HomeMy WebLinkAbout20231003 CC RM - Packet
AGENDA
City Council Regular Meeting
Tuesday, October 3, 2023
7:00 PM
Council Chambers
1. CALL TO ORDER/PLEDGE OF ALLEGIANCE
2. APPROVAL OF AGENDA
3. PRESENTATIONS, PROCLAMATIONS AND ACKNOWLEDGMENTS
4. PUBLIC COMMENT
Individuals will be allowed to address the Council on subjects that are not a part of the meeting agenda.
Typically, replies to the concerns expressed will be made via letter or phone call within a week or at the
following council meeting.
5. RESPONSE TO PUBLIC COMMENT
6. CONSENT AGENDA
a. Bill Listings
b. Minutes of the September 19, 2023 Regular Meeting Minutes
c. Amendments to City Code, Title 10: Water Resources
d. Declaration of Surplus Property
e. Resolution for Counting Write-In Voters for Local Elective Office
f. Amendments to City Code, Title 3: Business Regulations
g. Appointing Deputy City Clerks for Election Purpose
h. Appointment of Election Judges for 2023 Election
i. Accept Public Street and Utilities - Emerald Isle 3rd Addition
j. Donation Acceptance from Xcel Energy
7. PUBLIC HEARINGS
8. UNFINISHED BUSINESS
9. NEW BUSINESS
10. ANNOUNCEMENTS
a. City Staff Updates
b. Upcoming Community Calendar
Qbhf!2!pg!22:
11. ADJOURNMENT
Qbhf!3!pg!22:
9-22-2023 8:57 AM A/P PAYMENT REGISTER PAGE: 1
PACKET: 06794 09/22/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-040435 DAKOTA ELECTRIC ASSOCIATION
I 200001066414 8/23 STREET LIGHTS APBNK 9/22/2023 R 9/06/2023 6,438.52 6,438.52CR
G/L ACCOUNT CK: 153425 6,438.52
608 49508-01-381.00 ELECTRIC UTILITIES 6,438.52 STREET LIGHTS
I 200001519073 8/23 SIREN #10 APBNK 9/22/2023 R 9/06/2023 5.00 5.00CR
G/L ACCOUNT CK: 153425 5.00
101 43121-01-381.00 ELECTRIC UTILITIES 5.00 SIREN #10
I 200001834654 8/23 LIFT STATION #4 APBNK 9/22/2023 R 9/06/2023 182.22 182.22CR
G/L ACCOUNT CK: 153425 182.22
602 49454-01-381.00 ELECTRIC UTILITIES 182.22 LIFT STATION #4
I 200002004786 8/23 CONNEMARA PARK SHELTER/LIGH APBNK 9/22/2023 R 9/06/2023 36.40 36.40CR
G/L ACCOUNT CK: 153425 36.40
101 45202-01-381.00 ELECTRIC UTILITIES 36.40 CONNEMARA PARK SHELTER/LIGHTS
I 200002007870 8/23 IRRIGATION PUMP/SP CONTROL APBNK 9/22/2023 R 9/06/2023 86.69 86.69CR
G/L ACCOUNT CK: 153425 86.69
101 45202-01-381.00 ELECTRIC UTILITIES 86.69 IRRIGATION PUMP/SP CONTROL BLD
I 200002009231 8/23 WELL #8 APBNK 9/22/2023 R 9/06/2023 3,218.84 3,218.84CR
G/L ACCOUNT CK: 153425 3,218.84
601 49408-01-381.00 ELECTRIC UTILITIES 3,218.84 WELL #8
I 200002009496 8/23 WATER TOWER #2 APBNK 9/22/2023 R 9/06/2023 308.47 308.47CR
G/L ACCOUNT CK: 153425 308.47
601 49416-01-381.00 ELECTRIC UTILITIES 308.47 WATER TOWER #2
I 200002079739 8/23 JAYCEE PARK SHELTER/LIGHTS APBNK 9/22/2023 R 9/06/2023 156.73 156.73CR
G/L ACCOUNT CK: 153425 156.73
101 45202-01-381.00 ELECTRIC UTILITIES 156.73 JAYCEE PARK SHELTER/LIGHTS
I 200002080539 8/23 LIFT STATION #3 APBNK 9/22/2023 R 9/06/2023 212.82 212.82CR
G/L ACCOUNT CK: 153425 212.82
602 49453-01-381.00 ELECTRIC UTILITIES 212.82 LIFT STATION #3
I 200002112506 8/23 JAYCEE PARK TRAIL LIGHTS APBNK 9/22/2023 R 9/06/2023 178.09 178.09CR
G/L ACCOUNT CK: 153425 178.09
101 45202-01-381.00 ELECTRIC UTILITIES 178.09 JAYCEE PARK TRAIL LIGHTS
I 200002868701 8/23 STORM DRAIN LIFT STATION #3 APBNK 9/22/2023 R 9/06/2023 92.91 92.91CR
G/L ACCOUNT CK: 153425 92.91
603 49513-01-381.00 ELECTRIC UTILITIES 92.91 STORM DRAIN LIFT STATION #3
I 200003329984 8/23 SDLS #4/LS #6 APBNK 9/22/2023 R 9/06/2023 142.74 142.74CR
G/L ACCOUNT CK: 153425 142.74
603 49514-01-381.00 ELECTRIC UTILITIES 28.55 SDLS #4/LS #6
Qbhf!4!pg!22:
9-22-2023 8:57 AM A/P PAYMENT REGISTER PAGE: 2
PACKET: 06794 09/22/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
602 49456-01-381.00 ELECTRIC UTILITIES 114.19 SDLS #4/LS #6
I 200003564457 8/23 METERED TUNNEL LIGHTS APBNK 9/22/2023 R 9/06/2023 17.63 17.63CR
G/L ACCOUNT CK: 153425 17.63
608 49508-01-381.00 ELECTRIC UTILITIES 17.63 METERED TUNNEL LIGHTS
I 200003949690 8/23 LIFT STATION #9 APBNK 9/22/2023 R 9/06/2023 122.14 122.14CR
G/L ACCOUNT CK: 153425 122.14
602 49457-01-381.00 ELECTRIC UTILITIES 122.14 LIFT STATION #9
I 200004097754 8/23 STORM DRAIN LIFT STATION #6 APBNK 9/22/2023 R 9/06/2023 32.76 32.76CR
G/L ACCOUNT CK: 153425 32.76
603 49516-01-381.00 ELECTRIC UTILITIES 32.76 STORM DRAIN LIFT STATION #6
I 200010038900 8/23 STORM DRAIN LIFT STATION #8 APBNK 9/22/2023 R 9/06/2023 46.21 46.21CR
G/L ACCOUNT CK: 153425 46.21
603 49518-01-381.00 ELECTRIC UTILITIES 46.21 STORM DRAIN LIFT STATION #8
I 200010054799 8/23 LIFT STATION #5 APBNK 9/22/2023 R 9/06/2023 358.79 358.79CR
G/L ACCOUNT CK: 153425 358.79
602 49455-01-381.00 ELECTRIC UTILITIES 358.79 LIFT STATION #5
I 200010057891 8/23 LIFT STATION #12 APBNK 9/22/2023 R 9/06/2023 60.22 60.22CR
G/L ACCOUNT CK: 153425 60.22
602 49462-01-381.00 ELECTRIC UTILITIES 60.22 LIFT STATION #12
REG. CHECK 1 11,697.18 11,697.18CR 0.00
11,697.18 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005066 MARCO TECHNOLOGIES LLC
I 510616386 LEASE COPIER - MX-3071 APBNK 9/22/2023 R 9/07/2023 178.30 178.30CR
G/L ACCOUNT CK: 153427 178.30
101 41810-01-580.00 OTHER EQUIPMENT 178.30 LEASE COPIER - MX-3071
REG. CHECK 1 178.30 178.30CR 0.00
178.30 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-240010 XCEL ENERGY
I 6870492-3 8/23 NON METERED STREET LIGHTS APBNK 9/22/2023 R 9/05/2023 11,457.71 11,457.71CR
G/L ACCOUNT CK: 153428 11,457.71
608 49508-01-381.00 ELECTRIC UTILITIES 11,457.71 NON METERED STREET LIGHTS
REG. CHECK 1 11,457.71 11,457.71CR 0.00
11,457.71 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!5!pg!22:
9-22-2023 8:57 AMA/P PAYMENT REGISTERPAGE:3
PACKET:06794 09/22/2023 AP CHECK RUN
VENDOR SET: 01
=================================================== R E P O R T T O T A L S ===================================================
F U N D D I S T R I B U T I O N
FUND NO# FUND NAME AMOUNT
----------------------------------------------------------
101 GENERAL FUND641.21CR
601 WATER UTILITY FUND3,527.31CR
602 SEWER UTILITY FUND1,050.38CR
603 STORM WATER UTILITY FUND200.43CR
608 STREET LIGHT UTILITY FUND17,913.86CR
** TOTALS ** 23,333.19CR
====================================================================================================================================
---- TYPE OF CHECK TOTALS ----
GROSSPAYMENTOUTSTANDING
NUMBERBALANCEDISCOUNT
HAND CHECKS0.000.000.00
0.000.00
DRAFTS0.000.000.00
0.000.00
REG-CHECKS323,333.1923,333.19CR0.00
23,333.190.00
EFT0.000.000.00
0.000.00
NON-CHECKS0.000.000.00
0.000.00
ALL CHECKS 3 23,333.19 23,333.19CR 0.00
23,333.190.00
------------------------------------------------------------------------------------------------------------------------------------
ERRORS:0WARNINGS:0
Qbhf!6!pg!22:
9/21/2023 3:20 PM A / P CHECK REGISTER PAGE: 1
PACKET: 06793 09/21/23 PY Regular Payments
VENDOR SET: 01 *** DRAFT/OTHER LISTING ***
BANK : PYBNK MERCHANTS BANK - PY
ITEM PAID ITEM ITEM
VENDOR NAME / I.D. DESC TYPE DATE DISCOUNT AMOUNT NO# AMOUNT
011310 AFLAC
C-202309219872 AFLAC INSURANCE PREMIUMS D 9/21/2023 98.00 001624
I-161202309209776 AFLAC INSURANCE PREMIUMS D 9/21/2023 406.24CR 001624
I-162202309209776 AFLAC INSURANCE PREMIUMS D 9/21/2023 311.94CR 001624 620.18
005806 BPAS-BENEFIT PLANS ADMIN SRVS
I-250202309209776 VEBA - EMPLOYEE CONTRIBUTIONS D 9/21/2023 90.00CR 001625 90.00
002708 GUARDIAN
I-111202309069774 DENTAL INSURANCE PREMIUMS D 9/21/2023 1,176.00CR 001626
I-111202309209776 DENTAL INSURANCE PREMIUMS D 9/21/2023 1,176.00CR 001626
I-112202309069774 DENTAL INSURANCE PREMIUMS D 9/21/2023 1,961.80CR 001626
I-112202309209776 DENTAL INSURANCE PREMIUMS D 9/21/2023 1,961.80CR 001626
I-202309219875 DENTAL INSURANCE PREMIUMS D 9/21/2023 136.80CR 001626 6,412.40
000003 INTERNAL REVENUE SERVICE
I-T1 202309209776 FEDERAL WITHHOLDING D 9/21/2023 34,279.17CR 001627
I-T3 202309209776 FICA W/H & CONTRIBUTIONS D 9/21/2023 30,407.38CR 001627
I-T4 202309209776 MEDICARE W/H & CONTRIBUTIONS D 9/21/2023 10,556.10CR 001627 75,242.65
004117 MEDICA
I-101202309069774 HEALTH INSURANCE PREMIUMS D 9/21/2023 5,121.16CR 001628
I-101202309209776 HEALTH INSURANCE PREMIUMS D 9/21/2023 5,121.16CR 001628
I-104202309069774 HEALTH INSURANCE PREMIUMS D 9/21/2023 12,049.56CR 001628
I-104202309209776 HEALTH INSURANCE PREMIUMS D 9/21/2023 12,049.56CR 001628
I-106202309069774 HEALTH INSURANCE PREMIUMS D 9/21/2023 17,177.52CR 001628
I-106202309209776 HEALTH INSURANCE PREMIUMS D 9/21/2023 17,177.52CR 001628
I-107202309069774 HEALTH INSURANCE PREMIUMS D 9/21/2023 23,327.06CR 001628
I-107202309209776 HEALTH INSURANCE PREMIUMS D 9/21/2023 23,327.06CR 001628
I-202309219874 HEALTH INSURANCE PREMIUMS D 9/21/2023 7,430.43CR 001628 122,781.03
000004 MN DEPT OF REVENUE
I-T2 202309209776 MN STATE WITHHOLDING D 9/21/2023 16,193.82CR 001629 16,193.82
002238 MN STATE RETIREMENT SYSTEM
I-260202309209776 MSRS-EMPLOYEE CONTRIBUTION D 9/21/2023 585.00CR 001630
I-262202309209776 MSRS-EMPLOYEE CONTRIBUTION D 9/21/2023 936.98CR 001630
I-263202309209776 MSRS-EMPLOYEE CONTRIBUTION D 9/21/2023 700.00CR 001630
I-264202309209776 MSRS-EMPLOYEE CONTRIBUTION D 9/21/2023 510.00CR 001630
I-350202309209776 DEFERRED COMP WITHHOLDING D 9/21/2023 3,469.00CR 001630
I-351202309209776 DEFERRED COMP WITHHOLDING D 9/21/2023 319.29CR 001630
I-352202309209776 ROTH 457 CONTRIBUTIONS D 9/21/2023 2,650.00CR 001630
I-353202309209776 ROTH 457 CONTRIBUTIONS D 9/21/2023 643.48CR 001630
I-354202309209776 DEF COMP W/H INS. WAIVER D 9/21/2023 3,900.00CR 001630 13,713.75
Qbhf!7!pg!22:
9/21/2023 3:20 PM A / P CHECK REGISTER PAGE: 2
PACKET: 06793 09/21/23 PY Regular Payments
VENDOR SET: 01 *** DRAFT/OTHER LISTING ***
BANK : PYBNK MERCHANTS BANK - PY
ITEM PAID ITEM ITEM
VENDOR NAME / I.D. DESC TYPE DATE DISCOUNT AMOUNT NO# AMOUNT
140290 NATIONWIDE RETIREMENT SOL
I-310202309209776 DEFERRED COMP WITHHOLDING D 9/21/2023 4,056.39CR 001631
I-311202309209776 DEFERRED COMP WITHHOLDING D 9/21/2023 723.57CR 001631
I-312202309209776 DEF COMP W/H INS. WAIVER D 9/21/2023 1,814.68CR 001631
I-340202309209776 ROTH 457 CONTRIBUTIONS D 9/21/2023 1,438.92CR 001631
I-341202309209776 ROTH 457 CONTRIBUTIONS D 9/21/2023 63.13CR 001631 8,096.69
162110 PUBLIC EMPLOYEE
I-300202309209776 PERA W/H - COORDINATED D 9/21/2023 33,170.72CR 001632
I-301202309209776 PERA W/H - POLICE DEPT D 9/21/2023 36,849.02CR 001632 70,019.74
004118 SUN LIFE FINANCIAL
C-202309219877 LONG TERM DISABILITY PREMIUMS D 9/21/2023 22.24 001633
C-202309219878 SHORT TERM DISABILITY PREMIUMS D 9/21/2023 0.10 001633
I-141202309069774 GROUP LIFE INS PREMIUMS D 9/21/2023 76.59CR 001633
I-141202309209776 GROUP LIFE INS PREMIUMS D 9/21/2023 76.59CR 001633
I-142202309069774 GROUP LIFE INS PREMIUMS D 9/21/2023 36.50CR 001633
I-142202309209776 GROUP LIFE INS PREMIUMS D 9/21/2023 36.50CR 001633
I-150202309069774 SUPPL. LIFE INS PREMIUMS D 9/21/2023 534.23CR 001633
I-150202309209776 SUPPL. LIFE INS PREMIUMS D 9/21/2023 534.23CR 001633
I-170202309069774 LONG TERM DISABILITY PREMIUMS D 9/21/2023 873.79CR 001633
I-170202309209776 LONG TERM DISABILITY PREMIUMS D 9/21/2023 879.21CR 001633
I-190202309069774 SHORT TERM DISABILITY PREMIUMS D 9/21/2023 861.62CR 001633
I-190202309209776 SHORT TERM DISABILITY PREMIUMS D 9/21/2023 862.01CR 001633
I-202309219876 LIFE INSURANCE PREMIUMS D 9/21/2023 61.07CR 001633 4,810.00
005807 WEX HEALTH INC
I-230202309209776 HSA - EMPLOYEE CONTRIBUTION D 9/21/2023 3,252.90CR 001634 3,252.90
* * T O T A L S * * NO# DISCOUNTS CHECK AMT TOTAL APPLIED
REGULAR CHECKS: 0 0.00 0.00 0.00
HANDWRITTEN CHECKS: 0 0.00 0.00 0.00
PRE-WRITE CHECKS: 0 0.00 0.00 0.00
DRAFTS: 11 0.00 321,233.16 321,233.16
VOID CHECKS: 0 0.00 0.00 0.00
NON CHECKS: 0 0.00 0.00 0.00
CORRECTIONS: 0 0.00 0.00 0.00
REGISTER TOTALS: 11 0.00 321,233.16 321,233.16
TOTAL ERRORS: 0 TOTAL WARNINGS: 0
Qbhf!8!pg!22:
9/21/2023 3:20 PMA / P CHECK REGISTERPAGE: 3
PACKET:06793 09/21/23 PY Regular Payments
VENDOR SET: 01*** DRAFT/OTHER LISTING ***
BANK: PYBNK MERCHANTS BANK - PY
ITEM PAIDITEMITEM
VENDOR NAME / I.D.DESCTYPE DATEDISCOUNTAMOUNTNO#AMOUNT
** POSTING PERIOD RECAP **
FUND PERIOD AMOUNT
-------------------------------------------
1019/2023274,810.03CR
2019/20232,216.87CR
6019/202312,536.25CR
6029/202312,536.28CR
6039/202312,771.04CR
6509/20236,362.69CR
===========================================
ALL 321,233.16CR
Qbhf!9!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 1
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-004555 ABT MAILCOM
I 46378 MONTHLY OUTSOURCING-UB BILL APBNK 9/28/2023 R 9/21/2023 2,626.12 2,626.12CR
G/L ACCOUNT CK: 153429 2,626.12
601 49400-01-313.00 OUTSOURCE BILL PRINT/MAIL 787.83 MONTHLY OUTSOURCING-UB BILLS
602 49450-01-313.00 OUTSOURCE BILL PRINT/MAIL 787.83 MONTHLY OUTSOURCING-UB BILLS
603 49500-01-313.00 OUTSOURCE BILL PRINT/MAIL 787.83 MONTHLY OUTSOURCING-UB BILLS
608 49508-01-313.00 OUTSOURCE BILL PRINT/MAIL 262.63 MONTHLY OUTSOURCING-UB BILLS
REG. CHECK 1 2,626.12 2,626.12CR 0.00
2,626.12 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-003691 ADVANCED FIRST AID INC
I 0923-669 AED KIT APBNK 9/28/2023 R 9/18/2023 646.00 646.00CR
G/L ACCOUNT CK: 153430 646.00
650 45130-01-219.00 OTHER OPERATING SUPPLIES 323.00 AED KIT
101 45100-01-219.00 OTHER OPERATING SUPPLIES 323.00 AED KIT
REG. CHECK 1 646.00 646.00CR 0.00
646.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-004026 ALERUS
I C145708 COBRA MONTHLY SRV FEE-AUG 2 APBNK 9/20/2023 D 9/06/2023 70.00 70.00CR
G/L ACCOUNT CK: 001635 70.00
101 41320-31-319.00 OTHER PROFESSIONAL SERVICES 70.00 COBRA MONTHLY SRV FEE-AUG 2023
DRAFTS 1 70.00 70.00CR 0.00
70.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005849 API GARAGE DOOR INC
I Z251935 ANNUAL INSPECTION/PM APBNK 9/28/2023 R 9/11/2023 1,020.00 1,020.00CR
G/L ACCOUNT CK: 153431 1,020.00
650 45130-01-404.00 CONTRACTED MACH & EQUIP R & M 1,020.00 ANNUAL INSPECTION/PM
REG. CHECK 1 1,020.00 1,020.00CR 0.00
1,020.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!:!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 2
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-003728 AREHART PAINTING INC
I 091723 CITY HALL EXTERIOR PAINTING APBNK 9/28/2023 R 9/17/2023 8,700.00 8,700.00CR
G/L ACCOUNT CK: 153432 8,700.00
101 41940-01-530.00 IMPROVEMENTS OTHER THAN BLDGS 8,700.00 CITY HALL EXTERIOR PAINTING
I 092023 BROCKWAY SHELTER PAINTING APBNK 9/28/2023 R 9/20/2023 2,400.00 2,400.00CR
G/L ACCOUNT CK: 153432 2,400.00
101 45202-01-530.00 IMPROVEMENTS OTHER THAN BLDGS 2,400.00 BROCKWAY SHELTER PAINTING
REG. CHECK 1 11,100.00 11,100.00CR 0.00
11,100.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-002377 ASPEN MILLS
I 319177 UNIFORM PANTS-ALEX SALINAS APBNK 9/28/2023 R 9/08/2023 56.95 56.95CR
G/L ACCOUNT CK: 153433 56.95
101 42210-01-218.00 FIRE DEPARTMENT CLOTHING 56.95 UNIFORM PANTS-ALEX SALINAS
I 319601 UNIFORM PANTS-MICHAEL LEE APBNK 9/28/2023 R 9/15/2023 56.95 56.95CR
G/L ACCOUNT CK: 153433 56.95
101 42210-01-218.00 FIRE DEPARTMENT CLOTHING 56.95 UNIFORM PANTS-MICHAEL LEE
REG. CHECK 1 113.90 113.90CR 0.00
113.90 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005828 ATMS ANYWHERE
I 230001974 ATM FEES-FOOD TRUCK EVENT 2 APBNK 9/28/2023 R 9/25/2023 139.25 139.25CR
G/L ACCOUNT CK: 153434 139.25
101 45100-01-315.00 SPECIAL PROGRAMS 139.25 ATM FEES-FOOD TRUCK EVENT 2023
REG. CHECK 1 139.25 139.25CR 0.00
139.25 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005998 BELAIR BUILDERS INC
I 2023-0361 ROSEMOUNT PD/PW PROJECT APBNK 9/28/2023 R 8/31/2023 752,604.00 752,604.00CR
G/L ACCOUNT CK: 153435 752,604.00
421 48000-01-521.00 BUILDING & STRUCTURE PURCHASES 752,604.00 ROSEMOUNT PD/PW PROJECT
REG. CHECK 1 752,604.00 752,604.00CR 0.00
752,604.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!21!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 3
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-003889 BERRY COFFEE COMPANY
I 972698 COFFEE SUPPLIES FOR SC APBNK 9/28/2023 R 9/21/2023 138.35 138.35CR
G/L ACCOUNT CK: 153436 138.35
101 45100-30-219.00 OTHER OPERATING SUPPLIES 138.35 COFFEE SUPPLIES FOR SC
REG. CHECK 1 138.35 138.35CR 0.00
138.35 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005738 BOARMAN KROOS VOGEL GROUP I
I 62524 POLICE AND PW CAMPUS APBNK 9/28/2023 R 9/10/2023 40,666.61 40,666.61CR
G/L ACCOUNT CK: 153437 40,666.61
421 48000-01-302.00 ARCHITECTS' FEES 40,666.61 POLICE AND PW CAMPUS
REG. CHECK 1 40,666.61 40,666.61CR 0.00
40,666.61 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-004012 BOLTON & MENK INC
I 0318595 DRIVER AVE TRUNK SEWER EXT APBNK 9/28/2023 R 8/24/2023 402.00 402.00CR
G/L ACCOUNT CK: 153438 402.00
628 48000-01-303.00 ENGINEERING FEES 402.00 DRIVER AVE TRUNK SEWER EXT
I 0320642 DESIGN WORK-PICKLE BALL PRO APBNK 9/28/2023 R 9/21/2023 17,997.00 17,997.00CR
G/L ACCOUNT CK: 153438 17,997.00
205 49005-01-540.00 IMPROVEMENTS OTHER THAN BLDGS 17,997.00 DESIGN WORK-PICKLE BALL PROJ
REG. CHECK 1 18,399.00 18,399.00CR 0.00
18,399.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-003249 BRANDL ANDERSON HOMES
I 2023-01658 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/20/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153439 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
REG. CHECK 1 2,000.00 2,000.00CR 0.00
2,000.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!22!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 4
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-021815 BRAUN INTERTEC CORP
I B357840 PD & PW CAMPUS PROJECT APBNK 9/28/2023 R 9/14/2023 13,943.00 13,943.00CR
G/L ACCOUNT CK: 153440 13,943.00
421 48000-01-303.00 ENGINEERING FEES 13,943.00 PD & PW CAMPUS PROJECT
I B358703 PW/PD CAMPUS - STORM SHELTE APBNK 9/28/2023 R 9/21/2023 1,550.00 1,550.00CR
G/L ACCOUNT CK: 153440 1,550.00
421 48000-01-303.00 ENGINEERING FEES 1,550.00 PW/PD CAMPUS - STORM SHELTER
REG. CHECK 1 15,493.00 15,493.00CR 0.00
15,493.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-021890 BRYAN ROCK PRODUCTS INC
I 61174 RED ROCK STOCKPILE APBNK 9/28/2023 R 9/15/2023 8,236.06 8,236.06CR
G/L ACCOUNT CK: 153441 8,236.06
101 45202-01-219.00 OTHER OPERATING SUPPLIES 8,236.06 RED ROCK STOCKPILE
REG. CHECK 1 8,236.06 8,236.06CR 0.00
8,236.06 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-004103 BUSINESS ESSENTIALS
I WO-1259912-1 OFFICE SUPPLIES APBNK 9/28/2023 R 9/08/2023 165.86 165.86CR
G/L ACCOUNT CK: 153442 165.86
101 41810-01-209.00 OTHER OFFICE SUPPLIES 165.86 OFFICE SUPPLIES
I WO-1260062-1 OFFICE SUPPLIES APBNK 9/28/2023 R 9/08/2023 57.97 57.97CR
G/L ACCOUNT CK: 153442 57.97
101 41810-01-209.00 OTHER OFFICE SUPPLIES 57.97 OFFICE SUPPLIES
I WO-1261814-1 OFFICE SUPPLIES APBNK 9/28/2023 R 9/20/2023 55.69 55.69CR
G/L ACCOUNT CK: 153442 55.69
101 41810-01-209.00 OTHER OFFICE SUPPLIES 55.69 OFFICE SUPPLIES
I WO-1262013-1 OFFICE SUPPLIES APBNK 9/28/2023 R 9/21/2023 61.34 61.34CR
G/L ACCOUNT CK: 153442 61.34
101 41810-01-209.00 OTHER OFFICE SUPPLIES 61.34 OFFICE SUPPLIES
REG. CHECK 1 340.86 340.86CR 0.00
340.86 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!23!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 5
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-004169 CCP NI MASTER TENANT 4, LLC
I AUG 2023 MONTHLY SOLAR SUBSCRIPTIONS APBNK 9/28/2023 R 9/20/2023 5,906.12 5,906.12CR
G/L ACCOUNT CK: 153443 5,906.12
101 41940-01-381.00 ELECTRIC UTILITIES 2,478.41 MONTHLY SOLAR SUBSCRIPTIONS
601 49414-01-381.00 ELECTRIC UTILITIES 2,730.94 MONTHLY SOLAR SUBSCRIPTIONS
601 49407-01-381.00 ELECTRIC UTILITIES 696.77 MONTHLY SOLAR SUBSCRIPTIONS
REG. CHECK 1 5,906.12 5,906.12CR 0.00
5,906.12 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005542 CHARTER COMMUNICATIONS
I 113140301091423 FIRE STATION 2 CABLE APBNK 9/28/2023 R 9/14/2023 132.92 132.92CR
G/L ACCOUNT CK: 153444 132.92
101 42210-01-439.00 OTHER MISCELLANEOUS CHARGES 132.92 FIRE STATION 2 CABLE
REG. CHECK 1 132.92 132.92CR 0.00
132.92 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-030784 CINTAS CORPORATION
I 4167109358 MATS @ CARPENTER SHOP APBNK 9/28/2023 R 9/07/2023 22.75 22.75CR
G/L ACCOUNT CK: 153445 22.75
101 41940-01-319.00 OTHER PROFESSIONAL SERVICES 22.75 MATS @ CARPENTER SHOP
I 4167109371 MATS @ PW OFFICE BLDG APBNK 9/28/2023 R 9/07/2023 68.25 68.25CR
G/L ACCOUNT CK: 153445 68.25
101 41940-01-319.00 OTHER PROFESSIONAL SERVICES 68.25 MATS @ PW OFFICE BLDG
I 4167109379 MATS @ POLICE APBNK 9/28/2023 R 9/07/2023 48.75 48.75CR
G/L ACCOUNT CK: 153445 48.75
101 41940-01-319.00 OTHER PROFESSIONAL SERVICES 48.75 MATS @ POLICE
I 4167109426 MATS @ FS #2 APBNK 9/28/2023 R 9/07/2023 20.00 20.00CR
G/L ACCOUNT CK: 153445 20.00
101 41940-01-319.00 OTHER PROFESSIONAL SERVICES 20.00 MATS @ FS #2
I 4167109452 MATS & TOWELS @ MAINT BLDG APBNK 9/28/2023 R 9/07/2023 42.75 42.75CR
G/L ACCOUNT CK: 153445 42.75
101 41940-01-319.00 OTHER PROFESSIONAL SERVICES 9.00 MATS & TOWELS @ MAINT BLDG
101 43100-01-211.00 CLEANING SUPPLIES 33.75 MATS & TOWELS @ MAINT BLDG
I 4167109453 MATS @ CITY HALL APBNK 9/28/2023 R 9/07/2023 86.25 86.25CR
G/L ACCOUNT CK: 153445 86.25
101 41940-01-319.00 OTHER PROFESSIONAL SERVICES 86.25 MATS @ CITY HALL
Qbhf!24!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 6
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 4167109456 MATS @ FS #1 APBNK 9/28/2023 R 9/07/2023 20.00 20.00CR
G/L ACCOUNT CK: 153445 20.00
101 41940-01-319.00 OTHER PROFESSIONAL SERVICES 20.00 MATS @ FS #1
REG. CHECK 1 308.75 308.75CR 0.00
308.75 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-030925 CITY OF FARMINGTON
I 2023-0349 2023 DC GRANT REIMBURSEMENT APBNK 9/28/2023 R 9/18/2023 4,087.66 4,087.66CR
G/L ACCOUNT CK: 153446 4,087.66
101 11500 ACCOUNTS RECEIVABLE 4,087.66 2023 DC GRANT REIMBURSEMENT
REG. CHECK 1 4,087.66 4,087.66CR 0.00
4,087.66 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-001627 CITY OF HASTINGS
I 2023-0350 2023 DC GRANT REIMBURSEMENT APBNK 9/28/2023 R 9/18/2023 4,376.66 4,376.66CR
G/L ACCOUNT CK: 153447 4,376.66
101 11500 ACCOUNTS RECEIVABLE 4,376.66 2023 DC GRANT REIMBURSEMENT
REG. CHECK 1 4,376.66 4,376.66CR 0.00
4,376.66 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005742 CLEAR CHOICE HEADSETS & TEC
I 0923045 COMMUNITY DEV HEADSET APBNK 9/28/2023 R 9/11/2023 413.00 413.00CR
G/L ACCOUNT CK: 153448 413.00
101 41810-01-321.00 TELEPHONE COSTS 413.00 COMMUNITY DEV HEADSET
REG. CHECK 1 413.00 413.00CR 0.00
413.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-003078 CLEARSTREAM RECYCLING INC
I 10063 X-FRAMES AND CARTS APBNK 9/28/2023 R 9/12/2023 2,175.00 2,175.00CR
G/L ACCOUNT CK: 153449 2,175.00
101 41940-01-384.00 REFUSE DISPOSAL 2,175.00 X-FRAMES AND CARTS
REG. CHECK 1 2,175.00 2,175.00CR 0.00
