Loading...
HomeMy WebLinkAbout7.b. UMore Ballfields Park Building - Concept PlansE X E C U T I V E S U M M A R Y Parks and Recreation Commission Meeting: April 24, 2023 AGENDA ITEM: UMore Ballfield Park Building – Concept Plans AGENDA SECTION: New Business PREPARED BY: Dan Schultz, Parks & Recreation Director AGENDA NO. 7 b. ATTACHMENTS: Power Point APPROVED BY: dls RECOMMENDED ACTION: None, update only. ISSUE As part of the UMore Ballfield Complex development, there are plans for a park building to support the activities in the park and for the future pickle ball court complex that will be built just south of the complex. Staff have been working with the Oertel Architects on developing a couple of concept plans for the building. The building will include restrooms, mechanical space and a flex space that can be used to serve concessions from. This building will function much like the park building at Erickson Park. Included in the packet are the two concept plans that have been developed for the building. The early estimate for either building is around $1,100,000. As we further develop a final concept plan, we can tighten up the budget. BACKGROUND When the park project was originally developed, the City installed sewer and water pipes for future connections. This summer the water and sewer services will be brought past the complex and will be ready for us to hook into. SUMMARY Staff would like for the Commission to review and discuss the two concepts and provide direction to staff regarding moving forward on a preferred design. 4 4 ' - 0 " 48'- 0 " 1 PLAN 1 UMORE PARK BUILDING 3/16" = 1'-0"ROSEMOUNT DESIGN CONCEPTS UMORE PARK BUILDING PLAN 01 OVERALL SITE PLAN 44'- 0 " 4 8 ' - 0 " 1 PL A N 1 UM O R E P A R K B U I L D I N G 3/ 1 6 " = 1 ' - 0 " NORTH 4 4 ' - 0 " 48'- 0 " 1 PLAN 1 UMORE PARK BUILDING 3/16" = 1'-0" TO PARKING ENLARGED SITE PLAN 4 4 ' - 0 " 48'- 0 " 1 PLAN 1 UMORE PARK BUILDING 3/16" = 1'-0" 48’- 0 ” 4 4 ’ - 0 ” ROSEMOUNT DESIGN CONCEPTS UMORE PARK BUILDING PLAN 01 WOMEN'S MEN'S FAMILY STORAGE JAN. MECH./ELEC. FLEX 250 SF 250 SF 120 SF 110 SF 350 SF 1,390 SF BUILDING FOOTPRINT 37 ' - 3 " 37'-4" 1 PLAN 1 UMORE PARK BUILDING 1/4" = 1'-0" PLAN NORTH TRUE NORTH WOMEN'S MEN'S FAMILY STORAGE JAN. MECH./ELEC. FLEX 250 SF 250 SF 120 SF 110 SF 350 SF 1,390 SF BUILDING FOOTPRINT 37 ' - 3 " 37'-4" 1 PLAN 1 UMORE PARK BUILDING 1/4" = 1'-0" 1,390 SF BUILDING FOOTPRINT THIN VENEER MASONRY HALF-COURSE MASONRY VENEER CHARCOAL STANDING SEAM METAL ROOF DOUGLAS FIR 4 4 ' - 0 " 48'- 0 " 2 PLAN 2 UMORE PARK BUILDING 3/16" = 1'-0"ROSEMOUNT DESIGN CONCEPTS UMORE PARK BUILDING PLAN 02 OVERALL SITE PLAN 44'- 0 " 4 8 ' - 0 " 1 PL A N 1 UM O R E P A R K B U I L D I N G 3/ 1 6 " = 1 ' - 0 " 4 4 ' - 0 " 48'- 0 " 2 PLAN 2 UMORE PARK BUILDING 3/16" = 1'-0" TO PARKING ENLARGED SITE PLAN 4 4 ' - 0 " 48'- 0 " 2 PLAN 2 UMORE PARK BUILDING 3/16" = 1'-0" 4 4 ’ - 0 ” 48’- 0 ” NORTH ROSEMOUNT DESIGN CONCEPTS UMORE PARK BUILDING PLAN 02 WOMEN'S 235 SF MEN'S 235 SF FLEX FAMILY 140 SF STORAGE JAN. MECH./ELEC. 160 SF OFFICE/ 120 SF 375 SF STORAGE 1,757 SF BUILDING FOOTPRINT 44 ' - 4 " 37'-8" 2 PLAN 2 UMORE PARK BUILDING 1/4" = 1'-0" PLAN NORTH TRUE NORTH WOMEN'S MEN'S FAMILY STORAGE JAN. MECH./ELEC. FLEX 250 SF 250 SF 120 SF 110 SF 350 SF 1,390 SF BUILDING FOOTPRINT 37 ' - 3 " 37'-4" 1 PLAN 1 UMORE PARK BUILDING 1/4" = 1'-0" 1,757 SF BUILDING FOOTPRINT WOMEN'S 235 SF MEN'S 235 SF FLEX FAMILY 140 SF STORAGE JAN. MECH./ELEC. 160 SF OFFICE/ 120 SF 375 SF STORAGE 1,757 SF BUILDING FOOTPRINT 44 ' - 4 " 37'-8" 2 PLAN 2 UMORE PARK BUILDING 1/4" = 1'-0" METAL PANEL: FOREST GREEN STANDING SEAM METAL ROOF: CHARCOAL THIN VENEER MASONRY THIN VENEER MASONRY DOUGLAS FIR