HomeMy WebLinkAbout20230919 CC RM - Packet
Page 1 of 233
Page 2 of 233
Page 3 of 233
Page 4 of 233
Page 5 of 233
Page 6 of 233
Page 7 of 233
Page 8 of 233
Page 9 of 233
Page 10 of 233
Page 11 of 233
Page 12 of 233
Page 13 of 233
Page 14 of 233
Page 15 of 233
Page 16 of 233
Page 17 of 233
Page 18 of 233
Page 19 of 233
Page 20 of 233
Page 21 of 233
Page 22 of 233
Page 23 of 233
Page 24 of 233
Page 25 of 233
Page 26 of 233
Page 27 of 233
Page 28 of 233
Page 29 of 233
Page 30 of 233
Page 31 of 233
Page 32 of 233
Page 33 of 233
Page 34 of 233
Page 35 of 233
Page 36 of 233
Page 37 of 233
Page 38 of 233
Page 39 of 233
Page 40 of 233
Page 41 of 233
Page 42 of 233
Page 43 of 233
Page 44 of 233
Page 45 of 233
Page 46 of 233
Page 47 of 233
Page 48 of 233
Page 49 of 233
Page 50 of 233
Page 51 of 233
Page 52 of 233
Page 53 of 233
Page 54 of 233
Page 55 of 233
Page 56 of 233
Page 57 of 233
Page 58 of 233
Page 59 of 233
Page 60 of 233
Page 61 of 233
Page 62 of 233
Page 63 of 233
Page 64 of 233
Page 65 of 233
Page 66 of 233
Page 67 of 233
Page 68 of 233
Page 69 of 233
Page 70 of 233
Page 71 of 233
Page 72 of 233
Page 73 of 233
Page 74 of 233
Page 75 of 233
Page 76 of 233
Page 77 of 233
Page 78 of 233
Page 79 of 233
Page 80 of 233
Page 81 of 233
Page 82 of 233
Page 83 of 233
Page 84 of 233
Page 85 of 233
Page 86 of 233
Page 88 of 233
Page 22 of 33
Page 89 of 233
Page 23 of 33
Page 90 of 233
Page 24 of 33
Page 91 of 233
Page 92 of 233
Page 94 of 233
Page 95 of 233
Page 96 of 233
Memorandum
To:Brian Erickson, City Engineer
CC:Anthony Nemcek, Senior Planner
From:Jeff PearsonPE,WSB Engineering Consultant
Date:August 14, 2023
th
Re:Amber Fields12AdditionPlan Review
Final PlatReview
ConstructionPlan Review
WSB File Number 020079-000
SUBMITTAL:
th
Construction Documentshave been submittedfor the construction of Amber Fields 12Addition,
nd
within Outlot G, Amber Fields2Addition.The construction plan constructs AshtownLaneand
the extension of Amber Fields Boulevardeastfromthecurrent terminus.Theplans submitted
were prepared by Alliant Engineering. Review comments were generated from Construction
Documents, submittal dated 07-28-2023. The submittal includedthe following:
Construction Plans
Cover Sheet -1
Details -2-4
Existing Conditions Plan -5
Site, Lighting, and SignagePlan 6-7
Erosion and Sediment Control Plan, Notes and Details8-10
Sanitary Sewer and Watermain Plan and Profile 11-13
Street and Storm Sewer Plan Profiles 14-16
Street Intersection Details 17
Landscape Plan 18-19
Final Plat
DETAILS
1.Update all City details to 2023 detail plates.
2.Sheet 3 Detail ST-8Please remove this detail, in its place reference MnDot Standard
Construction plan sheets for Pedestrian Curb Ramp Construction.
EXISTING CONDITIONS PLAN
SITE, LIGHTING AND SIGNAGEPLAN
3.Sheet 7 Temp cul-de-revise to be temp
hammerhead turnaround.
4.Sheet 7 Identify curb type transitions.
5.Recommend including the street light at temp turnaround location with this phase.
K:\\020079-000\\Admin\\Docs\\AF 12 Plan Review\\2023.08.10 Review Comments\\2023.08.14 -Amber Fields 12th -Construction Plan Review.docx
Page 99 of 233
th
Amber Fields 12 Addition Plan Review
August 14, 2023
Page 2
EROSION AND SEDIMENT CONTROL PLAN
6. Sheet 8 & 9 Show INLET PROTECTION devices (dark color symbol) for structures
previously constructed at the low point adjacent to the rock construction entrance.
7. Sheet 9 GRADING ACTIVITY (Note above the legend.) A concrete washout area
must be provided as detailed on sheet 11.
SANITARY SEWER AND WATERMAIN PLAN AND PROFILE
8. Sheet 11 with corporation
connections
9. Sheet 12 Include a gate valve at WM stub after Lot 18 service.
10. Sheet 13
limit of permanent street construction.
11. Sheet 13 Amber Fields Boulevard sanitary sewer stub should extend past permanent
street construction at minimum a length equal to the depth of the stub.
12. Sheet 13 Amber Fields Boulevard sanitary sewer stub shows a service to unplatted lot.
Remove service and lot info from plans.