2,175.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!25!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 7
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-004214 COMMERCIAL RECREATION SPEC
I 0023719 SPLASH PAD NOZZLE TOOL APBNK 9/28/2023 R 9/08/2023 166.60 166.60CR
G/L ACCOUNT CK: 153450 166.60
101 45202-01-220.00 SPLASH PAD MAINTENANCE 166.60 SPLASH PAD NOZZLE TOOL
REG. CHECK 1 166.60 166.60CR 0.00
166.60 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005611 COMMUNITY FIRST NAT'L BANK
I 82078-2023 PYMT #3 AERIAL FIRE TRUCK APBNK 9/28/2023 R 9/15/2023 153,177.12 153,177.12CR
G/L ACCOUNT CK: 153451 153,177.12
207 49007-01-601.00 PRINCIPAL ON LEASE PAYMENTS 130,894.58 PYMT #3 AERIAL FIRE TRUCK
207 49007-01-611.00 INTEREST ON LEASE PAYMENTS 22,282.54 PYMT #3 AERIAL FIRE TRUCK
REG. CHECK 1 153,177.12 153,177.12CR 0.00
153,177.12 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-031530 COMPUTER INTEGRATION TECH
I 358603 MANAGED SERVER BACKUP-OCT APBNK 9/28/2023 R 9/15/2023 2,655.00 2,655.00CR
G/L ACCOUNT CK: 153452 2,655.00
101 41520-01-391.00 P.C. MAINTENANCE 2,655.00 MANAGED SERVER BACKUP-OCT
I 358743 OFFICE 365 BACKUPS APBNK 9/28/2023 R 9/15/2023 666.00 666.00CR
G/L ACCOUNT CK: 153452 666.00
101 41520-01-391.00 P.C. MAINTENANCE 666.00 OFFICE 365 BACKUPS
REG. CHECK 1 3,321.00 3,321.00CR 0.00
3,321.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006013 CONSTRUCTION SYSTEMS INC
I 2023-0362 ROSEMOUNT PD/PW PROJECT APBNK 9/28/2023 R 8/31/2023 16,587.00 16,587.00CR
G/L ACCOUNT CK: 153453 16,587.00
421 48000-01-521.00 BUILDING & STRUCTURE PURCHASES 16,587.00 ROSEMOUNT PD/PW PROJECT
REG. CHECK 1 16,587.00 16,587.00CR 0.00
16,587.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!26!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 8
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-004277 CORE & MAIN LP
I T534429 3/4" IPERL METERS WITH KITS APBNK 9/28/2023 R 9/08/2023 45,405.53 45,405.53CR
G/L ACCOUNT CK: 153454 45,405.53
601 49400-01-220.00 METER PURCHASES 45,405.53 3/4" IPERL METERS WITH KITS
I T557632 OMNI 2" REGISTERS APBNK 9/28/2023 R 9/12/2023 1,273.65 1,273.65CR
G/L ACCOUNT CK: 153454 1,273.65
601 49400-01-220.00 METER PURCHASES 1,273.65 OMNI 2" REGISTERS
REG. CHECK 1 46,679.18 46,679.18CR 0.00
46,679.18 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-031577 CORPORATE MECHANICAL INC
I W69341 PNEUMATIC LEAK APBNK 9/28/2023 R 9/20/2023 216.00 216.00CR
G/L ACCOUNT CK: 153455 216.00
101 11510 NATIONAL GUARD A/R 108.00 PNEUMATIC LEAK
101 45100-01-404.00 CONTRACTED MACH & EQUIP R & M 108.00 PNEUMATIC LEAK
REG. CHECK 1 216.00 216.00CR 0.00
216.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005821 CORRECTIVE ASPHALT MATERIAL
I 23074 2023 PAVEMENT REJUVENATION APBNK 9/28/2023 R 9/15/2023 81,423.10 81,423.10CR
G/L ACCOUNT CK: 153456 81,423.10
101 43121-01-408.00 CRACKSEAL,SEALC'T,PATCH,STRIP 81,423.10 2023 PAVEMENT REJUVENATION
REG. CHECK 1 81,423.10 81,423.10CR 0.00
81,423.10 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-031880 CROWN RENTAL
I 383504-1 FOOD TRUCK EVENT RENTALS APBNK 9/28/2023 R 9/17/2023 1,344.00 1,344.00CR
G/L ACCOUNT CK: 153457 1,344.00
101 45100-01-315.00 SPECIAL PROGRAMS 1,344.00 FOOD TRUCK EVENT RENTALS
REG. CHECK 1 1,344.00 1,344.00CR 0.00
1,344.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!27!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 9
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-004437 CUSTOM CAP & TIRE
I 270060697 4 TIRES APBNK 9/28/2023 R 9/12/2023 502.84 502.84CR
G/L ACCOUNT CK: 153458 502.84
101 43100-01-222.00 TIRES 502.84 4 TIRES
I 270060730 LABOR FOR TIRE REPAIR APBNK 9/28/2023 R 9/13/2023 95.00 95.00CR
G/L ACCOUNT CK: 153458 95.00
101 43100-01-404.00 CONTRACTED MACH & EQUIP SERV 95.00 LABOR FOR TIRE REPAIR
I 270060926 4 TIRES APBNK 9/28/2023 R 9/20/2023 638.92 638.92CR
G/L ACCOUNT CK: 153458 638.92
101 43100-01-222.00 TIRES 638.92 4 TIRES
REG. CHECK 1 1,236.76 1,236.76CR 0.00
1,236.76 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-001935 DAKOTA COUNTY FINANCE
I 5501189 AUGUST 2023 RADIO REPAIRS APBNK 9/28/2023 R 9/18/2023 665.00 665.00CR
G/L ACCOUNT CK: 153459 665.00
101 42110-01-323.00 RADIO UNITS 665.00 AUGUST 2023 RADIO REPAIRS
REG. CHECK 1 665.00 665.00CR 0.00
665.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006001 DAVID WEEKLEY HOMES
I 2023-00415 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/20/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153460 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00663 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153460 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00664 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153460 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
REG. CHECK 1 6,000.00 6,000.00CR 0.00
6,000.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!28!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 10
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-041800 DR HORTON INC
I 2022-02083 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2022-02251 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2022-03251 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00635 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00636 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00768 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00832 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00871 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00886 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-01504 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153461 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
REG. CHECK 1 20,000.00 20,000.00CR 0.00
20,000.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!29!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 11
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-004400 DUNDAS SOLAR HOLDINGS LLC
I 2309-6951A AUGUST SOLAR SUBSCRIPTION APBNK 9/28/2023 R 9/18/2023 15,240.84 15,240.84CR
G/L ACCOUNT CK: 153463 15,240.84
650 45130-01-381.00 ELECTRIC UTILITIES 15,240.84 AUGUST SOLAR SUBSCRIPTION
REG. CHECK 1 15,240.84 15,240.84CR 0.00
15,240.84 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-050213 EARL F ANDERSEN INC
I 0133535-IN STOP, DIRECTIONAL & ST SIGN APBNK 9/28/2023 R 8/09/2023 3,348.60 3,348.60CR
G/L ACCOUNT CK: 153464 3,348.60
101 43121-01-226.00 SIGN REPAIR MATERIALS 3,348.60 STOP, DIRECTIONAL & ST SIGNS
REG. CHECK 1 3,348.60 3,348.60CR 0.00
3,348.60 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-050329 ECM PUBLISHERS INC
I 963461 FOOD TRUCK AD APBNK 9/28/2023 R 9/03/2023 400.00 400.00CR
G/L ACCOUNT CK: 153465 400.00
101 45100-01-315.00 SPECIAL PROGRAMS 400.00 FOOD TRUCK AD
I 964197 2ND FOOD TRUCK AD APBNK 9/28/2023 R 9/10/2023 275.00 275.00CR
G/L ACCOUNT CK: 153465 275.00
101 45100-01-315.00 SPECIAL PROGRAMS 275.00 2ND FOOD TRUCK AD
I 964865 PH:AMBER FIELDS 13TH ADD APBNK 9/28/2023 R 9/15/2023 39.60 39.60CR
G/L ACCOUNT CK: 153465 39.60
101 41810-01-351.00 LEGAL NOTICES PUBLISHING 39.60 PH:AMBER FIELDS 13TH ADD
I 964866 PN: AL-MADINA ASSN CUP APBNK 9/28/2023 R 9/15/2023 46.80 46.80CR
G/L ACCOUNT CK: 153465 46.80
101 41810-01-351.00 LEGAL NOTICES PUBLISHING 46.80 PN: AL-MADINA ASSN CUP
REG. CHECK 1 761.40 761.40CR 0.00
761.40 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-050340 ECOLAB PEST
I 2283226 PEST CONTROL-CITY HALL APBNK 9/28/2023 R 9/11/2023 500.00 500.00CR
G/L ACCOUNT CK: 153466 500.00
101 41940-01-319.00 OTHER PROFESSIONAL SERVICES 500.00 PEST CONTROL-CITY HALL
Qbhf!2:!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 12
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 2283227 PEST CONTROL-WELL HOUSES APBNK 9/28/2023 R 9/11/2023 925.00 925.00CR
G/L ACCOUNT CK: 153466 925.00
601 49400-01-319.00 OTHER PROFESSIONAL SERVICES 925.00 PEST CONTROL-WELL HOUSES
REG. CHECK 1 1,425.00 1,425.00CR 0.00
1,425.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-001139 ELECTRIC PUMP
I 0076602-IN MINI CAS FUSES APBNK 9/28/2023 R 9/12/2023 1,544.14 1,544.14CR
G/L ACCOUNT CK: 153467 1,544.14
602 49456-01-221.00 EQUIPMENT PARTS 1,544.14 MINI CAS FUSES
REG. CHECK 1 1,544.14 1,544.14CR 0.00
1,544.14 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-051330 EMERGENCY APPARATUS MAINT
I 128218 PARTS AND LABOR-E11 APBNK 9/28/2023 R 8/01/2023 226.32 226.32CR
G/L ACCOUNT CK: 153468 226.32
101 43100-01-221.00 EQUIPMENT PARTS 46.32 PARTS AND LABOR-E11
101 43100-01-404.00 CONTRACTED MACH & EQUIP SERV 180.00 PARTS AND LABOR-E11
I 128220 PARTS AND LABOR-E12 APBNK 9/28/2023 R 8/01/2023 198.64 198.64CR
G/L ACCOUNT CK: 153468 198.64
101 43100-01-221.00 EQUIPMENT PARTS 18.64 PARTS AND LABOR-E12
101 43100-01-404.00 CONTRACTED MACH & EQUIP SERV 180.00 PARTS AND LABOR-E12
I 128222 PARTS AND LABOR-L11 APBNK 9/28/2023 R 8/01/2023 1,913.77 1,913.77CR
G/L ACCOUNT CK: 153468 1,913.77
101 43100-01-221.00 EQUIPMENT PARTS 383.55 PARTS AND LABOR-L11
101 43100-01-404.00 CONTRACTED MACH & EQUIP SERV 1,530.22 PARTS AND LABOR-L11
I 128224 PARTS AND LABOR-E21 APBNK 9/28/2023 R 8/01/2023 257.20 257.20CR
G/L ACCOUNT CK: 153468 257.20
101 43100-01-221.00 EQUIPMENT PARTS 77.20 PARTS AND LABOR-E21
101 43100-01-404.00 CONTRACTED MACH & EQUIP SERV 180.00 PARTS AND LABOR-E21
REG. CHECK 1 2,595.93 2,595.93CR 0.00
2,595.93 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!31!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 13
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-004327 ENTERPRISE FM TRUST
I FBN4834323 LEASE VEHICLES-PD APBNK 9/20/2023 D 9/06/2023 14,267.67 14,267.67CR
G/L ACCOUNT CK: 001636 14,267.67
207 49007-01-549.00 LEASE PROGRAM-POLICE VEHICLES 14,267.67 LEASE VEHICLES-PD
I FBN4835230 LEASE VEHICLES-PW APBNK 9/20/2023 D 9/06/2023 9,721.10 9,721.10CR
G/L ACCOUNT CK: 001636 9,721.10
207 49007-01-548.00 LEASE PROGRAM-P.W. VEHICLES 9,245.54 LEASE VEHICLES-PW
601 49400-01-548.00 LEASE PROGRAM-P.W. VEHICLES 475.56 LEASE VEHICLES-PW
I FBN4838972 MAINT MGMT-PD LEASE VEHICLE APBNK 9/20/2023 D 9/06/2023 18.00 18.00CR
G/L ACCOUNT CK: 001636 18.00
207 49007-01-549.00 LEASE PROGRAM-POLICE VEHICLES 18.00 MAINT MGMT-PD LEASE VEHICLES
DRAFTS 1 24,006.77 24,006.77CR 0.00
24,006.77 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-003798 FIRST ADVANTAGE OCCUPATIONA
I 2510842308 PRE-EMPLOYMENT DRUG SCREENI APBNK 9/28/2023 R 8/31/2023 109.02 109.02CR
G/L ACCOUNT CK: 153469 109.02
101 41320-31-305.00 MEDICAL & DENTAL FEES 109.02 PRE-EMPLOYMENT DRUG SCREENINGS
REG. CHECK 1 109.02 109.02CR 0.00
109.02 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-060840 FIRST STATE BANK
I 2023-0368 SAFE DEPOSIT BOX RENTAL #98 APBNK 9/28/2023 R 9/25/2023 75.00 75.00CR
G/L ACCOUNT CK: 153470 75.00
101 41520-01-409.00 OTHER CONTRACTED REPAIR & MAIN 75.00 SAFE DEPOSIT BOX RENTAL #988
REG. CHECK 1 75.00 75.00CR 0.00
75.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005314 FLEET SERVICES
I 2024020021 LEASE VEHICLES-PD/PW APBNK 9/28/2023 R 9/14/2023 8,458.81 8,458.81CR
G/L ACCOUNT CK: 153471 8,458.81
207 49007-01-548.00 LEASE PROGRAM-P.W. VEHICLES 4,210.06 LEASE VEHICLES-PD/PW
207 49007-01-549.00 LEASE PROGRAM-POLICE VEHICLES 3,638.61 LEASE VEHICLES-PD/PW
601 49400-01-548.00 LEASE PROGRAM-P.W. VEHICLES 203.38 LEASE VEHICLES-PD/PW
602 49450-01-548.00 LEASE PROGRAM-P.W. VEHICLES 203.38 LEASE VEHICLES-PD/PW
Qbhf!32!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 14
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
603 49500-01-548.00 LEASE PROGRAM-P.W. VEHICLES 203.38 LEASE VEHICLES-PD/PW
REG. CHECK 1 8,458.81 8,458.81CR 0.00
8,458.81 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-000677 GERTENS
I 102166/30 PLANTS FOR FALL POTS APBNK 9/28/2023 R 9/20/2023 1,189.50 1,189.50CR
G/L ACCOUNT CK: 153472 1,189.50
101 43121-01-225.00 LANDSCAPING MATERIALS 1,189.50 PLANTS FOR FALL POTS
I 713597/1 FALL BULBS APBNK 9/28/2023 R 9/14/2023 171.29 171.29CR
G/L ACCOUNT CK: 153472 171.29
101 43121-01-225.00 LANDSCAPING MATERIALS 171.29 FALL BULBS
I 722907/1 ITEMS FOR FALL POTS APBNK 9/28/2023 R 9/19/2023 491.05 491.05CR
G/L ACCOUNT CK: 153472 491.05
101 43121-01-225.00 LANDSCAPING MATERIALS 491.05 ITEMS FOR FALL POTS
REG. CHECK 1 1,851.84 1,851.84CR 0.00
1,851.84 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-004158 GILBERT MECHANICAL CONTRACT
I 61241 REPLACE 3 RTU @ FS #2 APBNK 9/28/2023 R 6/30/2023 69,920.00 69,920.00CR
G/L ACCOUNT CK: 153473 69,920.00
101 41940-01-530.00 IMPROVEMENTS OTHER THAN BLDGS 32,425.00 REPLACE 3 RTU @ FS #2
101 24429 F/B ASSIGNED FOR GOVT BLDG R&M 37,495.00 REPLACE 3 RTU @ FS #2
REG. CHECK 1 69,920.00 69,920.00CR 0.00
69,920.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-071220 GRAINGER
I 9828694530 FS1 CORD REPAIRS APBNK 9/28/2023 R 9/06/2023 185.70 185.70CR
G/L ACCOUNT CK: 153474 185.70
101 41940-01-223.00 BUILDING REPAIR SUPPLIES 185.70 FS1 CORD REPAIRS
I 9831431821 WIRE & PACKING TAPE APBNK 9/28/2023 R 9/08/2023 288.42 288.42CR
G/L ACCOUNT CK: 153474 288.42
601 49400-01-220.00 METER PURCHASES 288.42 WIRE & PACKING TAPE
REG. CHECK 1 474.12 474.12CR 0.00
474.12 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!33!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 15
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-005693 GREAT AMERICA FINANCIAL SVC
I 34766807 POSTAGE EQUIPMENT RENTAL APBNK 9/27/2023 D 8/28/2023 190.63 190.63CR
G/L ACCOUNT CK: 001637 190.63
101 41810-01-413.00 OFFICE EQUIPMENT RENTAL 190.63 POSTAGE EQUIPMENT RENTAL
I 34823216 FOLDER EQUIPMENT RENTAL APBNK 9/27/2023 D 9/04/2023 167.00 167.00CR
G/L ACCOUNT CK: 001637 167.00
101 41810-01-413.00 OFFICE EQUIPMENT RENTAL 167.00 FOLDER EQUIPMENT RENTAL
DRAFTS 1 357.63 357.63CR 0.00
357.63 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-080050 HACH COMPANY
I 13728313 2-DPD FREE REFILL VIAL APBNK 9/28/2023 R 9/07/2023 145.38 145.38CR
G/L ACCOUNT CK: 153475 145.38
601 49400-01-216.00 CHEMICALS & CHEMICAL PRODUCTS 145.38 2-DPD FREE REFILL VIAL
REG. CHECK 1 145.38 145.38CR 0.00
145.38 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-080458 HAWKINS INC
I 6578438 CHLORINE TANK RENTAL APBNK 9/28/2023 R 9/15/2023 80.00 80.00CR
G/L ACCOUNT CK: 153476 80.00
601 49400-01-216.00 CHEMICALS & CHEMICAL PRODUCTS 80.00 CHLORINE TANK RENTAL
REG. CHECK 1 80.00 80.00CR 0.00
80.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005278 HLS OUTDOOR
I 0011526296-002 IRRIGATION CONTROL VALVE PA APBNK 9/28/2023 R 9/11/2023 647.61 647.61CR
G/L ACCOUNT CK: 153477 647.61
101 45202-01-221.00 EQUIPMENT PARTS 647.61 IRRIGATION CONTROL VALVE PARTS
I 0011683272-002 IRRIGATION RPZ PARTS APBNK 9/28/2023 R 9/07/2023 747.50 747.50CR
G/L ACCOUNT CK: 153477 747.50
101 45202-01-403.00 CONTRACTED R & M-OTHER IMPROV 747.50 IRRIGATION RPZ PARTS
REG. CHECK 1 1,395.11 1,395.11CR 0.00
1,395.11 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!34!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 16
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-000225 HOISINGTON KOEGLER GROUP
I 022-045-11 INITIAL DRAFT ORDINANCES APBNK 9/28/2023 R 9/18/2023 5,758.75 5,758.75CR
G/L ACCOUNT CK: 153478 5,758.75
101 41910-01-319.00 OTHER PROFESIONAL SERVICES 5,758.75 INITIAL DRAFT ORDINANCES
REG. CHECK 1 5,758.75 5,758.75CR 0.00
5,758.75 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005977 HOLLENBACK & NELSON INC
I 2023-0363 ROSEMOUNT PD/PW PROJECT APBNK 9/28/2023 R 8/31/2023 532,000.00 532,000.00CR
G/L ACCOUNT CK: 153479 532,000.00
421 48000-01-521.00 BUILDING & STRUCTURE PURCHASES 532,000.00 ROSEMOUNT PD/PW PROJECT
REG. CHECK 1 532,000.00 532,000.00CR 0.00
532,000.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006041 INNOVA DISC GOLF
I 720259 BROCKWAY DISC GOLF BASKETS APBNK 9/28/2023 R 9/15/2023 4,202.00 4,202.00CR
G/L ACCOUNT CK: 153480 4,202.00
205 49005-01-439.00 OTHER MISCELLANEOUS CHARGES 4,202.00 BROCKWAY DISC GOLF BASKETS
REG. CHECK 1 4,202.00 4,202.00CR 0.00
4,202.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-002700 INNOVATIVE OFFICE SOLUTIONS
I CIN117840 SC - FURNITURE APBNK 9/28/2023 R 9/14/2023 15,839.57 15,839.57CR
G/L ACCOUNT CK: 153481 15,839.57
202 49002-01-524.00 BUILDING & STRUCTURE PURCHASES 949.34 SC - FURNITURE
202 49002-01-523.00 BUILDING & STRUCTURE PURCHASES 2,160.43 SC - FURNITURE
202 24434 F/B ASSIGNED FOR S/C IMPROVMNS 10,200.00 SC - FURNITURE
101 45100-30-221.00 EQUIPMENT PARTS 2,529.80 SC - FURNITURE
REG. CHECK 1 15,839.57 15,839.57CR 0.00
15,839.57 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!35!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 17
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-001515 INVER GROVE FORD
I 6393316 PARTS & LABOR-SQUAD REPAIRS APBNK 9/28/2023 R 6/27/2023 498.48 498.48CR
G/L ACCOUNT CK: 153482 498.48
101 43100-01-221.00 EQUIPMENT PARTS 349.48 PARTS & LABOR-SQUAD REPAIRS
101 43100-01-404.00 CONTRACTED MACH & EQUIP SERV 149.00 PARTS & LABOR-SQUAD REPAIRS
REG. CHECK 1 498.48 498.48CR 0.00
498.48 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-110314 KENNEDY & GRAVEN CHARTERED
I 176604 AUGUST RETAINER-ADMIN APBNK 9/28/2023 R 9/19/2023 2,593.56 2,593.56CR
G/L ACCOUNT CK: 153483 2,593.56
101 41810-01-304.00 LEGAL FEES 2,593.56 AUGUST RETAINER-ADMIN
I 176606 AUGUST RETAINER-PLANNING APBNK 9/28/2023 R 9/19/2023 116.13 116.13CR
G/L ACCOUNT CK: 153483 116.13
101 41910-01-319.00 OTHER PROFESIONAL SERVICES 116.13 AUGUST RETAINER-PLANNING
I 176607 AUGUST RETAINER-FIRE APBNK 9/28/2023 R 9/19/2023 48.39 48.39CR
G/L ACCOUNT CK: 153483 48.39
101 41810-01-304.00 LEGAL FEES 48.39 AUGUST RETAINER-FIRE
I 176608 AUGUST RETAINER-POLICE APBNK 9/28/2023 R 9/19/2023 77.41 77.41CR
G/L ACCOUNT CK: 153483 77.41
101 41810-01-304.00 LEGAL FEES 77.41 AUGUST RETAINER-POLICE
I 176609 AUGUST RETAINER-P&R APBNK 9/28/2023 R 9/19/2023 135.48 135.48CR
G/L ACCOUNT CK: 153483 135.48
101 41810-01-304.00 LEGAL FEES 135.48 AUGUST RETAINER-P&R
I 176610 AUGUST NON-RETAINER APBNK 9/28/2023 R 9/19/2023 8,808.91 8,808.91CR
G/L ACCOUNT CK: 153483 8,808.91
101 41810-01-304.00 LEGAL FEES 1,861.66 AUGUST NON-RETAINER
403 48000-01-304.00 LEGAL FEES 203.50 AUGUST NON-RETAINER
471 48000-01-304.00 LEGAL FEES 234.50 AUGUST NON-RETAINER
439 48000-01-304.00 LEGAL FEES 55.50 AUGUST NON-RETAINER
421 48000-01-304.00 LEGAL FEES 64.75 AUGUST NON-RETAINER
474 48000-01-304.00 LEGAL FEES 5,728.50 AUGUST NON-RETAINER
101 41910-01-439.00 OTHER MISCELLANEOUS CHARGES 87.00 AUGUST NON-RETAINER
442 48000-01-304.00 LEGAL FEES 573.50 AUGUST NON-RETAINER
REG. CHECK 1 11,779.88 11,779.88CR 0.00
11,779.88 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!36!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 18
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-110526 KIMBALL MIDWEST
I 101395989 SHOP SUPPLIES APBNK 9/28/2023 R 8/30/2023 450.83 450.83CR
G/L ACCOUNT CK: 153485 450.83
101 43100-01-215.00 SHOP MATERIALS 450.83 SHOP SUPPLIES
I 101403538 MINOR EQUIPMENT APBNK 9/28/2023 R 9/01/2023 499.00 499.00CR
G/L ACCOUNT CK: 153485 499.00
101 43100-01-242.00 MINOR EQUIPMENT 499.00 MINOR EQUIPMENT
REG. CHECK 1 949.83 949.83CR 0.00
949.83 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005999 KRAUS-ANDERSON CONSTRUCTION
I 60140 CONST MGMT SERVICE-PD/PW PR APBNK 9/28/2023 R 9/08/2023 132,219.70 132,219.70CR
G/L ACCOUNT CK: 153486 132,219.70
421 48000-01-521.00 BUILDING & STRUCTURE PURCHASES 132,219.70 CONST MGMT SERVICE-PD/PW PROJ
REG. CHECK 1 132,219.70 132,219.70CR 0.00
132,219.70 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006042 LAKEWOOD CEMETERY ASSOCIATI
I 2023-0351 SENIOR MYSTERY TRIP TOUR APBNK 9/28/2023 R 9/12/2023 200.00 200.00CR
G/L ACCOUNT CK: 153487 200.00
101 45100-87-219.00 OTHER OPERATING SUPPLIES 200.00 SENIOR MYSTERY TRIP TOUR
REG. CHECK 1 200.00 200.00CR 0.00
200.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-001511 LENNAR HOMES
I 2017-02287 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2018-01485 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2020-02101 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
Qbhf!37!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 19
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 2021-00328 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00485 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00494 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00497 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00499 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2023-00923 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/21/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153488 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
REG. CHECK 1 18,000.00 18,000.00CR 0.00
18,000.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-003535 MANSFIELD OIL COMPANY
I 24612091 1,500 GAL UNLEADED FUEL APBNK 9/28/2023 R 9/11/2023 5,493.96 5,493.96CR
G/L ACCOUNT CK: 153490 5,493.96
101 43100-01-212.00 MOTOR FUELS 5,493.96 1,500 GAL UNLEADED FUEL
I 24612134 2,700 GAL UNLEADED FUEL APBNK 9/28/2023 R 9/11/2023 7,725.36 7,725.36CR
G/L ACCOUNT CK: 153490 7,725.36
101 43100-01-212.00 MOTOR FUELS 7,725.36 2,700 GAL UNLEADED FUEL
REG. CHECK 1 13,219.32 13,219.32CR 0.00
13,219.32 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006043 MARTIN MARIETTA MATERIALS
I 40216382 5 GALLON TACK OIL APBNK 9/28/2023 R 8/30/2023 50.00 50.00CR
G/L ACCOUNT CK: 153491 50.00
101 43121-01-231.00 BITUMINOUS PATCHING MATERIALS 50.00 5 GALLON TACK OIL
Qbhf!38!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 20
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
REG. CHECK 1 50.00 50.00CR 0.00
50.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-130575 MCNAMARA CONTRACTING INC
I 5473 34.75 TONS ASPHALT APBNK 9/28/2023 R 7/31/2023 2,258.75 2,258.75CR
G/L ACCOUNT CK: 153492 2,258.75
101 43121-01-231.00 BITUMINOUS PATCHING MATERIALS 2,258.75 34.75 TONS ASPHALT
I 5515 119.38 TONS ASPHALT APBNK 9/28/2023 R 8/31/2023 7,759.70 7,759.70CR
G/L ACCOUNT CK: 153492 7,759.70
101 43121-01-231.00 BITUMINOUS PATCHING MATERIALS 7,759.70 119.38 TONS ASPHALT
REG. CHECK 1 10,018.45 10,018.45CR 0.00
10,018.45 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-130725 MENARDS-APPLE VALLEY
I 61542 SEALANT APBNK 9/28/2023 R 9/13/2023 44.61 44.61CR
G/L ACCOUNT CK: 153493 44.61
101 45202-01-221.00 EQUIPMENT PARTS 44.61 SEALANT
REG. CHECK 1 44.61 44.61CR 0.00
44.61 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-004079 METRO SALES INC
I INV2362278 IM C300F COPIER USAGE APBNK 9/28/2023 R 9/11/2023 6.47 6.47CR
G/L ACCOUNT CK: 153494 6.47
101 41810-01-202.00 DUPLICATING & COPYING COSTS 6.47 IM C300F COPIER USAGE
I INV2362639 C307 COPIER LEASE APBNK 9/28/2023 R 9/12/2023 67.00 67.00CR
