Loading...
HomeMy WebLinkAbout20230919 CC RM - Packet Page 1 of 233 Page 2 of 233 Page 3 of 233 Page 4 of 233 Page 5 of 233 Page 6 of 233 Page 7 of 233 Page 8 of 233 Page 9 of 233 Page 10 of 233 Page 11 of 233 Page 12 of 233 Page 13 of 233 Page 14 of 233 Page 15 of 233 Page 16 of 233 Page 17 of 233 Page 18 of 233 Page 19 of 233 Page 20 of 233 Page 21 of 233 Page 22 of 233 Page 23 of 233 Page 24 of 233 Page 25 of 233 Page 26 of 233 Page 27 of 233 Page 28 of 233 Page 29 of 233 Page 30 of 233 Page 31 of 233 Page 32 of 233 Page 33 of 233 Page 34 of 233 Page 35 of 233 Page 36 of 233 Page 37 of 233 Page 38 of 233 Page 39 of 233 Page 40 of 233 Page 41 of 233 Page 42 of 233 Page 43 of 233 Page 44 of 233 Page 45 of 233 Page 46 of 233 Page 47 of 233 Page 48 of 233 Page 49 of 233 Page 50 of 233 Page 51 of 233 Page 52 of 233 Page 53 of 233 Page 54 of 233 Page 55 of 233 Page 56 of 233 Page 57 of 233 Page 58 of 233 Page 59 of 233 Page 60 of 233 Page 61 of 233 Page 62 of 233 Page 63 of 233 Page 64 of 233 Page 65 of 233 Page 66 of 233 Page 67 of 233 Page 68 of 233 Page 69 of 233 Page 70 of 233 Page 71 of 233 Page 72 of 233 Page 73 of 233 Page 74 of 233 Page 75 of 233 Page 76 of 233 Page 77 of 233 Page 78 of 233 Page 79 of 233 Page 80 of 233 Page 81 of 233 Page 82 of 233 Page 83 of 233 Page 84 of 233 Page 85 of 233 Page 86 of 233 Page 88 of 233 Page 22 of 33 Page 89 of 233 Page 23 of 33 Page 90 of 233 Page 24 of 33 Page 91 of 233 Page 92 of 233 Page 94 of 233 Page 95 of 233 Page 96 of 233 Memorandum To:Brian Erickson, City Engineer CC:Anthony Nemcek, Senior Planner From:Jeff PearsonPE,WSB Engineering Consultant Date:August 14, 2023 th Re:Amber Fields12AdditionPlan Review Final PlatReview ConstructionPlan Review WSB File Number 020079-000 SUBMITTAL: th Construction Documentshave been submittedfor the construction of Amber Fields 12Addition, nd within Outlot G, Amber Fields2Addition.The construction plan constructs AshtownLaneand the extension of Amber Fields Boulevardeastfromthecurrent terminus.Theplans submitted were prepared by Alliant Engineering. Review comments were generated from Construction Documents, submittal dated 07-28-2023. The submittal includedthe following: Construction Plans Cover Sheet -1 Details -2-4 Existing Conditions Plan -5 Site, Lighting, and SignagePlan 6-7 Erosion and Sediment Control Plan, Notes and Details8-10 Sanitary Sewer and Watermain Plan and Profile 11-13 Street and Storm Sewer Plan Profiles 14-16 Street Intersection Details 17 Landscape Plan 18-19 Final Plat DETAILS 1.Update all City details to 2023 detail plates. 2.Sheet 3 Detail ST-8Please remove this detail, in its place reference MnDot Standard Construction plan sheets for Pedestrian Curb Ramp Construction. EXISTING CONDITIONS PLAN SITE, LIGHTING AND SIGNAGEPLAN 3.Sheet 7 Temp cul-de-revise to be temp hammerhead turnaround. 4.Sheet 7 Identify curb type transitions. 5.Recommend including the street light at temp turnaround location with this phase. K:\\020079-000\\Admin\\Docs\\AF 12 Plan Review\\2023.08.10 Review Comments\\2023.08.14 -Amber Fields 12th -Construction Plan Review.docx Page 99 of 233 th Amber Fields 12 Addition Plan Review August 14, 2023 Page 2 EROSION AND SEDIMENT CONTROL PLAN 6. Sheet 8 & 9 Show INLET PROTECTION devices (dark color symbol) for structures previously constructed at the low point adjacent to the rock construction entrance. 7. Sheet 9 GRADING ACTIVITY (Note above the legend.) A concrete washout area must be provided as detailed on sheet 11. SANITARY SEWER AND WATERMAIN PLAN AND PROFILE 8. Sheet 11 with corporation connections 9. Sheet 12 Include a gate valve at WM stub after Lot 18 service. 10. Sheet 13 limit of permanent street construction. 11. Sheet 13 Amber Fields Boulevard sanitary sewer stub should extend past permanent street construction at minimum a length equal to the depth of the stub. 12. Sheet 13 Amber Fields Boulevard sanitary sewer stub shows a service to unplatted lot. Remove service and lot info from plans. 13. Sheet 13 The corporation location for Lot 3, Block 3 needs to be moved to be 8 feet from the edge of the catchbasin. (The catchbasin location may be able to be adjusted slightly). 14. Sheet 13 permanent street construction. 15. Sheet 13 Askeaton Place waterma permanent street construction. 