORTH
ROSEMOUNT
DESIGN CONCEPTS
UMORE PARK BUILDING
PLAN 02
WOMEN'S
235 SF
MEN'S
235 SF
FLEX
FAMILY
140 SF
STORAGE
JAN.
MECH./ELEC.
160 SF
OFFICE/
120 SF
375 SF
STORAGE
1,757 SF BUILDING
FOOTPRINT
44
'
-
4
"
37'-8"
2 PLAN 2
UMORE PARK BUILDING 1/4" = 1'-0"
PLAN
NORTH
TRUE
NORTH
WOMEN'S
MEN'S
FAMILY STORAGE
JAN.
MECH./ELEC.
FLEX
250 SF
250 SF
120 SF
110 SF
350 SF
1,390 SF BUILDING
FOOTPRINT
37
'
-
3
"
37'-4"
1 PLAN 1
UMORE PARK BUILDING 1/4" = 1'-0"
1,757 SF BUILDING
FOOTPRINT
WOMEN'S
235 SF
MEN'S
235 SF
FLEX
FAMILY
140 SF
STORAGE
JAN.
MECH./ELEC.
160 SF
OFFICE/
120 SF
375 SF
STORAGE
1,757 SF BUILDING
FOOTPRINT
44
'
-
4
"
37'-8"
2 PLAN 2
UMORE PARK BUILDING 1/4" = 1'-0"
METAL PANEL:
FOREST GREEN
STANDING SEAM
METAL ROOF:
CHARCOAL
THIN VENEER
MASONRY
THIN VENEER
MASONRY
DOUGLAS
FIR