G/L ACCOUNT CK: 153494 67.00
101 41810-01-580.00 OTHER EQUIPMENT 67.00 C307 COPIER LEASE
I INV2365459 IM C3500 LEASE & USAGE APBNK 9/28/2023 R 9/15/2023 512.00 512.00CR
G/L ACCOUNT CK: 153494 512.00
101 41810-01-202.00 DUPLICATING & COPYING COSTS 336.00 IM C3500 LEASE & USAGE
101 41810-01-580.00 OTHER EQUIPMENT 176.00 IM C3500 LEASE & USAGE
I INV2369709 C300F COPIER LEASE APBNK 9/28/2023 R 9/22/2023 95.00 95.00CR
G/L ACCOUNT CK: 153494 95.00
101 41810-01-580.00 OTHER EQUIPMENT 95.00 C300F COPIER LEASE
REG. CHECK 1 680.47 680.47CR 0.00
680.47 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!39!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 21
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-005706 MIDWEST MACHINERY CO
I 9767357 EQUIPMENT APBNK 9/28/2023 R 9/15/2023 939.96 939.96CR
G/L ACCOUNT CK: 153495 939.96
101 45202-01-242.00 MINOR EQUIPMENT 939.96 EQUIPMENT
I 9771258 GARDEN TRIMMER APBNK 9/28/2023 R 9/19/2023 299.99 299.99CR
G/L ACCOUNT CK: 153495 299.99
101 45202-01-242.00 MINOR EQUIPMENT 299.99 GARDEN TRIMMER
REG. CHECK 1 1,239.95 1,239.95CR 0.00
1,239.95 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-000030 MN DEPT OF REVENUE
I 202309229881 AUGUST PETROLEUM TAX APBNK 9/20/2023 D 9/20/2023 135.66 135.66CR
G/L ACCOUNT CK: 001638 135.66
101 43100-01-212.00 MOTOR FUELS 135.66 AUGUST PETROLEUM TAX
I 202309229882 PETROLEUM SPEC FUEL LICENSE APBNK 9/20/2023 D 9/20/2023 25.00 25.00CR
G/L ACCOUNT CK: 001638 25.00
101 43100-01-212.00 MOTOR FUELS 25.00 PETROLEUM SPEC FUEL LICENSE
DRAFTS 1 160.66 160.66CR 0.00
160.66 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-000031 MN DEPT OF REVENUE
I 202309229883 AUGUST SALES & USE TAX APBNK 9/20/2023 D 9/20/2023 5,065.00 5,065.00CR
G/L ACCOUNT CK: 001639 5,065.00
101 22810 SALES TAX PAYABLE 41.21 AUGUST SALES & USE TAX
601 22810 SALES TAX PAYABLE 3,974.97 AUGUST SALES & USE TAX
604 22810 SALES TAX PAYABLE 0.73 AUGUST SALES & USE TAX
650 22810 SALES TAX PAYABLE 1,041.15 AUGUST SALES & USE TAX
101 41110-01-315.00 SPECIAL PROGRAMS 2.06 AUGUST SALES & USE TAX
101 42110-01-439.00 OTHER MISCELLANEOUS CHARGES 4.12 AUGUST SALES & USE TAX
208 49008-01-315.00 SPECIAL PROGRAMS 1.15 AUGUST SALES & USE TAX
101 41520-01-439.00 OTHER MISCELLANEOUS CHARGES 0.39CRAUGUST SALES & USE TAX
DRAFTS 1 5,065.00 5,065.00CR 0.00
5,065.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!3:!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 22
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-001328 MN ENERGY RESOURCES CORP
I 0502350036-1 8/23 PW BUILDINGS-1ST METER APBNK 9/28/2023 D 9/06/2023 69.47 69.47CR
G/L ACCOUNT CK: 001640 69.47
101 41940-01-383.00 GAS UTILITIES 69.47 PW BUILDINGS-1ST METER
I 0502440191-1 8/23 PW BUILDINGS-2ND METER APBNK 9/28/2023 D 9/06/2023 65.20 65.20CR
G/L ACCOUNT CK: 001640 65.20
101 41940-01-383.00 GAS UTILITIES 65.20 PW BUILDINGS-2ND METER
I 0502574702-1 8/23 WELL #9 APBNK 9/28/2023 D 9/06/2023 27.02 27.02CR
G/L ACCOUNT CK: 001640 27.02
601 49409-01-383.00 GAS UTILITIES 27.02 WELL #9
I 0502798212-1 8/23 FIRE STATION #1 APBNK 9/28/2023 D 9/06/2023 91.37 91.37CR
G/L ACCOUNT CK: 001640 91.37
101 41940-01-383.00 GAS UTILITIES 91.37 FIRE STATION #1
I 0503984315-1 8/23 FIRE STATION #2 APBNK 9/28/2023 D 8/24/2023 77.16 77.16CR
G/L ACCOUNT CK: 001640 77.16
101 41940-01-383.00 GAS UTILITIES 77.16 FIRE STATION #2
I 0504255593-1 8/23 COMMUNITY CENTER APBNK 9/28/2023 D 9/06/2023 124.19 124.19CR
G/L ACCOUNT CK: 001640 124.19
101 11510 NATIONAL GUARD A/R 59.61 COMMUNITY CENTER
650 45130-01-383.00 GAS UTILITIES 32.29 COMMUNITY CENTER
101 45100-01-383.00 GAS UTILITIES 32.29 COMMUNITY CENTER
I 0504510160-1 8/23 CENTRAL PARK BUILDING APBNK 9/28/2023 D 9/06/2023 23.91 23.91CR
G/L ACCOUNT CK: 001640 23.91
101 45202-01-383.00 GAS UTILITIES 23.91 CENTRAL PARK BUILDING
I 0504741418-1 8/23 RSMT SC-ASSEMBLY HALL APBNK 9/28/2023 D 9/07/2023 23.91 23.91CR
G/L ACCOUNT CK: 001640 23.91
101 45100-30-383.00 GAS UTILITIES 23.91 RSMT SC-ASSEMBLY HALL
I 0505173085-1 8/23 WELL #8 APBNK 9/28/2023 D 9/06/2023 23.91 23.91CR
G/L ACCOUNT CK: 001640 23.91
601 49408-01-383.00 GAS UTILITIES 23.91 WELL #8
I 0505316075-1 8/23 JAYCEE PARK SHELTER APBNK 9/28/2023 D 9/06/2023 23.91 23.91CR
G/L ACCOUNT CK: 001640 23.91
101 45202-01-383.00 GAS UTILITIES 23.91 JAYCEE PARK SHELTER
I 0506007839-1 8/23 CH,CARPENTER SHOP,GENERATOR APBNK 9/28/2023 D 9/06/2023 996.31 996.31CR
G/L ACCOUNT CK: 001640 996.31
101 41940-01-383.00 GAS UTILITIES 996.31 CH,CARPENTER SHOP,GENERATOR
Qbhf!41!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 23
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 0507933425-1 8/23 RSMT SC-ACTIVITY CENTER APBNK 9/28/2023 D 9/06/2023 12.62 12.62CR
G/L ACCOUNT CK: 001640 12.62
101 45100-30-383.00 GAS UTILITIES 12.62 RSMT SC-ACTIVITY CENTER
I 0737046210-2 8/23 FLINT HILLS REC COMPLEX APBNK 9/28/2023 D 8/25/2023 66.34 66.34CR
G/L ACCOUNT CK: 001640 66.34
101 15500 PREPAID ITEMS 52.79 FLINT HILLS REC COMPLEX
101 45202-01-383.00 GAS UTILITIES 13.55 FLINT HILLS REC COMPLEX
DRAFTS 1 1,625.32 1,625.32CR 0.00
1,625.32 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-137885 MN VALLEY TESTING LABS
I 1216645 BAC-T TESTING APBNK 9/28/2023 R 9/13/2023 407.00 407.00CR
G/L ACCOUNT CK: 153496 407.00
601 49400-01-310.00 TESTING SERVICES 407.00 BAC-T TESTING
REG. CHECK 1 407.00 407.00CR 0.00
407.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006047 MOLIN CONCRETE PRODUCTS
I 2023-0364 ROSEMOUNT PD/PW PROJECT APBNK 9/28/2023 R 8/24/2023 1,010,228.55 1,010,228.55CR
G/L ACCOUNT CK: 153497 1,010,228.55
421 48000-01-521.00 BUILDING & STRUCTURE PURCHASES 1,010,228.55 ROSEMOUNT PD/PW PROJECT
REG. CHECK 1 1,010,228.55 1,010,228.55CR 0.00
1,010,228.55 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-002228 MORNING GLORY'S BAKERY CAFE
I 070056 FOOD FOR SEPT WELLNESS EVEN APBNK 9/28/2023 R 9/13/2023 264.20 264.20CR
G/L ACCOUNT CK: 153498 264.20
101 41320-31-315.00 SPECIAL PROGRAMS 264.20 FOOD FOR SEPT WELLNESS EVENT
REG. CHECK 1 264.20 264.20CR 0.00
264.20 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!42!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 24
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-138820 MOTOROLA SOLUTIONS INC
I 8281697318 MOTOROLA HANDHELD RADIOS APBNK 9/28/2023 R 8/23/2023 9,586.80 9,586.80CR
G/L ACCOUNT CK: 153499 9,586.80
101 42210-01-580.00 OTHER EQUIPMENT PURCHASES 9,586.80 MOTOROLA HANDHELD RADIOS
REG. CHECK 1 9,586.80 9,586.80CR 0.00
9,586.80 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006048 MUSKA ELECTRIC COMPANY
I 2023-0365 ROSEMOUNT PD/PW PROJECT APBNK 9/28/2023 R 8/31/2023 239,162.50 239,162.50CR
G/L ACCOUNT CK: 153500 239,162.50
421 48000-01-521.00 BUILDING & STRUCTURE PURCHASES 239,162.50 ROSEMOUNT PD/PW PROJECT
REG. CHECK 1 239,162.50 239,162.50CR 0.00
239,162.50 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006040 ARCHANA NAIR
I 2023-0348 PERMIT 4980-DAMAGE DEPOSIT APBNK 9/28/2023 R 9/19/2023 500.00 500.00CR
G/L ACCOUNT CK: 153501 500.00
101 22005 REFUNDS PAYABLE - P&R 500.00 PERMIT 4980-DAMAGE DEPOSIT
REG. CHECK 1 500.00 500.00CR 0.00
500.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006000 NORTHERN LINES CONTRACTING
I 2023-0352 AKRON AVE SOUTH EXTENSION APBNK 9/28/2023 R 9/07/2023 1,095,656.85 1,095,656.85CR
G/L ACCOUNT CK: 153502 1,095,656.85
483 48000-01-530.00 IMPROVEMENTS OTHER THAN BUILD 1,095,656.85 AKRON AVE SOUTH EXTENSION
I 2023-0360 2023 STREET IMPV PROJECT APBNK 9/28/2023 R 8/31/2023 1,241,133.24 1,241,133.24CR
G/L ACCOUNT CK: 153502 1,241,133.24
486 48000-01-530.00 IMPROVEMENTS OTHER THAN B 1,241,133.24 2023 STREET IMPV PROJECT
REG. CHECK 1 2,336,790.09 2,336,790.09CR 0.00
2,336,790.09 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!43!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 25
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-004427 ONE TEN TEN HOMES LLC
I 2023-00662 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/21/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153503 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
REG. CHECK 1 2,000.00 2,000.00CR 0.00
2,000.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-004740 PELLICCI ACE ROSEMOUNT
I 10650/R PARTS APBNK 9/28/2023 R 9/05/2023 33.81 33.81CR
G/L ACCOUNT CK: 153504 33.81
101 43100-01-221.00 EQUIPMENT PARTS 33.81 PARTS
I 10656/R PARTS APBNK 9/28/2023 R 9/06/2023 29.97 29.97CR
G/L ACCOUNT CK: 153504 29.97
101 43100-01-221.00 EQUIPMENT PARTS 29.97 PARTS
I 10672/R PARTS AND TOOL APBNK 9/28/2023 R 9/08/2023 57.98 57.98CR
G/L ACCOUNT CK: 153504 57.98
101 43100-01-221.00 EQUIPMENT PARTS 17.99 PARTS AND TOOL
101 43100-01-241.00 SMALL TOOLS 39.99 PARTS AND TOOL
I 10705/R STORAGE CABINET APBNK 9/28/2023 R 9/15/2023 44.99 44.99CR
G/L ACCOUNT CK: 153504 44.99
101 45202-01-241.00 SMALL TOOLS 44.99 STORAGE CABINET
I 10707/R BATTERIES APBNK 9/28/2023 R 9/15/2023 33.98 33.98CR
G/L ACCOUNT CK: 153504 33.98
101 43121-01-226.00 SIGN REPAIR MATERIALS 33.98 BATTERIES
I 10725/R HOLE SAW BLADE & CUTTING OI APBNK 9/28/2023 R 9/19/2023 29.98 29.98CR
G/L ACCOUNT CK: 153504 29.98
602 49450-01-241.00 SMALL TOOLS 29.98 HOLE SAW BLADE & CUTTING OIL
I 10726/R BEE AND WASP SPRAY APBNK 9/28/2023 R 9/19/2023 84.00 84.00CR
G/L ACCOUNT CK: 153504 84.00
101 45202-01-229.00 OTHER MAINTENANCE SUPPLIES 84.00 BEE AND WASP SPRAY
REG. CHECK 1 314.71 314.71CR 0.00
314.71 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!44!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 26
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-000602 PINE BEND PAVING INC
I 23-2813 49.1 TONS ASPHALT APBNK 9/28/2023 R 9/14/2023 3,387.90 3,387.90CR
G/L ACCOUNT CK: 153505 3,387.90
101 43121-01-231.00 BITUMINOUS PATCHING MATERIALS 3,387.90 49.1 TONS ASPHALT
REG. CHECK 1 3,387.90 3,387.90CR 0.00
3,387.90 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006044 PULTE HOMES OF MN
I 2022-04885 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153506 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2022-04888 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153506 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2022-04890 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153506 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2022-04892 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153506 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2022-04893 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153506 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
I 2022-04895 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/18/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153506 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
REG. CHECK 1 12,000.00 12,000.00CR 0.00
12,000.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006026 R.J. MECHANICAL INC
I 2023-0366 ROSEMOUNT PD/PW PROJECT APBNK 9/28/2023 R 8/31/2023 38,209.62 38,209.62CR
G/L ACCOUNT CK: 153507 38,209.62
421 48000-01-521.00 BUILDING & STRUCTURE PURCHASES 38,209.62 ROSEMOUNT PD/PW PROJECT
REG. CHECK 1 38,209.62 38,209.62CR 0.00
38,209.62 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!45!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 27
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-180980 RINK-TEC INTERNATIONAL
I 5469 QTRLY MAINT AGREEMENT APBNK 9/28/2023 R 9/15/2023 815.86 815.86CR
G/L ACCOUNT CK: 153508 815.86
650 45130-01-404.00 CONTRACTED MACH & EQUIP R & M 815.86 QTRLY MAINT AGREEMENT
REG. CHECK 1 815.86 815.86CR 0.00
815.86 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-001665 ROUGH CUTT
I 2023-0353 MOWING @ 2501 149TH ST W APBNK 9/28/2023 R 9/12/2023 110.00 110.00CR
G/L ACCOUNT CK: 153509 110.00
101 41910-01-409.00 OTHER CONTRACTED REPAIR & MAIN 110.00 MOWING @ 2501 149TH ST W
REG. CHECK 1 110.00 110.00CR 0.00
110.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-190555 SHORT ELLIOT HENDRICKSON
I 452658 BLAINE AVE TRUNK WM EXTENSI APBNK 9/28/2023 R 9/12/2023 415.41 415.41CR
G/L ACCOUNT CK: 153510 415.41
474 48000-01-303.00 ENGINEERING FEES 415.41 BLAINE AVE TRUNK WM EXTENSION
I 453042 WELL 17 PRELIM DESIGN APBNK 9/28/2023 R 9/16/2023 3,975.39 3,975.39CR
G/L ACCOUNT CK: 153510 3,975.39
601 49400-01-303.00 ENGINEERING FEES 3,975.39 WELL 17 PRELIM DESIGN
REG. CHECK 1 4,390.80 4,390.80CR 0.00
4,390.80 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-003954 SITEONE LANDSCAPE SUPPLY LL
I 134394525-001 FERTILIZER SPREADER APBNK 9/28/2023 R 9/12/2023 293.20 293.20CR
G/L ACCOUNT CK: 153511 293.20
101 43121-01-225.00 LANDSCAPING MATERIALS 293.20 FERTILIZER SPREADER
REG. CHECK 1 293.20 293.20CR 0.00
293.20 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!46!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 28
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-191510 SOLBERG AGGREGATE COMPANY
I 27845 CLASS 5 GRAVEL APBNK 9/28/2023 R 8/31/2023 625.11 625.11CR
G/L ACCOUNT CK: 153512 625.11
101 43121-01-232.00 CRUSHED ROCK 625.11 CLASS 5 GRAVEL
REG. CHECK 1 625.11 625.11CR 0.00
625.11 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-001474 SRF CONSULTING GROUP INC
I 16955.00-1 ASPEN AVE EXTENSION APBNK 9/28/2023 R 8/31/2023 1,745.83 1,745.83CR
G/L ACCOUNT CK: 153513 1,745.83
493 48000-01-303.00 ENGINEERING FEES 1,745.83 ASPEN AVE EXTENSION
REG. CHECK 1 1,745.83 1,745.83CR 0.00
1,745.83 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-000535 ST CROIX RECREATION
I 21714 PLAYGROUND PARTS APBNK 9/28/2023 R 9/06/2023 3,187.60 3,187.60CR
G/L ACCOUNT CK: 153514 3,187.60
101 45202-01-221.00 EQUIPMENT PARTS 3,187.60 PLAYGROUND PARTS
I 21715 PLAYGROUND PARTS APBNK 9/28/2023 R 9/06/2023 751.00 751.00CR
G/L ACCOUNT CK: 153514 751.00
101 45202-01-221.00 EQUIPMENT PARTS 751.00 PLAYGROUND PARTS
REG. CHECK 1 3,938.60 3,938.60CR 0.00
3,938.60 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005825 STONE COTTAGE CONSTRUCTION
I 2022-03704 AS-BUILT SURVEY REFUND APBNK 9/28/2023 R 9/26/2023 2,000.00 2,000.00CR
G/L ACCOUNT CK: 153515 2,000.00
101 22010 AS-BUILT SURVEY DEPOSITS 2,000.00 AS-BUILT SURVEY REFUND
REG. CHECK 1 2,000.00 2,000.00CR 0.00
2,000.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!47!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 29
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-192536 STREICHER'S
I I1656147 40MM LAUNCHER, ETC APBNK 9/28/2023 R 9/22/2023 2,301.02 2,301.02CR
G/L ACCOUNT CK: 153516 2,301.02
101 42110-01-221.00 EQUIPMENT PARTS 2,301.02 40MM LAUNCHER, ETC
REG. CHECK 1 2,301.02 2,301.02CR 0.00
2,301.02 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005740 THE HUNTINGTON NAT'L BANK
I 498310 MOWER LEASE 1ST PAYMENT APBNK 9/28/2023 R 9/12/2023 26,704.20 26,704.20CR
G/L ACCOUNT CK: 153517 26,704.20
101 45202-01-416.00 MACHINERY RENTAL 26,704.20 MOWER LEASE 1ST PAYMENT
REG. CHECK 1 26,704.20 26,704.20CR 0.00
26,704.20 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006049 THELEN HEATING & ROOFING IN
I 2023-0367 ROSEMOUNT PD/PW PROJECT APBNK 9/28/2023 R 8/31/2023 144,400.00 144,400.00CR
G/L ACCOUNT CK: 153518 144,400.00
421 48000-01-521.00 BUILDING & STRUCTURE PURCHASES 144,400.00 ROSEMOUNT PD/PW PROJECT
REG. CHECK 1 144,400.00 144,400.00CR 0.00
144,400.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006046 TTEC DIGITAL LLC
I MNT0006762 PHONE SYSTEM MAINTENANCE APBNK 9/28/2023 R 9/18/2023 19,245.93 19,245.93CR
G/L ACCOUNT CK: 153519 19,245.93
101 41810-01-321.00 TELEPHONE COSTS 19,245.93 PHONE SYSTEM MAINTENANCE
REG. CHECK 1 19,245.93 19,245.93CR 0.00
19,245.93 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-001337 US BANK
I 202309209777 CANDY FOR LEP DAY PARADE APBNK 9/07/2023 D 7/25/2023 161.24 161.24CR
G/L ACCOUNT CK: 001641 161.24
101 41110-01-598.00 COUNCIL DESIGNATED 161.24 CANDY FOR LEP DAY PARADE
I 202309209778 PARADE CANDY APBNK 9/07/2023 D 7/27/2023 50.48 50.48CR
G/L ACCOUNT CK: 001641 50.48
101 41110-01-598.00 COUNCIL DESIGNATED 50.48 PARADE CANDY
Qbhf!48!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 30
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 202309209779 MEMBERSHIP RENEWAL - FASBEN APBNK 9/07/2023 D 8/01/2023 50.00 50.00CR
G/L ACCOUNT CK: 001641 50.00
101 41320-01-433.00 DUES & SUBSCRIPTIONS 50.00 MEMBERSHIP RENEWAL - FASBENDER
I 202309209780 FOOD FOR CC MEETING 8/2 APBNK 9/07/2023 D 8/02/2023 66.71 66.71CR
G/L ACCOUNT CK: 001641 66.71
101 41110-01-315.00 SPECIAL PROGRAMS 66.71 FOOD FOR CC MEETING 8/2
I 202309209781 SENATOR KLOBUCHAR CHAMBER E APBNK 9/07/2023 D 8/23/2023 15.00 15.00CR
G/L ACCOUNT CK: 001641 15.00
101 41320-01-437.00 CONFERENCES & SEMINARS 15.00 SENATOR KLOBUCHAR CHAMBER EVT
I 202309209782 LUNCH FOR 8/15 WELLNESS EVE APBNK 9/07/2023 D 8/16/2023 481.09 481.09CR
G/L ACCOUNT CK: 001641 481.09
101 41320-31-315.00 SPECIAL PROGRAMS 481.09 LUNCH FOR 8/15 WELLNESS EVENT
I 202309209783 OFFICE SUPPLIES APBNK 9/07/2023 D 8/16/2023 11.49 11.49CR
G/L ACCOUNT CK: 001641 11.49
101 41810-01-209.00 OTHER OFFICE SUPPLIES 11.49 OFFICE SUPPLIES
I 202309209784 OFFICE SUPPLIES APBNK 9/07/2023 D 8/16/2023 44.48 44.48CR
G/L ACCOUNT CK: 001641 44.48
101 41810-01-209.00 OTHER OFFICE SUPPLIES 44.48 OFFICE SUPPLIES
I 202309209785 GARDEN WATERING WAND APBNK 9/07/2023 D 8/17/2023 22.99 22.99CR
G/L ACCOUNT CK: 001641 22.99
101 41320-31-315.00 SPECIAL PROGRAMS 22.99 GARDEN WATERING WAND
I 202309209787 BUDGET PLANNERS FOR EMPLOYE APBNK 9/07/2023 D 8/23/2023 44.51 44.51CR
G/L ACCOUNT CK: 001641 44.51
101 41320-31-315.00 SPECIAL PROGRAMS 44.51 BUDGET PLANNERS FOR EMPLOYEES
I 202309209788 BUDGET PLANNERS FOR EMPLOYE APBNK 9/07/2023 D 8/23/2023 44.51 44.51CR
G/L ACCOUNT CK: 001641 44.51
101 41320-31-315.00 SPECIAL PROGRAMS 44.51 BUDGET PLANNERS FOR EMPLOYEES
I 202309209789 BUDGET PLANNERS FOR EMPLOYE APBNK 9/07/2023 D 8/24/2023 44.51 44.51CR
G/L ACCOUNT CK: 001641 44.51
101 41320-31-315.00 SPECIAL PROGRAMS 44.51 BUDGET PLANNERS FOR EMPLOYEES
I 202309209790 BUDGET PLANNERS FOR EMPLOYE APBNK 9/07/2023 D 8/23/2023 638.72 638.72CR
G/L ACCOUNT CK: 001641 638.72
101 41320-31-315.00 SPECIAL PROGRAMS 638.72 BUDGET PLANNERS FOR EMPLOYEES
I 202309209791 EQUIPMENT AND EVENT ITEMS APBNK 9/07/2023 D 7/28/2023 38.98 38.98CR
G/L ACCOUNT CK: 001641 38.98
101 41320-41-315.00 SPECIAL PROGRAMS 38.98 EQUIPMENT AND EVENT ITEMS
Qbhf!49!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 31
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 202309209792 PARK EVENT PROMOS APBNK 9/07/2023 D 8/19/2023 75.00 75.00CR
G/L ACCOUNT CK: 001641 75.00
101 41320-41-315.00 SPECIAL PROGRAMS 75.00 PARK EVENT PROMOS
I 202309209793 E.F. RETIREMENT PARTY TREAT APBNK 9/07/2023 D 8/02/2023 104.28 104.28CR
G/L ACCOUNT CK: 001641 104.28
101 41320-31-315.00 SPECIAL PROGRAMS 104.28 E.F. RETIREMENT PARTY TREATS
I 202309209794 ANNUAL CDL CHECK - ALL DOT APBNK 9/07/2023 D 8/04/2023 25.00 25.00CR
G/L ACCOUNT CK: 001641 25.00
101 41320-31-306.00 PERSONNEL TESTING & RECRUITMNT 25.00 ANNUAL CDL CHECK - ALL DOT EES
I 202309209795 PARKING FOR MPELRA SUMMER C APBNK 9/07/2023 D 8/09/2023 3.00 3.00CR
G/L ACCOUNT CK: 001641 3.00
101 41320-31-331.00 TRAVEL EXPENSE 3.00 PARKING FOR MPELRA SUMMER CONF
I 202309209796 HOTEL FOR MPELRA CONFERENCE APBNK 9/07/2023 D 8/11/2023 330.42 330.42CR
G/L ACCOUNT CK: 001641 330.42
101 41320-31-331.00 TRAVEL EXPENSE 330.42 HOTEL FOR MPELRA CONFERENCE
I 202309209797 MNGFOA EVENT 8/16/23 APBNK 9/07/2023 D 7/26/2023 8.00 8.00CR
G/L ACCOUNT CK: 001641 8.00
101 41520-01-437.00 CONFERENCES & SEMINARS 8.00 MNGFOA EVENT 8/16/23
I 202309209798 CONTINUING EDUCATION APBNK 9/07/2023 D 7/25/2023 45.00 45.00CR
G/L ACCOUNT CK: 001641 45.00
101 41910-01-437.00 CONFERENCES & SEMINARS 45.00 CONTINUING EDUCATION
I 202309209799 BUILDING CODE BOOK APBNK 9/07/2023 D 8/01/2023 48.15 48.15CR
G/L ACCOUNT CK: 001641 48.15
101 41910-01-435.00 BOOKS & PAMPHLETS 48.15 BUILDING CODE BOOK
I 202309209800 Chris Mart BO License APBNK 9/07/2023 D 8/04/2023 65.00 65.00CR
G/L ACCOUNT CK: 001641 65.00
101 41910-01-433.00 DUES & SUBSCRIPTIONS 65.00 Chris Mart BO License
I 202309209801 Uniforms-Dahlstrom APBNK 9/07/2023 D 7/25/2023 539.17 539.17CR
G/L ACCOUNT CK: 001641 539.17
101 42110-01-217.00 CLOTHING ALLOWANCE - POLICE 539.17 Uniforms-Dahlstrom
I 202309209802 Sumps and Hose for lep days APBNK 9/07/2023 D 7/28/2023 215.64 215.64CR
G/L ACCOUNT CK: 001641 215.64
101 42110-01-221.00 EQUIPMENT PARTS 215.64 Sumps and Hose for lep days
I 202309209803 Lep Days Sump pumps and hos APBNK 9/07/2023 D 7/28/2023 546.27 546.27CR
G/L ACCOUNT CK: 001641 546.27
101 42110-01-221.00 EQUIPMENT PARTS 546.27 Lep Days Sump pumps and hose
Qbhf!4:!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 32
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 202309209804 LITTLE CAESARS KIDS DANCE APBNK 9/07/2023 D 7/24/2023 615.17 615.17CR
G/L ACCOUNT CK: 001641 615.17
208 49008-01-315.00 SPECIAL PROGRAMS 615.17 LITTLE CAESARS KIDS DANCE
I 202309209805 NEW TASER BATTERY-3547 APBNK 9/07/2023 D 7/31/2023 96.00 96.00CR
G/L ACCOUNT CK: 001641 96.00
101 42110-01-221.00 EQUIPMENT PARTS 96.00 NEW TASER BATTERY-3547
I 202309209806 PEER SUPPORT TRAINING-3545 APBNK 9/07/2023 D 8/01/2023 450.00 450.00CR
G/L ACCOUNT CK: 001641 450.00
101 42110-01-437.00 CONFERENCES & SEMINARS 450.00 PEER SUPPORT TRAINING-3545
I 202309209807 VEH. EXTRACTION COURSE-3546 APBNK 9/07/2023 D 8/07/2023 499.99 499.99CR
G/L ACCOUNT CK: 001641 499.99
101 42110-01-221.00 EQUIPMENT PARTS 499.99 VEH. EXTRACTION COURSE-3546
I 202309209808 SUPERVISORY TRAINING-3546 APBNK 9/07/2023 D 8/07/2023 250.00 250.00CR
G/L ACCOUNT CK: 001641 250.00
101 42110-01-437.00 CONFERENCES & SEMINARS 250.00 SUPERVISORY TRAINING-3546
I 202309209809 NARCOTICS INV TRAINING-3556 APBNK 9/07/2023 D 8/07/2023 375.00 375.00CR
G/L ACCOUNT CK: 001641 375.00
101 42110-01-437.00 CONFERENCES & SEMINARS 375.00 NARCOTICS INV TRAINING-3556
I 202309209810 NEW TASER BATTERY-ZABOJ APBNK 9/07/2023 D 8/08/2023 96.00 96.00CR
G/L ACCOUNT CK: 001641 96.00
101 42110-01-221.00 EQUIPMENT PARTS 96.00 NEW TASER BATTERY-ZABOJ
I 202309209811 SRO UOF TRAINING-3562 APBNK 9/07/2023 D 8/21/2023 299.00 299.00CR
G/L ACCOUNT CK: 001641 299.00
101 42110-01-437.00 CONFERENCES & SEMINARS 299.00 SRO UOF TRAINING-3562
I 202309209812 JUICE FOR PARADE BRIEFING APBNK 9/07/2023 D 7/29/2023 15.38 15.38CR
G/L ACCOUNT CK: 001641 15.38
101 42110-01-439.00 OTHER MISCELLANEOUS CHARGES 15.38 JUICE FOR PARADE BRIEFING
I 202309209813 COFFEE FOR PARADE BRIEFING APBNK 9/07/2023 D 7/29/2023 42.85 42.85CR
G/L ACCOUNT CK: 001641 42.85
101 42110-01-439.00 OTHER MISCELLANEOUS CHARGES 42.85 COFFEE FOR PARADE BRIEFING
I 202309209814 OFFICE SUPPLIES APBNK 9/07/2023 D 7/28/2023 30.62 30.62CR
G/L ACCOUNT CK: 001641 30.62