16. Sheet 13 Askeaton Place sanitary sewer stub should extend past permanent street construction at minimum a length equal to the depth of the stub. 17. Sheet 13 Askeaton Place sanitary sewer stub shows a service to unplatted lot. Remove service and lot info from plans. 18. Sheet 13 permanent street construction. 19. Sheet 13 Athenry Bay sanitary sewer stub should extend past permanent street construction at minimum a length equal to the depth of the stub. 20. Sheet 13 Athenry Bay sanitary sewer stub shows a service to unplatted lot. Remove service and lot info from plans. STREET AND STORM SEWER PLAN AND PROFILE 21. All street profiles site grading was completed. 22. The following structures are not listed in either STRUCTURE AND CASTING SCHEDULE: 725, 726, 727, 728, 732, 733, 734 23. Sheet 15 It is recommended to shift the low point and CBs at CBMH733/CB734 further away from driveway. 24. Sheet 16 It is recommended routing from CB710 to CB711 to CB708 rather than taking drainage southeast before going back northwest (unless street light is already installed and in conflict with the proposed routing option). INTERSECTION DETAILS LANDSCAPE PLAN 25. Sheet 18 and 19 Verify tree locations are minimum 5 feet from the curb stops. General Guidelines and Standards. Infrastructure construction shall be completed in accordance with the d Detail Plates for Street and Utility Construction. K:\\020079-000\\Admin\\Docs\\AF 12 Plan Review\\2023.08.10 Review Comments\\2023.08.14 - Amber Fields 12th - Construction Plan Review.docx Page 100 of 233 Page 101 of 233 Page 102 of 233 Page 103 of 233 CITY OFROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2023- A RESOLUTION APPROVINGTHE FINALPLAT FORAMBER FIELDS 11THADDITION Page 104 of 233 Page 105 of 233 Page 106 of 233 Page 107 of 233 Page 108 of 233 Page 109 of 233 Page 110 of 233 Page 111 of 233 Page 112 of 233 Page 113 of 233 Page 114 of 233 Page 115 of 233 Page 116 of 233 Page 117 of 233 Page 118 of 233 Page 119 of 233 Page 120 of 233 Page 121 of 233 Page 122 of 233 Page 123 of 233 Page 124 of 233 Page 125 of 233 Page 126 of 233 Page 128 of 233 Page 9 of 33 Page 129 of 233 Page 10 of 33 Page 130 of 233 Page 131 of 233 Page 132 of 233 Page 133 of 233 Page 134 of 233 Page 136 of 233 Memorandum To:Brian Erickson, City Engineer CC:Anthony Nemcek, Senior Planner From:Jeff PearsonPE,WSB Engineering Consultant Date:August 9, 2023 th Re:Amber Fields11AdditionPlan Review Final PlatReview ConstructionPlan Review WSB File Number 020403-000 SUBMITTAL: th Construction Documentshave been submittedfor the construction of Amber Fields 11Addition, rd within Outlot A, Amber Fields3Addition.The construction plan constructs Archdale Lane, Ahena Curveand Adare Waysouthfromtheircurrent termii, connectingto the new Ardfinnan Pass and other internal drives within the addition.Theplans submittedwere prepared by Alliant Engineering. Review comments were generated from Construction Documents, submittal dated 07-19-2023. The submittal includedthe following: Construction Plans Cover Sheet -1 Details -2-4 Existing Conditions Plan -5 Site, Lighting, and SignagePlan 6-8 Erosion and Sediment Control Plan, Notes and Details9-12 Sanitary Sewer and Watermain Plan and Profile -13-19 Street and Storm Sewer Plan Profiles 20-25 Street and Storm Sewer Plan Profiles 26-29 Street Intersection Details 30-32 Landscape Plan 33-34 Final Plat WATER RESOURCES/STORM WATER MANAGEMENTREVIEW No additional comments. Plans consistent with previous review. DETAILS 1.Update all City details to 2023 detail plates. 2.Sheet2Details SI-4 andSD-4do not appear to beneeded for the proposed work. They can be removed from the plan set. 3.Sheet 3 Detail ST-8Please remove this detail, in its place reference MnDot Standard Construction plan sheets for Pedestrian Curb Ramp Construction. K:\\020403-000\\Admin\\Docs\\Amber Fields 11th\\2023.07.27 Review Comments\\2023.08.09 -Amber Fields 11th -Construction Plan Review.docx Page 137 of 233 th Amber Fields 11 Addition Plan Review August 9, 2023 Page 2 EXISTING CONDITIONS PLAN SITE, LIGHTING AND SIGNAGE PLAN 4. Sheets 6, 7, 8 The barricades at the formerly terminating streets can be eliminated. 