13. Sheet 13 The corporation location for Lot 3, Block 3 needs to be moved to be 8 feet from
the edge of the catchbasin. (The catchbasin location may be able to be adjusted slightly).
14. Sheet 13
permanent street construction.
15. Sheet 13 Askeaton Place waterma
permanent street construction.
16. Sheet 13 Askeaton Place sanitary sewer stub should extend past permanent street
construction at minimum a length equal to the depth of the stub.
17. Sheet 13 Askeaton Place sanitary sewer stub shows a service to unplatted lot. Remove
service and lot info from plans.
18. Sheet 13
permanent street construction.
19. Sheet 13 Athenry Bay sanitary sewer stub should extend past permanent street
construction at minimum a length equal to the depth of the stub.
20. Sheet 13 Athenry Bay sanitary sewer stub shows a service to unplatted lot. Remove
service and lot info from plans.
STREET AND STORM SEWER PLAN AND PROFILE
21. All street profiles
site grading was completed.
22. The following structures are not listed in either STRUCTURE AND CASTING SCHEDULE:
725, 726, 727, 728, 732, 733, 734
23. Sheet 15 It is recommended to shift the low point and CBs at CBMH733/CB734 further
away from driveway.
24. Sheet 16 It is recommended routing from CB710 to CB711 to CB708 rather than taking
drainage southeast before going back northwest (unless street light is already installed
and in conflict with the proposed routing option).
INTERSECTION DETAILS
LANDSCAPE PLAN
25. Sheet 18 and 19 Verify tree locations are minimum 5 feet from the curb stops.
General
Guidelines and Standards. Infrastructure construction shall be completed in accordance with the
d Detail Plates for Street and Utility
Construction.
K:\\020079-000\\Admin\\Docs\\AF 12 Plan Review\\2023.08.10 Review Comments\\2023.08.14 - Amber Fields 12th - Construction Plan Review.docx
Page 100 of 233
Page 101 of 233
Page 102 of 233
Page 103 of 233
CITY OFROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2023-
A RESOLUTION APPROVINGTHE FINALPLAT
FORAMBER FIELDS 11THADDITION
Page 104 of 233
Page 105 of 233
Page 106 of 233
Page 107 of 233
Page 108 of 233
Page 109 of 233
Page 110 of 233
Page 111 of 233
Page 112 of 233
Page 113 of 233
Page 114 of 233
Page 115 of 233
Page 116 of 233
Page 117 of 233
Page 118 of 233
Page 119 of 233
Page 120 of 233
Page 121 of 233
Page 122 of 233
Page 123 of 233
Page 124 of 233
Page 125 of 233
Page 126 of 233
Page 128 of 233
Page 9 of 33
Page 129 of 233
Page 10 of 33
Page 130 of 233
Page 131 of 233
Page 132 of 233
Page 133 of 233
Page 134 of 233
Page 136 of 233
Memorandum
To:Brian Erickson, City Engineer
CC:Anthony Nemcek, Senior Planner
From:Jeff PearsonPE,WSB Engineering Consultant
Date:August 9, 2023
th
Re:Amber Fields11AdditionPlan Review
Final PlatReview
ConstructionPlan Review
WSB File Number 020403-000
SUBMITTAL:
th
Construction Documentshave been submittedfor the construction of Amber Fields 11Addition,
rd
within Outlot A, Amber Fields3Addition.The construction plan constructs Archdale Lane,
Ahena Curveand Adare Waysouthfromtheircurrent termii, connectingto the new Ardfinnan
Pass and other internal drives within the addition.Theplans submittedwere prepared by Alliant
Engineering. Review comments were generated from Construction Documents, submittal dated
07-19-2023. The submittal includedthe following:
Construction Plans
Cover Sheet -1
Details -2-4
Existing Conditions Plan -5
Site, Lighting, and SignagePlan 6-8
Erosion and Sediment Control Plan, Notes and Details9-12
Sanitary Sewer and Watermain Plan and Profile -13-19
Street and Storm Sewer Plan Profiles 20-25
Street and Storm Sewer Plan Profiles 26-29
Street Intersection Details 30-32
Landscape Plan 33-34
Final Plat
WATER RESOURCES/STORM WATER MANAGEMENTREVIEW
No additional comments. Plans consistent with previous review.
DETAILS
1.Update all City details to 2023 detail plates.
2.Sheet2Details SI-4 andSD-4do not appear to beneeded for the proposed work. They
can be removed from the plan set.
3.Sheet 3 Detail ST-8Please remove this detail, in its place reference MnDot Standard
Construction plan sheets for Pedestrian Curb Ramp Construction.
K:\\020403-000\\Admin\\Docs\\Amber Fields 11th\\2023.07.27 Review Comments\\2023.08.09 -Amber Fields 11th -Construction Plan Review.docx
Page 137 of 233
th
Amber Fields 11 Addition Plan Review
August 9, 2023
Page 2
EXISTING CONDITIONS PLAN
SITE, LIGHTING AND SIGNAGE PLAN
4. Sheets 6, 7, 8 The barricades at the formerly terminating streets can be eliminated.
5. Sheets 6, 7, 8 Light locations not shown
6. Sheets 6, 7, 8 Sign locations not shown
7. Sheet 7 Clean up legend, scale and north arrow.
8. Sheet 7 Include curb type call outs for areas not shown on Sheet 8.
9. Sheet 8 Confirm curb type between Dwy 5 and 7. Called out as surmountable.
10. Sheet 8 Identify curb type between Dwy 7 and 8.
11.