101 41810-01-209.00 OTHER OFFICE SUPPLIES 30.62 OFFICE SUPPLIES
I 202309209815 OFFICE SUPPLIES APBNK 9/07/2023 D 7/30/2023 197.91 197.91CR
G/L ACCOUNT CK: 001641 197.91
101 41810-01-209.00 OTHER OFFICE SUPPLIES 197.91 OFFICE SUPPLIES
Qbhf!51!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 33
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 202309209816 OFFICE SUPPLIES APBNK 9/07/2023 D 7/30/2023 21.99 21.99CR
G/L ACCOUNT CK: 001641 21.99
101 41810-01-209.00 OTHER OFFICE SUPPLIES 21.99 OFFICE SUPPLIES
I 202309209817 OFFICE SUPPLIES APBNK 9/07/2023 D 7/30/2023 7.99 7.99CR
G/L ACCOUNT CK: 001641 7.99
101 41810-01-209.00 OTHER OFFICE SUPPLIES 7.99 OFFICE SUPPLIES
I 202309209818 Office Supplies APBNK 9/07/2023 D 8/14/2023 4.49 4.49CR
G/L ACCOUNT CK: 001641 4.49
101 41810-01-209.00 OTHER OFFICE SUPPLIES 4.49 Office Supplies
I 202309209819 Office Supplies APBNK 9/07/2023 D 8/14/2023 123.08 123.08CR
G/L ACCOUNT CK: 001641 123.08
101 41810-01-209.00 OTHER OFFICE SUPPLIES 123.08 Office Supplies
I 202309209820 OFFICE SUPPLIES APBNK 9/07/2023 D 8/20/2023 7.99 7.99CR
G/L ACCOUNT CK: 001641 7.99
101 41810-01-209.00 OTHER OFFICE SUPPLIES 7.99 OFFICE SUPPLIES
I 202309209821 OFFICE SUPPLIES APBNK 9/07/2023 D 8/20/2023 105.99 105.99CR
G/L ACCOUNT CK: 001641 105.99
101 41810-01-209.00 OTHER OFFICE SUPPLIES 105.99 OFFICE SUPPLIES
I 202309209822 OFFICE SUPPLIES APBNK 9/07/2023 D 8/23/2023 18.31 18.31CR
G/L ACCOUNT CK: 001641 18.31
101 41810-01-209.00 OTHER OFFICE SUPPLIES 18.31 OFFICE SUPPLIES
I 202309209823 DMT TRAINING @ BCA APBNK 9/07/2023 D 8/21/2023 375.00 375.00CR
G/L ACCOUNT CK: 001641 375.00
208 49008-01-437.00 CONFERENCES & SEMINARS 375.00 DMT TRAINING @ BCA
I 202309209824 DMT TRAINING @ BCA FOR ROSE APBNK 9/07/2023 D 8/21/2023 375.00 375.00CR
G/L ACCOUNT CK: 001641 375.00
208 49008-01-437.00 CONFERENCES & SEMINARS 375.00 DMT TRAINING @ BCA FOR ROSEL
I 202309209825 DMT TRAINING @ BCA FOR WAGN APBNK 9/07/2023 D 8/21/2023 375.00 375.00CR
G/L ACCOUNT CK: 001641 375.00
208 49008-01-437.00 CONFERENCES & SEMINARS 375.00 DMT TRAINING @ BCA FOR WAGNER
I 202309209826 DMT TRAINING @ BCA FOR GRAF APBNK 9/07/2023 D 8/21/2023 375.00 375.00CR
G/L ACCOUNT CK: 001641 375.00
208 49008-01-437.00 CONFERENCES & SEMINARS 375.00 DMT TRAINING @ BCA FOR GRAFF
I 202309209827 CPR TRAINING FOR RESERVES APBNK 9/07/2023 D 8/11/2023 218.54 218.54CR
G/L ACCOUNT CK: 001641 218.54
101 42110-01-437.00 CONFERENCES & SEMINARS 218.54 CPR TRAINING FOR RESERVES
Qbhf!52!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 34
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 202309209828 SQUAD KEYS FOR RESERVES APBNK 9/07/2023 D 8/18/2023 32.07 32.07CR
G/L ACCOUNT CK: 001641 32.07
101 42110-01-221.00 EQUIPMENT PARTS 32.07 SQUAD KEYS FOR RESERVES
I 202309209829 TINT DURANGO DTF APBNK 9/07/2023 D 8/17/2023 520.63 520.63CR
G/L ACCOUNT CK: 001641 520.63
207 49007-01-576.00 OTHER EQUIPMENT PURCHASES 520.63 TINT DURANGO DTF
I 202309209830 STOP/SLOW PADDLES, LIGHT WA APBNK 9/07/2023 D 7/26/2023 149.47 149.47CR
G/L ACCOUNT CK: 001641 149.47
101 42210-01-241.00 SMALL TOOLS 149.47 STOP/SLOW PADDLES, LIGHT WANDS
I 202309209831 FIRE LINE DO NOT CROSS TAPE APBNK 9/07/2023 D 7/27/2023 40.96 40.96CR
G/L ACCOUNT CK: 001641 40.96
101 42210-01-204.00 ENVELOPES & LETTERHEADS 40.96 FIRE LINE DO NOT CROSS TAPE
I 202309209832 2023 STATE FIRE CHIEF CONFE APBNK 9/07/2023 D 8/09/2023 365.00 365.00CR
G/L ACCOUNT CK: 001641 365.00
101 42210-01-433.00 DUES & SUBSCRIPTIONS 365.00 2023 STATE FIRE CHIEF CONFER
I 202309209833 PHONE CASE FOR ON-CALL PHON APBNK 9/07/2023 D 8/18/2023 30.80 30.80CR
G/L ACCOUNT CK: 001641 30.80
601 49400-01-321.00 TELEPHONE COSTS 30.80 PHONE CASE FOR ON-CALL PHONE
I 202309209834 SHOP SUPPLIES APBNK 9/07/2023 D 7/26/2023 18.95 18.95CR
G/L ACCOUNT CK: 001641 18.95
101 43100-01-215.00 SHOP MATERIALS 18.95 SHOP SUPPLIES
I 202309209835 SHOP SUPPLIES APBNK 9/07/2023 D 7/27/2023 16.27 16.27CR
G/L ACCOUNT CK: 001641 16.27
101 43100-01-215.00 SHOP MATERIALS 16.27 SHOP SUPPLIES
I 202309209836 SHOP SUPPLIES APBNK 9/07/2023 D 7/27/2023 32.04 32.04CR
G/L ACCOUNT CK: 001641 32.04
101 43100-01-215.00 SHOP MATERIALS 32.04 SHOP SUPPLIES
I 202309209837 Zone valve actuators APBNK 9/07/2023 D 7/27/2023 563.28 563.28CR
G/L ACCOUNT CK: 001641 563.28
101 41940-01-223.00 BUILDING REPAIR SUPPLIES 563.28 Zone valve actuators
I 202309209838 AED pads Public works APBNK 9/07/2023 D 8/10/2023 92.95 92.95CR
G/L ACCOUNT CK: 001641 92.95
101 41940-01-208.00 MISCELLANEOUS SUPPLIES 92.95 AED pads Public works
I 202309209839 Light pole covers for parki APBNK 9/07/2023 D 8/22/2023 54.87 54.87CR
G/L ACCOUNT CK: 001641 54.87
101 41940-01-223.00 BUILDING REPAIR SUPPLIES 54.87 Light pole covers for parking
Qbhf!53!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 35
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 202309209840 Broken drinking fountain FS APBNK 9/07/2023 D 8/23/2023 116.12 116.12CR
G/L ACCOUNT CK: 001641 116.12
101 41940-01-223.00 BUILDING REPAIR SUPPLIES 116.12 Broken drinking fountain FS2
I 202309209841 MN GIS/LIS CONF REGISTRATIO APBNK 9/07/2023 D 8/07/2023 325.00 325.00CR
G/L ACCOUNT CK: 001641 325.00
101 43121-01-437.00 CONFERENCES & SEMINARS 65.00 MN GIS/LIS CONF REGISTRATION
101 45202-01-437.00 CONFERENCES & SEMINARS 65.00 MN GIS/LIS CONF REGISTRATION
601 49400-01-437.00 CONFERENCES & SEMINARS 65.00 MN GIS/LIS CONF REGISTRATION
602 49450-01-437.00 CONFERENCES & SEMINARS 65.00 MN GIS/LIS CONF REGISTRATION
603 49500-01-437.00 CONFERENCES & SEMINARS 65.00 MN GIS/LIS CONF REGISTRATION
I 202309209842 DOOR HANGERS APBNK 9/07/2023 D 8/10/2023 27.99 27.99CR
G/L ACCOUNT CK: 001641 27.99
601 49400-01-209.00 OTHER OFFICE SUPPLIES 27.99 DOOR HANGERS
I 202309209843 OUTLET COVERS STEEPLE CENTE APBNK 9/07/2023 D 7/26/2023 5.31 5.31CR
G/L ACCOUNT CK: 001641 5.31
101 45100-30-221.00 EQUIPMENT PARTS 5.31 OUTLET COVERS STEEPLE CENTER
I 202309209844 WATER BOTTLE FILLER FILTERS APBNK 9/07/2023 D 7/27/2023 262.99 262.99CR
G/L ACCOUNT CK: 001641 262.99
101 45100-01-223.00 BUILDING REPAIR SUPPLIES 262.99 WATER BOTTLE FILLER FILTERS RC
I 202309209845 ARENA OFFICE SUPPLIES APBNK 9/07/2023 D 8/02/2023 29.89 29.89CR
G/L ACCOUNT CK: 001641 29.89
650 45130-01-208.00 MISCELLANEOUS SUPPLIES 29.89 ARENA OFFICE SUPPLIES
I 202309209846 AIRTAGS FOR STAFF KEYS APBNK 9/07/2023 D 8/16/2023 86.97 86.97CR
G/L ACCOUNT CK: 001641 86.97
101 45100-01-221.00 EQUIPMENT PARTS 86.97 AIRTAGS FOR STAFF KEYS
I 202309209847 AIRTAG KEY CHAIN COVERS APBNK 9/07/2023 D 8/16/2023 7.99 7.99CR
G/L ACCOUNT CK: 001641 7.99
101 45100-01-221.00 EQUIPMENT PARTS 7.99 AIRTAG KEY CHAIN COVERS
I 202309209848 SENIOR PIE SOCIAL APBNK 9/07/2023 D 7/27/2023 148.53 148.53CR
G/L ACCOUNT CK: 001641 148.53
101 45100-87-219.00 OTHER OPERATING SUPPLIES 148.53 SENIOR PIE SOCIAL
I 202309209849 ICE CREAM FOR SENIOR EVENT APBNK 9/07/2023 D 8/07/2023 23.16 23.16CR
G/L ACCOUNT CK: 001641 23.16
101 45100-87-219.00 OTHER OPERATING SUPPLIES 23.16 ICE CREAM FOR SENIOR EVENT
I 202309209850 NAME BADGES FOR VOLUNTEERS APBNK 9/07/2023 D 8/07/2023 25.09 25.09CR
G/L ACCOUNT CK: 001641 25.09
101 45100-87-219.00 OTHER OPERATING SUPPLIES 25.09 NAME BADGES FOR VOLUNTEERS
Qbhf!54!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 36
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 202309209851 YOGA BLOCKS - SENIOR CLASSE APBNK 9/07/2023 D 8/10/2023 32.97 32.97CR
G/L ACCOUNT CK: 001641 32.97
101 45100-87-219.00 OTHER OPERATING SUPPLIES 32.97 YOGA BLOCKS - SENIOR CLASSES
I 202309209852 YOGA EQUIPMENT - SENIOR CLA APBNK 9/07/2023 D 8/10/2023 13.98 13.98CR
G/L ACCOUNT CK: 001641 13.98
101 45100-87-219.00 OTHER OPERATING SUPPLIES 13.98 YOGA EQUIPMENT - SENIOR CLASS
I 202309209853 SENIOR CRAFT SUPPLIES APBNK 9/07/2023 D 8/14/2023 38.50 38.50CR
G/L ACCOUNT CK: 001641 38.50
101 45100-87-219.00 OTHER OPERATING SUPPLIES 38.50 SENIOR CRAFT SUPPLIES
I 202309209854 STORAGE BINS APBNK 9/07/2023 D 7/30/2023 150.00 150.00CR
G/L ACCOUNT CK: 001641 150.00
101 45100-01-219.00 OTHER OPERATING SUPPLIES 150.00 STORAGE BINS
I 202309209855 Standing desk for Violet APBNK 9/07/2023 D 8/19/2023 361.25 361.25CR
G/L ACCOUNT CK: 001641 361.25
101 45100-01-205.00 DRAFTING SUPPLIES 361.25 Standing desk for Violet
I 202309209856 LEP DAYS SPECIAL EVENT SUPP APBNK 9/07/2023 D 7/25/2023 128.54 128.54CR
G/L ACCOUNT CK: 001641 128.54
101 45100-01-219.00 OTHER OPERATING SUPPLIES 128.54 LEP DAYS SPECIAL EVENT SUPPLIE
I 202309209857 LEP DAYS SPECIAL EVENT SUPP APBNK 9/07/2023 D 7/25/2023 20.09 20.09CR
G/L ACCOUNT CK: 001641 20.09
101 45100-01-219.00 OTHER OPERATING SUPPLIES 20.09 LEP DAYS SPECIAL EVENT SUPPLIE
I 202309209858 PEDAL POWER KIDS CAMP STOP APBNK 9/07/2023 D 7/31/2023 68.69 68.69CR
G/L ACCOUNT CK: 001641 68.69
101 45100-93-219.00 OTHER OPERATING SUPPLIES 68.69 PEDAL POWER KIDS CAMP STOP
I 202309209859 KIDS FAV FIELD TRIP CAMP 3 APBNK 9/07/2023 D 8/07/2023 577.50 577.50CR
G/L ACCOUNT CK: 001641 577.50
101 45100-91-219.00 OTHER OPERATING SUPPLIES 577.50 KIDS FAV FIELD TRIP CAMP 3
I 202309209860 FALL COMMUNITY TENNIS NIGHT APBNK 9/07/2023 D 8/07/2023 25.98 25.98CR
G/L ACCOUNT CK: 001641 25.98
101 45100-01-219.00 OTHER OPERATING SUPPLIES 25.98 FALL COMMUNITY TENNIS NIGHT
I 202309209861 LIL AD CAMP ENTERTAINMENT APBNK 9/07/2023 D 8/07/2023 350.00 350.00CR
G/L ACCOUNT CK: 001641 350.00
101 45100-91-219.00 OTHER OPERATING SUPPLIES 350.00 LIL AD CAMP ENTERTAINMENT
I 202309209862 FALL COMMUNITY TENNIS EVENT APBNK 9/07/2023 D 8/08/2023 37.98 37.98CR
G/L ACCOUNT CK: 001641 37.98
101 45100-01-219.00 OTHER OPERATING SUPPLIES 37.98 FALL COMMUNITY TENNIS EVENT
Qbhf!55!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 37
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
I 202309209863 KIDS FAV FIELD TRIP CAMP 3 APBNK 9/07/2023 D 8/07/2023 1,140.00 1,140.00CR
G/L ACCOUNT CK: 001641 1,140.00
101 45100-91-219.00 OTHER OPERATING SUPPLIES 1,140.00 KIDS FAV FIELD TRIP CAMP 3
I 202309209864 SUPPLIES FOR FALL TENNIS NI APBNK 9/07/2023 D 8/08/2023 38.25 38.25CR
G/L ACCOUNT CK: 001641 38.25
101 45100-01-219.00 OTHER OPERATING SUPPLIES 38.25 SUPPLIES FOR FALL TENNIS NIGHT
I 202309209865 KIDS FAV CAMP ADMISSION APBNK 9/07/2023 D 8/09/2023 575.85 575.85CR
G/L ACCOUNT CK: 001641 575.85
101 45100-91-219.00 OTHER OPERATING SUPPLIES 575.85 KIDS FAV CAMP ADMISSION
I 202309209866 KIDS FAV CAMP ADDITIONAL ME APBNK 9/07/2023 D 8/10/2023 5.90 5.90CR
G/L ACCOUNT CK: 001641 5.90
101 45100-91-219.00 OTHER OPERATING SUPPLIES 5.90 KIDS FAV CAMP ADDITIONAL MEAL
I 202309209867 KIDS FAV FIELD TRIP CAMP 3 APBNK 9/07/2023 D 8/10/2023 1,283.25 1,283.25CR
G/L ACCOUNT CK: 001641 1,283.25
101 45100-91-219.00 OTHER OPERATING SUPPLIES 1,283.25 KIDS FAV FIELD TRIP CAMP 3
I 202309209868 DONUTS FOR REC LEADERS LAST APBNK 9/07/2023 D 8/10/2023 25.97 25.97CR
G/L ACCOUNT CK: 001641 25.97
101 45100-01-219.00 OTHER OPERATING SUPPLIES 25.97 DONUTS FOR REC LEADERS LAST DA
I 202309209869 BAND REFRESMENTS FOR BYOC M APBNK 9/07/2023 D 8/19/2023 44.52 44.52CR
G/L ACCOUNT CK: 001641 44.52
101 45100-01-315.00 SPECIAL PROGRAMS 44.52 BAND REFRESMENTS FOR BYOC MUSI
I 202309209870 BAND REFRESHMENTS FIR BYOC APBNK 9/07/2023 D 8/19/2023 13.98 13.98CR
G/L ACCOUNT CK: 001641 13.98
101 45100-01-315.00 SPECIAL PROGRAMS 13.98 BAND REFRESHMENTS FIR BYOC MUS
I 202309209871 MONTHLY SUBSCRIPTION APBNK 9/07/2023 D 7/28/2023 45.00 45.00CR
G/L ACCOUNT CK: 001641 45.00
101 45100-01-433.00 DUES & SUBSCRIPTIONS 45.00 MONTHLY SUBSCRIPTION
DRAFTS 1 16,650.47 16,650.47CR 0.00
16,650.47 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006045 SOFIA VARELA
I 2023-0354 PERMIT 5063-DAMAGE DEPOSIT APBNK 9/28/2023 R 9/19/2023 500.00 500.00CR
G/L ACCOUNT CK: 153520 500.00
101 22005 REFUNDS PAYABLE - P&R 500.00 PERMIT 5063-DAMAGE DEPOSIT
REG. CHECK 1 500.00 500.00CR 0.00
500.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!56!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 38
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-220480 VERIZON WIRELESS
I 9944102623 PD CELLULAR SERVICE 09/10/2 APBNK 9/28/2023 R 9/10/2023 1,363.40 1,363.40CR
G/L ACCOUNT CK: 153521 1,363.40
101 42110-01-321.00 TELEPHONE COSTS 1,363.40 PD CELLULAR SERVICE 09/10/2023
REG. CHECK 1 1,363.40 1,363.40CR 0.00
1,363.40 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-221575 VOL FIREFIGHTERS BENEFIT
I 2023-0355 VFBAM MEMBERSHIP-BOHLKEN APBNK 9/28/2023 R 9/20/2023 14.00 14.00CR
G/L ACCOUNT CK: 153522 14.00
101 42210-01-433.00 DUES & SUBSCRIPTIONS 14.00 VFBAM MEMBERSHIP-BOHLKEN
I 2023-0356 VFBAM MEMBERSHIP-MCDONALD APBNK 9/28/2023 R 9/20/2023 14.00 14.00CR
G/L ACCOUNT CK: 153522 14.00
101 42210-01-433.00 DUES & SUBSCRIPTIONS 14.00 VFBAM MEMBERSHIP-MCDONALD
I 2023-0357 VFBAM MEMBERSHIP-SALINAS APBNK 9/28/2023 R 9/20/2023 14.00 14.00CR
G/L ACCOUNT CK: 153522 14.00
101 42210-01-433.00 DUES & SUBSCRIPTIONS 14.00 VFBAM MEMBERSHIP-SALINAS
I 2023-0358 VFBAM MEMBERSHIP-LEE APBNK 9/28/2023 R 9/20/2023 14.00 14.00CR
G/L ACCOUNT CK: 153522 14.00
101 42210-01-433.00 DUES & SUBSCRIPTIONS 14.00 VFBAM MEMBERSHIP-LEE
I 2023-0359 VFBAM MEMBERSHIP-HARMS APBNK 9/28/2023 R 9/20/2023 14.00 14.00CR
G/L ACCOUNT CK: 153522 14.00
101 42210-01-433.00 DUES & SUBSCRIPTIONS 14.00 VFBAM MEMBERSHIP-HARMS
REG. CHECK 1 70.00 70.00CR 0.00
70.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-002340 VONBANK LAWN CARE
I 26260 SEPTEMBER LAWN SERVICES APBNK 9/28/2023 R 9/10/2023 1,700.00 1,700.00CR
G/L ACCOUNT CK: 153523 1,700.00
101 45202-01-409.00 OTHER CONTRACTED REPAIR & MAIN 1,700.00 SEPTEMBER LAWN SERVICES
REG. CHECK 1 1,700.00 1,700.00CR 0.00
1,700.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!57!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 39
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-005938 WARNING LITES OF MN INC
I 2552 BONAIRE RR CROSSING APBNK 9/28/2023 R 8/17/2023 2,726.50 2,726.50CR
G/L ACCOUNT CK: 153524 2,726.50
446 48000-01-530.00 IMPROVEMENTS OTHER THAN BLDGS 2,726.50 BONAIRE RR CROSSING
I 628 BONAIRE RR CROSSING APBNK 9/28/2023 R 4/30/2023 15,197.50 15,197.50CR
G/L ACCOUNT CK: 153524 15,197.50
446 48000-01-530.00 IMPROVEMENTS OTHER THAN BLDGS 15,197.50 BONAIRE RR CROSSING
REG. CHECK 1 17,924.00 17,924.00CR 0.00
17,924.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005240 WARSAW SOLAR, LLC
I 2309-6994F AUGUST SOLAR SUBSCRIPTIONS APBNK 9/28/2023 R 9/18/2023 25,217.22 25,217.22CR
G/L ACCOUNT CK: 153525 25,217.22
101 41940-01-381.00 ELECTRIC UTILITIES 7,914.19 AUGUST SOLAR SUBSCRIPTIONS
601 49407-01-381.00 ELECTRIC UTILITIES 720.11 AUGUST SOLAR SUBSCRIPTIONS
601 49410-01-381.00 ELECTRIC UTILITIES 810.87 AUGUST SOLAR SUBSCRIPTIONS
601 49412-01-381.00 ELECTRIC UTILITIES 3,713.89 AUGUST SOLAR SUBSCRIPTIONS
650 45130-01-381.00 ELECTRIC UTILITIES 12,058.16 AUGUST SOLAR SUBSCRIPTIONS
REG. CHECK 1 25,217.22 25,217.22CR 0.00
25,217.22 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-005808 WEX HEALTH INC
I 0001807927-IN AUGUST ADMIN FEES APBNK 9/25/2023 D 8/31/2023 281.75 281.75CR
G/L ACCOUNT CK: 001642 281.75
101 41320-31-319.00 OTHER PROFESSIONAL SERVICES 281.75 AUGUST ADMIN FEES
DRAFTS 1 281.75 281.75CR 0.00
281.75 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-006050 WHEELCO TRUCK & TRAILER
I INV407389 PARTS APBNK 9/28/2023 R 9/14/2023 452.14 452.14CR
G/L ACCOUNT CK: 153526 452.14
101 43100-01-221.00 EQUIPMENT PARTS 452.14 PARTS
REG. CHECK 1 452.14 452.14CR 0.00
452.14 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!58!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 40
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
01-005231 WHITEWOOD GRAPHICS
I 2601R ARENA SIGNAGE APBNK 9/28/2023 R 6/19/2023 375.00 375.00CR
G/L ACCOUNT CK: 153527 375.00
650 45130-01-349.00 OTHER ADVERTISING 375.00 ARENA SIGNAGE
REG. CHECK 1 375.00 375.00CR 0.00
375.00 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-004606 WILLIAMS SCOTSMAN INC
I 9018946609 PW PARKS TRAILER RENTAL APBNK 9/28/2023 R 9/25/2023 780.28 780.28CR
G/L ACCOUNT CK: 153528 780.28
101 45202-01-416.00 MACHINERY RENTAL 780.28 PW PARKS TRAILER RENTAL
REG. CHECK 1 780.28 780.28CR 0.00
780.28 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-231910 WSB AND ASSOCIATES INC
I 11659-000-42 HARMONY VILLAS 2ND APBNK 9/28/2023 R 8/16/2023 400.00 400.00CR
G/L ACCOUNT CK: 153529 400.00
442 48000-01-303.00 ENGINEERING FEES 400.00 HARMONY VILLAS 2ND
I 20605-000-13 AMBER FIELDS 5TH, 10TH, & 1 APBNK 9/28/2023 R 8/31/2023 3,555.75 3,555.75CR
G/L ACCOUNT CK: 153529 3,555.75
441 48000-01-303.00 ENGINEERING FEES 452.00 AMBER FIELDS 5TH, 10TH, & 11TH
489 48000-01-303.00 ENGINEERING FEES 2,908.75 AMBER FIELDS 5TH, 10TH, & 11TH
494 48000-01-303.00 ENGINEERING FEES 195.00 AMBER FIELDS 5TH, 10TH, & 11TH
I 21700-000-7 2023 GENERAL STORMWATER APBNK 9/28/2023 R 8/31/2023 487.00 487.00CR
G/L ACCOUNT CK: 153529 487.00
603 49500-01-303.00 ENGINEERING FEES 487.00 2023 GENERAL STORMWATER
I 22713-000-4 BROCKWAY POND OUTLET IMPRV APBNK 9/28/2023 R 8/31/2023 2,653.25 2,653.25CR
G/L ACCOUNT CK: 153529 2,653.25
603 49500-01-303.00 ENGINEERING FEES 2,653.25 BROCKWAY POND OUTLET IMPRV
I 22714-000-3 2023 MS4 & MONITORING APBNK 9/28/2023 R 8/31/2023 7,092.00 7,092.00CR
G/L ACCOUNT CK: 153529 7,092.00
603 49500-01-405.00 MS4 PERMIT COMPLIANCE 7,092.00 2023 MS4 & MONITORING
I 22825-000-3 2023 MSA COUNTS APBNK 9/28/2023 R 8/31/2023 1,827.50 1,827.50CR
G/L ACCOUNT CK: 153529 1,827.50
101 43121-01-303.00 ENGINEERING FEES 1,827.50 2023 MSA COUNTS
Qbhf!59!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 41
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
VENDOR SEQUENCE
VENDOR ITEM NO# DESCRIPTION BANK CHECK STAT DUE DT GROSS PAYMENT OUTSTANDING
DISC DT BALANCE DISCOUNT
------------------------------------------------------------------------------------------------------------------------------------
REG. CHECK 1 16,015.50 16,015.50CR 0.00
16,015.50 0.00
------------------------------------------------------------------------------------------------------------------------------------
01-260150 ZACK'S INCORPORATED
I 36389 TRUCK SHACKLE APBNK 9/28/2023 R 9/02/2023 224.65 224.65CR
G/L ACCOUNT CK: 153530 224.65
101 43100-01-221.00 EQUIPMENT PARTS 224.65 TRUCK SHACKLE
REG. CHECK 1 224.65 224.65CR 0.00
224.65 0.00
------------------------------------------------------------------------------------------------------------------------------------
Qbhf!5:!pg!22:
9-28-2023 9:29 AM A/P PAYMENT REGISTER PAGE: 42
PACKET: 06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
=================================================== R E P O R T T O T A L S ===================================================
F U N D D I S T R I B U T I O N
FUND NO# FUND NAME AMOUNT
----------------------------------------------------------
101 GENERAL FUND 403,852.15CR
202 BUILDING CIP FUND 13,309.77CR
205 PARK IMPROVEMENT FUND 22,199.00CR
207 EQUIPMENT CIP FUND 185,077.63CR
208 DUI FORFEITURE FUND 2,116.32CR
403 DUNMORE 2ND ADDITION 203.50CR
421 PD & PW BUILDINGS PROJECT 2,921,635.73CR
439 AMBER FIELDS 2 OUTLOT G 55.50CR
441 AMBER FIELDS 5TH ADDITION 452.00CR
442 HARMONY VILLAS 2ND ADD'N 973.50CR
446 BONAIRE PATH 17,924.00CR
471 RICH VALLEY 1ST ADDITION 234.50CR
474 PROJECT BIGFOOT 6,143.91CR
483 AKRON AVE SOUTH EXT 1,095,656.85CR
486 2023 PAVEMENT MANAGEMENT 1,241,133.24CR
489 AMBER FIELDS 10TH 2,908.75CR
493 ASPEN AVE EXTENSION 1,745.83CR
494 AMBER FIELDS 11TH 195.00CR
601 WATER UTILITY FUND 66,789.41CR
602 SEWER UTILITY FUND 2,630.33CR
603 STORM WATER UTILITY FUND 11,288.46CR
604 CAPITAL INVESTMENT FUND 0.73CR
608 STREET LIGHT UTILITY FUND 262.63CR
628 DRIVER AVE & TRK SWR EXT 402.00CR
650 ARENA FUND 30,936.19CR
** TOTALS ** 6,028,126.93CR
====================================================================================================================================
Qbhf!61!pg!22:
9-28-2023 9:29 AMA/P PAYMENT REGISTERPAGE: 43
PACKET:06797 09/28/2023 AP CHECK RUN
VENDOR SET: 01
=================================================== R E P O R T T O T A L S ===================================================
---- TYPE OF CHECK TOTALS ----
GROSSPAYMENTOUTSTANDING
NUMBERBALANCEDISCOUNT
HAND CHECKS0.000.000.00
0.000.00
DRAFTS848,217.6048,217.60CR0.00
48,217.600.00
REG-CHECKS99 5,979,909.33 5,979,909.33CR0.00
5,979,909.330.00
EFT0.000.000.00
0.000.00
NON-CHECKS0.000.000.00
0.000.00
ALL CHECKS 107 6,028,126.93 6,028,126.93CR0.00
6,028,126.930.00
------------------------------------------------------------------------------------------------------------------------------------
ERRORS:0WARNINGS:0
Qbhf!62!pg!22:
ROSEMOUNT CITY COUNCIL
REGULAR MEETING PROCEEDINGS
SEPTEMBER 19, 2023
CALL TO ORDER/PLEDGE OF ALLEGIANCE
Pursuant to due call and notice thereof, a regular meeting of the Rosemount City Council was
held on Tuesday, September 19, 2023, at 7:00 PM. in Rosemount Council Chambers, 2875
145th Street West.
Mayor Weisensel called the meeting to order with Councilmembers Freske, Essler and Klimpel.
Councilmember Theisen was absent.
APPROVAL OF AGENDA
Motion by Weisensel Second by Freske
Motion to approve the agenda
Ayes: 4.
Nays: None. Motion carried.
PRESENTATIONS, PROCLAMATIONS AND ACKNOWLEDGMENTS
None
PUBLIC COMMENT
Arlos Strata (unable to confirm spelling of name)
8302 143rd Street West
Mr. Strata voiced concerns regarding the proposed Meta Facility; the environmental impact that
needs to be discussed and the possible land contamination on the site. He also questioned why
there is a focus on Rosemount for projects like this and why is Meta focused on this specific
piece of land? Mr. Strata stated residents should be asking these questions.
Michael Pekrik
13572 Dellwood Way
Rosemount, MN
Mr. Pekrik asked several questions regarding the proposed Meta facility; noting the current
Rosemount water restrictions that took place over the summer and how the proposed facility
will be a high water user and questioned what will happen to residents' water usage as Meta
begins using volumes of water? Will there be any tax increment financing to recruit Meta to
Rosemount? Also questioned if UMore Park has addressed the water quality issue and if the
contamination of soil has been addressed?
Kathy Pritchard
15703 Crystal Path
Rosemount, MN
Ms. Pritchard voiced concerns about the lack of charging stations for electric vehicles in
Qbhf!63!pg!22:
Rosemount. Then, she stated she is an independent and believes Meta is coming forward to
impact the First Amendment rights of citizens. Ms. Pritchard also discussed the timeline of the
project and how that is connected to the actions of President Biden. Ms. Pritchard also voiced
concerns about not receiving public notice of the area re-zoned from agriculture.