5. Sheets 6, 7, 8 Light locations not shown 6. Sheets 6, 7, 8 Sign locations not shown 7. Sheet 7 Clean up legend, scale and north arrow. 8. Sheet 7 Include curb type call outs for areas not shown on Sheet 8. 9. Sheet 8 Confirm curb type between Dwy 5 and 7. Called out as surmountable. 10. Sheet 8 Identify curb type between Dwy 7 and 8. 11. EROSION AND SEDIMENT CONTROL PLAN 12. Sheet 9, 10, and 11 Show all INLET PROTECTION devices as dark color symbol including those on structures from phase 1. 13. Sheet 9 The sheet indicates seed restoration with MnDot 25-151. A less maintenance and more rigorous seed mixture needs to be provided upon completion of the work. 14. Sheet 9 No seed areas are identified. Update with seed areas or remove the hatch from the legend if not needed. 15. Sheet 9 GRADING ACTIVITY (Note above the legend.) A concrete washout area must be provided as detailed on sheet 11. 16. Sheet 9 NOTES: 1 See Sheet SANITARY SEWER AND WATERMAIN PLAN AND PROFILE 17. Sheet 13 is mislabeled as Sheet 14. 18. Sheet 13 with corporation connections 19. Sheet 14 The valve on Ardfinnan Pass at Driveway 9 can be relocated to Ahena Curve. Adjust hydrant lead location as needed to be east of valve. 20. Sheet 13 The corporation locations for Lot 2, Block 14 and Lot 2, Block 15 need to be moved to be 8 feet from the edge of the catchbasins. (The catchbasins locations may be able to be adjusted slightly). 21. Sheet 16 Clean up scales and north arrows STREET AND STORM SEWER PLAN AND PROFILE 22. All street profiles site grading was completed. 23. Sheet 28 Confirm casting types for CB 6 and CB 8 since they are in surmountable curb. 24. Sheet 29 Confirm casting type for CB 52 since it is in surmountable curb. 25. Sheet 30 Confirm casting type for CB 58 since it is in surmountable curb. INTERSECTION DETAILS LANDSCAPE PLAN 26. Sheet 33 and 34 - Tree locations need to be 5 feet from the curb stops. Show water services in underlying linework as sewer is currently shown. 27. Sheet 22 and 23 The landscape plan does not identify tree types symbols indicated in the LANDSCAPE SCHEDULE. Provide either callouts or a symbol legend to identify trees correlating to the LANDSCAPE SCHEDULE. General K:\\020403-000\\Admin\\Docs\\Amber Fields 11th\\2023.07.27 Review Comments\\2023.08.09 - Amber Fields 11th - Construction Plan Review.docx Page 138 of 233 th Amber Fields 11 Addition Plan Review August 9, 2023 Page 3 Guidelines and Standards. Infrastructure construction shall be completed in accordance with the Construction. K:\\020403-000\\Admin\\Docs\\Amber Fields 11th\\2023.07.27 Review Comments\\2023.08.09 - Amber Fields 11th - Construction Plan Review.docx Page 139 of 233 Page 140 of 233 Page 141 of 233 Page 142 of 233 Page 143 of 233 CITY OFROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2023- A RESOLUTION APPROVING A MINOR SUBDIVISION FORHAWKINS POND 2ND ADDITION Page 144 of 233 Page 145 of 233 Page 146 of 233 Page 147 of 233 Page 149 of 233 Page 150 of 233 Page 151 of 233 Page 152 of 233 Page 153 of 233 Page 154 of 233 Page 155 of 233 Page 156 of 233 Page 157 of 233 Page 158 of 233 Page 159 of 233 Page 160 of 233 Page 161 of 233 Page 162 of 233 Page 163 of 233 Page 164 of 233 Page 165 of 233 Page 166 of 233 Page 167 of 233 Page 168 of 233 Page 169 of 233 Page 170 of 233 Page 171 of 233 Page 173 of 233 Page 174 of 233 Page 175 of 233 Page 176 of 233 Page 177 of 233 Page 178 of 233 Page 179 of 233 Page 180 of 233 Page 181 of 233 Page 182 of 233 Page 183 of 233 Page 184 of 233 Page 185 of 233 Page 186 of 233 Page 187 of 233 Page 188 of 233 Page 189 of 233 Page 190 of 233 Page 191 of 233 Page 192 of 233 Page 193 of 233 Page 194 of 233 Page 195 of 233 Page 196 of 233 Page 197 of 233 Page 198 of 233 Page 199 of 233 Page 200 of 233 Page 201 of 233 Page 202 of 233 Page 203 of 233 Page 204 of 233 Page 205 of 233 Page 206 of 233 Page 207 of 233 Page 208 of 233 Page 209 of 233 Page 210 of 233 Page 211 of 233 Page 212 of 233 Page 213 of 233 Page 214 of 233 Page 215 of 233 Page 216 of 233 Page 217 of 233 Page 218 of 233 Page 219 of 233 Page 220 of 233 Page 221 of 233 Page 222 of 233 Page 223 of 233 Page 224 of 233 Page 225 of 233 Page 226 of 233 Page 227 of 233 Page 228 of 233 Page 229 of 233 Page 230 of 233 Page 231 of 233 Page 232 of 233 Page 233 of 233