EROSION AND SEDIMENT CONTROL PLAN
12. Sheet 9, 10, and 11 Show all INLET PROTECTION devices as dark color symbol
including those on structures from phase 1.
13. Sheet 9 The sheet indicates seed restoration with MnDot 25-151. A less maintenance
and more rigorous seed mixture needs to be provided upon completion of the work.
14. Sheet 9 No seed areas are identified. Update with seed areas or remove the hatch from
the legend if not needed.
15. Sheet 9 GRADING ACTIVITY (Note above the legend.) A concrete washout area
must be provided as detailed on sheet 11.
16. Sheet 9 NOTES: 1 See Sheet
SANITARY SEWER AND WATERMAIN PLAN AND PROFILE
17. Sheet 13 is mislabeled as Sheet 14.
18. Sheet 13 with corporation
connections
19. Sheet 14 The valve on Ardfinnan Pass at Driveway 9 can be relocated to Ahena Curve.
Adjust hydrant lead location as needed to be east of valve.
20. Sheet 13 The corporation locations for Lot 2, Block 14 and Lot 2, Block 15 need to be
moved to be 8 feet from the edge of the catchbasins. (The catchbasins locations may be
able to be adjusted slightly).
21. Sheet 16 Clean up scales and north arrows
STREET AND STORM SEWER PLAN AND PROFILE
22. All street profiles
site grading was completed.
23. Sheet 28 Confirm casting types for CB 6 and CB 8 since they are in surmountable curb.
24. Sheet 29 Confirm casting type for CB 52 since it is in surmountable curb.
25. Sheet 30 Confirm casting type for CB 58 since it is in surmountable curb.
INTERSECTION DETAILS
LANDSCAPE PLAN
26. Sheet 33 and 34 - Tree locations need to be 5 feet from the curb stops. Show water
services in underlying linework as sewer is currently shown.
27. Sheet 22 and 23 The landscape plan does not identify tree types symbols indicated in
the LANDSCAPE SCHEDULE. Provide either callouts or a symbol legend to identify trees
correlating to the LANDSCAPE SCHEDULE.
General
K:\\020403-000\\Admin\\Docs\\Amber Fields 11th\\2023.07.27 Review Comments\\2023.08.09 - Amber Fields 11th - Construction Plan Review.docx
Page 138 of 233
th
Amber Fields 11 Addition Plan Review
August 9, 2023
Page 3
Guidelines and Standards. Infrastructure construction shall be completed in accordance with the
Construction.
K:\\020403-000\\Admin\\Docs\\Amber Fields 11th\\2023.07.27 Review Comments\\2023.08.09 - Amber Fields 11th - Construction Plan Review.docx
Page 139 of 233
Page 140 of 233
Page 141 of 233
Page 142 of 233
Page 143 of 233
CITY OFROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2023-
A RESOLUTION APPROVING
A MINOR SUBDIVISION FORHAWKINS POND 2ND ADDITION
Page 144 of 233
Page 145 of 233
Page 146 of 233
Page 147 of 233
Page 149 of 233
Page 150 of 233
Page 151 of 233
Page 152 of 233
Page 153 of 233
Page 154 of 233
Page 155 of 233
Page 156 of 233
Page 157 of 233
Page 158 of 233
Page 159 of 233
Page 160 of 233
Page 161 of 233
Page 162 of 233
Page 163 of 233
Page 164 of 233
Page 165 of 233
Page 166 of 233
Page 167 of 233
Page 168 of 233
Page 169 of 233
Page 170 of 233
Page 171 of 233
Page 173 of 233
Page 174 of 233
Page 175 of 233
Page 176 of 233
Page 177 of 233
Page 178 of 233
Page 179 of 233
Page 180 of 233
Page 181 of 233
Page 182 of 233
Page 183 of 233
Page 184 of 233
Page 185 of 233
Page 186 of 233
Page 187 of 233
Page 188 of 233
Page 189 of 233
Page 190 of 233
Page 191 of 233
Page 192 of 233
Page 193 of 233
Page 194 of 233
Page 195 of 233
Page 196 of 233
Page 197 of 233
Page 198 of 233
Page 199 of 233
Page 200 of 233
Page 201 of 233
Page 202 of 233
Page 203 of 233
Page 204 of 233
Page 205 of 233
Page 206 of 233
Page 207 of 233
Page 208 of 233
Page 209 of 233
Page 210 of 233
Page 211 of 233
Page 212 of 233
Page 213 of 233
Page 214 of 233
Page 215 of 233
Page 216 of 233
Page 217 of 233
Page 218 of 233
Page 219 of 233
Page 220 of 233
Page 221 of 233
Page 222 of 233
Page 223 of 233