Karin Miller
17985 Jacquard Path
Lakeville, MN
Ms. Miller researched the UMore property and found articles discussing the vision of the
property that will impact Dakota County and the entire state. The findings stated the decisions
made regarding this property will impact not only Rosemount, but the entire Dakota County
and state. Ms. Miller would like more information regarding what the vision is and is concerned
about Meta being secretive and a lack of transparency regarding the project between the City
and the public.
Mayor Weisensel requested Ms. Miller provide her sources of information as the information
found in internet searches may not be the latest information. Mayor Weisensel also stated that
staff will prepare responses to these questions and will answer them to the best of their ability
at the next meeting.
RESPONSE TO PUBLIC COMMENT
None.
CONSENT AGENDA
Motion by Council Member Klimpel Second by Council Member Freske
Motion to approve consent agenda
Ayes: 4.
Nays: None. Motion Carried.
a.Bill Listings
b.Minutes of the September 5, 2023 Regular Meeting Minutes
c.Minutes of the September 5, 2023 Work Session Proceedings
d.Donation Acceptance - Rosemount Beyond The Yellow
e.Donation Acceptance from shoppers at Cub Foods
f.Request by Maplewood Development for approval of the Amber Fields 12th Addition
Final Plat
g.Request by Maplewood Development for approval of the Amber Fields 11th Addition
Final Plat
h.Donation Acceptance from the City of Mendota Heights
i.Request by Florence Omogho for a minor subdivision
Qbhf!64!pg!22:
j.Letter of Support for TED Grant with Dakota County
k.Declaration of Surplus Property – Parks and Recreation Department
l.Transportation Economic Development Infrastructure Grant
m.Authorize Letter of Support for NLC Board Appointment
PUBLIC HEARINGS
None
UNFINISHED BUSINESS
None
NEW BUSINESS
a.Establish Preliminary 2024 Budget and Levy
City Administrator Martin provided the latest numbers for the Preliminary Operating Budget and
Preliminary Levy for 2024. Mr. Martin expressed gratitude in the partnership in working with
councilmembers and staff in working to set the 2024 Budget.
Headlines from the budget include: record breaking growth in value of new construction, City’s tax
capacity valuation increased by 10.97% and new construction saved pre-existing homeowners $55.The
entirety of the City’s operational costs are growing by 2.4% and the remainder is cost of living wage /
benefit increases. The median valued home with no assessed value increase would see taxes decreased
by $7 from this Budget.
The draft 2024 Budget shows 10.21% increase to operating budget ($1,696,771) operating budget
results in 7.92% increase to tax levy ($1,155,040) and debt issuance for the PD PW Campus project
results in a 4.5% levy increase.
Councilmember Freske questioned the number of employees the City has and staff confirmed
approximately 102 full-time employees plus temporary staff. Councilmember Freske asked Mr. Martin
to further elaborate on the upcoming union negotiations and historically what the increases have been;
anywhere from 1.5% to 3.5% increase tied to the market competitiveness and inflation. Councilmember
Freske questioned how Rosemount compares to other Dakota County cities levy; a lot of 7-9% numbers
out there.
Councilmember Klimpel asked Mr. Martin to further speak to the increase in the budget for Oracle and
what the new addition means for City staff. Mr. Martin stated that the staff had been working off
extremely old software that doesn't meet modern-day needs and will provide additional features that
will benefit staff. Councilmember Klimpel questioned the number of miles added to Rosemount and Mr.
Martin will provide that number to council, but noted in the past 8 years a new Public Works position
for plow driving has not been added.
Councilmember Essler praised staff for controlling the budget with the understanding the school district
passed a referendum last year as the tax statement includes the City, School and County taxes.
Qbhf!65!pg!22:
Mayor Weisensel stated the importance of Oracle and the impact the software will have on service to
residents and for staff.
The Truth in Taxation hearing will be held on December 5, 2023 at 7pm.
Motion by Council Member Essler Second by Council Member Freske
Motion to Adopt a Resolution Setting the Preliminary 2024 General Fund Operating Budget,
the Preliminary 2024 C.I.P. Budgets, the Preliminary 2024 Insurance Budget, the Preliminary
2024 Port Authority Operating Levy and the Preliminary 2023 Levy and a Budget Hearing
Date of December 5, 2023 at 7:00 p.m. at City Hall.
Ayes: 4.
Nays: None. Motion Carried.
ANNOUNCEMENTS
a.City Staff Updates
Parks and Recreation Director Schultz recapped the successful Food Truck Festival.
b.Upcoming Community Calendar
Mayor Weisensel reviewed the calendar of events and upcoming meetings.
ADJOURNMENT
There being no further business to come before the City Council at the regular council meeting
and upon a motion by Weisensel and a second by Essler the meeting was adjourned at 8:11
p.m.
Respectfully submitted,
Erin Fasbender
City Clerk
Qbhf!66!pg!22:
EXECUTIVE SUMMARY
City Council Regular Meeting: October 3, 2023
AGENDA ITEM: Amendments to City Code, Title 10: Water AGENDA SECTION:
Resources Management CONSENT AGENDA
PREPARED BY: Jane Byron, Stormwater Specialist AGENDA NO. 6.c.
ATTACHMENTS: Resolution, Ordinance APPROVED BY: LJM
RECOMMENDED ACTION: Motion to adopt resolution approving summary publication of amendments to Title 10
of City Code and Motion to approve Rosemount amendments to Title 10 of City Code.
BACKGROUND
Title 10 of the Rosemount City Code covers water resources regulations. Chapter 1 focuses on
pollution prevention from construction sites and installation of permanent stormwater control
facilities, such as stormwater ponds. Chapter 2 focuses on preventing contaminants from entering the
stormwater system through spills, illegal dumping, illegal connections to the stormwater system, and
materials management on properties.
Updates to the Code are required to come into compliance with the Minnesota Municipal Seperate
Storm Sewer System (MS4) and Construction Stormwater (CSW) National Pollutant Discharge
Elimination System (NPDES) administered by the Minnesota Pollution Control Agency (MPCA).
Additional updates are proposed to improve clarity and city operations.
The proposed updates to the Code fall into the following general categories:
Clarification that construction projects requiring a CSW NPDES Permit will be reviewed by the
city for conformance with stormwater requirements.
Storage requirements for deicing salts.
Storage requirements for certain materials to prevent water resources and stormwater
pollution.
Clarification regarding collection of project/permit review, administration, and enforcement
costs.
Clarification of grading permit applicability.
Project/permit stormwater review, administration, and enforcement efficiency updates.
Language cleanup and housekeeping.
RECOMMENDATION
Staff recommends approving amendments to Title 10 of City Code as summarized in the attached
resolution.
Qbhf!67!pg!22:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 2023 - 109
RESOLUTION APPROVING SUMMARY PUBLICATION
OF ORDINANCE NO. 2023 - 05
WHEREAS, the City has adopted the above referenced ordinance; and
WHEREAS, the verbatim text of the ordinance is cumbersome, and the expense of publication of
the complete text is not justified; and
WHEREAS, the following summary clearly informs the public of the intent and effect of the
ordinance.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Rosemount that
the following summary is hereby approved for official publication:
SUMMARY PUBLICATION
ORDINANCE NO. 2023-05
AN ORDINANCE AMENDING TITLE 10 OF THE CITY CODE PERTAINING TO AN
ORDINANCE AMENDING ORDINANCE NO. 2015-01, 2015-05, AND XVI.61 AND
BRINGING CITY REGULATIONS INTO CONFORMANCE WITH THE MOST CURRENT
MINNESOTA CONSTRUCTION STORMWATER AND SMALL MUNICIPAL SEPARATE
STORM SEWER SYSTEMS NATIONAL POLLUTANT DISCHARGE ELIMNATION
SYSTEM PERMITS; UPDATING CONSTRUCTION SITE STORMWATER REGULATIONS;
AND UPDATING WATER POLLUTION PREVENTION REGULATIONS;
On October 3, 2023, the Rosemount City Council adopted an ordinance designated as
Ordinance No. 2023-05 the title of which is stated above. This summary of the ordinance is
published pursuant to Title 10 of the City Charter/Code. The purpose of the ordinance is to, by
the adoption of amendments to the code, comply with current state stormwater general permits
regulating construction sites and city stormwater systems and improve procedures of city
stormwater approvals, stormwater permitting programs, and water pollution prevention
enforcement. Compliance with state stormwater permits is required; and improvements to
permitting, approval, and enforcement procedures associated with stormwater programs
streamline the process, lead to swifter resolutions of pollution incidents, prevent more
pollution incidents from occurring, and ensure that local taxpayers don’t bear the brunt of
costs associated with new development, pollution mitigation, and regulation violations. Copies
of the ordinance are available for public inspection in the office of the City Clerk during
normal business hours or upon request by calling 651-322-2003.
Erin Fasbender, City Clerk
432854v1 MDT NE136-8
Qbhf!68!pg!22:
BE IT FURTHER RESOLVED, that the City Clerk is directed to keep a copy of the ordinance
in her office at City Hall for public inspection and to post a full copy of the ordinance in a public
place in the City for a period of two weeks.
Adopted by the City Council of the City of Rosemount, Minnesota this 3rd day of October, 2023.
Jeffery D. Weisensel, Mayor
ATTEST:
Erin Fasbender, City Clerk
432854v1 MDT NE136-8
Qbhf!69!pg!22:
TITLE 10
WATER RESOURCES MANAGEMENT
CHAPTER 1
SURFACE WATER MANAGEMENT
SECTION:
10-1-1: Statutory Authorization
10-1-2: Findings
10-1-3: Purpose
10-1-4: Definitions
10-1-5: Scope And Effect
10-1-6: Incorporation By Reference
10-1-7: Development Site Stormwater Management Plan Approval Procedures
10-1-8: Plan Review Procedure
10-1-9: Approval Standards
10-1-10: Surface Water Related Fees
10-1-11: Wetlands
10-1-12: Erosion And Sediment Control
10-1-13: Stormwater Management For Permanent Facilities
10-1-14: Lawn Fertilizer Regulations
10-1-15: Penalty
10-1-16: Appeals
10-1-17: Other Controls
10-1-1: STATUTORY AUTHORIZATION:
This chapter is adopted pursuant to Minnesota statutes, section 462.351 (1990). (Ord.
2015-01, 2-17-2015)
10-1-2: FINDINGS:
The city hereby finds that uncontrolled and inadequately planned use of wetlands,
woodlands, natural habitat areas, areas subject to soil erosion and areas containing
restrictive soils adversely affects the public health, safety and general welfare by impacting
water quality and contributing to other environmental problems, creating nuisances,
impairing other beneficial uses of environmental resources and hindering the ability of the
city to provide adequate water, sewage, flood control, and other community services. In
addition, extraordinary public expenditures may be required for the protection of persons
and property in such areas and in areas which may be affected by unplanned land usage.
(Ord. 2015-01, 2-17-2015)
10-1-3: PURPOSE:
The purpose of this chapter is to promote, preserve and enhance the natural resources
within the city and protect them from adverse effects occasioned by poorly sited
development or incompatible activities: by regulating land disturbing or development
Qbhf!6:!pg!22:
activities that would have an adverse and potentially irreversible impact on water quality
and unique and fragile environmentally sensitive land; by minimizing conflicts and
encouraging compatibility between land disturbing and development activities and water
quality and environmentally sensitive lands; and by requiring detailed review standards
and procedures for land disturbing or development activities proposed for such areas,
thereby achieving a balance between urban growth and development and protection of
water quality and natural areas. (Ord. 2015-01, 2-17-2015)
10-1-4: DEFINITIONS:
For the purposes of this chapter, the following terms, phrases, words, and their derivatives
shall have the meanings stated below. When not inconsistent with the context, words used
in the present tense include the future tense, words in the plural number include the
singular number, and words in the singular number include the plural number. The word
"shall" is always mandatory and not merely directive.
APPLICANT: Any person who wishes to obtain a building permit, grading permit, zoning or
subdivision approval.
BEST MANAGEMENT PRACTICES (BMPs): The most effective and practicable means of
erosion prevention and sediment control, and water quality management practices that are
the most effective and practicable means to control, prevent, and minimize degradation of
surface water, including avoidance of impacts, construction phasing, minimizing the length
of time soil areas are exposed, prohibitions, pollution prevention through good
housekeeping, and other management practices published by state or designated area wide
planning agencies.
BUILDING INSPECTOR: A person who has received training and is given authority by the
city of Rosemount to inspect and maintain erosion and sediment control practices.
CHIEF BUILDING OFFICIAL OR BUILDING OFFICIAL: The building official designated by the
city as the chief building official or a representative thereof.
CITY: The city of Rosemount.
CITY ENGINEER: The professional engineer designated by the city as city engineer or a
representative thereof.
CLEARING: Any activity that removes the vegetative surface cover.
CONSERVATION EASEMENT: Legal land preservation agreement between a landowner and
a municipality or a qualified land protection organization. The easement confers the
transfer of usage rights from one party to another.
CONSTRUCTION ACTIVITY: A disturbance to the land that results in a change in the
topography, existing soil cover (both vegetative and nonvegetative), or the existing soil
topography that may result in accelerated stormwater runoff, leading to soil erosion and
movement of sediment into surface waters or drainage systems. Examples of construction
activity may include clearing, grading, filling and excavating. Construction activity includes
the disturbance of less than one acre of total land area that is a part of a larger common
plan of development or sale if the larger common plan will ultimately disturb one acre or
more.
CONTROL MEASURE: A practice or combination of practices to control prevent erosion,
capture sediment transport, control wastes, or otherwiseand attendant prevent pollution.
Qbhf!71!pg!22:
CONTROL PLAN: A plan indicating the specific measures and sequencing to be used to
control grading, sediment and erosion on a development site during and after construction.
DETENTION FACILITY: A permanent natural or manmade structure, including wetlands,
for the temporary storage of runoff which contains a permanent pool of water.
DEVELOPER: Any person, group, firm, corporation, sole proprietorship, partnership, state
agency, or political subdivision thereof engaged in a land disturbance activity.
DEVELOPMENT: Any land disturbance activity that changes the site's runoff characteristics
in conjunction with residential, commercial, industrial or institutional construction or
alteration.
DEWATERING: The removal of water for construction activity. It can be a discharge of
appropriated surface water or ground water to dry and/or solidify a construction site. It
may require Minnesota Ddepartment of Nnatural Rresources permits to be appropriated
and if contaminated may require other MPCA permits to be discharged.
DNR OR MNDNR: Minnesota Department of Natural Resources
DRAINAGEWAY: Any channel that conveys surface runoff throughout the site.
-EASEMENT: A legal land preservation agreement between a landowner and a municipality
or a qualified land protection organization. The easement confers the transfer of usage
rights from one party to another.
EROSION: Any process that wears away the surface of the land by the action of water or
wind.
EROSION CONTROL: Refers to methods employed to prevent erosion. Examples include soil
stabilization practices, horizontal slope grading, temporary or permanent cover, and
construction phasing.
EROSION PREVENTION: Any measures employed to prevent erosion. Examples include, but
are not limited to: soil stabilization practices, limited grading, mulch, temporary or
permanent cover, and construction phasing.
EXPOSED SOIL OR EXPOSED SOIL AREAS: All areas of the construction site where the
vegetation (trees, shrubs, brush, grasses, etc.) or impervious surface has have been
removed, thus rendering the soil more prone to erosion. This includes topsoil stockpile
areas, borrow areas and disposal areas within the construction site.
FINAL GRADE: Excavation or fill of material to final smooth condition. Final grade
completed as part of individual site development.
FINAL STABILIZATION: A. All soil disturbing activities at the site have been completed and
a uniform (e.g., evenly distributed, without large bare areas) perennial vegetative cover
with a density of seventy percent (70%) of the native background vegetative cover for the
area has been established on all unpaved areas and areas not covered by permanent
structures, or equivalent permanent stabilization measures (such as the use of riprap,
gabions, or geotextiles) have been employed;
B. For individual lots in residential construction by either: 1) the homebuilder
completing final stabilization as specified above, or 2) the homebuilder establishing
temporary stabilization including perimeter controls for an individual lot prior to
occupation of the home by the homeowner and informing the homeowner of the need for,
and benefits of, final stabilization (Homeowners typically have an incentive to put in the
Qbhf!72!pg!22:
landscaping functionally equivalent to final stabilization as quick as possible to keep mud
out of their homes and off sidewalks and driveways.); or
C. For construction projects on land used for agricultural purposes (e.g., pipelines across
crop or range land) final stabilization may be accomplished by returning the disturbed land
to its preconstruction agricultural use. Areas disturbed that were not previously used for
agricultural activities, such as buffer strips immediately adjacent to surface waters and
drainage systems, and areas which are not being returned to their preconstruction
agricultural use must meet the final stabilization criteria in subsection A or B of this
definition.
FLOOD FRINGE: The portion of the floodplain outside of the floodway.
FLOODPLAIN: The areas adjoining a watercourse or water basin that have been or may be
covered by a regional flood.
FLOODWAY: The channel of the watercourse, the bed of water basins, and those portions of
the adjoining floodplains that are reasonably required to carry and discharge floodwater
and provide water storage during a regional flood.
GRADING: Changing elevation or smoothing of the ground surfaces; Eexcavation or fill of
material, including the resulting conditions thereof.
GRADING, EROSION CONTROL AND SEDIMENT CONTROL PLANS: A set of plans prepared
by or under the direction of a licensed professional engineer. Plans are required to meet
the specifications as detailed in the city of Rosemount regulations and standards, including
those of the Rosemount "Plan Requirements And Design Guidelines".Engineering
Guidelines and Rosemount Comprehensive Surface Water Management Plan,
GROUNDWATER: Water contained below the surface of the earth in the saturated zone
including, without limitation, all waters whether under confined, unconfined, or perched
conditions, in near surface unconsolidated sediment or regolith, or in rock formations
deeper underground.
HYDRIC SOILS: Soils that are saturated, flooded, or ponded long enough during the growing
season to develop anaerobic conditions in the upper part.
HYDROPHYTIC VEGETATION: Macrophytic plant life growing in water, soil or on a
substrate that is at least periodically deficient in oxygen as a result of excessive water
content.
IMPERVIOUS SURFACE: A constructed hard surface that either prevents or retards the
entry of water into the soil and causes water to run off the surface in greater quantities and
at an increased rate of flow than prior to development. Examples include rooftops,
sidewalks, patios, driveways, parking lots, storage areas, and concrete, asphalt, or gravel
roads.
LAND DISTURBING OR DEVELOPMENT ACTIVITIES: Any change of the land surface
including removing vegetative cover, removing structures and exposing native soils
underneath, excavating, filling, grading, and the construction of any structure.
MPCA: Minnesota Pollution Control Agency
MS4 PERMIT: Small Municipal Separate Storm Sewer Systems NPDES Permit
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES): The program for
issuing, modifying, revoking, reissuing, terminating, monitoring, and enforcing permits
under the clean water actUnited States Clean Water Act , as amended (. Applicable federal
Qbhf!73!pg!22:
regulations include 33 U.S.C. 1251 et seq. Section 1342 and 40 CFR parts 122, 123, 124 and
450). (sections 301, 318, 402, and 405) and United States code of federal regulations title
33, sections 1317, 1328, 1342, and 1345. The NPDES Programs regulating discharges to
Wwaters of the United States for construction stormwater, industrial stormwater, and
municipal stormwater are administered by the Minnesota Pollution Control Agency
(MPCA) in the State of Minnesota.
PERIMETER CONTROL: A barrier that prevents sediment from leaving a site by filtering
sediment laden runoff or diverting it to a sediment trap or basin. Examples include silt
fence, woodchip logs, compost logs, and stabilized soil berms.
PERMANENT COVER: Final site stabilization. Examples include grass, gravel, asphalt, and
concrete. See also the definition of Final Stabilization.
PERMIT: A permit issued by the municipality city for the construction or alteration of
ground.
PERSON: Any individual, firm, organization, corporation, partnership, franchisee,
association or governmental entity.
PERMITTEE: Any person who has received a building permit, grading permit, zoning
approval or subdivision approval.
PHASING: Clearing a parcel of land in distinct phases, with the stabilization of each phase
completed before the clearing of the next.
PLAN REQUIREMENTS AND DESIGNSPECS OR ENGINEERING GUIDELINES: Manuals
detailing city specifications for all plan requirements.
PUBLIC WATERS: Waters of the state as defined in Minnesota statutes, section 103G.005,
subdivision 15.
ROUGH GRADE: Excavation or fill of materialGrading to a condition suitable for general
maintenance.
SEDIMENT: The product of an erosion process; solid material both mineral and organic,
that is in suspension, is being transported, or has been moved by water, wind, or ice, and
has come to rest on the earth's surface either above or below water level.
SEDIMENT CONTROL: Measures and methods employed to prevent sediment from leaving
the site. Sediment control practices include silt fences, sediment traps, earth dikes,
drainage swales, check dams, subsurface drains, pipe slope drains, storm drain inlet
protection, and temporary or permanent sedimentation basins.
SEDIMENTATION: The process or action of depositing sediment.
SITE: A parcel of land or a contiguous combination thereof, where grading work is
performed as a single unified operation.
SITE DEVELOPMENT: Improvements and structures for the control of erosion, runoff, and
grading.
SOIL: The unconsolidated mineral and organic material on the immediate surface of the
earth. For the purposes of this chapter temporary stockpiles of clean sand, gravel,
aggregate, concrete or bituminous materials (which have less stringent protection) are not
considered "soil" stockpiles.
STABILIZED: The exposed ground surface has been covered by appropriate materials such
as mulch, staked sod, riprap, wood fiber blanket, or other material that prevents erosion
from occurring. Grass seeding is not stabilization.
Qbhf!74!pg!22:
STANDARD PLATES: General drawings having or showing similar characteristics or
qualities that are representative of a construction practice or activity.
START OF CONSTRUCTION: The first land disturbing activity associated with a
development, including land preparation such as clearing, grading, and filling; installation
of streets and walkways; excavation for basements, footings, piers, or foundations; erection
of temporary forms; and installation of accessory buildings such as garages.
STORMWATER: Defined under Minnesota rules 7077.0105, subp. 41(b), and includes
Surface flows of water generated from precipitation events. Stormwater includesPp
precipitation runoff, stormwater runoff, snowmelt runoff, and any other surface runoff and
drainage.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP): A plan for stormwater
discharge that includes erosion prevention measures, and sediment controls, waste
controls, and pollution prevention measures that, when implemented, will decrease soil
erosion on a parcel of land and decrease off site nonpoint pollution in surface water and
groundwater.
STRUCTURE: Anything manufactured, constructed or erected which is normally attached to
or positioned on land, including portable structures, earthen structures, roads, parking lots,
and paved storage areas.
SURFACE WATER OR WATERS: All streams, lakes, ponds, marshes, wetlands, reservoirs,
springs, rivers, drainage systems, waterways, and watercourses, and irrigation systems
whether natural or artificial, public or private.
TEMPORARY EROSION PROTECTION OR TEMPORARY COVER: Methods employed to
prevent erosion. Examples of temporary cover include disc anchored straw, wood fiber
blanket, wood chips, and erosion netting.
WATERCOURSE: Any body of water, including, but not limited to, lakes, ponds, rivers,
streams, and bodies of water delineated by Rosemount.A channel in which a flow of water
occurs either continuously or intermittently, whether natural or artificially constructed.
Examples include, but are not limited to, streams, rivers, and ditches.
WATERWAY: A channel that directs surface runoff to a watercourse or to the public storm
drain.
WETLAND OR WETLANDS: Defined in Minnesota rules 7050.0130, subp. F and includes
those areas that are inundated or saturated by surface water or groundwater at a
frequency and duration sufficient to support, and that under normal circumstances do
support, a prevalence of vegetation typically adapted for life in saturated soil conditions.
Wetlands generally include swamps, marshes, bogs, and similar areas. Constructed
wetlands designed for wastewater treatment are not waters of the state. Wetlands must
have the following attributes:
A. A predominance of hydric soils;
B. Inundated or saturated by surface water or groundwater at a frequency and duration
sufficient to support a prevalence of hydrophytic vegetation typically adapted for life in a
saturated soil condition; and
C. Under normal circumstances support a prevalence of such vegetation. (Ord. 2015-01,
2-17-2015; amd. Ord. 2015-05, 7-7-2015)
Qbhf!75!pg!22:
10-1-5: SCOPE AND EFFECT:
A. Applicability:
1. Every applicant for a subdivision approval or a permit to allow land disturbing
activities must submit a stormwater management plan to the city engineer. No subdivision
approval, or grading permit to allow land disturbing activities, shall be issued until
approval of the stormwater management plan or a waiver of the approval requirement has
been obtained in strict conformance with the provisions of this chapter.
2. Every applicant for a subdivision approval or a grading permit to allow wetland
disturbing activities must submit a wetland assessment report to the city engineer. No
subdivision approval, or grading permit to allow wetland disturbing activities shall be
issued until approval of the wetland replacement plan application or a certificate of
exemption has been obtained in strict conformance with the provisions of this chapter and
the Minnesota wetland conservation act. This chapter applies to all land, public or private,
located within the city.
3. Every applicant for a building permit, subdivision approval, or a grading permit to
allow land disturbing activities must adhere to erosion and sediment and waste control
design criteria, specifications, inspection requirements, and maintenance requirements
erosion control measure standards and specifications in strict conformance with the
provisions of this chapter and the its specifications and be consistent with national
pollution discharge elimination permit (NPDES general construction permit)applicable
NPDES Permits or as approved by the city engineer or designated representative.
4. A grading permit is required for land disturbing activities unless the provisions of this
chapter have already been met through a building permit or a current subdivision approval
where the subdivision agreement has been fully executed. This provision shall not prohibit
the building official from imposing additional conditions and special requirements
consistent with international building code. (Ord. 2015-01, 2-17-2015)
B. Exemptions: The provisions of this chapter do not apply to:
1. Any part of subdivision if a plat for the subdivision has been approved by the city
council on or before the effective date hereof;
2. Any land disturbing activity for which plans have been approved by the Vermillion
River Watershed Management Organization within six (6) months prior to the effective
date hereof;
3. Installation of fence, sign, telephone, and electric poles and other kinds of posts or
poles unless the installation project results in an acre or more of land disturbing activities;
4. Excavations and/or land moving activitiesLand disturbing activities involving less
than thirty thirty-eight (38) cubic meters (50 cubic yards) of soil and less than one acre of
disturbance unless those activities are part of a common plan of development or sale that
will ultimately disturb one or more acres;
5. Emergency work to protect life, limb, or property.
C. Waiver: The city council may waive any requirement of this chapter upon making a
finding that compliance with the requirement will involve an unnecessary hardship and the
waiver of such requirement will not adversely affect the standards and requirements set
forth in this chapter. The city council may require as a condition of the waiver such
Qbhf!76!pg!22:
dedication or construction, or agreement to dedicate or construct, as may be necessary to
adequately meet said standards and requirements. (Ord. 2015-05, 7-7-2015)
10-1-6: INCORPORATION BY REFERENCE:
The following are incorporated into this chapter by reference:
A. The Rosemount comprehensive wetland management plan.
B. The Rosemount surface water management plan.
C. The Rosemount stormwater utility policy.
D. The Minnesota wetland conservation act.
E. The national pollutant discharge elimination system permit, MN R100001 (NPDES
general construction permit) issued by the Minnesota pollution control agency, August 1,
2013, as amended.The most current and applicable National Pollutant Discharge
Elimination System (NPDES) Permits (Construction Stormwater, Small Municipal Separate
Storm Sewer Systems, Industrial Stormwater, etc.) issued and administered by the State of
Minnesota that are in effect.
F. City of Rosemount engineering guidelines
G. City of Rosemount general specifications and standard detail plates
(Ord. 2015-01, 2-17-2015)
10-1-7: DEVELOPMENT SITE STORMWATER MANAGEMENT PLAN APPROVAL
PROCEDURES:
A. Application: An written application for stormwater management plan approval, along
with the proposed stormwater management plan and grading plan, shall be filed with the
city engineer and shall include a statement indicating the grounds upon which the approval
is requested, that the proposed use is permitted by right or as an exception in the
underlying zoning district, and adequate evidence showing that the proposed use will
conform to the standards set forth in this chapter. Prior to applying for approval of a
stormwater management plan, an applicant may have the stormwater management and
grading plans reviewed by the appropriate departments of the city.
The applicant shall submit Ffive (5) sets of clearly legible blue or black lined copies of all
drawings on bond paper upon request by the Cityare required. Required information shall
be submitted to the city engineer and shall be accompanied by a receipt from the finance
department evidencing the payment of all required fees for processing and approval as set
forth in section 10-1-9 of this chapter, and security when required by subsection 10-1-8D
of this chapter in the amount to be calculated in accordance with that subsection.
Stormwater management and grading plan drawings shall be prepared to a scale
appropriate to the site of the project and suitable for the review to be performed. At a
minimum the scale shall be one to six hundred (1:600) (1 inch = 50 feet). Drawing sheets
shall be twenty twotwenty-two by thirty fourthirty-four inches (22 x 34").
B. Stormwater Management Plan: At a minimum, the stormwater management plan shall
contain the following:
Qbhf!77!pg!22:
1. Existing Site Map: A map of existing site conditions showing the site and immediately
adjacent areas within two hundred feet (200'), and including:
a. The names, addresses, telephone numbers, and fax numberemails of the applicant,
owner, developer, surveyor, engineer and contact person.
b. The section, township and range, north point oriented either up or to the right, date
and scale of drawing and number of sheets.
c. Plat names and block, lot and outlot boundaries for adjacent platted property and
full property identification numbers for adjacent unplatted property.
d. Location of the tract by an insert map at a scale sufficient to clearly identify the
location of the property and giving such information as the names and numbers of
adjoining roads, railroads, utilities, subdivisions, towns and districts or other landmarks.
e. Location and indication of demolition, relocation, or abandonment of existing
structures, driveways, septic systems, alternate septic systems and wells.
f. Existing underground and overhead utilities, easements and rights of way.
g. Existing topography with a contour interval appropriate to the topography of the
land but in no case having a contour interval greater than two feet (2').
h. Existing topographic contours extending beyond the site two hundred feet (200')
or enough to completely show the limits of drainage basins not fully contained within the
proposed plat limits.
i. A delineation of all streams, rivers, ponds, public waters and wetlands located on
and immediately adjacent to the site, including depth of water, a statement of general water
quality and any classification given to the water body or wetland by the Minnesota
department of natural resources (include MNDNR number and ordinary high water level),
the Minnesota pollution control agency, the U.S. fish and wildlife service, and/or the United
States army corps of engineers.
j. The city's most recent stormwater management plan district number along with
normal and high water levels for ponds.
k. Location and dimensions of existing stormwater drainage systems and natural
drainage patterns on and immediately adjacent to the site delineating in which direction
and at what rate stormwater is conveyed from the site, identifying the receiving stream,
river, public water, or wetland, and setting forth those areas of the unaltered site where
stormwater collects.
l. A description of the soils of the site, including a map indicating soil types of areas to
be disturbed as well as a soil report containing information on the suitability of the soils for
the type of development proposed and for the type of sewage disposal proposed and for
stormwater infiltration and describing any remedial steps to be taken by the developer to
render the soils suitable.
m. Vegetative cover such as brush, grass and trees, including tree diameters, and
clearly delineating any vegetation proposed for removal.
n. The 10-year and 100-year floodplains, flood fringes and floodways.
2. Site Grading Plan: Drawings shall be prepared to a scale appropriate to the site of the
project and suitable for the review to be performed. At a minimum the scale shall be one to
six hundred (1:600) (1 inch = 50 feet). Drawing sheets shall be twenty twotwenty-two by
thirty fourthirty-four inches (22 x 34"). A site grading plan shall include:
Qbhf!78!pg!22:
a. The section, township and range, north point oriented either up or to the right,
date, revision number, scale of drawing and number of sheets.
b. Signature and Minnesota license number of the professional land surveyor or
professional engineer under whose supervision the plan was prepared.
c. Proposed septic systems, alternative septic systems and wells.
d. Locations and dimensions of all proposed land disturbing activities and any
phasing of those activities.
e. Locations and dimensions of all temporary soil or dirt stockpiles.
f. Existing topography with a contour interval appropriate to the topography of the
land but in no case having a contour interval greater than two feet (2').
g. Existing topographic contours extending beyond the site two hundred feet (200')
or enough to completely show the limits of drainage basins not fully contained within the
proposed plat limits.
h. Finished grading shown at contours at the same interval as provided above or as
required to clearly indicate the relationship of proposed changes to existing topography
and remaining features.
i. All lot corner elevations and bench marks utilized.
j. The proposed footprint and intended use of any structures or driveways to be
constructed on the site.
k. A delineation of all streams, rivers, ponds, public waters and wetlands located on
and immediately adjacent to the site, including depth of water, a statement of general water
quality and any classification given to the water body or wetland by the Minnesota
department of natural resources (include MNDNR number and ordinary high water level),
the Minnesota pollution control agency, the U.S. fish and wildlife service, and/or the United
States army corps of engineers.
l. The city's most recent stormwater management plan district number along with
pond storage volume and normal and high water levels for ponds.
m. Emergency overflow routes from all low points, elevation of high point along
overflow route and directional flow arrows.
n. A drainage plan of the developed site delineating 10-year and 100-year design
drainage area/watershed and hydrologic/hydraulic calculations verifying location and
capacity of all overland drainage routes.
o. Access routes for maintenance to all inlets, outlets, manholes, and lift stations at
ponding areas proposed.
p. A clear delineation and tabulation of all areas which shall be paved or surfaced,
including a description of the surfacing material to be used.
q. A landscape plan, drawn to an appropriate scale, including dimensions and
distances and the location, type, size and description of all proposed landscape materials
which will be added to the site as part of the development.
r. Any other information pertinent to the particular project which in the opinion of
the applicant or the city engineer is necessary for the review of the project.
Qbhf!79!pg!22:
s. Within thirty (30) days after completion of site development as per the approved
grading plan, and prior to the approval of individual building permits, the developer shall
provide the city with an as built grading plan.
3. Erosion And Sediment Control Plans: At a minimum, a separate erosion control plan
is required that will accompany the grading plan. No land shall be disturbed until the plan
is approved by the city engineer and conforms to the standards set forth herein. All plans
shall be consistent with national pollutant discharge elimination permits (NPDES
construction general permit and MS4 permit) requirements, Rosemount engineering
guidelines, the Rosemount comprehensive surface water management plan, Rosemount
spec and detail plates, and the filing or approval requirements of relevant watershed
districts, watershed management organizations, ditch authorities, soil and water
conservation districts, or other regulatory bodies.
a. The erosion and sediment control plan shall include the following:
(1) A project description of the nature and purpose of the land disturbing activity
and the amount of grading involved.
(2) All existing site conditions, including existing soils, topography, vegetation
(including size and type cover), natural resources and drainage.
(3) All critical erosion areas for areas on the site that have potential for serious
erosion problems.
(4) A description of how the site will be stabilized after construction is completed,
including specifications.
(5) A schedule of regular inspections and repair of erosion and sediment control
structures.
(6) A project schedule describing the projected time line for completion of all site
activities and the sequence of construction of the development site, including stripping and
clearing; rough grading; construction of utilities, infrastructure, and buildings; and final
grading and landscaping. Sequencing shall identify the expected date on which clearing will
begin, phasing of clearing or grading, the estimated duration of exposure of cleared areas,
areas of clearing, installation of temporary erosion and sediment control measures, and
establishment of permanent vegetation.
(7) All erosion and sediment control measures necessary to meet the objectives of
this local regulation and state and federal regulations throughout all phases of construction
and after completion of development of the site. Depending upon the complexity of the
project, the drafting of intermediate plans may be required at the close of each season. All
of the following requirements shall be adhered to during the construction of the site:
(A) Stabilize all soils and soil stockpiles within the shortest feasible period of time,
and according to the time lines established in the NDPES construction general permits.
(B) Prevent sediment damage to adjacent properties and other designated areas.
(C) Develop land in increments of workable sizes so that adequate erosion and
sediment controls can be provided as construction progresses.
(D) Coordinate erosion and sediment control measures with the different stages of
construction. Install appropriate control measures prior to development when necessary to
control erosion.
(E) Engineer the construction of steep slopes.
Qbhf!7:!pg!22:
(F) Use of temporary sediment basins is encouraged when construction projects
will impact steep slopes or when highly erodible soils are present. Temporary sediment
basins must be designed according to NPDES construction general permit requirements.
(G) Protect storm sewers and paved roads from the entrance of sediment.
(H) Manage solid and hazardous wastes on site and properly dispose of wastes.
(I) When working in or crossing water bodies, take precautions to contain
sediment.
(J) Ensure that a trained person will regularly inspect the construction site,
according to the time lines established in the NPDES construction general permits.
(K) Maintain all temporary or permanent erosion and sediment control practices,
according to the time lines established in the NPDES construction general permits.
(L) Establish permanent vegetation cover upon completion of the construction
activity.
(M) Dispose of temporary erosion and sediment control measures following final
stabilization.
(N) Seeding mixtures and rates, types of sod, method of seedbed preparation,
expected seeding dates, type and rate of lime and fertilizer application, and kind and
quantity of mulching for both temporary and permanent vegetative control measures.
Required specifications are detailed in the city of Rosemount general specifications and
"Plan Requirements And Design Guidelines"engineering guidelines manual.
(O) Use methods of dewatering to reduce the discharge of turbid or sediment
laden waters and prevent nuisance conditions.
(P) Use methods to manage solid and hazardous wastes, and limit the exposure of
stormwater to any products, materials, and wastes and to prevent the contamination of
stormwater.
4. Not withstandingNotwithstanding those items listed for inclusion in the Stormwater
Management Plan above, all projects must show conformance with plans, policies,
regulations, and procedures incorporated by reference in section 10-1-6 of this chapter.
54. Stormwater Management For Permanent Facilities: Stormwater control facilities
included as part of the final design for a permanent development shall be addressed in
section 10-1-13 of this chapter. Postconstruction stormwater management BMPs must be
submitted to the city for review and approval before construction activity may begin.
65. Waiver: Any or all of the above plan requirements in this subsection B may be
waived by the city engineer. (Ord. 2015-01, 2-17-2015)
10-1-8: PLAN REVIEW PROCEDURE:
A. Process: Stormwater management plans meeting the requirements of section 10-1-7
of this chapter shall be submitted to the city engineer for review in accordance with the
standards of section 10-1-9 of this chapter.
B. Duration: Approval of a plan submitted under the provisions of this chapter shall
expire one year after the date of approval unless construction has commenced in
accordance with the plan. However, if prior to the expiration of the approval, the applicant
Qbhf!81!pg!22:
makes a written request to the city engineer for an extension of time to commence
construction setting forth the reasons for the requested extension, the city engineer may
grant one extension of not greater than one single year. Receipt of any request for an
extension shall be acknowledged by the city engineer within fifteen (15) days. The city
engineer shall make a decision on the extension within thirty (30) days of receipt. Any plan
may be revised in the same manner as originally approved.
C. Conditions: A stormwater management plan may be approved subject to compliance
with conditions reasonable and necessary to ensure that the requirements contained in
this chapter are met. Such conditions may, among other matters, limit the size, kind or
character of the proposed development, require the construction of structures, drainage
facilities, storage basins and other facilities, require replacement of vegetation, establish
required monitoring procedures, require turf is established in specified areas, require
erosion control measures have been removed and their removal area inspected, and
landscaping is completed, stage the work over time, require alteration of the site design to
ensure buffering, and require the conveyance to the city or other public entity of certain
lands or interests therein.
D. Security: Prior to approval of any stormwater management plan, the applicant shall
submit an agreement to construct such required physical improvements, to dedicate
property or easements, or to comply with such conditions as may have been agreed to.
Such agreement shall be accompanied by irrevocable, automatically renewing letter of
credit, performance bond or other improvement security in the amount specified by the
current city ordinance for fee schedule. The security shall cover all costs of engineering and
inspection, site improvements, street sweeping, repairs to erosion control measures, and
maintenance of improvements for such period as specified by the city. Such security shall
be provided prior to the release of the grading permit. The security shall be released after
final stabilization is complete, erosion control measures have been removed and their
removal area inspected. The agreement shall guarantee completion and compliance with
conditions within a specific time, which time may be extended in accordance with
subsection B of this section.
The adequacy, conditions and acceptability of any agreement and security shall be
determined by the city council or any official of the city as may be designated by resolution
of the city council. (Ord. 2015-01, 2-17-2015)
10-1-9: APPROVAL STANDARDS:
No stormwater management plan which fails to meet the standards contained in this
section shall be approved by the city engineer.
A. Surface Water Management Plan: See the most recent version of the city's surface
water management plan. All stormwater management plans shall be consistent with it.
B. Site Erosion And Sediment Control: Erosion control measures specified in grading
plans must meet all requirements of section 10-1-12 of this chapter.
C. Wetlands: Plans must meet all requirements for wetlands contained in section 10-1-
11 of this chapter.
Qbhf!82!pg!22:
D. Comprehensive Wetland Management Plan: See the most recent version of the city's
comprehensive wetland management plan. All stormwater management plans shall be
consistent with it.
E. Stormwater Management Criteria For Permanent Facilities: Plans must meet all
requirements for permanent facilities contained in section 10-1-13 of this chapter. See the
most recent version of the city's surface water management plan. All stormwater
management plans shall be consistent with it.
F. Design Standards: See the most recent version of the city's surface water management
plan. All stormwater management plans shall be consistent with it.
G. Steep Slopes: No land disturbing or development activities shall be allowed on slopes
of twenty five percent (25%) or more.
H. Retaining Walls: Retaining walls shall not be allowed in any city drainage, ponding or
utility easement.
I. Catch Basins: Newly installed and rehabilitated catch basins shall be provided with a
sump area for the collection of coarse grained material as specified by the city engineer.
Such basins shall be cleaned when they are half filled with material or as resources allow.
J. Drain Leaders: All newly constructed and reconstructed buildings will route drain
leaders to pervious areas wherein the runoff can be allowed to infiltrate. The flow rate of
water exiting the leaders shall be controlled so no erosion occurs in the pervious areas.
K. Structures: See the most recent version of the city's surface water management plan.
All stormwater management plans shall be consistent with it.
L. Inspection And Maintenance: All stormwater management facilities shall be designed
to minimize the need of maintenance, to provide access for maintenance purposes and to
be structurally sound. All stormwater management facilities shall have a plan of operation
and maintenance that assures continued effective removal of pollutants carried in
stormwater runoff. It shall be the responsibility of the applicant to obtain any necessary
easements or other property interests to allow access to the stormwater management
facilities for inspection and maintenance purposes. The city may require a developer to
enter into a contract providing for access to perform maintenance and inspection to public
or private stormwater management facilities.
M. Models/Methodologies/Computations: Hydrologic models and design methodologies
used for the determination of runoff and analysis of stormwater management structures
shall be approved by the city engineer. Plans, specification and computations for
stormwater management facilities submitted for review shall be sealed and signed by a
registered professional engineer. All computations shall appear on the plans submitted for
review, unless otherwise approved by the city engineer.
N. Watershed Management Plans/Groundwater Management Plans: Stormwater
management plans shall be consistent with adopted watershed management plans and
groundwater management plans prepared in accordance with Minnesota statutes, sections
103B.231 and 103B.255, respectively, and as approved by the Minnesota board of water
and soil resources in accordance with state law.
O. Easements:
Qbhf!83!pg!22:
1. If a stormwater management plan involves direction of some or all runoff off of the
site, it shall be the responsibility of the applicant to obtain from adjacent property owners
any necessary easements or other property interests concerning flowage of water.
2. Easements are required for all ponding areas to the basin's 100-year storm high
water level elevation.
3. Easements are required for all outlet swales and ditches, and for overland overflow
routes located downstream of basins located on site.
4. If the storm sewer is to be installed less than ten feet (10') deep within private
property, the easement shall be a minimum of twenty feet (20') wide. If the storm sewer is
ten feet (10') or greater, the easement shall be twice as wide as the depth.
5. Easements necessary for maintenance vehicle access are required for all of the above
where not directly available on a public road.
P. NPDES Permits: All plans shall be consistent with the most recent and applicable
NPDES Permits.
Q. Engineering guidelines: All plans shall be consistent with the current version of the
Rosemount engineering guidelines.
R. General specifications and standard detail plates: All plans shall be consistent with the
current version of the City of Rosemount general specifications and standard detail plates.
SR. Most protective standard: Where any of the approval standards listed above are in
disagreement, the most protective standard shall be required. (Ord. 2015-01, 2-17-2015)
10-1-10: SURFACE WATER RELATED FEES:
A. Stormwater Utility:
1. Utility Established: The city does hereby establish the Rosemount stormwater utility
for the purpose of managing city owned stormwater facilities, the collection of stormwater
connection charges, utility user fees and expenditures necessary to own and operate this
utility as expressly allowed under Minnesota statutes, sections 412.321 through 412.391.
2. Operation And Administration: The operation and administration of the Rosemount
stormwater utility will be the responsibility of the utilities commission as established in
title 2, chapter 4 of this code.
3. Rules And Regulations: Establishment of operational standards, user fees and other
rules and regulations established for the purpose of operating this utility are established in
the "stormwater utility policy" adopted herein by reference and may be amended by city
council resolution as is deemed necessary by the council.
4. Effect, User Fees: The Rosemount stormwater utility will be established on April 1,
1992, with the first user fees collected in July 1992.
B. Processing And Approval Fee: All applications for stormwater management plan
approval shall be accompanied by a processing and approval fee determined by the city
council. An applicant may also be required to pay a stormwater trunk area charge and/or
stormwater connection charge in order to fund the development and maintenance of
community stormwater management facilities designed to serve multiple land disturbing
and development activities undertaken by one or more persons, including the applicant.
Qbhf!84!pg!22:
C. Reimbursement For Costs Incurred: Notwithstanding any of the fees listed above, the
City retains the right to recoup any costs incurred in reviewing, processing, remediating,
enforcing, and inspecting any land disturbing activity, permit, easement, or agreements,
including engineering and legal costs, associated with Title 10 of this Code. The City may
require the deposit of funds equal to estimated city costs prior to the issuance of any
permit, the unused portion of which to be refunded upon project completion or
cancellation and verification of conformance of the project with city requirements.
(Ord. 2015-05, 7-7-2015)
10-1-11: WETLANDS:
A. Assessment Report Required: Every applicant for a subdivision approval or a grading
permit to allow wetland disturbing activities must submit a wetland assessment report to
the city engineer. No subdivision approval, or grading permit to allow wetland disturbing
activities shall be issued until approval of the wetland replacement plan application or a
certificate of exemption has been obtained in strict conformance with the provisions of this
chapter and the Minnesota wetland conservation act. This section applies to all land, public
or private, located within the city.
B. Consistency With Comprehensive Wetland Management Plan: Utilization and
development impacts to wetlands shall be consistent with the city's comprehensive
wetland management plan.
C. Impacts To Wetland:
1. Concentrated runoff discharge into wetlands shall be consistent with the stormwater
management guidelines within the Rosemount comprehensive wetland management plan.
2. A protective buffer strip of natural vegetation of width prescribed by the Rosemount
comprehensive wetland management plan shall surround all wetlands.
3. Wetlands must not be drained or filled, wholly or partially, unless replaced by
restoring or creating wetland areas of at least equal public value. Replacement must be
guided by the following principles and standards prescribed by the Rosemount
comprehensive wetland management plan.in descending order of priority:
a. Avoiding the direct or indirect impact of the activity that may destroy or diminish
the wetland;
b. Minimizing the impact by limiting the degree or magnitude of the wetland activity
and its implementation;
c. Rectifying the impact by repairing, rehabilitating, or restoring the affected wetland
environment;
d. Reducing or eliminating the impact over time by preservation and maintenance
operations during the life of the activity; and
e. Compensating for the impact by replacing or providing approved substitute
wetland resources or environments. (Ord. 2015-01, 2-17-2015; amd. Ord. 2015-05, 7-7-
2015)
10-1-12: EROSION AND SEDIMENT CONTROL:
Qbhf!85!pg!22:
A. Design Criteria: At minimum erosion control practices, sediment control practices,
and waterway crossings shall meet the design criteria set forth below and shall be
consistent with city of Rosemount general specifications and "Plan Requirements And
Design Guidelines"engineering guidelines manual.
1. Cut and fill slopes shall be no greater than four to one (4:1), except as approved by
the city engineer.
2. Clearing, except that necessary to establish sediment control devices, shall not begin
until all sediment control devices have been installed and have been stabilized.
3. Phasing may be required on all sites based on site specifics, with the size of each
phase to be established at plan review and as approved by the city engineer/city of
Rosemount.
4. Proposed erosion control measures may be approved by the city engineer as part of
a grading plan review toward grading or building permit approval. Erosion control may be
specified by the city engineer as part of a site survey for individual building permits.
Erosion control may also be specified by the city engineer as needed and deemed
appropriate during the construction and postconstruction periods separate from the
process described below.
B. Specifications: At a minimum, applicants shall meet the specifications set forth below
and observe the standards established in NPDES construction general permit requirements
and the city's surface water management plan.
1. Soil Stabilization: Soil stabilization shall be completed in a time period as specified
by the NPDES construction general permit requirements and the city's general
specifications and standards. The city of Rosemount may require the site to be reseeded or
a nonvegetative option employed.
2. Seeding: Seeding shall be in accordance with seeding specifications. All seeded areas
shall be fertilized, mulched, and disc anchored and temporary cover provided as necessary
for seed retention.
3. Special Techniques: Special techniques that meet the design criteria outlined in "Plan
Requirements And Design Guidelines"Rosemount specs and engineering guidelines shall be
in place on steep slopes or in drainageways and shall be used to ensure stabilization.
Special techniques may include: temporary sediment basins, slope draining and terracing.
4. Soil Stockpiles: Soil stockpiles which shall be inactive for a period of seven (7) or
more days must be stabilized or covered at the end of each workday. Stockpiles shall
include perimeter sediment controls and must not be placed in natural buffers or surface
waters, including stormwater conveyances.
5. Ninety Percent Coverage: The entire site must be stabilized at a ninety percent
(90%) coverage, using a heavy mulch layer or another temporary cover method that does
not require germination to control erosion, at the close of the construction season.
6. Site Development Sediment Controls: Site development sediment controls practices
shall include those identified in the city's general specifications and engineering guidelines
including, but not limited to:
a. Settling basins, sediment traps, or tanks.
b. Protection for adjacent properties by the use of a vegetated buffer strip in
combination with perimeter controls.
Qbhf!86!pg!22:
c. Perimeter controls, including machine sliced silt fence or other city approved BMPs,
which shall be in place before, during and after grading of the site. Fencing Perimeter
controls shall be removed only after seventy percent (70%)final stabilization. (Ord. 2015-
01, 2-17-2015; amd. Ord. 2015-05, 7-7-2015)
d. Designated as a concrete -washout area for concrete and other liquid wastes. (Ord.
2015-05, 7-7-2015)
e. Designated as a temporary construction staging area.
7. Temporary Sediment Basins: For sites that have more than ten (10) acres of
disturbed soil that drains to a common location (or 5 or more acres for special or impaired
waters), one or more temporary sediment basins shall be constructed. Use of temporary
basins is encouraged when construction projects will impact steep slopes or when highly
erodible soils are present. The basin shall provide treatment to the runoff before it leaves
the construction site or enters surface waters. The temporary sediment basins must be
designed and constructed as follows:
a. Provide live storage for a calculated volume of runoff from a 2-year, 24-hour storm
from each acre drained to the basin. All basins shall provide at least one thousand eight
hundred (1,800) cubic feet of live storage from each acre drained or more.
b. For basins where the calculation in subsection B7a of this section has not been
performed, a temporary sediment basin providing three thousand six hundred (3,600)
cubic feet of live storage from each acre drained to the basin shall be provided for the
entire drainage area of the temporary basin.
c. The outlet structure must be designed to withdraw water from the surface in order
to minimize the discharge of pollutants.
d. The basin outlet shall be designed to prevent short circuiting and the discharge of
floating debris.
e. Ensure the basin can be completely drawn down to conduct maintenance activities.
f. Include energy dissipation on the outlet of the basin and a stabilized emergency
overflow to prevent failure of pond integrity.
g. Be located outside of surface waters or any buffer zone, and be designed to avoid
draining water from wetlands unless appropriate approval from the U.S. army corps of
engineers and the Minnesota department of natural resources is obtained.
h. If installation of a temporary sediment basin is not feasible, equivalent sediment
controls such as smaller sediment basins, and/or sediment traps, silt fences, vegetative
buffer strips, or any appropriate combination of measures are required for all down slope
boundaries of the construction area and for side slope boundaries where appropriate.
Determination of feasibility shall be documented in the erosion and sediment control plan.
8. Individual Construction Site Sediment Controls: Individual construction site
sediment controls shall be installed as specified in the city's "Plan Requirements And
Design Guidelines"specs and engineering guidelines and shall include:
a. Rock construction entrance (driveway) or other city approved BMP to prevent
sediment track out;
b. Perimeter controls, including such as silt fence, in place before, during and after
grading of the site. Fencing shall be removed only after proper turf establishment.
Qbhf!87!pg!22:
9. Waterway And Watercourse Protection: Waterway and watercourse protection
requirements shall include stabilization of the watercourse channel before, during and
after any in-channel work consistent with the city's general specifications.
a. A temporary stream crossing must be installed and approved by the local
government unit and regulating agency if a wet watercourse will be crossed regularly
during construction.
b. The watercourse channel shall be stabilized before, during, and within twenty
twenty-four (24) hours after any in-channel work.
c. No in-water work shall be allowed in public waters during the MNDNR'S work
exclusion dates.
d. Prior to placement of any equipment into any waters, all equipment must be free of
aquatic plants and nonnative animals.
All on site stormwater conveyance channels shall be designed according to the criteria
outlined in this document. Stabilization adequate to prevent erosion located at the outlets
of all pipes and paved channels is required.
10. Site Dewatering: Site dewatering shall be conducted pursuant to the city's general
specifications document. Water pumped from the site shall be treated by temporary
sediment basins, grit chambers, sand filters, or other controls as appropriate to ensure
adequate treatment is obtained and that nuisance conditions will not result from the
discharge. Discharges from the site shall not be released in a manner that causes erosion,
scour, sedimentation or flooding of the site, receiving channels or wetlands.
11. Waste And Material Disposal: All waste and unused building materials (including
garbage, debris, cleaning wastes, wastewater, toxic materials or hazardous materials) shall
be properly disposed of off site and not allowed to be carried by runoff into a receiving
channel water or storm sewer system.
a. Solid Waste: All unused building materials and waste (including, but not limited to:
collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, etc.)
must be disposed of accordingly and shall comply with disposal requirements set forth by
the MPCA.
b. Hazardous/Toxic Waste: Paint, gasoline, oil and any hazardous materials must be
properly stored, including secondary containment, to prevent spills, leaks or other
discharges. Access to the storage areas must be restricted to prevent vandalism. Storage
and disposal of hazardous or toxic substance must be in compliance with the requirements
set forth by the MPCA.
c. Liquid Waste: All other non-stormwater discharges (including, but not limited to,
concrete truck washout, vehicle washing or maintenance spills) produced during the
construction activity shall not be discharged to any surface waters.
d. External Washing Of Equipment And Vehicles: All external washing activities shall
be limited to a designated area of the site. All runoff must be contained and wastes from
external washing activities must be disposed of properly. No engine degreasing shall be
allowed on the site.
e. Wastes Generated By Concrete And Other Washout Operations: All liquid and solid
wastes generated by any concrete or other washout operations must be contained in a
leakproof facility or impermeable liner. Concrete Liquid waste must not come into contact
Qbhf!88!pg!22:
with the ground. Concrete waste must be disposed of properly and in compliance with
applicable MPCA regulations.
12. Drain Inlet Protection: All storm drain inlets shall be protected during construction
until control measures are in place with a straw bale, silt fence or equivalent barrier
meeting accepted design criteria, MPCA standards and specificationspermanent cover in
the contributing drainage is established.
13. Energy Dissipation: Pipe outlets must have temporary or permanent energy
dissipation within twenty twenty-four (24) hours of connection to a surface water.
14. Tracking: Vehicle tracking BMPs (including, but not limited to: rock pads, mud
mats, slash mulch, concrete or steel wash racks, or similar systems) must be installed to
minimize track out of sediment from the construction site. If vehicle tracking BMPs are not
actively preventing sediment from being tracked into the street, the applicant must utilize
street sweeping to contain sediment.
15. Final Stabilization: Final stabilization is not complete until the following criteria are
met:
a. All land disturbing activities must be finished and all soils shall be stabilized by a
uniform perennial vegetative cover with a density of seventy percent (70%) or greater of
its expected final growth density over the entire pervious surface area, or other equivalent
permanent means necessary to prevent soil failure under erosive conditions.
b. The permanent stormwater management system is constructed, meets all of the
required design parameters and is operating as designed.
c. All temporary synthetic and structural erosion prevention and sediment control
BMPs (such as silt fence) have been removed. BMPs designed to decompose on site may be
left in place.
d. For residential construction only, individual lots are considered finally stabilized if
the structure(s) are finished and temporary erosion protection and down gradient
perimeter control has been completed and the homeowner has been informed of the need
for, and benefits of, final stabilizationthe residence has been sold to the homeowner.
e. For construction projects on agricultural land the disturbed land has been returned
to its preconstruction agricultural use.
C. Inspection:
1. Notification: The city engineer, chief building official or designated agent shall make
inspections as hereinafter required and either shall approve that portion of the work
completed or shall notify the permittee wherein the work fails to comply with the erosion
and sediment control plan as approved.
2. Procedure: To obtain inspections, the permittee shall notify the city of Rosemount at
least two (2) working days before the following:
a. Start of construction.
b. Installation of sediment and erosion measures.
c. Completion of site clearing.
d. Completion of rough grading.
e. Completion of final grading.
f. Close of the construction season.
Qbhf!89!pg!22:
g. Completion of final landscaping.
h. Removal of erosion control measures.
i. Final project compliance and acceptance closeout.
3. Permittee Inspection: The applicant shall be responsible at all times for the
maintenance and proper operation of all erosion prevention, and sediment control, waste
control, and pollution prevention practices.
a. Inspections: The permittee or his/her agent shall ensure that a trained person will
regularly inspect the construction site at least once every seven (7) days until final
stabilization, and within twenty fourtwenty-four (24) hours of a rainfall event of one-half
inch (1/2") or greater in a twenty four (24) hour period.
b. Recordkeeping: All inspection and maintenance activities conducted on the site
during construction must be recorded in writing and retained with the erosion and
sediment control plan. Records of each inspection and maintenance activity shall include
the following:
(1) Date and time of inspection;
(2) Name(s) of persons conducting the inspection;
(3) Findings of inspections, including recommendations for corrective actions;
(4) Corrective actions taken, including the dates, times and the name of the party
completing the corrective action;
(5) Date and the amount of rainfall events that are greater than one-half inch (1/2")
in a twenty fourtwenty-four (24) hour period; and
(6) Documentation of any changes made to the erosion and sediment control plan.
D. Site And BMP Maintenance:
1. Responsibilities: Prior to any construction land disturbing activityin the plat, the
developer, the permittee or developer shall provide the city engineer with a schedule for
erosion and sediment control inspection and maintenance, including schedules for street
cleaning, and street sweeping. All site and BMP maintenance activities must comply with
the requirements of the NPDES construction general permits. The applicant project shall
investigate and comply with the following BMP maintenance requirements:
a. Silt FencePerimeter Controls: All perimeter controlssilt fences must be repaired,
replaced or supplemented when they become nonfunctional or the sediment reaches one-
half (1/2) of the height of the fenceBMP. Repairs shall be made by the end of the next
business day after discovery or as soon as field conditions allow access.
b. Temporary Sediment Basins: Temporary sedimentation basins must be drained
and the sediment must be removed when the depth of the sediment collected in the basin
reaches one-half (1/2) the storage volume. Drainage and removal must be completed
within seventy twoseventy-two (72) hours of discovery or as soon as field conditions allow
access.
c. Surface Waters And Conveyance Systems: Surface waters, including drainage
ditches and conveyance systems, must be inspected for visible signs of sediment being
deposited by erosion. The applicant must remove all sediment deposited in surface waters,
including drainageways, catch basins, and other drainage systems and must restabilize the
areas of exposed soil as a result of sediment removal. The removal and stabilization must
take place within seven (7) days of discovery unless legal, regulatory or physical access
Qbhf!8:!pg!22:
constraints prevent remediation. In the event of an access constraint, the applicant shall
use all reasonable efforts to obtain access. If access is precluded, removal and stabilization
must take place within seven (7) calendar days of obtaining access. The applicant is
responsible for contacting all local, regional, state and federal authorities and obtaining any
required permits prior to conducting any work.
d. Streets And Paved Surfaces: Where vehicle traffic leaves any part of the site with
exposed soils, the exit locations must be inspected for visible signs of off site sediment
tracking onto paved surfaces. Tracked sediment must be removed from all off site paved
surfaces within and adjacent to the site as soon as possible or within twenty fourtwenty-
four (24) hours of discovery.
e. General Maintenance: The applicant shall be responsible for the operation and
maintenance of temporary and permanent water quality management BMPs, as well as
erosion prevention, and sediment control, and waste control BMPs for the duration of the
construction work on the site. The applicant remains responsible until another party has
assumed control over all areas of the site that have not established final stabilization and a
notice of termination (NOT) has been submitted to the Minnesota pollution Pollution
control Control agencyAgency.
f. Off Site Deposition: If sediment escapes the construction site, off site accumulations
of sediment must be removed in a manner and at a frequency sufficient to minimize off site
impacts.
g. Infiltration Areas: All infiltration areas must be inspected to ensure that no
sediment or turbid runoff from ongoing construction activities is reaching the infiltration
area and these areas are protected from compaction caused by construction equipment
driving across the infiltration area.
h. Conformance with NPDES Permits: Inspection and maintenance schedules and
thresholds must conform with NPDES Permit standards and requirements.
2. Lapse: If the site development permittee repeatedly fails to meet or maintain
sediment and erosion control measures per the approved grading, sediment and erosion
control plan, the city may, in its discretion, perform the work or contract to have the work
completed and drawn down on the escrow deposit, letter of credit or bond to pay any costs.
a. The city will attempt to notify the developer in advance of any proposed action, but
failure of the city to do so will not affect the developer's and city's rights or obligations
hereunder.
b. If the developer does not reimburse the city for any cost the city incurred beyond
that covered by the deposit, for such work within ten (10) days from the date notice of the
amount owed to the city is mailed, the city may draw on the security to reimburse city for
such costs. (Ord. 2015-01, 2-17-2015; amd. Ord. 2015-05, 7-7-2015)
10-1-13: STORMWATER MANAGEMENT FOR PERMANENT FACILITIES:
A. Specifications: All postconstruction stormwater management plans must be submitted
to the city engineer prior to the start of construction activity. At a minimum, applicants
shall meet the specifications set forth below and observe the standards established in
NPDES construction general permit requirements, the city's surface water management
Qbhf!91!pg!22:
plan, the and the city's "Plan Requirements And Design
Guidelines".engineering guidelines.
B. Design Criteria:
1. Volume Control: Volume control measures are required on projects to meet the
water quality criteria of the city's surface water management plan and the standard for the
general permit authorization to discharge stormwater associated with construction activity
under the NPDES construction general permitstate administered NPDES Permits.
2. Rate Control:
a. For newly developing areas, no discharge or infiltration can be assumed for
purposes of establishing the 100-year, 24-hour storm event high water elevation. For
events with longer duration, a maximum peak stormwater discharge rate will be limited to
0.05 cfs per acre. Redeveloping areas will be required to meet these standards to the
maximum reasonable extent practical.
b. In the event that the city will not be providing a regional system, storage of the
runoff from the 100-year, 24-hour storm event is required on site.
c. Landlocked depressions that presently do not have a defined outlet and do not
typically overflow may be allowed a positive overflow to prevent damage to adjacent
properties. Any overflows from landlocked depressions will comply with the city's rate
control, runoff volume control, and low floor requirements including storing runoff from
the 100-year, 24-hour storm event for new development and restricting discharge to 0.05
cfs per acre for longer duration storm events.
d. New storm sewer systems shall be designed to accommodate discharge rates from
a 10-year storm event.
3. Flood Control: The city requires that for any new or redevelopment, at least three
feet (3') of freeboard between the anticipated critical 100-year high water elevation and
the minimum building opening be maintained. Any deviation from the three feet (3')
freeboard requirement is subject to the following conditions and may be approved by the
city engineer if the following can be demonstrated:
a. That within the two foot (2') freeboard area, stormwater storage is available which
is equal to or exceeds fifty percent (50%) of the stormwater storage currently available in
the basin below the 100-year high water elevation.
b. That a twenty five percent (25%) obstruction of the basin outlet over a twenty
fourtwenty-four (24) hour period would not result in more than one foot (1') of additional
bounce in the basin.
c. An adequate overflow route from the basin is available that will provide assurance
that one foot (1') of freeboard will be maintained for the proposed low building opening.
4. Design Criteria Of Permanent Facilities: All permanent stormwater facilities must
meet the design criteria as provided in the city's surface water management plan.
C. Limitations And Restrictions:
1. Stormwater control facilities shall not receive discharges from or be constructed in
areas where:Infiltration BMPs shall be prohibited or otherwise restricted in those same
areas and situations where prohibited or otherwise restricted in applicable state
administered NPDES Permits or regulations.
Qbhf!92!pg!22:
a. Industrial facilities are not authorized to infiltrate industrial stormwater under an
NPDES industrial stormwater permit issued by the MPCA.
b. Vehicle fueling or maintenance activities occur.
c. There is less than three feet (3') of separation between the bottom of the
infiltration system to the elevation of the seasonally saturated soils or the top of bedrock.
d. There are known groundwater contaminants or groundwater will be mobilized by
the construction of infiltration BMPs.
2. For areas where infiltration is prohibited the applicant shall consider alternative
volume reduction BMPs and the water quality volume must be treated by a wet
sedimentation basin, filtration system, regional ponding or similar method prior to the
release of stormwater to surface water.
3. For linear projects with lack of right of way, easements or other permissions from
property owners to install treatments systems that are capable of treating the total water
quality volume on site, the project must maximize treatment through other methods or
combination of methods before runoff is released to nearby surface waters. Alternative
treatment options include: grassed swales, filtration systems, smaller ponds, or grit
chambers. In all circumstances, a reasonable attempt must be made to obtain right of way
during the project planning and all attempts of infeasibility must be recorded.
4. The city may restrict the use of infiltration features to meet postconstruction
requirements for stormwater management, without higher engineering review, if the
infiltration techniques will be constructed in the following areas where:
a. Soils are predominately hydrologic soil group D (clay) soils.
b. Within one thousand feet (1,000') up gradient, or one hundred feet (100') down
gradient of active karst features.
c. Drinking water supply management areas are present, as defined by Minnesota
rules 4720.51000, subp. 13, unless precluded by a local unit of government with an MS4
permit.
d. Soil infiltration rates are more than 8.3 inches per hour unless soils are amended to
flow the infiltration rate below 8.3 inches per hour.
D. Exceptions: The city may authorize lesser volume control for the following situations:
1. If the project meets one of the limitations outlined above; and
2. If the owner/operator implements to the maximum extent possible other volume
reduction practices, besides infiltration, on the site but may not meet the requirements for
postconstruction stormwater management.
E. Mitigation Provisions:
1. Under certain circumstances some construction projects cannot meet the total
suspended solids (TSS) and/or total phosphorus (TP) reduction requirements for new or
redevelopment projects on the site of the original construction. When this occurs, the
owner/operator will be required to identify alternative locations where TSS and TP
treatment standards can be achieved. Mitigation project locations are chosen in the
following order of preference:
a. Locations that yield benefits to the same receiving water that receives runoff from
the original construction activity.
Qbhf!93!pg!22:
b. Locations within the same department of natural resource (DNR) catchment area
as the original construction activity.
c. Locations in the next adjacent DNR catchment area upstream.
d. Locations anywhere within the city of Rosemount.
2. Mitigation projects shall also meet the following criteria:
a. Mitigation projects shall involve the establishment of new structural stormwater
BMPs or the retrofit of existing structural stormwater BMPs, or the use of a properly
designed regional structural stormwater BMP.
b. Previously required routine maintenance of structural stormwater BMPs cannot be
considered mitigation.
c. Mitigation projects must be finished within twenty fourtwenty-four (24) months
after the original construction activity begins.
d. Monies received for mitigation purposes in lieu of meeting conditions for
postconstruction stormwater management shall be applied to a public stormwater project
and shall comply with this subsection.
e. A maintenance agreement specifying the responsible party for long term
maintenance shall be identified.
F. Maintenance Agreement: The applicant shall enter into a maintenance agreement with
the city that documents all responsibilities for operation and maintenance of private long
long-term stormwater treatment BMPs. Such responsibility shall be documented in a
maintenance plan and executed through a maintenance agreement. All maintenance
agreements must be approved by the city and recorded at the Dakota County recorder's
office prior to final plan approval. At a minimum, the maintenance agreement shall
describe the inspection and maintenance obligations:
1. The responsible party who is permanently responsible for maintenance of the
structural and nonstructural measures.
2. Pass responsibilities for such maintenance to successors in title.
3. Allow the city and its representatives the right of entry for the purposes of
inspecting all permanent stormwater management systems.
4. Allow the city the right to repair and maintain the facility, and recoup costs there for
maintenance, if necessary maintenance is not performed after proper and reasonable
notice to the responsible party of the permanent stormwater management system.
5. Include a maintenance plan that contains, but is not limited to, the following:
a. Identification of all structural permanent stormwater management systems.
b. A schedule for regular inspections, monitoring, and maintenance for each practice.
Monitoring shall verify whether the practice is functioning as designed and may include,
but is not limited to, quality, temperature, and quantity of runoff.
c. Identification of the responsible party for conducting the inspection, monitoring
and maintenance for each practice.
d. Include a schedule and format for reporting compliance with the maintenance
agreement to the city.
6. The issuance of a permit constitutes a right of entry for the city, its contractors, and
agents to enter upon the construction site. The applicant shall allow the city, its
Qbhf!94!pg!22:
contractors, agents and any authorized representatives, upon presentation of credentials,
to:
a. Enter upon the permitted site for the purpose of obtaining information,
examination of records, conducting investigations or surveys.
b. Bring such equipment upon the permitted development as is necessary to conduct
such surveys and investigations.
c. Examine and copy any books, papers, records, or memoranda pertaining to
activities or records required to be kept under the terms and conditions of the permit.
d. Inspect the stormwater pollution control measures and BMPs.
e. Sample and monitor any items or activities pertaining to stormwater pollution
control measures and BMPs.
f. Correct deficiencies in stormwater and erosion and sediment control measures.
(Ord. 2015-01, 2-17-2015; amd. Ord. 2015-05, 7-7-2015)
10-1-14: LAWN FERTILIZER REGULATIONS:
A. Use Of Impervious Surfaces: No person shall apply fertilizer to or deposit grass
clippings, leaves, or other vegetative materials on impervious surfaces, or within
stormwater drainage systems, natural drainageways, or within wetland buffer areas.
B. Lawn Fertilizer Content: Except for the first growing season for newly established turf
areas, no person shall apply liquid fertilizer which contains more than one-half percent
(0.5%) by weight of phosphorus, or granular fertilizer which contains more than three
percent (3%) by weight of phosphorus, unless the single application is less than or equal to
one-tenth (0.1) pound of phosphorus per one thousand (1,000) square feet. Annual
application amount shall not exceed one-half (0.5) pound of phosphorus per one thousand
(1,000) square feet of lawn area.
C. Buffer Zone: Fertilizer applications shall not be made adjacent to any water body or
wetland to a distance which is the larger of 16.5 feet or any buffer width as specified for
individual wetlands in the Rosemount comprehensive wetland management plan. (Ord.
2015-01, 2-17-2015; amd. Ord. 2015-05, 7-7-2015)
10-1-15: PENALTY:
A. Notice Of Violation: When the city determines that an activity is not being carried out
in accordance with the requirements of this chapter, it shall issue a written notice of
violation to the owner of the property. The notice of violation shall contain:
1. The name and address of the owner or applicant;
2. The address when available or a description of the land upon which the violation is
occurring;
3. A statement specifying the nature of the violation;
4. A description of the remedial measures necessary to bring the development land
disturbing activity into compliance with this chapter and a time schedule for the
completion of such remedial action; and
5. A statement of the penalty or penalties that shall or may be assessed against the
person to whom the notice of violation is directed; and.
Qbhf!95!pg!22:
6. A statement that the determination of violation may be appealed to the city by filing
a written notice of appeal within fifteen (15) days of service of the notice of violation.
Service may be accomplished by mail or by personal delivery of the notice.
B. Stop Work Order/Revocation Of Site Development Permits or Approvals: In the event
that any person holding a site development permit or approval pursuant to this chapter
violates the terms of the permit or approval or implements site developmentland
disturbing activities in such a manner as to materially adversely affect the health, welfare,
environment, or safety of persons residing or working in the neighborhood or development
site so as to be materially detrimental to the public welfare or injurious to property or
improvements in the neighborhood, the city of Rosemount may suspend or revoke the site
development permit or approval through the issuance of a stop work order or the
revocation of site development or building permit or approval. No development, utility or
street construction, or land disturbing activity will be allowedallowed, and no building
permits will be issuedissued, and no building inspections scheduled unless the
development is in full compliance with the requirements of this subsection.
C. Restoration Of Lands: Any violator may be required to restore land to its undisturbed
condition. In the event that restoration is not undertaken within a reasonable time after
notice, the city may take necessary corrective action, the cost of which may, after notice
and opportunity for hearing, be specially assessed against the property and collected along
with the ordinary taxes by the county.
D. Violation And Penalties:
1. No person shall construct, enlarge, alter, repair, or maintain any grading, excavation,
or fill, or cause the same to be done, contrary to or in violation of any terms of this chapter.
Any person violating any of the provisions of this chapter shall be deemed guilty of a
misdemeanor and is subject to the penalty as described in title 1, chapter 4 of this code and
each day during which any violation of any of the provisions of this chapter is committed,
continued, or permitted, shall constitute a separate offense.
2. Upon conviction of any such violation, such person, partnership, or corporation shall
be punished by a fine as specified by the city ordinance for fee schedule for each offense. In
addition to any other penalty authorized by this section, any person, partnership, or
corporation convicted of violating any of the provisions of this chapter shall be required to
bear the expense of such restoration. (Ord. 2015-01, 2-17-2015; amd. Ord. 2015-05, 7-7-
2015)
10-1-16: APPEALS:
Any person aggrieved by an action relating to the enforcement of this chapter, including the
disapproval of a properly filed application for approval, issuance of a written notice of
violation, or an alleged failure to properly enforce this chapter in regard to a specific
application, may appeal the action to the city. The following conditions apply to all appeals:
A. The applicant shall submit the appeal in writing to the city clerk and include
supporting documentation. The city must receive the written appeal within ten (10) days of
the notice of violation.
B. City staff shall make a decision on the appeal within fifteen (15) business days of
receipt of a complete appeal application.
Qbhf!96!pg!22:
C. The applicant may appeal the decision of city staff to the city council. This appeal must
be filed with the city clerk within thirty (30) days of city staff's decision. Subject to any
applicable state law, the decision of the city council is final. (Ord. 2015-01, 2-17-2015; amd.
Ord. 2015-05, 7-7-2015)
10-1-17: OTHER CONTROLS:
In the event of any conflict between the provisions of this chapter and the provisions of any
other city ordinance adopted by the city council or regulation adopted by any land use local
government with land use authority in Rosemount or any state regulation, the more
restrictive standard prevails. (Ord. 2015-01, 2-17-2015; amd. Ord. 2015-05, 7-7-2015)
CHAPTER 2
STORMWATER SYSTEM
SECTION:
10-2-1: Purpose; Intent
10-2-2: Definitions
10-2-3: Applicability
10-2-4: Responsibility For Administration
10-2-5: Ultimate Responsibility
10-2-6: Discharge Prohibitions
10-2-7: Suspension Of MS4 Access
10-2-8: Industrial Or Construction Activity Discharges
10-2-9: Monitoring Of Discharges
10-2-10: Pollutants
10-2-11: Watercourse Protection
10-2-12: Notification Of Spills
10-2-13: Enforcement
10-2-14: Appeal Of Notice Of Violation
10-2-15: Enforcement Measures After Appeal
10-2-16: Cost Of Abatement Of The Violation
10-2-17: Legal Action
10-2-18: Compensatory Action
10-2-19: Nuisance
10-2-20: Criminal Prosecution
10-2-1: PURPOSE; INTENT:
The purpose of this chapter is to provide for the health, safety, and general welfare of the
citizens of the city of Rosemount through the regulation of non-stormwater discharges to
the storm drainage system to the maximum extent practicable as required by federal and
state law. This chapter establishes methods for controlling the introduction of pollutants
Qbhf!97!pg!22:
into the municipal separate storm sewer system (MS4) in order to comply with
requirements of the national pollutant discharge elimination system (NPDES) permit
process.
The objectives of this chapter are as follows:
A. To regulate the contribution of pollutants to the municipal separate storm sewer
system (MS4) by stormwater discharges by any user.
B. To prohibit illicit connections and discharges to the municipal separate storm sewer
system.
C. To establish legal authority to carry out all inspection, surveillance and monitoring
procedures necessary to ensure compliance with this chapter. (Ord. XVI.61, 5-19-2009, eff.
5-19-2009)
10-2-2: DEFINITIONS:
For the purposes of this chapter, all definitions of Title 10 Chapter 1 of the City Code of
Rosemount, Minnesota, are incorporated herein, and, the following shall mean:
AUTHORIZED ENFORCEMENT AGENCY: The city of Rosemount.
BEST MANAGEMENT PRACTICES (BMPs): Practices to prevent or reduce the discharge of
pollutants directly or indirectly to stormwater, groundwater, receiving surface waters, or
stormwater conveyance systems. BMPs include schedules of activities, prohibitions, other
management practices, also include treatment practices/requirements, operating
procedures, and practices to control site runoff, spillage or leaks, sludge or water disposal,
or drainage from raw materials storage. On construction sites, BMPs include The most
effective and practicable means of erosion prevention and sediment control, and water
quality management practices that are the most effective and practicable means to control,
prevent, and minimize degradation of surface water, including avoidance of impacts,
construction phasing, minimizing the length of time soil areas are exposed, prohibitions,
pollution prevention through good housekeeping, and other management practices
published by state or designated area wide planning agencies.Schedules of activities,
prohibitions of practices, general good housekeeping practices, pollution prevention and
educational practices, maintenance procedures, and other management practices to
prevent or reduce the discharge of pollutants directly or indirectly to stormwater, receiving
waters, or stormwater conveyance systems. BMPs also include treatment practices,
operating procedures, and practices to control site runoff, spillage or leaks, sludge or water
disposal, or drainage from raw materials storage.
CITY: The City of Rosemount.
CLEAN WATER ACT: The federal water pollution control act (33 USC section 1251 et seq.),
and any subsequent amendments thereto.
CONSTRUCTION ACTIVITY: A disturbance to the land that results in a change in the
topography, existing soil cover (both vegetative and nonvegetative), or the existing soil
topography that may result in accelerated stormwater runoff, leading to soil erosion and
movement of sediment into surface waters or drainage systems. Examples of construction
activity may include clearing, grading, filling and excavating.Activities subject to NPDES
construction permits. These include construction projects resulting in land disturbance of
Qbhf!98!pg!22:
one acre or more. Such activities include, but are not limited to, clearing and grubbing,
grading, excavating, and demolition.
CONSTRUCTION STORMWATER OR CSW: Stormwater associated with construction
activity.
HAZARDOUS MATERIALS: Any material, including any substance, waste, or combination
thereof, that because of its quantity, concentration, or physical, chemical, or infectious
characteristics may cause, or significantly contribute to, a substantial present or potential
hazard to human health, safety, property, or the environment when improperly treated,
stored, transported, disposed of, or otherwise managed.
ILLEGAL DISCHARGE OR ILLICIT DISCHARGE: Any direct or indirect non-stormwater
discharge to the storm drain system, except as exempted in this chapter.
ILLICIT CONNECTIONS: An illicit connection is defined as aAny drain or conveyance,
whether on the surface or subsurface, that allows an illegal discharge to enter the storm
drain system including, but not limited to, any conveyances that allow any non-stormwater
discharge including sewage, process wastewater, and wash water to enter the storm drain
system and any connections to the storm drain system from indoor drains and sinks,
regardless of whether said drain or connection had been previously allowed, permitted, or
approved by an authorized enforcement agencythe city or any other government agencies
with permitting authority or, any drain or conveyance connected from a commercial or
industrial land use to the storm drain system that has not been documented in plans, maps,
or equivalent records and approved by an the authorized enforcement agencycity or other
government agencies with permitting authority.
INDUSTRIAL ACTIVITY: Activities subject to NPDES industrial permits as defined in 40
CFR, section 122.26(b)(14).
MPCA: The Minnesota Pollution Control Agency
MUNICIPAL SEPARATE STORM SEWER SYSTEM OR MS4: A stormwater system or portion
thereof subject to an NPDES MS4 Permit
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES): The program for
issuing, modifying, revoking, reissuing, terminating, monitoring, and enforcing permits
under the United States Clean Water Act, as amended. Applicable federal regulations
include 33 U.S.C. 1251 et seq. Section 1342 and 40 CFR parts 122, 123, 124 and 450. The
NPDES Programs regulating discharges to Waters of the United States for construction
stormwater, industrial stormwater, and municipal stormwater are administered by the
Minnesota Pollution Control Agency (MPCA) in the State of Minnesota.
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER
DISCHARGE PERMIT OR NPDES PERMIT: A permit issued by MPCA that authorizes the
discharge of pollutants stormwater to Wwaters of the United States, whether the permit is
applicable on an individual, group, or general areawide basis. This chapter is primarily
concerned with NPDES Permits for Industrial Activity, Construction Stormwater, and
Municipal Separate Storm Sewer Systems.
NONSTORMWATER DISCHARGE: Any discharge to the storm drain system that is not
composed entirely of stormwater.
PERSON: Any individual, organization, firm, corporation, partnership, franchisee,
association or governmental entity.Any individual, association, organization, partnership,
Qbhf!99!pg!22:
firm, corporation or other entity recognized by law and action as either the owner or as the
owner's agent.
POLLUTANT: Anything that causes or contributes to pollution. Pollutants may include, but
are not limited to: paints, varnishes, and solvents; oil and other automotive fluids;
nonhazardous liquid and solid wastes and yard wastes; eroded soil or sediment; refuse,
rubbish, garbage, litter, or other discarded or abandoned objects, pesticides, herbicides,
and fertilizers; hazardous substances and wastes and residues that result from
constructing a building or structure; and noxious or offensive matter of any kind, that,
because of its quantity, concentration, or physical, chemical, or infectious characteristics
may cause, or significantly contribute to, a substantial present or potential hazard to
human health, safety, property or the environment, or that may degrade, impair or pollute
ground or surface waters.
PREMISES: Any building, lot, parcel of land, or portion of land whether improved or
unimproved including adjacent sidewalks and parking strips.
SECONDARY CONTAINMENT OR SECONDARY SPILL CONTAINMENT: Any system, device,
or control measure used to capture spills or leaks of hazardous liquids and prevent them
from migrating from their storage area in order to prevent pollution to soils and waters.
STORM DRAIN SYSTEM OR STORMWATER SYSTEM: Publicly owned facilities by which
stormwater is collected and/or conveyed, including, but not limited to, any roads with
drainage systems, municipal streets, gutters, curbs, inlets, piped storm drains, pumping
facilities, retention and detention basins, natural and humanmade or altered drainage
channels, reservoirs, and other drainage structures.
STORMWATER: Surface flows of water generated from precipitation events. Stormwater
includes precipitation runoff, stormwater runoff, snowmelt runoff, and any other surface
runoff and drainage.Any surface flow, runoff, and drainage consisting entirely of water
from any form of natural precipitation, and resulting from such precipitation.
STORMWATER POLLUTION PREVENTION PLAN: A document that describes the best
management practices and activities to be implemented by a person or business to identify
sources of pollution or contamination at a site and the actions to eliminate or reduce
pollutant discharges to stormwater, stormwater conveyance systems, and/or receiving
waters to the maximum extent practicable.
WASTEWATER: Any water or other liquid, other than uncontaminated stormwater,
discharged from a facility. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-3: APPLICABILITY:
This chapter shall apply to all water entering the storm drain system generated on any
developed or undeveloped lands unless explicitly exempted by an authorized enforcement
agencythe city. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-4: RESPONSIBILITY FOR ADMINISTRATION:
The authorized enforcement agencyCity shall administer, implement, and enforce the
provisions of this chapter. Any powers granted or duties imposed upon the authorized
enforcement agencyCity may be delegated in writing by the city administrator to persons
Qbhf!9:!pg!22:
or entities acting in the beneficial interest of or in the employ of the agencyCity. (Ord.
XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-5: ULTIMATE RESPONSIBILITY:
The standards set forth herein and promulgated pursuant to this chapter are minimum
standards; therefore, this chapter does not intend or imply that compliance by any person
will ensure that there will be no contamination, pollution, or unauthorized discharge of
pollutants. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-6: DISCHARGE PROHIBITIONS:
A. Prohibition oOf Illegal Discharges: No person shall discharge or cause to be discharged
into the municipal storm drain system or watercourses surface waters any materials,
including, but not limited to, pollutants or waters containing any pollutants that cause or
contribute to a violation of applicable water quality standards, other than stormwater.
The commencement, conduct, or continuance of any illegal discharge to the storm drain
system is prohibited. except as described as followsThe following discharges are allowed:
1. The following discharges are exempt from discharge prohibitions established by this
chapter: wWater line flushing or other potable water sources, landscape irrigation or lawn
watering, diverted stream flows, rising groundwater, groundwater infiltration to storm
drains, uncontaminated pumped groundwater, foundation or footing drains (not including
active groundwater dewatering systems), crawl space pumps, air conditioning
condensation, springs, noncommercial washing of vehicles, natural riparian habitat or
wetland flows, swimming pools (if dechlorinated to less than 0.1 ppm chlorine), firefighting
activities, and any other water source not containing pollutants., and the use of fertilizers,
herbicides and pesticides for agricultural or landscaping purposes when applied for their
intended purpose in accordance with label directions and with all applicable local, state
and federal ordinances, laws and regulations.
2. Discharges specified in writing by the authorized enforcement agencycity as being
necessary to protect public health and safety.
3. Dye testing is an allowable discharge, but requiresprovided a verbal notification to
the authorized enforcement agencyhas been given to the City prior to the time of the test.
4. The prohibition shall not apply to aAny non-stormwater discharge permitted under
an NPDES permit, waiver, or waste discharge order issued to the discharger and
administered under the authority of the federal environmental protection agency, provided
that the discharger is in full compliance with all requirements of the permit, waiver, or
order and other applicable laws and regulations, and provided that written approval has
been granted for any discharge to the storm drain system.
5. The use of fertilizers, herbicides and pesticides for agricultural or landscaping
purposes when applied for their intended purpose in accordance with label directions and
with all applicable local, state and federal ordinances, laws and regulations. Spillage or
overspray beyond the intended treatment area of fertilizers, herbicides and pesticides is
not an intended use.
B. Prohibition Of of Illicit Connections:
Qbhf!:1!pg!22:
1. The construction, use, maintenance or continued existence of illicit connections to
the storm drain system is prohibited.
2. This prohibition expressly includes, without limitation, illicit connections made in
the past, regardless of whether the connection was permissible under law or practices
applicable or prevailing at the time of the connection.
3. A person is considered to be in violation of this chapter if the person connects a line
conveying sewage to the MS4, or allows such a connection to continue.
(Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
C. Proper Storage of Materials: Materials, including pollutants and hazardous materials,
must be stored in a manner such that the potential to erode, dissolve, infiltrate, or
otherwise cause an illicit discharge or pollution to surface waters and groundwaters is
limited. Proper storage measures shall include the following:
1. Easily dissolvable materials, such as salts used for deicing, shall be covered or stored
indoors to prevent contact with precipitation or runoff. Said storage must be located on
impervious surfaces to prevent dissolved materials from infiltrating into the ground when
exposed to water.
2. Easily erodible materials, such as soils, shall be stored within contained areas to
reduce the potential for migration of stored substances off site, into the stormwater
system, or into surface waters.
3. Hazardous materials must be stored in compliance with State and Federal
Regulations, stored in sealed containers, and secondary containment must be provided
when stored outside.
4. Stored materials must be located outside of surfaces waters, waterways, and areas
needed to store, carry, or discharge floodwaters.
D. Protective Measures and Best Practices During Materials Transfer: Best practices
must be implemented to reduce risks of illicit discharges, spills, pollution to surface waters,
and pollution to groundwater when transferring materials to or from storage areas,
whether those storage areas be indoors, outdoors, temporary, or permanent.
10-2-7: SUSPENSION OF MS4 ACCESS:
A. Suspension Due To Illicit Discharges In Emergency Situations: The city council may,
without prior notice, suspend MS4 discharge access to a person when such suspension is
necessary to stop an actual or threatened discharge that presents or may present imminent
and substantial danger to the environment, or to the health or welfare of persons, or to the
MS4 or waters of the United States. If the violator fails to comply with a suspension order
issued in an emergency, the authorized enforcement agencycity may take such steps as it
deems necessary to prevent or minimize damage to the MS4 or waters of the United States,
or to minimize danger to persons.
B. Suspension Due To The Detection Of Illicit Discharge: Any person discharging to the
MS4 in violation of this chapter may have their MS4 access terminated if such termination
would abate or reduce an illicit discharge. The authorized enforcement agencycity will
notify a violator of the proposed termination of its MS4 access. The violator may petition
the authorized enforcement agencycity for reconsideration and a hearing. A person
commits an offense if the person reinstates MS4 access to premises terminated pursuant to
Qbhf!:2!pg!22:
this section, without the prior approval of the authorized enforcement agencycity. (Ord.
XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-8: INDUSTRIAL OR CONSTRUCTION ACTIVITY DISCHARGES:
Any person subject to an industrial or construction activity stormwater NPDES stormwater
discharge permit shall comply with all provisions of such permit. Proof of compliance with
said permit may be required in a form acceptable to the city council prior to the allowing of
discharges to the MS4. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-9: MONITORING OF DISCHARGES:
A. Applicability: This section applies to all facilities that have stormwater discharges
associated with industrial activity, including construction activity.
B. Access To Facilities:
1. The authorized enforcement agencycity shall be permitted to enter and inspect
facilities subject to regulation under this chapter as often as may be necessary to determine
compliance with this chapter. If a discharger has security measures in force that require
proper identification and clearance before entry into its premises, the discharger shall
make the necessary arrangements to allow access to representatives of the authorized
enforcement agencycity.
2. Facility operators shall allow the authorized enforcement agencycity ready access to
all parts of the premises for the purposes of inspection, sampling, examination and copying
of records that must be kept under the conditions of an NPDES permit to discharge
stormwater, and the performance of any additional duties as defined by state and federal
law.
3. The authorized enforcement agencycity shall have the right to set up on any
permitted facility such devices as are necessary in the opinion of the authorized
enforcement agencycity to conduct monitoring and/or sampling of the facility's
stormwater discharge.
4. The authorized enforcement agencycity has the right to require the discharger to
install monitoring equipment as necessary. The facility's sampling and monitoring
equipment shall be maintained at all times in a safe and proper operating condition by the
discharger at its own expense. All devices used to measure stormwater flow and quality
shall be calibrated to ensure their accuracy.
5. Any temporary or permanent obstruction to safe and easy access to the facility to be
inspected and/or sampled shall be promptly removed by the operator at the written or oral
request of the authorized enforcement agencycity and shall not be replaced. The costs of
clearing such access shall be borne by the operator.
6. Unreasonable delays in allowing the authorized enforcement agencycity or other
government agencies with regulatory authority access to a permitted facility is a violation
of a stormwater discharge permit and of this chapter. A person who is the operator of the
facility with a NPDES permit to discharge stormwater associated with industrial activity
commits an offense if the person denies the authorized enforcement agencythe city or
other government agencies with regulatory authority reasonable access to the permitted
facility for the purpose of conducting any activity authorized or required by this chapter.
Qbhf!:3!pg!22:
7. If the authorized enforcement agencycity has been refused access to any part of the
premises from which stormwater is discharged, and the city is able to demonstrate
probable cause to believe that there may be a violation of this chapter, or that there is a
need to inspect and/or sample as part of a routine inspection and sampling program
designed to verify compliance with this chapter or any order issued hereunder, or to
protect the overall public health, safety and welfare of the community, then the authorized
enforcement agencycity may seek issuance of a search warrant from any court of
competent jurisdiction. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-10: POLLUTANTS:
The city will adopt requirements identifying best management practices (BMPs) of any
activity, operation, or facility that may cause or contribute to pollution or contamination of
stormwater, the storm drain system, or waters of the U.S. The owner or operator of a
commercial or industrial establishment shall provide, at their own expense, reasonable
protection from accidental discharge of prohibited materials or other wastes into the
municipal storm drain system or watercourses surface waters through the use of these
structural and nonstructural BMPs. Further, any person responsible for a property or
premises that is, or may be, the source of an illicit discharge, may be required to implement,
at said person's expense, additional structural and nonstructural BMPs to prevent the
further discharge of pollutants to the municipal separate storm sewer system. Compliance
with all terms and conditions of a valid NPDES permit authorizing the discharge of
stormwater associated with industrial activity, to the extent practicable, shall be deemed
compliant with the provisions of this section. These BMPs shall be part of a stormwater
pollution prevention plan (SWPPP) as necessary for compliance with requirements of the
NPDES permit. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-11: WATERCOURSE PROTECTION:
Every person owning property through which a watercourse passes, or such person's
lessee, shall keep and maintain that part of the watercourse within the property free of
trash, debris, excessive vegetation, and other obstacles that would pollute, contaminate, or
significantly retard the flow of water through the watercourse. In addition, the owner or
lessee shall maintain existing privately owned structures within or adjacent to a
watercourse, so that such structures will not become a hazard to the use, function, or
physical integrity of the watercourse. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-12: NOTIFICATION OF SPILLS:
Notwithstanding other requirements of law, as soon as any person responsible for a facility
or operation, or responsible for emergency response for a facility or operation has
information of any known or suspected release of materials that are resulting or may result
in illegal discharges or pollutants discharging into stormwater, the storm drain system, or
waters of the U.S., said person shall take all necessary steps to ensure the discovery,
containment, and cleanup of such release. In the event of such a release of hazardous
materials said person shall immediately notify emergency response agencies of the
occurrence via emergency dispatch services. In the event of a release of nonhazardous
Qbhf!:4!pg!22:
materials, said person shall notify the authorized enforcement agencycity in person or by
phone or facsimile email no later than the next business day. Notifications in person or by
phone shall be confirmed by written notice or email addressed and mailedsent to the city
within three (3) business days of the phone or in person notice. If the discharge of
prohibited materials emanates from a commercial or industrial establishment, the owner
or operator of such establishment shall also retain an on on-site written record of the
discharge and the actions taken to prevent its recurrence. Such records shall be retained
for at least three (3) years. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-13: ENFORCEMENT:
A. Notice Of Violation: Whenever the city finds that a person has violated a prohibition or
failed to meet a requirement of this chapter, the authorized enforcement agencycity may
order compliance by written notice of violation to the responsible person. Such notice may
require, without limitation, the following:
1. Tthe performance of monitoring, analysis, and reporting;
2. Tthe elimination of illicit connections or discharges;
3. Tthat violating discharges, practices, or operations shall cease and desist;
4. Tthe abatement or remediation of stormwater pollution or contamination hazards
and the restoration of any affected property; and
5. Tthe implementation of source control or treatment BMPs.
1. If abatement of a violation and/or restoration of affected property is required, the
notice shall set forth a deadline within which such remediation or restoration must be
completed. Said notice shall further advise that, should the violator fail to remediate or
restore within the established deadline, the work will be done by a designated
governmental agencythe city or a contractor and the expense thereof shall be charged to
the violator.
26. The notice shall state that the determination of violation may be appealed to the
city administrator by filing with the city clerk a written notice of appeal within seven (7)
calendar days of service of the notice of violation. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-14: APPEAL OF NOTICE OF VIOLATION:
Any person receiving a notice of violation may appeal the determination of the authorized
enforcement agencycity. The notice of appeal must be received by the city clerk within
seven (7) calendar days from the date of the notice of violation. Hearing on the appeal
before the city administrator or the city administrator's designee shall take place within
seven (7) calendar days from the date of receipt of the notice of appeal. The decision of the
city administrator or city administrator's designee shall be final. (Ord. XVI.61, 5-19-2009,
eff. 5-19-2009)
10-2-15: ENFORCEMENT MEASURES AFTER APPEAL:
If the violation had has not been corrected pursuant to the requirements set forth in the
notice of violation, or, in the event of an appeal, within fifteen (15) days of the decision of
the municipal authority upholding
the decision of the authorized enforcement agencycity, then representatives of the
Qbhf!:5!pg!22:
authorized enforcement agencycity shall enter upon the subject private property and are
authorized to take any and all measures necessary to abate the violation and/or restore the
property. It shall be unlawful for any person, owner, agent or person in possession of any
premises to refuse to allow the government agencycity or designated contractor to enter
upon the premises for the purposes set forth above. (Ord. XVI.61, 5-19-2009, eff. 5-19-
2009)
10-2-16: COST OF ABATEMENT OF THE VIOLATION:
Within thirty (30) days after abatement of the violation, the owner of the property will be
notified of the cost of abatement, including administrative costs. If the amount due is not
paid within a timely manner as determined by the decision of the municipal authority, the
enforcement agencycity may levy the charges as a special assessment against the property,
which assessments shall constitute a lien on the property for the amount of the assessment.
Any person violating any of the provisions of this chapter shall become liable to the city by
reason of such violation. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-17: LEGAL ACTION:
It shall be unlawful for any person to violate any provision or fail to comply with any of the
requirements of this chapter. If a person has violated and continues to violate the
provisions of this chapter, the authorized enforcement agencycity may petition for a
preliminary or permanent injunction restraining the person from activities which would
create further violations or compelling the person to perform abatement or remediation of
the violation, or seek any other available remedy in law or equity. (Ord. XVI.61, 5-19-2009,
eff. 5-19-2009)
10-2-18: COMPENSATORY ACTION:
In lieu of enforcement proceedings, penalties, and remedies authorized by this chapter, the
authorized enforcement agencycity and violator may agree on alternative compensatory
actions, such as storm drain stenciling, attendance at compliance workshops, creek
cleanup, etc. (Ord. XVI.61, 5-19-2009, eff. 5-19-2009)
10-2-19: NUISANCE:
In addition to the enforcement processes and penalties provided, any condition caused or
permitted to exist in violation of any of the provisions of this chapter is a threat to public
health, safety, and welfare, and is declared and deemed a nuisance, and may be summarily
abated or restored at the violator's expense, and/or a civil action to abate, enjoin, or
otherwise compel the cessation of such nuisance may be taken. (Ord. XVI.61, 5-19-2009, eff.
5-19-2009)
10-2-20: CRIMINAL PROSECUTION:
Any person that has violated or continues to violate this chapter shall be liable to criminal
prosecution to the fullest extent of the law, and shall be subject to a criminal penalty in
accordance with section 1-4-1 of this code. The authorized enforcement agencycity may
recover all attorney fees, court costs, and other expenses associated with enforcement of
Qbhf!:6!pg!22:
this chapter, including sampling and monitoring expenses. (Ord. XVI.61, 5-19-2009, eff. 5-
19-2009)
Qbhf!:7!pg!22:
EXECUTIVE SUMMARY
City Council Regular Meeting: October 3, 2023
AGENDA ITEM: Declaration of Surplus Property - Administrative AGENDA SECTION:
Services CONSENT AGENDA
PREPARED BY: Teah Malecha, Administrative Services Director AGENDA NO. 6.d.
ATTACHMENTS: Fixed Asset List APPROVED BY: LJM
RECOMMENDED ACTION: Motion to declare the items on the Fixed Asset List as surplus property and
for staff to appropriately dispose of the items.
BACKGROUND
The Administrative Services Department is asking that the City Council declare the computers listed in
the attached Fixed Asset List as surplus property. This declaration will authorize staff to appropriately
dispose of these items.
The computers on the attached list are no longer usable within the City's operations due to budgeted
technology updates. Rather than paying to recycle these computers, staff would like to donate these to
the following organization:
PC's for People
2492 Doswell Avenue
Saint Paul, MN 55108
Through electronic reuse, PC's for People provides the opportunity for low-income individuals and non-
profits to benefit from the life changing impact of computers and mobile internet.
All hard drives are wiped of data or destroyed by PC's for People. A certificate of destruction and
recycling for the City listing whether each item was wiped or destroyed.
RECOMMENDATION
Staff recommends declaring the attached Fixed Asset List as surplus property for donation to PC's for
People.
Qbhf!:8!pg!22:
FixedAssetList
FixedAsset#MakeModelSerialNumber
002553MICROSOFTSURFACE PRO 4031737763253
002554MICROSOFTSURFACE PRO 4032282463253
002175CANNONDR-9080CCZ308656
002555RICOHC440DNX686P300189D
002949LEVOVOTHINKCENTRE M902ZMJ08RV8N
002950LENOVOTHINKCENTRE M902ZMJ08RV8S
002951LENOVOTHINKCENTRE M902ZMJ08RV85
002952LENOVOTHINKCENTRE M902ZMJ08RV8Z
002953LENOVOTHINKCENTRE M902ZMJ08RV8A
002954LENOVOTHINKCENTRE M902ZMJ08RV80
002955LENOVOTHINKCENTRE M902ZMJ08RV8D
002982LENOVOTHINKCENTRE M902ZMJ08RV96
002984LENOVOTHINKCENTRE M902ZMH08RV81
002986LENOVOTHINKCENTRE M902ZMJ08RV86
002987LENOVOTHINKCENTRE M902ZMJ08RV8Q
002988LENOVOTHINKCENTRE M902ZMJ08RV93
002989LENOVOTHINKCENTRE M902ZMJ08RV90
002990LENOVOTHINKCENTRE M902ZMJ08RV8T
002991LENOVOTHINKCENTRE M902ZMJ08RV94
002992LENOVOTHINKCENTRE M902ZMJ08RV8Y
002993LENOVOTHINKCENTRE M902ZMJ08RV7Z
002994LENOVOTHINKCENTRE M902ZMJ08RV7Y
002995LENOVOTHINKCENTRE M902ZMJ08TV8J
002996LENOVOTHINKCENTRE M902ZMJ08RV8K
002997LENOVOTHINKCENTRE M902ZMJ08RV88
002998LENOVOTHINKCENTRE M902ZMJ08RV8V
002999LENOVOTHINKCENTRE M902ZMJ08RV7X
003000LENOVOTHINKCENTRE M902ZMJ08RV8F
003001LENOVOTHINKCENTRE M902ZMJ08RV8ZA
003002LENOVOTHINKCENTRE M902ZMJ08RV8P
003005LENOVOTHINKCENTRE M902ZMJ08RV89
003006LENOVOTHINKCENTRE M902ZMJ08RV8M
003013LENOVOTHINKCENTRE M902ZMJ08RV83
003015LENOVOTHINKCENTRE M902ZMJ08RV8G
003023LENOVOTHINKSTATION P330MJ08181J
003024LENOVOTHINKSTATION P330MJ08181K
003025LENOVOTHINKCENTRE P330MJ08181L
Qbhf!:9!pg!22:
003026LENOVOTHINKCENTRE M920QMJ07ZE7K
003027LENOVOTHINKCENTRE M920QMJ07ZE81
003031LENOVOTHINKSTATION P330MJ095NMB
003032LENOVOTHINKSTATION P330MJ095NMC
003033LENOVOTHINKSATION P330MJ095NMD
001576HEWLETT PACKARDLASER JET 4101 MFPUSRGY23673
001578HEWLETT PACKARDLASER JET 4200 DTNUSDNX20155
002511HEWLETT PACKARDELITE 8405CG5513WYR
002153DELLLATITUDE D810F7RGP91
002346HEWLETT PACKARDPROBOOK 155CB3420LLK
002350HEWLETT PACKARDPROBOOK 155CB3420LNS
002398HEWLETT PACKARDPROBOOK 155CB3420LLX
002467HEWLETT PACKARDZBOOKCND4405PG1
002468HEWLETT PACKARDZBOOKCND5033KT6
002469HEWLETT PACKARDPROBOOK5CG5093PSB
002632PANASONICTOUGHBOOK7ATSA12112
002633PANASONICTOUGHBOOK7ETSA30081
002653PANASONICTOUGHBOOK7ATSA11598
002654PANASONICTOUGHBOOK7ATSA12074
002655PANASONICTOUGHBOOK7ATSA12680
002656PANASONICTOUGHBOOK7HTSA53439
002657PANASONICTOUGHBOOK7HTSA53498
002658PANASONICTOGHBOOK7HTSA53775
002659PANASONICTOUGHBOOK7HTSA53912
002660PANASONICTOUGHBOOK7HTSA53933
002662PANASONICTOUGHBOOK7HTSA56613
002663PANASONICTOUGHBOOK7HTSA56634
002666APPLEIPAD PRODMPT30PQGXPY
003019LENOVOTHINKPADPF1JY7SD
003020LENOVOTHINKPADPF1JYE8G
003021LENOVOTHNKPADPF1JYJHU
002301APPLEIPAD3DYTJ4BG4DJ8T
002472DELL PRECISIONT3610
002473DELL PRECISIONT3610
002506HEWLETT PACKARDPROCURVE 24GSG51FLX9YO
002721CYBERPOWER
003014LENOVOTHINKCENTRE M902ZMJ08RV8C
003016LENOVOTHINKCENTRE M902ZMJ08RV8B
003022LENOVOTHINKCENTRE M920QMJ09JNSA
002704MICROSOFTSURFACE PRO 4000700772053
Qbhf!::!pg!22:
002983LENOVOTHINKCENTRE M902ZMJ08RV8X
003003LENOVOTHINKCENTRE M902ZMJ08RV8H
003004LENOVOTHINKCENTRE M902ZMJ08RV84
003007LENOVOTHINKCENTRE M902ZMJ08RV91
003008LENOVOTHINKCENTRE M902ZMJ08RV8E
003009LENOVOTHINKCENTRE M902ZMJ08RV97
003010LENOVOTHINKCENTRE M902ZMJ08RV82
003011LENOVOTHINKCENTRE M902ZMJ08RV8W
003012LENOVOTHINKCENTRE M902ZMJ08RV92
003017LENOVOTHINKCENTRE M902ZMJ08RV8R
003018LENOVOTHINKCENTRE M902ZMJ08RV8RA
002507HEWLETT PACKARDPROCURVE 24GSG51FLX99J
002720LENOVOTHINK CENTER M7001S10GT003EUSMJ04VB3J
002719LENOVOTHINK CENTER M7001S10GT003EUSMJ04VBOT
002985LENOVOTHINKCENTRE M902ZMJ08RV87
Qbhf!211!pg!22:
EXECUTIVE SUMMARY
City Council Regular Meeting: October 3, 2023
AGENDA ITEM: Resolution for Counting Write-In Voters for Local AGENDA SECTION:
Elective Office CONSENT AGENDA
PREPARED BY: Erin Fasbender, City Clerk AGENDA NO. 6.e.
ATTACHMENTS: Resolution APPROVED BY: LJM
RECOMMENDED ACTION: Staff recommends the City Council approve a resolution to tabulate write-in
votes only if the amount of write-in votes received is greater than a filed candidate's total votes.
BACKGROUND
The new election legislation approved in 2023 allows a municipality to adopt a resolution about
counting write-in votes for city offices. Local offices can choose from the following resolutions to
adopt:
1. Require a write-in candidate to file a written request for their votes to be individually tallied.
This request must be filed with the City Clerk no later than the 7th day before the general
election; or
2. Require that write-in votes only be individually tallied if the total number of write-in votes (per
contest) is equal to or greater than the fewest number of non-write-in votes for a candidate on
the ballot.
If a resolution is not adopted, all write-in votes are individually tallied without requiring a written
request. The write-in counting process can be overly time-consuming and burdensome. This change
does not impact election results unless a single write-in candidate receives the most votes for an office.
With that, staff would recommend the City Council adopt a resolution requiring that write-in votes only
be tabulated if the write-in votes are greater than a candidate’s total votes.
RECOMMENDATION
Staff recommends the City Council approve a resolution to tabulate write-in votes only if the amount
of write-in votes received is greater than a filed candidate's total votes.
Qbhf!212!pg!22:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2023
– 110
A RESOLUTION FOR COUNTING WRITE-IN VOTES FOR LOCAL ELECTIVE OFFICES
WHEREAS, Minnesota Statute 204B.09, subdivision 3 allows for the governing body of a statutory or
home rule charter city to adopt a resolution governing the counting of write-in votes for local elective
office; and
WHEREAS, the current write-in vote counting process is overly time consuming and unnecessary. It
does not result in a change in election results unless a single write-in candidate receives the most votes
for an office.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ROSEMOUNT, MINNESOTA hereby requires that write-in votes for an individual candidate will only
be individually recorded if the total number of write-in votes for that office is equal to or greater than the
fewest number of non-write-in votes for a ballot candidate.
rd
ADOPTED this 3 day of October, 2023.
Jeffery D. Weisensel, Mayor
ATTEST:
Erin Fasbender, City Clerk
Qbhf!213!pg!22:
EXECUTIVE SUMMARY
City Council Regular Meeting: October 3, 2023
AGENDA ITEM: Amendments to City Code, Title 3: Business AGENDA SECTION:
Regulations CONSENT AGENDA
PREPARED BY: Erin Fasbender, City Clerk AGENDA NO. 6.f.
ATTACHMENTS: Resolution, Ordinance APPROVED BY: LJM
RECOMMENDED ACTION:
1. Motion to Adopt an Ordinance Amending City Code Title 3 Chapter 1 Relating to Liquor
Regulations
2. Motion to approve a Resolution Approving Summary Publication of Ordinance 2023-04 Relating
to Liquor Regulations
BACKGROUND
Under current City Code Title 3, Chapter 1 Section 3-1-14 regarding liquor regulations for outdoor
patios and decks, there are specific fencing requirements for all licensed establishments. Based on
research of other nearby cities, our city code is more restrictive than the majority of surrounding cities
and state statute requirements.
Minnesota Statute 340A.410 subdivision 7, requires a retail alcoholic beverage licensed premises to be
compact and contiguous. The state does not specifically regulate how a licensee delineates their
compact and contiguous additions to their licensed premises. Minnesota Rules Chapter 7515.0430
subpart 2 defines the types of additions license holders can include as part of their licensed premises
and the rule states that the licensed premises can include physically connected attachments to the
main structure, such as patios, decks, or pavilions. The space would have to be owned and/or leased
or have formal use permitted as a part of the business premises. The city must approve any compact
and contiguous additions to the licensed premises and include such additions in the license files and on
documentation defining the licensed premises. The licensee should provide the city with proof that
their liquor liability insurance covers alcohol sales/service in their compact and contiguous expanded
licensed patio space.
Under current code language, the railing options (wrought iron) allowed can be expensive additions for
establishments wanting to include an outdoor patio and deck. Staff supports the recommendation to
remove the type of fencing requirement and instead have the area quartined off by an appropriate
fence, wall or staff monitor as approved by City staff. Staff also recommends approval of the resolution
to approve the publication notice and summary of the ordinance.
Qbhf!214!pg!22:
RECOMMENDATION
Staff recommends approval of the above motions.
Qbhf!215!pg!22:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION NO. 2023 - 107
RESOLUTION APPROVING SUMMARY PUBLICATION OF
ORDINANCE NO. 2023
– 04
WHEREAS, the City has adopted the above referenced ordinance; and
WHEREAS, the verbatim text of the ordinance is cumbersome, and the expense of publication of
the complete text is not justified; and
WHEREAS, the following summary clearly informs the public of the intent and effect of the
ordinance.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Rosemount that
the following summary is hereby approved for official publication:
SUMMARY PUBLICATION
ORDINANCE NO. 2023-04
AN ORDINANCE REGULATING AMENDING CITY CODE 3-1 LIQUOR
REGULATIONS
AN ORDINANCE AMENDING ORDINANCE NO. 2015-06
On October 3, 2023, the Rosemount City Council adopted an ordinance designated as
Ordinance No. 2023-04, the title of which is stated above. The purpose of the ordinance is to
update Title 3, Chapter 1 of the Rosemount City Code entitled “Liquor Regulations”. The
ordinance amendments apply to section 3-1-14; outdoor patios and decks. Copies of the
ordinance are available for public inspection in the office of the City Clerk during normal
business hours or upon request by calling 651-322-2003.
/s/ Erin Fasbender, City Clerk
BE IT FURTHER RESOLVED, that the City Clerk is directed to keep a copy of the ordinance
in her office at City Hall for public inspection and to post a full copy of the ordinance in a public
place in the City for a period of two weeks.
rd
Adopted by the City Council of the City of Rosemount, Minnesota this 3 day of October, 2023.
______________________________
Jeffery D. Weisensel, Mayor
ATTEST:
_____________________________________
Erin Fasbender, City Clerk
Qbhf!216!pg!22:
3-1-14: OUTDOOR PATIOS AND DECKS:
A. Conditions Under Which Permitted: Service and consumption of alcohol on outdoor
patios and decks in conjunction with an intoxicating liquor "on-sale" license, an "on-sale"
wine license, a special club license, a special license for Sunday sales or a 3.2 percent malt
liquor license may be permitted by the city council under the following conditions:
1. The patio or deck area must be compact and contiguous to the licensed premises and
shall be quarantined off by an appropriate fence, wall or staff monitor as approved by City
staff.enclosed with a wrought iron railing that meets standards set forth in this code and
final inspection by the chief building official.
2. Appropriate receptacles for rubbish, garbage, cigarette paraphernalia, etc., must be
provided.
3. Lighting must be sufficient to promote public safety, directed downward, and
compatible with the surrounding area.
4. A buffer zone should be provided between the patio or deck area and adjacent
parking lot. The area surrounding a patio or deck area must be fenced so as to not allow
entrance from outside the fenced area onto the patio or deck area.
5. Smoking may be allowed on the patio or deck area, provided it is in compliance with
the Minnesota "freedom to breathe act of 2007".
6. Music, televisions, bands, amplified sound or any activity that would disturb the
peace of the surrounding area is prohibited on the outdoor patio or deck area. Background
music that does not disturb the peace of the surrounding area is permitted during hours
when service of alcoholic beverages is permitted.
7. The patio or deck area shall be controlled and monitored continuously during the
hours of operation and unruly patrons shall be removed immediately.
8. The hours and days of sale of alcoholic beverages shall be in accordance with this
code.
9. Patrons shall not leave the premises with a drink nor can drinks be taken onto a
public sidewalk.
10. The amendment to the licensee's licenses for the outdoor patio or deck area shall
be approved on a provisional basis. The council may revoke, suspend or decline to renew
the license for the patio or deck area portion of the licensed premises on the grounds of
failure to comply with the conditions outlined in the resolution or undue annoyance or
burden on nearby residents.
11. The outdoor patio or deck area must be included in the required liquor liability
insurance for the premises.
Qbhf!217!pg!22:
12. The city council may impose any additional conditions it deems necessary in the
interest of the public health, safety and welfare at the time of initial approval or any
renewal of the license for a patio or deck. The conditions set forth allowing the patio or
deck shall be reviewed during the yearly renewal period. (Ord. 2015-06, 7-7-2015)
Qbhf!218!pg!22:
EXECUTIVE SUMMARY
City Council Regular Meeting: October 3, 2023
AGENDA ITEM: Appointing Deputy City Clerks for Election Purposes AGENDA SECTION:
CONSENT AGENDA
PREPARED BY: Erin Fasbender, City Clerk AGENDA NO. 6.g.
ATTACHMENTS: Resolution APPROVED BY: LJM
RECOMMENDED ACTION: Motion to approve a resolution appointing deputy city clerks for the
purposes of administering the 2023-2024 elections.
BACKGROUND
Minnesota Statute 203B.121 allows for deputy city clerks to be members of the Absentee Ballot Board
if they have had training in processing of absentee ballots. Staff recommends the following city
employees be appointed deputy city clerks for the 2023 & 2024 election season;
Stephen Grund
Katlyn Chigro-Munoz
Alysha Grant
RECOMMENDATION
Staff recommends approving the motion above.
Qbhf!219!pg!22:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2023 - 111
A RESOLUTION APPOINTING DEPUTY CITY CLERKS FOR THE PURPOSE OF
ADMINISTERING ELECTIONS
WHERAS, Minn. Stat. 203B.05 allows counties to designate municipalities to administer absentee
balloting; and
WHEREAS, Dakota County has designated the City of Rosemount to administer absentee ballots
for Rosemount voters; and
WHEREAS, Minnesota Statute 203B.121 allows for deputy city clerks trained in the processing to
serve on the absentee ballot board.
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Rosemount,
Minnesota, that
a.)The appointment of the following people and/or positions to deputy city clerk is approved;
Stephen Grund
Katlyn Chigro-Munoz
Alysha Grant
b.) Said deputy city clerks are hereby appointed to the absentee ballot board, and
c.) These appointments shall expire on November 5, 2024.
rd
ADOPTED this 3 day of October, 2023
Jeffery D. Weisensel, Mayor
ATTEST:
Erin Fasbender, City Clerk
Qbhf!21:!pg!22:
EXECUTIVE SUMMARY
City Council Regular Meeting: October 3, 2023
AGENDA ITEM: Appointment of Election Judges for 2023 Election AGENDA SECTION:
CONSENT AGENDA
PREPARED BY: Erin Fasbender, City Clerk AGENDA NO. 6.h.
ATTACHMENTS: Resolution APPROVED BY: LJM
RECOMMENDED ACTION: Motion to approve the attached Resolution appointing election judges and
officials for the 2023 Election.
BACKGROUND
Minn. Stat. 204B.21, Subd. 2, requires that all cities appoint election judges at least 25 days before the
election. Staff has recruited Rosemount and/or Dakota County residents to serve as election judges for
the 2023 election on November 7th.
The individuals listed in the resolution have indicated their willingness to serve at the upcoming
election. In order to serve as a judge, the law requires regular judges to complete a minimum of two
hours of training and head election judges to complete a minimum of three hours training every two
years.
Staff is still looking for a few more judges. Those interested should apply online through the City
website.
RECOMMENDATION
Staff recommends approval of the above-referenced motion.
Qbhf!221!pg!22:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2023-108
RESOLUTION APPOINTING ELECTION JUDGES
FOR THE 2023 SPECIAL ELECTION
WHEREAS, Minnesota Statute 204B.21 requires the governing body of a municipality to
appoint election judges to serve in its precincts; and
WHEREAS, the Rosemount 2023 Election Judge appointments consists of individuals recommended
by the City Clerk with the approval of the majority of the City Council.
NOW, THEREFORE BE IT RESOLVED, that the general public listed below to serve as election
judges reside in in the State of Minnesota as required by Minnesota Election Laws and will be trained
according to Minnesota State Statutes:
Aldahl, PeterHuey, ReidPekarik, Michael
Anderson, AngelineJanikowski, DavinPhillips, Madyson
Baumel, AngelaJohnson, CherylRene, Avery
Behm, JamesJorgenson, GloriaRoberts, Sabrina
Behm, Marcia
Kasch, MyronRohlf, Janet
Berdichevski, Alexandra
Killey, JasonSandve, Paul L.
Carlson, Susan
Knapp, AnneSchwartz, Jane
Carroll, Norah
Lauby, CherylSchwartz, Robert
Clysdale, Rita
Leach, EllenSustacek, Sonya
Collotzi, Heidi
McSheehy, MauryaTadese, Debora
Dalum,Miriam
McSheehy, RichardWalsh, Christine
Dwyer, Kadrin
Nara, LindaWebb, Karen
Farrell, Kathleen
Nugent, SpencerWeise, Charles
Geske-Peer, Julia
Olson, SandraWiig, Roberta
Gohman, Margaret
Paro, IsabelleYoung, Jayna
Holt, Marcia
NOW THEREFORE BE IT FURTHER RESOLVED, that pursuant to Minn. Stat.
203B.21, additional judges may be appointed within 25 days of the election if it is determined
additional election judges will be required.
th
ADOPTED this 3day of October, 2023 by the City Council of the City of Rosemount.
_______________________________________
Jeffery D. Weisensel, Mayor
ATTEST:
___________________________________
Erin Fasbender, City Clerk
Qbhf!222!pg!22:
EXECUTIVE SUMMARY
City Council Regular Meeting: October 3, 2023
AGENDA ITEM: Accept Public Street and Utilities - Emerald Isle 3rd AGENDA SECTION:
Addition, City Project 2022-07 CONSENT AGENDA
PREPARED BY: Brian Erickson, City Engineer AGENDA NO. 6.i.
ATTACHMENTS: Resolution APPROVED BY: LJM
RECOMMENDED ACTION: Approve resolution to accept Emerald Isle 3rd Addition, City Project 2022-
07, Public Improvements for Perpetual Maintenance
BACKGROUND
Public improvements installed as part of Emerald Isle 3rd Addition, City Project 2022-07, included
streets, sanitary sewer, watermain and storm sewer during the 2022 construction season with wear
course installed in 2023.
The developer requested final acceptance of the public improvements. WSB & Associates, Inc. (WSB)
has confirmed that the public improvements have been installed per the plans and specifications and
recommends acceptance of said improvements.
RECOMMENDATION
Staff recommends that City Council approve the resolution accepting the improvements for perpetual
maintenance.
Qbhf!223!pg!22:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2023
– 112
A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT
rd
FOR EMERALD ISLE 3 ADDITION,
CITY PROJECT 2022-07
WHEREAS, the developer has requested City acceptance of the public improvements; and,
WHEREAS, WSB & Associates, Inc. confirmed the public improvements were installed in accordance
with the approved plans and specifications and finds the improvements acceptable.
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota. The work completed
under said agreement is hereby accepted for perpetual maintenance and ownership.
th
ADOPTED this 4 day of October 2023.
Jeffery D. Weisensel, Mayor
ATTEST:
Erin Fasbender, City Clerk
Qbhf!224!pg!22:
EXECUTIVE SUMMARY
City Council Regular Meeting: October 3, 2023
AGENDA ITEM: Donation Acceptance from Xcel Energy AGENDA SECTION:
CONSENT AGENDA
PREPARED BY: Michelle Rambo, Office Specialist AGENDA NO. 6.j.
ATTACHMENTS: Resolution APPROVED BY:
RECOMMENDED ACTION: Motion to approve the acceptance and expenditure of $500 dollars from
Xcel Energy to be used for Safety Camp.
BACKGROUND
The Parks and Recreation department received a donation from Xcel Energy for $500. Xcel Energy
recently sent a letter regarding a 2020 donation check still outstanding. Funds were never received at
the City and Xcel Energy issued a new check.
RECOMMENDATION
Motion to approve the acceptance and expenditure of $500 from Xcel Energy to be used for Safety
Camp.
Qbhf!225!pg!22:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2023 - 113
A RESOLUTION ACCEPTING A DONATION TO THE CITY
WHEREAS, the City of Rosemount is generally authorized to accept donations of real and personal
property pursuant to Minnesota Statutes Section 465.03 et seq. for the benefit of its citizens and is
specifically authorized to accept gifts;
WHEREAS, the following persons and entities have offered to contribute the cash amounts set
forth below to the city:
Xcel Energy$500.00
WHEREAS, the terms or conditions of the donations, if any, are as follows:
Parks & Recreation: Safety Camp – speaker presentations, t-shirts, lunch and miscellaneous
programming costs.
WHEREAS, all such donations have been contributed to the city for the benefit of its citizens, as
allowed by law; and
WHEREAS, the City Council finds that it is appropriate to accept the donations offered.
THEREFORE, NOW BE IT RESOLVED by the City Council of the City of Rosemount as
follows:
1. The donations described above are accepted and shall be used to establish and/or operate
services either alone or in cooperation with others, as allowed by law.
2. The city clerk is hereby directed to issue receipts to each donor acknowledging the city’s
receipt of the donor’s donation.
rd
ADOPTED this 3 day of October, 2023, by the City Council of the City of Rosemount.
______________________________
Jeffery D. Weisensel, Mayor
ATTEST:
_____________________________________
Erin Fasbender, City Clerk
Qbhf!226!pg!22:
Qbhf!227!pg!22:
Qbhf!228!pg!22:
Qbhf!229!pg!22:
Qbhf!22:!pg!22: