Loading...
HomeMy WebLinkAbout20240123 Packet AGENDA Planning Commission Regular Meeting Tuesday, January 23, 2024 6:30 PM City Council Chambers, City Hall 1. CALL TO ORDER/PLEDGE OF ALLEGIANCE 2. ADDITIONS TO AGENDA 3. AUDIENCE INPUT 4. CONSENT AGENDA a. Minutes of the December 18, 2023 Regular Meeting b. Request by Maplewood Development for Approval of the Amber Fields 13th Addition Final Plat. 5. OLD BUSINESS 6. PUBLIC HEARINGS a. Request by Maplewood Development for Rezoning, a Major Amendment to the Amber Fields Planned Unit Development Agreement, Preliminary and Final Plat approval for Amber Fields 14th Addition. b. Request by Independent School District 196 for approval of a rezoning of the site from AG-Agricultural to R1-Low Density Residential, minor subdivision, conditional use permit, and site plan review for an elementary school to be constructed on site. c. Request by Spectro Alloys for approval of a preliminary plat, a site plan review, and a variance to construct a 70,000 square foot addition to the existing building at 13135 Doyle Path and combine the site into a single parcel. d. Request by Maplewood Development for Amber Fields 15th Addition preliminary and final plat approval to create 167 single-family lots. e. Renewal of the Danner, Inc. Small Scale Mineral Extraction Permit for 2024. 7. NEW BUSINESS 8. DISCUSSION 9. ADJOURNMENT Page 1 of 221 ROSEMOUNT PLANNING COMMISSION REGULAR MEETING PROCEEDINGS DECEMBER 18, 2023 CALL TO ORDER/PLEDGE OF ALLEGIANCE Pursuant to due call and notice thereof, a regular meeting of the Rosemount Planning Commission was held on Monday, December 18, 2023, at 6:30 PM. in Rosemount Council Chambers, 2875 145th Street West. Chair Kenninger called the meeting to order with Commissioners Whitman, Reed, Hebert, and Thiagarajan. Commissioner Rivera was absent. Staff present included the following: Community Development Director Kienberger, Senior Planner Nemcek, Planner Hogan, and Community Development Technician Grant. ADDITIONS TO AGENDA None. AUDIENCE INPUT None. CONSENT AGENDA Motion by Kenninger Second by Reed Motion to approve the Consent Agenda. Ayes: 5. Nays: None. Motion Carried. a. Minutes of the November 28, 2023 Regular Meeting b. Resignation of Commissioner Powell OLD BUSINESS PUBLIC HEARINGS a. Renewal of the Vesterra, LLC, and Stonex, LLC, Small Scale Mineral Extraction Permit for 2024. Senior Planner Nemcek presented the application for a renewal of a small-scale mineral extraction permit for 2024 from Vesterra, LLC, and Stonex, LLC. The public hearing opened at 6:35 pm. The public hearing was closed at 6:36 pm. Motion by Kenninger Second by Reed Motion to close the public hearing. Page 2 of 221 Ayes: 5. Nays: None. Motion Carried. Commissioner Comments: Commissioner Reed thanked the applicant for being great to work with over the years as a partner. Motion by Reed Second by Hebert Motion to recommend City Council approve renewal of the Vesterra, LLC, and Stonex, LLC, Small Scale Mineral Extraction Permit for 2024, subject to the terms and conditions in the attached 2024 Conditions for Mineral Extraction. Ayes: 5. Nays: None. Motion Carried. b. Renewal of the Shafer Contracting Co., Inc. Small Scale Mineral Extraction Permit for 2024 Senior Planner Nemcek presented the application for a renewal of a small-scale mineral extraction permit for 2024 from Shafer Contracting Company. Commissioner Whitman asked for clarification on the compaction testing requirement. Senior Planner Nemcek stated that the soil needs to be compacted to at least ninety-five percent (95%) in order for the soil and land to be redeveloped in the future. Nemcek noted that the soil compaction testing results met that minimum requirement. The public hearing opened at 6:42 pm. The public hearing closed at 6:43 pm. Motion by Kenninger Second by Reed Motion to close the public hearing. Ayes: 5. Nays: None. Motion carried. Commissioner Comments: Chair Kenninger expressed thanks for cooperation and consistency in mining operations from the applicant. Motion by Kenninger Second by Thiagarajan Motion to recommend the City Council renew the Shafer Contracting Co., Inc. Small Scale Mineral Extraction Permit for 2024, subject to the terms and conditions in the attached Draft 2024 Conditions for Mineral Extraction. Ayes: 5. Nays: None. Motion Carried. c. Renewal of the Dakota Aggregates Large Scale Mineral Extraction Permit for 2024 Senior Planner Nemcek presented the application for a renewal of a large-scale mineral extraction permit for 2024 from Dakota Aggregates, LLC. Page 3 of 221 Chair Kenninger asked on the record if there was a noise issue, having worked with Dakota Aggregates in the past and working to figure out what was going on, or how to reduce it, or if something was happening. Chair Kenninger asked if it is something that gets reported back to Dakota Aggregates, and if it could be something that could be addressed by them, or if there's something to be done. Senior Planner Nemcek verified yes to Chair Kenninger's questions. Commissioner Reed asked how the timing and distance would affect Amber Fields' development. Nemcek deferred to the applicant, stating it depends on the type of jobs coming through and the level of activity of the mine. The public hearing opened at 6:54 pm. Ruth Simon - 14642 Bloomfield Path Rosemount, MN Simon asked if there are any restrictions on noise from machinery, particularly at night. Matt Mettling - 423 Ramsey Ct Carver, MN Commissioner Reed asked about phasing of the the north mine for Dakota Aggregates, and the noise levels pertaining to the adjacent neighborhood development, Amber Fields. Dakota Aggregates Operating Manager Mettling stated that there are six to seven phases of the north mine, which the company will have to leave by the end of 2028; phase 11B is not included within that. Mettling said there will be a berm on the edge of phase 11 with no height requirement, in addition to an access road within the mine phase. Mettling noted it is approximately fifty to sixty feet from the north mine to the edge of the Amber Fields development. Mettling noted that the University of Minnesota and the developer are working to put in a fence for the Amber Fields development for security to keep the residents out of the mining area. Chair Kenninger clarified that the residents buying the houses are cognizant of the mining operations adjacent to Amber Fields, and that they will mostly be gone in two to three years. Chair Kenninger asked for clarification on operating times. Operating Manager Mettling clarified that on the north end of the mine, there is only a loader hitting the face of a stockpile and the material is conveyed, transporting material. Mettling stated the company is permitted to run 24 hours. Mettling noted operations may slow depending on projects. The public hearing closed at 7:00 pm. Motion by Kenninger Second by Reed Motion to close the public hearing. Ayes: 5. Nays: None. Motion carried. Commissioner Comments: Commissioner Reed and Commissioner Whitman asked questions regarding noise levels, and the possibility of a super-berm. Senior Planner Nemcek stated the northern mining operation changed hauling routes, limited hauling times, placing the equipment below grade to prevent noise traveling, and investigated previous noise complaints. Nemcek noted there is an opportunity to adjust requirements down the line to mitigate noise levels should issues arise in the future, and that a super- berm would require further discussion. Nemcek noted that there was noise monitoring and other research done a few years back and that the noise complaints have significantly decreased since implementing noise mitigation measures. Page 4 of 221 Motion by Reed Second by Hebert Motion to recommend the City Council renew the Dakota Aggregates Large Scale Mineral Extraction Permit for 2024, subject to the terms and conditions in the attached 2024 Draft Conditions for Mineral Extraction Permit Ayes: 5. Nays: None. Motion Carried. d. Renewal of the Carl Bolander and Sons, LLC, Small Scale Mineral Extraction Permit for 2024 Community Development Technician Grant presented the application for a renewal of a small-scale mineral extraction permit for 2024 from Carl Bolander & Sons, LLC. Commissioner Whitman asked for clarification on soil compaction test results. Community Development (CD) Technician Grant deferred to the applicant and noted the Terracon representative listed in the compaction testing reports. Grant clarified that the soil tests water content, density and compaction for future research, construction, and development. The public hearing opened at 7:08 pm. The public hearing closed at 7:09 pm. Motion by Kenninger Second by Hebert Motion to close the public hearing. Ayes: 5. Nays: None. Motion Carried. Motion by Kenninger Second by Hebert Motion to recommend City Council approve renewal of the Carl Bolander & Sons, LLC, Small Scale Mineral Extraction Permit for 2024, subject to the terms and conditions in the attached 2024 Conditions for Mineral Extraction. Ayes: 5. Nays: None. Motion Carried. e. Renewal of the Max Steininger, Inc. Small Scale Mineral Extraction Permit for 2024 Planner Hogan presented the application for a renewal of a small-scale mineral extraction permit for 2024 from Max Steininger, Inc. The public hearing opened at 7:15 pm. The public hearing closed at 7:15 pm. Motion by Kenninger Second by Reed Motion to close the public hearing. Ayes: 5. Nays: None. Motion . Motion by Kenninger Second by Reed Page 5 of 221 Motion to recommend renewal of the Max Steininger, Inc. Small Scale Mineral Extraction Permit for 2024 to City Council, subject to the terms and conditions in the attached Draft 2024 Conditions for Mineral Extraction. Ayes: 5. Nays: None. Motion . f. Zoning Ordinance Text Amendment Request to Section 11-5-2: Supplementary Regulations to allow for horseshoe/looped shaped driveways within the RR-Rural Residential Zoning District. Planner Hogan presented the application for a zoning text amendment to section 11-5-2, which would allow horseshoe and loop-shaped driveways within the RR-Residential Rural zoning district. Commissioner Reed asked about minimum lot width and access on non-city roads. Planner Hogan shared that 200 feet width is required for rural-residential lot dimensions within that zoning district. Hogan noted that the city does not have jurisdiction over state or county roads, hence specifying access to non-city roads within the text amendment. Commissioner Thiagarajan asked if there is a minimum distance requirement between curb cuts. Planner Hogan stated there is not one currently in the presented standards and text amendment, but it could be implemented or looked into. Commissioner Whitman confirmed with Planner Hogan that the zoning text amendment needs to be considered by itself, separate from the background information including code enforcement issues. The public hearing opened at 7:23 pm. Megan Rogers - Larkin Hoffman - 8300 Normandale Blvd, Bloomington, MN Rogers thanked city staff for the opportunity to come to a solution about a zoning text amendment on behalf of the applicant. Rogers asked for the city and commission's thoroughness in reviewing surrounding city codes and policies, where multiple curb cuts are permitted in rural residential areas. Rogers noted that there is high value on the City Engineer's review of driveways to ensure safety within the proposed text amendment. The public hearing closed at 7:25 pm. Motion by Kenninger Second by Reed Motion to close the public hearing. Ayes: 5. Nays: None. Motion Carried. Commission Comments: Chair Kenninger expressed that it is preferred for property owners to work with City Staff prior to implementation in case a costly improvement needs to be removed or changed. Commissioner Whitman asked about the code violation as it pertains to the applicant's driveway. Planner Hogan stated that letters were sent, the code enforcement officer talked to the property owner in the summer of 2023, and once the code violation was known to city staff another letter was sent out, and there were discussions with the property owner to come up with this solution. Community Development Director Kienberger stated that the city code is set up to send a notice for owners to remedy the situation or come up with a solution with city staff to aim for code compliance. Kienberger Page 6 of 221 shared that the final enforcement mechanism is proceeding with prosecution through the Dakota County court system or abatement by the city. Commissioner Whitman thanked the applicant and Larkin Hoffman for the detailed letter. Motion by Kenninger Second by Whitman Motion to recommend the City Council approve the Text Amendment to the Zoning Ordinance Modifying Section 11-5-2: Supplementary Regulations to allow for horseshoe or looped driveways with no more than two curb cuts within the RR-Rural Residential Zoning District. Ayes: 5. Nays: None. Motion Carried. NEW BUSINESS None. DISCUSSION Chair Kenninger stated that Commissioner Powell's chair will be opened for re-appointment in the spring of 2024 and reminded Commissioners of future Planning Commission dates in 2024. Community Development Director Kienberger noted that appointment will be opened for applications early spring of 2023. ADJOURNMENT There being no further business to come before the Planning Commission, the meeting was adjourned at 7:32 p.m. Respectfully submitted, Alysha Grant Community Development Technician Page 7 of 221 EXECUTIVE SUMMARY Planning Commission Regular Meeting: January 23, 2024 Tenative City Council Meeting: February 6, 2024 AGENDA ITEM: Request by Maplewood Development for Approval of the Amber Fields 13th Addition Final Plat. AGENDA SECTION: CONSENT AGENDA PREPARED BY: Julia Hogan, Planner AGENDA NO. 4.b. ATTACHMENTS: Site Location, Final Plat, Existing Conditions; Phasing Plan; Site Plan; Grading and Drainage Plan; Erosion Control Plan; Utility Plan; Landscape Plan, City Engineer's Memo Dated January 15, 2024, Parks and Recreation Director's Memo Dated January 17, 2024 APPROVED BY: AK RECOMMENDED ACTION: 1. Motion to recommend the City Council approve the Final Plat for Amber Fields 13thAddition, subject to: a. Execution of a Subdivision Agreement b. Drainage and utility easements with storm sewer infrastructure may contain fences but shall be required to include gates to provide truck access; shall prohibit sheds or other accessory structures; and shall prohibit landscaping that would impede drainage. c. Submission of $300/tree plus 10% for Landscaping Surety, taking into account any surety already received. BACKGROUND SUMMARY Owner: Earl Street Partners II, LLC. Preliminary Plat Acres: 14.68 Acres Met Council Net Acres: 14.68 Acres Residential Lots Created: 37 Single-Family Residential Lots Gross Density: 2.52 Units/Acre Net Density: 2.52 Units/Acre Comprehensive Plan Guiding: MUR - Mixed Use Residential Current Zoning: R1 - Low Density Residential The Planning Commission is being asked to consider a request by Maplewood Development for approval of a Final Plat for Amber Fields 13th Addition to create 37 single-family residential lots. This Page 8 of 221 final plat will consist of the first phase of development for the 13th Addition preliminary plat area that was approved by council. The final plat is necessary to facilitate subdivision of the property into individual residential lots, and public streets. Staff finds the application consistent with the preliminary plat for this area and recommends approval of this application subject to the conditions listed above. BACKGROUND The present applications are the latest step in a long process of planning for the development within UMore Park. The developer received Planned Unit Development approval with Rezoning from the City Council at its September 7, 2021, meeting. The Planned Unit Development anticipated roughly 1,959 residential units, which were to include a mixture of housing types such as single-family lots, townhome lots, and multifamily lots. There are a total of 13 Amber Fields additions that have been approved by the City Council. Preliminary Plat Areas that have been approved by City Council include Amber Fields 2nd, 3rd, 4th, 5th, 6th, 7th and 8th additions with additions the 9th, 10th, 11th and 12th being the remaining areas of the designated preliminary plat areas that are shown in the table below. There has been a total of 1,458 housing units approved so far within the Amber Fields Development Area and the table below shows the break down of units that have been approved per addition. Amber Field Additions Housing Type Total Units Approved by City Council Amber Fields 2nd and 12th Additions Single Family and Townhome 301 units May 2022 and September 2023 Amber Fields 3rd and 11th Additions Single Family 182 units June 2022 and September 2023 Amber Fields 4th and 9th Additions Single Family 108 units July 2022 and April 2023 Amber Fields 5th and 10th Additions Single Family 124 units July 2022 and April 2023 Amber Fields 6th Addition Multifamily 268 units July 2022 Amber Fields 7th Addition Multifamily 250 units August 2022 Amber Fields 8th Addition Multifamily 160 units December 2022 Amber Fields 13th Addition Single Family 65 units October 2023 In October 2023 the preliminary plat for Amber Fields 13th Addition was approved by City Council. The preliminary plat consisted of 65 single family residential lots throughout a 14.68-acre section of the Amber Fields development area. The preliminary plat area is located in the southeast portion of the development extending north from the connection road that will connect Amber Fields to Akron Ave. The preliminary plat area was planned to be built out in two phases, with this final plat being the first phase which will consist of the eastern portion of the site along with the connection road off of Akron Ave and the eastern portion of the interior roadway. The second phase will consist of the remaining western portion of the site and the trail connection of the central greenway area. Legal Authority The final plat application is Quasi-Judicial because the City has a set of standards and requirements for reviewing this type of application that is described in detail below. Generally, if the final plat meets the Page 9 of 221 ordinance requirements it must be approved. General Subdivision Design The preliminary plat area is located in the southeastern portion of the Amber Fields development area directly west of Akron Avenue and north of 154th St W. The preliminary plat area is shown to be accessed by two public streets directly off of the future connection road to Akron Avenue currently called Road A. The proposed access road is shown as Road B and will extend from the southwest corner of the subdivision off of Road A and loop through the site back to Road A in the southeast corner. There is another street shown within the subdivision called Road C, this road will connect the looped Road B. There is a 5-foot concrete sidewalk shown to be located throughout the site and as well as a trail in the northwest area of the site that will connect to the Greenway Area access trial. Land Use and Zoning The site is designated for MUR-Mixed Use Residential land uses, which can include a range of housing types from single-family homes on traditional sixty-five foot lots to townhomes. The zoning district in which the preliminary plat is located in is the R1-Low Density Residential zoning district. The Amber Fields Planned Unit Development Agreement includes several deviations from the Zoning Ordinance. A Minor Amendment to the PUD to reduce the minimum lot width and to reduce the minimum lot area square footage was approved with the Amber Fields 13th Addition preliminary plat. The proposed corner lots The proposed corner lots within the subdivision meet the Amber Fields PUD requirements for minimum lot width and minimum lot area but there are a few interior lots that do not meet the minimum 45 ft. lot width and 5,400 square foot lot area minimum. In addition to dimensional standards the table below compares the proposed preliminary plat to the standards of the Amber Fields PUD. Category Required (Amber Fields PUD) Amber Fields 13th Addition Min. Lot Area (sf) 5,400 (interior) 7,200 (corner) 5,200 (interior) 7,200 (corner) Min. Lot Width 45 ft. (interior) 55 ft. (corner) 40 ft. (interior) 55 ft. (corner) Min. Front Yard Setback 25 ft 25 ft. Min. Side Yard Setback 5 ft. dwelling/5 ft. garage/10 ft. corner (45-ft. wide lots) 10 ft. dwelling/5 ft. garage/20 ft. corner (55- and 65-ft. wide lots) 5 ft. dwelling and garage/20 ft. for corner lots Min. Rear Yard Setback 20 ft. 20 ft., 30 ft. for Block 3 Final Plat Standards for reviewing subdivision requests are detailed in Title 12 of the Rosemount City Code. This section of the Code outlines the two-step Preliminary and Final Plat process for land subdivision. In this case, the preliminary plat was approved by Council on June 21, 2022, consisting of 65 single-family lots. The current application proposes to plat 37 of the 65 single family lots and to dedicate right of way. There are two outlots proposed on the plat, Outlot B will consist of the remaining portion of the Page 10 of 221 approved 13th addition preliminary plat area and Outlot A will consist of the requested Amber Fields 14th Addition preliminary plat area. The final plat is consistent with the approved preliminary plat. Streets There are two proposed public streets going into the Amber Fields 13th Addition preliminary plat area with both of those streets extending from the future connection road that is currently called Road A. Road B extends from Road A in the southwest corner of the subdivision and loops through the site back to Road A in the southeast corner. Road C extends through the central portion of the site in between the looped Road B. Road A is shown to be completed with the first phase of development with the 13th Addition final plat. Half of Roads B and C are shown to be completed as well with temporary cul-de- sacs being constructed at the end of them. Parks The Parks and Recreation staff has reviewed the park dedication requirement for Amber Fields 13th Addition as part of the overall Master Development Plan in order to take into account the multiple playgrounds and extensive open space within the development. Therefore, there is no park dedication requirement for this phase of Amber Fields. Landscaping The landscape plan submitted by the applicant shows a total of 88 trees to be planted throughout the 13th addition preliminary plat area. The City code requires one tree per lot/frontage in the R1 and R2 zoning districts, which the landscape plan meets that requirement. A total of 88 trees will be planted with this development, therefore a landscaping surety in the amount of $29,040 (88 trees x $300 plus 10%) was required as a condition of approval with the preliminary plat. 56 trees will be planted with this first phase of the 13th addition. Engineering Review The City’s engineer has provided a memorandum containing comments related to the plans provided. The memorandum included comments related to utilities and grading. A copy of the memorandum is included in the attachments. RECOMMENDATION Staff is recommending approval of the final plat, subject to conditions, based on the information provided by the applicant and reviewed within this report. Page 11 of 221 Page 12 of 221 AMBER FIELDS THIRTEENTH ADDITION CITY COUNCIL, CITY OF ROSEMOUNT, MINNESOTA This plat was approved by the City Council of ROSEMOUNT, Minnesota, this _________ day of _____________________, 20 ____ and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By:___________________________________________________________________ Mayor Clerk COUNTY SURVEYOR, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this _________ day of _____________________, 20 ____. _________________________________ Todd B. Tollefson Dakota County Surveyor BOARD OF COUNTY COMMISSIONERS, COUNTY OF DAKOTA, STATE OF MINNESOTA We do hereby certify that on the 24th day of October, 2023 the Board of Commissioners of Dakota County, Minnesota approved this plat of AMBER FIELDS THIRTEENTH ADDITION and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2 and pursuant to the Dakota County Contiguous Plat Ordinance. __________________________________________________________________ Chair, County Board County Treasurer - Auditor DEPARTMENT OF PROPERTY TAXATION AND RECORDS, COUNTY OF DAKOTA, STATE OF MINNESOTA Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20___ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this _________ day of _____________________, 20 ____. _________________________________________, Director Amy A. Koethe, Department of Property Taxation and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of AMBER FIELDS THIRTEENTH ADDITION was filed in the office of the County Recorder for public record on this _________ day of _____________________, 20 ____, at ___ o'clock ___.M. and was duly filed in Book_________________ of Plats, Page______________________ , as Document Number _______________________ . _______________________________________ Amy A. Koethe, County Recorder KNOW ALL PERSONS BY THESE PRESENTS: That Earl Street Partners II, LLC, a Minnesota limited liability company, owner of the following described property: Outlot O and Outlot P, AMBER FIELDS according to the recorded plat thereof, Dakota County, Minnesota. Has caused the same to be surveyed and platted as AMBER FIELDS THIRTEENTH ADDITION and does hereby dedicate to the public for public use the public ways and the drainage and utility easements as created by this plat. In witness whereof said Earl Street Partners II, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this _________ day of _____________________, 20 ____. Signed: Earl Street Partners II, LLC by ___________________________________________ Mario J. Cocchiarella, Chief Manager STATE OF MINNESOTA COUNTY OF ____________________ This instrument was acknowledged before me on _________ day of _____________________, 20 ____, by Mario J. Cocchiarella, Chief Manager of Earl Street Partners II, LLC, a Minnesota limited liability company, on behalf of the limited liability company. ________________________________________ Signature ________________________________________ Printed Name Notary Public, ___________County, Minnesota My Commission Expires _________________ SURVEYORS CERTIFICATE I Daniel Ekrem do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this ___________ day of _____________________ , 20 ____. _________________________________________ Daniel Ekrem, Licensed Land Surveyor Minnesota License No. 57366 STATE OF MINNESOTA COUNTY OF _____________________ This instrument was acknowledged before me on ___________ day of _____________________ , 20 ____, by Daniel Ekrem. ________________________________________ Signature ________________________________________ Printed Name Notary Public, ___________County, Minnesota My Commission Expires__________________ OFFICIAL PLAT Page 13 of 221 OUTLOT A S40 ° 1 9 ' 4 9 " W 5 8 9 . 4 2 S40 ° 1 9 ' 4 9 " W 3 0 4 . 1 6 S 4 8 ° 1 2 ' 0 8 " E 30. 0 1 R =2 6 0 .0 0 L =4 1 5 .0 7 Δ=91°28'03" N 4 8 ° 1 2 ' 0 8 " W 7 6 . 1 3 R=221.98 L=120.65 =31°08'24" C.Brg=S63°49'17"E C.=119.17 R = 2 6 0 . 0 0 L = 3 6 0 . 8 9 Δ = 7 9 ° 3 1 ' 4 0 " C . Br g = N 3 9 ° 3 7 ' 3 9 " W C . = 3 3 2 . 6 1 N0 0 ° 2 1 ' 3 2 " E 4 1 6 . 3 9 S8 9 ° 4 2 ' 1 5 " E 5 7 . 4 0 N0 0 ° 1 5 ' 5 3 " E 9 8 2 . 1 2 R = 3 2 2 5.0 0 L = 7 3 4.0 9 Δ = 1 3°0 2'3 1" C .B rg = S 5 4°4 3'2 3"E C .= 7 3 2.51 S 4 8 ° 1 2 ' 0 8 " E 4 8 0 . 7 4 N41 ° 4 7 ' 5 2 " E 2 5 . 0 0 S 4 8 ° 1 2 ' 0 8 " E 2 1 9 . 5 8 R = 2 1 7 5.0 0 L = 3 2 9.7 6 Δ = 8°4 1'1 3" C.Brg = N 5 2°3 2'4 4" W C . = 3 2 9 .4 5 451 . 1 4 92 2 . 1 2 60 . 0 0 78. 2 8 INSET S 4 9 ° 4 0 ' 1 1 " E 4 5 5 . 6 2 R =830.00 L=579.95 Δ=40°02'04" S89°42'15"E 230.34 S 4 9 ° 4 0 ' 1 1 " E 4 4 1 . 0 0 N40 ° 1 9 ' 4 9 " E 130 . 0 0 N40 ° 1 2 ' 5 9 " E 60. 0 0 N40 ° 1 9 ' 4 9 " E 130 . 0 9 N3 1 ° 2 4 ' 3 4 " E 13 5 . 8 0 N2 6 ° 0 9 ' 2 9 " E 60 . 3 0 N3 2 ° 1 8 ' 2 8 " E 13 0 . 0 0 60. 0 0 S50°26'56"E 22.32 L=36.58 =9°26'26" L=84.07 Δ =21°41'58" OUTLOT B AMBER FIELDS THIRTEENTH ADDITION OFFICIAL PLAT SITE Page 14 of 221 L=46.54Δ=3°27'47" R=221.98L=84.07 Δ=21°41'58" C.Brg =S68°32'30"E C.=83.57 L=75.33 Δ=12°15'46" L=57.97Δ=9°26'12" 13.35 L=46.03 Δ=20°17'13" L = 4 6. 0 3 Δ = 2 0°1 7 '1 3 " L = 4 6 . 0 3 Δ = 2 0 ° 1 7 ' 1 3 " L = 3 4 . 8 0 Δ=15 ° 2 0 ' 1 8 " L= 7 . 3 4 =3 ° 1 4 ' 1 1 " L= 2 9 . 6 1 =2° 1 2 ' 1 3 " L = 4 6.5 4 Δ = 3°2 7'4 7" L = 46.54 Δ = 3°27'47" L =46.54 Δ = 3°27'47" L=46.54 Δ=3°27'47"L=46.54 Δ=3°27'47"L=46.54Δ=3°27'47" L=46.54Δ=3°27'47"L=46.54Δ=3°27'47"L=7 2.47 Δ=5°23'3 4 " L = 2 4 . 6 1 =2° 1 2 ' 1 3 " L = 3 8 . 6 8 =3° 2 7 ' 4 7 " L = 3 8 . 6 8 =3 ° 2 7 ' 4 7 " L = 3 8 . 6 8 =3 ° 2 7 ' 4 7 " L = 3 8 . 6 8 =3 ° 2 7 ' 4 7 " L = 3 8 . 6 8 =3 ° 2 7 ' 4 7 " L = 3 8 . 6 8 =3 ° 2 7 ' 4 7 " L = 3 8 . 6 8 =3 ° 2 7 ' 4 7 " L = 3 8 . 6 8 =3 ° 2 7 ' 4 7 " L = 3 8 . 6 8 =3 ° 2 7 ' 4 7 " L=57.4 9 Δ=5 °08 '50" L=71.15 Δ=7°01'41" L=47.84Δ=4°43'33" L=47.84Δ=4°43'33" L=47.84Δ=4°43'33" L=47.84 Δ=4°43'33" L = 47.84 Δ = 4°43'33" L = 4 7.8 4 Δ = 4°4 3'3 3" L= 3 0 . 2 1 =2° 5 9 ' 0 3 " R=800.00 L=558.99 Δ=40°02'04" S89°42'15"E 230.35 N0 0 ° 2 1 ' 3 2 " E 4 4 6 . 1 8 R=610.00 L=439.31 41°15'49"Δ=41°15'49" C.Brg=S70°18'05"E C.=429.88 217.47 12.88 19 0 . 1 4 25 6 . 0 4 30 . 0 0 30 . 0 0 55 . 8 7 55 . 8 7 55 . 8 7 55 . 8 7 55 . 8 7 55 . 8 9 67 . 6 4 130.00 13 0 . 0 3 13 4 . 8 4 91 . 0 2 N3 2 ° 1 8 ' 2 8 " E 1 3 0 . 0 0 S2 0 ° 0 2 ' 4 2 " W 1 3 0 . 0 0 S1 3 ° 5 0 ' 4 2 " W 1 3 0 . 0 0 S34 ° 0 7 ' 5 5 " W 1 3 0 . 0 0 S54° 2 5 ' 0 8 " W 1 3 0 . 0 0 S74°42'2 1 " W 1 3 0 . 0 0 N89°38'28"W 130.00 N89°38'28"W 130.00 N89°38'28"W 130.00 N89°38'28"W 130.00 N89°38'28"W 130.00 N89°38'28"W 130.00 N89°38'28"W 130.00 R = 2 6 0 . 0 0 L = 3 6 0 . 8 9 Δ = 7 9 ° 3 1 ' 4 0 " C .B rg = N 3 9 ° 3 7 ' 3 9 " W C . = 3 3 2 . 6 1 S89°42'15"E 57.40 N0 0 ° 1 5 ' 5 3 " E 60 . 0 0 N3 1 ° 2 4 ' 3 4 " E 1 3 5 . 8 0 N2 6 ° 0 9 ' 5 4 " E 1 4 2 . 5 5 N2 0 ° 5 5 ' 1 4 " E 1 4 7 . 7 2 N1 5 ° 4 0 ' 3 4 " E 1 5 2 . 0 3 N1 2 ° 2 1 ' 4 3 " E 1 5 5 . 2 5 N0 8 ° 5 9 ' 3 1 " E 1 3 0 . 0 0 N1 3 ° 4 3 ' 0 4 " E 1 3 0 . 0 0 N1 8 ° 2 6 ' 3 6 " E 1 3 0 . 0 0 N2 3 ° 1 0 ' 0 9 " E 1 3 0 . 0 0 N2 7 ° 5 3 ' 4 2 " E 1 3 0 . 0 0 N32 ° 3 7 ' 1 4 " E 1 3 0 . 0 0 N37 ° 2 0 ' 4 7 " E 1 3 0 . 0 0 N40 ° 1 9 ' 4 9 " E 1 3 0 . 0 9 N40 ° 1 9 ' 4 9 " E 1 3 0 . 0 0 N38 ° 0 7 ' 3 7 " E 1 3 0 . 0 0 N34 ° 3 9 ' 5 0 " E 1 3 0 . 0 0 N3 1 ° 1 2 ' 0 4 " E 1 3 0 . 0 0 N2 7 ° 4 4 ' 1 7 " E 1 3 0 . 0 0 N2 4 ° 1 6 ' 3 0 " E 1 3 0 . 0 0 N2 0 ° 4 8 ' 4 4 " E 1 3 0 . 0 0 N0 6 ° 5 7 ' 3 8 " E 1 3 0 . 0 0 N1 0 ° 2 5 ' 2 4 " E 1 3 0 . 0 0 N1 3 ° 5 3 ' 1 1 " E 1 3 0 . 0 0 N1 7 ° 2 0 ' 5 7 " E 1 3 0 . 0 0 67 . 5 0 55 . 8 9 55 . 8 7 55 . 8 7 55 . 8 7 55 . 8 7 55 . 8 7 S50 ° 2 6 ' 5 6 " E 3 8 . 1 7 S55 ° 0 0 ' 5 9 " E 3 7 . 1 1 S5 9 ° 4 4 ' 3 2 " E 3 7 . 1 1 S6 4 ° 2 8 ' 0 5 " E 3 7 . 1 1 S6 9 ° 1 1 ' 3 7 " E 3 7 . 1 1 S7 3 ° 5 5 ' 1 0 " E 3 7 . 1 1 S89°36'31"E 51.30 L= 3 7 . 7 1 =5 ° 1 4 ' 4 0 " L= 3 7 . 7 1 =5 ° 1 4 ' 4 0 " L= 3 7 . 7 1 =5 ° 1 4 ' 4 0 " L = 9 4 . 7 7 Δ = 7 7 ° 3 4 ' 0 5 " L=2.14 =1°45'12" L= 3 6 . 4 4 =5 ° 0 4 ' 0 3 " 10.4 4 26.6 7 24. 9 7 12. 1 4 2. 0 4 2 2 . 3 2 1 5 . 8 5 35 . 0 7 2 1 3 1 2 3 5 6 7 8 9 10 11 12 13 4 123 4 5 6 7 8 9 10 11 12 3 4 5 6 7 8 9 10 11 12 13 S7 8 ° 3 8 ' 4 3 " E 3 7 . 1 1 N0 0 ° 2 1 ' 3 2 " E 4 1 6 . 3 9 13 . 6 5 L = 7 0 . 0 2 Δ= 15 ° 2 5 ' 5 0 " L = 9 2 . 0 6 Δ = 2 0 ° 1 7 ' 1 3 " L = 9 2 . 0 6 Δ = 2 0 °17'1 3 " L=92.06 Δ=20°17'13" L = 1 4 . 6 9 =3 ° 1 4 ' 1 1 " L=47.51 Δ =12°15'46"L=36.56Δ=9°26'12" 1 4 . 6 2 14. 6 2 14. 7 4 ANN E S T O W N W A Y AN N E S T O W N W A Y 152 N D S T AB U N D A N C E D R I V E L=579.95 Δ=40°02'04" 230.34 R = 1 0 0. 0 0 L = 1 3 8 . 5 6 Δ = 7 9 ° 2 3 ' 2 9 " C.Brg = N 3 9 °4 1' 4 5 " W C . = 1 2 7 . 7 4 30. 0 0 30. 0 0 30 . 1 6 30 . 1 4 N2 6 ° 0 9 ' 2 9 " E 6 0 . 3 0 N40 ° 1 2 ' 5 9 " E 6 0 . 0 0 S 4 9 ° 4 0 ' 1 1 " E 4 5 5 . 6 2 R=381.98 L=141.43 Δ=21°12'53" C.Brg =S68°47'03"E C.=140.63 S 4 9 ° 4 0 ' 1 1 " E 1 4 . 6 8 S 4 9 ° 4 0 ' 1 1 " E 4 5 5 . 6 2 S 4 9 ° 4 0 ' 1 1 " E 4 4 1 . 0 0 S40 ° 1 9 ' 4 9 " W 6 0 . 0 0 30. 0 0 30. 0 0 AMBER FIELDS THIRTEENTH ADDITION OFFICIAL PLAT INSET SEE SHEET 2 OF 3 SHEETS Page 15 of 221 CO U N T Y RO A D N O . 7 3 C. S. A. H. NO. 42(145TH ST. W.) (A K R O N A V E . ) AK R O N A V E . C. S. A. H. NO. 42 (145TH ST. W.) AK R O N A V E . AK R O N A V E . AK R O N A V E . AK R O N A V E . STORMWATER MANAGEMENT AREA 1 BASIN 1918PER CITY STORMWATER MANAGEMENT AREA 2 STORMWATER MANAGEMENTAREA 3 STORMWATER MANAGEMENTAREA 3 WETLAND WE-18-00611258-000 WETLAND WE-18-006 11258-000 WETLANDWE-18-006 11258-000 AU B U R N A V E . AB B E Y F I E L D A V E . 148TH ST. W. 148TH ST. W. 148 T H S T . W . 148TH ST. W. AK R O N A V E . ( C . R . 7 3 ) AB B E Y F I E L D A V E . 149TH STREET WEST AR T A I N E T R A I L BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C R O A D A OUTLOT B ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA AD A ADA ADA AD A AD A AD A ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADAADA ADA AD A ADA AD A ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ELEC RISER ADA ADA ADA ELEC RISER ADA ADA ADA ADAADA 48" 36" * 3" WINDOW 24"x24" 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA 10' DRAINAGE AND UTILITY EASEM E N T 5' DRAINAGE AND UTILITY EASEMENT 5' D R A I N A G E A N D U T I L I T Y E A S E M E N T 10' D R A I N A G E A N D U T I L I T Y E A S E M E N T HWY 42 T AK R O N A V E . PROJECT LOCATION FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L CO V E R S H E E T 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SHEET INDEX SHEET TITLENO. COVER SHEET1 EXISTING CONDITIONS PLAN 2-4 STANDARD DETAILS 5 SITE, LIGHTING, AND SIGNAGE PLAN7 GRADING AND DRAINAGE PLAN8 EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL NOTES AND DETAILS 9-11 SANITARY SEWER AND WATERMAIN PLAN 12 STREET AND STORM SEWER PLAN 13 LANDSCAPE PLAN 17 24-25 PHASING PLAN6 SUITE 700 ALLIANT ENGINEERING, INC. 733 MARQUETTE AVENUE SOUTH MINNEAPOLIS, MN 55402 PH: 612-758-3080 CONSULTANT FX: 612-758-3099 SURVEYOR ENGINEER DANIEL EKREM LICENSE NO. 57366 CLARK WICKLUND LICENSE NO. 40922 LANDSCAPE ARCHITECT EM: cwicklund@alliant-inc.com EM: dekrem@alliant-inc.com MARK KRONBECK LICENSE NO. 26222 EM: mkronbeck@alliant-inc.com VICINITY MAP SCALE: 1" = 4000' DEVELOPER MAPLEWOOD DEVELOPMENT 1128 HARMON PLACE SUITE 320 PH: 612-746-4046 CONTACT: MARIO J. COCCHIARELLA MINNEAPOLIS, MN 55403 AMBER FIELDS - 13TH ADDITION ROSEMOUNT, MINNESOTA 1 SANITARY SEWER AND WATERMAIN PLAN AND PROFILES STREET AND STORM SEWER PLAN AND PROFILES 14-16 18-20 STREET INTERSECTION DETAILS23 STORM SEWER PLAN AND PROFILES21-22 APPROVED CITY OF ROSEMOUNT PROJECT NO: 2022-16 2875 145TH STREET WEST ROSEMOUNT, MN 55068 (651) 423-4411 Page 16 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST A N D A R D D E T A I L S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 2 Page 17 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST A N D A R D D E T A I L S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 3 Page 18 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST A N D A R D D E T A I L S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 4 Page 19 of 221 AK R O N A V E . 11258-000 WETLAND WE-18-006 11258-000 10-DAY SNOWMELT: 927.74 100-YR HWL: 927.23 LEGEND NOTES: 5 AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L EX I S T I N G C O N D I T I O N S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N Page 20 of 221 25 24 23 22 20 19 18 17 16 15 14 13 12 10 9 8 7 6 5 4 3 2 1 BL O C K 1 21 11 26 BL O C K 1 BLO C K 1 1 1 B L O C K 2 BL O C K 3 ROAD A ROAD B R O A D A RO A D B R O A D C RO A D B 234 5 6 7 8 9 10 11 12 13 14 15 16 23 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 15 ROAD A RO A D B R O A D C R O A D A 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZU N 32 4 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSFER STATION TRANSFE R STATION ZZPM 4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213"156" 188"188" 188" 8731ZZUN FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L PH A S I N G P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: 6 Page 21 of 221 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZU N 32 4 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSFER STATIO N TRANSFER STATION ZZPM 4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213"156" 188"188" 188" 8731ZZUN 2 3 4 5 6 7 8 1 2 3 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 BLO C K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) B L O C K 1 0 ( P H 2 ) B L O C K 1 1 ( P H 2 ) ROAD A ROAD B R O A D A RO A D B R O A D C RO A D B BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C R O A D A OUTLOT B TYPICAL 40' LOT DETAIL TYPICAL 55' LOT DETAIL FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L SI T E , L I G H T I N G , A N D S I G N A G E P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SITE PLAN NOTES: LEGEND: SINGLE FAMILY LOT DATA: TOTAL DENSITY CALCULATIONS: TYPICAL 60' ROW ROAD SECTION 7 Page 22 of 221 2 3 4 5 6 7 8 1 2 3 HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T C HOA OWN E D D&U EASE M E N T O V E R ENTIRE O U T L O T C H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 1 2 3 4 5 6 BLOCK 1 B L O C K 2 OUTLOT C OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) B L O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) B L O C K 1 0 ( P H 2 ) B L O C K 1 1 ( P H 2 ) ROAD A ROAD B R O A D A RO A D B R O A D C RO A D B BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C R O A D A OUTLOT B 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZU N 32 4 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSFER STATION TRANSFER STATIO N ZZPM4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213"156" 188"188" 188" 8731ZZUN 10-DAY SNOWMELT: 927.74 100-YR HWL: 927.23 WETLAND WE-18-006 11258-000 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 8 AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L GR A D I N G A N D D R A I N A G E P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 GRADING NOTES: LEGEND: SINGLE FAMILY HOME HOLD DOWN DETAILS LOOKOUT PAD WALKOUT PAD SLAB ON GRADE Page 23 of 221 ROAD B R O A D C 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZU N 324 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSFER STATION TRANSFERSTATION ZZPM4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213"156" 188"188" 188" 8731ZZUN WETLAND WE-18-006 11258-000 WETLAND WE-18-006 11258-000 OUTLOT N ROAD A ROAD B R O A D A RO A D B R O A D C RO A D B BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C R O A D A OUTLOT B 10-DAY SNOWMELT: 927.74 100-YR HWL: 927.23 POND 3 10-DAY SNOWMELT: 927.19 100-YR HWL: 927.70 PROJECT LOCATION SITE LOCATION FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ER O S I O N A N D S E D I M E N T C O N T R O L P L A N - O V E R A L L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SWPPP BMP QUANTITIES EROSION CONTROL RESPONSIBLE PARTY: CONTRACTOR: (PER PLAN): NOTES: NOTE TO CONTRACTOR: CONSTRUCTION SEQUENCING: VICINITY MAP SCALE: 1" = 4000' ACTIVE SWPPP MAP LEGEND LEGEND: DND 9 Page 24 of 221 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZ U N 32 4 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSF E R STATIO N TRANSFE R STATION ZZPM 4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213" 156" 188"188" 188" 8731ZZUN WETLAND WE-18-006 11258-000 ROAD B R O A D A RO A D B R O A D C RO A D B BLOCK 2 13 12 10 9 11 1 23 4 5 6 7 8 9 10 11 12 13 RO A D B R O A D C R O A D A OUTLOT B 10-DAY SNOWMELT: 927.74 100-YR HWL: 927.23 POND 3 10-DAY SNOWMELT: 927.19 100-YR HWL: 927.70 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ER O S I O N A N D S E D I M E N T C O N T R O L P L A N - V I E W 1 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 10 Page 25 of 221 ROAD A ROAD B RO A D B R O A D C RO A D B BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C OUTLOT B FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ER O S I O N A N D S E D I M E N T C O N T R O L P L A N - V I E W 2 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 11 Page 26 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ER O S I O N A N D S E D I M E N T C O N T R O L N O T E S A N D D E T A I L S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 12 EROSION CONTROL SCHEDULE: PERMANENT COVER: MANAGEMENT MEASURES: POLLUTION PREVENTION · SEDIMENT CONTROL PRACTICES: EROSION CONTROL GENERAL NOTES: MAINTENANCE PROGRAM: EROSION AND SEDIMENT CONTROL DEWATERING: FINAL STABILIZATION: CONCRETE WASHOUT DETAIL Page 27 of 221 1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 BLO C K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) B L O C K 1 0 ( P H 2 ) B L O C K 1 1 ( P H 2 ) 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZU N 32 4 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSFER STATION TRANSFE R STATION ZZPM 4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213"156" 188"188" 188" 8731ZZUN ROAD A ROAD B R O A D A RO A D B R O A D C RO A D B BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C R O A D A OUTLOT B FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: UTILITY NOTES: 13 Page 28 of 221 3 4 5 6 ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 BLOCK 1(PH 2) BLOC K 2 ( P H 2 ) BLOC K 3 ( P H 2 ) BL O C K 4 ( P H 2 ) BL O C K 5 ( P H 2 ) BLOC K 1 1 ( P H 2 ) ROAD A ROA D A R O A D B ROAD C RO A D B B L O C K 1 BLOCK 3 4 3 2 1 1234567891011 12345678 ROAD A R O A D B ROAD C ROA D A Road A PROFILE RO A D B ( 0 + 0 0 . 0 0 ) RO A D B ( 1 4 + 3 9 . 9 2 ) FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N A N D P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 14 NOTES: ROAD A Page 29 of 221 8 RO A D A ROAD B BLOCK 1 BLOCK 3 BL O C K 2 87654321 1 2 3 4 5 1 2 3 4 5 9 10 11 12 13 RO A D A ROAD B RO A D B BLOC K 2 13 12 109 8 11 2 3 4 5 6 7 8 9 10 11 12 13 OUT L O T B Road B PROFILE RO A D C ( 0 + 0 0 . 0 0 ) RO A D A ( 2 + 9 0 . 4 5 ) B1 L 1 B1 L 2 B1 L 3 B1 L 4 B1 L 5 B1 L 2 0 B2 L 1 2 B2 L 1 3 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N A N D P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 15 LEGEND: NOTES: ROAD B Page 30 of 221 3 4 5 6 7 8 1 2 3 4 5 6 7 8 BLOC K 3 ( P H 2 ) BL O C K 4 ( P H 2 ) ROAD A ROA D A R O A D B ROAD C RO A D B B L O C K 1 BLOCK 3 BLOCK 2 7 6 5 4 3 2 1 1234567891011 12345678 9 10 11 12 13 ROAD A R O A D B ROAD C ROA D A OUTLO T B Road C PROFILE RO A D B ( 1 + 9 0 . 0 0 ) RO A D B ( 1 2 + 4 9 . 9 2 ) B3 L 1 FU T U R E BL O C K L1 2 FU T U R E BL O C K L1 3 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N A N D P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 16 LEGEND: NOTES: ROAD C Page 31 of 221 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZ U N 32 4 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSFE R STATION TRANSFE R STATION ZZPM4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213" 156" 188"188" 188" 8731ZZUN WETLAND WE-18-006 11258-000 ROAD A ROAD B R O A D A RO A D B R O A D C RO A D B BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C R O A D A OUTLOT B POND 3 NWL: 920.00 10-DAY SNOWMELT: 927.70 100-YR HWL: 927.19 10-DAY SNOWMELT: 927.74 100-YR HWL: 927.23 WETLAND WE-18-006 11258-000 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST R E E T A N D S T O R M S E W E R P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: UTILITY NOTES: 17 Page 32 of 221 ROAD B R O A D C ROAD A ROA D A R O A D B ROAD C RO A D B B L O C K 1 BLOCK 3 4 3 2 1 1234567891011 12345678 ROAD A R O A D B ROAD C ROA D A Road A PROFILE RO A D B ( 0 + 0 0 . 0 0 ) RO A D B ( 1 4 + 3 9 . 9 2 ) FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST R E E T A N D S T O R M S E W E R P L A N A N D P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 18 NOTES: ROAD A Page 33 of 221 RO A D A ROAD B BLOCK 1 BLOCK 3 BL O C K 2 9 87654321 1 2 3 4 5 1 2 3 4 5 9 10 11 12 13 RO A D A ROAD B RO A D B BLOC K 2 13 12 109 8 11 2 3 4 5 6 7 8 9 10 11 12 13 OUT L O T B 10-DAY SNOWMELT: 927.74 100-YR HWL: 927.23 WETLAND WE-18-006 11258-000 Road B PROFILE RO A D C ( 0 + 0 0 . 0 0 ) RO A D A ( 2 + 9 0 . 4 5 ) FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST R E E T A N D S T O R M S E W E R P L A N A N D P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 19 NOTES: ROAD B Page 34 of 221 HOA OW N E D D&U EAS E M E N T O V E R HOA OWNED 1 2 B L O C K 2 OUTLOT C ROAD A ROA D A R O A D B ROAD C RO A D B B L O C K 1 BLOCK 3 BLOCK 2 7 6 5 4 3 2 1 1234567891011 12345678 9 10 11 12 13 ROAD A R O A D B ROAD C ROA D A OUTLO T B Road C PROFILE RO A D B ( 1 + 9 0 . 0 0 ) RO A D B ( 1 2 + 4 9 . 9 2 ) FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST R E E T A N D S T O R M S E W E R P L A N A N D P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 20 NOTES: ROAD C Page 35 of 221 72"1,8 3 M 96"2,44M 48"1,22M 72"1,83M ZZU N 324 9 4707ZZPM 4707ZZ P M 47 0 7 ZZPM 47 0 7 ZZPM 47 0 7 ZZ P M 4707ZZPM 47 0 7 ZZPM 4707ZZPM TRANSFERSTATION TRANSFERSTATION ZZPM4708 4708 ZZPM ZZPM4708 CK I T - V 229" 217" 217" 234" 234" 234" 213" 213" 213" 156" 188" 188" 188" 8731ZZ U N R O A D B RO A D A ROAD B RO A D A POND 3 NWL: 920.00 10-DAY SNOWMELT: 927.70 100-YR HWL: 927.19 10-DAY SNOWMELT: 927.74 100-YR HWL: 927.23 WETLAND WE-18-006 11258-000 STUB 5 TO MH 2 PROFILE FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST O R M S E W E R P L A N A N D P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 21 NOTES: STUB 5 - FES 1 Page 36 of 221 RO A D A ROAD B BLOCK 1 12 10 9 87654321 11 1 1 13 RO A D A ROAD B CB 16 TO STUB PROFILE FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST O R M S E W E R P L A N A N D P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 22 NOTES: CB 18 - EX STUB Page 37 of 221 RO A D B BL O C K 1 5 4 3 2 23 1 2 RO A D B HOA OW N E D D&U EASE M E N T O V E R ENTIRE O U T L O T C ROAD A 1 12 ROAD A 4 5 6 7 8 1BLO C K 4 ( P H 2 ) R O A D A RO A D B R O A D A FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L IN T E R S E C T I O N D E T A I L S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 23 ROAD B - ROAD C ROAD B - ROAD A ROAD B - ROAD A Page 38 of 221 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B HOA OWN E D D&U EASE M E N T O V E R ENTIRE OU T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 5 6 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 OUTLOT C OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) BLO C K 5 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) B L O C K 1 1 ( P H 2 ) 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZU N 324 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSFER STATION TRANSFERSTATION ZZPM4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213"156" 188"188" 188" 8731ZZUN WETLAND WE-18-006 11258-000 WETLAND WE-18-006 11258-000 ROAD A ROAD B R O A D A RO A D B R O A D C RO A D B BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C R O A D A OUTLOT B 10-DAY SNOWMELT: 927.74 100-YR HWL: 927.23 2 - SL 7 - RO 7 - SL 1 - GM 7 - HL 7 - AB 6 - GM 6 - SL 7 - GM 1 - CH 1 - RO 4 - CH FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L LA N D S C A P I N G P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 24TREE PLANTING DETAIL1 LANDSCAPE NOTES: MITIGATION & LANDSCAPE REQUIREMENTS: LANDSCAPE SCHEDULE: (PHASE ONE) Page 39 of 221 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 HOA OWN E D D&U EASE M E N T O V E R ENTIRE O U T L O T C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 1 2 3 4 5 6 BLOCK 1 B L O C K 2 OUTLOT C OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) BLO C K 5 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) B L O C K 1 0 ( P H 2 ) B L O C K 1 1 ( P H 2 ) 72"1,83M 96"2,44M 48"1,22M72"1,83M ZZ U N 32 4 9 4707ZZPM 4707ZZPM4707ZZPM4707ZZPM 4707ZZPM4707ZZPM 4707ZZPM 4707ZZPM TRANSF E R STATION TRANSFE R STATIO N ZZPM 4708 4708ZZPM ZZPM 4708 CKIT-V 229" 217" 217" 234" 234" 234" 213"213" 213" 156" 188"188" 188" 8731ZZUN ROAD A ROAD B R O A D A RO A D B R O A D C RO A D B BL O C K 1 BLO C K 3 BLOCK 2 13 12 10 9 8 7 6 5 4 3 2 1 11 1234 5 6 7 8 9 10 11 1 23 4 5 6 7 8 9 10 11 12 13 ROAD A RO A D B R O A D C R O A D A OUTLOT B 2 - SL 7 - RO 7 - SL 1 - GM 7 - HL 7 - AB 6 - GM 6 - SL 7 - GM 1 - CH 1 - RO 4 - CH FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 3 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L LA N D S C A P I N G P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 25 LANDSCAPE SCHEDULE: (PHASE ONE) Page 40 of 221 C:\Users\jh\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I8FO6670\023542-000 Amber Fields 13th Addition - Plan Review Memo 2024.01.15.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 55 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M Memorandum To: Brian Erickson, City Engineer Nick Egger, Director of Public Works From: Amanda Sachi, PE Kendra Fallon, PE Kris Keller, PE Date: January 15, 2024 Re: Amber Fields 13th Addition – Phase 1 Final Plat Review WSB Project No. 023542-000 We have reviewed the documents provided by Alliant Engineering on December 15, 2023. Documents reviewed include: • Amber Fields 13th Addition Final Plat – Phase 1 Civil Set, dated 12/15/2023 Additional redline comments are provided on the submitted civil plans. Applicant should provide responses to each comment and redline comment. We offer the following comments below. Civil Comments: 1. General a. Update street names when available. b. Provide benchmark elevations. 2. Utilities a. Use SDR 26 PVC pipe for sanitary sewer depths between 18’ to 26’ i. Consider C900 PVC for depths greater than 26’ b. Install a hydrant along Road A for air release or modify the watermain such that high points are at the proposed hydrant locations c. Clarify why some hydrant gate valves are in the street and not behind the back of curb per City details d. Insulate between watermain and storm sewer when vertical separation is less than 3’ e. Install a temporary hydrant for flushing instead of a bleeder at the end of Road C for the active services (L7,8 B2; L10,11 B3) on the line 3. Signage and Street Lighting a. No comments at this time 4. Landscape a. No comments at this time Grading, Drainage, and Erosion Control Comments: Page 41 of 221 Amber Fields 15th Addition – Phase 1 Final Plat Review January 15, 2024 Page 2 5. General a. No comments. 6. Ponds and Wetlands a. No comments. 7. Emergency Overflow Routes: a. No comments. 8. Retaining Walls: a. No comments. 9. Erosion Control: a. No comments. 10. Grading: a. The contours should be added for the area west of the 13th Addition on the grading plans to confirm the drainage condition behind the proposed homes included in the 13th Addition and to confirm proposed contours tie into existing at the edge of the properties. Stormwater Management Plan: 11. General Storm Sewer Design a. No comments. 12. Water Quantity a. No comments. 13. Rate/Volume Control b. No comments. 14. Freeboard c. No comments. 15. Water Quality d. No comments. 16. Easements e. No comments. General Infrastructure design shall be completed in accordance with the City of Rosemount’s Engineering Guidelines and Standards. Infrastructure construction shall be completed in accordance with the latest edition of the City’s General Specifications and Standard Detail Plates for Street and Utility Construction. Page 42 of 221 M E M O R A N D U M To: Adam Kienberger, Community Development Director Anthony Nemcek, Senior Planner Julia Hogan, Planner From: Dan Schultz, Parks and Recreation Director Date: January 17, 2024 Subject: Amber Field 13th and 14th Additions The Parks and Recreation Department recently reviewed the plans for the Amber Fields 13th and 14th Additions. After reviewing the plans, the Parks and Recreation Department staff has the following comments: Parks Dedication The parks dedication for the 13th and 14th additions will be met through developer installed improvements as outlined in the subdivision agreement. Please let me know if you have any questions about this memo. Page 43 of 221 EXECUTIVE SUMMARY Planning Commission Regular Meeting: January 23, 2024 Tenative City Council Meeting: February 20, 2024 AGENDA ITEM: Request by Maplewood Development for Rezoning, a Major Amendment to the Amber Fields Planned Unit Development Agreement, Preliminary and Final Plat approval for Amber Fields 14th Addition. AGENDA SECTION: PUBLIC HEARINGS PREPARED BY: Julia Hogan, Planner AGENDA NO. 6.a. ATTACHMENTS: Site Location, Existing Conditions; Preliminary Plat; Phasing Plan; Site Plan; Grading and Drainage Plan; Erosion Control Plan; Utility Plan; Landscape Plan, Site, Lighting, and Signage Plan, Final Plat, City Engineer's Memo Dated January 15, 2024, Parks and Recreation Director's Memo Dated January 17, 2024 APPROVED BY: AK RECOMMENDED ACTION: 1. Motion to recommend the City Council approve a Zoning Map amendment to rezone the site from R1 PUD – Low Density Residential Planned Unit Development to R3 PUD – Medium Density Residential Planned Unit Development. 2. Motion to recommend the City Council approve the Preliminary and Final Plats for Amber Fields 14thAddition, subject to: a. Execution of a Subdivision Agreement. b. Conformance with all requirements of the City Engineer as detailed in the attached memorandum dated January 15, 2024. c. Road A within Outlot D shall be extended to the south property boundary for future connection. d. Conformance with all requirements stated within the Dakota County Plat Commission Memorandum. e. Payment of $57,420 as a landscape surety. f. Compliance with the conditions and standards within the Parks and Recreation Director’s memorandum dated January 17, 2024. g. Payment of trunk area charges in the amount of: I. Sanitary Sewer Trunk Charge: $1,075/acre II. Watermain Trunk Charge: $6,500/acre III. Storm Sewer Trunk Charge: $6,865/acre 3. Motion to recommend the City Council approve a Major Amendment to the Amber Fields Planned Page 44 of 221 Unit Development Agreement, subject to: a. Secion 11-4-8. F.6.c. R-3 Minimum rear yard setback: The minimum rear yard setback requirement for surface parking shall be 8-feet. BACKGROUND SUMMARY Owner: Earl Street Partners II, LLC. Preliminary Plat Acres: 18.42 Acres Met Council Net Acres: 18.42 Acres Residential Lots Created: 174 Townhome lots Gross Density: 9.45 Units/Acre Net Density: 9.45 Units/Acre Comprehensive Plan Guiding: MUR - Mixed Use Residential Current Zoning: R1 PUD - Low Density Residential PUD and R3 PUD - Medium Density Residential PUD Proposed Zoning: R3 PUD - Medium Density Residential The Planning Commission is being asked to consider a request by Maplewood Development for approval of rezoning, a major amendment to the Amber Fields Planned Unit Development Agreement, preliminary and final plats for Amber Fields 14th Addition to create 174 townhome lots. A total of 25 buildings will be constructed on site with 14 of the buildings consisting of 8 dwelling units, 9 of the buildings consisting of 6 dwelling units and 2 of the buildings consisting of 4 dwelling units. The request to rezone the property to R3-Medium Density Residential is to allow for townhome/single-family attached units and the higher density of units that is proposed. The eastern portion of the site is currently zoned R3 – Medium Density Residential and the western portion is zoned R1-Low Density Residential. Now that both areas will be combined on one plat the developer is requesting the preliminary plat area be rezoned to R3 – Medium Density Residential. The request for a major amendment to the Amber Fields PUD agreement is to allow for six guest parking stalls to be closer than 10-feet to the rear property line. The amendment is also needed because the proposed addition increases the number of residential dwelling units by more than five percent and decreases the amount of open space by more than five percent from the originally approved PUD. Staff is recommending approval of the requests by the developer, subject to the conditions included in the recommended action and the Engineer’s Memo dated January 15, 2024. BACKGROUND The present applications are the latest step in a long process of planning for the development within UMore Park. The developer received Planned Unit Development approval with Rezoning from the City Council at its September 7, 2021, meeting. The Planned Unit Development anticipated roughly 1,959 residential units, which were to include a mixture of housing types such as single-family lots, townhome lots, and multi-family lots. There are a total of 12 Amber Fields additions that have been Page 45 of 221 approved by the City Council. Preliminary Plat Areas that have been approved by City Council include Amber Fields 2nd, 3rd, 4th, 5th, 6th, 7th, 8th and 13th additions with additions 9th, 10th, 11th, and 12th being the remaining areas of the designated preliminary plat areas that are shown in the table below. There has been a total of 1,458 housing units approved so far within the Amber Fields Development Area and the table below shows the break-down of units that have been approved per addition. Amber Field Additions Housing Type Total Units Approved by City Council Amber Fields 2nd and 12th Additions Single Family and Townhome 301 units May 2022 and September 2023 Amber Fields 3rd and 11th Additions Single Family 182 units June 2022 and September 2023 Amber Fields 4th and 9th Additions Single Family 108 units July 2022 and April 2023 Amber Fields 5th and 10th Additions Single Family 124 units July 2022 and April 2023 Amber Fields 6th Addition Multifamily 268 units July 2022 Amber Fields 7th Addition Multifamily 250 units August 2022 Amber Fields 8th Addition Multifamily 160 units December 2022 Amber Fields 13th Addition Single Family 65 Units October 2023 The developer is proposing 174 townhome lots throughout the 18.42-acre section of the Amber Fields development area. This addition is located in the southeastern portion of the development area, directly west of Akron Avenue and south of the Amber Fields 13th Addition preliminary plat area. The Amber Fields 14th Addition subdivision is planned to be built out in two phases; the first phase will consist of 90 units in the eastern portion of the site with the second phase consisting of the remaining 84 units in the western portion of the site. ISSUE ANALYSIS Legal Authority Preliminary Plat and Final Plat requests are quasi-judicial decisions for the Planning Commission, meaning that the Planning Commission is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance and Subdivision Ordinance are being followed. Major Planned Unit Development Amendments are a legislative decision because of the Code deviations being requested. Legislative decisions give the Planning Commission more latitude, but consideration should be given to the PUD standards of the existing Amber Fields Planned Unit Development Agreement. Rezoning is also a legislative decision for the City, but the rezoning must conform with the adopted Comprehensive Plan to be approved. Therefore, while technically legislative in nature, if a rezoning is in line with the Comprehensive Plan, it should be approved. Staff’s review of each application is provided below. General Subdivision Design The preliminary plat area is located in the southeastern portion of the Amber Fields development area directly west of Akron Avenue and south of the connection road that will extend off of Akron Ave. The preliminary plat area is shown to be accessed by two private streets directly off the connection road Page 46 of 221 off of Akron Ave, which will be constructed with the construction of Amber Fields 13th Addition. The eastern access road is shown as Road C and it extends south from the entrance to the site. The western access road shown as Road A extends south and east throughout the site and eventually connects to Road C. The third road is shown as Road B and connects between Roads A and C on the northern end of site. There are guest parking stalls shown throughout the site and also open space that will be maintained by the HOA. There will be a mixture of 4-unit, 6-unit, and 8-unit townhome buildings throughout the development area. Rezoning and Land Use The site is designated for MUR-Mixed Use Residential land use, which can include a range of housing types, from single-family homes on traditional sixty-five foot lots to townhomes. The zoning districts in which the preliminary plat is located in is the R1 PUD – Low Density Residential Planned Unit Development district and the R3 PUD – Medium Density Residential Planned Unit Development district. The eastern 12.74 acres of the site is zoned R3 PUD and the remaining 5.68 acres is zoned R1 PUD. The applicant is asking for the western portion of the site to be rezoned to R3 PUD to accommodate the development of the proposed townhome development. The city code only allows single-family attached dwellings/townhomes within the R2-Moderate Density Residential district and R3-Medium Density Residential district. Also, by rezoning the western portion to R3 PUD it would allow the site to have up to the proposed 9.45 units per acre, which is over the units per acre that is allowed within the R1-Low Density Residential zoning district. Major Amendment to the Amber Fields PUD Agreement Amendments to the approved master development plans may be approved by the City Council following review by the planning commission. The notification and public hearing procedure for a Major Amendment is the same as that of the original approval. An amendment is determined to be major if it: 1. Substantially alters the location of buildings, parking areas or roads. 2. Increases or decreases the number of residential dwelling units by more than five percent (5%). 3. Increases the gross floor area of nonresidential buildings by more than five percent (5%) or increases the gross floor area of any individual building by more than ten percent (10%). 4. Increases the number of stories of any building. 5. Decreases the amount of open space by more than five percent (5%) or alters it in such a way as to change its original design or intended use. 6. Creates noncompliance with any special condition attached to the approval of the master development plan. In this case, the proposed project increases the gross floor area by more than five percent and decreases the amount of open space by more than five percent. Therefore, the proposed project requires a major amendment to the Custom Apparel Planned Unit Development Agreement. An additional deviation to the code that is needed for the 14th Addition preliminary plat area is to reduce the minimum rear yard setback requirement for surface parking from 10-feet to 8-feet for 6 Page 47 of 221 guest parking stalls that are located in the northwestern portion of the site. Phasing The applicant has provided a phasing plan that shows development initially occurring in the eastern portion of the preliminary plat area. This area will contain 90 lots of the proposed 174 townhome lots. 14 buildings will be constructed within the first phase. 5 buildings will consist of 8 units per building, 7 buildings will consist of 6 units per building, and 2 buildings will consist of 4 units per building. The eastern access point into the site will be constructed with the first phase and as well ass Road C and portions or Roads A and B. The second phase will consist of the remaining 84 lots and along with the second access to the site and the remainder of Roads A and B. Streets and Parking There are two access points into the preliminary plat area with both accesses into the site coming off of the connection road from Akron Avenue. The western access into the site comes from Road A which loops around the southern portion of the site and continues east to connect to Road C. The eastern access into the site comes from Road B which is a north south road that Roads A and B connect to. Road B is an east-west road that connects to both Roads A and C in the northern portion of the site. All roads within the development area are private. There are no pedestrian facilities planned for this addition of Amber Fields. Currently, there are a total of 783 parking stalls proposed to be provided throughout the development area. 348 garage stalls, 348 driveway stalls, and 87 guest parking stalls. The proposed number of stalls meets the City’s requirements. The city met with the Dakota County Plat Commission at their January 17, 2024, meeting to discuss this item. One comment that was stated by the Commission was that there should be a road extension to the property boundary to the south for future connection to the future roadway system/development to the south. Staff agrees with this comment and are recommending the extension of Road A within Outlot D south to the property boundary. Parks The Parks and Recreation staff has reviewed the park dedication requirement for Amber Fields 14th Addition as part of the overall Master Development Plan in order to take into account the multiple playgrounds and extensive open space within the development. Therefore, there is no park dedication requirement for this phase of Amber Fields. Preservation and Landscaping A tree inventory was conducted for the overall Amber Fields development area, and a total of 1,983 caliper inches of trees were identified for replacement following the formula laid out in the City Code. A total of 462.5 caliper inches of trees as mitigation has been provided throughout the Amber Fields Development area. 1,520.5 caliper inches of trees are still needing to be provided as replacements throughout the remaining phases of Amber Fields. The applicant is aware that the remainder of caliper inches of trees will need to be replaced and staff are confident this will be met as development continues. The landscaping plan provided by the applicant shows a total of 174 trees to be planted throughout the Page 48 of 221 preliminary plat area. The R3 zoning standard for landscaping requires 1 tree per open space unit exposure and for other attached dwellings trees must be deciduous and spacing must include trees at the boulevard at 50-foot intervals. The landscape plat submitted conforms with those requirements. Trees are shown on the landscape plan throughout the site within the open areas, along the private roadways and public right of way. A total of 174 trees will be planted within this development, therefore a landscaping surety in the amount of $57,420 (174 trees x $300 plus 10%) is required as a condition of approval. Utilities The site will be served by existing sanitary sewer located within the connection road that extends off of Akron Avenue. The sanitary sewer system will extend throughout the private roads and will service the entire development area. Water will be provided to the site via an existing 8” watermain that is proposed to be extended within the private streets of the preliminary plat area. Stormwater is managed across the entire site with detention and retention ponds located in the central open area of Amber Fields. Engineering Review The City’s engineer has provided a memorandum containing comments related to the plans provided. The memorandum included comments related to utilities, grading and general storm sewer design. A copy of the memorandum is included in the attachments. Final Plat Standards for reviewing subdivision requests are detailed in Title 12 of the Rosemount City Code. This section of the Code outlines the two-step Preliminary and Final Plat process for land subdivision. The final plat for Amber Fields 14th Addition includes 90 townhome units throughout 14 buildings. 5 of the buildings will contain 8 units per building, 7 of the buildings will contain 6 units per building and 2 of the buildings will contain 4 units per building. Additionally, there are five outlots identified on the plat. Outlots A, B, and C are open area that will be HOA owned with drainage and utility easements located over them. Outlot D contains the private streets within the first phase of development. Outlot E will encompass phase two of the development, which will consist of the remaining townhome units and private streets. Staff finds the Final Plat is consistent with the Preliminary Plat and meets the requirements of the Zoning Ordinance. RECOMMENDATION Staff is recommending approval of the rezoning, major amendment to the Amber Fields Planned Unit Development Agreement, preliminary and final plats for Amber Fields 14th Addition, subject to conditions in the recommended action and contained within the Engineer’s memorandum. The recommendation is based on information provided by the application and reviewed in this report. Page 49 of 221 Page 50 of 221 CO U N T Y RO A D N O . 7 3 C. S. A. H. NO. 42(145TH ST. W.) (A K R O N A V E . ) AK R O N A V E . C. S. A. H. NO. 42 (145TH ST. W.) AK R O N A V E . AK R O N A V E . AK R O N A V E . AK R O N A V E . STORMWATER MANAGEMENT AREA 1 BASIN 1918PER CITY STORMWATER MANAGEMENT AREA 2 STORMWATER MANAGEMENT AREA 3 STORMWATER MANAGEMENT AREA 3 WETLANDWE-18-00611258-000 WETLAND WE-18-006 11258-000 WETLAND WE-18-00611258-000 AU B U R N A V E . AB B E Y F I E L D A V E . 148TH ST. W. 148TH ST. W. 148 T H S T . W . 148TH ST. W. AK R O N A V E . ( C . R . 7 3 ) AB B E Y F I E L D A V E . 149TH STREET WEST AR T A I N E T R A I L ADA ADA ADAADAADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADAADAADA ADA ADAADAADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADAADAADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADAADAELEC RISER ADA ADA ADA ELEC RISER ADA ADA ADA ADAADA 48" 36" * 3" WINDOW 24"x24" 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA 10' DRAINAGE AND UTILITY EASEMENT 5' DRAINAGE AND UTILITY EASEMENT 5' D R A I N A G E A N D U T I L I T Y E A S E M E N T 10 ' D R A I N A G E A N D U T I L I T Y E A S E M E N T HWY 42 T O U T L O T C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLOC K 1 7 OUT L O T A O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BLO C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 BL O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 81 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 AK R O N A V E . ROAD A RO A D B R O A D C R O A D A O U T L O T C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLOC K 1 7 OUT L O T A O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BLO C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 BL O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 81 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 PROJECT LOCATION FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L CO V E R S H E E T 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SHEET INDEX SHEET TITLENO. COVER SHEET1 EXISTING CONDITIONS PLAN2 PRELIMINARY PLAT3-5 SITE PLAN7-9 GRADING AND DRAINAGE PLAN10-12 EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL NOTES 15-17 SANITARY SEWER AND WATERMAIN PLAN 18 STORM SEWER PLAN 19-21 LANDSCAPE PLAN 22-24 25-27 GRADING PROFILES13-14 PHASING PLAN6 SUITE 700 ALLIANT ENGINEERING, INC. 733 MARQUETTE AVENUE SOUTH MINNEAPOLIS, MN 55402 PH: 612-758-3080 CONSULTANT FX: 612-758-3099 SURVEYOR ENGINEER DANIEL EKREM LICENSE NO. 57366 CLARK WICKLUND LICENSE NO. 40922 LANDSCAPE ARCHITECT EM: cwicklund@alliant-inc.com EM: dekrem@alliant-inc.com MARK KRONBECK LICENSE NO. 26222 EM: mkronbeck@alliant-inc.com VICINITY MAP SCALE: 1" = 4000' DEVELOPER MAPLEWOOD DEVELOPMENT 1128 HARMON PLACE SUITE 320 PH: 612-746-4046 CONTACT: MARIO J. COCCHIARELLA MINNEAPOLIS, MN 55403 AMBER FIELDS - LENNAR TOWNHOMES PRELIMINARY PLAT 1 Page 51 of 221 LEGEND NOTES: 2 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L EX I S T I N G C O N D I T I O N S P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N Page 52 of 221 O U T L O T C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 HOA O W N E D D&U E A S E M E N T O V E R ENT I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A OUT L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 BL O C K 2 5 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 L = 2 9 9.5 5' R = 2 1 7 5.0 0' Δ = 7°5 3'2 7" S 4 8 ° 1 2 ' 0 8 " E 2 1 9 . 5 8 ' N41°47'52"E 25.00' S 4 8 ° 1 2 ' 0 8 " E 4 8 0 . 7 4 ' L = 7 3 4.0 9' R = 3 2 2 5.0 0' Δ = 13°0 2'3 1" N0 ° 1 5 ' 5 3 " E 9 2 2 . 1 2 ' S89°42'15"E 230.34' L=574.96'R=830.00' Δ=39°41'23" S 4 9 ° 4 0 ' 1 1 " E 4 2 5 . 6 2 ' S40 ° 1 9 ' 4 9 " W 4 4 7 . 5 6 ' OU T L O T D OUT L O T D OUT L O T D OU T L O T D PARCEL AREA TABLE PARCEL B1-L1 B1-L2 B1-L3 B1-L4 B1-L5 B1-L6 B2-L1 B2-L2 B2-L3 B2-L4 B2-L5 B2-L6 B2-L7 B2-L8 B3-L1 B3-L2 B3-L3 B3-L4 B3-L5 B3-L6 B3-L7 B3-L8 B4-L1 B4-L2 B4-L3 B4-L4 B4-L5 B4-L6 B4-L7 B4-L8 B5-L1 B5-L2 B5-L3 B5-L4 B5-L5 B5-L6 B5-L7 B5-L8 B6-L1 B6-L2 B6-L3 B6-L4 B6-L5 B6-L6 B7-L1 B7-L2 B7-L3 B7-L4 B7-L5 B7-L6 B7-L7 B7-L8 B8-L1 B8-L2 B8-L3 B8-L4 B9-L1 B9-L2 B9-L3 B9-L4 AREA SF 2,160 1,800 1,800 1,800 1,800 2,160 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,160 1,800 1,800 1,800 1,800 2,160 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,160 1,800 1,800 2,160 2,160 1,800 1,800 1,800 AREA AC 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.05 0.05 0.04 0.04 0.04 PARCEL AREA TABLE PARCEL B9-L5 B9-L6 B10-L1 B10-L2 B10-L3 B10-L4 B10-L5 B10-L6 B10-L7 B10-L8 B11-L1 B11-L2 B11-L3 B11-L4 B11-L5 B11-L6 B12-L1 B12-L2 B12-L3 B12-L4 B12-L5 B12-L6 B13-L1 B13-L2 B13-L3 B13-L4 B13-L5 B13-L6 B13-L7 B13-L8 B14-L1 B14-L2 B14-L3 B14-L4 B14-L5 B14-L6 B14-L7 B14-L8 B15-L1 B15-L2 B15-L3 B15-L4 B15-L5 B15-L6 B15-L7 B15-L8 B16-L1 B16-L2 B16-L3 B16-L4 B16-L5 B16-L6 B16-L7 B16-L8 B17-L1 B17-L2 B17-L3 B17-L4 B17-L5 B17-L6 AREA SF 1,800 2,160 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,160 1,800 1,800 1,800 1,800 2,160 2,160 1,800 1,800 1,800 1,800 2,160 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 AREA AC 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 PARCEL AREA TABLE PARCEL B17-L7 B17-L8 B19-L1 B19-L2 B19-L3 B19-L4 B20-L1 B20-L2 B20-L3 B20-L4 B20-L5 B20-L6 B20-L7 B20-L8 B21-L1 B21-L2 B21-L3 B21-L4 B21-L5 B21-L6 B21-L7 B21-L8 B22-L1 B22-L2 B22-L3 B22-L4 B22-L5 B22-L6 B22-L7 B22-L8 B23-L1 B23-L2 B23-L3 B23-L4 B23-L5 B23-L6 B24-L1 B24-L2 B24-L3 B24-L4 B24-L5 B24-L6 B25-L1 B25-L2 B25-L3 B25-L4 B25-L5 B25-L6 Outlot A Outlot B Outlot C Outlot D Total AREA SF 1,850 2,220 2,160 1,800 1,800 2,160 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,220 1,850 1,850 1,850 1,850 1,850 1,850 2,220 2,160 1,800 1,800 1,800 1,800 2,160 2,160 1,800 1,800 1,800 1,800 2,160 2,160 1,800 1,800 1,800 1,800 2,160 171,360 143,262 46,923 103,826 802,450 AREA AC 0.04 0.05 0.05 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.05 0.05 0.04 0.04 0.04 0.04 0.05 3.93 3.29 1.08 2.38 18.42 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 3 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L PR E L I M I N A R Y P L A T O V E R A L L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 MI HO M E S D E V E L O P M E N T LEGEND: DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: Being 5 feet in width and adjoining lot lines and 10 feet in width and adjoining right of way lines, unless otherwise indicated on the plat. NOT TO SCALE Page 53 of 221 O U T L O T C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 B L O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 HOA O W N E D D&U E A S E M E N T O V E R ENT I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B HO A O W N E D D & U E A S E M E N T O V E R EN T I R E O U T L O T C OUT L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A O U T L O T D O U T L O T D OUTLOT B 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 B L O C K 1 9 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 L = 2 9 9.5 5' R = 2 1 7 5.0 0' Δ = 7°5 3'2 7 " S 4 8 ° 1 2 ' 0 8 " E 2 1 9 . 5 8 ' N41°47'52"E 25.00' S 4 8 ° 1 2 ' 0 8 " E 4 8 0 . 7 4 ' S89°42'15"E 230.34' L=574.96'R=830.00' Δ=39°41'23" S 4 9 ° 4 0 ' 1 1 " E 4 2 5 . 6 2 ' S40 ° 1 9 ' 4 9 " W 4 4 7 . 5 6 ' = = = = = OU T L O T D OUT L O T D OUT L O T D OU T L O T D AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L PR E L I M I N N A R Y P L A T P L A N V I E W A 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: 4 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N Page 54 of 221 B L O C K 3 BLO C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 BL O C K 1 6 BLO C K 1 7 HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B D&U E A S E M E N T O V E R EN T I R E O U T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A OUT L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 5 6 7 8 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 S 4 8 ° 1 2 ' 0 8 " E 2 1 9 . 5 8 ' N41°47'52"E 25.00' S 4 8 ° 1 2 ' 0 8 " E 4 8 0 . 7 4 ' L = 7 3 4.0 9' R = 3 2 2 5.0 0' Δ = 13°0 2'3 1" N0 ° 1 5 ' 5 3 " E 9 2 2 . 1 2 ' S89°42'15"E 230.34' L=574.96'R=830.00' Δ=39°41'23" = = = = = OU T L O T D OUT L O T D OU T L O T D AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L PR E L I M I N A R Y P L A T P L A N V I E W B 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: 5 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N Page 55 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLOC K 1 7 OUT L O T A AK R O N A V E . O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 6 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L PH A S I N G P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: Page 56 of 221 25 24 23 12 10 9 8 7 6 5 4 3 2 1 11 26 BL O C K 1 BLO C K 1 1 1 B L O C K 2 BL O C K 3 ROAD A R O A D A RO A D B R O A D C RO A D B 234 5 6 7 8 9 10 11 12 13 14 15 16 23 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 15 ROAD A RO A D B R O A D C R O A D A O U T L O T C RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 HOA O W N E D D&U E A S E M E N T O V E R ENT I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A OUT L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A AK R O N A V E . O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 BL O C K 2 5 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 7 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L SI T E P L A N O V E R A L L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SITE PLAN NOTES: LEGEND: TOWNHOME LOT DATA: TOTAL DENSITY CALCULATIONS: TYPICAL PRIVATE ROAD SECTION MI HO M E S D E V E L O P M E N T TYPICAL 25' WIDE TOWNHOME LOT DETAIL Page 57 of 221 25 24 9 8 7 6 5 4 3 2 1 26 1 1 B L O C K 2 BL O C K 3 R O A D A RO A D B R O A D C RO A D B 234 5 6 7 8 9 10 11 12 13 14 15 16 23 4 5 6 7 8 9 10 11 12 13 17 18 19 20 21 22 23 RO A D B R O A D C R O A D A O U T L O T C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 B L O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 HOA O W N E D D&U E A S E M E N T O V E R ENT I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B HO A O W N E D D & U E A S E M E N T O V E R EN T I R E O U T L O T C OUT L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A O U T L O T D O U T L O T D OUTLOT B 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 B L O C K 1 9 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L SI T E P L A N V I E W A 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: 8 Page 58 of 221 1 ROAD AROAD A RO A D C R O A D A ROAD B R O A D A R O A D C B L O C K 3 BLO C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 BL O C K 1 6 BLO C K 1 7 HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B D&U E A S E M E N T O V E R EN T I R E O U T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A AK R O N A V E . OUT L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B RO A D C R O A D A ROAD B R O A D C 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 5 6 7 8 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L SI T E P L A N V I E W B 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: 9 Page 59 of 221 25 24 23 10 9 8 7 6 5 4 3 2 1 11 26 BL O C K 1 BLO C K 1 1 1 B L O C K 2 BL O C K 3 ROAD A R O A D A RO A D B R O A D C RO A D B 234 5 6 7 8 9 10 11 12 13 14 15 16 23 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 15 ROAD A RO A D B R O A D C R O A D A O U T L O T C RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 OUT L O T A AK R O N A V E . O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 BL O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 81 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 10 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L GR A D I N G A N D D R A I N A G E P L A N O V E R A L L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 GRADING NOTES: LEGEND: TOWNHOME HOLD DOWN DETAILS Page 60 of 221 25 24 9 8 7 6 5 4 3 2 1 26 1 1 B L O C K 2 BL O C K 3 R O A D A RO A D B R O A D C RO A D B 234 5 6 7 8 9 10 11 12 13 14 15 16 23 4 5 6 7 8 9 10 11 12 13 17 18 19 20 21 22 23 RO A D B R O A D C R O A D A O U T L O T C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 B L O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 OUT L O T A O U T L O T D O U T L O T D OUTLOT B 1 2 3 4 5 6 7 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 B L O C K 1 9 OUTLOT A OU T L O T D O U T L O T B R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 11 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L GR A D I N G A N D D R A I N A G E P L A N V I E W A 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: Page 61 of 221 1 ROAD AROAD A RO A D C R O A D A ROAD B R O A D A R O A D C B L O C K 3 BLOC K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 BLO C K 1 6 BLO C K 1 7 AK R O N A V E . OUTL O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 5 6 7 8 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 12 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L GR A D I N G A N D D R A I N A G E P L A N V I E W B 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: Page 62 of 221 Road A-S PROFILE RO A D B RO A D A RO A D C FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 13 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L GR A D I N G P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 ROAD A ROAD A CONT. Page 63 of 221 Road B-S PROFILE RO A D A ( s ) RO A D C Road C-S PROFILE RO A D B RO A D A FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 14 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L GR A D I N G P R O F I L E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 ROAD B ROAD C Page 64 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLOC K 1 7 OUT L O T A AK R O N A V E . O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 15 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L ER O S I O N A N D S E D I M E N T C O N T R O L P L A N O V E R A L L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SWPPP BMP QUANTITIES EROSION CONTROL RESPONSIBLE PARTY: CONTRACTOR: (PER PLAN): NOTE TO CONTRACTOR: CONSTRUCTION SEQUENCING: ACTIVE SWPPP MAP LEGEND LEGEND: DND NOTES: Page 65 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 OUT L O T A O U T L O T D O U T L O T D OUTLOT B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 B L O C K 1 9 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 16 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L ER O S I O N A N D S E D I M E N T C O N T R O L P L A N V I E W A 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: DND Page 66 of 221 ROAD AROAD A RO A D C R O A D A ROAD B R O A D A R O A D C B L O C K 3 BLOC K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 BLO C K 1 6 BLO C K 1 7 AK R O N A V E . O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 5 6 7 8 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 17 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L ER O S I O N A N D S E D I M E N T C O N T R O L P L A N V I E W B 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: DND Page 67 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L ER O S I O N A N D S E D I M E N T C O N T R O L N O T E S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 18 EROSION CONTROL SCHEDULE: PERMANENT COVER: MANAGEMENT MEASURES: POLLUTION PREVENTION · SEDIMENT CONTROL PRACTICES: EROSION CONTROL GENERAL NOTES: MAINTENANCE PROGRAM: EROSION AND SEDIMENT CONTROL DEWATERING: FINAL STABILIZATION: CONCRETE WASHOUT DETAIL Page 68 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLOC K 1 7 OUT L O T A AK R O N A V E . O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 19 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N O V E R A L L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: UTILITY NOTES: Page 69 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 OUT L O T A O U T L O T D O U T L O T D OUTLOT B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 B L O C K 1 9 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 20 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N V I E W A 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: Page 70 of 221 ROAD AROAD A RO A D C R O A D A ROAD B R O A D A R O A D C B L O C K 3 BLOC K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 BLO C K 1 6 BLO C K 1 7 AK R O N A V E . O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 5 6 7 8 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 21 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N V I E W B 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: Page 71 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLOC K 1 7 OUT L O T A AK R O N A V E . O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 22 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L ST O R M S E W E R P L A N O V E R A L L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: UTILITY NOTES: STORM SEWER SCHEDULE Page 72 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 OUT L O T A O U T L O T D O U T L O T D OUTLOT B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 B L O C K 1 9 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 23 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L ST O R M S E W E R P L A N V I E W A 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: Page 73 of 221 ROAD AROAD A RO A D C R O A D A ROAD B R O A D A R O A D C B L O C K 3 BLOC K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 BLO C K 1 6 BLO C K 1 7 AK R O N A V E . O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D O U T L O T B RO A D C R O A D A ROAD B R O A D C 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 5 6 7 8 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 24 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L ST O R M S E W E R P L A N V I E W B 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: Page 74 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLOC K 1 7 HOA O W N E D D&U E A S E M E N T O V E R ENT I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A OUT L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A AK R O N A V E . O U T L O T D O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 - RB 5 - KC 2 - PO 1 - NS 1 - RB 1 - NS 1 - RB 1 - RB 1 - NS 1 - RB 1 - NS 1 - RB 1 - NS 4 - RO 3 - AE 4 - PO 4 - CH 5 - AE 5 - AB 5 - AE 4 - NF 1 - RB 1 - RB 1 - RB 1 - RB 5 - HL 5 - AB 5 - CH 1 - HL 1 - HL 6 - HL 1 - GM 3 - CH 7 - RO FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 25 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L LA N D S C A P E P L A N O V E R A L L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 TREE PLANTING DETAIL1 LANDSCAPE NOTES: MITIGATION & LANDSCAPE REQUIREMENTS: LANDSCAPE SCHEDULE: Page 75 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A O U T L O T C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C BLO C K 1 BLO C K 2 B L O C K 3 B L O C K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 B L O C K 1 5 BL O C K 1 6 BLO C K 1 7 HOA O W N E D D&U E A S E M E N T O V E R ENT I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B H O A O W N E D D & U E A S E M E N T O V E R EN T I R E O U T L O T C OUT L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A O U T L O T D O U T L O T D OUTLOT B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 B L O C K 1 9 B L O C K 2 5 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 - RB 2 - NF 3 - NF 5 - HL 4 - PO 2 - KC 5 - KC 2 - PO 1 - NS 1 - RB 1 - NS 1 - RB 1 - RB 1 - NS 1 - RB 1 - NS 1 - RB 1 - NS 1 - RB 1 - NS 1 - NS 1 - RB 1 - NS 1 - RB 1 - RB 4 - RO 3 - AE 4 - PO 4 - CH 5 - AE 5 - AB 5 - AE 4 - RO5 - NF 4 - CH 4 - NF 1 - RB 1 - RB 1 - RB 1 - RB 2 - CH 2 - CH 8 - PO 7 - AB 9 - HL 4 - AE1 - RB 1 - RB 1 - RB 5 - HL 5 - AB 5 - CH 4 - NF 1 - HL 1 - HL 3 - CH 7 - RO FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 26 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L LA N D S C A P E P L A N V I E W A 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LANDSCAPE SCHEDULE: Page 76 of 221 ROAD AROAD A RO A D C R O A D A ROAD B R O A D A R O A D C B L O C K 3 BLOC K 1 4 BL O C K 4 B L O C K 1 3 BLO C K 5 BL O C K 1 2 BLO C K 1 6 BLO C K 1 7 HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B D&U EA S E M E N T O V E R EN T I R E O U T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A AK R O N A V E . O U T L O T D OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 6 BL O C K 7 BL O C K 8 BL O C K 9 BLOCK 10 BLOCK 1 1 BLOCK 18 BL O C K 2 0 B L O C K 1 9 BL O C K 2 1 BL O C K 2 2 BL O C K 2 3 BL O C K 2 4 B L O C K 2 5 OUTLOT A OU T L O T D H O A O W N E D D & U E A S E M E N T O V E R E N T I R E O U T L O T B O U T L O T B RO A D C R O A D A ROAD B R O A D C 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 5 6 7 8 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 5 - HL 4 - PO 2 - KC 1 - NS 1 - RB 1 - NS 1 - RB 1 - NS 1 - RB 1 - NS 1 - NS 1 - RB 1 - NS 1 - RB 1 - RB 1 - NS 1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 5 - AB 5 - AE 4 - RO5 - NF 4 - CH 4 - NF 1 - RB 1 - RB 1 - RB 2 - CH 2 - CH 8 - PO 7 - AB 9 - HL 8 - RO 4 - AE1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 1 - NS 5 - HL 5 - AB 5 - CH 4 - NF 8 - KC FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N 27 AM B E R F I E L D S - 1 4 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L LA N D S C A P E P L A N V I E W B 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 Page 77 of 221 CO U N T Y RO A D N O . 7 3 C. S. A. H. NO. 42(145TH ST. W.) (A K R O N A V E . ) AK R O N A V E . C. S. A. H. NO. 42 (145TH ST. W.) AK R O N A V E . AK R O N A V E . AK R O N A V E . AK R O N A V E . STORMWATER MANAGEMENT AREA 1 BASIN 1918PER CITY STORMWATER MANAGEMENT AREA 2 STORMWATER MANAGEMENTAREA 3 STORMWATER MANAGEMENTAREA 3 WETLAND WE-18-00611258-000 WETLAND WE-18-006 11258-000 WETLANDWE-18-006 11258-000 AU B U R N A V E . AB B E Y F I E L D A V E . 148TH ST. W. 148TH ST. W. 148 T H S T . W . 148TH ST. W. AK R O N A V E . ( C . R . 7 3 ) AB B E Y F I E L D A V E . 149TH STREET WEST AR T A I N E T R A I L ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA AD A AD A AD A ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADAADA ADA AD A ADA AD A ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ADA ELEC RISER ADA ADA ADA ELEC RISER ADA ADA ADA ADAADA 48" 36" * 3" WINDOW 24"x24" 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 5" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW 6" WINDOW ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA ADAADA 10' DRAINAGE AND UTILITY EASEM E N T 5' DRAINAGE AND UTILITY EASEMENT 5' D R A I N A G E A N D U T I L I T Y E A S E M E N T 10 ' D R A I N A G E A N D U T I L I T Y E A S E M E N T HWY 42 T RO A D C R O A D A ROAD B RO A D C OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BLO C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E AK R O N A V E . RO A D C R O A D A ROAD B RO A D C OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BLO C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E PROJECT LOCATION FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L CO V E R S H E E T 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SHEET INDEX SHEET TITLENO. COVER SHEET1 STANDARD DETAILS 5 EXISTING CONDITIONS PLAN 2-4 SITE, LIGHTING, AND SIGNAGE PLAN7-8 GRADING AND DRAINAGE PLAN9-11 EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL NOTES AND DETAILS SANITARY SEWER AND WATERMAIN PLAN STREET AND STORM SEWER PLAN 17-19 LANDSCAPE PLAN 12-14 PHASING PLAN6 SUITE 700 ALLIANT ENGINEERING, INC. 733 MARQUETTE AVENUE SOUTH MINNEAPOLIS, MN 55402 PH: 612-758-3080 CONSULTANT FX: 612-758-3099 SURVEYOR ENGINEER DANIEL EKREM LICENSE NO. 57366 CLARK WICKLUND LICENSE NO. 40922 LANDSCAPE ARCHITECT EM: cwicklund@alliant-inc.com EM: dekrem@alliant-inc.com MARK KRONBECK LICENSE NO. 26222 EM: mkronbeck@alliant-inc.com VICINITY MAP SCALE: 1" = 4000' DEVELOPER MAPLEWOOD DEVELOPMENT 1128 HARMON PLACE SUITE 320 PH: 612-746-4046 CONTACT: MARIO J. COCCHIARELLA MINNEAPOLIS, MN 55403 AMBER FIELDS - 14TH ADDITION ROSEMOUNT, MINNESOTA 1 SANITARY SEWER AND WATERMAIN PLAN AND PROFILES STREET AND STORM SEWER PLAN AND PROFILES STREET INTERSECTION DETAILS 15 16 20 21-24 26-28 25 APPROVED CITY OF ROSEMOUNT PROJECT NO: 2022-16 2875 145TH STREET WEST ROSEMOUNT, MN 55068 (651) 423-4411 Page 78 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST A N D A R D D E T A I L S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 2 Page 79 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST A N D A R D D E T A I L S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 3 Page 80 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L ST A N D A R D D E T A I L S 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 4 Page 81 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N LEGEND NOTES: AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 5 EX I S T I N G C O N D I T I O N S P L A N Page 82 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 AK R O N A V E . 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) BLO C K 5 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) BL O C K 1 1 ( P H 2 ) FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: PH A S I N G P L A N 6 Page 83 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B HOA OWN E D D&U EASE M E N T O V E R ENTIRE O U T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A RO A D C R O A D A ROAD B R O A D C OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E AK R O N A V E N U E AK R O N A V E N U E FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L SI T E , L I G H T I N G , A N D S I G N A G E P L A N - O V E R A L L V I E W 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SITE PLAN NOTES: LEGEND: TOWNHOME LOT DATA: TOTAL DENSITY CALCULATIONS: TYPICAL PRIVATE ROAD SECTION MI HO M E S D E V E L O P M E N T TYPICAL 25' WIDE TOWNHOME LOT DETAIL 7 Page 84 of 221 ROAD AROAD A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT B HOA OWN E D D&U EASE M E N T O V E R ENTIRE O U T L O T C HO A O W N E D D& U E A S E M E N T O V E R EN T I R E O U T L O T A HOA OWNED D&U EASEMENT OVER ENTIRE OUTLOT A RO A D C R O A D A ROAD B R O A D C OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 B L O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E OUTLOT C ROAD A AK R O N A V E N U E ROAD A AK R O N A V E N U E FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L SI T E , L I G H T I N G , A N D S I G N A G E P L A N - V I E W A 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: 8 Page 85 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 AK R O N A V E . RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) BLO C K 5 ( P H 2 ) BL O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) BL O C K 1 1 ( P H 2 ) AK R O N A V E N U E AK R O N A V E N U E FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 GRADING NOTES: LEGEND: TOWNHOME HOLD DOWN DETAILS GR A D I N G A N D D R A I N A G E P L A N - O V E R A L L V I E W 9 Page 86 of 221 ROAD AROAD A RO A D C R O A D A ROAD B R O A D A R O A D C 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 AK R O N A V E . RO A D C R O A D A ROAD B R O A D C 7 8 1 2 3 4 5 6 7 8 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 B L O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BLOCK 2 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) BLOCK 1 1 ( P H 2 ) ROAD A AK R O N A V E N U E ROAD A AK R O N A V E N U E FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: GR A D I N G A N D D R A I N A G E P L A N - V I E W A 10 Page 87 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 B L O C K 2 OUTLOT A OU T L O T D OUTLOT C OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) BLO C K 5 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) B L O C K 1 1 ( P H 2 ) FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: GR A D I N G A N D D R A I N A G E P L A N - V I E W B 11 Page 88 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A RO A D C R O A D A ROAD B R O A D C OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SWPPP BMP QUANTITIES EROSION CONTROL RESPONSIBLE PARTY: CONTRACTOR: (PER PLAN): NOTE TO CONTRACTOR: CONSTRUCTION SEQUENCING: ACTIVE SWPPP MAP LEGEND LEGEND: DND NOTES: ER O S I O N A N D S E D I M E N T C O N T R O L P L A N - O V E R A L L V I E W 12 Page 89 of 221 ROAD AROAD A RO A D C R O A D A ROAD B R O A D C OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 B L O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: DND ER O S I O N A N D S E D I M E N T C O N T R O L P L A N - V I E W A 13 Page 90 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A R O A D A ROAD B R O A D C OUTLOT B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 B L O C K 2 OUTLOT A OU T L O T D OUTLOT C OUTLOT D OUTLOT E FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: DND ER O S I O N A N D S E D I M E N T C O N T R O L P L A N - V I E W B 14 Page 91 of 221 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 EROSION CONTROL SCHEDULE: PERMANENT COVER: MANAGEMENT MEASURES: POLLUTION PREVENTION · SEDIMENT CONTROL PRACTICES: EROSION CONTROL GENERAL NOTES: MAINTENANCE PROGRAM: EROSION AND SEDIMENT CONTROL DEWATERING: FINAL STABILIZATION: CONCRETE WASHOUT DETAIL ER O S I O N A N D S E D I M E N T C O N T R O L N O T E S A N D D E T A I L S 15 Page 92 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 AK R O N A V E . RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) BLO C K 5 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) BL O C K 1 1 ( P H 2 ) FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LEGEND: UTILITY NOTES: SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N - O V E R A L L V I E W 16 Page 93 of 221 RO A D A RO A D A ROAD CROAD C AKRON AVE. ROAD CROAD C OU T L O T B OUTLOT A 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 4 5 6 1 2 3 4 5 61234561234 1 2 3 4 2 3 4 5 6 BLO C K 1 0 BLOCK 11BLOCK 12 BL O C K 1 3 BL O C K 1 BLOCK 3 BLOC K 2 BLOCK 4 BLOCK 5 BLO C K 6 BLO C K 7 OUTLOT D OU T L O T C OU T L O T D OU T L O T D Road C-S PROFILE RO A D B RO A D A B2 L 1 B2 L 2 B2 L 3 B2 L 4 B3 L 1 B3 L 2 B3 L 3 B3 L 4 B3 L 5 B3 L 6 B3 L 7 B3 L 8 B4 L 1 B4 L 2 B4 L 3 B4 L 4 B4 L 5 B4 L 6 B4 L 7 B4 L 8 B5 L 1 B1 1 L 1 B1 1 L 2 B1 1 L 3 B1 1 L 4 B1 2 L 6 B1 2 L 5 B1 2 L 4 B1 2 L 3 B1 2 L 2 B1 2 L 1 B1 2 L 1 B5 L 2 B5 L 3 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N A N D P R O F I L E S 17 ROAD C NOTES: SANITARY SERVICE SHEDULE Page 94 of 221 R O A D C ROAD A12345678 R O A D C ROAD A 1 2 3 4 5 6 OUT L O T B 1 2 3 4 5 6 7 8 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 BLOCK 9 BLOCK 10 B L O C K 1 1 B L O C K 1 2 BLOCK 1 4 B L O C K 4 B L O C K 5 BLOCK 6BLOCK 7BLOCK 8OUT L O T A O U T L O T D OUTLOT D BLOCK 8(P H 2 ) BLOCK 9(PH 2 ) Road A-S PROFILE RO A D C FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N A N D P R O F I L E S 18 ROAD A NOTES: SANITARY SERVICE SHEDULE Page 95 of 221 ROA D A ROAD A ROAD C RO A D B ROA D A ROAD C ROAD A ROAD B RO A D A ROAD B R O A D C 3 4 5 6 1 2 3 4 ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTL O T B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 2 3 4 5 6 1 2 3 4 1 2 3 4 5 6 B L O C K 1 2 BLOC K 1 3 BLOCK 1 4 BLOC K 1 BL O C K 2 OUTLO T C OUTL O T D OUTL O T E BLOCK 1(PH 2 )BLOCK 2(PH 2) BLOCK 3(PH 2 ) BL O C K 4 ( P H 2 ) BL O C K 5 ( P H 2 ) BLOCK 6(P H 2 ) BLOCK 9(PH 2) BLOCK 10( P H 2 ) BLOCK 11(P H 2 ) Road B-S PROFILE RO A D A ( s ) RO A D C B3 L 1 ( P H 2 ) B3 L 2 ( P H 2 ) B3 L 3 ( P H 2 ) B3 L 4 ( P H 2 ) B3 L 5 ( P H 2 ) B3 L 6 ( P H 2 ) RO A D B RO A D A B4 L 4 ( P H 2 ) B4 L 5 ( P H 2 ) B4 L 6 ( P H 2 ) B4 L 7 ( P H 2 ) B4 L 8 ( P H 2 ) FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N A N D P R O F I L E S 19 ROAD B NOTES: SANITARY SERVICE SHEDULE ROAD A Page 96 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A RO A D C R O A D A ROAD B RO A D A R O A D A R O A D B R O A D C AK R O N A V E . RO A D C R O A D A ROAD B R O A D C OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N LEGEND: UTILITY NOTES: STORM SEWER SCHEDULE ST R E E T A N D S T O R M S E W E R P L A N - O V E R A L L V I E W 20 Page 97 of 221 RO A D A RO A D A ROAD CROAD C AKRON AVE. ROAD CROAD C OU T L O T B OUTLOT A 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 4 5 6 1 2 3 4 5 61234561234 1 2 3 4 2 3 4 5 6 BLO C K 1 0 BLOCK 11BLOCK 12 BL O C K 1 3 BL O C K 1 BLOCK 3 BLOC K 2 BLOCK 4 BLOCK 5 BLO C K 6 BLO C K 7 OUTLOT D OU T L O T C OU T L O T D OU T L O T D Road C-S PROFILE RO A D B RO A D A FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 ST R E E T A N D S T O R M S E W E R P L A N A N D P R O F I L E S 21 ROAD C GENERAL NOTES: CASTING SCHEDULE Page 98 of 221 R O A D C ROAD A R O A D C ROAD A OUT L O T B 1 2 3 4 5 6 7 8 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 1 2 3 4 BLOCK 9 BLOCK 10 B L O C K 1 1 B L O C K 1 2 BLOCK 1 4 B L O C K 4 B L O C K 5 BLOCK 6BLOCK 7BLOCK 8OUT L O T A O U T L O T D OUTLOT D Road A-S PROFILE RO A D C FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 ST R E E T A N D S T O R M S E W E R P L A N A N D P R O F I L E S 22 GENERAL NOTES: ROAD A CASTING SCHEDULE Page 99 of 221 ROA D A ROAD A RO A D B ROA D A ROAD A ROAD B RO A D A ROAD B R O A D C ROAD B R O A D C OUTL O T B 1 2 3 4 5 6 7 8 5 6 1 2 3 4 5 6 4 5 6 1 2 3 4 1 2 3 4 5 6 BLOCK 9 BLOCK 10 B L O C K 1 2 BLOC K 1 3 BLOCK 1 4 BLOC K 1 BL O C K 2 OUTLO T C OUTL O T D OUTL O T E Road B-S PROFILE RO A D A ( s ) RO A D C RO A D B RO A D A FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 ST R E E T A N D S T O R M S E W E R P L A N A N D P R O F I L E S 23 GENERAL NOTES: CASTING SCHEDULE ROAD BROAD A Page 100 of 221 RO A D A R O A D B ROA D C RO A D A R O A D B ROA D C O U T L O T B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 3 4 5 6 1 2 3 4 BL O C K 9 BL O C K 1 0 BLOCK 1 2 B L O C K 1 3 B L O C K 1 4 B L O C K 1 BL O C K 8 O U T L O T A OU T L O T D O U T L O T D CB 56 TO STUB PROFILE R O A D A ROAD B R O A D A ROAD A CBMH 49 TO CBMH 21 PROFILE FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 ST R E E T A N D S T O R M S E W E R P L A N A N D P R O F I L E S 24 GENERAL NOTES: CASTING SCHEDULE CB 56 - EX STUB CBMH 48 - CBMH 21 Page 101 of 221 ROAD AROAD A R O A D C R O A D C 2 3 4 5 6 7 8 1 2 3 4 3 4 5 6 BLOCK 13 BLOCK 1 B L O C K 2 OUTLOT C OUTLOT D RO A D C RO A D C OUTLOT A 8 3 4 5 6 7 8 1 2 3 4 5 6 2 3 4 5 6 1 2 3 4 BL O C K 1 1 BL O C K 4 BL O C K 5 BL O C K 6 FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 ST R E E T I N T E R S E C T I O N D E T A I L S 25 ROAD C - ROAD A ROAD C - ROAD B Page 102 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 RO A D C R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 BL O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) BLO C K 5 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) BL O C K 1 1 ( P H 2 ) 1 - HL 1 - HL 6 - HL 1 - GM 3 - CH 7 - RO FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 TREE PLANTING DETAIL1 LANDSCAPE NOTES: MITIGATION & LANDSCAPE REQUIREMENTS: LA N D S C A P E P L A N - O V E R A L L V I E W 26 LANDSCAPE SCHEDULE: (PHASE ONE) Page 103 of 221 ROAD AROAD A 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 RO A D C R O A D A ROAD B R O A D C 7 8 1 2 3 4 5 6 7 8 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B OU T L O T A 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 BL O C K 3 B L O C K 2 BL O C K 4 BL O C K 5 BL O C K 6 BL O C K 7 B L O C K 8 OUTLOT A OU T L O T D OUTLOT C O U T L O T D OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BLOCK 2 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) BLOCK 1 1 ( P H 2 ) 5 - HL 4 - PO 2 - KC 1 - RB 1 - NS 1 - NS 1 - RB 1 - NS 1 - RB 1 - RB 1 - NS 1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 4 - RO5 - NF 4 - CH 1 - RB 2 - CH 2 - CH 8 - PO 7 - AB 9 - HL 8 - RO 4 - AE1 - RB 1 - RB 1 - RB 1 - RB 1 - RB 1 - NS 4 - NF 8 - KC FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LA N D S C A P E P L A N - V I E W A 27 LANDSCAPE SCHEDULE: (PHASE ONE) Page 104 of 221 ROAD A R O A D A RO A D B R O A D C RO A D B ROAD A RO A D B R O A D C R O A D A 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 R O A D A ROAD B R O A D C 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 OUTLOT B 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 1 2 3 4 5 6 1 2 3 4 5 6 4 1 2 3 4 1 2 3 4 5 6 BL O C K 9 BL O C K 1 0 BL O C K 1 1 BL O C K 1 2 BLOCK 13 BLOCK 1 4 BLOCK 1 B L O C K 2 OUTLOT A OU T L O T D OUTLOT C OUTLOT D OUTLOT E BLOC K 1 ( P H 2 ) BL O C K 2 ( P H 2 ) BL O C K 3 ( P H 2 ) BLO C K 4 ( P H 2 ) BLO C K 5 ( P H 2 ) B L O C K 6 ( P H 2 ) B L O C K 7 ( P H 2 ) BLO C K 8 ( P H 2 ) BL O C K 9 ( P H 2 ) B L O C K 1 0 ( P H 2 ) B L O C K 1 1 ( P H 2 ) 2 - NF 3 - NF 5 - HL 4 - PO 2 - KC 1 - RB 1 - NS 1 - NS 1 - RB 1 - NS 1 - RB 1 - RB 4 - RO5 - NF 4 - CH 1 - RB 2 - CH 2 - CH 8 - PO 7 - AB 9 - HL 4 - AE1 - RB 1 - RB 4 - NF 1 - HL 1 - HL 3 - CH 7 - RO FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 4 T H A D D I T I O N PH A S E 1 FI N A L P L A T S U B M I T T A L 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 LA N D S C A P E P L A N - V I E W B 28 LANDSCAPE SCHEDULE: (PHASE ONE) Page 105 of 221 S40 ° 1 9 ' 4 9 " W 4 5 1 . 1 4 N0 0 ° 1 5 ' 5 3 " E 9 2 2 . 1 2 R = 3 2 2 5.0 0 L = 7 3 4.0 9 Δ = 1 3°0 2'3 1" C .B rg = S 5 4°4 3'2 3"E C .= 7 3 2.51 S 4 8 ° 1 2 ' 0 8 " E 4 8 0 . 7 4 N41 ° 4 7 ' 5 2 " E 2 5 . 0 0 S 4 8 ° 1 2 ' 0 8 " E 2 1 9 . 5 8 R = 217 5.0 0 L = 3 2 9.7 6 Δ = 8° 4 1'1 3" C.Brg = N 5 2°3 2'4 4" W C . = 3 2 9 .4 5 INSET 1 5 9 . 4 4 3 2 1 . 3 0 S 4 9 ° 4 0 ' 1 1 " E 4 5 5 . 6 2 R =830.00 L=579.95 Δ=40°02'04"S89°42'15"E 230.34 L = 393.16 Δ=27°08'24" L=186.79Δ=12°53'4 0" OUTLOT E S41°47'52"W 56.28 S21°33'21"W 54.00 N69°19'27"W 28.81 S51°00'49"W 14.05 N2 5 ° 2 2 ' 4 9 " E 72 . 0 0 S17°15'28"W 47.49 N13°14'28"E 72.00 N2 4 ° 0 1 ' 1 7 " E 50 . 5 3 N09°22'08"E 15.70 N0 3 ° 0 3 ' 1 6 " E 72 . 0 0 N09°22'35"E 40.68 R=685.00L=119.18Δ=9°58'08" C.Brg=S75°49'55"EC.=119.03 AMBER FIELDS FOURTEENTH ADDITION CITY COUNCIL, CITY OF ROSEMOUNT, MINNESOTA This plat was approved by the City Council of ROSEMOUNT, Minnesota, this _________ day of _____________________, 20 ____ and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By:___________________________________________________________________ Mayor Clerk COUNTY SURVEYOR, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this _________ day of _____________________, 20 ____. _________________________________ Todd B. Tollefson Dakota County Surveyor KNOW ALL PERSONS BY THESE PRESENTS: That Earl Street Partners II, LLC, a Minnesota limited liability company, owner of the following described property: Outlot A, AMBER FIELDS THIRTEENTH ADDITION, according to the recorded plat thereof, Dakota County, Minnesota. Has caused the same to be surveyed and platted as AMBER FIELDS FOURTEENTH ADDITION and does hereby dedicate to the public for public use the drainage and utility easements as created by this plat. In witness whereof said Earl Street Partners II, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this _________ day of _____________________, 20 ____. Signed: Earl Street Partners II, LLC by ___________________________________________ Mario J. Cocchiarella, Chief Manager STATE OF MINNESOTA COUNTY OF ____________________ This instrument was acknowledged before me on _________ day of _____________________, 20 ____, by Mario J. Cocchiarella, Chief Manager of Earl Street Partners II, LLC, a Minnesota limited liability company, on behalf of the limited liability company. ________________________________________ Signature ________________________________________ Printed Name Notary Public, ___________County, Minnesota My Commission Expires _________________ SURVEYORS CERTIFICATE I Daniel Ekrem do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this ___________ day of _____________________ , 20 ____. _________________________________________ Daniel Ekrem, Licensed Land Surveyor Minnesota License No. 57366 STATE OF MINNESOTA COUNTY OF _____________________ This instrument was acknowledged before me on ___________ day of _____________________ , 20 ____, by Daniel Ekrem. ________________________________________ Signature ________________________________________ Printed Name Notary Public, ___________County, Minnesota My Commission Expires__________________ OFFICIAL PLAT BOARD OF COUNTY COMMISSIONERS, COUNTY OF DAKOTA, STATE OF MINNESOTA We do hereby certify that on the 24th day of October, 2023 the Board of Commissioners of Dakota County, Minnesota approved this plat of AMBER FIELDS THIRTEENTH ADDITION and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2 and pursuant to the Dakota County Contiguous Plat Ordinance. _________________________________________________________________ Chair, County Board County Treasurer - Auditor DEPARTMENT OF PROPERTY TAXATION AND RECORDS, COUNTY OF DAKOTA, STATE OF MINNESOTA Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20___ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this _________ day of _____________________, 20 ____. _________________________________________, Director Amy A. Koethe, Department of Property Taxation and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of AMBER FIELDS FOURTEENTH ADDITION was filed in the office of the County Recorder for public record on this _________ day of _____________________, 20 ____, at ___ o'clock ___.M. and was duly filed in Book_________________ of Plats, Page______________________ , as Document Number _______________________ . _______________________________________ Amy A. Koethe, County Recorder SI T E Page 106 of 221 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N 5 2 ° 5 2 ' 2 5 " W 1 6 0 . 0 0 N 5 2 ° 5 2 ' 2 5 " W 1 6 0 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 N 5 2 ° 5 2 ' 2 5 " W 1 6 0 . 0 0 N 5 2 ° 5 2 ' 2 5 " W 1 6 0 . 0 0 N 5 2 ° 5 2 ' 2 5 " W 1 6 0 . 0 0 N 5 2 ° 5 2 ' 2 5 " W 1 6 0 . 0 0 S2 5 ° 2 2 ' 4 9 " W 7 2 . 0 0 S2 5 ° 2 2 ' 4 9 " W 7 2 . 0 0 S2 5 ° 2 2 ' 4 9 " W 7 2 . 0 0 S2 5 ° 2 2 ' 4 9 " W 7 2 . 0 0 S2 5 ° 2 2 ' 4 9 " W 7 2 . 0 0 S2 5 ° 2 2 ' 4 9 " W 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 N37 ° 0 7 ' 3 5 " E 7 4 . 0 0 S6 4 ° 3 7 ' 1 1 " E 1 6 0 . 0 0 S6 4 ° 3 7 ' 1 1 " E 1 6 0 . 0 0 S 5 2 ° 5 2 ' 2 5 " E 2 1 0 . 0 0 S 5 2 ° 5 2 ' 2 5 " E 2 1 0 . 0 0 30. 0 0 25. 0 0 25. 0 0 25. 0 0 25. 0 0 30. 0 0 30. 0 0 25. 0 0 25. 0 0 25. 0 0 25. 0 0 30. 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 N89°38'28"W 72.00 N89°38'28"W 72.00 N89°38'28"W 72.00 N89°38'28"W 72.00 N89°38'28"W 72.00 S89°38'28"E 72.00 S89°38'28"E 72.00 S89°38'28"E 72.00 S89°38'28"E 72.00 S89°38'28"E 72.00 S89°38'28"E 72.00 S89°38'28"E 72.00 N0 0 ° 2 1 ' 3 2 " E 1 6 0 . 0 0 N0 0 ° 2 1 ' 3 2 " E 1 6 0 . 0 0 N0 0 ° 2 1 ' 3 2 " E 1 1 0 . 0 0 N0 0 ° 2 1 ' 3 2 " E 1 1 0 . 0 0 30 . 0 0 25 . 0 0 25 . 0 0 30 . 0 0 30 . 0 0 25 . 0 0 25 . 0 0 30 . 0 0 30 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 30 . 0 0 30 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 30 . 0 0 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 S89°38'28"E 74.00 30 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 30 . 0 0 30 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 30 . 0 0 30 . 0 0 30 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 30 . 0 0 30 . 0 0 30 . 0 0 30 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 30 . 0 0 30 . 0 0 25 . 0 0 30.00 30.00 25.00 25.00 25.00 25.00 30.00 N1 3 ° 1 4 ' 2 8 " E 7 2 . 0 0 N1 3 ° 1 4 ' 2 8 " E 7 2 . 0 0 N1 3 ° 1 4 ' 2 8 " E 7 2 . 0 0 N1 3 ° 1 4 ' 2 8 " E 7 2 . 0 0 N1 3 ° 1 4 ' 2 8 " E 7 2 . 0 0 N1 3 ° 1 4 ' 2 8 " E 7 2 . 0 0 25.00 25.00 25.00 25.00 30.00 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 S0 0 ° 2 1 ' 3 2 " W 7 4 . 0 0 30.00 25.00 25.00 25.00 25.00 25.00 25.00 30.00 30.00 25.00 25.00 25.00 25.00 25.00 25.00 30.00 30.00 25.00 25.00 25.00 25.00 30.00 30.00 25.00 25.00 25.00 25.00 30.00 S0 3 ° 0 3 ' 1 6 " W 7 2 . 0 0 S0 3 ° 0 3 ' 1 6 " W 7 2 . 0 0 S0 3 ° 0 3 ' 1 6 " W 7 2 . 0 0 S0 3 ° 0 3 ' 1 6 " W 7 2 . 0 0 S0 3 ° 0 3 ' 1 6 " W 7 2 . 0 0 S0 3 ° 0 3 ' 1 6 " W 7 2 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 3 0 . 0 0 2 5 . 0 0 2 5 . 0 0 3 0 . 0 0 N61°4 0 ' 0 1 " E 7 2 . 0 0 N61°4 0 ' 0 1 " E 7 2 . 0 0 N61°4 0 ' 0 1 " E 7 2 . 0 0 N61°4 0 ' 0 1 " E 7 2 . 0 0 N61°4 0 ' 0 1 " E 7 2 . 0 0 N76°45' 3 2 " W 1 6 0 . 0 0 N76°45' 3 2 " W 1 6 0 . 0 0 N89°38'28"W 210.00 N89°38'28"W 210.00 S86°56'44"E 160.00 S86°56'44"E 160.00 S 2 8 ° 1 9 ' 5 9 " E 1 1 0 . 0 0 S 2 8 ° 1 9 ' 5 9 " E 1 1 0 . 0 0 S0 0 ° 2 1 ' 3 2 " W 2 1 0 . 0 0 S0 0 ° 2 1 ' 3 2 " W 2 1 0 . 0 0 S0 0 ° 2 1 ' 3 2 " W 2 1 0 . 0 0 S0 0 ° 2 1 ' 3 2 " W 2 1 0 . 0 0 S0 0 ° 2 1 ' 3 2 " W 2 1 0 . 0 0 S0 0 ° 2 1 ' 3 2 " W 2 1 0 . 0 0 1 9 3 4 5 10 13 14 8 2 7 1 6 11 12 N41 ° 4 7 ' 5 2 " E 5 6 . 2 8 S69°19'27"E 28.81 N51°00'49"E 14.05 N2 5 ° 2 2 ' 4 9 " E 7 2 . 0 0 N1 7 ° 1 5 ' 2 8 " E 47 . 4 9 N1 3 ° 1 4 ' 2 8 " E 7 2 . 0 0 N09°22'08"E 15.70 N0 3 ° 0 3 ' 1 6 " E 7 2 . 0 0 N0 9 ° 2 2 ' 3 5 " E 40 . 6 8 S89°42'15"E 230.34 N0 0 ° 1 5 ' 5 3 " E 9 2 2 . 1 2 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 4 5 6 S 1 6 ° 4 4 ' 5 5 " E 1 2 3 . 3 4 N0 0 ° 2 1 ' 3 2 " E 10 . 0 0 N00°21'32"E 10.00 N78°53'01" E 1 1 7 . 5 6 N00°21'32"E 10.00 N6 0 ° 4 0 ' 1 9 " W 1 2 0 . 7 8 S 5 2 ° 5 2 ' 2 5 " E 3 7 2 . 9 8 N 5 2 ° 5 2 ' 2 5 " W 3 7 2 . 9 8 N0 0 ° 2 1 ' 3 2 " E 1 2 6 . 0 2 S0 0 ° 2 1 ' 3 2 " W 5 2 7 . 7 6 N0 0 ° 2 1 ' 3 2 " E 3 2 3 . 6 8 S00°12'38"W 20.89 R=685.00 L=224.69 Δ=18°47'37" C.Brg=S80°14'39"E C.=223.68 R=24.00 L=12.22 =29°10'31" OUTLOT B OU T L O T A OUTLOT A OU T L O T D OUTLOT C OUTLO T D R=715.00 L=237.08 Δ=18°59'5 4 " C.Brg=S80°08'31"E C.=236.00 N2 1 ° 3 3 ' 2 1 " E 54 . 0 0 12.0 0 12.0 0 30 . 0 0 R=980.00L=78.67Δ=4°35'59" C.Brg=S70°44'38"E C.=78.65 R=950.00L=76.26Δ=4°35'59" C.Brg=S70°44'38"E C.=76.24 R=265.00 L=93.29 Δ=20°10'13"R=235.00 L=82.73 Δ=20°10'13" N6 3 ° 0 8 ' 2 3 " W 10. 1 6 N 5 2 ° 5 2 ' 2 5 " W 1 0 . 0 0 N 5 1 ° 5 1 ' 0 9 " W 7 1 . 6 1 R = 90.00 L=55.93 Δ=35°36'17" R =2 4.00 L =3 9 .2 4 Δ =9 3 °4 1'03" R =2 4 . 0 0 L =3 7 . 2 1 Δ=8 8 ° 5 0 ' 1 4 " N89°38'28"W 30.00 R =60.00L=34.64 Δ =33°05'00" N60° 0 0 ' 0 9 " E 59.36 R = 2 8 5 . 0 0 L = 1 3 2 . 6 8 Δ = 2 6 ° 4 0 ' 2 5 " R = 3 1 5 . 0 0 L = 1 9 9 . 7 1 Δ = 3 6 ° 1 9 ' 3 1 " R=24.00L=38.39Δ=9 1°38'34 "R =11 5 .0 0 L =5 6 .8 3 Δ =2 8 °1 8 '5 9 " S89°38'28"E 50.24 N89°38'28"W 50.24 30 . 1 0 20 . 4 3 R =8 5 .0 0 L =3 7 .8 3 Δ=2 5 °2 9 '5 6 " R =24.00 L =36.31 Δ =86°40'52" R = 11 4 . 9 9 L = 4 4 . 5 1 Δ= 2 2 ° 1 0 ' 4 1 " R = 8 5 . 0 0 L = 5 3 . 8 9 Δ = 3 6 ° 1 9 ' 3 5 " R=24.00 L=11.75 =28°03'07" N45°38'53"W 22.05 N 4 8 ° 1 2 ' 1 0 " W 1 5 9 . 4 4 N2 4 ° 0 1 ' 1 7 " E 50 . 5 3 L=186.79Δ=12°53'40" R=830.00 L=186.7 9 Δ=12 °5 3'40 "C.Br g=S83°15'25"E C.=186 .40 L=4.99 =0°20'41" 30.80 199.54 N0 0 ° 1 9 ' 4 3 " E 21 . 3 0 N 3 8 ° 2 6 ' 4 2 " W 4 4 . 0 9 N78°29' 2 8 " W 22.64 N57° 2 2 ' 2 6 " E 25.8 7 R=685.00 L=119.18 Δ=9°58'08" L=105.50 Δ=8 °49 '2 9 " N 4 3 ° 2 8 ' 4 7 " W 3 4 . 8 4 R = 3 2 2 5.0 0 L = 7 3 4.0 9 Δ = 1 3°0 2'3 1" C .Brg = S 5 4°4 3'2 3"E C.= 7 3 2.51 S86°56'44"E 160.00 1 1 2 N0 3 ° 0 3 ' 1 6 " E 7 2 . 0 0 14 6 1 N05°26'27"E 54.99 N05°26'27"E 72.74 7.46 6.44 72 . 4 5 54 . 4 8 13 N1 3 ° 1 4 ' 2 8 " E 7 2 . 0 0 N2 4 ° 0 1 ' 1 7 " E 5 0 . 5 3 1 2 3 N2 4 ° 0 1 ' 1 7 " E 30 . 5 7 5.72 30 . 0 3 14 4 5 6 1 2 3 N3 2 ° 2 9 ' 2 7 " E 5 5 . 2 3 6.84 54 . 8 1 S3 2 ° 2 9 ' 2 7 " W 7 4 . 2 4 74. 0 0 6.55 0.55 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N37 ° 0 7 ' 3 5 " E 7 2 . 0 0 N 5 2 ° 5 2 ' 2 5 " W 1 6 0 . 0 0 7 6 3 4 5 6 1 2 3 4 5 72. 0 0 5.00 5.00 4.95 N37 ° 2 2 ' 5 2 " E 7 2 . 0 0 5.27 72. 0 0 72. 0 0 7 8 1 5. 0 0 5. 0 0 N89°38'28"W 74.00 N89°38'28"W 74.00 5. 0 0 5. 0 0 74.00 74.00 30 . 0 0 25 . 0 0 25 . 0 0 25 . 0 0 8 1 2 5. 0 0 5. 0 0 5. 0 0 5. 0 0 74.00 74.00 N89°38'28"W 74.00 N89°38'28"W 74.00 3 4 8 N67°44 ' 0 1 " E 5 9 . 7 0 6.31 59.37 19.39 N67°44'01"E 21.018.08 OFFICIAL PLAT AMBER FIELDS FOURTEENTH ADDITION INSET SI T E Page 107 of 221 C:\Users\jh\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I8FO6670\024359-000 Amber Fields 14th Addition - Plan Review Memo 2024.01.15.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 55 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M Memorandum To: Brian Erickson, City Engineer Nick Egger, Director of Public Works Anthony Nemcek, Senior Planner Jane Byron, Storm Water Specialist From: Amanda Sachi, PE Kendra Fallon, PE Kris Keller, PE Date: January 15, 2024 Re: Amber Fields 14th Addition – Phase 1 Final Plat Review WSB Project No. 024359-000 We have reviewed the documents provided by Alliant Engineering on December 23, 2023. Documents reviewed include: • Amber Fields 14th Addition Preliminary Plat Civil Set, dated 12/18/23 • Amber Fields 14th Addition Final Plat Civil Set, dated 12/18/23 • Amber Fields 14th Addition Plat, dated 12/15/23 Additional redline comments are provided on the submitted civil plans. Applicant should pr ovide responses to each comment and redline comment. We offer the following comments below. Civil Comments: 1. General a. Update street names when available. b. Provide benchmark elevations on future construction plans. 2. Utilities a. Install hydrant lead valves behind curb as shown in City Details b. Provide minimum vertical 18" separation between watermain and storm sewer i. Insulate when separation is less than 36" ii. Reference City Detail W-7 for all watermain offsets c. Potential conflict with storm sewer main and water and sanitary sewer services i. Offset and insulate water services crossing the storm sewer (minimum 18") d. Potential conflict with water and sanitary sewer main with water and sanitary sewer services e. Shift gate valves out of the wheel paths and away from the curb f. Shift sanitary sewer casting away from the curb line for bituminous placement and compaction g. Install sanitary sewer structures after the last active sanitary sewer service i. Lots 1-2 Block 9 cannot be active until upstream manhole is installed Page 108 of 221 Amber Fields 14th Addition – Phase 1 Final Plat Review January 15, 2024 Page 2 h. Verify water stub pipe material from 13th Addition. PVC C900 is called on the current plans but DIP is shown in the 13th Addition plans 3. Streets, Signage and Street Lighting a. Street centerline grades should be a minimum 1.0% 4. Landscape a. No comments at this time Grading, Drainage, and Erosion Control Comments: 5. General a. No comments. 6. Ponds and Wetlands a. No comments. 7. Emergency Overflow Routes: a. The City requires 1.5 feet of freeboard between low lying area EOFs and building opening elevations. This requirement is not being met for multiple blocks throughout the addition. Applicant should update grading and/or building elevations to meet freeboard requirements. 8. Retaining Walls: a. No comments. 9. Erosion Control: a. No comments. 10. Grading: a. No comments. Stormwater Management Plan: 11. General Storm Sewer Design a. Provide a catch basin drainage area map (including the area intended to drain to the proposed stubs) along with storm sewer sizing calculations to confirm storm sewer is sized for a 10-year storm event. b. A sump is requested to be added to structure MH-4 prior to the connection into the main trunk line system. 12. Water Quantity a. No comments. 13. Rate/Volume Control c. No comments. 14. Freeboard d. No comments. 15. Water Quality e. No comments. 16. Easements f. Storm sewer between CBMH 48-CBMH 49-CBMH 21 is deeper than 10 feet so easement at a 1:1 depth to width ratio should be provided on both sides of the proposed storm sewer. Page 109 of 221 Amber Fields 14th Addition – Phase 1 Final Plat Review January 15, 2024 Page 3 General Infrastructure design shall be completed in accordance with the City of Rosemount’s Engineering Guidelines and Standards. Infrastructure construction shall be completed in accordance with the latest edition of the City’s General Specifications and Standard Detail Plates for Street and Utility Construction. Page 110 of 221 M E M O R A N D U M To: Adam Kienberger, Community Development Director Anthony Nemcek, Senior Planner Julia Hogan, Planner From: Dan Schultz, Parks and Recreation Director Date: January 17, 2024 Subject: Amber Field 13th and 14th Additions The Parks and Recreation Department recently reviewed the plans for the Amber Fields 13th and 14th Additions. After reviewing the plans, the Parks and Recreation Department staff has the following comments: Parks Dedication The parks dedication for the 13th and 14th additions will be met through developer installed improvements as outlined in the subdivision agreement. Please let me know if you have any questions about this memo. Page 111 of 221 EXECUTIVE SUMMARY Planning Commission Regular Meeting: January 23, 2024 Tenative City Council Meeting: AGENDA ITEM: Request by Independent School District 196 for approval of a rezoning of the site from AG- Agricultural to R1-Low Density Residential, minor subdivision, conditional use permit, and site plan review for an elementary school to be constructed on site. AGENDA SECTION: PUBLIC HEARINGS PREPARED BY: Julia Hogan, Planner AGENDA NO. 6.b. ATTACHMENTS: Site Location, Preliminary Plat, Final Plat, Site Plan, Demolition Plan, Geometric Plan, Finishing Plan, Erosion Control Plan, Grading and Drainage Plan, Utilities Plan, Landscaping Plan, Photometric Plan, Architectural Elevations , City Engineer's Memo Dated January 15, 2024, Stormwater Review Memo Dated January 16, 2024, Parks and Recreation Director's Memo Dated January 17, 2024 APPROVED BY: AK RECOMMENDED ACTION: Staff recommends the Planning Commission make the following motion: 1. Motion to continue the Public Hearing until the Planning Commission Meeting on February 26, 2024, so that a traffic study can be provided to the city for review. The Planning Commission could also make the following motions listed below: 1. Motion to recommend the City Council approve a Zoning Map amendment to rezone the site from AG-Agricultural to R1 – Low Density Residential. 2. Motion to recommend the City Council approve the minor subdivision for Rosemount School District Third Addition, subject to all conditions approved as part of the City’s site and building design review for the project. 3. Motion to approve the site plan and building design to allow Independent School District 196 to construct a new elementary school on Rosemount School District Third Addition, subject to the following conditions: a. Approval of the Rosemount School District Third Addition minor subdivision. b. Conformance with all conditions of the City Engineer as outlined in the memo dated January 15, 2024, and associated stormwater review memo dated January 16, 2024. c. Applicant shall work with staff to verify lumens identified on the photometric plan do not Page 112 of 221 exceed .05 lumens at residential property lines. d. Applicant shall provide verification on the number of classrooms that will be provided and projected number of students that will be attending the school to identify if the proposed parking numbers are sufficient. e. Payment of $54,250 in-lieu of replacement trees. f. Conformance with the requirements of the Parks and Recreations Director contained within the memo dated January 17, 2024. g. Site signage shall require a separate sign permit and meet the requirement of signs in the PI zoning district. h. Light fixtures within 100 feet of a residential property line shall be no higher than 20 feet. 4. Motion to recommend the City Council approve a Conditional Use Permit for an elementary school to be located on the Rosemount School District Third Addition subject to all conditions approved as part of the City’s site and building design review for the project. BACKGROUND SUMMARY Application & Property Owner(s): Independent School District 196 (Rosemount, Apple Valley, Eagan Public Schools) Location: West of Akron Avenue and South of Bonaire Path West Areas in Acres: 34.51-Acres Comp. Guide Plan Designation: LDR - Low Density Residential Current Zoning: AG - Agricultural Requested Zoning: R1 - Low Density Residential The Planning Commission is being asked to consider requests submitted by Independent School District 196 (Rosemount, Apple Valley, Eagan Public Schools) for approval of a rezoning, minor subdivision, site plan and building design review and conditional use permit to construct an elementary school on the proposed 34.41 acre site located directly west of Akron Avenue and south of Bonaire Path West. The applicant is requesting the site be rezoned from AG-Agricultural to R1 – Low Density Residential because elementary schools are not an allowed use within the AG zoning district but are an allowed conditional use within the R1 zoning district, which is why a conditional use permit is being requested as well. The applicant is requesting a minor subdivision to plat the land since the site is currently unplatted. A site plan review and building design is being requested by the applicant because they are required for all commercial, industrial, institutional, and multifamily development projects. At this time, staff is recommending the continuation of the four requested items until the February 26, 2024, Planning Commission meeting due to the need of additional information. Staff requested a traffic study be provided to the city for review. Though a traffic study is currently in the process, it will not be finalized until early February. Due to potential issues that could arise without a traffic study, staff is wanting the continuation of the request until after that study is received and reviewed by staff. Page 113 of 221 BACKGROUND The City of Rosemount currently has one large school campus area that includes the Rosemount High School, Rosemount Middle School and Rosemount Elementary school, all of which have been located on the present site west of Robert Trail South since the mid 1960’s when the high school was built in that location. Portions of the middle school and elementary schools were on or near their present locations prior to construction of the high school. Over time, each of the buildings on the campus have been modified and expanded to accommodate the needs of a growing district and to add space for a growing student population. Independent School District 196 is now the 4th largest district in Minnesota with the current Rosemount schools serving over 4,500 students. In recognition of the need for safety and security and space for growth around the school district, ISD 196 brought forward a combined $493 million dollar bond referendum in 2023. The first portion of the referendum was for $374 million dollars, which would include safety and security improvements at all district schools, a new elementary school, a new Rosemount middle school and repurposing the current school. Additions were also proposed for various other schools within the district and Rosemount High school. The second portion of the referendum was for $119 million dollars, which was to include improvements and an activity center at each of the districts four high schools. The referendum ultimately was approved and was the state’s largest successful public school funding request in Minnesota history. ISD 196 has owned the 34.51-acre subject site for a number of years, with the school district and the city anticipating an elementary school to be constructed on this site when the need was there. ISSUE ANALYSIS Legal Authority Minor Subdivisions, Conditional Use Permits, and Site Plan applications are quasi-judicial decisions for the Planning Commission, meaning that the Planning Commission is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance and Subdivision Ordinance are being followed. Generally, if these applications meet the City’s established requirements, they must be approved. Rezonings are a legislative decision for the city, but the rezoning must conform with the adopted Comprehensive Plan to be approved. Therefore, while technically legislative in nature, if a rezoning is in line with the Comprehensive Plan, it should be approved. Staff’s review of each application is provided below. Rezoning The subject property is currently zoned AG- Agricultural and is guided for LDR – Low Density Residential. The applicant is requesting a rezoning of the site from AG-Agricultural to R1 – Low Density Residential. The need for the rezoning is because elementary schools are not an allowed use within the AG-Agricultural zoning district, but are an allowed conditional use within the R1 – Low Density Residential zoning district. Within the City’s 2040 Comprehensive Plan it describes the Low Density Residential Land Use as land that provides housing suitable for families with children, and as such, should be located close to schools, churches, public parks, and neighborhood commercial. The primary zoning for the LDR land use designation is the R1 zoning district, which is why the applicant is requesting the rezoning to R1-Low Density Residential. Page 114 of 221 Minor Subdivision The minor subdivision process is a platting alternative that combines the approval of the preliminary and final plats into a single process. Additionally, some of the required engineering feasibility studies are waived. In this case, the site's engineering and stormwater management was reviewed by staff through the site plan review process. The 34.51-acre subject site is currently unplatted. When the applicant came to the city with its request to build a new elementary school the city suggested the applicant apply for a minor subdivision to plat the site to clean up the boundaries of the site and for easements located on the site. Site Plan and Design Review The purpose of a site plan review is to evaluate each project as it relates to the performance and site design standards of the zoning ordinance. Site plan approval is required for all commercial, industrial, institutional and multifamily development projects. Land Use & Zoning The subject property is currently zoned AG-Agricultural, and the future land use designated is guided for LDR – Low Density Residential. The applicant is requesting the site be rezoned to R1-Low Density Residential. Elementary schools are not an allowed use within the AG zoning district but are an allowed conditional use within the R1 zoning district. The rezoning of the site to R1-Low Density Residential is in accordance with the 2040 Future Land Use Plan and Comprehensive Plan. Site Layout The 34.51-acre vacant site is located directly west of Akron Ave and south of Bonaire Path West. The site is mostly rectangular with the western portion of the site being longer than the eastern portion due to the railroad tracks and residential development to the south. The main principal building is proposed to be located on the north end of the site, closer to Bonaire Path. There are two parking lots proposed on the site as well. The eastern parking lot is designated as the main lot, with the southwestern lot designated as the bus lot. West of the main building and northwest of the bus lot is a hard play area and soft play area shown. A softball field is also planned to be constructed on site, which will be located west of the bus lot area and east of the main entrance to the site off of Kaylemore Trail. There is one access point into the site which is off of Kaylemore Trail and Ardroe Ave, on the western side of the site, south of Bonaire Path West. This access road continues east on the site from Kaylemore Trail and loops around the main lot. There is a series of pedestrian trails shown on the site plan as well. There are two trails off of the existing sidewalks on Ardroe Ave that lead to the main building. There is also a trail shown off of the proposed sidewalk on Bonaire Path West which leads to the main building as well. On the southern portion of the site, it is shown to have stormwater ponding and infiltration basin. Lot and Building Standards. The proposed elementary school site covers over 34 acres of land with a significant amount of open space that will be dedicated to a ballfield, play areas, and open space at the southern end of the site. The plans submitted for the proposed building show a combination of classrooms, common areas, gymnasium, cafeteria, media area, art and music area, etc. Since elementary schools are a conditional use within the R1-Low Density Residential zoning district, they are subject to the minimum lot Page 115 of 221 requirements, setbacks, and site and building standards of the PI – Public and Institutional zoning district. The table below shows the required setbacks in comparison with those provided on the site plan. Building Performance Standards for the PI – Public/Institutional Category Standard Proposed Elementary School Standard Proposed Parking Surfaces Front (Ardroe Ave) 30 ft. >30-feet 20 ft. >20 ft. Side (Railroad Tracks) 30 ft. >30-feet 10 ft. >10 ft. Side (Bonaire Path West) 30 ft. >30-feet 10 ft. >10 ft. Rear (Akron Ave) 30 ft. >30 ft. 10 feet. >10 ft. Exterior Building Materials The PI – Public Institutional building materials standards require the building to be at least 50% brick or natural stone. The remaining 50% of the wall surface may be specialty integral colored concrete block, tile, architectural textured concrete cast in place or better. Up to 10% of the building can be used for materials not listed above as accents. Buildings are required to have “360 degree” architecture so that all sides of the building meet the architectural standards. The building elevation plans that were submitted by the applicant show that the exterior of the principal building will be a mixture of brick, precast wall panels, and ornamental metal panels. While metal paneling and siding is not normally permitted in the PI – Public Institutional zoning district, the metal panel/siding façade is of a quality considered “equal to or better” in the permitted materials within the code. The applicant has expressed that the proposed principal building will have a similar look and design to the newly built elementary school in Lakeville called East Lake, which is south of County Road 46. Traffic At this time, a traffic study has not been submitted for the city’s review. The applicant has been working with a traffic engineer to get a traffic analysis completed, but a draft of that analysis will not be ready for review until early February. City staff feels that a traffic study and time to review the traffic study is needed prior to approval of the requested item, which is why staff is recommending continuation of this item until the February 26, 2024, Planning Commission meeting. Access & Parking The site is shown to be accessed by a road off of Kaylemore Trail and Ardroe Ave. Ardroe Ave extends south from Bonaire Path West and leads into the newly developed Ardan Place subdivision. Off of Ardroe Ave is Kaylemore Trail, which also extends into the Ardan Place subdivision, but the access road to the proposed elementary site will extend off of that road to the east. The main access road enters the site on the western site and extends east, looping south of the proposed ballfield and then goes north to access the two parking lot areas. The eastern parking lot area is shown as the main lot with the access road shown to loop around this main lot. The parking area that is southwest of the main building is shown to be the secondary lot and bus lot with additional accesses to the main building. There are 153 parking stalls proposed for the eastern main lot parking area. For the secondary parking/bus lot area there are 15 proposed bus stalls and 106 parking stalls. Some of the parking stalls Page 116 of 221 in the secondary lot will be unusable during times when buses are parked there, but during non-school times the additional parking will be beneficial with the additional recreational amenities on site. The City’s parking requirements are the same for the various types of public schools: one parking stall for each classroom and one per 20 students. There are a total of 259 parking stalls that are proposed for the site. The plans submitted by the applicant did not include a complete count of classroom space or the number of students proposed for the school, but staff does believe the proposed number of parking stalls is adequate for the site. Staff will work with the applicant to verify the proposed number of classrooms and students to make sure the proposed number of parking stalls is sufficient for the site. Parks and Trails The proposed elementary school site has shown a network of sidewalks and trails providing access to the site from neighboring communities and internally. Shown are trails off of Ardroe Ave to the site which will provide access to the playground area, hard court area, softball field and main building. There are also trails shown along the entirety of the site along Bonaire Path West and a trail off of that that leads to the main building. There are sidewalks connecting to the different entrances to the main building which will help with safety to and from the different parking lots on site. The City of Rosemount Parks and Recreation department reviewed the submitted development plans and have provided review comments in the attached memorandum. The Parks and Rec department are recommending that park dedication not be collected due to the public recreation spaces being created on site, which consist of a large playground, hard court space, a ballfield, and greenspaces. Landscaping A landscaping plan was provided by the applicant that contains a total of 156 trees throughout the site. There are 116 deciduous trees and 40 conifer trees proposed throughout the site. The trees are shown to be spread out along the right of way areas of Ardroe Ave, Bonaire Path West and Akron Ave. They also have trees shown along the access road to the site and some along the stormwater ponding to the south of the site. Currently, on the site there is a 3-acre area of existing trees on the western portion of the site, as well as existing trees along the railroad tracks that runs along the southern boundary of the site. A portion of the 3-acre area of existing trees will need to be removed for the access road into the site, but the other existing trees will remain. A mixture of different sods and seeds will be planted around the site. There will be sod planted around the main building, the main parking area, and around the playground/hard court area. The proposed ballfield will contain an athletic seed mix with area around the ballfield and playground areas as a general seed mix. The city’s tree removal and replacement requirements will apply to this site. The applicant is proposing to eliminate a total of 2116 caliper inches. The city code states that 25% of existing caliper inches of trees can be removed during development without obligation of replacement, but removal beyond 25% will require replacement. The applicant is proposing to provide 389 caliper inches of replacement trees on site, which is being provided with the proposed 156 trees. This is a shortfall of 389 caliper inches of replacement. Staff finds that a fee-in-lieu is appropriate, and a condition of approval will be included to collect $54,250 in lieu of replacement (389 inches/2.5 inches per tree = 155 trees multiplied by $350 per tree according to the City’s fee schedule). Page 117 of 221 Also required by the landscaping ordinance is one foundation planting for every 10 linear feet of building exterior. The proposed building has 1,596 linear feet of perimeter, which requires a total of 160 foundation plantings. The landscape plan includes 160 total foundation plantings located around the main entrance of the principal building and around the main parking area. Signs No signs are shown on the applicant’s plans. Generally, signs are reviewed and approved administratively through the sign permitting process. Staff has included a condition reiterating that a sign permit must be submitted for any site signage. Site Lighting The applicant has submitted an overall lighting and photometric plan as part of the request, and the plans demonstrate compliance with the City’s light intensity standards. Specifically, the light fixtures to be used are shielded and will direct light towards the ground and not towards residential property. The maximum level of lighting allowed by the code is 0.5 lumen at adjacent residential property lines and 1.0 lumen at non-residential property lines. The plan overall adheres to the lumen requirements, but staff will need to verify with the applicant that the level of lighting does not exceed over 0.5 lumen across Bonaire Path to the residential development to the north and does not exceed 0.5 lumen near the trail area off of Kaylemore Trail. The plans do not show the height of the poles on which the lights will be mounted, but the zoning ordinance maximum is 30-feet except for if it is within 100-feet of a residential use, then the maximum height is 20-feet. This standard will be called out as a condition of approval. Engineering Detailed grading, erosion control, and storm water management plans have been submitted with the applications and these plans, along with the proposed connections to existing City utilities within and adjacent to the project site, have been reviewed by the City Engineer. The engineer’s comments and recommendations are included in a January 15, 2024, memorandum (attached), and include specific recommendations concerning planned utility connections and the submitted geometric/finishing plans. A stormwater management review memorandum was also completed and is attached as well. Comments in that memo include specific recommendations concerning grading, drainage, and erosion control and comments on the submitted stormwater management plan specifically regarding the general storm sewer design. Conditional Use Permit Review A conditional use permit (CUP) is required for elementary and middle or special needs schools within the R1-Low Density Residential zoning district. The City may approve a CUP upon finding that the use at the proposed location: 1. Will not be detrimental to or endanger the public health, safety, or general welfare of the neighborhood or the city. 2. Will be harmonious with the objectives of the comprehensive plan and city code provisions. 3. Will be designed, constructed, operated and maintained so as to be compatible or similar in an architectural and landscape appearance with the existing or intended character of the general vicinity and will not change the essential character of that area, nor substantially diminish or impair property values within the neighborhood. Page 118 of 221 4. Will be served adequately by existing (or those proposed in the project) essential public facilities and services, including streets, police and fire protection, drainage, structures, refuse disposal, water and sewer systems and schools. 5. Will not involve uses, activities, processes, material equipment and conditions of operation that will be hazardous or detrimental to any persons, property, or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. 6. Will have vehicular ingress and egress to the property which does not create traffic congestion or interfere with traffic on surrounding public streets. 7. Will not result in the destruction, loss or damage of a natural, scenic, or historic feature of major importance and will comply with all local, state, and federal environmental quality standards. 8. These standards apply in addition to specific conditions as may be applied throughout this code. Based on the staff review and analysis for the above site and building design analysis, staff has determined that the proposed elementary school meets each of these required findings. RECOMMENDATION Staff is recommending that the Planning Commission continue the requested rezoning, minor subdivision, site plan and building design review and conditional use permit for a new elementary school to the February 26, 2024, Planning Commission meeting so that a traffic study can be provided to the city for review. Page 119 of 221 Page 120 of 221 N Page 121 of 221 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X N SIT E Page 122 of 221 HakansonAnderson Page 123 of 221 HakansonAnderson N SIT E Page 124 of 221 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ONLY BUS ON L Y BU S ON L Y BU S ONLY BUS ONLY BUS D R O P O F F BYPASS DROP OFF DROPOFF DROP OFF DROP OFF D R O P O F F DROP OFF BYPASS B Y P A S S BYPASS B Y P A S S BYPASS BYPASS 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 PROJECT MATCH LINE PROJECT MATCH LINE PROPOSED BUILDING STORMWATER POND INFILTRATION BASIN AREA BY ALTERNATE C1.01 OVERALL SITE PLAN R FEETSCALE 0 HORZ. 60 120 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 Page 125 of 221 OU T L O T C OU T L O T E E1/2 of the SW1/4 E1/2 of the SW1/4 PROJECT MATCH LINE PROJECT MATCH LINE REMOVE ASPHALT REMOVE CURB & GUTTER REMOVE ASPHALT REMOVE CURB & GUTTER REMOVE PEDESTRIAN RAMP REMOVE PEDESTRIAN RAMP / / / ///////////////// / / / / / / / / / //////////// ///////////////////////////////////// ///////////////////// / / / / / / REMOVE TREES/SHRUBS PROTECT WALK PROTECT WALK PROTECT WALK PROTECT WALK C1.11 DEMOLITION PLAN NORTH R FEETSCALE 0 HORZ. DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 ///////////////////////////////// XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXX R1 P1 CONCRETE CURB AND GUTTER REMOVALS UNDERGROUND UTILITY REMOVALS CONCRETE PAVEMENT REMOVALS ASPHALT PAVEMENT REMOVALS ASPHALT PAVEMENT RECLAIM GRAVEL SURFACE REMOVALS AGLIME REMOVALS FENCING REMOVALS RETAINING WALL REMOVALS SAWCUT TREE REMOVAL MASS TREE AND SHRUB REMOVALS REMOVALS KEY NOTE PROTECTION KEY NOTE PROPERTY LINE LEGEND 1.REFER TO SHEET C1.41, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. 2.MINIMIZE DISTURBANCE TO SITE AND PROTECT EXISTING VEGETATION AND SITE FEATURES (CURBS, WALKS, PAVEMENTS, OVERHEAD AND UNDERGROUND UTILITIES, SIGNAGE, FENCING, ROADWAYS, ETC.) WHICH ARE TO REMAIN. 3.REPAIR OR REPLACE EXISTING PROPERTY AND SITE FEATURES, INCLUDING GRASS AND VEGETATION, WHICH IS TO REMAIN THAT IS DAMAGED BY THE WORK, TO THE OWNER'S SATISFACTION AND AT NO ADDITIONAL COST TO THE OWNER. 4.VISIT THE SITE PRIOR TO BIDDING; BE FAMILIAR WITH ACTUAL CONDITIONS IN THE FIELD. EXTRA COMPENSATION WILL NOT BE ALLOWED FOR CONDITIONS WHICH COULD HAVE BEEN DETERMINED OR ANTICIPATED BY EXAMINATION OF THE SITE, THE CONTRACT DRAWINGS AND THE INFORMATION AVAILABLE PERTAINING TO EXISTING SOILS, UTILITIES AND OTHER SITE CHARACTERISTICS. 5.HIRE THE SERVICES OF A UTILITY LOCATOR COMPANY TO LOCATE ALL PRIVATELY OWNED UTILITIES THAT MAY BE DISTURBED BY CONSTRUCTION OPERATIONS. NOTES Page 126 of 221 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X OU T L O T E OU T L O T D OUTLOT D 4 3 2 1 PREST W I C K P L A C E 1 3 T H A D D I T I O N 1 2 3 PREST W I C K PLACE 1 6 T H ADDIT I O N 5 4 3 2 1 PREST W I C K P L A C E 1 9 T H A D D I T I O N 13 12 11 10 PREST W I C K P L A C E 2 0 T H A D D I T I O N AR D A N P L A C E E1/2 of the SW1/4 E1/2 of the SW1/4 PROJECT MATCH LINE PROJECT MATCH LINE REMOVE TREES/SHRUBS /////////////////////// REMOVE TREES/SHRUBS C1.12 DEMOLITION PLAN SOUTH R FEETSCALE 0 HORZ. DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 ///////////////////////////////// XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXX R1 P1 CONCRETE CURB AND GUTTER REMOVALS UNDERGROUND UTILITY REMOVALS CONCRETE PAVEMENT REMOVALS ASPHALT PAVEMENT REMOVALS ASPHALT PAVEMENT RECLAIM GRAVEL SURFACE REMOVALS AGLIME REMOVALS FENCING REMOVALS RETAINING WALL REMOVALS SAWCUT TREE REMOVAL MASS TREE AND SHRUB REMOVALS REMOVALS KEY NOTE PROTECTION KEY NOTE PROPERTY LINE LEGEND 1.REFER TO SHEET C1.11, DEMOLITION PLAN NORTH, FOR NOTES. NOTES Page 127 of 221 D R O P O F F BYPASS DROP OFF DROPOFF DROP OFF DROP OFF D R O P O F F DROP OFF BYPASS B Y P A S S BYPASS B Y P A S S BYPASS BYPASS 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 PROJECT MATCH LINE PROJECT MATCH LINE PROPOSED BUILDING AREA BY ALTERNATE 8.0 0 ' 8.0 0 ' 9 . 0 0 ' ( T Y P ) 6 . 0 0 ' 3 6 . 0 0 ' 9.0 0 ' 15.0 0 ' 9. 0 0 ' 8. 0 0 ' 8. 0 0 ' 10 . 0 0 ' 10 . 0 0 ' 6.0 0 ' 6.00' 8.00' 42.00' 15 . 0 0 ' 20 . 0 0 ' 20.00' (T Y P ) 36.0 0 ' R64. 5 0 '20 . 0 0 ' 12 8 . 0 0 ' 3 0 . 0 0 ' R4 4 . 0 0 ' R8 4 . 0 0 ' R8 4 . 0 0 ' 24.00' 5. 0 0 ' 5.0 0 ' 5. 0 0 ' R20 . 0 0 ' R1 5 0 . 0 0 ' 36. 0 0 ' C1.21 GEOMETRIC PLAN NORTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 PI PT PCC BASELINE FOR DIMENSIONS POINT OF INTERSECTION POINT OF CURVATURE POINT OF TANGENCY POINT OF COMPOUND CURVATURE PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE PC LEGEND 1.REFER TO SHEET C1.41, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. 2.ALL APPLICABLE DIMENSIONS ARE TO FACE OF CURB, EDGE OF PAVEMENT, CENTERLINE OF FENCE, OR PROPERTY LINE UNLESS OTHERWISE NOTED. 3.CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT. 4.TRAFFIC SIGNS SHALL BE INSTALLED 18" BEHIND THE BACK OF CURB OR EDGE OF PAVEMENT. NOTES Page 128 of 221 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ONLY BUS ON L Y BU S ON L Y BU S ONLY BUS ONLY BUS DROP OFF D R O P O F F BYPASS B Y P A S S PROJECT MATCH LINE PROJECT MATCH LINE 1 2 3 6 . 0 0 ' 3 6 . 0 0 ' 4 2 . 0 0 ' 9.0 0 ' 42.00' 20 . 0 0 ' 36.0 0 ' 3 0 . 0 0 ' 4 2 . 5 0 ' R1 6 0 . 0 0 ' R2 0 0 . 0 0 ' 39.00' R20 . 0 0 ' R40. 0 0 ' R1 5 0 . 0 0 ' 36. 0 0 ' C1.22 GEOMETRIC PLAN SOUTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 PI PT PCC BASELINE FOR DIMENSIONS POINT OF INTERSECTION POINT OF CURVATURE POINT OF TANGENCY POINT OF COMPOUND CURVATURE PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE PC LEGEND 1.REFER TO SHEET C1.21, GEOMETRIC PLAN NORTH, FOR NOTES. NOTES Page 129 of 221 D R O P O F F BYPASS DROP OFF DROPOFF DROP OFF DROP OFF D R O P O F F DROP OFF BYPASS B Y P A S S BYPASS B Y P A S S BYPASS BYPASS 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 10 9 8 7 6 5 4 3 2 1 PROJECT MATCH LINE PROJECT MATCH LINE PROPOSED BUILDING AREA BY ALTERNATE SOFTBALL 1 HARD PLAY SOFT PLAY 23 52 52 26MAIN LOT 153 STALLS BUS LOT 15 STALLS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 4" YELLOW PAINT STRIPE 5. 0 0 ' P a r k i n g S e t b a c k fr o m E a s e m e n t 30 . 0 0 ' S t r u c t u r e S e t b a c k fr o m E a s e m e n t 30.00' Structure Setback from Easement 5.00' Parking Setback from Easement C1.23 FINISHING PLAN NORTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 4' CLF X X A D REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) PROPOSED CONCRETE WALK PROPOSED CONCRETE SLAB PROPOSED LIGHT DUTY ASPHALT PAVEMENT PROPOSED MEDIUM DUTY ASPHALT PAVEMENT PROPOSED HEAVY DUTY ASPHALT PAVEMENT PROPOSED SOFT PLAY AREA PROPOSED RETAINING WALL PROPOSED CHAIN LINK FENCING PROPOSED CHAIN LINK FENCING WITH MAINTENANCE STRIP FENCING KEY NOTE PROPOSED TRAFFIC SIGN SIGNAGE KEY NOTE PROPOSED BOLLARD PROPOSED ACCESSIBLE SYMBOL PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED FLARED END SECTION (FES) PROPOSED HYDRANT (HYD) PROPOSED GATE VALVE (GV) PROPOSED POST INDICATOR VALVE (PIV) PROPOSED FLAGPOLE - REFER TO ARCHITECTURAL PLANS PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPOSED LIGHT POLE - REFER TO ELECTRICAL PLANS PROPERTY LINE LEGEND 1.REFER TO SHEET C1.41, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. 2.CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT. 3.TRAFFIC SIGNS SHALL BE INSTALLED 18'' BEHIND THE BACK OF CURB OR EDGE OF PAVEMENT. 4.ALL DISTURBED AREAS OUTSIDE THE BUILDING PAD, WHICH ARE NOT DESIGNATED TO BE PAVED OR RECEIVE AGLIME, SHALL RECEIVE AT LEAST 6” OF TOPSOIL AND SHALL BE SODDED OR SEEDED. ALL AREAS NOT DESIGNATED FOR SOD OR A SPECIFIC SEED MIX, WHICH ARE DISTURBED BY CONSTRUCTION, SHALL BE SEEDED WITH SEED MIX #1. 5.WHERE NEW SOD MEETS EXISTING SOD, CUT A CLEAN, SHARP EDGE TO ALLOW FOR A CONSISTENT, UNIFORM, AND STRAIGHT JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS. JAGGED OR UNEVEN JOINTS WILL NOT BE ACCEPTED. REMOVE TOPSOIL AT THE JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS, AS REQUIRED, TO ALLOW NEW SOD SURFACE TO BE FLUSH WITH EXISTING TURFGRASS SURFACE. 6.FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE AN ACCEPTABLE TURF, RE-SOD OR RE-SEED ALL APPLICABLE AREAS, AT NO ADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF THE ENGINEER OR LANDSCAPE ARCHITECT. NOTES Page 130 of 221 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X ONLY BUS ON L Y BU S ON L Y BU S ONLY BUS ONLY BUS DROP OFF D R O P O F F BYPASS B Y P A S S PROJECT MATCH LINE PROJECT MATCH LINE STORMWATER POND INFILTRATION BASIN 1 2 3 C1.24 FINISHING PLAN SOUTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 4' CLF X X A D REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) PROPOSED CONCRETE WALK PROPOSED CONCRETE SLAB PROPOSED LIGHT DUTY ASPHALT PAVEMENT PROPOSED MEDIUM DUTY ASPHALT PAVEMENT PROPOSED HEAVY DUTY ASPHALT PAVEMENT PROPOSED SOFT PLAY AREA PROPOSED RETAINING WALL PROPOSED CHAIN LINK FENCING PROPOSED CHAIN LINK FENCING WITH MAINTENANCE STRIP FENCING KEY NOTE PROPOSED TRAFFIC SIGN SIGNAGE KEY NOTE PROPOSED BOLLARD PROPOSED ACCESSIBLE SYMBOL PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED FLARED END SECTION (FES) PROPOSED HYDRANT (HYD) PROPOSED GATE VALVE (GV) PROPOSED FLAGPOLE - REFER TO ARCHITECTURAL PLANS PROPOSED LIGHT POLE - REFER TO ELECTRICAL PLANS PROPERTY LINE LEGEND 1.REFER TO SHEET C1.23, FINISHING PLAN NORTH, FOR NOTES. NOTES Page 131 of 221 PROJECT MATCH LINE PROJECT MATCH LINE PROPOSED BUILDING AREA BY ALTERNATE 3.9 6 % > > > > > > > > D > > D >> >> >> D >> >> >> D >> >> >> >> D >> >> >> >> >> >> >> >> > > >> >> > > > > > > >> >> >> >> >> >>>>>> D >> >> >> >> >> D > > >> >> >> >> >> >> >> >> > > > > > > > > >> >> >> >> >> > > 1.77 % >> >> IP SF SF SF SF S F S F S F S F SF SFSFSF SF 955 960 956 957 958 959 961 95 5 960 95 6 95 7 958 959 9 5 5 9 5 3 9 5 4 9 5 6 96 5 96396 496 696 7968 96 9 96 0 96 1 96 2 962 960 965 958 959 961 962 963 964 951 952 95 3 9 5 5 95 2 9 5 3 9 5 4 9 5 6 9 5 7 958 955 960 953 954 956 957 958 959 961 962 9 7 0 955 9 6 0 954954 956 957 9 5 8 9 5 9 9 6 1 96 2 9 5 0 955 94 9 9 5 1 95 2 953 954 956 957 95 8 9 5 9 9 5 7 9 5 8 9 5 9 96 0 IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP IP 96 1 96 2 IP C1.31 EROSION CONTROL PLAN NORTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 IP X X 955 54.6 955 D SD >>>> SF SF REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING EOF = EMERGENCY OVERFLOW TC = TOP OF CURB TW = FINISH GRADE AT HIGH SIDE OF WALL BW = FINISH GRADE AT LOW SIDE OF WALL PROPOSED GRADING LIMITS PROPOSED STORM SEWER PROPOSED DRAIN TILE / SUBSURFACE DRAINS (SD) PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) INLET PROTECTION DEVICE AT STORM SEWER INLET PROPOSED SILT FENCE PROPOSED ROCK CONSTRUCTION ENTRANCE PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE LEGEND 1.REFER TO SHEET C1.41, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. 2.REFER TO SWPPP NARRATIVE, SHEET C1.34, FOR CONSTRUCTION SEQUENCING AND EROSION CONTROL REQUIREMENTS. 3.MAINTAIN ADJACENT PROPERTY AND PUBLIC STREETS CLEAN FROM CONSTRUCTION CAUSED DIRT AND DEBRIS ON A DAILY BASIS. PROTECT DRAINAGE SYSTEMS FROM SEDIMENTATION AS A RESULT OF CONSTRUCTION RELATED DIRT AND DEBRIS. 4.MAINTAIN DUST CONTROL DURING GRADING OPERATIONS. 5.ALL EROSION CONTROL METHODS SHALL COMPLY WITH MPCA AND OTHER LOCAL REGULATIONS. 6.IF EROSION AND SEDIMENT CONTROL MEASURES TAKEN ARE NOT ADEQUATE AND RESULT IN DOWNSTREAM SEDIMENTATION, CLEAN OUT DOWNSTREAM STORM SEWERS AND OTHER CONVEYANCE DEVICES AS NECESSARY, INCLUDING ASSOCIATED RESTORATION. 7.INLET PROTECTION DEVICE AT STORM SEWER INLETS. AT THE INLETS TO ALL STORM SEWER STRUCTURES, PROVIDE A PRODUCT FROM THE FOLLOWING LIST OF APPROVED PRODUCTS: a.ROAD DRAIN "TOP SLAB", MANUFACTURED BY WIMCO b.ROAD DRAIN "CURB & GUTTER", MANUFACTURED BY WIMCO c.INFRASAFE "SEDIMENT CONTROL BARRIER", MANUFACTURED BY ROYAL ENVIRONMENTAL SYSTEMS, INC. d.INFRASAFE "DEBRIS COLLECTION DEVICE", MANUFACTURED BY ROYAL ENVIRONMENTAL SYSTEMS, INC. e.INFRASAFE "CULVERT INLET PROTECTOR", MANUFACTURED BY ROYAL ENVIRONMENTAL SYSTEMS, INC. f.DANDY SACK, MANUFACTURED BY DANDY PRODUCTS, INC. g.DANDY CURB SACK, MANUFACTURED BY DANDY PRODUCTS, INC. h.OR APPROVED EQUAL. 8.PRIOR TO CONSTRUCTION, DELINEATE TURF AND VEGETATED AREAS NOT TO BE DISTURBED WITH ORANGE SNOW FENCE. DO NOT ALLOW CONSTRUCTION TRAFFIC, EQUIPMENT, OR MATERIALS TO UTILIZE, ACCESS, OR OTHERWISE ENTER THE DELINEATED AREAS. MINIMIZE SOIL COMPACTION AND DISRUPTION OF TOPSOIL IN AREAS OUTSIDE THE CONSTRUCTION LIMITS TO COMPLY WITH THE MN CONSTRUCTION STORMWATER PERMIT. NOTES Page 132 of 221 PROJECT MATCH LINE PROJECT MATCH LINE STORMWATER POND INFILTRATION BASIN X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X I I I D D >> >> >> D >> >> >> D >>>> >> >> >> >> >> > > > > > > > > >> >> >> >> >> >> > > D >> >> >> >> >> >>> > >> >> >> >> > > > > > > >> >> > > > > >> >> D D >> >> >> >> >> >> >> >> >> >> >> 1.77 % > > > > > > S > > > > S S F S F S F S F S F SF SF IP IP IP IP IP IP IP IP IP SF SF SF SF SF IP SF SF SF SF SF IP S F S F S F S F S F S F [] [] [] [] [] [] [] [] [ ] [ ] [ ] [] [] [] [] [] [] [] [] [] [] [] [ ] [ ] [][][][] 951 952 95 3 9 5 5 9 5 2 9 5 3 9 5 4 9 5 6 955 953 954 956 957 958 959 9 5 0 955 94 9 9 5 1 95 2 953 954 95 8 9 5 9 9 5 7 9 5 8 9 5 9 940 937 938 939 941 942 943 944 940 945 950 937 938 939 941 942 943 944 946 947 948 949 9 4 1 9 4 2 9 4 3 9 5 5 9 6 0 9 6 5 9 5 6 9 5 7 9 5 8 9 5 9 9 6 1 9 6 2 9 6 3 9 6 4 945 950 955 946 947 948 949 951 952 953 954 956 957 958 945 942943944 96 0 IP IP TEMPORARY SEDIMENT BASIN C1.32 EROSION CONTROL PLAN SOUTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 IP X X 955 54.6 955 D SD >>>> SF SF [][] REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING EOF = EMERGENCY OVERFLOW TC = TOP OF CURB TW = FINISH GRADE AT HIGH SIDE OF WALL BW = FINISH GRADE AT LOW SIDE OF WALL PROPOSED GRADING LIMITS PROPOSED STORM SEWER PROPOSED DRAIN TILE / SUBSURFACE DRAINS (SD) PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED FLARED END SECTION (FES) INLET PROTECTION DEVICE AT STORM SEWER INLET PROPOSED SILT FENCE PROPOSED SEDIMENT CONTROL LOG PROPOSED ROCK CONSTRUCTION ENTRANCE PROPOSED EROSION CONTROL BLANKET PROPOSED TEMPORARY DIVERSION BERM PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE LEGEND 1.REFER TO SHEET C1.31, EROSION CONTROL PLAN NORTH, FOR NOTES. NOTES Page 133 of 221 STORMWATER POLLUTION PREVENTION PLAN (SWPPP) PERMANENT STORMWATER MANAGEMENT SYSTEM: Type of storm water management used if more than 1 acre of new impervious surface is created: PROJECT LOCATION 1-MILE BOUNDARY RECEIVING WATERS ISD 196 NEW ES #20 -2024 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA PROJECT LOCATION: RECEIVING WATERS: Receiving waters, including surface water, wetlands, Public Waters, and stormwater ponds, within 1-mile of the project boundary are identified on the USGS 7.5 min quad map above. Receiving waters that are impaired, the impairment, and WLA are listed as follows. All specific BMPs relative to construction activities listed in the permit for special, prohibited, restricted, or impaired have been incorporated into this plan. All specific BMPs listed in approved TMDLs and those BMPs listed for construction related waste load allocations have also been incorporated. DESCRIPTION OF CONSTRUCTION ACTIVITIES AND STORMWATER MANAGEMENT: Construction activities include: Site grading, sanitary sewer and water main extensions, road construction, storm sewer improvements, building construction, temporary erosion and sediment control, and permanent stabilization. Stormwater currently sheet flows to an onsite wetland. After construction is complete stormwater will be directed into curb and gutter and discharged into stormwater ponds. Stormwater will ultimately discharge into pond 1618 that connects to the existing stormwater infrastructure. This project includes the following stormwater management BMPs ... IMPLEMENTATION SCHEDULE AND PHASING: The Contractor is required to provide an updated schedule and site management plan meeting the minimum requirements of Section 1717 of the Minnesota Standard Specifications for Construction. 1)Submit SWPPP Updates to Engineer. Submittal shall include any requested changes to the SWPPP, including but not limited to: Trained Personnel, Locations for Stockpiles, Concrete Washout, Sanitation Facilities, Types and Locations of Erosion & Sediment Control. Failure to submit updates shall be considered acceptance of the SWPPP as designed with no changes. 2)Install perimeter sediment control, inlet protection, and construction exit. 3)Grade site 4)Install utilities 5)Construct building 6)Construct roads and curb and curb & gutter 7)Pave roads 8)Add additional temporary BMPs as necessary during construction based on inspection reports. 9)Ensure final stabilization measures are complete. 10)Provide digital copy of all Field SWPPP Documentation including Inspection Reports and SWPPP Revisions to the Owner. 11)Submit Notice of Termination (NOT) to MPCA. NOTE: The NOT must be submitted to MPCA before Final Stabilization is considered complete. The SWPPP Designer, Construction SWPPP Manager, and BMP Installer must have appropriate training. Documentation showing training commensurate with the job duties and responsibilities is required to be included in the SWPPP prior to any work beginning on the site. Training documentation for the SWPPP Designer is included on the Narrative sheet. The Contractor shall attach training documentation to this SWPPP for the Construction SWPPP Manager and BMP Installer prior to the start of construction. This information shall be kept up to date until the project NOT is filed. RESPONSIBLE PARTIES: The Contractor and Owner will be joint applicants under the MPCA's General Stormwater Permit for Construction Activity as required by the National Pollutant Discharge Elimination System (NPDES) Phase II program. The Contractor shall provide one or more trained Construction SWPPP Manager(s) knowledgeable and experienced in the application of erosion prevention and sediment control BMPs that will oversee the implementation of the SWPPP, and the installation, inspection and maintenance of the erosion prevention and sediment control BMPs. A Construction SWPPP Manager must be available for an on-site inspection within 72 hours upon request by the MPCA. ADDITIONAL COMPENSATION Payment for all work associated with Erosion and Sediment Control shall be as described in the Project Manual. Unless otherwise authorized by the Owner no additional payment shall be made for any work required to administer and maintain the site erosion and sediment control in compliance with the Minnesota Pollution Control Agency (MPCA) - General Stormwater Permit for Construction Activity (MN R100001) including but not limited to inspection, maintenance, and removal of BMPs or addition of BMPs to accommodate Contractor phasing. DOCUMENT RETENTION Permittees must make the SWPPP, including all inspection reports, maintenance records, training records and other information required by this permit, available to federal, state, and local officials within three (3) days upon request for the duration of the permit and for three (3) years following the NOT. GENERAL STORMWATER DISCHARGE REQUIREMENTS All requirements listed in Section 5.1 of the Permit for the design of the permanent stormwater management system and discharge have been included in the preparation of this SWPPP. These include but are not limited to: 1.The expected amount, frequency, intensity, and duration of precipitation. 2.The nature of stormwater runoff and run-on at the site 3.Peak flow rates and stormwater volumes to minimize erosion at outlets and downstream channel and stream bank erosion. 4.The range of soil particle sizes expected to be present on the site. Permanent stormwater treatment systems for this project have been designed in accordance with the guidance in the MN Stormwater Manual in place at the time of bidding. Copies of the design information and calculations are part of this SWPPP and will be provided in digital format upon written request to the Engineer. FEETSCALE 0 1500 3000 X Wet Sedimentation Basin X Infiltration/Filtration Regional Pond Permanent Stormwater Management Not Required COUNTY TOWNSHIP RANGE SECTION LATITUDE LONGITUDE Dakota T115N R19W 22 44.7522°-93.9879° BMP SUMMARY QUANTITY UNIT ROCK CONSTRUCTION ENTRANCE 1 EACH INLET PROTECTION DEVICE 42 EACH SILT FENCE 1340 LF EROSION CONTROL BLANKET 82000 SF SEDIMENT CONTROL LOG 840 LF NAME OF WATER BODY TYPE (ditch, pond, wetland, lake, etc.) Special, Prohibited, Restricted Water 1 Flows to Impaired Water Within 1-Mile 2 USEPA Approved Construction Related TMDL 3 1618 POND NO NO - 3060 POND NO NO - COMPANY CONTACT PERSON PHONE OWNER:ISD 196 Mary Kreger 651-423-7723 SWPPP DESIGNER:Bolton & Menk, Inc.Paul Strong 651-247-8789 CONTRACTOR:TBD TBD TBD CONSTRUCTION SWPPP MANAGER:TBD TBD TBD PARTY RESPONSIBLE FOR LONG TERM O&M:ISD 196 Mike Schwanke 651-423-7706 Total Project Size (disturbed area) =34.5 ACRES Existing area of impervious surface =0.0 ACRES Post construction area of impervious surface =7.9 ACRES Total new impervious surface area created =7.9 ACRES Planned Construction Start Date:04/2024 Estimated Construction Completion Date:10/2024 PROJECT AREAS: PROJECT BOUNDARY NATIONAL WETLANDS INVENTORY IMPAIRED, SPECIAL OR PROTECTED WATERSOR 1-MILE BOUNDARY LEGEND RECEIVING WATERS R 1 Special, prohibited, and restricted waters are listed in Section 23 of the MN Construction Stormwater General Permit (MNR100001). 2 Identified as impaired under section 303 (d) of the federal Clean Water Act for phosphorus, turbidity, TSS, dissolved oxygen, and/or aquatic biota. 3 Construction Related TMDLs include those related to: phosphorus, turbidity, TSS, dissolved oxygen, and/or aquatic biota. PROJECT LOCATION DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 C1.33 STORMWATER POLLUTION PREVENTION PLAN - PROJECT INFORMATION Page 134 of 221 Information contained in this SWPPP narrative sheet summarizes requirements of the GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM PROGRAM - Permit No: MN Rl0000l (Permit) as they apply to this project. All provisions of the Permit including those not specifically cited herein shall apply to this project. The Contractor is responsible to be familiar with and comply with all conditions of the permit. The full text of the Permit is available at: https://www.pca.state.mn.us/sites/default/files/wq-strm2-80a.pdf SWPPP AMENDMENTS AND SUBMITTALS Contractor must prepare and submit to the Engineer a SWPPP amendment as necessary to include additional Best Management Practices (BMPs) to correct problems identified or address the following situations. 1.Contact information and training documentation for Construction SWPPP Manager and BMP Installer, 2.There is a change in construction method of phasing, operation, maintenance, weather or seasonal conditions not anticipated during the design of the SWPPP including but not limited to: a.Types and/or Locations of BMPs b.Material Storage and Spill Response c.Fueling Plans d.Locations for Stockpiles, Concrete Washout, and Sanitation Facilities and e.Project Phasing 3.It is determined that the SWPPP is not achieving objectives of minimizing pollutants in stormwater discharges associated with construction activity, or 4.The SWPPP is not consistent with the terms and conditions of the permit. The Contractor may implement SWPPP amendments immediately and is not required to wait for Engineer review of the submittal. The responsibility for completeness of SWPPP amendments and compliance with the Permit lies with the Contractor. Review, comment, or lack of comment by the Engineer on a SWPPP amendment shall not absolve the responsibilities of the Contractor in any way. If a change order is issued for a design change the SWPPP amendment will be prepared by the Engineer and included in the change order. In addition to SWPPP amendments, the Contractor shall submit to the Engineer Weekly Erosion and Sediment Control Schedule meeting the requirements of MnDOT 1717. The Contractor shall keep copies of all SWPPP amendments, Weekly Erosion and Sediment Control Schedules, inspection logs, and maintenance logs with the field copy of the SWPPP. A PDF copy of these documents will be provided along with a copy of the final Field Copy of the SWPPP to the Engineer along with the signed Notice of Termination when final stabilization is complete. EROSION PREVENTION PRACTICES Stormwater conveyance channels shall be routed around unstabilized areas. Erosion controls and velocity dissipation devices shall be used at outlets within and along the length of any constructed conveyance channel. The normal wetted perimeter of all ditches or swales, including storm water management pond slopes, that drain waters from the site must be stabilized within 200' of any property edge or discharge point, including storm sewer inlets, within 24 hours of connection. Temporary or permanent ditches or swales used as sediment containment during construction do not need to be stabilized during temporary period of use and shall be stabilized within 24 hours after no longer used as sediment containment. Mulch, hydromulch, tackifier, or similar practice shall not be used in any portion of the wetted perimeter of a temporary or permanent drainage ditch or swale section with a continuous slope of greater than 2 percent. Energy dissipation shall be installed at all temporary or permanent pipe outlets within 24 hours of connection to a surface water or permanent stormwater treatment system. The Contractor shall phase construction and use construction methods to the extent practical to minimize exposed soils. The project phasing shall be documented in the Weekly Erosion and Sediment Control Schedule. SEDIMENT CONTROL PRACTICES Down gradient BMPs including perimeter BMPs must be in place before up gradient land- disturbing activities begin and shall remain in place until final stabilization. All BMPs that have been adjusted or removed to accommodate short-term activities shall be re-installed or replaced the earlier of the end of the work day or before the next precipitation event even if the activity is not complete. Inlet BMPs may be removed for specific safety concerns. The BMPs shall be replaced as soon as the safety concern is resolved. The removal shall be documented in the SWPPP as a SWPPP amendment. Temporary stockpiles must have sediment control BMPs. The Contractor shall prepare and submit to the Engineer a SWPPP amendment showing the location of temporary stockpiles and the BMPs for each stockpile. The SWPPP amendment must meet the minimum requirements of Section 9 of the Permit. Soil compaction shall be minimized and topsoil shall be preserved, unless infeasible or if construction activities dictate soil compaction or topsoil stripping. The use of polymers, flocculants, or other sedimentation treatment chemicals are not proposed as part of this SWPPP as designed by the Engineer. If methods or phasing of construction require the use of any of these chemicals, the Contractor shall prepare and submit to the Engineer a SWPPP amendment that meets the minimum requirements of Section 9 of the Permit. TEMPORARY SEDIMENTATION BASINS A temporary sedimentation basin has not been included in this SWPPP as designed by the Engineer. If a basin is later determined to be desirable or necessary the Contractor shall prepare and submit to the Engineer a SWPPP amendment. Temporary sedimentation basins shall meet or exceed the minimum requirements of Section 14 of the Permit and shall include a basin draining plan meeting or exceeding the minimum requirements of Section 10 of the Permit. Where the site discharges to Special and/or Impaired Waters the SWPPP amendment shall also meet or exceed the minimum requirements of Section 23 of the permit. DEWATERING A dewatering plan has not been included in this SWPPP as designed by the Engineer. If dewatering is required for this project, the Contractor shall prepare and submit to the Engineer a SWPPP amendment. All dewatering shall meet or exceed the minimum requirements of Section 10 of the Permit. POLLUTION PREVENTION Products and materials that have the potential to leach pollutants that are stored on the site must be stored in a manner designed to minimize contact with stormwater. Materials that are not a source of potential contamination to stormwater or that are designed for exposure to stormwater are not required to be covered. Hazardous materials including but not limited to pesticides, fertilizer, petroleum products, curing compounds and toxic waste must be properly stored and protected from stormwater exposure as recommended by the manufacturer in an access restricted area. Solid waste must be stored, collected and disposed of in compliance with Minnesota Administrative Rules Chapter 7035. Portable toilets must be positioned so that they are secure and will not be tipped or knocked over. Sanitary waste must be disposed of properly in accordance with Minn. R. CH 7041. Exterior vehicle or equipment washing on the project site shall be limited to a defined area of the site. No engine degreasing is allowed on site. A sign must be installed adjacent to each washout facility that requires site personnel to utilize the proper facilities for disposal of concrete and other washout wastes. The Contractor shall prepare and submit a SWPPP amendment detailing the location and BMPs proposed for storage of materials, solid waste, portable toilets, and exterior vehicle or equipment washing on the site. The SWPPP amendment shall include a spill prevention and response plan that is appropriate for the materials proposed to be on the site. The SWPPP amendment shall meet or exceed the minimum requirements of Section 12 of the Permit. INSPECTION & MAINTENANCE A trained person shall routinely inspect the entire construction site at the time interval indicated on this sheet of the SWPPP during active construction and within 24-hours after a rainfall event greater than 0.5 inches in 24 hours. Following an inspection that occurs within 24-hours after a rainfall event, the next inspection must be conducted at the time interval indicated in the Receiving Waters Table found on the SITE PLAN AND INFORMATION SHEET of the SWPPP. All inspections and maintenance conducted during construction must be recorded on the day it is completed and must be retained with the SWPPP. Inspection report forms are available in the Project Specifications. Inspection report forms other than those provided shall be approved by the engineer. The Contractor may request a change in inspection schedule for the following conditions: a.Inspections of areas with permanent cover to be reduced to once per month, b.Inspections of areas that have permanent cover and have had no construction activity for 12 months to be suspended until construction resumes, c.Inspections of areas where construction is suspended due to frozen ground conditions, inspections to be suspended until the earlier of within 24 hours of runoff occurring, or upon resuming construction. No change in inspection schedule shall occur until authorized by the Engineer. Inspections must include: 1.All erosion prevention and sediment control BMPs and Pollution Prevention Management Measures to ensure integrity and effectiveness. 2.Surface waters, including drainage ditches and conveyance systems for evidence of erosion and sediment deposition. 3.Construction site vehicle exit locations, streets and curb and gutter systems within and adjacent to the project for sedimentation from erosion or tracked sediment from vehicles. 4.Infiltration areas to ensure that no sediment from ongoing construction activity is reaching the infiltration area and that equipment is not being driven across the infiltration area. All non-functioning BMPs and those BMPs where sediment reaches one-half (1/2) of the depth of the BMP, or in the case of sediment basins one-half (1/2) of the storage volume, must be repaired, replaced, or supplemented by the end of the next business day after discovery, or as soon as field conditions allow. Permittees must repair, replace or supplement all nonfunctional BMPs with functional BMPs by the end of the next business day after discovery, or as soon as field conditions allow. Any sediment that escapes the site must be removed and the area stabilized within 7 calendar days of discovery unless precluded by legal, regulatory, or physical access in which case the work shall be completed within 7 calendar days of authorization. Paved surfaces such as streets shall have any escaped or tracked sediment removed by the end of the day that it is discovered. Sediment release, other than paved surfaces that can be cleaned up with street sweeping shall be reported immediately upon discovery to the Engineer. PUBLIC WATER RESTRICTIONS: For public waters that have been promulgated "work in water restrictions" during fish spawning time frames, all exposed soil areas that are within 200 feet of the water's edge, and drain to these waters must complete stabilization within 24-hours during the time period. MN DNR permits are not valid for work in waters that are designated as infested waters unless accompanied by an Infested Waters Permit or written notification has been obtained from MN DNR stating that such permit is not required. There is no exception for pre-existing permits. If a MN DNR Permit has been issued for the project and the water is later designated as infested, the Contractor shall halt all work covered by the MN DNR Permit until an Infested Waters Permit is obtained or that written notification is obtained stating that such permit is not required. FINAL STABILIZATION Final Stabilization is not complete until all the following requirements have been met: 1.Substantial Completion has been reached and no ground disturbing activities are anticipated. 2.Permanent cover has been installed with an established minimum uniform perennial vegetation density of 70 percent of its expected final growth. Vegetation is not required in areas where no vegetation is proposed by this project such as impervious surfaces or the base of a sand filter. 3.Accumulated sediment has been removed from all permanent stormwater treatment systems as necessary to ensure the system is operating as designed. 4.All sediment has been removed from conveyance systems 5.All temporary synthetic erosion prevention and sediment control BMPs have been removed. BMPs designated on the SWPPP to remain to decompose on-site may remain. 6.For residential construction only, permit coverage terminates on individual lots if the structures are finished and temporary erosion prevention and downgradient perimeter control is complete, the residence sells to the homeowner, and the permittee distributes the MPCA's "Homeowner Fact Sheet" to the homeowner. 7.For agricultural land only (e.g., pipelines across cropland), the disturbed land must be returned to its preconstruction agricultural use prior to submitting the NOT. SITE STABILIZATION COMPLETION: SITE INSPECTION INTERVAL: SPECIAL ENVIRONMENTAL CONSIDERATIONS AND PERMITS: TYPE OF PERMIT PERMITTING AGENCY PERMIT STATUS AND CONDITIONS Construction Stormwater NPDES MPCA IN PROGRESS DOLI Permit DOLI NOT STARTED MDH Permit MDH NOT STARTED Conditional Use Permit NOT STARTED Rezoning Permit NOT STARTED 1)Was an environmental review required for this project or any part of a common plan of development or sale that includes all or any portion of this project?NO 2)Does any portion of the site have the potential to affect threatened or endangered species or their critical habitat?NO 3)Does any portion of this site discharge to a Calcareous fen.NO 4)Will any portion of the site potentially affect properties listed on the National Register of Historic Places or a known or discovered archeological site?NO 5)Have any Karst features have been identified in the project vicinity?NO 6)Is compliance with temporary or permanent stormwater management design requirements infeasible for this project?NO 7)Has the MN DNR promulgated "work in water restrictions" for any Public Water this site disharges to during fish spawning?NO A trained person shall routinely inspect the entire construction site during active construction at an interval of no more than:7 calendar days SWPPP DESIGNER TRAINING DOCUMENTATION: Stabilization of exposed soils shall begin immediately and shall be completed after the construction activity has temporarily or permanently ceased no later than: 14 calendar days DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 C1.34 STORMWATER POLLUTION PREVENTION PLAN - NARRATIVE Page 135 of 221 320B 301B 39B2 301B 411B 454C 411A 611C 411B 301B 411B 415B 320C2 411B 611C 250 LEGEND PROJECT BOUNDARY SOIL TYPE NATIONAL WETLANDS INVENTORY DWSMA, HIGH VULNERABILITY STEEP SLOPES (>33.3%) RECEIVING WATERS SOIL TYPE SUMMARY Map Unit Symbol Soil Name Hyd. Soil Group 250 Kennebec silt loam C 301B Lindstrom silt loam, 1 to 4 percent slopes B 320B Tallula silt loam, 2 to 6 percent slopes B 320C2 Tallula silt loam, 6 to 12 percent slopes, eroded B 39B2 Wadena loam, 2 to 6 percent slopes, eroded B 411A Waukegan silt loam, 0 to 1 percent slopes B 411B Waukegan silt loam, 1 to 6 percent slopes B 415B Kanaranzi loam, 2 to 6 percent slopes B 454C Mahtomedi loamy sand, 8 to 15 percent slopes A 611C Hawick coarse sandy loam, 6 to 12 percent slopes A LOCATION OF SWPPP REQUIREMENTS IN PROJECT PLAN DESCRIPTION SHEET NO. SITE MAP C1.35 DIRECTION OF FLOW C1.41 FINAL STABILIZATION C1.31 SOILS C1.35 DRAINAGE STRUCTURES C1.52 DRAINAGE TABULATION C1.XX STORM SEWER PLAN & PROFILE SHEETS C1.52 EROSION & SEDIMENT CONTROL DETAILS C1.71 EROSION CONTROL TABULATION C1.34 TURF ESTABLISHMENT TABULATION L1.61 NARRATIVE & NOTES C1.33-C1.34 FEETSCALE 0 100 200 R DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 C1.35 STORMWATER POLLUTION PREVENTION PLAN - SOIL MAP Page 136 of 221 PROJECT MATCH LINE PROJECT MATCH LINE PROPOSED BUILDING AREA BY ALTERNATE 1.5 % D D D D D D D S S S 52.4 62.5 52.2 52.9 52.3 56.9 57.2 57.257.2 9 5 5 9 5 5 95 3 9 5 3 9 5 4 9 5 4 9 5 6 950 955 949 951 952 953 954 954 9 5 0 955 960 96 0 96 5 96 5 9 4 8 948 9 4 9 9 5 1 9 5 2 95 3 9 5 4 956 957 958 95 8 959 959 9 6 1 9 6 1 961 962 962 962 963 9 6 3 963 9 6 4 96 4 96 6 96 6 967 96 7 96 8 968 9 6 9 9 6 9 56.7 57.2 57.2 56.7 57.2 57.2 56.7 56.7 56.7 57.2 57.2 56.6 56.7 57.2 57.2 56.5 56.5 56.5 56.5 56.5 57.2 57.2 56.7 56.7 56.7 57.2 57.1 57.5 65.4 68.5 70.2 70.0 70.0 70.0 70.270.5 70.3 70.5 69.9 68.5 68.5 55.9 54.1 54.1 52.8 66.2 TW68.0 61.8 TW 57.2 BW 57.5 BW 60.9 TW 53.0 BW 52.9 BW 58.1 TW 53.4 52.5 53.1 54.0 52.7 53.8 1.8 % 3. 8 % 67.1 1.8 % 68.2 2.6% 3.1% ??? 3.5 % ??? ??? ??? 1.5 % 0.7% ??? ??? 0.6% 49.2 59.7 60.1 60.3 59.6 48.0 48.9 49.6 49.6 49.8 58.4 58.2 64.0 67.1 67.4 68.4 66.5 64.7 62.9 61.3 61.4 62.963.2 63.2 63.0 62.2 62.5 63.8 63.8 63.4 64.3 64.6 65.2 65.3 66.1 66.1 66.6 67.4 67.1 67.2 67.3 67.4 68.5 68.5 68.7 68.4 66.8 66.5 67.9 66.5 66.4 65.8 65.7 65.0 64.9 64.1 64.2 55.4 54.7 55.6 55.7 55.9 56.2 57.0 57.1 57.3 57.3 57.1 56.7 56.1 56.3 56.5 54.6 55.0 55.1 55.1 57.9 54.4 53.4 57.9 56.4 56.9 59.6 54.6 46.0 53.4 95 0 955 960 965 94 7 94 8 94 9 951 952 95 3 954 956 957 958 959 961 962 963 964 9 6 0 9 5 9 9 5 8 9 5 7 9 5 6 957 958 9 5 5 95 7 9 5 8 9 5 9 95 5 960 95 6 95 7 95 8 95 9 9 6 1 9 6 2 9 6 3 961 962 963 96 0 96 1 52.9 53.5 55.4 55.6 61.2 62.4 64.4 67.0 67.7 62.7 60.1 55.1 54.9 56.3 55.7 58.3 53.6 68.9 64.8 9 6 2 9 6 3 9 6 4 9 6 1 965 964 966 967 955 9 6 0 956 957 9 5 8 9 5 9 9 6 1 9 6 2 963 955 960 956 957 958 959 95 5 95 6 950 949 951 952 955 960 953 954 956 957 958 959 1.8% 4.2 % 5. 6 % UPPER LEVEL:970.5 LOWER LEVEL:957.2 69.756.3 C1.41 GRADING AND DRAINAGE PLAN NORTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 X X SB-1 TP X 955 54.6 955 X.XX D REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR EXISTING SPOT ELEVATION PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING EOF = EMERGENCY OVERFLOW TC = TOP OF CURB TW = FINISH GRADE AT HIGH SIDE OF WALL BW = FINISH GRADE AT LOW SIDE OF WALL PROPOSED GRADING LIMITS PROPOSED SAND SUBBASE AT FROST FOOTED STOOPS APPROXIMATE SOIL BORING / TEST PIT LOCATION PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED FLARED END SECTION (FES) PROPOSED HYDRANT (HYD) PROPOSED GATE VALVE (GV) PROPOSED STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE LEGEND 1.ALL CONSTRUCTION SHALL COMPLY WITH APPLICABLE STATE AND LOCAL ORDINANCES. 2.THE CONTRACTOR WILL BE RESPONSIBLE FOR AND SHALL PAY FOR ALL CONSTRUCTION STAKING / LAYOUT. 3.OBTAIN AND PAY FOR ALL RELATED CONSTRUCTION PERMITS, INCLUDING THE NPDES PERMIT FROM THE MPCA. SUBMIT A COPY OF ALL PERMITS TO THE CITY. 4.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL SIGNAGE (CONSTRUCTION ZONES) NECESSARY TO CONSTRUCT PROPOSED IMPROVEMENTS. ALL SIGNAGE LAYOUTS MUST BE DESIGNED BY THE CONTRACTOR AND APPROVED BY LOCAL AUTHORITIES. 5.INSTALL CONTROL FENCING AND BARRICADING AS NECESSARY TO PROTECT THE PUBLIC. 6.INSPECT SITE AND REVIEW SOIL BORINGS TO DETERMINE EXTENT OF WORK AND NATURE OF MATERIALS TO BE HANDLED. 7.REFER TO SPECIFICATIONS FOR DEWATERING REQUIREMENTS. 8.CHECK ALL PLAN AND DETAIL DIMENSIONS AND VERIFY SAME BEFORE FIELD LAYOUT. 9.REFER TO ARCHITECTURAL PLANS FOR BUILDING AND STOOP DIMENSIONS AND LAYOUT. 10.REFER TO THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE, SHEET C1.34, FOR EROSION CONTROL REQUIREMENTS. SECTION 31 00 00 SHALL BE RESPONSIBLE FOR FULL IMPLEMENTATION OF THE SWPPP. 11.MAINTAIN ADJACENT PROPERTY AND PUBLIC STREETS CLEAN FROM CONSTRUCTION CAUSED DIRT AND DEBRIS ON A DAILY BASIS. PROTECT DRAINAGE SYSTEMS FROM SEDIMENTATION AS A RESULT OF CONSTRUCTION RELATED DIRT AND DEBRIS. 12.MAINTAIN DUST CONTROL DURING GRADING OPERATIONS. 13.ALL EROSION CONTROL METHODS SHALL COMPLY WITH MPCA AND LOCAL REGULATIONS. 14.MINIMIZE DISTURBANCE TO SITE AND PROTECT EXISTING SITE FEATURES (INCLUDING TURF AND VEGETATION) WHICH ARE TO REMAIN. 15.PROPOSED CONTOURS AND SPOT ELEVATIONS ARE SHOWN TO FINISH GRADE UNLESS OTHERWISE NOTED. 16.PROPOSED ELEVATIONS SHOWN TYPICALLY AS 55.1 OR 55 SHALL BE UNDERSTOOD TO MEAN 955.1 OR 955. 17.SPOT ELEVATIONS SHOWN IN PARKING LOTS, DRIVES AND ROADS INDICATE GUTTER GRADES, UNLESS NOTED OTHERWISE. SPOT ELEVATIONS WITH LABELS OUTSIDE THE BUILDING PERIMETER INDICATE PROPOSED GRADES OUTSIDE THE BUILDING. SPOT ELEVATIONS WITH LABELS INSIDE THE BUILDING PERIMETER INDICATE PROPOSED FINISH FLOOR ELEVATIONS. 18.THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR DETERMINING QUANTITIES OF CUT, FILL AND WASTE MATERIALS TO BE HANDLED, AND FOR AMOUNT OF GRADING TO BE DONE IN ORDER TO COMPLETELY PERFORM ALL WORK INDICATED ON THE DRAWINGS. IMPORT SUITABLE MATERIAL AND EXPORT UNSUITABLE / EXCESS / WASTE MATERIAL, AS REQUIRED, AT NO ADDITIONAL COST TO THE OWNER. 19.IT IS INTENDED THAT EARTHWORK (CUT VS. FILL) BALANCE ON SITE. SUBMIT THE QUANTITY OF MATERIAL AND AMOUNT OF ANTICIPATED GRADE ADJUSTMENT FOR REVIEW BY THE ENGINEER A MINIMUM OF FOUR WEEKDAYS PRIOR TO MAKING ADJUSTMENTS. ALL GRADE ADJUSTMENTS MUST BE APPROVED BY THE ENGINEER. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR WORK ASSOCIATED WITH GRADING ADJUSTMENTS, INCLUDING, BUT NOT LIMITED TO, EARTHWORK OPERATIONS, STORM SEWER PIPING AND STRUCTURE ADJUSTMENTS, CONSTRUCTION SURVEYING FOR ADJUSTING FEATURE LOCATIONS ACCORDINGLY, SILT FENCE, ETC. 20.NO FINISHED SLOPES SHALL EXCEED 4' HORIZONTAL TO 1' VERTICAL (4:1), UNLESS OTHERWISE NOTED. 21.ALL DISTURBED AREAS OUTSIDE THE BUILDING PAD, WHICH ARE NOT DESIGNATED TO BE PAVED OR RECEIVE AGLIME, SHALL RECEIVE AT LEAST 6” OF TOPSOIL AND SHALL BE SODDED OR SEEDED. REFER TO LANDSCAPING PLANS FOR SOD AND SEED LOCATIONS. ALL AREAS NOT DESIGNATED FOR SOD OR A SPECIFIC SEED MIX, WHICH ARE DISTURBED BY CONSTRUCTION, SHALL BE SEEDED WITH SEED MIX #1. 22.WHERE NEW SOD MEETS EXISTING SOD, CUT A CLEAN, SHARP EDGE TO ALLOW FOR A CONSISTENT, UNIFORM, AND STRAIGHT JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS. JAGGED OR UNEVEN JOINTS WILL NOT BE ACCEPTED. REMOVE TOPSOIL AT THE JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS, AS REQUIRED, TO ALLOW NEW SOD SURFACE TO BE FLUSH WITH EXISTING TURFGRASS SURFACE. 23.FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE AN ACCEPTABLE TURF, RE-SEED OR RE-SOD ALL APPLICABLE AREAS, AT NO ADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF THE ENGINEER OR LANDSCAPE ARCHITECT. 24.ALL WATERMAIN PIPE SHALL BE DIP, CLASS 52. ALL WATERMAIN SHALL HAVE MINIMUM 8'-0" BURY (TOP OF PIPE TO FINISH GRADE). DIP SHALL BE ENCASED WITH POLYETHYLENE FILM CONFORMING TO ASTM D 1248-889. 25.ALL WATERMAIN SHALL BE AWWA C900, CAST IRON OD, DR 18, PVC PIPE INSTALLED IN ACCORDANCE WITH ASTM D2321. ALL WATERMAIN SHALL HAVE MINIMUM 8'-0" BURY (TOP OF PIPE TO FINISH GRADE). 26.ALL SANITARY SEWER PIPE SHALL BE PVC PIPE (ASTM D 3034, SDR 26), UNLESS OTHERWISE NOTED. SANITARY SEWER INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM D2321. 27.ALL SANITARY SEWER PIPE CROSSING WATERMAIN, OUTSIDE OF THE PUBLIC RIGHT-OF-WAY, SHALL BE ASTM D2665, SCHEDULE 40 PVC WITH SOLVENT WELD JOINTS. 28.ALL STORM SEWER PIPE SHALL BE RCP, CLASS III (MIN.), WITH FLEXIBLE WATERTIGHT JOINTS IN ACCORDANCE WITH ASTM C-361 OR PVC PIPE (ASTM D3034, SDR 35) INSTALLED IN ACCORDANCE WITH ASTM D2321, UNLESS OTHERWISE NOTED. 29.ALL STORM SEWER PIPE CROSSING WATERMAIN, OUTSIDE OF THE PUBLIC RIGHT-OF-WAY, SHALL BE ASTM D2665, SCHEDULE 40 PVC WITH SOLVENT WELD JOINTS. 30.FLEXIBLE JOINTS AT STORM SEWER PIPE CONNECTIONS TO STRUCTURES: a.IN ACCORDANCE WITH MINNESOTA PLUMBING CODE, PROVIDE FLEXIBLE JOINTS AT ALL PIPE CONNECTIONS TO ALL STORM SEWER STRUCTURES. b.ACCEPTABLE MANUFACTURERS / PRODUCTS: i. FERNCO, “CONCRETE MANHOLE ADAPTORS” OR “LARGE-DIAMETER WATERSTOPS” ii. PRESS-SEAL, WATERSTOP GROUTING RINGS” iii. OR APPROVED EQUAL. 31.INSTALL WATERMAIN AT LEAST 10 FEET HORIZONTALLY FROM ANY MANHOLE, CATCH BASIN, STORM SEWER, SANITARY SEWER, DRAIN TILE, OR OTHER POTENTIAL SOURCE FOR CONTAMINATION PER MN PLUMBING CODE. THIS ISOLATION DISTANCE IS MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR SIMILAR). 32.INSTALL MANOLES, CATCH BASINS, STORM SEWER, SANITARY SEWER, DRAIN TILE, AND OTHER POTENTIAL SOURCES OF CONTAMINATION AT LEAST 10 FEET HORIZONTALLY FROM ANY WATERMAIN PER MN PLUMBING CODE. THIS ISOLATION DISTANCE IS MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR SIMILAR). 33.LOCATE ALL EXISTING UTILITIES. VERIFY LOCATION, SIZE AND INVERT ELEVATION OF ALL EXISTING UTILITIES. BEFORE BEGINNING CONSTRUCTION. 34.PRIOR TO CONSTRUCTION OF PROPOSED BUILDING UTILITY SERVICES (STORM, SANITARY SEWER, WATERMAIN), VERIFY ALL PROPOSED BUILDING UTILITY SERVICE PIPE SIZES, LOCATIONS AND ELEVATIONS WITH MECHANICAL PLANS. COORDINATE CONSTRUCTION AND CONNECTIONS WITH MECHANICAL CONTRACTOR. 35.MAINTAIN DRAINAGE FROM EXISTING BUILDING AT ALL TIMES. PROVIDE TEMPORARY STORM SEWER, INCLUDING, BUT NOT LIMITED TO, CATCH BASINS, MANHOLES, PIPING, AND SIMILAR. DO NOT REMOVE EXISTING STORM SEWER UNTIL TEMPORARY OR PERMANENT STORM SEWER IS INSTALLED AND FUNCTIONAL. COORDINATE ALL REMOVALS WITH APPROPRIATE TRADES (SITE UTILITY CONTRACTOR, MECHANICAL CONTRACTOR, ETC.) AS REQUIRED. 36.STAKE LIMITS OF WALKS AND CURBING PRIOR TO INSTALLATION OF GATE VALVES, CATCH BASINS, AND MANHOLES. ADJUST GATE VALVE AND MANHOLE LOCATIONS TO AVOID PLACEMENT OF THESE STRUCTURES IN WALKS AND CURB AND GUTTER. STAKE CURB AND GUTTER ALIGNMENTS TO ALLOW CURB INLET TYPE CATCH BASINS TO PROPERLY ALIGN WITH CURB AND GUTTER. GENERAL NOTES Page 137 of 221 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PROJECT MATCH LINE PROJECT MATCH LINE STORMWATER POND INFILTRATION BASIN I I I D D D D D D D S S 52.2 52.9 52.3 9 5 5 95 5 9 5 1 9 5 2 9 5 3 9 5 4 9 5 4 9 5 6 95 6 950 949 951 952 953 954 9 5 0 95 0 955 95 5 9 5 5 955 96 0 9 4 8 948 948 94 8 9 4 9 94 9 9 5 1 95 1 9 5 2 95 2 95 3 95 3 9 5 4 95 4 9 5 6 956 956 95 6 95 7 957 958 95 8 959 940 945 950 937 938 939 941 942 943 944946 947 948 949 951 952 52.5 53.1 54.0 52.7 53.8 3. 8 % 49.2 47.5 48.5 53.5 56.0 54.3 56.5 59.7 60.1 60.3 59.6 56.4 54.1 55.8 53.3 48.2 48.5 47.8 48.0 48.9 49.6 49.6 49.8 58.2 53.2 53.2 55.1 53.4 37.0 31.0 50.6 46.0 95 0 955 94 7 94 8 94 9 951 952 95 3 954 956 940 945 950 955 937 938 939 941 942 943 944 946 947 948 949 951 952 953 954 956 957 958 940 945 941 942 943 944 946 947 948 940 945 941 942 942 943 943 944 944 9 6 6 9 6 5 9 6 4 9 6 3 9 6 2 9 6 1 9 6 0 9 5 9 9 5 8 9 5 7 9 5 6 9 5 5 9 6 0 9 5 9 9 5 8 9 5 7 952 953 954 955 9 5 6 9 5 5 95 7 9 5 8 9 5 9 44.5 52.9 53.5 945 950 946 947 948 949 951 952 955 960 953 954 956 957 958 959 STORMWATER POND NWL:940.0 BTM:931.0 HWL:944.1 BTM:937.0 WQV:938.8 HWL:944.1 1.8% 1.7 % 2 3 . 5 % 2 4 . 7 % 9 . 5 % 2 5 . 7 % 4.2 % 25.1% 22.4 % 4.1% 5. 6 % 9 5 0 948 9 4 9 9 5 1 9 5 2 9 4 1 94 0 94 4 94 4 94 0 9 3 9 9 3 1 44.5 C1.42 GRADING AND DRAINAGE PLAN SOUTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 1.REFER TO SHEET C1.41, GRADING AND DRAINAGE PLAN NORTH, FOR NOTES. NOTES X X SB-1 TP X 955 54.6 955 X.XX D REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR EXISTING SPOT ELEVATION PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING EOF = EMERGENCY OVERFLOW TC = TOP OF CURB TW = FINISH GRADE AT HIGH SIDE OF WALL BW = FINISH GRADE AT LOW SIDE OF WALL PROPOSED GRADING LIMITS PROPOSED SAND SUBBASE AT FROST FOOTED STOOPS APPROXIMATE SOIL BORING / TEST PIT LOCATION PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED FLARED END SECTION (FES) PROPOSED HYDRANT (HYD) PROPOSED GATE VALVE (GV) PROPOSED STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE LEGEND Page 138 of 221 PROJECT MATCH LINE PROJECT MATCH LINE PROPOSED BUILDING AREA BY ALTERNATE 1 1 1 1 11 1 1 220' - 6 " P V C @ 2 . 0 8 % 134' - 6 " P V C @ 2 . 0 8 % 20 6 ' - 6 " P V C @ 2 . 0 8 % I I I I I I I I I I III I I I I I I I I I I I I I I I I > > > > > > > > D > > D >> >> >> D >> >> >> D >> >> >> >> D >> >> >> >> >> >> >> >> > > >> >> > > > > > > >> >> >> >> >> >>>>>> D >> >> >> >> >> D > > >> >> >> >> >> >> >> >> > > > > > > > > >> >> >> >> >> > > >> >> > > > > > > S > > > > > > S > > > > S I SANMH 2 RIM: 948.01 INV (IN): 939.38 INV (OUT): 939.28 48" DIA SANMH 1 RIM: 949.09 INV (IN): 936.50 INV (OUT): 929.50 48" DIA SANMH 3 RIM: 954.21 INV (IN): 945.06 6" N INV (OUT): 943.96 6" SE 48" DIA, Standard FIRE WATER LINE DOMESTIC WATER LINE PROPOSED DROP MANHOLE CONNECT TO EXISTING SANITARY SEWER STUB WITH BOOTED CONNECTION BS INV. = 949.5 BD INV. = 953.75 57,465 SF CONNECT TO EXISTING WM CONNECT TO EXISTING WM 6" WM 4" WM 8" WM 8" WM 8" WM 6" WM 6" WM 8" WM 8" WM 6" WM 6" WM C1.51 SANITARY SEWER AND WATERMAIN PLAN NORTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 X X 955 2 3 54.6 955 D REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING EOF = EMERGENCY OVERFLOW TC = TOP OF CURB TW = FINISH GRADE AT HIGH SIDE OF WALL BW = FINISH GRADE AT LOW SIDE OF WALL PROPOSED GRADING LIMITS PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED WATERMAIN PROPOSED DRAIN TILE / SUBSURFACE DRAINS (SD) PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED SURGE BASIN (SB) PROPOSED FLARED END SECTION (FES) PROPOSED HYDRANT (HYD) PROPOSED GATE VALVE (GV) PROPOSED POST INDICATOR VALVE (PIV) PROVIDE MINIMUM 18" VERTICAL SEPARATION AT CROSSING - PROVIDE VERTICAL BENDS IN WATERMAIN AS REQUIRED TO ACCOMPLISH. CENTER ONE LENGTH WATERMAIN PIPE ON CROSSING. CONNECT DRAIN TILE TO STRUCTURE AND PROVIDE BACKWATER VALVE CENTER ONE LENGTH OF SOLID PVC PIPE ON WATERMAIN AT CROSSING PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE I >>>> >> >>>>>>>>>> LEGEND 1.REFER TO SHEET C1.41, GRADING AND DRAINAGE PLAN NORTH, FOR GENERAL NOTES. 2.ALL WATERMAIN PIPE SHALL BE DIP, CLASS 52. ALL WATERMAIN SHALL HAVE MINIMUM 8'-0" BURY (TOP OF PIPE TO FINISH GRADE). DIP SHALL BE ENCASED WITH POLYETHYLENE FILM CONFORMING TO ASTM D 1248-889. 3.ALL WATERMAIN SHALL BE AWWA C900, CAST IRON OD, DR 18, PVC PIPE INSTALLED IN ACCORDANCE WITH ASTM D2321. ALL WATERMAIN SHALL HAVE MINIMUM 8'-0" BURY (TOP OF PIPE TO FINISH GRADE). 4.ALL SANITARY SEWER PIPE SHALL BE PVC PIPE (ASTM D 3034, SDR 26), UNLESS OTHERWISE NOTED. SANITARY SEWER INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM D2321. 5.ALL SANITARY SEWER PIPE CROSSING WATERMAIN, OUTSIDE OF THE PUBLIC RIGHT-OF-WAY, SHALL BE ASTM D2665, SCHEDULE 40 PVC WITH SOLVENT WELD JOINTS. 6.ALL STORM SEWER PIPE SHALL BE RCP, CLASS III (MIN.), WITH FLEXIBLE WATERTIGHT JOINTS IN ACCORDANCE WITH ASTM C-361 OR PVC PIPE (ASTM D3034, SDR 35) INSTALLED IN ACCORDANCE WITH ASTM D2321, UNLESS OTHERWISE NOTED. 7.ALL STORM SEWER PIPE CROSSING WATERMAIN, OUTSIDE OF THE PUBLIC RIGHT-OF-WAY, SHALL BE ASTM D2665, SCHEDULE 40 PVC WITH SOLVENT WELD JOINTS. 8.FLEXIBLE JOINTS AT STORM SEWER PIPE CONNECTIONS TO STRUCTURES: a.IN ACCORDANCE WITH MINNESOTA PLUMBING CODE, PROVIDE FLEXIBLE JOINTS AT ALL PIPE CONNECTIONS TO ALL STORM SEWER STRUCTURES. b.ACCEPTABLE MANUFACTURERS / PRODUCTS: i. FERNCO, “CONCRETE MANHOLE ADAPTORS” OR “LARGE-DIAMETER WATERSTOPS” ii. PRESS-SEAL, WATERSTOP GROUTING RINGS” iii. OR APPROVED EQUAL. 9.INSTALL WATERMAIN AT LEAST 10 FEET HORIZONTALLY FROM ANY MANHOLE, CATCH BASIN, STORM SEWER, SANITARY SEWER, DRAIN TILE, OR OTHER POTENTIAL SOURCE FOR CONTAMINATION PER MN PLUMBING CODE. THIS ISOLATION DISTANCE IS MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR SIMILAR). 10.INSTALL MANOLES, CATCH BASINS, STORM SEWER, SANITARY SEWER, DRAIN TILE, AND OTHER POTENTIAL SOURCES OF CONTAMINATION AT LEAST 10 FEET HORIZONTALLY FROM ANY WATERMAIN PER MN PLUMBING CODE. THIS ISOLATION DISTANCE IS MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE CONTAMINATION SOURCE (OUTER EDGE OF STRUCTURES OR SIMILAR). 11.LOCATE ALL EXISTING UTILITIES. VERIFY LOCATION, SIZE AND INVERT ELEVATION OF ALL EXISTING UTILITIES BEFORE BEGINNING CONSTRUCTION. 12.PRIOR TO CONSTRUCTION OF PROPOSED BUILDING UTILITY SERVICES (STORM, SANITARY SEWER, WATERMAIN), VERIFY ALL PROPOSED BUILDING UTILITY SERVICE PIPE SIZES, LOCATIONS AND ELEVATIONS WITH MECHANICAL PLANS. COORDINATE CONSTRUCTION AND CONNECTIONS WITH MECHANICAL CONTRACTOR. 13.MAINTAIN DRAINAGE FROM EXISTING BUILDING AT ALL TIMES. PROVIDE TEMPORARY STORM SEWER, INCLUDING, BUT NOT LIMITED TO, CATCH BASINS, MANHOLES, PIPING, AND SIMILAR. DO NOT REMOVE EXISTING STORM SEWER UNTIL TEMPORARY OR PERMANENT STORM SEWER IS INSTALLED AND FUNCTIONAL. COORDINATE ALL REMOVALS WITH APPROPRIATE TRADES (SITE UTILITY CONTRACTOR, MECHANICAL CONTRACTOR, ETC.) AS REQUIRED. 14.STAKE LIMITS OF WALKS AND CURBING PRIOR TO INSTALLATION OF GATE VALVES, CATCH BASINS, AND MANHOLES. ADJUST GATE VALVE AND MANHOLE LOCATIONS TO AVOID PLACEMENT OF THESE STRUCTURES IN WALKS AND CURB AND GUTTER. STAKE CURB AND GUTTER ALIGNMENTS TO ALLOW CURB INLET TYPE CATCH BASINS TO PROPERLY ALIGN WITH CURB AND GUTTER NOTES 1 Page 139 of 221 OU T L O T C OU T L O T E E1/2 of the SW1/4 E1/2 of the SW1/4 PROJECT MATCH LINE PROJECT MATCH LINE PROPOSED BUILDING AREA BY ALTERNATE 1 1 1 1 11 1 1 220' - 6 " P V C @ 2 . 0 8 % 134' - 6 " P V C @ 2 . 0 8 % 20 6 ' - 6 " P V C @ 2 . 0 8 % I I I I I I I I I I III I I I I I I I I I I I I I I I I > > > > > > > > D > > D >> >> >> D >> >> >> D >> >> >> >> D >> >> >> >> >> >> >> >> > > >> >> > > > > > > >> >> >> >> >> >>>>>> D >> >> >> >> >> D > > >> >> >> >> >> >> >> >> > > > > > > > > >> >> >> >> >> > > >> >> > > > > > > S > > > > > > S > > > > S I 1 6 9 ' - 2 4 " R C P @ 0 . 5 0 % 6 0 ' - 2 4 " R C P @ 0 . 5 0 % 13 0 ' - 2 4 " R C P @ 3 . 0 0 % 130 ' - 2 4 " R C P @ 3 . 0 0 % 134' - 24" R C P @ 2 . 5 4 % 111' - 30" R C P @ 0 . 5 0 % 16 4 ' - 1 5 " R C P @ 0 . 5 0 % 18 4 ' - 1 5 " R C P @ 0 . 5 0 % 24' - 15" RCP @ 0.50% 5 2 ' - 1 5 " R C P @ 0 . 5 0 % 33' - 15" RCP @ 0.50% 77' - 15 " R C P @ - 2 . 3 2 % 38' - 15 " R C P @ 0.50% 37 ' - 1 8 " R C P @ 0. 5 0 % 19' - 18" RCP @ 0.50% 20' - 15" RCP @ 0.50% 16' - 15" RCP @ 0.63% 57' - 15" RCP @ 0.50% 24' - 15" RCP @ 0.15% 1 2 4 ' - 1 5 " R C P @ 0 . 1 5 % 203' - 1 8 " R C P @ 2 . 5 8 % 24' - 15" RCP @ 0.50% 126' - 15" R C P @ 0 . 5 0 % 15 9 ' - 1 5 " R C P @ 0 . 5 0 % 69 ' - 1 5 " R C P @ 0 . 5 0 % 6 2 ' - 1 8 " R C P @ 0 . 5 0 % 11 3 ' - 1 8 " R C P @ 0 . 5 0 % 13 9 ' - 1 8 " R C P @ 0 . 5 0 % 12 6 ' - 2 1 " R C P @ 2 . 0 0 % 1 0 3 ' - 2 1 " R C P @ 2 . 0 0 % 90' - 15" RCP @ 5.62% 198' - 18 " R C P @ 2 . 0 4 % 24' - 15" RCP @ -0.50% 7 1 ' - 1 5 " R C P @ 0 . 5 0 % CB 111 RIM: 968.24 INV (OUT): 964.30 15" E 48" DIA, Standard CB 110 RIM: 967.72 INV (IN): 963.84 15" S INV (IN): 964.18 15" W INV (OUT): 963.84 18" E 48" DIA, Standard CB 112 RIM: 967.56 INV (IN): 964.03 15" W INV (OUT): 964.03 15" N 48" DIA, Standard CB 113 RIM: 968.00 INV (OUT): 964.07 15" E 48" DIA, Standard CB 118 RIM: 964.00 INV (OUT): 960.00 15" E 48" DIA, Standard STMH 105 RIM: 963.10 INV (IN): 954.68 24" N INV (IN): 959.72 15" W INV (OUT): 953.28 24" S 60" DIA, Standard CB 109 RIM: 963.09 INV (IN): 959.10 15" S 48" DIA, Standard CB 108 RIM: 963.01 INV (OUT): 958.98 15" N INV (OUT): 958.98 15" S 48" DIA, Standard CB 107 RIM: 962.67 INV (IN): 958.62 15" N INV (IN): 955.83 15" E INV (IN): 958.62 18" W INV (OUT): 955.83 24" S 48" DIA, Standard CB 106 RIM: 962.21 INV (IN): 954.98 24" N INV (IN): 957.78 15" E INV (OUT): 954.98 24" S 48" DIA, Standard CB 115 RIM: 960.74 INV (IN): 956.26 15" E INV (OUT): 956.26 15" NW 48" DIA, Standard CB 116 RIM: 960.70 INV (OUT): 956.38 15" W 48" DIA, Standard CB 117 RIM: 960.02 INV (OUT): 956.00 15" W 48" DIA, Standard CB 114 RIM: 960.03 INV (IN): 956.00 15" SE INV (OUT): 956.00 15" W 48" DIA, Standard STMH 104 RIM: 958.22 INV (IN): 949.38 24" N INV (IN): 953.90 15" W INV (IN): 953.90 15" E INV (OUT): 949.37 24" SW 60" DIA, Standard CB 120 RIM: 957.92 INV (OUT): 954.00 15" W 48" DIA, Standard CB 119 RIM: 957.92 INV (OUT): 954.00 15" E 48" DIA, Standard STMH 219 RIM: 956.78 INV (OUT): 951.30 15" S 48" DIA, Standard CB 218 RIM: 957.64 INV (IN): 950.48 15" N INV (OUT): 950.48 15" S 48" DIA, Standard CB 212 RIM: 956.03 INV (IN): 952.56 18" N INV (OUT): 951.89 18" W 48" DIA, Standard STMH 209 RIM: 956.09 INV (IN): 948.52 15" N INV (OUT): 948.52 15" S 48" DIA, Standard CB 210 RIM: 954.75 INV (IN): 949.31 15" E INV (OUT): 949.31 15" S 48" DIA, Standard STMH 207 RIM: 954.40 INV (IN): 947.86 18" NW INV (IN): 947.86 18" E INV (OUT): 947.86 18" SW 60" DIA, Standard CB 208 RIM: 953.53 INV (IN): 948.17 15" N INV (OUT): 948.17 18" SE 48" DIA, Standard CB 211 RIM: 953.30 INV (OUT): 949.94 15" W 48" DIA, Standard CB 205 RIM: 952.88 INV (IN): 946.60 18" NW INV (OUT): 946.60 21" SE 60" DIA, Standard CB 206 RIM: 952.44 INV (IN): 947.29 18" NE INV (OUT): 947.29 18" SE 48" DIA, Standard CB 123 RIM: 952.24 INV (OUT): 947.42 15" SE 48" DIA, Standard STMH 103 RIM: 952.32 INV (IN): 945.47 24" NE INV (OUT): 945.47 24" W 60" DIA, Standard CB 204 RIM: 952.22 INV (IN): 944.08 21" NW INV (OUT): 944.08 21" S 48" DIA, Standard STMH-102 CB 121 RIM: 947.39 INV (IN): 942.17 18" NW INV (OUT): 942.17 18" S 48" DIA, Standard CB 122 RIM: 946.02 INV (IN): 942.36 15" NW INV (OUT): 942.36 18" SE 48" DIA, Standard 10 2 ' - 1 8 " R C P @ 0 . 9 8 % C1.52 STORM SEWER PLAN NORTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 LEGEND NOTES X X 955 1 2 3 54.6 955 D REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING EOF = EMERGENCY OVERFLOW TC = TOP OF CURB TW = FINISH GRADE AT HIGH SIDE OF WALL BW = FINISH GRADE AT LOW SIDE OF WALL PROPOSED GRADING LIMITS PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED WATERMAIN PROPOSED DRAIN TILE / SUBSURFACE DRAINS (SD) PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED SURGE BASIN (SB) PROPOSED FLARED END SECTION (FES) PROPOSED HYDRANT (HYD) PROPOSED GATE VALVE (GV) PROPOSED POST INDICATOR VALVE (PIV) PROVIDE MINIMUM 18" VERTICAL SEPARATION AT CROSSING - PROVIDE VERTICAL BENDS IN WATERMAIN AS REQUIRED TO ACCOMPLISH. CENTER ONE LENGTH WATERMAIN PIPE ON CROSSING. CONNECT DRAIN TILE TO STRUCTURE AND PROVIDE BACKWATER VALVE CENTER ONE LENGTH OF SOLID PVC PIPE ON WATERMAIN AT CROSSING PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE I >>>> >> >>>>>>>>>> 1.REFER TO SHEET C1.51, SANITARY SEWER AND WATERMAIN PLAN NORTH, FOR NOTES. Page 140 of 221 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X OU T L O T E OU T L O T D OUTLOT D 4 3 2 1 PREST W I C K P L A C E 1 3 T H A D D I T I O N 1 2 3 PREST W I C K PLACE 1 6 T H ADDIT I O N 5 4 3 2 1 PREST W I C K P L A C E 1 9 T H A D D I T I O N 13 12 11 10 PREST W I C K P L A C E 2 0 T H A D D I T I O N AR D A N P L A C E E1/2 of the SW1/4 E1/2 of the SW1/4 PROJECT MATCH LINE PROJECT MATCH LINE STORMWATER POND INFILTRATION BASIN 1 1 NWL:940.0 BTM:931.0 HWL:944.1 BTM:937.0 WQV:938.8 HWL:944.1 220' - 6 " P V C @ 2 . 0 8 % 134' - 6 " P V C @ 2 . 0 8 % I I I D D >> >> >> D >> >> >> D >>>> >> >> >> >> >> > > > > > > > > >> >> >> >> >> >> > > D >> >> >> >> >> >>> > >> >> >> >> > > > > > > >> >> > > > > >> >> D D >> >> >> >> >> >> >> >> >> >> >> > > > > > > S > > > > S SANMH 2 RIM: 948.01 INV (IN): 939.38 INV (OUT): 939.28 48" DIA RIM: 954.21 INV (IN): 945.06 6" N INV (OUT): 943.96 6" SE 48" DIA, Standard 130 ' - 2 4 " R C P @ 3 . 0 0 % 134' - 24" R C P @ 2 . 5 4 % 111' - 30" R C P @ 0 . 5 0 % 10 9 ' - 3 0 " R C P @ 0 . 4 9 % 18 4 ' - 1 5 " R C P @ 0 . 5 0 % 1 8 3 ' - 1 5 " R C P @ 0 . 5 0 % 76' - 18 " R C P @ 0 . 5 0 % 191' - 1 8 " R C P @ 0 . 5 0 % 4 2 ' - 1 8 " R C P @ 0 . 5 0 % 248' - 1 8 " R C P @ 0 . 5 0 % 5 7 ' - 3 0 " R C P @ 0 . 5 0 % 39' - 3 6 " R C P @ -15.5 6 % 29' - 3 6 " RCP @ 0.35% 39' - 15" R C P @ 0.50% 38' - 15 " R C P @ 0.50% 37 ' - 1 8 " R C P @ 0. 5 0 % 19' - 18" RCP @ 0.50% 17' - 15" RCP @ 1.00% 20' - 15" RCP @ 0.50% 16' - 15" RCP @ 0.63% 13 9 ' - 1 8 " R C P @ 0 . 5 0 % 12 6 ' - 2 1 " R C P @ 2 . 0 0 % 1 0 3 ' - 2 1 " R C P @ 2 . 0 0 % 42' - 24" RCP @ 0.50% 104 ' - 2 4 " R C P @ 0 . 5 0 % 90' - 15" RCP @ 5.62% 49' - 1 5 " R C P @ 2 . 0 3 % 43' - 1 8 " R C P @ 0.70 % 333' - 1 5 " R C P @ 0 . 4 8 % 13 9 ' - 1 5 " R C P @ 3 . 3 9 % CB 217 RIM: 958.28 INV (IN): 949.56 15" N INV (IN): 953.53 15" W INV (OUT): 949.56 15" S 48" DIA, Standard CB 120 RIM: 957.92 INV (OUT): 954.00 15" W 48" DIA, Standard CB 220 RIM: 957.53 INV (OUT): 953.72 15" E 48" DIA, Standard CB 216 RIM: 954.33 INV (IN): 948.64 15" N INV (IN): 950.00 15" W INV (OUT): 946.88 18" E 48" DIA, Standard CB 221 RIM: 954.08 INV (OUT): 950.20 15" E 48" DIA, Standard CB 214 RIM: 953.50 INV (IN): 945.55 18" W INV (OUT): 945.55 18" SE 48" DIA, Standard CB 213 RIM: 953.39 INV (IN): 945.34 18" NW INV (OUT): 945.34 18" NE 48" DIA, Standard CB 205 RIM: 952.88 INV (IN): 946.60 18" NW INV (OUT): 946.60 21" SE 60" DIA, Standard 48" DIA, Standard CB 123 RIM: 952.24 INV (OUT): 947.42 15" SE 48" DIA, Standard STMH 103 RIM: 952.32 INV (IN): 945.47 24" NE INV (OUT): 945.47 24" W 60" DIA, Standard CB 204 RIM: 952.22 INV (IN): 944.08 21" NW INV (OUT): 944.08 21" S 48" DIA, Standard CB 215 RIM: 950.60 INV (IN): 946.50 18" W INV (OUT): 946.50 18" E 48" DIA, Standard STMH 201 RIM: 949.51 INV (IN): 944.10 18" SW INV (IN): 941.29 24" NE INV (OUT): 941.29 30" SE 72" DIA, Standard STMH 101 RIM: 948.80 INV (IN): 941.53 30" E INV (OUT): 941.53 30" S 72" DIA, Standard STMH-102 RIM: 947.86 INV (IN): 942.08 24" E INV (IN): 942.08 18" N INV (IN): 943.06 15" S INV (OUT): 942.08 30" W 60" DIA, Standard CB 121 RIM: 947.39 INV (IN): 942.17 18" NW INV (OUT): 942.17 18" S 48" DIA, Standard CB 124 RIM: 947.23 INV (OUT): 943.23 15" N 48" DIA, Standard CB 203 RIM: 947.21 INV (IN): 942.02 21" N INV (OUT): 942.02 24" SE 48" DIA, Standard CB 202 RIM: 946.90 INV (IN): 941.81 24" NW INV (OUT): 941.81 24" SW 60" DIA, Standard CB 122 RIM: 946.02 INV (IN): 942.36 15" NW INV (OUT): 942.36 18" SE 48" DIA, Standard OCS RIM: 943.66 INV (IN): 940.00 36" NE INV (OUT): 938.90 36" SW 72" DIA, Standard FES 200 INV: 941.00 30" FES 100 INV: 941.00 30" FES 304 INV: 941.00 15" FE 301 INV: 940.00 18" FES 302 INV: 939.70 18" FES 303 INV: 940.00 15" PIPE INV: 934.00 36" FES 300 INV: 938.80 36" STMH 307 RIM: 953.21 INV (OUT): 947.30 15" NE 48" DIA, Standard STMH 306 RIM: 959.47 INV (IN): 945.70 15" SW INV (OUT): 944.70 15" NE 48" DIA, Standard FES 305 INV: 940.00 15" C1.53 STORM SEWER PLAN SOUTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 LEGEND 1.REFER TO SHEET C1.51, SANITARY SEWER AND WATERMAIN PLAN NORTH, FOR NOTES. NOTES X X 955 1 2 3 54.6 955 D REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) EXISTING CONTOUR PROPOSED CONTOUR PROPOSED SPOT ELEVATION ME = MATCH EXISTING EOF = EMERGENCY OVERFLOW TC = TOP OF CURB TW = FINISH GRADE AT HIGH SIDE OF WALL BW = FINISH GRADE AT LOW SIDE OF WALL PROPOSED GRADING LIMITS PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED WATERMAIN PROPOSED DRAIN TILE / SUBSURFACE DRAINS (SD) PROPOSED MANHOLE (MH) PROPOSED CATCH BASIN (CB) PROPOSED SURGE BASIN (SB) PROPOSED FLARED END SECTION (FES) PROPOSED HYDRANT (HYD) PROPOSED GATE VALVE (GV) PROPOSED POST INDICATOR VALVE (PIV) PROVIDE MINIMUM 18" VERTICAL SEPARATION AT CROSSING - PROVIDE VERTICAL BENDS IN WATERMAIN AS REQUIRED TO ACCOMPLISH. CENTER ONE LENGTH WATERMAIN PIPE ON CROSSING. CONNECT DRAIN TILE TO STRUCTURE AND PROVIDE BACKWATER VALVE CENTER ONE LENGTH OF SOLID PVC PIPE ON WATERMAIN AT CROSSING PROPOSED BUILDING STOOP - REFER TO ARCHITECTURAL PLANS PROPERTY LINE I >>>> >> >>>>>>>>>> Page 141 of 221 I I I I I I I I I I III I I I I I I I I I I I I I I I I > > > > > > > > D > > D >> >> >> D >> >> >> D >> >> >> >> D >> >> >> >> >> >> >> >> > > >> >> > > > > > > >> >> >> >> >> >>>>>> D >> >> >> >> >> D > > >> >> >> >> >> >> >> >> > > > > > > > > >> >> >> >> >> > > >> >> > > > > > > S > > > > > > S > > > > S I PROJECT MATCH LINE PROJECT MATCH LINE PROPOSED BUILDING AREA BY ALTERNATE ATHLETIC SEED MIX GENERAL SEED MIX IN ALL OTHER DISTURBED AREAS GENERAL SEED MIX IN ALL OTHER DISTURBED AREAS GENERAL SEED MIX IN ALL OTHER DISTURBED AREAS GENERAL SEED MIX IN ALL OTHER DISTURBED AREASGENERAL SEED MIX IN ALL OTHER DISTURBED AREAS GENERAL SEED MIX IN ALL OTHER DISTURBED AREAS GENERAL SEED MIX IN ALL OTHER DISTURBED AREAS NATIVE SEED MIX NATIVE SEED MIX L1.61 LANDSCAPING PLAN NORTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 X X REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) PROPOSED SOD LIMITS PROPOSED SEED MIX #1 - GENERAL MIX PROPOSED SEED MIX #2 - ATHLETIC MIX PROPOSED NATIVE SEEDING PROPOSED MULCH BED WITH SHRUBS OR PERENNIALS PROPOSED LIGHT POLE - REFER TO ELECTRICAL PLANS PROPERTY LINE LEGEND 1.REFER TO SHEET CXXX, XXXXXXX, FOR GENERAL NOTES. 2.REFER TO SWPPP NARRATIVE, SHEET XXX, FOR CONSTRUCTION SEQUENCING AND EROSION CONTROL REQUIREMENTS. 3.LANDSCAPE ARCHITECT MUST INSPECT AND APPROVE FINE GRADING BEFORE CONTRACTOR PROCEEDS WITH SODDING OR SEEDING. 4.ALL DISTURBED AREAS OUTSIDE THE BUILDING PAD, WHICH ARE NOT DESIGNATED TO BE PAVED OR RECEIVE AGLIME, SHALL RECEIVE AT LEAST 6” OF TOPSOIL AND SHALL BE SODDED OR SEEDED. ALL AREAS NOT DESIGNATED FOR SOD OR A SPECIFIC SEED MIX, WHICH ARE DISTURBED BY CONSTRUCTION, SHALL BE SEEDED WITH SEED MIX #1. 5.WHERE NEW SOD MEETS EXISTING SOD, CUT A CLEAN, SHARP EDGE TO ALLOW FOR A CONSISTENT, UNIFORM, AND STRAIGHT JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS. JAGGED OR UNEVEN JOINTS WILL NOT BE ACCEPTED. REMOVE TOPSOIL AT THE JOINT BETWEEN NEW SOD AND EXISTING TURFGRASS, AS REQUIRED, TO ALLOW NEW SOD SURFACE TO BE FLUSH WITH EXISTING TURFGRASS SURFACE. 6.FAILURE OF TURF DEVELOPMENT: IN THE EVENT THE CONTRACTOR FAILS TO PROVIDE AN ACCEPTABLE TURF, RE-SOD OR RE-SEED ALL APPLICABLE AREAS, AT NO ADDITIONAL COST TO THE OWNER, TO THE SATISFACTION OF THE ENGINEER OR LANDSCAPE ARCHITECT. 7.BEGIN TURF ESTABLISHMENT IMMEDIATELY AFTER SODDING OR SEEDING. REFER TO SPECIFICATION FOR PROCEDURE. 8.ALL TREES SHALL BE BALLED AND BURLAPPED. 9.ALL TREES AND SHRUBS SHALL RECEIVE 4" DEPTH OF WOOD MULCH, UNLESS OTHERWISE SPECIFIED. 10.ALL PLANT MATERIALS SHALL BE NO. 1 QUALITY, NURSERY GROWN AND SPECIMENS MUST BE MATCHED. 11.ALL DECIDUOUS TREES ALONG DRIVES OR WITHIN PARKING LOTS SHALL BEGIN BRANCHING NO LOWER THAN 6'. NOTES OVERSTORY DECIDUOUS TREE 116 CONIFER TREE 40 SHRUB 160 CONCEPT PLANT SCHEDULE EXISTING SIGNIFICANT TREES: TOTAL CALIPER INCHES = 5353" 25% OF EXISTING = 1338.25" ESTIMATED REMOVED TOTAL INCHES = 2116" REPLACEMENT REQUIREMENTS: 2116" - 1338.15" (25% OF TOTAL) = 778" IF ALL SIGNIFICANT, NO HERITAGE = 389" TO PROVIDE TOTAL OF 156 TREES - 2.5" DECIDUOUS OR 6'H CONIFER TREES PERIMETER OF BUILDING = 1596 LINEAR FEET 160 SHRUBS REQUIRED TREE & SHRUB STATISTICS PROVIDE VARIETY OF DECIDUOUS TREES BELOW. NO MORE THAN 8 OF ANY ONE VARIETY OR 40 OF ANY SPECIES. MINIMUM OF 39 CATEGORIZED AS A HARDWOOD. FINAL LOCATIONS DETERMINED BY LANDSCAPE ARCHITECT. PROVIDE VARIETY OF CONIFER TREES BELOW. NO MORE THAN 6 OF ANY ONE VARIETY OR 12 OF ANY SPECIES. FINAL LOCATIONS DETERMINED BY LANDSCAPE ARCHITECT. Page 142 of 221 I I I D D >> >> >> D >> >> >> D >>>> >> >> >> >> >> > > > > > > > > >> >> >> >> >> >> > > D >> >> >> >> >> >>> > >> >> >> >> > > > > > > >> >> > > > > >> >> D D >> >> >> >> >> >> >> >> >> >> >> > > > > > > S > > > > S PROJECT MATCH LINE PROJECT MATCH LINE STORMWATER POND INFILTRATION BASIN ATHLETIC SEED MIX NATIVE SEED MIXES X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X NATIVE SEED MIXES NATIVE SEED MIXES ATHLETIC SEED MIX GENERAL SEED MIX IN ALL OTHER DISTURBED AREASGENERAL SEED MIX IN ALL OTHER DISTURBED AREAS GENERAL SEED MIX IN ALL OTHER DISTURBED AREAS L1.62 LANDSCAPING PLAN SOUTH R FEETSCALE 0 HORZ. 40 80 DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 1.REFER TO SHEET L1.61 LANDSCAPING PLAN NORTH, FOR NOTES. NOTES OVERSTORY DECIDUOUS TREE 116 CONIFER TREE 40 SHRUB 160 CONCEPT PLANT SCHEDULE X X REFERENCE KEY TO SITE DETAILS DETAIL I.D. NUMBER (TOP) DETAIL SHEET NUMBER (BOTTOM) PROPOSED SOD LIMITS PROPOSED SEED MIX #1 - GENERAL MIX PROPOSED SEED MIX #2 - ATHLETIC MIX PROPOSED NATIVE SEEDING PROPOSED MULCH BED WITH SHRUBS OR PERENNIALS PROPOSED LIGHT POLE - REFER TO ELECTRICAL PLANS PROPERTY LINE LEGEND TREES REMOVED Page 143 of 221 C1.71 DETAILS NOT TO SCALE DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 6" 6" 12" 6"24 5 3B 1 3A NOTES: 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS SHALL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 6" OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 6" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE BLANKET WIDTH. 6. BLANKET SHALL BE STAPLED AS PER MANUFACTURER'S RECOMMENDATION. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. 6" DET# SHT# EROSION CONTROL BLANKET NOT TO SCALE 6 D 51 5D 2' - 0 " D 5D PLAN SECTION A - A SECTION B - B 12 " 18 " B B A A DET# SHT# RIPRAP AT FLARED END SECTION NOT TO SCALE CLASS III RIPRAP GEOTEXTILE FABRIC PLAN FINISH GRADE CLASS III RIPRAP GEOTEXTILE FABRIC PLAN FINISH GRADE FABRIC SHALL COVER THE AREA OF THE RIPRAP AND EXTEND UNDER THE APRON 3' MIN 12 " 10' 1' 18 " DET# SHT# OVERFLOW SWALE NOT TO SCALE 4:1 SLOPE (TYP) GEOTEXTILE FABRIC CLASS III RIPRAP 4:1 SLOPE (TYP) PLACE RIPRAP AT ELEVATION SUCH THAT FLOWLINE DEPICTED BY PROPOSED GRADES IS MAINTAINED 5.00' DET# SHT# AGLIME AND DRAIN TILE NOT TO SCALE TOPSOIL ON PLAYING FIELD 5" DEPTH AGLIME EXTEND AGLIME DOWN TO DRAIN TILE WHERE DEPTH TO TOP OF PIPE IS GREATER THAN 5" 6" DRAIN TILE - REFER TO PLAN FOR LOCATION AND INVERT ELEVATIONS BURRITO WRAP PEA ROCK IN GEOTEXTILE FABRIC 4" MINIMUM PEA ROCK AROUND DRAIN TILE 5" MIN. TO TOP OF DRAIN TILE APPLY SOIL STERILANT TO SUBGRADE PRIOR TO AGLIME PLACEMENT FLOW DET# SHT# BACKWATER VALVE NOT TO SCALE BACKWATER VALVE SOLVENT WELD BACKWATER VALVE TO DRAIN TILE PROVIDE FLEXIBLE JOINT 6" DRAIN TILE CONNECT DRAIN TILE TO STRUCTURE AT ELEVATION SHOWN ON THE DRAWING. GROUT SECURE TO STRUCTURE WALL. MINIMIZE STUB THROUGH WALL. STUB ONLY AS REQUIRED TO ALLOW BACKWATER VALVE TO BE CONNECTED TO DRAIN TILE. PROVIDE FLEXIBLE JOINT AT CONNECTION REFER TO PLAN FOR STRUCTURE TYPE NOTE: ATTACH TRACER WIRE WITH BROWN STRIPE TO PIPE AT 3' O.C. WITH PLASTIC ZIP-TIES (OR APPROVED EQUAL). SEWER 15" 11 1 2" 4" DET# SHT# CLEANOUT ASSEMBLY NOT TO SCALE MCDONALD 74M "A" SERIES CAST IRON METER PIT FRAME AND COVER FITTING HUB WITH 4" THREADED PLUG. APPLY TEFLON THREAD TAPE, OR APPROVED EQUAL, OVER THREADS. FINISH GRADE LEAVE 24" OF EXCESS WIRE AT SURFACE TRACER WIRE 24" DIA. x 8" THICK CONCRETE SLAB POURED AROUND CASTING (FLUSH WITH FINISH GRADE) REFER TO PLAN FOR INVERT ELEVATION 6" DRAIN TILE 10 " 6" UNSUITABLE SOIL TOPSOIL REFER TO STRUCTURAL DRAWINGS 3'-0" 1 1 VA R I E S NOTES: 1.BOTTOM OF EXCAVATION (INCLUDING ROCK EXCAVATION) MUST BE APPROVED BY THE GEOTECHNICAL ENGINEER'S REPRESENTATIVE PRIOR TO PLACEMENT OF ANY FILL. 2.IN SOME LOCATIONS, FOOTING WILL REST ON ROCK. REFER TO STRUCTURAL DRAWINGS. 3.ROCK EXCAVATION WILL BE REQUIRED IN SOME LOCATIONS. DET# SHT# ENGINEERED FILL NOT TO SCALE 4" SLAB AND 6" STABILIZED AGGREGATE BASE - VERIFY WITH ARCHITECTURAL PLANS FINISH FLOOR SUBGRADE FINISH GRADE (TURF) MINIMUM EXCAVATION LIMITS FOOTING SUITABLE SOIL ENGINEERED FILL 5'-0"20'-0" 5' - 0 " 6' - 0 " 4" NOTE: REFER TO GRADING AND DRAINAGE PLAN FOR LIMITS OF SAND SUBBASE DET# SHT# SAND SUBBASE / DRAIN TILE AT DOORS & FROST FOOTED STOOPS NOT TO SCALE FINISH GRADE AT EDGE OF STOOP FINISH GRADE OF PAVEMENT ADJACENT TO FOOTED STOOP STOOP FOOTING - REFER TO STRUCTURAL DRAWINGS 6" DRAIN TILE (WHERE INDICATED ON DRAWINGS) - EXTEND TO STORM SEWER STRUCTURE WHERE INDICATED ON DRAWINGS SUBGRADE SOILS SAND SUBBASE SHT# DET# BUILDING PAD (ENGINEERED FILL) 1 1 2'-0" 6' ' DET# SHT# BELOW GRADE BUILDING WALLS NOT TO SCALE SHT# DET# FINISH GRADE (TURF AREAS)FINISH FLOOR BACKFILL AT BELOW GRADE WALLS FOOTING (REFER TO STRUCTURAL PLANS) FINISH FLOOR ELEVATION (FFE): REFER TO ARCHITECTURAL PLANS AND VERIFY LOWER LEVEL FFE AND LOCATIONS WHERE FFE VARIES 12" TOPSOIL OVER BACKFILL 6" TOPSOIL INFILTRATION AREA CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING: 1.INFILTRATION AREA LIMITS SHALL BE SURVEYED AND A VISUAL BARRIER, SUCH AS ORANGE SNOW FENCE, SHALL BE PLACED AROUND THE FULL PERIMETER TO KEEP ALL CONSTRUCTION TRAFFIC, EQUIPMENT AND MATERIAL STOCKPILES OUT OF THE PROPOSED INFILTRATION AREAS. THE VISUAL BARRIER MUST BE INSTALLED BEFORE NEW CONSTRUCTION BEGINS AND SHALL BE MAINTAINED THROUGH THE DURATION OF THE PROJECT. 2.DELIVER SAMPLE MATERIALS ONSITE FOR PRIOR APPROVAL. PRIOR TO BEGINNING THE INSTALLATION, SUFFICIENT MATERIAL QUANTITIES SHALL BE ONSITE TO COMPLETE THE INSTALLATION. STABILIZE EXPOSED SOIL AREAS WITHOUT DELAY. 3.CARE MUST BE TAKEN TO AVOID CONTAMINATION OF ENGINEERED SOILS WITH SEDIMENT, IN-SITU OR TOPSOIL DURING AND AFTER INSTALLATION. MATERIALS MUST BE SEGREGATED. 4.INSTALLATION WITH DRY SOIL CONDITIONS IS CRITICAL TO PREVENT SMEARING AND COMPACTION. SCHEDULE WORK FOR PERIODS OF DRY WEATHER. DO NOT WORK IF SOIL CONDITIONS ARE WET. EXCAVATION, SOIL PLACEMENT AND RAPID STABILIZATION OF PERIMETER SLOPES WITH TURF SOD MUST COMPLETED BEFORE THE NEXT PRECIPITATION EVENT. TURF SOD PLACED IN FLOW PATHS SHALL BE SECURED WITH AT LEAST 6 STAKES PER SQUARE YARD. PLACE STAKES ALONG UPHILL SEAM EDGES TO PREVENT UNDERMINING FLOWS UNTIL SOD ROOTS ESTABLISH. 5.DO NOT LEAVE STORMWATER AREAS AND / OR PERIMETER SLOPES EXPOSED OVERNIGHT. SECURE THE SITE FROM RISK OF PRECIPITATION DAMAGES AT THE END OF EVERY WORK DAY. IN THE EVENT OF RAIN, TAKE ACTION TO DIVERT STORMWATER AWAY FROM THE WORK AREA AND TEMPORARILY COVER OF ALL EXPOSED SOILS WITH WOVEN GEOTEXTILE FABRIC OR IMPERMEABLE SHEETING. 6.FIELD OBSERVATION OF EXCAVATION AND SOIL PLACEMENT IS REQUIRED. NOTIFY GEOTECHNICAL ENGINEER PRIOR TO DIGGING. USE BACKHOE WITH TOOTH BUCKET FOR CELL EXCAVATION TO AVOID COMPACTING OR SMEARING OF SOILS. DO NOT USE SKID STEER FOR EXCAVATION WITHIN THE CELL. USE TOOTH BUCKET TO SCARIFY (RIP) UNDERLYING SOILS 6" TO 9" DEEP TO REMOVE COMPACTION. GENTLY MIX THE FIRST LIFT OF ENGINEERED SOILS WITH THE LOOSENED UNDERLYING SOILS TO AVOID STRATIFICATION AND PROMOTE PERMEABILITY. USE EXCAVATOR BUCKET TO PLACE MATERIALS. CONSTRUCTION EQUIPMENT SHALL NOT BE ALLOWED INTO THE STORMWATER AREAS. LEVELING AND FINAL GRADING WITHIN THE CELL MUST BE COMPLETED BY HAND. 7.INFILTRATION AREA SOIL MIX SHALL BE MINNESOTA STORMWATER MANUAL 4.1.2 MIX B: ENHANCED FILTRATION BLEND (WELL BLENDED MIXTURE OF 70% ASTM C-33 COARSE WASHED SAND (MN/DOT 3126) AND 30% MN/DOT 3890 GRADE 2 LEAF LITTER COMPOST). THE MATERIAL SUPPLIER SHALL PROVIDE DOCUMENTATION THAT THE COMPOST HAS BEEN SAMPLED AND TESTED AS REQUIRED BY THE SEAL OF TESTING ASSURANCE (STA) PROGRAM OF THE UNITED STATES COMPOSTING COUNCIL (USCC) AND A GRADATION SIEVE ANALYSIS FOR THE WASHED SAND. THE ENGINEERED SOIL SHALL NOT CONTAIN ANY TOPSOIL OR FILTER AGGREGATE WITH FINES. 8.INSTALL PLANTINGS BY HAND. 9.INSTALLED SOD AND PLANTINGS REQUIRE A TOTAL OF 1" OF WATER PER WEEK AND ACTIVE WEED MANAGEMENT UNTIL WELL ESTABLISHED. INCLUDE ALL WATERING COSTS IN THE BID. CONSTRUCT A TEMPORARY IRRIGATION SYSTEM, CONSISTING OF ABOVE GROUND HEADS, PIPING, VALVES, ETC., FOR WATERING UNTIL VEGETATION IS ESTABLISHED. DO NOT USE A WATER TRUCK AS THE FORCE OF THE WATER WILL ADVERSELY AFFECT THE STORMWATER AREA SOILS. 10.REMOVAL OF ACCUMULATED SEDIMENT AND DEBRIS SHALL BE DONE BY HAND OR, IF SELF-PROPELLED EQUIPMENT IS REQUIRED, FROM OUTSIDE THE PERIMETER OF THE INFILTRATION AREAS. DET# SHT# INFILTRATION AREA NOTES NOT TO SCALE INFILTRATION AREA LIMITS AS SHOWN ON PLAN 1 1 DET# SHT# INFILTRATION AREA SECTION NOT TO SCALE NOTE: SEE x OF xx / [Sheet#] FOR ENGINEERED SOIL MIXTURE PLACE SEDIMENT CONTROL LOG AT EDGE OF INFILTRATION AREA - FULL PERIMETER, AND REMOVE ONCE ALL UPSLOPE AREAS ARE FULLY STABILIZED (PERMANENT STABILIZATION) LANDSCAPE EDGING (TYP) FLAT BOTTOM STAKE STAKE EXCAVATE TO SUBGRADE ELEVATION WITH A TOOTHED BUCKET BACKHOE. RIP SOILS 6" TO 9" TO REMOVE COMPACTION 3" DEPTH MIN. SHREDDED WOOD MULCH (MnDOT TYPE 6) PLANTS WITH MULCH ROOT BALL OR POT INFILTRATION AREA SOIL MIXTURE - SEE BELOW FILL SOIL BETWEEN THE EXISTING SP SANDS AND BOTTOM OF ENGINEERED SOIL MIXTURE SHALL MEET THE SPECIFICATION FOR SAND SUBBASE GRASS 6" DEPTH TOPSOIL NOTES: 1.TRENCH SIDEWALLS TO MEET O.S.H.A REQUIREMENTS. 2.UPPER 3 FT. OF BACKFILL SHALL BE COMPACTED TO AT LEAST 100% STANDARD PROCTOR DRY DENSITY. BELOW THIS ELEVATION, BACKFILL SHALL BE COMPACTED TO AT LEAST 95% STANDARD PROCTOR DRY DENSITY. 3.INSTALLATION SHALL BE IN ACCORDANCE WITH ASTM D2321. DE P T H ( V A R I E S ) 6" M I N . 1/ 8 O . D . (6 " M I N . ) O.D. + 2' (MAX) PI P E D I A . DET# SHT# PIPE BEDDING PVC NOT TO SCALE SUBGRADE PIPE BEDDING NOTES: 1.TRENCH SIDEWALLS TO MEET O.S.H.A REQUIREMENTS. 2.UPPER 3 FT. OF BACKFILL SHALL BE COMPACTED TO AT LEAST 100% STANDARD PROCTOR DRY DENSITY. BELOW THIS ELEVATION, BACKFILL SHALL BE COMPACTED TO AT LEAST 95% STANDARD PROCTOR DRY DENSITY. DE P T H ( V A R I E S ) 1/ 8 D E P T H ( 1 2 " M I N . ) 1/ 6 O . D . 1/ 8 O . D . ( 4 " M I N . ) O.D. + 2' (MAX) DET# SHT# PIPE BEDDING - RCP & DIP NOT TO SCALE SUBGRADE BACKFILL ABOVE PIPE BEDDING PIPE BEDDING DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE Page 144 of 221 C1.72 DETAILS NOT TO SCALE DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 VARIES FLOW FLOW 6 1 CATCH BASINDET# SHT# NOT TO SCALE "RIM ELEVATION" PRECAST COVER - 8" THICK STEPS - INSTALL ON DOWNSTREAM SIDE @ 16" O.C. RUBBER GASKET - TYP AT ALL JOINTS PRECAST CONCRETE SECTION GROUT SHELF AND CHANNELSBASES SHALL BE 8" STANDARD PRECAST WITH 2" LEAN GROUT, OR POURED 8" SLAB REINFORCED WITH 6" x 6" 10/10 MESH PROVIDE FLEXIBLE JOINT AT CONNECTION - REFER TO SPECS STORM SEWER PIPE- REFER TO PLAN FOR LOCATION, INVERT, AND SIZES MIN. 2 AND MAX. 5 ADJUSTING RINGS. GROUT BETWEEN RINGS, CASTING, AND ALONG OUTSIDE. METAL SEWER CASTING - REFER TO PLAN FOR TYPE 3"3" 3" SUBSURFACE DRAINDET# SHT# NOT TO SCALE SHT# DET# SHT# DET# SHT# DET# CURB AND GUTTER ASPHALT PAVEMENT SECTION REFER TO DETAIL 6" 3" MINIMUM UNDER TILE BURRITO WRAP TRENCH AND PEA ROCK WITH GEOTEXTILE FABRIC PEA ROCK AROUND TILE 6" DRAIN TILE - LENGTH OF INDIVIDUAL FINGER DRAIN SHALL BE 30' MINIMUM UNLESS NOTED OTHERWISE. PIPE SIZE 21" & LESS 24" TO 36" 42" TO 54" 60" & GREATER "U" BOLT DIA. 1/2" 5/8" 3/4" 1" WIDTH 24" 24" 24" 24" "U" BOLT REQUIREMENTS NOTE: 2 - "U" BOLT FASTENERS TO BE INSTALLED ACROSS EACH JOINT, ONE EACH SIDE OF PIPE AT 60° FROM THE TOP OF THE PIPE. FASTEN FIRST THREE JOINTS AS SHOWN. RCP FLARED END SECTION (FES)DET# SHT# NOT TO SCALE SHT# DET# CONCRETE PIPE TIES ("U" BOLTS) TRASH GUARD WITH 5 8" DIA. RODS AT 6" ON CENTER. FASTEN TO FES WITH 3 HOT DIPPED GALV. CLIPS RIPRAP - REFER TO DETAIL NOTES: 1.DIRECTION OF TRANSVERSE GUTTER SLOPE SHALL MATCH DIRECTION OF ADJACENT PAVEMENT SLOPE. 2.CONSTRUCT WITH CURBING MACHINE. 3.AT CURB INLET CATCH BASINS, ADJUST CASTING TO BE 1'' BELOW GUTTER GRADE. SLOPE GUTTER 5' EACH SIDE OF CATCH BASIN. PROVIDE POSITIVE DRAINAGE TO CATCH BASINS. 12" 6" 712" 13 1 2" 6"12" 1 2 AGGREGATE BASE TO BE PLACED BY PAVING CONTRACTOR (4" MIN.) 7" B-612 CURB AND GUTTERDET# SHT# NOT TO SCALE FACE OF CURB 1 2" RADIUS 3" RADIUS SLOPE 3/4" PER FOOT TOWARDS PAVEMENT ON HIGH SIDE OF LOT / DRIVE (TIP OUT). SLOPE 3/4" PER FOOT TOWARDS CURB FACE ON LOW SIDE OF LOT / DRIVE (TIP BACK). 1 2" RADIUS 1:3 BATTER 6" 6" 12" 12" 5'-0" TAPER SLOPE TOP OF CURB DOWN TO GUTTER SHT# DET# B-612 CURB TERMINATORDET# SHT# NOT TO SCALE GUTTER UNIFORM ELEVATION NOTES: 1.DIRECTION OF TRANSVERSE GUTTER SLOPE SHALL MATCH DIRECTION OF ADJACENT PAVEMENT SLOPE. 2.CONSTRUCT WITH CURBING MACHINE. 3.AT CURB INLET CATCH BASINS, ADJUST CASTING TO BE 1'' BELOW GUTTER GRADE. SLOPE GUTTER 5' EACH SIDE OF CATCH BASIN. PROVIDE POSITIVE DRAINAGE TO CATCH BASINS. 12" 4' ' 712"13 1 2" 6" 12" 1 2 AGGREGATE BASE TO BE PLACED BY PAVING CONTRACTOR (4" MIN.) 7" B-412 CURB AND GUTTERDET# SHT# NOT TO SCALE 3" RADIUS1 2" RADIUS SLOPE 3/4" PER FOOT TOWARDS PAVEMENT ON HIGH SIDE OF LOT / DRIVE (TIP OUT). SLOPE 3/4" PER FOOT TOWARDS CURB FACE ON LOW SIDE OR LOT / DRIVE (TIP BACK). 1 2" RADIUS FACE OF CURB 1:3 BATTER 10' T R A N S I T I O N SHT# DET# SHT# DET# CURB TRANSITION D-412 TO B-612DET# SHT# NOT TO SCALE PROVIDE EXPANSION JOINT AT ENDS OF TRANSITION (TYP.) 3" 3" SOFT PLAY AREADET# SHT# NOT TO SCALE 1" RADIUS (TYP) EXCEPT FOR AREA ABUTTING RAMP LANDING PEA ROCK PREPARED SUBGRADE 6" x 18" CONCRETE CURB GEOTEXTILE FABRIC FINISH GRADE OF CURB SHALL BE 1" ABOVE SOD A FLUSH WITH PAVEMENT 6" DRAIN TILE 12'' DEPTH WOOD FIBER SURFACING FINISH GRADE OF SOFT PLAY SURFACE 3'' MIN. PEA ROCK AROUND DRAIN TILE 5 1 2"7" 2'-0" 1'-0"SHT# DET# CONCRETE VALLEY GUTTERDET# SHT# NOT TO SCALE CONCRETE VALLEY GUTTER MIN. 6" STABILIZED AGGREGATE BASE TO BE PLACED BY PAVING CONTRACTOR 3'-0" 10 " 10 " 1' ' T Y P I C A L 3'-0" CONCRETE SLABDET# SHT# NOT TO SCALE 8" CONCRETE SLAB 6" STABILIZED AGGREGATE BASE TO BE PLACED BY PAVING CONTRACTOR CURB THICKENED SLABPREPARED SUBGRADE 8" CONCRETE SLAB 6" STABILIZED AGGREGATE BASE THICKENED SLAB PREPARED SUBGRADE EXPANSION JOINT 12" LONG - #5 REBAR DOWEL SPACED 2'-6" TYP. REQUIRED AT COLD JOINTS ONLY EQUAL 15" 4" 3" 2" PLAN SECTION CONCRETE MAINTENANCE STRIPDET# SHT# NOT TO SCALE SHT# DET# 1 2" RADIUS (TYPICAL) FINISH GRADE OF MAINTENANCE STRIP SHALL BE ONE INCH ABOVE TURFGRASS AND FLUSH WITH PAVEMENT (2) #4 REBAR 1" DEPTH CONSTRUCTION JOINT COMPACTED SUBGRADE 1'' DEPTH CONSTRUCTION JOINT AT EACH POST AND AT MIDPOINT BETWEEN POSTS POST (2) #4 REBAR TOPSOIL 1'' BELOW CONCRETE 1" NOTE: PROVIDE EXPANSION JOINT AND CAULK SEALANT AT ALL WALK, BUILDING, AND STOOP JOINTS. WALK WIDTH AS LABELED ON PLAN 12" MI N . 4 " DE P T H SHT# DET# SHT# DET# SHT# DET# CONCRETE WALKDET# SHT# NOT TO SCALE ASPHALT PAVEMENT CONCRETE CURB AND GUTTER WALK FLUSH WITH TOP OF CURB AND PROVIDE TOOLED EDGE WITH EXPANSION JOINT 4" CONCRETE WALK MIN. 4" SAND BASE OR STABILIZED AGGREGATE BASE THICKENED TO BOTTOM OF CURB WHERE APPLICABLE TYPICAL AT ALL GRASS AREAS PREPARED SUBGRADE PROVIDE 2% CROSS SLOPE (MAX.) DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE DET# SHT# NOT TO SCALE Page 145 of 221 C1.73 DETAILS NOT TO SCALE DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 3/ 4 " - 1 " 22" 8'-0" 48" 10'-5" 7' 4' FOOTING DETAIL BASKETBALL GOALDET# SHT# NOT TO SCALE 18'' DIAM. x 60'' DEPTH CONCRETE FOOTING GROUND ANCHORSLOPE AWAY FROM POLE FINISH GRADE UPPER YOKE LOWER YOKE HEIGHT ADJUSTMENT HANDLE MAST GROUND ANCHOR BACKBOARD AND RIM, WITH RIM AT 10' ABOVE FINISH GRADE 40'-0" CENTER SECTION 10'-0" 10 ' - 0 " 20'- 0 " W I T H O V E R H A N G 10'-0" 10'- 0 " 4 0 ' - 0 " 1 0 ' - 0 " 10'-0" SECTION 5' - 0 " 4' - 6 " 18 ' - 0 " 12 ' - 0 " 2' - 0 " 2' - 0 " 2' - 0 " ELEVATION 40' WINGS PLAN 12'' WHERE A P P L I C A B L E 40 ' - 0 " HOODED BACKSTOPDET# SHT# NOT TO SCALE SHT# DET# SHT# DET# 4" NOM. DIAM. POSTS (TYP) MAINTENANCE STRIP 4" NOM. DIAM. POSTS (TYP) 15 8" NOM. DIAM. RAILS TACK WELD HOOD MOUNTING BRACKETS TO POSTS FOR SECURE ATTACHMENTS MAINTENANCE STRIPFABRIC ON LOWER 6' OF BACKSTOP (CENTER SECTION AND WINGS) SHALL BE #6 GAUGE FABRIC. ALL OTHER FABRIC SHALL BE #9 GAUGE 16" X 60" FOOTINGS 4' - 0 " 3' - 0 " 1' - 0 " 1'-6" SHT# DET# BOLLARDDET# SHT# NOT TO SCALE 5" PIPE CAP 2" WIDE BANDS OF REFLECTORIZED TAPE 10° SLOPE EXPANSION JOINT (TYP.) CONCRETE FOOTING 5'' SCH. 40 STEEL PIPE BOLLARD WITH ONE COAT OF PRIMER AND TWO COATS OF PAINT. COLOR SHALL BE SHERWIN WILLIAMS "SAFETY YELLOW" OR EQUAL. VERIFY COLOR WITH ARCHITECT FILL BOLLARD WITH CONCRETE 2" 66 " T O B O T T O M O F S I G N (M E A S U R E D F R O M P A R K I N G S U R F A C E ) 12" 18 " SIGN: WHITE LEGEND AND BORDER ON BLUE BACKGROUND FULLY REFLECTORIZED NOTE: SIGN SHALL BE PLACED NOT MORE THAN 96" FROM FACE OR EDGE OF PAVEMENT AT THE ACCESSIBLE STALL. 60 " T O B O T T O M O F "V A N - A C C E S S I B L E " SI G N W H E N P R E S E N T ACCESSIBLE PARKING SIGN AND POST WITH BREAKAWAY BASE DET# SHT# NOT TO SCALE POST TOP METAL SIGN ACCORDING TO MN STATE STATUTE 169.346 (MNMUTCD R7-8m) 2" X 2" 12 GAUGE SQUARE POST PER Mn/DOT 3402 PROVIDE "VAN-ACCESSIBLE" LABELING (MNMUTCD R7-8bP) - PROVIDE AT ONE STALL BREAKAWAY SIGN BASE BOLTED TO CONCRETE SURFACE 2" 7' - 0 " - V E R I F Y WI T H L O C A L C O D E 3' - 0 ' ' TRAFFIC SIGN AND POST IN GRASS DET# SHT# NOT TO SCALE POST TOP REFER TO PLAN FOR SPECIFIC SIGN METAL SIGN 31 2" FLANGED CHANNEL SIGN POST PER Mn/DOT 3401 6'-0'' 6'-0" 12'-0" 4' - 0 " 15 ' - 0 " 19 ' - 0 " R6'- 0 " SHT# DET# BASKETBALL COURT STRIPINGDET# SHT# NOT TO SCALE 2" WIDE WHITE PAINT STRIPE (TYPICAL) 16" LONG DASHED LINES WITH 14" GAP BETWEEN DASHES END LINE OF COURT 6'-0"6'-0" 12'-0" 3' - 0 " 2' - 0 " 8'-0" FOUR-SQUARE STRIPINGDET# SHT# NOT TO SCALE 2" WIDE PAINT STRIPE (TYP.) 10 98 7 65 4 32 1 14 ' - 0 " 2'-0" 2' - 0 " 1'-0" HOP SCOTCH STRIPINGDET# SHT# NOT TO SCALE 2" WIDE WHITE PAINT STRIPE (TYP.) 12'' HIGH PAINTED NUMBERS TYP 8" DET# SHT# LIGHT DUTY ASPHALT PAVEMENT NOT TO SCALE 2" ASPHALT WEAR COURSE 6" STABILIZED AGGREGATE BASE 12" MIN. SUBGRADE PREPARATION 13 " DET# SHT# MEDIUM DUTY ASPHALT PAVEMENT NOT TO SCALE 1.5" ASPHALT WEAR COURSE TACK COAT 1.5" ASPHALT BINDER COURSE 10" STABILIZED AGGREGATE BASE 12" MIN. SUBGRADE PREPARATION 16 " DET# SHT# HEAVY DUTY ASPHALT PAVEMENT NOT TO SCALE 2" ASPHALT WEAR COURSE TACK COAT 2" ASPHALT BINDER COURSE 12" STABILIZED AGGREGATE BASE 12" MIN. SUBGRADE PREPARATION 2 3'-8" 2 3'-8" A 4' - 0 " MIN . 4' - 0 " MIN 4' - 0 " M I N 4'-0" UNLESS OTHERWISE NOTED ON PLAN 5'-8"5'-8" 2' - 0 " 4 3 6' - 0 " (6 " C U R B 4' - 0 " (4 " C U R B ) C O N C R E T E W A L K A 6'-3" (6" CURB) 4'-2" (4" CURB) 4'-0" UNLESS OTHERWISE NOTED ON PLAN 6'-3" (6" CURB) 4'-2" (4" CURB) 1 6'-0" (6" CURB) 4'-0" (4" CURB)4'-0" 7 8" - 1 7 16" 1 5"50%-60% OF BASE DIAMETER 5 8" M I N . 2' - 0 " 5 8" MIN. 15 16" (TYP.) 15 8" - 23 8" 158" - 2 3 8" 15 16 " ( T Y P . ) 6'-3" (6" CURB & 0.08 FT./FT. SLOPE) 4'-2" (4" CURB & 0.08 FT./FT. SLOPE) 4'-0" 6'-3" (6" CURB & 0.08 FT./FT. SLOPE) 4'-2" (4" CURB & 0.08 FT./FT. SLOPE) 0. 0 6 PEDESTRIAN CURB RAMPDET# SHT# NOT TO SCALE NOTES: 1.1/2 INCH PREFORMED JOINT FILLER MATERIAL, AASHTO M 213. 2.PROVIDE A PATH OF TRAVEL 4'-0'' WIDE BEHIND THE PEDESTRIAN RAMP. A RELATIVELY FLAT 4' X 4' LANDING WILL ALLOW WHEELCHAIRS TO NAVIGATE AROUND THE PEDESTRIAN RAMP. 3.6'' TO 8'' IS THE REQUIRED OFFSET OF THE DETECTABLE WARNINGS/TRUNCATED DOME AREA FROM THE FRONT FACE OF CURB, OR PLACE THE DETECTABLE WARNINGS AT THE BACK OF CURB. 4.ADA REQUIRED TRUNCATED DOME AREA SHALL BE 2'-0'' MIN. IN DIRECTION OF TRAVEL AND SHALL EXTEND THE FULL WIDTH (4'-0'' TYP.) OF THE CURB RAMP. THIS 2'-0'' BY 4'-0'' WIDTH (TYP.) TRUNCATED DOME AREA SHALL CONTRAST VISUALLY WITH THE ADJACENT WALKING SURFACE. THE ENTIRE TRUNCATED DOME AREA SHALL BE A LIGHT COLOR (LIGHT GRAY, WHITE, OR YELLOW) WHEN THE ADJACENT SIDEWALK IS A DARK COLOR. THE ENTIRE TRUNCATED DOME AREA SHALL BE A DARK COLOR (RED, BLACK, DARK GRAY, OR BRIGHT YELLOW) WHEN THE ADJACENT SIDEWALK IS A "WHITE" OR LIGHT GREY CEMENT COLOR. SECTION VIEW PLAN VIEW DOME SPACING DOME SECTION ELEVATION VIEW SHT# DET# DISTURBED MINIMUM OUTER LIMITS OF CONCRETE WALK BACK OF CURB FRONT FACE OF CURB ROUND ALL SLOPED INTERSECTIONS0.08 FT./FT. SLOPE OF FLARED SIDE CURB OR, CURB AND GUTTER 0.083 FT./FT. OR FLATTER 0.02 FT./FT. MAX DOME (TYP) CONCRETE WALK 6'-0'' 3" 6'' 6'' 6' ' 1' - 6 " VA R I E S SECTION B-B VA R I E S 5'-0" 3" 6'' 6'' 6' ' 1' - 6 " SECTION A-A 6" 6" SHT# DET# SHT# DET# SOFT PLAY AREA ACCESSIBLE RAMPDET# SHT# NOT TO SCALE 12'' DEPTH WOOD FIBER SURFACING GEOTEXTILE FABRIC PEA ROCK SAND BASE 5" CONCRETE FINISH GRADE AT SOFT PLAY SURFACE 1 2" RADIUS TYP. CONCRETE RAMP SLOPED @ 1:20 MAX CONCRETE CURB 12'' DEPTH WOOD FIBER SURFACING GEOTEXTILE FABRIC PEA ROCK SAND BASE 5" CONCRETE FINISH GRADE AT PLAY SURFACE 1 2" RADIUS TYP. CONCRETE RAMP SLOPED @ 1:20 MAX CONCRETE CURB EXPANSION JOINTS EXPANSION JOINTS SHT# DET# SHT# DET# 6' ' 6'' CONCRETE CURB SHT# DET# 6'' 6' ' Page 146 of 221 C1.74 DETAILS NOT TO SCALE DateRegistration Number Check: Drawn: Date: Comm: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of H G F E D C B A 1 2 3 4 5 6 7 8 109 C MN Revisions Description Date Num Scale: North 7575 GOLDEN VALLEY ROAD, SUITE 200 GOLDEN VALLEY, MINNESOTA 55427 Phone: (763) 544-7129 Email: goldenvalley@bolton-menk.com www.bolton-menk.com R DAVID A. REY XX/XX/XX40180 MINNESOTA ENGINEER PUBLIC SCHOOLS 3455 153RD STREET WEST APPLE VALLEY - EAGAN NEW ELEMENTARY ROSEMOUNT, MINNESOTA 55068 SCHOOL #20 ISD #196: ROSEMOUNT - CITY SUBMITTAL 12/27/2023 1'-0" MIN 1'-0" MIN CONIFEROUS TREEDET# SHT# NOT TO SCALE SET TREE WITH ROOT COLLAR AT FINISH GRADE. ADJUST TREE AS REQUIRED SO THAT ROOT COLLAR STANDS LEVEL TO, OR SLIGHTLY ABOVE, FINISH GRADE. WOOD MULCH, MIN. 4'' DEPTH PLANTING SOIL TOPSOIL SOIL SAUCER CUT ROPES AT TOP OF ROOT BALL. REMOVE TOP 1/3 OF BURLAP. REMOVE ALL NON-BIODEGRADABLE MATERIAL. 6'' DEPTH PLANTING SOIL - FORM PEDESTAL TO PREVENT SETTLING NOTE: WATER TREE THOROUGHLY AT THE TIME OF PLANTING. PRUNE TREE TO REMOVE DEAD, DAMAGED, BROKEN, AND WEAKENED BRANCHES. 1'-0" MIN 1'-0" MIN DECIDUOUS TREEDET# SHT# NOT TO SCALE NOTE: WATER TREE THOROUGHLY AT THE TIME OF PLANTING. PRUNE TREE TO REMOVE DEAD, DAMAGED, BROKEN, AND WEAKENED BRANCHES. SET TREE WITH ROOT COLLAR AT FINISH GRADE. ADJUST TREE AS REQUIRED SO THAT ROOT COLLAR STANDS LEVEL TO, OR SLIGHTLY ABOVE, FINISHED GRADE WOOD MULCH, MIN. 4'' DEPTH PLANTING SOIL TOPSOIL SOIL SAUCER CUT ROPES AT TOP OF ROOT BALL. REMOVE TOP 1/3 OF BURLAP. REMOVE ALL NON-BIODEGRADABLE MATERIAL. PREPARED SUBSOIL TO FORM PEDESTAL TO PREVENT SETTLING 9" (MIN.) 9" (MIN.) SHRUBDET# SHT# NOT TO SCALE NOTE: WATER SHRUBS THOROUGHLY AT TIME OF PLANTING. PRUNE SHRUBS TO REMOVE DEAD, DAMAGED, AND BROKEN BRANCHES. WOOD MULCH, MIN. 4'' DEPTH EDGING ROOT BALL OR POT PLANTING SOIL UNDISTURBED SOIL OR COMPACTED SUBGRADE SET SHRUB AT FINISH GRADE. ADJUST SHRUB AS REQUIRED SO THAT ROOT COLLAR STANDS LEVEL TO, OR SLIGHTLY ABOVE, FINISH GRADE. 4" M I N . WOOD MULCH BEDDET# SHT# NOT TO SCALE FINISH GRADE 6'' MIN TOPSOIL EDGING FINISH GRADE WOOD MULCH SUBGRADE PLAN SECTION PERENNIALS AND CONTAINER GROWN PLANT STOCK DET# SHT# NOT TO SCALE EDGING PLANT ALL PERENNIALS AND CONTAINER GROWN PLANT STOCK AT EQUAL TRIANGULAR SPACING 4" DEPTH WOOD MULCH PLANTING SOIL 1'-0"1'-0"1'-0"1'-0" BV IC V MV QC V GR JUMBO RECTANGULAR VALVE BOX (22" X 16" X 12") STANDARD RECTANGULAR VALVE BOX (18" X 12" X 12") 1'- 0" Typ. # 1 # 2 # 2 # 3 # 4 EXAMPLE POTABLE WATER SYSTEM ON CONTROLLER 'A', REMOTE CONTROL VALVE STATION # 3. NOTES: 1. VALVE BOX # 1 THRU # 3 SHALL HAVE STAINLESS STEEL LOCKING HARDWARE. 2. VALVE BOXES SHALL BE LABELED BY HOT IRON BRANDING OR ALUMINUM ASPHALTIC BASE WATER PROOF PAINT. 3. LOCATE VALVE ASSEMBLIES IN PLANTING AREA. 4. VALVE LOCATIONS SHALL BE APPROVED BY THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. 5. VALVE BOXES SHALL BE CENTERED ABOVE VALVE ASSEMBLIES TO FACILITATE ACCESS AND MAINTENANCE. 6. VALVE BOXES SHALL BE FLUSH WITH FINISHED GRADE. 7. VALVE BOXES SHALL BE SET PARALLEL TO EACH OTHER AND PERPENDICULAR TO THE EDGE OF PAVEMENT. 8. SEE OTHER IRRIGATION DETAILS FOR FURTHER INFORMATION. STANDARD RECTANGULAR VALVE BOX (18" X 12" X 12") CIRCULAR VALVE BOX (10" D) CIRCULAR VALVE BOX (6" D) PAVEMENT, WALL, OR BUILDING. SERVICE BOX REQUIREMENTSDET# SHT# NOT TO SCALE Wa t e r t y p e Co n t r o l l e r De s i g n a t i o n Bo x s i z e Li d C o l o r Identification Guide PW PW PW PW PW PW PW PW PW PW PW PW PW A A A A A A A A A A A A A MV FS HM BV BV GV ARV QCV RCV MS GR SB FC # 2 # 2 # 2 # 2 # 1 # 2 # 2 # 3 # 2 # 2 # 4 # 3 # 3 Green Green Green Green Green Green Green Green Green Green Green Green Green Master valve Flow sensor Hydrometer Ball valve 3" or less Ball valve 4" or more Gate valve Air release valve Quick coupler valve Remote control valve Moisture sensor Grounding rod Splice box Future connection BRASS ISOLATION VALVEDET# SHT# NOT TO SCALE 18" BELOW GRADE FOUR COMMON BRICK SUPPORTS. 10" DIA. PVC PIPE EXTENSION, LENGTH AS REQUIRED. PVC MAIN LINE. SLIP/THREAD COUPLING. 6" SCHEDULE 80 THREADED NIPPLE. SET BOX FLUSH TO GRADE AT LAWN. SET BOX 2" ABOVE GRADE AT SHRUBS. ISOLATION VALVE AS SPECIFIED. FINISH GRADE. 10" DIAMETER ROUND SERVICE BOX, SEE SPECIFICATIONS. FLOW SENSORDET# SHT# NOT TO SCALE 24" MINIMUM 5X DIAMETER OF PIPE 10X DIAMETER OF PIPE FLOW FLOW METER AS SPECIFIED (2 WIRES TO CONTROLLER) 2 X 12 PVC SCH 80 PIPING. 4" PVC MAIN LINE WITH 2" REDUCING BUSHING. FINISHED GRADE 2 X 6 X 16 CONCRETE WALL CAPS, TWO PER BOX, ONE EACH SIDE. WATER PROOF CONNECTORS. 2 X 24 PVC SCH 80 TOE PIPING. 2" GALVANIZED FLANGE X 1 PT ADAPTER. 2"X4" FLANGED REDUCER. 4" FLANGED ELL. 18"X 18"X18" CONCRETE SUPPORT BLOCK. PVC SCH 80 2"X8" NIPPLE. MASTER VALVE AS SPECIFIED. SPECIFIED RECTANGULAR SERVICE BOXES WITH EXTENTIONS AS NEEDED. 4" FLANGED ELBOW P.O.C. TO EXISTING RP BACKFLOW IRRIGATION TRENCHINGDET# SHT# NOT TO SCALE 12 " I N PL A N T I N G AR E A 24" MIN. 1' - 6 " I N P L A N T I N G A R E A 6" NOTES: 1. SEE IRRIGATION LEGEND FOR MAINLINE AND LATERAL LINE PIPE SIZES AND TYPE. 2. DIRECT BURIAL CONTROL WIRES SHALL BE INSTALLED IN SCHEDULE 40 PVC ELECTRICAL CONDUIT IF REQUIRED. 3. 2-WIRE IRRIGATION WIRE SHALL BE INSTALLED IN SCHEDULE 40 PVC ELECTRICAL CONDUIT. 4.DETECTABLE LOCATOR TAPE SHALL BE LOCATED SIX INCHES (6") ABOVE THE ENTIRE MAINLINE RUN. PAVEMENT NON-PRESSURIZED LINE (LATERAL LINE). DETECTABLE LOCATOR TAPE. PRESSURIZED LINE (MAIN LINE). FINISHED GRADE DIRECT BURIAL LOW VOLTAGE CONTROL WIRES. NOTE: USE TEFLON TAPE ON ALL THREADED FITTINGS EXCEPT AT SPRINKLER HEAD. 12 " M I N I M U M B E L O W G R A D E 4" TO CURB OR WALK SHRUB SPRAY HIGHPOP ASSEMBLYDET# SHT# NOT TO SCALE DO NOT USE SIDE INLET HIGH POP HEAD TRIPLE SWING ASSEMBLY: (1) 8" SCH 80 THREADDED NIPPLE (3) MARLEX STREET ELLS INLET SIZE DIAMETERS LATERAL LINE 6" ROTARY SPRINKLERDET# SHT# NOT TO SCALE FINISHED GRADE MODEL PROS-06-PRS30-CV SWING JOINT LATERAL TEE OR ELBOW LATERAL PIPE 6" POP-UP SPRAY SPRINKLERDET# SHT# NOT TO SCALE FINISHED GRADE POP-UP SPRAY SPRINKLER PVC SCH 80 NIPPLE PVC SCH 40 ELL PVC SCH 40 STREET ELL PVC SCH 40 STREET ELL PVC SCH 40 TEE OR ELL NOTES: A.ALL WIRE SPLICING SHALL BE MADE WITH APPROVED CONNECTIONS. B.MAKE ALL WIRE SPLICES IN VALVE BOXES. C.LEAVE A MINIMUM OF 24" EXTRA WIRE AT ALL SPLICE POINTS. D.MAXIMUM DISTANCE FROM DECODER TO VALVE = 150 FT. E.MAXIMUM WIRE LENGTH = 10,200 FT. F.WIRE LENGTHS INCLUDE MASTER VALVE AND #16 2 WIRE TWO-WIRE PATHS EXAMPLEDET# SHT# NOT TO SCALE WIRE PATH #2 MASTER VALVE WIRE PATH #1 120 VAC POWER RAIN SENSOR CONTROLLER SHOWN AS REFERENCE ONLY 1 2 3 4 5 6 10 11 13 5 7 3 12 6 3 1 13 4 5 77 2 12 6 9 1 8 13 4 9 7 8 10 11 12 13 2 HUNTER HC FLOW METER HC-150 WITHUNION CONNECTIONS SCH 80 PVC FEMALE ADAPTER (S X T) RECTANGULAR VALVE BOX PERSPECIFICATIONS SCH 80 PVC 45 DEGREE ELBOW (S X S) TO LOWER MAIN LINE TO PROPER DEPTH (SIZE FOR LARGER MAIN LINE AS NEEDED) SCH 80 PVC 45 DEGREE ELBOW (S X S) TOLOWER MAIN LINE TO PROPER DEPTH 2" DIA. (50 mm) MAIN LINE AT INLET &OUTLET DETAIL LEGEND: TOP VIEW SIDE VIEW FLOW NOTE: INLET PIPE ENTERING METER: LENGTH MUST BE A MIN. OF 10 X PIPE DIA. OUTLET PIPE LEAVING METER: LENGTH MUST BE MIN. OF 5 X PIPE DIA. INLET AND OUTLET PIPE MUST BE STRAIGHT PIPE WITH NO FITTINGS OR TURNS UNTIL AFTER THESE SPECIFIED LENGTHS. PIPE AND FITTINGS MAY BE SCH 80 PVC SOLVENT WELD, THREADED SCH 80 PVC OR BRASS, AS REQUIRED FOR PROJECT. 10 x PIPE DIA.5 x PIPE DIA. MAIN LINE TO SYSTEM (SEE LEGEND AND PLANSFOR TYPE AND SIZE) TWO WIRES TO FLOW SENSOR TERMINALS AT CONTROLLER. MIN. 18 AWG-UF (2.08 mm2) SHIELDED WIRE WITH DIFFERENT COLOR FROM CONTROL/COMMON WIRE. WEATHERPROOF WIRE CONNECTOR FINISH GRADE SPECIFIED SOIL COVER (SEE LEGEND) COMMON BRICK GRAVEL BASE, 6" (15 cm) DEEP FLOW METERDET# SHT# NOT TO SCALE TYPICAL DRIPLINE REQUIREMENTSDET# SHT# NOT TO SCALE EMITTER FLOW 0.6 GPH 0.9 GPH LATERAL FLOW PER 100 FT (GPM) EMITTER FLOW RATE 12 18 24 GRID PRECIPITATION RATES (IN/HR) MAX GPM PSI LOSS SCHEDULE 40 PVC HEADER SIZE 1/2" 3/4" 1" 1-1/2" 2" POLY PIPE HEADER SIZE 1/2" 3/4" 1" 1-1/2" 2" MAXIMUM FLOW PER ZONE EMITTER FLOW RATE GPH PSI 10 20 30 40 50 60 MAXIMUM LATERAL LENGTH (FEET) DOGBONE SHAPED CORNER SHAPED CURVED POLYGON HOURGLASS SHAPED POLYGON SHAPED"C" SHAPED ODD SHAPED F A F A A F F A A F F AF F A F A A CENTER FEED EXAMPLE F A END FEED EXAMPLE F 0.6 0.9 125 96 249 191 307 236 350 268 125 96 125 96 12" SPACING 18" SPACING 24" SPACING 0.6 0.9 0.6 0.9 218 171 442 340 550 422 627 171 218 171 218 171 175 135 350 171 434 333 495 380 175 135 175 135 1.0 GPM 1.5 GPM 0.67 GPM 1.0 GPM 0.50 GPM 0.75 GPM 12" SPACING 18" SPACING 24" SPACING EMITTER SPACING LATERAL SPACING 0.6 0.9 0.96 0.69 0.28 1.44 1.03 0.41 12 18 24 4.7 GPM 8.3 GPM 13.5 GPM 33.9 GPM 52.4 GPM 7.7 PSI 5.6 PSI 4.2 PSI 2.9 PSI 1.9 PSI 4.7 GPM 8.3 GPM 13.5 GPM 31.8 GPM 52.4 GPM 8.8 PSI 6.3 PSI 4.8 PSI 2.9 PSI 2.2 PSI SLOPED CONDITION NOTE: 1.DRIPLINE LATERALS SHOULD FOLLOW THE CONTOURS OF THE SLOPE WHENEVER POSSIBLE. 2.INSTALL AIR RELIEF VALVE AT THE HIGHEST POINT. 3.NORMAL SPACING WITHIN THE TOP 2/3 OF SLOPE. 4.INSTALL DRIPLINE AT 25% GREATER SPACING AT THE BOTTOM 1/3 OF THE SLOPE. 5.WHEN ELEVATION CHANGE IS 10 FT OR MORE, ZONE THE BOTTOM ON A SEPARATE VALVE. MA X I M U M L E N G T H O F S I N G L E LA T E R A L , S E E C H A R T MA X I M U M L E N G T H O F S I N G L E LA T E R A L , S E E C H A R T WATER SOURCE DRIP VALVE OR LATERAL FROM VALVE LANDSCAPE DRIPLINE TUBING PVC MANIFOLD LINE WITH PVC TEE FLUSH VALVE AIR RELIEF VALVE: INSTALL AT HIGH POINT OF SYSTEM PVC SCH 40 TEE OR ELL PVC MANIFOLD LINE EASY FIT COMPRESSION ADAPTER EAST FIT COMPRESSION COUPLING LANDSCAPE DRIPLINE TUBING FLUSH VALVE OR CAP AT LOW END AS NOTED TYPICAL DRIP LINE WITH EMITTER SPACING AS NOTED. TIE DOWN STAKE AT ALL TEES, ELLS, AND AT 4' O.C. AT CLAY, 3' O.C. AT LOAM, OR 2' O.C. AT SAND AIR RELIEF VALVE AT HIGH POINT AS INDICATED DRIPLINE SPACING AS NOTED. EMITTERS OFFSET FOR TRIANGULAR SPACING TYPICAL OFFSET 2" FROM HARDSCAPE. 4" FROM PLANTED AREA. TYPICAL OFFSET 2" FROM HARDSCAPE. 4" FROM PLANTED AREA. DRIP VALVE/FILTER/ REGULATOR. 3 4" PVC LATERAL PIPE POLYETHYLENE OR PVC HEADER MANIFOLD, SIZE AS PER "MAXIMUM FLOW PER ZONE" CHART PVC MAINLINE TYPICAL COMPRESSION FITTING TYPICAL FPT ADAPTER AND COMPRESSION COUPLER DRIP FLUSH VALVE IN BOXDET# SHT# NOT TO SCALE 2" 4" THICK LAYER OF WASHED GRAVEL. THE BOX REST UPON THE ROCK BED. DO NOT EXTEND GRAVEL INTO BOX. DRIPLINE OR 1 2" DRIP TUBING. 3 4" PVC BALL VALVE WITH SHORT NIPPLE 1 2" DRIP TUBING TO 3/4" FPT ADAPTER. COIL 24" TO 30" OF DRIP TUBING IN THE BOX. 10" DIAMETER VALVE BOX. SET VALVE BOX 2" ABOVE FINISHED GRADE OF SHRUB AREA. DRIP AIR RELIEF VALVE IN BOXDET# SHT# NOT TO SCALE 1 2" 4" THICK LAYER OF WASHED GRAVEL. THE BOX REST UPON THE ROCK BED. DO NOT EXTEND GRAVEL INTO BOX. DRIP TUBING COUPLING. 3 4" FPT X 1" DRIP TUBING ADAPTER. AIR VALVE AS SPECIFIED. 1" FPTXMPT ELL. DRIPLINE OR 1/2" DRIP TUBING. FINISH GRADE 6" DRIP BOX 12 " B E L O W G R A D E . 1" DRIP VALVE WITH BASKET FILTERDET# SHT# NOT TO SCALE 3" M I N . 20"X14" JUMBO PLASTIC VALVE BOX. PVC TRUE UNION BALL VALVE. 2" ABOVE GRADE AT SHRUBS. SET BOX FLUSH AT TURF. CONTROLLER WIRE WITH 30 INCH LINEAR LENGTH OF COIL, WITH PLASTIC I.D. TAG AND WATERPROOF CONNECTORS. RCV AS SPECIFIED. BASKET FILTER AS SPECIFIED. PRESSURE REGULATOR AS SPECIFIED. PVC UNION W/ SHORT NIPPLES. SCH.80 RISER. SXT TEE W/ 2" NIPPLE AT MAINLINE. 1 2" WIRE CLOTH GOPHER SCREEN, WRAP UP SIDES. TWO 6X2X16 CONCRETE BLOCK CAPS, ONE ON EACH SIDE OF THE BOX. 45° DOWN AS REQ. TO LATERAL PIPE DEPTH. OUTLET PIPE SAME SIZE AS VALVE, 24" MIN. LENGTH TO FIRST FITTING. Page 147 of 221 IS D # 1 9 6 N E W E S S I T E L I G H I T N G Designer Date 12/26/2023 Scale Not to Scale Drawing No. Summary 1 of 1 Schedule Symbol Label Image QTY Manufacturer Catalog Description Number Lamps Lamp Output LLF Input Power Polar Plot AA2 19 Lithonia Lighting DSX2 LED P1 40K 80CRI T1S HS EGS-F D-Series Size 2 Area Luminaire P1 Performance Package 4000K CCT 80 CRI Type 1 Short Houseside Shield Forward External Glare Shield 1 13515 0.9 134.5 AA4 14 Lithonia Lighting DSX2 LED P4 40K 80CRI T4M EGS D-Series Size 2 Area Luminaire P4 Performance Package 4000K CCT 80 CRI Type 4 Medium External Glare Shield 1 27094 0.9 272.6516 BB2 13 Lithonia Lighting DSX0 LED P1 40K 70CRI T1S EGS-F D-Series Size 0 Area Luminaire P1 Performance Package 4000K CCT 70 CRI Type 1 Short Forward External Glare Shield 1 3818 0.9 33.21 Statistics Description Symbol Avg Max Min Max/Min Avg/Min Calc Zone #7 1.9 fc 8.9 fc 0.0 fc N/A N/A Calc Zone #8 1.0 fc 7.1 fc 0.0 fc N/A N/A Calc Zone #10 0.7 fc 6.4 fc 0.0 fc N/A N/A Calc Zone #6 1.4 fc 4.3 fc 0.1 fc 43.0:1 14.0:1 0.2 0.5 1.3 0.6 1.2 1.9 2.5 0.6 0.3 0.3 1.1 2.0 3.3 3.6 2.0 1.0 0.3 0.5 1.6 2.1 2.6 2.6 1.9 1.1 0.3 1.0 2.2 2.0 1.8 1.8 1.9 1.4 0.4 3.5 3.2 2.1 1.4 1.7 2.2 2.1 0.5 0.6 2.8 3.0 1.8 1.3 1.7 3.1 3.8 0.9 0.3 1.6 1.9 1.6 1.3 1.8 2.8 3.1 0.7 1.0 1.5 1.5 1.5 1.7 1.8 1.1 0.3 0.2 1.2 1.6 1.6 1.7 1.6 1.3 0.3 0.2 0.6 2.1 2.0 1.6 1.6 1.8 1.6 0.2 0.3 2.5 3.9 2.5 1.4 1.5 2.3 2.4 0.6 0.3 0.9 2.7 2.1 1.3 1.5 2.9 4.1 1.8 0.5 1.5 1.4 1.2 1.4 2.1 2.2 0.6 0.4 1.0 1.3 1.1 1.2 1.3 1.0 0.2 0.9 1.5 2.0 1.2 0.8 0.3 0.8 1.6 2.6 1.5 0.2 0.6 1.2 2.5 3.2 1.4 0.2 0.7 1.4 1.8 1.3 0.4 0.7 1.0 0.7 0.4 0.5 0.3 0.2 0.1 0.1 0.1 0.1 0.1 4.3 0.3 0.5 0.2 0.2 0.1 0.2 1.0 2.1 5.1 2.1 0.3 0.1 0.1 0.3 1.2 3.4 1.1 1.5 4.0 2.0 0.3 0.1 0.1 0.5 1.6 7.6 4.2 2.0 1.4 1.2 2.0 0.9 0.2 0.1 0.2 0.8 1.5 2.6 3.5 3.9 2.6 2.0 2.0 3.0 2.3 0.5 0.2 0.1 0.3 1.1 4.0 2.4 2.3 2.4 2.6 1.9 2.0 2.6 4.4 1.5 0.3 0.1 0.3 1.4 7.5 5.4 2.8 2.2 1.9 1.6 1.3 1.6 2.6 3.8 3.8 2.8 0.8 0.1 0.1 0.6 1.6 3.1 4.4 3.1 2.0 1.5 1.1 1.0 1.2 1.7 2.5 2.6 2.0 0.8 0.2 0.1 0.3 1.3 2.6 3.4 2.5 1.6 1.2 0.9 1.0 1.1 1.5 2.3 2.9 2.2 1.0 0.4 0.3 1.5 3.2 3.5 3.1 1.7 1.2 1.0 1.2 1.4 1.9 3.3 5.0 3.2 1.5 0.8 0.4 1.0 6.0 5.5 3.5 2.1 1.4 1.3 1.6 1.9 2.1 3.1 5.4 4.1 1.9 1.0 0.5 1.7 6.5 2.6 1.9 1.7 1.9 2.4 2.1 1.8 2.3 2.9 2.6 1.5 0.8 0.6 2.0 1.5 1.5 1.8 3.1 4.5 3.0 1.8 1.8 1.8 1.4 0.8 0.5 0.6 0.8 1.0 1.7 3.0 5.3 3.7 2.0 1.6 1.3 0.9 0.5 0.3 0.5 0.7 1.3 2.2 3.2 2.7 1.6 1.1 0.9 0.6 0.4 2.4 4.8 5.1 2.7 1.5 0.9 0.6 0.5 1.5 1.1 0.9 0.7 0.5 0.5 0.5 0.0 0.0 8.9 0.1 0.1 0.1 0.6 0.3 0.1 0.1 0.5 2.9 1.6 0.3 0.1 3.0 3.0 0.4 0.1 0.1 0.7 2.1 0.5 0.3 0.5 1.3 0.9 0.6 0.2 1.9 6.9 1.4 0.4 0.3 1.1 2.7 0.7 0.2 0.3 0.9 1.5 0.9 0.5 0.1 0.2 1.4 6.6 0.9 0.2 0.4 3.6 0.9 0.2 0.1 0.8 1.0 0.2 0.4 1.3 0.4 0.1 1.0 2.4 0.2 0.2 2.4 2.1 0.1 0.1 1.5 1.7 0.1 0.7 1.1 0.2 0.4 1.4 0.5 0.1 2.2 1.8 0.2 0.1 0.7 7.0 0.8 0.1 0.2 1.4 1.7 0.9 0.3 0.1 0.7 1.8 2.1 0.5 0.1 0.1 0.3 4.4 4.5 1.0 0.4 0.1 0.4 0.8 1.2 1.2 0.8 0.2 0.1 0.2 0.9 4.7 1.7 0.5 0.2 0.1 0.7 3.8 2.2 0.9 0.4 0.1 0.1 0.2 0.5 1.0 1.9 0.6 0.2 0.2 2.0 6.9 1.4 0.5 0.1 0.3 0.7 1.9 1.3 0.7 0.1 0.1 0.9 2.8 0.6 0.1 0.2 3.8 3.2 0.4 0.5 2.5 1.4 0.1 0.7 0.8 0.4 2.7 0.5 0.2 4.6 1.7 0.2 0.1 0.6 4.2 0.7 0.1 0.7 1.0 0.4 0.1 1.0 1.5 0.1 0.1 0.4 0.7 0.1 0.3 2.6 2.8 0.5 0.2 0.1 0.1 0.2 0.2 1.3 1.1 1.8 1.0 0.6 0.3 0.5 1.0 1.2 1.6 1.6 1.9 0.1 0.3 1.2 6.7 5.4 1.5 0.8 1.9 4.9 2.5 0.9 0.6 0.7 0.1 0.1 0.4 0.2 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.1 0.5 0.1 0.7 0.7 0.1 1.8 2.0 0.4 1.1 0.9 0.2 0.1 0.7 1.4 0.1 0.9 0.2 0.1 0.4 3.5 1.2 0.4 0.6 0.6 0.3 0.2 1.4 2.3 0.3 0.6 0.3 0.2 0.2 2.3 0.5 0.8 0.7 2.5 0.9 0.1 0.1 0.4 1.0 0.1 0.1 0.2 1.4 0.1 0.9 0.4 0.3 1.3 0.1 0.1 1.4 0.1 0.9 0.5 0.1 0.2 0.1 1.8 2.6 0.6 0.3 0.4 0.1 0.1 0.3 0.2 3.0 2.6 0.2 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.4 AA4 AA4 AA4 AA4 AA4 AA4 AA2 AA2 AA2 AA2 AA2 AA2 AA4 AA4 AA4 AA4 AA4 AA4 BB2 BB2 BB2 BB2BB2 BB2 AA2 AA2 AA2 AA2 AA2 AA2 AA2 AA2 BB2 BB2 BB2 BB2 BB2 BB2 BB2 AA2 AA2 AA2 AA2 AA4 AA4 AA2 Plan View Scale - 1" = 60ft Page 148 of 221 STAIR 'B' ELEC MECHELEV MECH KITCHEN BUS & AFTER HOURS ENTRY CLASSROOM CLASSROOM CLASSROOM COMMONS CLASSROOMCLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM MEDIA CENTER SMALL GROUP CIRC MEDIA COMMONS CIRC CONF CLASSROOM STOR CONF WASH TOILET CUSTODIAL CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM ART MUSIC KILN MUSIC STOR CIRC ENSEMBLE INSTRUMENTS STORVEST CAFETERIA GYMNASIUM SOUTH GYMNASIUM NORTH WORKROOM TOILET TOILET TOILET OFFICE RECEIVING/STOR DRY STOR DISHWASHER OFFICE CUST LOCKER FREEZER COOLER OUTDOOR STOR STORAGE DATA OFFICE STORAGE CENTER BASED CENTER BASED CENTER-BASED CENTER-BASED CIRC SENSORY CHANGING STAFF TOILET CALM CIRC COMMONS COMMONS LOADING DOCK (BELOW GRADE) FOOTPRINT OF MECHANICAL PENTHOUSE ABOVE MECH MAIN ENTRY CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM ELEC STOR SERVERCONFCOMMONS CLASSROOMCLASSROOM PRESCHOOL PRESCHOOL PRINCIPAL CONF WORKROOM OFFICE OFFICE STORAGE TOILET TOILETOFFICE SHARED OFFICE BREAKROOM CIRC RECEPTIONNURSE OFFICE VEST MECH CIRC CIRC BOYS GIRLS WASH TOILET COMMONS TOILET WASH TOILET CUST CONF CONF SMALL GROUP CIRC CONF TOILET COMMONS F E D C B A 1 2 3 4 5 6 7 8 A MN NorthCheck: Drawn: Date: Comm: License Number: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of Scale: Date 12 / 2 6 / 2 0 2 3 1 1 : 4 4 : 4 2 A M Au t o d e s k D o c s : / / I S D # 1 9 6 - N e w E l e m e n t a r y # 2 0 - R e p li c a t i o n / 2 3 2 1 0 4 _ N E W E S # 2 0 ( C E N T R A L ) . r v t 1" = 20'-0" Ce n t r a l : \ \ W a e - s r v - m n . w o l d a e . c o m \ S t P a u l \ I S D 1 9 6 \ E S _ N ew \ 1 5 2 2 3 4 - N e w E l e m e n t a r y Sc h o o l \ 0 2 _ A R C H \ R e v i t \ 1 5 2 2 3 4 _ N E W 2 0 1 7 E L E M E N T A R Y ( C e nt r a l ) . r v t ISD #196: ROSEMOUNT - APPLE VALLEY -EAGAN PUBLIC SCHOOLS ELEMENTARY SCHOOL #20 A1 FLOOR PLANS ARDROE AVENUE ROSEMOUNT, MINNESOTA 55068 3455 153RD STREET WEST ROSEMOUNT, MINNESOTA 55068 NOT FOR CONSTRUCTION CITY SUBMITTAL DK JPOC 12/27/2023 232104 MINNESOTA 12/27/2023 R. SCOTT MCQUEEN 20155 ARCHITECT 0 1" = 20'-0" FLOOR PLAN - LOWER LEVELF3 15'30' 0 1" = 20'-0" FLOOR PLAN - MAIN LEVELC3 15'30' Revisions Description Date Num Page 149 of 221 BRICK, TYP. LOWER LEVEL 86'-8" MAIN LEVEL 100'-0" T.O. WALL 115'-4" T.O. PENTHOUSE 131'-7" OVERALL 404'-2" FLAGPOLE PRECAST WALL PANEL WITH REVEAL PATTERN MECHANICAL LOUVER ORNAMENTAL METAL PANELS AT CANOPY FACE METAL COPING AT ROOF EDGE, TYP. BRICK, TYP. ORNAMENTAL METAL PANELS, TYP. ALUMUNUM WINDOWS WITH PRECAST SILLS, TYP. ALUMINUM CURTAINWALL DOOR/ WINDOWS, TYP. ORNAMENTAL METAL PANELS, TYP. METAL COPING AT ROOF EDGE, TYP. INSULATED METAL PANEL SYSTEM AT PENTHOUSE ALUMINUM CURTAINWALL DOOR/ WINDOWS, TYP. METAL COPING AT ROOF EDGE, TYP. ALUMUNUM WINDOWS WITH PRECAST SILLS, TYP.BRICK, TYP. ALUMINUM CURTAINWALL DOOR/ WINDOWS, TYP. ORNAMENTAL METAL PANELS, TYP. HOLLOW METAL DOOR AND FRAME, PAINTED SCREENED MECHANICAL UNIT, TYP. LOWER LEVEL 86'-8" MAIN LEVEL 100'-0" T.O. WALL 115'-4" T.O. PENTHOUSE 131'-7" OVERALL 404'-2" BRICK, TYP. METAL COPING AT ROOF EDGE, TYP. ORNAMENTAL METAL PANELS, TYP. ALUMUNUM WINDOWS WITH PRECAST SILLS, TYP. ALUMINUM CURTAINWALL DOOR/ WINDOWS, TYP. INSULATED METAL PANEL SYSTEM AT PENTHOUSE METAL COPING AT ROOF EDGE, TYP. BRICK, TYP. ORNAMENTAL METAL PANELS, TYP. ALUMINUM CURTAINWALL DOOR/ WINDOWS, TYP. BRICK, TYP. PRECAST WALL PANEL WITH REVEAL PATTERN ORNAMENTAL METAL PANELS AT CANOPY FACE SCREENED MECHANICAL UNIT ALUMUNUM WINDOWS WITH PRECAST SILLS, TYP. METAL COPING AT ROOF EDGE, TYP. SCREENED MECHANICAL UNIT, TYP. BRICK, TYP. HOLLOW METAL DOOR AND FRAME, PAINTED MECHANICAL LOUVER ALUMINUM STOREFRONT ENTRANCE SYSTEM ALUMINUM STOREFRONT ENTRANCE SYSTEM LOWER LEVEL 86'-8" MAIN LEVEL 100'-0" T.O. WALL 115'-4" T.O. PENTHOUSE 131'-7" LOADING DOCK 82'-5" OVERALL 245'-9" INSULATED METAL PANEL SYSTEM AT PENTHOUSE ORNAMENTAL METAL PANELS, TYP. PRECAST WALL PANEL WITH REVEAL PATTERN ORNAMENTAL METAL PANELS AT CANOPY FACE METAL COPING AT ROOF EDGE, TYP. BRICK, TYP. HOLLOW METAL DOOR AND FRAME, PAINTED MECHANICAL LOUVER ALUMINUM STOREFRONT ENTRANCE SYSTEM MECHANICAL LOUVER ALUMUNUM WINDOWS WITH PRECAST SILLS, TYP. ALUMUNUM WINDOWS WITH PRECAST SILLS, TYP. ALUMUNUM WINDOWS WITH PRECAST SILLS, TYP. METAL COPING AT ROOF EDGE, TYP. SCREENED MECHANICAL UNIT, TYP. HOLLOW METAL DOOR & FRAME, PAINTED LOWER LEVEL 86'-8" MAIN LEVEL 100'-0" T.O. WALL 115'-4" T.O. PENTHOUSE 131'-7" OVERALL 203'-0" INSULATED METAL PANEL SYSTEM AT PENTHOUSE BRICK, TYP. MECHANICAL LOUVER ALUMUNUM WINDOWS WITH PRECAST SILLS, TYP. METAL COPING AT ROOF EDGE, TYP. ORNAMENTAL METAL PANELS, TYP. ALUMINUM CURTAINWALL WINDOWS/DOORS, TYP. BRICK, TYP. ORNAMENTAL METAL PANELS, TYP. METAL COPING AT ROOF EDGE, TYP. ALUMINUM CURTAINWALL WINDOWS/DOORS, TYP. BRICK, TYP. ORNAMENTAL METAL PANELS, TYP. A2 B2 A2 C2 A2 E4 A2 F4 F E D C B A 1 2 3 4 5 6 7 8 A MN NorthCheck: Drawn: Date: Comm: License Number: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of Scale: Date 12 / 2 6 / 2 0 2 3 1 1 : 4 5 : 4 5 A M Au t o d e s k D o c s : / / I S D # 1 9 6 - N e w E l e m e n t a r y # 2 0 - R e p li c a t i o n / 2 3 2 1 0 4 _ N E W E S # 2 0 ( C E N T R A L ) . r v t As indicated Ce n t r a l : \ \ W a e - s r v - m n . w o l d a e . c o m \ S t P a u l \ I S D 1 9 6 \ E S _ N ew \ 1 5 2 2 3 4 - N e w E l e m e n t a r y Sc h o o l \ 0 2 _ A R C H \ R e v i t \ 1 5 2 2 3 4 _ N E W 2 0 1 7 E L E M E N T A R Y ( C e nt r a l ) . r v t ISD #196: ROSEMOUNT - APPLE VALLEY -EAGAN PUBLIC SCHOOLS ELEMENTARY SCHOOL #20 A2 EXTERIOR ELEVATIONS ARDROE AVENUE ROSEMOUNT, MINNESOTA 55068 3455 153RD STREET WEST ROSEMOUNT, MINNESOTA 55068 NOT FOR CONSTRUCTION CITY SUBMITTAL DK JPOC 12/27/2023 232104 MINNESOTA 12/27/2023 R. SCOTT MCQUEEN 20155 ARCHITECT 0 1/16" = 1'-0"B2 EXTERIOR ELEVATION - NORTH 12'24' 0 1/16" = 1'-0"C2 EXTERIOR ELEVATION - SOUTH 12'24' 0 1/16" = 1'-0"E4 EXTERIOR ELEVATION - EAST 12'24' 0 1/16" = 1'-0"F4 EXTERIOR ELEVATION - WEST 12'24' NOT TO SCALE EXT. ELEVATION LEGEND Revisions Description Date Num Page 150 of 221 F E D C B A 1 2 3 4 5 6 7 8 A MN NorthCheck: Drawn: Date: Comm: License Number: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed under the laws of the State of Scale: Date 12 / 2 6 / 2 0 2 3 1 1 : 4 5 : 4 6 A M Au t o d e s k D o c s : / / I S D # 1 9 6 - N e w E l e m e n t a r y # 2 0 - R e p li c a t i o n / 2 3 2 1 0 4 _ N E W E S # 2 0 ( C E N T R A L ) . r v t 1/8" = 1'-0" Ce n t r a l : \ \ W a e - s r v - m n . w o l d a e . c o m \ S t P a u l \ I S D 1 9 6 \ E S _ N ew \ 1 5 2 2 3 4 - N e w E l e m e n t a r y Sc h o o l \ 0 2 _ A R C H \ R e v i t \ 1 5 2 2 3 4 _ N E W 2 0 1 7 E L E M E N T A R Y ( C e nt r a l ) . r v t ISD #196: ROSEMOUNT - APPLE VALLEY -EAGAN PUBLIC SCHOOLS ELEMENTARY SCHOOL #20 A3 RENDERINGS ARDROE AVENUE ROSEMOUNT, MINNESOTA 55068 3455 153RD STREET WEST ROSEMOUNT, MINNESOTA 55068 NOT FOR CONSTRUCTION CITY SUBMITTAL DK JPOC 12/27/2023 232104 MINNESOTA 12/27/2023 R. SCOTT MCQUEEN 20155 ARCHITECT Revisions Description Date Num NOT TO SCALE RENDERING - OVERALL NOT TO SCALE RENDERING - MAIN ENTRY RENDERING - BUS ENTRY Page 151 of 221 C:\Users\jh\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I8FO6670\024361-000 ISD 196 Rosemount ES - Engineering Review Memo 20240115.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 55 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M Memorandum To: Brian Erickson, City Engineer Nick Egger, Director of Public Works From: Amanda Sachi PE Kris Keller, PE Date: January 15, 2024 Re: Independent School District 196 – Elementary School #20 Engineering Review WSB Project No. 024361-000 We have reviewed the documents provided by Wold and by Bolton & Menk on January 4, 2024. Documents reviewed include: • ISD 196 Elementary School #20 Site Plans, dated 12/27/2023 • ISD 196 Elementary School #20 Stormwater Summary, dated 12/27/2023 Additional redline comments are provided on the submitted civil plans. Applicant should provide responses to each comment and redline comment. We offer the following comments below. Engineering Review: 1. General a. The project consists of the construction of an elementary school campus with building, parking, and adjacent recreational and stormwater facilities 2. Site Demolition Plan a. No comments. 3. Geometric/Finishing Plans a. Call out locations and types of curb used on the site i. Identify areas of tipout curb b. The Bituminous trail should be 3" bituminous over 6" Class 5 (currently proposed as 2" bituminous over 6" Class 5 ) c. Intersection of Kaylemore Trail and Androe Avenue i. Incorporate a small radius from catch basin for right turning traffic from Kaylemore Trail ii. Verify need for additional stop sign along Kaylemore Trail at Androe Avenue for the rotation of the tee intersection iii. Provide a pedestrian ramp where the trail meets the curb at An droe Avenue near Kaylemore Trail iv. Show transitions (beavertails) at all curb terminations d. Verify the need for pedestrian ramps across the rear loading ramp 4. Grading Drainage and Erosion Control Plans Page 152 of 221 Independent School District 196 – Elementary School #20 Engineering Review January 15, 2024 Page 2 a. Provide/call out all EOFs for low points in the parking a reas and greenspaces b. Show all storm sewer (screened out) c. Provide all rim/inlet elevations d. Retaining walls exceeding 4’ in height shall require a plan prepared by a licensed engineer submitted for review and approval by the Building Official prior to permit issuance. i. Provide fences for safety e. Provide proposed contours (54-57) in the area of the loading ramp f. Direct drainage away from the building in the northern alternate area 5. Utility Plans a. Call out all proposed water fittings b. Fire Marshal to review fire coverage and emergency access i. Provide turning movements for access to hydrants on site c. Provide how access to the existing public sanitary sewer manholes in the easement will be maintained d. Insulate at crossings where the vertical separation between the water and the storm sewer is less than 36” e. Note the existing 8" gate valves on the water stubs from 2008 and 2021 are redundant with the 8” gate valves proposed. 6. Landscape Plans a. No comments. 7. Details & Specifications a. No comments. Page 153 of 221 C:\Users\jh\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I8FO6670\024361-000 ISD196 Elementary School Review Memo 20240116.docx 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 55 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M Memorandum To: Brian Erickson, City Engineer Nick Egger, Director of Public Works Anthony Nemcek, Senior Planner From: Bill Alms, PE Henry Meeker, EIT Date: January 16, 2024 Re: ISD 196 Elementary School 20 Stormwater Review WSB Project No. 024361-000 I have reviewed the documents provided by Bolton & Menk on January 4, 2024. Documents reviewed include: • ISD 196 Elementary School 20 Site Plans, dated 12/27/2023 • ISD 196 Elementary School 20 Stormwater Summary, dated 12/27/2023 Applicant should provide responses to each comment. I offer the following comments below. Grading, Drainage, and Erosion Control Comments: 1. General a. A NPDES permit will be required since over an acre of disturbance is proposed. b. Signed plans will be required for final permit approval. c. It is recommended to use existing regional basin 1618 (in the southeast corner of the site) in combination with proposed NURP cell grading to simplify regional system flows and increase site live storage. A sketch of this layout is provided on the Engineering Comments plan set. d. A higher level of engineering review is needed for the infiltration basin as it is located within a high-risk DWSMA region. i. More information on this higher level review can be found at https://stormwater.pca.state.mn.us/index.php?title=Guidance_and_recom mendations_for_conducting_a_higher_level_of_engineering_review_for_s tormwater_infiltration_in_DWSMAs_and_Wellhead_Protection_Areas . 2. Ponds and Wetlands a. Applicant to label all regional basins on the plans with the corresponding existing regional basin ID. b. Applicant to note snowmelt event high water levels for all basins on the grading plans. c. Applicant to show maintenance access routes to the proposed basins on the plans. The City Engineering guidelines note maintenance access paths should be a minimum width of 10 feet at 8% maximum grade and a maximum 2% cross slope. Page 154 of 221 ISD 196 Elementary School 20 Stormwater Review January 16, 2024 Page 2 C:\Users\jh\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I8FO6670\024361-000 ISD196 Elementary School Review Memo 20240116.docx d. Outfalls into proposed basins must be consolidated, FES 100 and 200 should be combined. e. Riprap at outfalls into proposed basins must be extended to the bottom of the proposed grading. This is applicable for FES 100, 200, 3030, and 305. f. The bottom elevation of the infiltration basin must match the NURP basin NWL of 940. An infiltration bench design may reduce earthwork and decrease the required basin footprint. g. The infiltration basin detail calls out shredded wood mulch on the basin surface, a topsoil or compost mixture is recommended instead. 3. Emergency Overflow Routes: a. Applicant to show the emergency overflow elevations and locations for all proposed basins and site low points on the plans. b. Localized low points north and west of the proposed building appear to have EOF elevations near the FFE. Applicant to call out these EOF elevations to ensure that 1’ of freeboard is provided to the FFE. 4. Retaining Walls: a. Not applicable. 5. Erosion Control: a. The SWPPP narrative must include street sweeping for dust control. b. Dual silt fence must be specified around proposed infiltrating surfaces until final stabilization has been reached to maintain soil permeability. c. Silt fence is required around delineated wetlands to ensure they are not degraded as a result of site disturbance. d. An erosion control note must be included specifying that final infiltration basin excavation will only be graded once site stabilization has been achieved. 6. Grading: a. Show grading limits on grading plan sheets. Stormwater Management Plan: 1. General Storm Sewer Design a. Storm sewer capacity calculations must be provided to confirm storm sewer is sized for the 10-year storm event. b. Roadway storm sewer design must match City standards of maximum 300’ spacing between catchbasins and a maximum inflow of 3 cfs for the 10-year storm event. c. Applicant to provide storm sewer profiles for review of routing and utility crossings. i. Crown matching is recommended where pipe size increases. d. Applicant to provide casting and structure tabulation summarizing proposed storm sewer structures. e. Applicant to use City storm sewer details. f. Applicant to show proposed draintile routing and tie-ins to storm sewer where specified for ag-lime and play area drainage. g. The furthest downstream storm sewer structure prior to draining to a pond must have a 3’ sump to capture sediment. h. Per City standard details, sheet piling will be required for all flared end sections on pipe diameters 24” and greater. Page 155 of 221 ISD 196 Elementary School 20 Stormwater Review January 16, 2024 Page 3 C:\Users\jh\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I8FO6670\024361-000 ISD196 Elementary School Review Memo 20240116.docx i. The final outlet of proposed stormwater basins must include a skimmer pipe to prevent floatables clogging and a sluice gate within the struc ture to limit outflows in major storm events. The City standard detail SD-12 is attached to this memo for reference of this OCS design. j. Storm sewer starting at STMH 219 must be 18” diameter or greater to prevent adverse effects from flow constriction of the existing 18” CMP leaving the basin on the northwest corner of the site. k. A storm sewer inlet is required to drain the proposed low point northwest of the baseball diamond. l. The following pipe slopes must be reviewed: i. STMH 104 to STMH 103 at 3% is too steep, full pipe flow velocities must be demonstrated as less than 10 ft/s. ii. STMH 105 to STMH 104 at 5.6% is too steep, full pipe flow velocities must be demonstrated as less than 10 ft/s. iii. CB 123 to CB 122 at 5.6% is too steep, full pipe flow velocities must be demonstrated as less than 10 ft/s. iv. CB 113 to CB 110 at 0.15% is too shallow, full pipe flow velocities must be demonstrated as above 3 ft/s to prevent pipe sedimentation. v. Any pipes to outfalls into ponds must have a full pipe flow velocity of 6 ft/s or less to prevent excessive scour. m. Landscaping plans should be reviewed to deconflict tree plantings over top utilities to prevent future root intrusion. 2. Water Quantity a. It appears that outdated storm event depths were specified for HydroCAD modeling. Design event depths should match the values outlined in the 2018 Rosemount CSWMP Section 5.3, policy 5. i. This CSWMP can be accessed at https://www.rosemountmn.gov/DocumentCenter/View/3788/2018- Rosemount-Surface-Water-Management-Plan. b. Land cover in proposed conditions modeling should be reviewed to ensure it matches proposed plan land cover. For example, proposed subbasin 33S shows woods land cover, but the site plan indicates primarily grassed land cover for pervious areas in the subbasin. 3. Rate/Volume Control a. No outflows are allowed offsite for storm events besides the snowmelt event, this includes the existing regional basin 1618 onsite. As noted, a City standard OCS is required at the outlet of the existing basin to manage these flows. b. The 10-day snowmelt modeling must be provided. The model must include time ranges sufficient to capture peak flows of the storm event. c. HydroCAD modeling must be set with Dyn-Stor-Ind routing to ensure tailwater effects are sufficiently modeled. 4. Freeboard a. No comments. 5. Water Quality a. The provided proposed HydroCAD model generates approximately 68,000 cubic feet of runoff in the 2.5” rain event from tributary areas to the stormwater basin. This is the controlling NURP dead storage, and the proposed 129,196 cubic feet of dead storage volume can be reduced accordingly. Page 156 of 221 ISD 196 Elementary School 20 Stormwater Review January 16, 2024 Page 4 C:\Users\jh\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\I8FO6670\024361-000 ISD196 Elementary School Review Memo 20240116.docx b. Infiltration area (not counting basin side slopes) must be provided for 1/12 ac- ft/ac/day for the entire site area. The following formula can be used to determine this area: 𝑅𝑐𝑞𝑞�ℎ𝑞𝑐𝑐 𝐴𝑞𝑐𝑎 (𝑎𝑐)=𝑅�ℎ𝑞𝑐 𝐴𝑞𝑐𝑎 (𝑎𝑐) 𝐼𝑛𝑐�ℎ𝑙𝑞𝑞𝑎𝑞�ℎ𝑛𝑛 𝑅𝑎𝑞𝑐 (�ℎ𝑛�𝑞⁄) ∗0.0416 (𝑐𝑛𝑛𝑞𝑐𝑞𝑞�ℎ𝑛𝑛 𝑐𝑎𝑐𝑞𝑛𝑞) c. For design purposes, a maximum infiltration rate of 3 in/hr will be considered by the City Engineer based on the high infiltration rates demonstrated in the provided infiltrometer testing. d. Final infiltration rates of the constructed basin will need to be shown as less than 8.3 in/hr based on NPDES permit requirements. Soils amendments will be required as needed to reach this upper limit. 6. Easements a. The drainage and utility easement over the proposed pipe between STMH 307 and FES 305 does not appear to be sufficiently sized. The easement must cover the excavation footprint of the pipe at a 1:1 ratio of pipe depth and horizontal travel. Page 157 of 221 M E M O R A N D U M To: Adam Kienberger, Community Development Director Anthony Nemcek, Senior Planner Julia Hogan, Planner From: Dan Schultz, Parks and Recreation Director Date: January 17, 2024 Subject: ISD 196 Elementary School Development The Parks and Recreation Department recently reviewed the plans for the ISD 196 Elementary School Development plans. After reviewing the plans, the Parks and Recreation Department staff has the following comments: Parks Dedication Staff is recommending that park dedication not be collected due to the public recreation spaces being created by the ISD 196 development plans for the elementary school. A large playground, hard court space, a ballfield and greenspaces are all part of the plans submitted by ISD 196. Please let me know if you have any questions about this memo. Page 158 of 221 EXECUTIVE SUMMARY Planning Commission Regular Meeting: January 23, 2024 Tenative City Council Meeting: February 20, 2024 AGENDA ITEM: Request by Spectro Alloys for approval of a preliminary plat, a site plan review, and a variance to construct a 70,000 square foot addition to the existing building at 13135 Doyle Path and combine the site into a single parcel. AGENDA SECTION: PUBLIC HEARINGS PREPARED BY: Anthony Nemcek , Senior Planner AGENDA NO. 6.c. ATTACHMENTS: Variance Resolution, Site Location, Preliminary Plat, Existing Conditions, Site Plan, Utility Plan, Utility Plan, Landscape Plan, Overall Impervious Exhibit, Concept Rendering, Elevations and Floor Plans, Site Aerials, Engineer's Memo dated January 15, 2024 APPROVED BY: AK RECOMMENDED ACTION: Motion by the Board of Appeals and Adjustments to approve a variance from the GI-General Industrial standards reducing the minimum setback from Courthouse Boulevard from 75 ft to 55 ft, subject to the platting of the overall Spectro Alloys site into a single parcel. Motion to recommend the City Council approve the Spectro Alloys Third Addition preliminary plat, subject to the following conditions: 1. Vacation of the Doyle Path right of way prior to final plat approval. 2. Dedication of any easements required by the City Engineer. 3. The applicant shall update the City regarding any changes in status related to a planned stormwater outlet beneath the railroad. Motion to approve the site plan for the Applicant’s proposed aluminum billet production facility, subject to the following conditions: 1. Approval of a variance to reduce the setback along Courthouse Boulevard from 75’ to 55’. 2. Approval of a final plat for Spectro Alloys Third Addition to combine the site into a single parcel. 3. Vacation of existing easements within the development area. 4. The applicant shall update the landscape plan to bring the number of trees and foundation plantings into conformation with the requirements of the zoning ordinance. 5. The screening wall shall be updated to match the billet expansion. 6. Existing easements internal to the subject property where the proposed building will be located shall be vacated prior to issuance of a building permit. 7. Conformance with all the requirements of the City’s engineer contained in the memorandum Page 159 of 221 dated January 15, 2024. BACKGROUND Applicant and Property Owner Spectro Alloys Site Location 13135 Courthouse Boulevard Site Area Billet Expansion Parcel: 6.15 Acres Overall Site Area: 36.16 Acres Land Use Designation General Industrial Current Zoning GI-General Industrial Surrounding Uses North: General and Heavy Industrial South: General Industrial and Waste Management East: General Industrial West: General Industrial The Planning Commission is being asked to consider three requests submitted to the City by Spectro Alloys to allow the applicant to construct a new building that will house manufacturing equipment that will produce aluminum billet. The applicant is requesting a variance due to site constraints created by the utilities located within Doyle Path. The overall Spectro Alloys site will be platted into a single parcel, and the applicant will be requesting the vacation of Doyle Path now that they own all the property served by the road. There will be public utilities that remain within the vacated right of way that limit how far from Courthouse Boulevard the applicant can position the new billet facility. Therefore, staff is recommending approval of the variance request. The second request is for approval of a preliminary plat that would combine the entire site into one parcel. The applicant is not requesting final plat approval at this time, but staff is recommending final plat approval as a condition of approval of the site plan since the site plan provided by the applicant would exceed the maximum lot coverage standard for the existing parcel formerly owned by Dahn Construction. By combining the overall site into a single parcel, the impervious percentage decreases to a point below the maximum. This is similar to a condition of approval of the warehouse/office building that required Spectro to plat the parcels it owned at that time into a single parcel. The final request by the applicant is for a site plan review of the new facility. The site plan includes the new building to be constructed as an addition to the existing building on site, which will remain. The applicant is also proposing an enclosed storage area. The submitted materials include renderings and a landscape plan that show how the overall appearance of the site will improve with the project. Staff is recommending approval of the site plan as well as the variance and preliminary plat requests, subject to conditions. SITE HISTORY Spectro Alloys was established in 1973, and its principal operation is as a secondary aluminum smelter. A primary aluminum smelter refines raw ore into aluminum ingots. A secondary aluminum smelter recycles existing aluminum scrap into ingots that are shipped to manufacturers. Spectro’s operation stores scrap aluminum in various areas on site, but mainly within an enclosed storage building south of the main function building. The scrap is normally shredded and sorted through the hammer mill Page 160 of 221 located on the far east side of the site adjacent to the railroad tracks. The shredded scrap is brought into the building and smelted in one of their two smelters. The smelted aluminum is poured into ingot molds. This process produces a number of waste streams including air emissions of metals from the smelting process. These air emissions are removed through a device called a baghouse (or filter house) which is essentially a metal box with a number of fabric socks or bags within it. The air travels through the fabric and the small particles (including metals) are removed. This debris is collected in bags. The debris is tested and is disposed of as either industrial or hazardous waste. In 2014, Spectro Alloys installed a new process at their facility that recycles aluminum without the need for smelting. The process, called Custom Clean Discharge, sorts shredded material into different metals or alloys through a system of conveyors that includes eddy currents to sort the material. Because the process involved the installation of new exterior equipment and outside storage in the northern portion of the site, the applicant applied for and was granted a Conditional Use Permit (CUP) for the project. This brought the overall amount of outdoor structures and equipment to 26% of the overall principal building coverage on the property (in excess of the 15% allowed under the code without a CUP). The City’s approval at that time specified that the total aggregate area of outdoor structures shall not exceed 30% of the total gross area of the principal building, and this provision still regulates outdoor structures and equipment on the site. A few years later, in 2018, Spectro Alloys made further improvements to their manufacturing process by installing two new aluminum furnaces used to recycle certain types of scrap aluminum that are currently shipped to other facilities in other states. This system replaced an older scrap dryer, resulting in process efficiencies and savings. The furnaces were fully enclosed in a new building addition, whereas the former dryer system was outside. The 2018 project included two main components: a building expansion of approximately 5,000 square feet, and significant property upgrades and improvements to accommodate the new equipment. The building addition enclosed a portion of the site that previously housed exterior equipment associated with the recycling operation, including the old scrap dryer. In its place, the applicant installed a new equipment pad with a modern filter house, exhaust stack, and other related structures. These site improvements required a side yard setback variance, which was approved by the Board of Adjustment and Appeals. Most recently, Spectro Alloys received approval to construct a new warehouse and office building. With the construction of this building, finished ingots no longer need to be delivered by truck to storage space near 117th Street in Inver Grove Heights. This has resulted in fewer truck trips and increased safety on Courthouse Boulevard. This project also included the surfacing of the parking area east of the new building with asphalt. These most recent improvements result in a general move toward a tidier site overall. Proposed Site Plan Spectro Alloys is proposing to add two new structures to their existing site along Courthouse Boulevard (State Highway 55) to produce aluminum billet and sheet ingots. Aluminum billet is used as raw material for extruders, who turn it into products like railings, window and door trim, and structural components for cars, boats, airplanes, trailers, docks, and more. Billets are shaped like long cylinders. Spectro will also recycle used beverage containers and other end of life aluminum products to produce Page 161 of 221 sheet ingot – high purity slabs of aluminum weighing up to 60,000 pounds each – a feedstock for rolling mills. In addition to the new building, the site plan shows the existing building being retained and an enclosed storage building being constructed in the western portion of the subject parcel. No changes to the site outside the subject parcel are proposed as a part of this project. Access to the project area will come from the to-be-vacated Doyle Path. While the buildings themselves will provide the most impactful screening of the less visually appealing aspects of the operation, the applicant’s landscape plan shows the land between the buildings and Courthouse Boulevard being bermed and planted with trees to improve the appearance of the site as viewed from the public right of way. The applicant has submitted architectural drawings of the proposed building, a storm water management plan, landscape plan, and other details concerning the site as required by the Zoning Ordinance. The next section of this report includes staff’s analysis of zoning requirements related to both the preliminary plat and the proposed site plan. Additionally, staff has received a written report from the City’s Project Engineer with most of the comments focused on plan details that will need to be addressed by the applicant. Preliminary Plat The applicant is proposing to plat the entire site, including the land most recently owned by Dahn Construction, into one single parcel. Additionally, when the applicant moves forward with final plat approval, they will be requesting the vacation of the Doyle Path right of way to convert that street into a private drive. Staff is supportive of the street vacation, which is the purview of the City Council, since it will release the City from responsibility for maintenance and snow removal. The final plat will also include easements for the public water infrastructure within Doyle Path that will remain following its vacation. At 36.16 acres, the proposed parcel to be created by the plat exceeds the minimum lot standard in the GI-General Industrial zoning district of 5 acres. There is no lot width minimum in this zoning district, and the lot coverage standard will be able to be calculated using the entire site rather than the existing parcel in which the proposed site plan is contained. A combination of lots owned by Spectro Alloys was a condition of approval for Spectro Alloy’s most recent project as it also would have exceeded the maximum lot coverage standard of 70% if it was only calculated based on the parcel in which the building was located. The same condition is being recommended for the current site plan as the proposed lot coverage of the subject parcel would be 74%. Lot Development Fees. The City has adopted a fee schedule that includes various access charges that apply to development of property within the City. These fees are typically paid at the time of platting, but because this area has already been platted and developed for industrial uses, the area trunk charges for water service will not apply to the project. The site is not served by public sanitary service and will not be required to pay these fees until such service is extended to the site. Finally, the City’s fee schedule does require newly developing properties to pay stormwater area and access charges based on the total acreage of the site. Staff is therefore recommending that trunk area water, sewer, and stormwater charges not be collected for the project. Individual connection charges for water (and potentially storm water Page 162 of 221 services) will be due at the time a building permit is issued based on the determined SAC unit count for the building. Based on the above analysis, the applicant will be required to pay the following fees at the time a building permit is issued. • Met Council Sewer Availability Charge: None • City Sanitary Sewer Availability Charge: None • City Water Availability Charge: Based on size of meter, ranging from $9,900 to $44,150 • Storm Water Connection Charge: None Site Plan and Design Review The purpose of a site plan review is to evaluate each project as it relates to the performance and site design standards of the zoning ordinance. Site plan approval is required for all commercial, industrial, institutional, and multi-family development projects. In this case, the applicant is proposing to construct a 72,845 square foot addition to the existing 10,000 square foot existing building and a 27,930 enclosed storage building that are subject to the site plan review process. Site plan applications are approved by the Planning Commission and considered a Quasi-Judicial action. As such, the City has a set of standards and requirements for review. Generally, if a site plan application meets the ordinance requirements, it must be approved. These standards are outlined in Section 11-4-16 (General Industrial District) and 11-10-3 (Site and Building Plan Review). The Planning Commission is the final authority for approval of site plans unless the matter is appealed to the City Council. Land Use & Zoning Standards. The subject property is guided for General Industrial uses in accordance with the 2040 Future Land Use Plan, which is a district that is intended to provide areas for manufacturing and warehousing activities and provide employment opportunities with higher paying wages for the community. The district purpose statement specifically notes that general industrial businesses normally generate noises, smells, vibrations, and truck traffic that can be disturbing to non-industrial land uses. The City has not expanded the areas devoted to the GI land use category in several years, but has allowed existing businesses and existing GI-guided sites to continue and improve and expand over time. The present zoning of the property is GI – General Industrial, and Spectro Alloys’ secondary aluminum smelting operation is considered a permitted use in this district (medium manufacturing and processing). Although the use is allowed and is consistent with the zoning of the property, there are some aspects of the Spectro Alloys site that are non-conforming in terms of dimensional standards due to the previous development on the site, specifically the amount of outside storage on the site and building setbacks. The site was first developed in 1973, and at that time the City did not limit outdoor storage in the General Industrial district, did not require parking and maneuvering areas to be paved, and the Mississippi River Critical Corridor Area (MRCCA) did not exist. Since 1973, the City has adopted zoning ordinances that included performance standards limiting outdoor storage, requiring the paving of parking and maneuvering areas, requiring a 40 foot building setback from the MRCCA bluff line, and requiring more substantial setbacks for industrial buildings. In general, any non-conforming aspects of Page 163 of 221 the site are allowed to continue, but cannot be expanded when new operations, processes, structures, or equipment is installed. With the current request, the applicant will be paving parking and maneuvering areas that have been gravel and increasing the overall size of the buildings, therefore bringing the property further into conformance with the City Code. No additional outdoor storage is being added, and existing storage areas will be paved and, in the case of the covered storage area, enclosed, which also brings the site further into conformance with the City Code. Lot and Building Standards. Staff is recommending three conditions that will need to be met for the proposed billet addition to meet the lot standards of the GI-General Industrial zoning district. These are the platting of the site into a single parcel with the rest of the Spectro Alloys site, the vacation of Doyle Path, and the approval of a variance from the minimum setback requirement from the property boundary along Courthouse Boulevard. The table below is based on the approval of a plat combing the entire site into a single parcel. Building Performance Standards for the GI – General Industrial District Standard Required Proposed Minimum Lot Size 5 acres 36.16 acres Front Setback 75 ft. 55 ft. Side Setback 50 ft. 350 ft. Rear Setback 50 ft. 592 ft. Front Parking Setback 40 ft. 144 ft. Side Parking Setback 25 ft. 505 ft. Maximum Lot Coverage 70% 46% Minimum Building Size 10% of property 15.6% of property Maximum Bldg. Height 75 ft. 58 ft. The other site requirement that has been reviewed with previous applications is the amount of outdoor structures permitted on the property. Outdoor structures are things like tanks, conveyors, and other equipment that support the principal use on the site but are not enclosed within a building. The GI – General Industrial district allows outdoor structures up to 15% of the total gross area of the principal building on a site, which can be exceeded with the approval of a Conditional Use Permit (CUP). Spectro Alloys requested, and was approved, for a CUP in 2014 that allows them to have up to 30% of the principal building area for outdoor structures and equipment. With the addition of the 63,272 square feet of warehouse building area constructed in 2022, this percentage fell below 15% and meets the GI district standard. With the addition of the proposed billet building, that percentage will fall even lower and into further conformance with the code. Access & Parking. The Zoning Ordinance requires that new uses provide a certain number of parking stalls based on the parking schedule found in Section 11-6-1 of the City Code. Focusing on the proposed site improvements, the applicant is not displacing any existing off-street parking areas as the areas being developed were used for outside storage by Dahn Construction. There will be no changes to the availability of parking in other portions of the site, so staff will not be reviewing the parking situation on the entire site. Staff considers the proposed use within the new Page 164 of 221 building “custom manufacturing”, which requires 1 stall per 300 square feet of retail space plus one stall per employee. Since there is no retail involved, the applicant is proposing 4 stalls, which is consistent with the expected number of employees working within the new building. Should the use of the site change, requiring more parking than currently required, there is room on the site for additional parking. This could be accomplished through striping the paved yard area or constructing additional parking lots on undeveloped portions of the site. As provided, staff finds the parking requirements of the zoning ordinance to be met. Site access was reconfigured as part of the previous addition of the warehouse and office building. All incoming traffic is routed to the Doyle Path entrance and traffic exiting onto Courthouse Boulevard does so at the private access further southeast. This traffic circulation will remain with the new billet expansion. Exterior Building Materials. The GI - General Industrial building materials standards require the portion of the building facing a public right-of-way to be constructed of a combination of glass, brick, natural stone, specialty integral colored concrete block (including textured, burnished, and rock faced block), tile (masonry, stone or clay), architectural textured concrete panels cast in place, precast concrete panels or better. The primary exterior building materials for the billet addition and covered storage building will be precast concrete wall panels. The building will feature a variation in the colors used to add a visual break to the relatively long expanse along all four sides. The architectural standards also include provisions for minimizing the impact of larger building massing and to provide visual interest at corners of the structure. The proposed use of windows in locations around the building will help address these requirements. The applicant is providing screening in the form of berming and landscaping in addition to a concrete screening wall along Courthouse Boulevard to shield the storage area from view. The code requires that any screening wall be made of the same materials as the principal building and shall not extend more than seventy feet (70') without a change in architecture to reduce its mass and appearance. The plans provided by the applicant do not meet this requirement. Therefore, staff is recommending the design of the wall along Courthouse Boulevard be updated to match the billet building. Landscaping and Berming. The City’s landscape ordinance (Section 11-6-3) requires that new developments include a minimum amount of landscaping, which includes a minimum number of trees based on the size of the site and exterior dimensions of the building. For the purposes of this analysis, the existing parcel (246,114 sf) will be used to determine the minimum number of trees. In addition to one foundation planting per 10 linear feet of building exterior, the code also requires that the perimeter measurement of the outdoor storage area shall be included in the calculation of required foundation plantings. These requirements, and the amount provided on the landscape plan, are as follows: Trees Requirement 1 tree per 3,000 square feet of land area Trees Required/Provided 82/26 Foundation Plantings Requirement 1 per 10 feet of building perimeter Page 165 of 221 Foundation Plants Required: 194/146 The landscape plan falls short of the minimum required by the code, and a condition of approval to provide additional trees on the landscape plan is included with staff’s recommendation. The trees shown on the landscape plan are mainly located along Courthouse Boulevard and concentrated near the covered storage to provide screening from the public right of way. Additional trees are shown along the Doyle Path right of way, which is now Spectro Alloy’s main entrance and will become a private drive upon vacation. Signage. There are no signs shown on the submitted plans. The applicant has expressed a desire to install a monument sign at the Doyle Path and Highway 55 intersection at some point in the future and will need to comply with the applicable sign regulations if a sign is installed in this location. If it hasn’t already been installed, directional signage ensuring incoming traffic enters the site at Doyle Path should be installed. Signage indicating that the original private drive further east is exit-only should also be provided. Exterior Lighting. The applicant’s lighting plan shows a combination of pole- and wall-mounted lights. The pole mounted lights are located along the northern boundary of the yard area, while the wall mounted lights are located around the billet building and near the entrance to the covered storage area. All lights will be mounted lower than 30’, the maximum for this site within the GI zoning district, at either 28’ or 24’. The photometric study shows illumination at the site boundaries to be less than the maximum of .5 lumens. Engineering The City’s engineer reviewed the plans and provided comments in a memorandum dated January 15, 2024, which is included in the attachments. Stormwater will be managed on site where it is collected and conveyed to the retention ponds in the north central portion of the Spectro site. The pond infrastructure was constructed with the warehouse project. The applicant is still working with the railroad to get permission to install an outlet under the tracks just north of the ponding. The site is not served by city sewer service, but a water main within the Doyle Path right of way provides municipal water to the site. Traffic and Pedestrian Circulation. The traffic circulation plan that has been put in place with the most recent project should continue providing improved safety for both vehicles and pedestrians accessing and traveling through the site. In particular. Sidewalks connecting the new building with parking and driving lanes is an improvement over the existing conditions on the site. With the warehouse project, the southeast corner of the Doyle Path cul-de-sac was modified to accommodate the now-current traffic pattern. In prior years, the applicant had been using Doyle Path for the stacking and parking of trucks waiting to load and unload at the site, which is not allowed under the City’s traffic regulations. A condition of approval of the warehouse building project was that stacking and parking of trucks on Doyle Path is not allowed. When staff visited the site, no stacking or parking was observed on Doyle Path. Parks and Open Space. Page 166 of 221 The area included in this application (that will ultimately be combined with the rest of the Spectro Alloys site) was platted and presumed to have paid any applicable park dedication fees associated with that subdivision. The applicant is not creating any new industrial lots and is therefore not required to pay any additional park dedication fees. Mississippi River Corridor Critical Area (MRCCA) Zoning. Spectro Alloys is located within the MRCCA area as designated in the Rosemount Comprehensive Plan and is therefore subject to any requirements and restrictions associated with this district. The specific MRCCA zoning is “urban mixed-district”, which does allow for development of sites within urban areas in accordance with the underlying local zoning classification. One aspect of the MRCAA zoning that does impact the overall site is the identification of a bluff impact zone along steep slopes that drain towards the Mississippi River. There are two primary lines that regulate the placement of buildings and structures (including parking areas) on the site, which include the top of the bluff and the bluff impact zone which extends out 20-feet from this line. No structures are allowed within the bluff impact zone, and the City’s ordinance requires a setback of 40 feet for all structures and roads. The project area is located outside the required bluff impact area, and no structures or roads will extend into the 40-foot setback area. VARIANCE The Planning Commission, acting as the Board of Appeals and Adjustments, is being asked to consider a variance as part of the applicant’s request. The proposed variance is a reduction of the front yard setback standard from 75’ to 55’. The variance request is based on the presumption that Doyle Path will be vacated, and the entire site will be platted into a single parcel. Therefore, the front yard will shift from Doyle Path to the side abutting Courthouse Boulevard. Were the site being developed from scratch, the findings to approve a variance would not be met since the applicant could simply shift the building further back from the Courthouse Boulevard right of way. The unique circumstance in this situation is that there are public utilities within the Doyle Path right of way that prevent the applicant from locating the building further from Courthouse Boulevard to meet the setback requirement. This infrastructure will remain even after the vacation of Doyle Path. Therefore, the applicant is requesting a variance to allow the building to be constructed 55’ from Courthouse Boulevard, 20’ closer than the setback standard allows. Variance Standards According to Section 11-12-2.G, there are five criteria for the Board of Appeals and Adjustments to review when considering a variance request. The five criteria used to assess each request along with staff’s findings for each are listed below. While weighing a variance request against these criteria, there are also two key issues to consider. The first is whether the applicant has reasonable use of their property without the variance. The second is whether the project can be redesigned to eliminate or reduce the need for a variance. The Board of Zoning Appeals must approve or deny each request based on findings related to each of the five standards. 1.The variance request is in harmony with the purposes and intent of the ordinance. Finding: Staff finds that the request is in harmony with the purposes and intend of the ordinance. The purpose of the GI General Industrial District is to provide for the establishment of both light and medium manufacturing uses. The GI General Industrial District is intended to include uses that may require outdoor and vehicle or trailer storage but exclude heavy industrial uses. Page 167 of 221 2.The variance is consistent with the comprehensive plan. Finding: The site is designated as General Industrial. The variance request is consistent with that designation. 3. The property owner proposes to use the property in a reasonable manner. Finding: Staff finds that the variance permits the property owner to use the property consistent with others in the GI-zoning district. 4. There are unique circumstances to the property which are not created by the landowner. Finding: Staff finds that there are unique circumstances to this property. Redevelopment of the site will occur within the context of existing infrastructure that cannot be relocated, and the variance request is in response to that context. 5. Granting of the variance does not alter the essential character of the locality. Finding: The essential character of the locality would not be altered by granting the variance. The proposed building and enclosed storage area are part of the Applicant’s ongoing improvements to their site by reducing the impact of outdoor storage and making use of new technology that results in less impact on nearby properties through reductions in noise and emissions. RECOMMENDATION Based on the information provided by the applicant and reviewed in this report, and on the findings made with regard to the requested variance, staff is recommending approval of the applicants request for approval of the proposed preliminary plat, site plan, and variance. The recommended approvals are subject to the conditions listed under each action in the Recommended Action section at the top of this report. Page 168 of 221 1 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION BA2024-01 A RESOLUTION APPROVING A VARIANCE REDUCING THE FRONT YARD SETBACK STANDARD IN THE GI-GENERAL INDUSTRIAL DISTRICT AT 13135 DOYLE PATH FROM 75’ TO 55’ WHEREAS, Spectro Alloys, (the “Applicants”) have submitted an application to the City of Rosemount (the “City”) for a variance from the GI-General Industrial district front yard setback standard for structures from seventy-five (75) feet to fifty-five (55) feet. WHEREAS, notice has been published, mailed and posted pursuant to the Rosemount Zoning Ordinance, Section 11-12-2; and WHEREAS, the Rosemount Board of Appeals and Adjustments held a public hearing for a variance from the 75’ front yard setback to 55’ on January 23, 2024; and NOW, THEREFORE, based on the testimony elicited and information received, the Rosemount Board of Appeals and Adjustments makes the following: FINDINGS 1. That the procedures for obtaining said Variance are found in the Rosemount Zoning Ordinance, Section 11-12-2. 2. That all the submission requirements of said Section 11-12-2 have been met by the Applicant. 3. That the proposed Variance will allow the construction of a 70,000 building addition and enclosed storage building because they encroach upon the front yard setback required by the Zoning Ordinance. 4. That the Variance will be located on property legally described as follows: Lots One through Three, Block 1, Hollenbach and Nelson 1st Addition, Dakota County, Minnesota. 5. That the request is in harmony with the purposes and intend of the ordinance. The purpose of the GI General Industrial District is to provide for the establishment of both light and medium manufacturing uses. The GI General Industrial District is intended to include uses that may require outdoor and vehicle or trailer storage but exclude heavy industrial uses. 6. The site is designated as General Industrial. The variance request is consistent with that designation. Page 169 of 221 2 7. The variance permits the property owner to use the property consistent with others in the GI-zoning district. 8. There are unique circumstances to this property. Redevelopment of the site will occur within the context of existing infrastructure that cannot be relocated, and the variance request is in response to that context. 9. The essential character of the locality would not be altered by granting the variance. The proposed building and enclosed storage area are part of the Applicant’s ongoing improvements to their site by reducing outdoor storage and making use of new technology that results in less impact on nearby properties through noise and emissions. CONCLUSIONS AND DECISION Based on the foregoing, the Applicant’s application for a Variance is granted, subject to the applicants receiving any required permits for the accessory structure. Passed and duly adopted this 23th day of January, 2024, by the Board of Appeals and Adjustments of the City of Rosemount, Minnesota. __________________________________ Melissa Kenninger, Chair ATTEST: ________________________________ Alysha Grant Community Development Technician Page 170 of 221 Page 171 of 221 C O U R T H O U S E B L V D C O U R T H O U S E B L V D CHICAGO & N O R T H W E S T E R N R A I L R O A D S 5 4 ° 0 6 ' 0 8 " E 1 9 8 9 . 1 8 N41 ° 3 6 ' 0 6 " E 1 9 4 . 8 3 L=1237.45 R =1960.08Δ=36°10'20" N80°26'15"E 3 9 5 . 2 5 L = 1 8 9 4 . 7 0 R = 7 6 9 . 0 2 Δ = 1 4 1 ° 0 9 ' 5 2 " C H = 1 4 5 0 . 5 6 C H B = N 2 8 ° 5 8 ' 4 9 " W L=941.49 R =5779.65 Δ =9°20'00" C H =940.45 C H B = N 58°46'08" W S6 3 ° 2 3 ' 2 5 " E 27 8 . 2 4 LOT 1 BLOCK 1 The following described property is proposed to be replatted into 1 Block and 1 Lot by combining two plats vacated Doyle Path. The plat is proposed to be named SPECTRO ALLOYS THIRD ADDITION. LEGAL DESCRIPTION OF PROPERTY TO BE PLATTED Parcel 1: The plats of HOLLENBACK & NELSON, INC. FIRST ADDITION and SPECTRO ALLOYS THIRD ADDITION, Dakota County, Minnesota, according to the record plat thereof. (Being Abstract Property) Parcel 2: Vacated Doyle Path dedicated as public right-of-way per the plats of HOLLENBACK & NELSON, INC. FIRST ADDITION and SPECTRO ALLOYS ADDITION. (Doyle Path is proposed to be be vacated) PID/OWNER / PROPERTY ADDRESS: PID: 34-3340-02-031 Pine Bend Recycling LLC, 13135 Doyle Path, Rosemount, MN 55068 ZONING: IP, INDUSTRIAL PARK DATE OF PREPLAT DECEMBER 20, 2023 AREA SUMMARY TOTAL AREA TO BE PLATTED = 1,583,904 S.F. (36.361 AC.) SURVEYOR: STANTEC GARY BJORKLUND LS 46563 PHONE: 763-479-5128 gary.bjorklund@stantec.com LEGEND Page 172 of 221 DOYLE PATH COURTHOUSE BLVD (TRUNK HIGHWAY NO. 55) LOT 1 LOT 2 LOT 3 BLOCK 2 Δ TR U C K S C A L E V A N G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G 88588 5885 8 8 5 890 890 89 5 895 900 900 900 9 0 0 9 0 5 91 0 88 6 8 8 6 887 8 8 7 888 88888 9 889 891 89 1 892 8 9 2 8 9 2 892893 89 3 893 89 3 8 9 3 893 894 89 4 894 894 89 6 896 89 7 89 7 89 8 898 898 89 8 899 899 8 9 9 901 901 90 1 901 902 902 90 2 902 903 903 9 0 3 904904 9 0 4 9 0 6 9 0 7 9 0 8 9 0 9 885 89 0 8 9 5 900 905 9 0 5 884 886 887 888 889 891 8 9 2 8 9 3 8 9 4 8 9 6 897 898899 901902 903 903 904 90 4 906 9 0 6 890 89 5 90 0 9 0 5 891 89 2 893894 8 9 6 8 9 7 8 9 8 89 9 9 0 1 9 0 2 90 2 902 90 3 9 0 4 90 4 9 0 4 906 906 906 8 9 5 9 0 0 89 3 8 9 4 8 9 6 8 9 7 8 9 8 8 9 9 9 0 1 90 2 SHEET NUMBER 12/20/20231 SURVEY APPROVED DESIGNED DRAWN PROJ. NO. WA S P R E P A R E D B Y M E O R U N D E R M Y D I R E C T S U P E R V I S I O N I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N , O R R E P O R T AN D T H A T I A M A D U L Y L I C E N S E D UN D E R T H E L A W S O F T H E S T A T E O F M I N N E S O T A PR I N T N A M E : SI G N A T U R E : DA T E : LI C . N O . CHECKED Pl o t D a t e : 1 2 / 2 0 / 2 0 2 3 - 2 : 1 1 p m Dr a w i n g n a m e : \ \ u s 0 2 4 2 - p p f s s 0 1 \ s h a r e d _ p r o j e c t s \ 1 9 3 8 0 6 0 0 6 \ 1 9 3 8 0 6 0 0 6 B I L L E T P R O D U C T I O N S F A C I L I T Y \ 5 _ D E S I G N \ 1 _ C A D \ 3 P L A N S H E E T S \ C - 0 0 2 E X I S T I N G C O N D I T I O N S 1 9 3 8 0 6 0 0 6 . d w g Xr e f s : , x - S U R V , x - T T L B , S R 5 5 _ o f f s i t e , x - S I T E C O M P L E T E D D E S I G N 2 1 4 2 , S R 5 5 _ u t i l i t i e s TH E C O N T R A C T O R S H A L L V E R I F Y A N D B E R E S P O N S I B L E F O R A L L D I M E N S I O N S . D O N O T S C A L E T H E DR A W I N G - A N Y E R R O R S O R O M I S S I O N S S H A L L B E R E P O R T E D T O S T A N T E C W I T H O U T D E L A Y . TH E C O P Y R I G H T S T O A L L D E S I G N S A N D D R A W I N G S A R E T H E P R O P E R T Y O F S T A N T E C . R E P R O D U C T I O N OR U S E F O R A N Y P U R P O S E O T H E R T H A N T H A T A U T H O R I Z E D B Y S T A N T E C I S F O R B I D D E N . SP E C T R O B I L L E T E X P A N S I O N RO S E M O U N T , M N 193806006 73 3 M a r q u e t t e A v e n u e , S u i t e 1 0 0 0 Mi n n e a p o l i s , M N 5 5 4 0 2 ww w . s t a n t e c . c o m STANTEC SAG SAG DML DML PR O F E S S I O N A L E N G I N E E R MI N N E S O T A . SITE PLAN REVIEW APPLICATION ( IN FEET ) GRAPHIC SCALE 0 1 inch = 40 ft. 40 8040 X X EASEMENT LINE SETBACK LINE EXISTING FENCE LINE EXISTING STORM SEWER EXISTING SANITARY SEWER EXISTING WATERMAIN G G EXISTING UNDERGROUND GAS LINE COM EXISTING UNDERGROUND COMM LINE F/O F/O EXISTING UNDERGROUND FIBER OPTIC LINE UE UE EXISTING UNDERGROUND ELECTRIC LINE OU EXISTING OVERHEAD UTILITY LINE EXISTING EDGE OF PAVEMENT EXISTING EDGE OF GRAVEL EXISTING TREE LINE EXISTING CONCRETE SURFACE EXISTING GRAVEL SURFACE EXISTING BUILDING EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPERTY BOUNDARY EXISTING CURB AND GUTTER EXISTING SANITARY MANHOLE EXISTING STORM SEWER MANHOLE EXISTING STORM SEWER INLET EXISTING STORM SEWER INLET EXISTING FLARED END SECTION EXISTING HYDRANT DYH EXISTING UTILITY POLE LEGEND C-002 EX I S T I N G C O N D I T I O N S Page 173 of 221 DOYLE PATH COURTHOUSE BLVD (TRUNK HIGHWAY NO. 55) TR U C K S C A L E V A N X X X X X X X X X X X X X X X EXISTING BUILDING FFE: 897.67 PROPOSED BUILDING FFE: 897.67 FFE SW: 897.17 CANOPY COVERED STORAGE AREA 27,810 SF 30' R2 0 ' R10 ' R 1 0 ' 34 ' 243.9' 11 4 ' CANOPY COVERED STORAGE AREA 27,930 SF 81.4' R2 0 ' 310.7' 96 . 5 ' 34.4' 2.4 29 0 . 3 ' 55 ' S E T B A C K R10' 55' 2.5 1.10 2.1 2.1 2.1 1.2 1.2 1.3 1.7 1.6 1.5 2.1 1.8 1.8 1.8 9' 2.2 2.9 2.3 20' PROPOSED WATERMAIN EASEMENT 20 ' P R O P O S E D WA T E R M A I N EA S E M E N T 20' PROPOSED WATERMAIN EASEMENT 1.1 1.1 1.1 2.1 2.6 1.4 1.11 1.3 2.7 20' PROPOSED WATERMAIN EASEMENT SHEET NUMBER 12/20/20231 SURVEY APPROVED DESIGNED DRAWN PROJ. NO. WA S P R E P A R E D B Y M E O R U N D E R M Y D I R E C T S U P E R V I S I O N I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N , O R R E P O R T AN D T H A T I A M A D U L Y L I C E N S E D UN D E R T H E L A W S O F T H E S T A T E O F M I N N E S O T A PR I N T N A M E : SI G N A T U R E : DA T E : LI C . N O . CHECKED Pl o t D a t e : 1 2 / 2 0 / 2 0 2 3 - 2 : 1 3 p m Dr a w i n g n a m e : \ \ u s 0 2 4 2 - p p f s s 0 1 \ s h a r e d _ p r o j e c t s \ 1 9 3 8 0 6 0 0 6 \ 1 9 3 8 0 6 0 0 6 B I L L E T P R O D U C T I O N S F A C I L I T Y \ 5 _ D E S I G N \ 1 _ C A D \ 3 P L A N S H E E T S \ C - 1 0 1 S I T E P L A N 1 9 3 8 0 6 0 0 6 . d w g Xr e f s : , x - S U R V , x - S I T E , x - T T L B , x - B L D G B I L L E T , x - S I T E C O M P L E T E D D E S I G N 2 1 4 2 , S R 5 5 _ o f f s i t e , S R 5 5 _ u t i l i t i e s TH E C O N T R A C T O R S H A L L V E R I F Y A N D B E R E S P O N S I B L E F O R A L L D I M E N S I O N S . D O N O T S C A L E T H E DR A W I N G - A N Y E R R O R S O R O M I S S I O N S S H A L L B E R E P O R T E D T O S T A N T E C W I T H O U T D E L A Y . TH E C O P Y R I G H T S T O A L L D E S I G N S A N D D R A W I N G S A R E T H E P R O P E R T Y O F S T A N T E C . R E P R O D U C T I O N OR U S E F O R A N Y P U R P O S E O T H E R T H A N T H A T A U T H O R I Z E D B Y S T A N T E C I S F O R B I D D E N . SP E C T R O B I L L E T E X P A N S I O N RO S E M O U N T , M N 193806006 73 3 M a r q u e t t e A v e n u e , S u i t e 1 0 0 0 Mi n n e a p o l i s , M N 5 5 4 0 2 ww w . s t a n t e c . c o m STANTEC SAG SAG DML DML PR O F E S S I O N A L E N G I N E E R MI N N E S O T A . SITE PLAN REVIEW APPLICATION ( IN FEET ) GRAPHIC SCALE 0 1 inch = 40 ft. 40 8040 NOTES EASEMENT LINE SETBACK LINE RIGHT OF WAY LINE PROPERTY BOUNDARY LEGEND CURB AND GUTTER GRASS / LANDSCAPING PROPOSED PARKING COUNT BITUMINOUS PAVEMENT CONCRETE SIDEWALK X X FENCE RETAINING WALL [BY OTHERS] # STORM MANHOLE STORM CATCH BASIN SANITARY MANHOLE HYDRANT 1.ALL DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED 2.DESIGN BY OTHERS ITEMS SHOWN FOR REFERENCE ONLY. EXACT LOCATION, DETAIL, AND DESIGN BY OTHERS. COORDINATE WITH PROJECT PARTNERS TO OBTAIN RELATED CONSTRUCTION DOCUMENTS/DRAWINGS KEYNOTES # 1.STANTEC DESIGN ITEM 1.1.MATCH EXISTING 1.2.CONCRETE PAVEMENT - SEE DETAIL 3/C-802 1.3.BITUMINOUS PAVEMENT - SEE DETAIL 4/C-802 1.4.B612 CURB AND GUTTER - SEE DETAIL 10/C-803 1.5.ADA ACCESSIBLE AISLE W/ SIGN - SEE DETAILS 5,7,8/C-803 1.6.ADA VAN ACCESSIBLE PARKING STALL W/ SIGN - SEE DETAILS 5,6,7,8/C-803 1.7.4" WHITE PAINT STRIPE (TYP.) - SEE DETAIL 9/C-803 1.8.PATCH BITUMINOUS - MATCH EXISTING SECTION 1.9.STOP SIGN - SEE DETAIL 5,7/C-803 1.10.RECESSED LOADING DOCK 1.11.PATCH GRAVEL - MATCH EXISTING SECTION 2.DESIGN BY OTHERS - SEE NOTE 2 2.1.DOOR LOCATION WITH STOOP, MAY HAVE STAIRS - SEE ARCHITECTURAL/STRUCTURAL PLANS 2.2.FENCE 2.3.TRANSFORMER 2.4.SEPTIC TANK 2.5.WATER TANK 2.6.RETAINING WALL 2.7.BAGHOUSE LOCATION C-101 SI T E P L A N Page 174 of 221 DOYLE PATH COURTHOUSE BLVD (TRUNK HIGHWAY NO. 55) TR U C K S C A L E V A N G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G X X X X X X X X X X X X X X X EXISTING BUILDING FFE: 897.67 PROPOSED BUILDING FFE: 897.67 FFE SW: 897.17 CANOPY COVERED STORAGE AREA 27,810 SF ►► ► ► ► ► ► ► ► ► ►► ►► ►► ►► ►► ►► ►► ►► ►► 900 900 9 0 0 89 6 8 9 6 8 9 7 8 9 8 8 9 9 901 ►►►► ► ► ►►►►►►►►►►►►►►►► ►►►►►► ►► ►► ►► ►►►►►►►►►► ►► ►► ►► ►► ►► ► ► ► ► ► ► ► ► ► ► 0+0 0 1+ 0 0 2+ 0 0 2 + 5 0 SANITARY SEWER BLDG CONNECTION 8" INV OUT=872.00 (NE) EX SSWR CO 03 CONTRACTOR TO VERIFY INVERT, MATERIAL, AND LOCATION IN FIELD RIM=885.82 8" INV IN=868.41 (W) DOMESTIC WATER SERVICE BUILDING CONNECTION VERIFY INVERT, MATERIAL, AND LOCATION WITH MEP PLANS 20 ' W A T E R M A I N EA S E M E N T 2 0 ' W A T E R M A I N E A S E M E N T 20' WATERMAIN EASEMENT 102 LF OF 8" PVC @ 2.00% 68 LF O F 8 " P V C @ 2 . 0 0 % 12" 45° BEND 12" 45° BEND 12" DIP I I I I 12"X6" TEE SANITARY SEWER SEPTIC CONNECTION RIM=870.74 8" INV IN=869.97 (SW) I I 12" 45° VERTICAL BEND 12" DIP 12" 45° VERTICAL BEND 12" DIP 12" BLOWOFF VALVE 12 " D I P 12" 45° BEND 12" 45° BEND 6" DIP 6" GV 12"X6" TEE 900 905 901902 903 904 906 907908 909 890 88 6 8 8 7 8 8 8 8 8 9 89 0 88 6 88 7 88 8 88 9 89 1 89 2 89 3890890 89 5 89189289389 4 90 5 90 6 90 7 90 8 90 9 8 9 6 89 6 897 8 9 7 ELEVATION 887.5 FROM CITY OF ROSEMOUNT AS BUILTS STA: 265+00 CONTRACTOR TO FIELD VERIFY ELEVATION, MATERIAL, AND LOCATION ELEVATION 881.5 FROM CITY OF ROSEMOUNT AS BUILTS STA: 259+40 ►►►► ►►►►►► ► ► ► ► ► ► RAISE HYDRANT TO FINISH GRADE SHEET NUMBER 12/20/20231 SURVEY APPROVED DESIGNED DRAWN PROJ. NO. WA S P R E P A R E D B Y M E O R U N D E R M Y D I R E C T S U P E R V I S I O N I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N , O R R E P O R T AN D T H A T I A M A D U L Y L I C E N S E D UN D E R T H E L A W S O F T H E S T A T E O F M I N N E S O T A PR I N T N A M E : SI G N A T U R E : DA T E : LI C . N O . CHECKED Pl o t D a t e : 1 2 / 2 0 / 2 0 2 3 - 2 : 1 9 p m Dr a w i n g n a m e : \ \ u s 0 2 4 2 - p p f s s 0 1 \ s h a r e d _ p r o j e c t s \ 1 9 3 8 0 6 0 0 6 \ 1 9 3 8 0 6 0 0 6 B I L L E T P R O D U C T I O N S F A C I L I T Y \ 5 _ D E S I G N \ 1 _ C A D \ 3 P L A N S H E E T S \ C - 4 0 1 U T I L I T Y P L A N 1 9 3 8 0 6 0 0 6 . d w g Xr e f s : , x - S U R V , x - S I T E , x - T T L B , x - B L D G B I L L E T , x - S I T E C O M P L E T E D D E S I G N 2 1 4 2 , S R 5 5 _ o f f s i t e , S R 5 5 _ u t i l i t i e s TH E C O N T R A C T O R S H A L L V E R I F Y A N D B E R E S P O N S I B L E F O R A L L D I M E N S I O N S . D O N O T S C A L E T H E DR A W I N G - A N Y E R R O R S O R O M I S S I O N S S H A L L B E R E P O R T E D T O S T A N T E C W I T H O U T D E L A Y . TH E C O P Y R I G H T S T O A L L D E S I G N S A N D D R A W I N G S A R E T H E P R O P E R T Y O F S T A N T E C . R E P R O D U C T I O N OR U S E F O R A N Y P U R P O S E O T H E R T H A N T H A T A U T H O R I Z E D B Y S T A N T E C I S F O R B I D D E N . SP E C T R O B I L L E T E X P A N S I O N RO S E M O U N T , M N 193806006 73 3 M a r q u e t t e A v e n u e , S u i t e 1 0 0 0 Mi n n e a p o l i s , M N 5 5 4 0 2 ww w . s t a n t e c . c o m STANTEC SAG SAG DML DML PR O F E S S I O N A L E N G I N E E R MI N N E S O T A . SITE PLAN REVIEW APPLICATION ( IN FEET ) GRAPHIC SCALE 0 1 inch = 40 ft. 40 8040 EASEMENT LINE SETBACK LINE RIGHT OF WAY LINE PROPERTY BOUNDARY LEGEND EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING SANITARY MANHOLE EXISTING CLEANOUT EXISTING STORM SEWER MANHOLE EXISTING STORM SEWER INLET EXISTING STORM SEWER INLET EXISTING FLARED END SECTION EXISTING HYDRANT EXISTING WATER VALVE WV DYH EXISTING STORM SEWER EXISTING SANITARY SEWER EXISTING WATERMAIN ►►►►STORM SEWER ►►SANITARY SEWER I I WATERMAIN STORM MANHOLE STORM CATCH BASIN SANITARY MANHOLE HYDRANT GATE VALVE FLARED END SECTION PROPOSED MINOR CONTOUR901 PROPOSED MAJOR CONTOUR900 C-401 UT I L I T Y P L A N Page 175 of 221 DOYLE PATH COURTHOUSE BLVD (TRUNK HIGHWAY NO. 55) TR U C K S C A L E V A N G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G X X X X X X X X X X X X X X X EXISTING BUILDING FFE: 897.67 PROPOSED BUILDING FFE: 897.67 FFE SW: 897.17 CANOPY COVERED STORAGE AREA 27,810 SF ►► ► ► ► ► ► ► ► ► ►► ►► ►► ►► ►► ►► ►► ►► ►► 900 900 9 0 0 89 6 8 9 6 8 9 7 8 9 8 8 9 9 901 ►►►► ► ► ►►►►►►►►►►►►►►►► ►►►►►► ►► ►► ►► ►►►►►►►►►► ►► ►► ►► ►► ►► ► ► ► ► ► ► ► ► ► ► 0+0 0 1+ 0 0 2+ 0 0 2 + 5 0 SANITARY SEWER BLDG CONNECTION 8" INV OUT=872.00 (NE) EX SSWR CO 03 CONTRACTOR TO VERIFY INVERT, MATERIAL, AND LOCATION IN FIELD RIM=885.82 8" INV IN=868.41 (W) DOMESTIC WATER SERVICE BUILDING CONNECTION VERIFY INVERT, MATERIAL, AND LOCATION WITH MEP PLANS 20 ' W A T E R M A I N EA S E M E N T 2 0 ' W A T E R M A I N E A S E M E N T 20' WATERMAIN EASEMENT 102 LF OF 8" PVC @ 2.00% 68 LF O F 8 " P V C @ 2 . 0 0 % 12" 45° BEND 12" 45° BEND 12" DIP I I I I 12"X6" TEE SANITARY SEWER SEPTIC CONNECTION RIM=870.74 8" INV IN=869.97 (SW) I I 12" 45° VERTICAL BEND 12" DIP 12" 45° VERTICAL BEND 12" DIP 12" BLOWOFF VALVE 12 " D I P 12" 45° BEND 12" 45° BEND 6" DIP 6" GV 12"X6" TEE 900 905 901902 903 904 906 907908 909 890 88 6 8 8 7 8 8 8 8 8 9 89 0 88 6 88 7 88 8 88 9 89 1 89 2 89 3890890 89 5 89189289389 4 90 5 90 6 90 7 90 8 90 9 8 9 6 89 6 897 8 9 7 ELEVATION 887.5 FROM CITY OF ROSEMOUNT AS BUILTS STA: 265+00 CONTRACTOR TO FIELD VERIFY ELEVATION, MATERIAL, AND LOCATION ELEVATION 881.5 FROM CITY OF ROSEMOUNT AS BUILTS STA: 259+40 ►►►► ►►►►►► ► ► ► ► ► ► RAISE HYDRANT TO FINISH GRADE SHEET NUMBER 12/20/20231 SURVEY APPROVED DESIGNED DRAWN PROJ. NO. WA S P R E P A R E D B Y M E O R U N D E R M Y D I R E C T S U P E R V I S I O N I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N , O R R E P O R T AN D T H A T I A M A D U L Y L I C E N S E D UN D E R T H E L A W S O F T H E S T A T E O F M I N N E S O T A PR I N T N A M E : SI G N A T U R E : DA T E : LI C . N O . CHECKED Pl o t D a t e : 1 2 / 2 0 / 2 0 2 3 - 2 : 1 9 p m Dr a w i n g n a m e : \ \ u s 0 2 4 2 - p p f s s 0 1 \ s h a r e d _ p r o j e c t s \ 1 9 3 8 0 6 0 0 6 \ 1 9 3 8 0 6 0 0 6 B I L L E T P R O D U C T I O N S F A C I L I T Y \ 5 _ D E S I G N \ 1 _ C A D \ 3 P L A N S H E E T S \ C - 4 0 1 U T I L I T Y P L A N 1 9 3 8 0 6 0 0 6 . d w g Xr e f s : , x - S U R V , x - S I T E , x - T T L B , x - B L D G B I L L E T , x - S I T E C O M P L E T E D D E S I G N 2 1 4 2 , S R 5 5 _ o f f s i t e , S R 5 5 _ u t i l i t i e s TH E C O N T R A C T O R S H A L L V E R I F Y A N D B E R E S P O N S I B L E F O R A L L D I M E N S I O N S . D O N O T S C A L E T H E DR A W I N G - A N Y E R R O R S O R O M I S S I O N S S H A L L B E R E P O R T E D T O S T A N T E C W I T H O U T D E L A Y . TH E C O P Y R I G H T S T O A L L D E S I G N S A N D D R A W I N G S A R E T H E P R O P E R T Y O F S T A N T E C . R E P R O D U C T I O N OR U S E F O R A N Y P U R P O S E O T H E R T H A N T H A T A U T H O R I Z E D B Y S T A N T E C I S F O R B I D D E N . SP E C T R O B I L L E T E X P A N S I O N RO S E M O U N T , M N 193806006 73 3 M a r q u e t t e A v e n u e , S u i t e 1 0 0 0 Mi n n e a p o l i s , M N 5 5 4 0 2 ww w . s t a n t e c . c o m STANTEC SAG SAG DML DML PR O F E S S I O N A L E N G I N E E R MI N N E S O T A . SITE PLAN REVIEW APPLICATION ( IN FEET ) GRAPHIC SCALE 0 1 inch = 40 ft. 40 8040 EASEMENT LINE SETBACK LINE RIGHT OF WAY LINE PROPERTY BOUNDARY LEGEND EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING SANITARY MANHOLE EXISTING CLEANOUT EXISTING STORM SEWER MANHOLE EXISTING STORM SEWER INLET EXISTING STORM SEWER INLET EXISTING FLARED END SECTION EXISTING HYDRANT EXISTING WATER VALVE WV DYH EXISTING STORM SEWER EXISTING SANITARY SEWER EXISTING WATERMAIN ►►►►STORM SEWER ►►SANITARY SEWER I I WATERMAIN STORM MANHOLE STORM CATCH BASIN SANITARY MANHOLE HYDRANT GATE VALVE FLARED END SECTION PROPOSED MINOR CONTOUR901 PROPOSED MAJOR CONTOUR900 C-401 UT I L I T Y P L A N Page 176 of 221 DOYLE PATH COURTHOUSE BLVD (TRUNK HIGHWAY NO. 55) TR U C K S C A L E V A N G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G X X X X X X X X X X X X X X X X X X X X EXISTING BUILDING FFE: 897.67 PROPOSED BUILDING FFE: 897.67 CANOPY COVERED STORAGE AREA 27,930 SF 20' WATERMAIN EASEMENT ► ► ► ► ► ► ► ► ►►►► ► ► ► ► ► ► ►► ►► ►► ►► ►► ►► ►► ►► ►► ►► ►► ►► ►► ►►►►►► ►►►►►►►►►►►►►►►►►►►► ►►►►►►►►►► ►► ►► ►► ►► ►► ►►►►►►►►►►►► ►► ►► ►► ►► ►► ►► ►► ►► ► ► ► ► ► ► ► ► ► ► ► ► ► ► ►► 895 9 0 0 893894 896897898899 9 0 1 90 2 902 903 9 0 3 904 90 4 90 7 908 909 890 89 5 89 5 886 887 888889891892893 89 4 89 4 89 6 89 6 89 7 89 7 I I I I I I 3'-0" LANDSCAPE MAINTENANCE STRIP EDGER, TYPICAL ►► I I I ROCK MULCH WOOD MULCH EDGER, TYP. ►►►►►► ► ► ►►►►►►►► ► ► ► ► ► ► ► ► ► ► SHEET NUMBER 12/20/20231 SURVEY APPROVED DESIGNED DRAWN PROJ. NO. WA S P R E P A R E D B Y M E O R U N D E R M Y D I R E C T S U P E R V I S I O N I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N , O R R E P O R T AN D T H A T I A M A D U L Y L I C E N S E D UN D E R T H E L A W S O F T H E S T A T E O F M I N N E S O T A PR I N T N A M E : SI G N A T U R E : DA T E : LI C . N O . CHECKED Pl o t D a t e : 1 2 / 2 0 / 2 0 2 3 - 2 : 2 7 p m Dr a w i n g n a m e : \ \ U S 0 2 4 2 - P P F S S 0 1 \ s h a r e d _ p r o j e c t s \ 1 9 3 8 0 6 0 0 6 \ 1 9 3 8 0 6 0 0 6 B I L L E T P R O D U C T I O N S F A C I L I T Y \ 5 _ D E S I G N \ 1 _ C A D \ 3 P L A N S H E E T S \ L - 1 0 1 L A N D S C A P E P L A N 1 9 3 8 0 6 0 0 6 . d w g Xr e f s : , x - S U R V , x - S I T E , x - T T L B , x - B L D G B I L L E T , x - S I T E C O M P L E T E D D E S I G N 2 1 4 2 , S R 5 5 _ o f f s i t e , S R 5 5 _ u t i l i t i e s TH E C O N T R A C T O R S H A L L V E R I F Y A N D B E R E S P O N S I B L E F O R A L L D I M E N S I O N S . D O N O T S C A L E T H E DR A W I N G - A N Y E R R O R S O R O M I S S I O N S S H A L L B E R E P O R T E D T O S T A N T E C W I T H O U T D E L A Y . TH E C O P Y R I G H T S T O A L L D E S I G N S A N D D R A W I N G S A R E T H E P R O P E R T Y O F S T A N T E C . R E P R O D U C T I O N OR U S E F O R A N Y P U R P O S E O T H E R T H A N T H A T A U T H O R I Z E D B Y S T A N T E C I S F O R B I D D E N . SP E C T R O B I L L E T E X P A N S I O N RO S E M O U N T , M N 193806006 73 3 M a r q u e t t e A v e n u e , S u i t e 1 0 0 0 Mi n n e a p o l i s , M N 5 5 4 0 2 ww w . s t a n t e c . c o m STANTEC SAG SAG DML DML PR O F E S S I O N A L E N G I N E E R MI N N E S O T A . SITE PLAN REVIEW APPLICATION ( IN FEET ) GRAPHIC SCALE 0 1 inch = 30 ft. 30 6030 L-101 LA N D S C A P E P L A N ZONED: IP - INDUSTRIAL PARK 1.1 TREE PER 3,000 SF LAND AREA: 77,914 SF 1.1.TOTAL TREES REQUIRED:26 1.2.TOTAL TREES PROPOSED 26 2.1 FOUNDATION PLANTING PER 10 LINEAR FEET OF BUILDING: 1,430 LF 2.1.TOTAL PLANTS REQUIRED:143 2.2.TOTAL PLANTS PROPOSED:146 3.VEGETATIVE SCREENING OF INDUSTRIAL STORAGE: PROVIDED MUNICIPAL CALCULATIONS 1.SEE SHEET L-801 FOR DETAILS, NOTES AND PLANT SCHEDULE. NOTES LOT LINE EASEMENT LINE SETBACK LINE RIGHT OF WAY LINE PROPERTY BOUNDARY LEGEND ROCK MULCH, SEE LANDSCAPE NOTES LOW MAINTENANCE TURF, SEE TURF RESTORATION NOTES WA S P R E P A R E D B Y M E O R U N D E R M Y D I R E C T S U P E R V I S I O N I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N , O R R E P O R T AN D T H A T I A M A D U L Y L I C E N S E D L A N D S C A P E A R C H I T E C T UN D E R T H E L A W S O F T H E S T A T E O F M I N N E S O T A Page 177 of 221 DOYLE PATH D O Y L E P A T H COURTHOUSE BLVD (TRUNK HIGHWAY NO. 55)COURTHOUSE BLVD CH I C A G O & N O R T H W E S T E R N R A I L R O A D PROPOSED 67,000 SF BUILDING LOADING DOCK TRUCK WAITING AREA TR U C K S C A L E V A N COVERED INGOT COOLING AREA X X X X X EXISTING BUILDING FFE: 897.67 PROPOSED BUILDING FFE: 897.67 FFE SW: 897.17 CANOPY COVERED STORAGE AREA 27,810 SF Refe r e n c e P o i n t N o r t h = F G T + 4 0 1 = C W P + 4 0 1 =MF2 +401 7 8 4 0 1207 0 5487 4 3 7 7 INC O M E R INCO M E R ESTIMATED PERVIOUS AREA: 14.90 ACRES ESTIMATED IMPERVIOUS AREA: 19.5 ACRES ESTIMATED PERVIOUS AREA: 1.46 ACRES ESTIMATED PERVIOUS AREA: .51 ACRES SHEET NUMBER 12/20/20231 SURVEY APPROVED DESIGNED DRAWN PROJ. NO. WA S P R E P A R E D B Y M E O R U N D E R M Y D I R E C T S U P E R V I S I O N I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N , O R R E P O R T AN D T H A T I A M A D U L Y L I C E N S E D UN D E R T H E L A W S O F T H E S T A T E O F M I N N E S O T A PR I N T N A M E : SI G N A T U R E : DA T E : LI C . N O . CHECKED Pl o t D a t e : 0 1 / 1 0 / 2 0 2 4 - 7 : 2 1 a m Dr a w i n g n a m e : P : \ 1 9 3 8 0 6 0 0 6 \ 1 9 3 8 0 6 0 0 6 B I L L E T P R O D U C T I O N S F A C I L I T Y \ 5 _ D E S I G N \ 1 _ C A D \ 2 E X H I B I T S \ 2 0 2 4 - 0 1 0 9 I M P E R V I O U S E X H I B I T . d w g Xr e f s : , x - S U R V , x - S I T E , x - T T L B , x - B L D G B I L L E T , x - S I T E C O M P L E T E D D E S I G N 2 1 4 2 , S R 5 5 _ o f f s i t e , S R 5 5 _ u t i l i t i e s TH E C O N T R A C T O R S H A L L V E R I F Y A N D B E R E S P O N S I B L E F O R A L L D I M E N S I O N S . D O N O T S C A L E T H E DR A W I N G - A N Y E R R O R S O R O M I S S I O N S S H A L L B E R E P O R T E D T O S T A N T E C W I T H O U T D E L A Y . TH E C O P Y R I G H T S T O A L L D E S I G N S A N D D R A W I N G S A R E T H E P R O P E R T Y O F S T A N T E C . R E P R O D U C T I O N OR U S E F O R A N Y P U R P O S E O T H E R T H A N T H A T A U T H O R I Z E D B Y S T A N T E C I S F O R B I D D E N . SP E C T R O B I L L E T E X P A N S I O N RO S E M O U N T , M N 193806006 73 3 M a r q u e t t e A v e n u e , S u i t e 1 0 0 0 Mi n n e a p o l i s , M N 5 5 4 0 2 ww w . s t a n t e c . c o m STANTEC SAG SAG DML DML PR O F E S S I O N A L E N G I N E E R MI N N E S O T A . SITE PLAN REVIEW APPLICATION ( IN FEET ) GRAPHIC SCALE 0 1 inch = 100 ft. 100 200100 LEGEND PERVIOUS AREA IMPERVIOUS AREA EX-1 IM P E R V I O U S A R E A E X H I B I T ESTIMATED PERVIOUS AREA = 16.87 AC = 46% ESTIMATED IMPERVIOUS AREA = 19.5 AC = 54% Page 178 of 221 Spectro Alloys Rosemount, MN 01-18-2024 32 2 7 3 1 0 0 Concept Rendering EXISTING INGOT FACILITY PROPOSED BUILDING EXISTING CMU BUILDING TO REMAIN PROPOSED CANOPY COVERED STORAGE AREA HIGHWAY 5 5 Page 179 of 221 A3.22 A3.1 A3.1 A3.2 1 2 1 1 1 3 4 5 6 6 7 8 8 B C D E F 9 9 A 2 4.5 5.3 6.9 7.97.1 E.1 D.1 D.9 E.9 CANOPY COVERED STORAGE AREA EXISTING CMU BUILDING TO REMAIN PROPOSED BUILDING 308' - 8 1/2" 32 2 ' - 4 1 / 2 " Opus Design Build, L.L.C. 10350 Bren Road West Minnetonka, MN 55343-0110 952-656-4444 Opus AE Group, L.L.C. 10350 Bren Road West Minnetonka, MN 55343-0110 952-656-4444 SHEET TITLE SHEET NUMBER PL O T D A T E : PROJECT PROJECT NUMBER DRAWN BY CHECKED BY PROJECT MANAGER DATE PROJECT ADDRESS 1/ 1 8 / 2 0 2 4 1 1 : 1 8 : 3 5 A M CONCEPT FLOOR PLAN A2.1 SPECTRO ALLOYS 13220 DOYLE PATH ROSEMOUNT, MN 55068 32273100 JW PN/JW RG 01/18/24 1" = 30'-0"1 LEVEL 1 ISSUE RECORD 12/21/2023 CITY SITE PLAN REVIEW 01/18/2024 CITY SITE PLAN REVIEW Page 180 of 221 LEVEL 1 100' -0" T.O.D. LOW POINT S 158' -10" 1 3 4 5 6 7 8 924.5 5.3 6.9 7.97.1 1 2 3 4 8 9 13,000 GALLON WATER TANK EXISTING CMU BUILDING TO REMAIN CONCRETE WALL FOR STORAGE AREA 161' - 4" PE R C E I V E D H E I G H T A B O V E G R A D E 55 ' - 1 " 175' - 10"+/- LEVEL 1 100' -0" T.O.D. LOW POINT S 158' -10" DOCK GRADE 96' -0" B C D E FAE.1D.1 D.9 E.9 T.O.D. LOW POINT N 136' -2" WT BASE 86' -2 1/2" 1 2 3 84 657 3 8 EXISTING CMU BUILDING TO REMAIN Opus Design Build, L.L.C. 10350 Bren Road West Minnetonka, MN 55343-0110 952-656-4444 Opus AE Group, L.L.C. 10350 Bren Road West Minnetonka, MN 55343-0110 952-656-4444 SHEET TITLE SHEET NUMBER PL O T D A T E : PROJECT PROJECT NUMBER DRAWN BY CHECKED BY PROJECT MANAGER DATE PROJECT ADDRESS 1/ 1 8 / 2 0 2 4 1 1 : 1 8 : 3 7 A M CONCEPT ELEVATIONS A3.1 SPECTRO ALLOYS 13220 DOYLE PATH ROSEMOUNT, MN 55068 32273100 JW PN/JW RG 01/18/24 1/16" = 1'-0"1 SOUTH ELEVATION 1/16" = 1'-0"2 WEST ELEVATION ISSUE RECORD 12/21/2023 CITY SITE PLAN REVIEW 01/18/2024 CITY SITE PLAN REVIEW 3 BIRSDEYE PERSPECTIVE PRECAST CONCRETE PANEL DARK GRAY EXPOSED AGGREGATE (MATCH EXISTING INGOT FACILITY) PRECAST CONCRETE PANEL LIGHT GRAY EXPOSED AGGREGATE (MATCH EXISTING INGOT FACILITY) VISION GLASS CLEAR ANODIZED ALUMINUM WINDOW FRAME BLACK PREFINISHED METAL PARAPET CAP, OVERHEAD DOORS, PEDESTRIAN DOORS DARK GRAY EXTERIOR FACADE PRIMARY MATERIALS KEYNOTE LEGEND PRECAST CONCRETE PANELS: 01 - DARK GRAY EXPOSED AGGREGATE (MATCH EXISTING INGOT FACILITY) 02 - LIGHT GRAY EXPOSED AGGREGATE (MATCH EXISTING INGOT FACILITY) 03 - UNIFORM RIB FINISH --------- 04 - VISION GLASS IN ANODIZED ALUMINUM FRAME 05 - INSULATED OVERHEAD DRIVE-IN DOOR 06 - INSULATED OVERHEAD DOCK DOOR 07 - INSULATED PEDESTRIAN DOOR 08 - PREFINISHED METAL PARAPET CAP 09 - PREFINISHED METAL CANOPY Page 181 of 221 LEVEL 1 100' -0" DOCK GRADE 96' -0" 1345678924.55.36.97.9 7.1 EXISTING CMU BUILDING TO REMAIN GRADE LINE BEHIND 4' - 0" CAST-IN-PLACE CONC. RETAINING WALL BEHIND WT BASE 86' -2 1/2" 12843 9 13,000 GALLON WATER TANK LEVEL 1 100' -0" T.O.D. LOW POINT S 158' -10" DOCK GRADE 96' -0" BCDEF A MEZZANINE 112' -0" E.1 D.1D.9E.9 T.O.D. LOW POINT N 136' -2" WT BASE 86' -2 1/2" 1 28 3 4 43 6 79 13,000 GALLON WATER TANK 1/16" = 1'-0"1 NORTH ELEVATION 1/16" = 1'-0"2 EAST ELEVATION Opus Design Build, L.L.C. 10350 Bren Road West Minnetonka, MN 55343-0110 952-656-4444 Opus AE Group, L.L.C. 10350 Bren Road West Minnetonka, MN 55343-0110 952-656-4444 SHEET TITLE SHEET NUMBER PL O T D A T E : PROJECT PROJECT NUMBER DRAWN BY CHECKED BY PROJECT MANAGER DATE PROJECT ADDRESS 1/ 1 8 / 2 0 2 4 1 1 : 1 8 : 4 0 A M CONCEPT ELEVATIONS A3.2 SPECTRO ALLOYS 13220 DOYLE PATH ROSEMOUNT, MN 55068 32273100 JW PN/JW RG 01/18/24 ISSUE RECORD 12/21/2023 CITY SITE PLAN REVIEW 01/18/2024 CITY SITE PLAN REVIEW 3 NORTHWEST 3D CONCEPT MASSING 4 NORTHEAST 3D CONCEPT MASSING 5 SOUTHEAST 3D CONCEPT MASSING KEYNOTE LEGEND PRECAST CONCRETE PANELS: 01 - DARK GRAY EXPOSED AGGREGATE (MATCH EXISTING INGOT FACILITY) 02 - LIGHT GRAY EXPOSED AGGREGATE (MATCH EXISTING INGOT FACILITY) 03 - UNIFORM RIB FINISH --------- 04 - VISION GLASS IN ANODIZED ALUMINUM FRAME 05 - INSULATED OVERHEAD DRIVE-IN DOOR 06 - INSULATED OVERHEAD DOCK DOOR 07 - INSULATED PEDESTRIAN DOOR 08 - PREFINISHED METAL PARAPET CAP 09 - PREFINISHED METAL CANOPY Page 182 of 221 Page 183 of 221 Page 184 of 221 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 5 5 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M Memorandum To: Brian Erickson, City Engineer Nick Egger, Director of Public Works From: Amanda Sachi, PE Kendra Fallon, PE Kris Keller, PE Date: January 15, 2024 Re: Spectro Billet – 2024 Expansion Engineering Review WSB Project No. 024362-000 We have reviewed the documents provided by Stantec on December 20, 2023. Documents reviewed include: •Spectro Billet Expansion - Preliminary Site Construction Drawings, dated 12/20/23 Additional redline comments are provided on the submitted civil plans. Applicant should provide responses to each comment and redline comment. We offer the following comments below. Engineering Review: 1. General a. The project consists of the expansion of the existing facility. The new addition is 70,000 sf to the existing 10,000 sf building. b. The expansion also includes adding a 28,000 sf canopy-covered storage area. 2. Site Demolition Plan a. Show the water and sanitary sewer services to the existing building b. There appears to be an existing utility pedestal near the proposed northwest entrance that will need to be relocated c. Call out the existing easement crossing the lot that will need to be vacated as part of the building expansion construction 3. Site Plan a. There is a permanent landing, sidewalk, and stairs proposed in the watermain easement on the east side of the building. 4. Grading Drainage and Erosion Control Plan a. Clarify the transitional grades around the perimeter of the building and site. i. The northwest corner and east side of the building are shown as having considerable exposed foundation relative to the 897.67 FFE 1. Maintain frost protection with construction ii. Conversely the south side of the building is shown as burying the building with 8-10’ of material Page 185 of 221 Spectro Billet – 2024 Expansion Engineering Review January 15, 2024 Page 2 iii. Describe what is creating the 8-10’ grading transition around the parking and canopy covered storage areas b. There appears to be a low point that does not drain at the northeast corner of the site on the south side of the road. Show the path of drainage and consider installing a catch basin to intercept surface flow. c. The drainage is proposed to run along the south edge of the roadway on Doyle Path. Consider installing curb to prevent wear and erosion. 5. Utility Plans a. Fire official to review fire coverage and emergency access b. Provide the material grade proposed for all pipe segments c. Label the septic tank as proposed or existing d. Clarify whether a new structure is proposed at EX SSWR CO 03 northeast of the site e. Update the watermain linework in the profile to reflect the correct elevations f. Show the existing gate vale just southwest of the existing blowoff hydrant assembly g. Update the existing and finished grades in the watermain profile h. Eliminate the proposed blowoff valve by connecting closer to the existing blowoff hydrant assembly i. Show minimum 7.5’ of cover over watermain j. Use RCP pipe for storm sewer under the roadway 6. Details & Specifications a. No comments. 7. Landscape Plan a. No comments. Page 186 of 221 EXECUTIVE SUMMARY Planning Commission Regular Meeting: January 23, 2024 Tenative City Council Meeting: February 20, 2024 AGENDA ITEM: Request by Maplewood Development for Amber Fields 15th Addition preliminary and final plat approval to create 167 single-family lots. AGENDA SECTION: PUBLIC HEARINGS PREPARED BY: Anthony Nemcek , Senior Planner AGENDA NO. 6.d. ATTACHMENTS: Site Location, Original Master Plan, Preliminary Plat, Final Plat, Phasing Plan, Utility Plan, Landscape Plan, Engineer's Memo dated January 15, 2024, Parks and Recreation Director's Memo dated January 17, 2024 APPROVED BY: AK RECOMMENDED ACTION: Motion to recommend the City Council approve the Amber Fields 15thAddition Preliminary Plat and Final Plats, subject to the following conditions: A. Execution of a Subdivision Agreement. B. The plat shall be updated to provide a connection to a future 155th Street south of the plat area. C. The applicant shall work with public works to address snow storage in the northeast corner of the plat area. D. Submittal of a landscaping surety in the amount of $69,300 E. Conformance with all requirements of the City Engineer as detailed in the attached memorandum dated January 15, 2024. F. Conformance with all requirements stated within the Dakota County Plat Commission Memorandum. G. Compliance with the conditions and standards within the Parks and Recreation Director’s memorandum dated January 17, 2024. H. Payment of trunk area charges in the amount of: 1. Sanitary Sewer Trunk Charge: $1,075/acre 2. Watermain Trunk Charge: $6,500/acre 3. Storm Sewer Trunk Charge: $6,865/acre BACKGROUND Owner Earl Street Partners II, LLC. Preliminary Plat Acres 77.58 acres Met Council Net Acres 77.58 acres Residential Lots Created 167 single-family lots Gross Density 2.15 units per acre Page 187 of 221 Net Density 2.7 units per acre Comp Plan Guidance MUR-Mixed Use Residential Current Zoning R1 PUD-Low Density Residential Planned Unit Development Surrounding Land Uses North Mixed Use Residential East Low Density Residential South Agricultural Research West Mixed use Residential The Planning Commission is being asked to consider a request by Maplewood Development for approval of the preliminary and final plats of Amber Fields Second Addition and a major amendment to the Amber Fields Planned Unit Development to create 267 single family lots. The lots created will be traditional single family lots with widths of 65’. The applicant’s proposed final plat encompasses the first phase of development within the preliminary plat area and includes 76 lots. Land in the western portion of the preliminary plat area is being platted as outlots for future development. That area was initially reserved for a future school site, but the most recent conversations with the developer indicate that the district will not be acquiring the land for a school as the acreage needed is much higher than what is available at that site. When a final plat application is submitted for this area, a rezoning of that site will be needed to accommodate residential development. It should be noted that staff and the Planning Commission have been aware of some fluidity in the placement of different residential products within Amber Fields, which is evidenced in the PUD amendments that have come before the commission over the course of the development of the site. None of the adjustments to the development patterns within Amber Fields have been unexpected or greatly out of line with the intended overall development of the 435 acre site. Based on staff’s calculations, the additional units will not cause the site to exceed the maximum density of the land guided for MUR. The proposed plat meets the lot standards of the R1-Low Density Residential zoning district and the Amber Fields Planned Unit Development. Staff is recommending approval of the preliminary and final plats, subject to the conditions included in the recommended action and the Engineers Memo dated January 15, 2024 HISTORY The developer received Planned Unit Development approval with rezoning from the City Council at its September 7, 2021 meeting. The Planned Unit Development anticipated a total of 265 traditional 65’ wide single-family lots, 366 55’ wide villa (detached townhome) and single-family lots, as well as 596 townhome lots. These are in addition to various multi-family and senior housing projects within Amber Fields. Since the original approval, several amendments to the PUD have been approved to shift where the different home types are located. The proposed preliminary plat is generally consistent with the original PUD, with some minor reconfiguration of the roadways. With this current request, the developer is proposing 167 65’ wide single-family lots. This is a slight decrease of 5 units from what was shown in the original development plan for this area. ISSUE ANALYSIS Legal Authority Page 188 of 221 Preliminary and Final Plat requests are quasi-judicial decisions for the Planning Commission, meaning that the Planning Commission is acting as a judge to determine if the regulations within the Comprehensive Plan, Zoning Ordinance and Subdivision Ordinance are being followed. If the proposed plats meet the standards and requirements of the zoning ordinance and associated Planned Unit Development, they should be approved. General Subdivision Design The preliminary plat area is located on the easternmost portion of the Amber Fields development area, south of Dakota County College. It is bound on the west by Akron Avenue and surrounded on the north, east and south by land owned by the University of Minnesota. Main access into the site will be from two streets that intersect Akron Avenue, shown on the plat as Roads A and B. Road B extends east from Akron where it curves up to connect with Road A in the northeast portion of the plat area. Because Akron Avenue is a County road, access onto it will limited in the future when Akron is extended as County Road 73, and only right in and right out maneuvers will be allowed where Road B intersects Akron Avenue. Staff is recommending the developer provide a connection to a future 155th Street immediately south of the site to allow full access onto Akron Avenue when that road is constructed. The street plan also includes two shorter north/south roads (D and F) that connect Roads A and B, and another street that connects D and F. Temporary cul-de-sacs will be constructed at the eastern termini of Roads A and B until the second phase of this portion of Amber Fields is developed. Land Use and Zoning The site is designated for MUR-Mixed Use Residential land use, which can include a range of housing types, from single-family homes on traditional sixty-five foot lots to townhomes. The zoning district in which the preliminary plat is located is R1-Low Density Residential. The Amber Fields Planned Unit Development Agreement includes several deviations from the Zoning Ordinance. In addition to dimensional standards, the table below compares the proposed preliminary plat to the standards of the Amber Fields PUD. Category Required (Amber Fields PUD) Amber Fields 15th Addition Min. Lot Area (sf) 5,400 (interior) 7,200 (corner) 8,450 Min. Lot Width 45 ft. (interior) 55 ft. (corner) 65 ft. Min. Front Yard Setback 25 ft 25 ft. Min. Side Yard Setback 10 ft. dwelling/5 ft. garage/20 ft. corner 10 ft. dwelling/5 ft. garage/20 ft. corner Min. Rear Yard Setback 20 ft. 30 ft. The Amber Fields PUD also includes a deviation from the maximum lot coverage as follows: The maximum lot coverage shall be fifty-five percent (55%) for lots less than 8,000 square feet, fifty percent (50%) for lots between 8,000 and 9,000 square feet, forty-five percent (45%) for lots between 9000 Page 189 of 221 and 10,000 square feet, and forty percent (40%) for lots over 10,000 square feet. This standard will be reviewed as part of the building permitting process to ensure compliance. Phasing The applicant has provided a phasing plan that shows development initially occurring in the central portion of the preliminary plat just east of the outlots. This area also contains some single-family lots in the northern portion of the site. As development continues, Roads A and B will be extended with the second phase of development with contains the remainder of the lots. At that point, Road B will connect with Road A. Street and Sidewalk System There are two access points into the preliminary plat area where Roads A and B intersect Akron Avenue. Additional local roads are located internally to the preliminary plat area connect with Roads A and B. Staff is recommending the addition of a connection to the southern boundary of the preliminary plat area to allow access to a future 155th Street since access onto Akron will be limited. Sidewalks are provided on at least one side of all streets in accordance with City policy. Parks The Parks and Recreation staff has reviewed the park dedication requirement for Amber Fields 15th Addition as part of the overall Master Development Plan to consider the multiple playgrounds and extensive open space within the development. The parks dedication for the 15th Addition will be met through developer installed improvements as outlined in the subdivision agreement. The street and sidewalk system within the preliminary plat provides direct access to the trails and parks. The Vermillion Highlands Regional Greenway is identified in the City’s Parks Master Plan as being in this area. The developer should work with the County to accommodate that trail. The County has indicated a willingness to acquire their required ROW using Met Council funds and has begun a dialogue with the developer. Landscaping and Tree Preservation The applicant’s landscape plan provides one tree per interior lot and two on every corner lot, which meets the planting requirement of the landscape ordinance. The applicant’s plan also provides additional trees around the stormwater basin in the northern portion of the plat area. A tree inventory was conducted for the overall Amber Fields development area, and a total of 1,983 caliper inches of trees were identified for replacement following the formula laid out in the City Code. So far, 462.5 inches have been provided as replacement, and the additional trees in this addition amount to 82.5 additional inches of mitigation for an overall total of 1,438 caliper inches remaining to be replaced. Staff has discussed this with the developer who has indicated the planting schedule for the open area in the center of the Amber Fields development will contain plantings in excess of that required by the tree preservation ordinance. A landscaping surety equal to 110% of the cost of the trees to be planted on the site must be submitted. For the 210 trees shown on the landscaping plan, that amount totals $69,300 for the entire preliminary plat area. Utilities Page 190 of 221 The site is served by water and sanitary sewer located within Akron Avenue. Stormwater is managed on site, which differs from previous Amber Fields additions located west of Akron Avenue. In that portion of Amber Fields, all stormwater is managed within the large open space central to the site. Storm sewers in Amber Fields 15th Addition carry water to the basin located in the north portion of the preliminary plat area. Engineering staff reviewed the proposed preliminary and final plat and provided a memorandum with comments generally related to plan details. No changes to the overall plan for the preliminary plat are called for, although the previously described connection to the future 155th Street should be accommodated. Final Plat The final plat contains the residential parcels and dedicated right of way. Additionally, the final plat contains four outlots. Outlot A encompasses the stormwater pond in the northern portion of the plat area. Outlots B and C contain land for future development in the western portion of the preliminary plat area that had originally been conceived as a potential school site. Outlot D is land being held for the second phase of this part of Amber Fields. The final plat is consistent with the preliminary plat provided by the applicant. Conversations staff has had with the developer regarding a connection to a future 155th Street indicate that such a connection will occur east of the final plat area where Road B curves north to connect with Road A. RECOMMENDATION Staff is recommending approval of the preliminary and final plats, subject to conditions in the recommended action and contained within the engineer’s memorandum dated January 15, 2024. This recommendation is based on information provided by the applicant and reviewed in this report. Page 191 of 221 Page 192 of 221 2 Amber Fields Master PlanDRAFT 8/20/21 Master Plan UMore ParkUMore Park 30’15’0’ 1”0’300’600’150’ Page 193 of 221 155TH ST. E. AN G U S A V E AK R O N A V E . 155TH ST. E. OUTLOT A 16151413 17 16 15 14 13 12 11 18 19 20 21 22 23 16 15 14 13 22232425 21 20 19 18 17 11 10 9 8 7 6 5 4 3 2 1 12 13 14 15 16 17 18 19 20 21 22 23 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 2625242322212019181716 BLOC K 2 BLOCK 5 BL O C K 5 BL O C K 6 ROAD A RO A D B ROAD B RO A D D ROAD E 1 2 3 4 5 6 7 8 9 10 11 12 OUTLOT C OUTLOT B 1 BLO C K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK 5 7 8 9 10 11 12 13 14 27282930 111098765 4 3 25262728293031 32 33 2 3 4 5 6 7 8 9 BLOCK 4 BLOCK 3 1 34 38 37 36 35 34 33 32 31 2 1 6 5 4 3 2 1 10 24 12 26 15 ROAD A ROAD A R O A D B ROAD B ROAD E RO A D F AK R O N A V E N U E ROAD A ROAD A R O A D B ROAD B ROAD E RO A D F AK R O N A V E N U E ROAD A RO A D D RO A D F RO A D F VIEW A VIEW C VIEW B VIEW D FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 5 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L SI T E P L A N - O V E R A L L V I E W 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 SITE PLAN NOTES:LEGEND: SINGLE FAMILY LOT DATA: DENSITY CALCULATIONS: TYPICAL 60' ROW ROAD SECTION 9 TYPICAL 65' LOT DETAIL Page 194 of 221 AMBER FIELDS FIFTEENTH ADDITION CITY COUNCIL, CITY OF ROSEMOUNT, MINNESOTA This plat was approved by the City Council of ROSEMOUNT, Minnesota, this _________ day of _____________________, 20 ____ and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By:___________________________________________________________________ Mayor Clerk COUNTY SURVEYOR, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this _________ day of _____________________, 20 ____. _________________________________ Todd B. Tollefson Dakota County Surveyor BOARD OF COUNTY COMMISSIONERS, COUNTY OF DAKOTA, STATE OF MINNESOTA We do hereby certify that on the 24th day of October, 2023 the Board of Commissioners of Dakota County, Minnesota approved this plat of AMBER FIELDS FIFTEENTH ADDITION and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2 and pursuant to the Dakota County Contiguous Plat Ordinance. _________________________________________________________________ Chair, County Board County Treasurer - Auditor KNOW ALL PERSONS BY THESE PRESENTS: That Earl Street Partners II, LLC, a Minnesota limited liability company, owner of the following described property: Outlots R, S, T and U, AMBER FIELDS according to the recorded plat thereof, Dakota County, Minnesota. Has caused the same to be surveyed and platted as AMBER FIELDS FIFTEENTH ADDITION and does hereby dedicate to the public for public use the public ways and the drainage and utility easements as created by this plat. In witness whereof said Earl Street Partners II, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this _________ day of _____________________, 20 ____. Signed: Earl Street Partners II, LLC by ___________________________________________ Mario J. Cocchiarella, Chief Manager STATE OF MINNESOTA COUNTY OF ____________________ This instrument was acknowledged before me on _________ day of _____________________, 20 ____, by Mario J. Cocchiarella, Chief Manager of Earl Street Partners II, LLC, a Minnesota limited liability company, on behalf of the limited liability company. ________________________________________ Signature ________________________________________ Printed Name Notary Public, ___________County, Minnesota My Commission Expires _________________ SURVEYORS CERTIFICATE I Daniel Ekrem do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this ___________ day of _____________________ , 20 ____. _________________________________________ Daniel Ekrem, Licensed Land Surveyor Minnesota License No. 57366 STATE OF MINNESOTA COUNTY OF _____________________ This instrument was acknowledged before me on ___________ day of _____________________ , 20 ____, by Daniel Ekrem. ________________________________________ Signature ________________________________________ Printed Name Notary Public, ___________County, Minnesota My Commission Expires__________________ OFFICIAL PLAT DEPARTMENT OF PROPERTY TAXATION AND RECORDS, COUNTY OF DAKOTA, STATE OF MINNESOTA Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20___ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer entered this _________ day of _____________________, 20 ____. _________________________________________, Director Amy A. Koethe, Department of Property Taxation and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of AMBER FIELDS FIFTEENTH ADDITION was filed in the office of the County Recorder for public record on this _________ day of _____________________, 20 ____, at ___ o'clock ___.M. and was duly filed in Book_________________ of Plats, Page______________________ , as Document Number _______________________ . _______________________________________ Amy A. Koethe, County Recorder Page 195 of 221 INSET 1 2 3 4 R=300.00 L=174.19 Δ=33°16'06" L= 4 2 . 9 7 =2° 0 9 ' 0 0 " N 5 1 ° 5 8 ' 5 7 " W 6 3 . 1 6 N 5 5 ° 3 8 ' 3 1 " W 63. 1 6 R = 2027.68 L=422.28 Δ=11°55'56" C.Brg = S62°24'07"E C.=421.51 R=300.00 L=217.61Δ=41°33'4 1" R = 11 7 5.0 0 L = 201.10 Δ = 9°4 8'2 1" R=1375.00 L=949.43 Δ=39°33'45" C.Brg=S77°43'48"E C.=930.68 S5 7 ° 5 6 ' 5 5 " E 2 . 1 3 L= 1 0 . 4 6 =0 ° 3 1 ' 2 5 " 2. 1 3 L= 5 7 . 6 6 =2 ° 2 7 ' 2 3 " 2. 1 3 L= 7 1 . 2 7 =3° 3 3 ' 5 8 " L= 7 1 . 2 7 =3° 3 3 ' 5 8 " 4 7 . 6 6 S89°42'15"E 257.25 S89°42'15"E 100.61 257.25 L=195.85 Δ=41°33'41" L = 2 0 6.2 3 Δ = 9°4 8'21" R=330.00 L=239.38 Δ=41°33'41" N89°42'15"W 257.28 S41 ° 5 1 ' 2 6 " W 111 . 0 3 L= 7 0 . 2 5 =2 ° 5 9 ' 3 4 " L= 7 0 . 2 0 =2 ° 5 9 ' 2 5 " L= 6 9 . 6 7 =2 ° 5 8 ' 0 5 " L= 7 0 . 2 5 =2 ° 5 9 ' 3 4 " L= 7 0 . 2 5 =2 ° 5 9 ' 3 4 " L= 7 0 . 2 5 =2 ° 5 9 ' 3 4 " L= 7 0 . 2 5 =2 ° 5 9 ' 3 4 " L= 7 0 . 2 5 =2 ° 5 9 ' 3 4 " L= 7 0 . 2 5 =2 ° 5 9 ' 3 4 " L= 7 0 . 2 5 =2 ° 5 9 ' 3 4 " L= 7 0 . 1 5 =2 ° 5 9 ' 1 9 " L =9 9 .10 Δ=4 °13 '18 " L=224.00 Δ=9°08'06" L=746.05 Δ=30°25'26" 28.38 N48°59'31"W 64.51 N5 8 ° 5 5 ' 0 5 " W 6 3 . 4 8 N6 1 ° 5 4 ' 0 5 " W 6 3 . 4 5 N6 4 ° 5 3 ' 3 4 " W 6 3 . 4 1 N6 7 ° 5 2 ' 1 9 " W 6 2 . 9 3 N7 0 ° 5 1 ' 0 9 " W 6 3 . 4 5 N7 3 ° 5 0 ' 4 2 " W 6 3 . 4 5 N7 6 ° 5 0 ' 1 6 " W 6 3 . 4 5 N7 9 ° 4 9 ' 4 9 " W 6 3 . 4 5 N8 2 ° 4 9 ' 2 3 " W 6 3 . 4 5 N8 5 ° 4 8 ' 5 7 " W 6 3 . 4 5 N8 8 ° 4 9 ' 1 4 " W 6 3 . 4 6 S8 8 ° 1 1 ' 5 6 " W 6 3 . 4 6 S 0 3 ° 1 5 ' 1 1 " E 1 3 0 . 0 0 N 0 7 ° 3 0 ' 5 4 " W 1 3 0 . 0 0 S 8 0 ° 5 9 ' 2 0 " W 6 3 . 4 5 S 7 7 ° 5 9 ' 4 6 " W 6 3 . 4 5 S 7 5 ° 0 0 ' 1 2 " W 6 3 . 4 5 S 7 2 ° 0 0 ' 3 9 " W 6 3 . 4 5 S 6 9 ° 0 1 ' 0 5 " W 6 3 . 4 5 S 6 6 ° 0 1 ' 3 1 " W 6 3 . 4 5 S 6 3 ° 0 1 ' 5 8 " W 6 3 . 4 5 S 6 0 ° 0 2 ' 2 4 " W 6 3 . 4 5 S 5 7 ° 0 5 ' 2 4 " W 6 2 . 7 9 S59° 3 7 ' 2 6 " W 84.59 S70°07 ' 3 3 " W 84.58 S79°46'41"W 84.72 N89°42'15"W 2024.14 S0 0 ° 1 9 ' 4 7 " W 1 3 7 1 . 8 7 S89°42'13"E 1185.84 R=3225.00 L=1433.54 Δ=25°28'06" C.Br g=S76°58'10"E C.=1421.76 N0 0 ° 1 5 ' 5 3 " E 1 0 5 8 . 4 5 63 0 . 0 0 30 8 . 4 5 1800.68 268.0830.00 30.0060 . 0 0 30.00 30.0060 . 0 0 32.96 32.86 100.59 L=156.77Δ=33°16'06" L=442.04 Δ =12°18'31" L =402.47 Δ=11°32'36" L=191.61Δ=33°16'06" 100.63 N2 1 ° 1 5 ' 2 0 " E 2 8 2 . 1 3 S89°42'13"E 2021.00 S0 0 ° 1 6 ' 3 2 " W 13 0 . 4 7 N08°5 8 ' 1 4 " W 60.79 N0 0 ° 4 1 ' 2 2 " E 13 0 . 0 0 N 0 7 ° 0 2 ' 3 9 " W 1 4 5 . 2 2 N03°28'35"W 60.12 S 0 5 ° 4 8 ' 2 7 " E 2 5 7 . 8 3 N07°20'4 2 " W 60.00 30.00 30.00 S2 0 ° 2 8 ' 0 8 " W 5 7 9 . 1 8 L=577.04 Δ=10°15'06" L=844.73 Δ=15°00'27" 5 6 7 8 9 10 11 12 13 14 15 OUTLOT B OUTLOT A OUTLOT C OUTLOT D 1075.93 945.07 L=11.77 =0°12'33" 11 0 . 0 0 N0 0 ° 1 8 ' 1 7 " W 1 3 0 . 0 0 N0 2 ° 4 1 ' 1 6 " E 1 3 0 . 0 0 N0 5 ° 4 0 ' 5 0 " E 1 3 0 . 0 0 N0 8 ° 4 0 ' 2 4 " E 1 3 0 . 0 0 N1 1 ° 3 9 ' 5 7 " E 1 3 0 . 0 0 N1 4 ° 3 9 ' 3 1 " E 1 3 0 . 0 0 N1 7 ° 3 9 ' 0 5 " E 1 3 0 . 0 0 N2 0 ° 3 8 ' 3 8 " E 1 3 0 . 0 0 N2 3 ° 3 6 ' 4 3 " E 1 3 0 . 0 0 N2 6 ° 3 6 ' 0 9 " E 1 3 0 . 0 0 N2 9 ° 3 5 ' 4 2 " E 1 3 0 . 0 0 N3 2 ° 3 4 ' 3 0 " E 1 3 0 . 0 0 N36 ° 0 8 ' 2 8 " E 1 3 0 . 0 0 N39 ° 4 2 ' 2 6 " E 1 3 0 . 1 0 ROA D A R O A D B 1 N 0 2 ° 3 9 ' 2 0 " W 65 . 8 3 12 6 1 . 8 7 S 4 8 ° 0 8 ' 3 4 " E 4 7 . 6 6 4 7 . 6 6 155TH ST E AMBER FIELDS FIFTEENTH ADDITION OFFICIAL PLAT SITE Page 196 of 221 S2 0 ° 2 8 ' 0 8 " W 5 7 9 . 1 8 N2 1 ° 1 5 ' 2 0 " E 2 8 2 . 1 3 S89°42'13"E 1075.93 S0 0 ° 1 6 ' 3 2 " W 1 3 0 . 4 7 N0 0 ° 4 1 ' 2 2 " E 1 3 0 . 0 0 N 0 7 ° 0 2 ' 3 9 " W 1 4 5 . 2 2 S 0 5 ° 4 8 ' 2 7 " E 2 5 7 . 8 3 80.62 71.75 70.82 70.04 69.41 68.95 68.57 68.36 67.04 65.00 74.99 84.79 N2 0 ° 0 9 ' 1 6 " E 2 5 9 . 8 5 N1 7 ° 4 0 ' 4 4 " E 2 3 5 . 0 9 N1 5 ° 4 1 ' 0 6 " E 2 1 3 . 8 2 N1 3 ° 5 3 ' 5 1 " E 1 9 3 . 5 1 N1 2 ° 0 6 ' 3 5 " E 1 7 7 . 7 3 N1 0 ° 1 9 ' 1 9 " E 1 6 4 . 3 1 N0 8 ° 3 2 ' 0 3 " E 1 5 3 . 1 9 N0 6 ° 4 4 ' 4 7 " E 1 4 4 . 3 2 N0 4 ° 5 7 ' 2 9 " E 1 3 7 . 6 4 N0 3 ° 1 0 ' 1 3 " E 1 3 3 . 1 4 N0 1 ° 2 2 ' 5 7 " E 1 3 0 . 7 8 N0 0 ° 1 6 ' 3 2 " E 1 3 0 . 3 9 N0 0 ° 1 6 ' 3 2 " E 1 3 0 . 4 1 N0 0 ° 1 6 ' 5 4 " E 1 3 0 . 4 4 N1 7 ° 5 3 ' 1 7 " E 1 3 0 . 0 0 N1 5 ° 5 2 ' 2 4 " E 1 3 0 . 0 0 N1 3 ° 5 0 ' 3 0 " E 1 3 0 . 0 0 N1 1 ° 4 9 ' 4 6 " E 1 3 0 . 0 0 N0 9 ° 4 8 ' 2 7 " E 1 3 0 . 0 0 N0 7 ° 4 7 ' 0 9 " E 1 3 0 . 0 0 N0 5 ° 4 5 ' 5 0 " E 1 3 0 . 0 0 N0 3 ° 4 4 ' 3 1 " E 1 3 0 . 0 0 N0 1 ° 4 3 ' 1 2 " E 1 3 0 . 0 0 S0 0 ° 1 6 ' 3 2 " W 1 3 0 . 0 0 S0 0 ° 1 6 ' 3 2 " W 1 3 0 . 0 0 N0 0 ° 1 7 ' 0 3 " E 1 3 0 . 0 0 N 0 4 ° 3 5 ' 3 3 " W 1 3 6 . 6 2 N 0 4 ° 0 3 ' 4 6 " W 1 3 1 . 9 0 N0 0 ° 0 3 ' 2 8 " W 1 2 9 . 8 8 N0 2 ° 0 7 ' 0 8 " E 1 2 9 . 8 8 N0 4 ° 1 7 ' 4 4 " E 1 2 9 . 9 0 N0 6 ° 2 8 ' 2 0 " E 1 2 9 . 9 2 N0 8 ° 4 4 ' 4 7 " E 1 2 9 . 9 4 N1 0 ° 5 1 ' 3 0 " E 1 2 9 . 9 5 N1 2 ° 5 8 ' 1 2 " E 1 2 9 . 9 7 N1 5 ° 0 4 ' 5 4 " E 1 2 9 . 9 8 N1 7 ° 2 1 ' 2 1 " E 1 2 9 . 9 9 N1 7 ° 1 5 ' 4 6 " E 2 5 8 . 3 3 N1 4 ° 4 1 ' 5 7 " E 1 3 0 . 0 0 N1 2 ° 2 0 ' 2 4 " E 1 3 0 . 0 0 N0 9 ° 5 8 ' 5 0 " E 1 3 0 . 0 1 N0 7 ° 3 7 ' 1 7 " E 1 3 0 . 0 1 N0 5 ° 1 5 ' 4 4 " E 1 3 0 . 0 1 N0 2 ° 5 4 ' 1 0 " E 1 3 0 . 0 1 N0 0 ° 3 2 ' 3 7 " E 1 3 0 . 0 1 N0 1 ° 4 8 ' 5 5 " W 1 3 0 . 0 0 S 0 5 ° 4 8 ' 2 7 " E 2 5 7 . 7 4 N0 1 ° 1 9 ' 0 9 " W 1 2 7 . 5 9 N0 1 ° 2 5 ' 5 1 " E 1 2 7 . 6 0 N0 4 ° 0 2 ' 1 0 " E 1 2 7 . 6 3 N0 6 ° 3 8 ' 2 9 " E 1 2 7 . 7 0 N0 9 ° 2 6 ' 4 9 " E 1 2 7 . 8 1 N1 2 ° 0 3 ' 0 8 " E 1 2 7 . 9 5 N1 4 ° 3 9 ' 2 7 " E 1 2 8 . 1 3 L=74.19Δ=2°16'34"L=68.88Δ=2°06'47"L=68.88Δ=2°06'47"L=68.88Δ=2°06'47"L=74.18Δ=2°16'33"L=71.0 0 Δ=2°10'41"L=71.0 0 Δ=2 °10 '41" L=5 9.51 Δ=1°4 9 '3 2 " R=1867.68 L=652.35 Δ=20°00'45" C.Brg=S79°43'05"E C.=649.04 R=1549.26 L=744.68 Δ=27°32'25" C.Br g=S83°31'01"E C.=737.53 L=85.81Δ=3°10'24" L=64.46Δ=2°23'02"L=63.79Δ=2°21'32"L=63.78Δ=2°21'32"L=63.78Δ=2°21'32"L=63.78 Δ=2°21'32" L=6 3.7 8 Δ=2°21'3 2 " L=6 3.7 8 Δ=2 °21'3 2 " L =6 3 .7 8 Δ=2 °2 1'3 1" L =6 7 .9 3 Δ=2 °3 0 '4 4 " L =8 0 .0 1 Δ =2 °5 7 '3 2 " L=69.71Δ=2°34'42"L=69.71Δ=2°34'41"L=69.70Δ=2°34'40"L=75.06Δ=2°46'33"L=6 9.69 Δ=2°34'38" L=6 9.6 9 Δ=2 °3 4 '3 8 " L =7 3 .5 6 Δ=2 °4 3 '14 " L =8 1.7 4 Δ=3 °0 1'2 3 " 1 3 0 . 0 6 L=93.08Δ=3°10'35" L=70.28Δ=2°23'53"L=69.14Δ=2°21'33"L=69.14Δ=2°21'33"L=69.14Δ=2°21'33"L=69.14 Δ=2°21'33"L=6 9.14 Δ=2 °21'3 3" L=6 9 .14 Δ=2 °21'3 3 " L=6 9 .13 Δ=2 °21'3 2 " ROAD E 2 1 8 9 21 5 . 5 2 R=1709.00 L=846.83Δ=28°23'27"C.Brg=S82°54'45"E C.=838.20 R=2027.68 L=738.74Δ=20°52'28"C.Brg=S79°17'14"E C.=734.66 S89°43'28"E 244.66 28 8 . 7 8 N2 0 ° 2 8 ' 0 8 " E 6 0 8 . 8 1 32 0 . 0 3 L = 3 0 . 0 2 =1 ° 1 3 ' 2 6 " L = 3 0 . 0 0 =1 ° 1 3 ' 2 5 " L=60.02Δ=2°26'51" 3 0 . 4 0 3 0 . 3 9 30 . 0 6 30 . 0 6 N0 2 ° 3 9 ' 2 0 " W 6 5 . 8 3 N 0 8 ° 5 8 ' 1 4 " W 6 0 . 7 9 N 0 3 ° 2 8 ' 3 5 " W 60 . 1 2 R=1405.00 L=746.05 Δ=30 °2 5'2 6"C.Br g=S82°17'44"E C.=7 37.32 L=64.52Δ=1°47'48"L=63.93Δ=1°46'48"L=64.10Δ=1°47'06"L=71.70Δ=1°59'48"L=64.20Δ=1°47'16"L=64.20Δ=1°47'16"L=64.20Δ=1°47'16"L=64.20Δ=1°47'16"L=6 4.23 Δ=1°47'19"L=6 4.20 Δ=1°47'16 " L=6 4.2 0 Δ=1°4 7 '16 " L = 3 9 . 7 5 =1 ° 0 6 ' 2 5 " 84.7775.0065.0024.76 19.75 67.00 73.02 80.00 L=84.09Δ=2°24'42" L=70.53Δ=2°01'22"L=70.56Δ=2°01'25"L=70.52Δ=2°01'22"L=70.54Δ=2°01'24"L=70.54Δ=2°01'23"L=70.54 Δ=2°01'23"L=70.5 4 Δ=2°01'23" L=7 0.5 4 Δ=2 °01'2 3" L=4 9 .7 7 Δ=1°2 5 '3 9 " L=88.77Δ=2°55'29" L=69.03Δ=2°16'27"L=64.09Δ=2°06'42"L=64.09Δ=2°06'42"L=64.09Δ=2°06'42"L=69.02Δ=2°16'27"L=6 6.07 Δ=2°10'36" L=6 6.0 7 Δ=2°10'3 6 " L=6 6 .0 7 Δ=2 °10 '3 6 " L =6 6 .0 7 Δ=2 °10 '3 6 " L =7 1.5 7 Δ=2 °2 1'2 9 " L =7 4 .4 4 Δ=2 °2 7 '0 9 " L =7 6 .9 9 Δ=2 °3 7 '3 8 " L =8 0 .0 1 Δ=2 °4 3 '4 9 " L=78.61Δ=3°12'22" L=63.89Δ=2°36'19"L=63.89Δ=2°36'19"L=63.89Δ=2°36'19"L=68.80Δ=2°48'20"L=6 3.89 Δ=2°36'19" L=6 3.8 9 Δ=2 °36 '19 " L=6 7 .4 3 Δ=2 °4 5 '0 0 " L =7 1.7 3 Δ=2 °5 5 '3 1" L =8 0 .0 1 Δ=3 °15 '4 7 " 12 8 . 6 3 12 9 . 9 9 13 0 . 0 0 13 0 . 0 0 S89°43'28"E 240.71 75.26 73.04 80.92 L=78.23Δ=2°24'00" L=95.83Δ=2°56'23" L=65.96Δ=2°01'24"L=65.95Δ=2°01'23"L=65.96Δ=2°01'24"L=65.95Δ=2°01'24"L=65.95Δ=2°01'24"L=65.95 Δ=2°01'24"L=6 5.9 5 Δ=2°01'2 4 " L=6 5.9 5 Δ=2 °01'2 4 " L =4 6 .5 0 Δ=1°2 5 '3 4 " 19.75 11.49 67.00 1 2 7 . 6 8 R=3225.00 L=11.77 =0°12'33" C.Brg=S74°35'29"E C.=11.77 61.89 78.74 74.96 ROAD B RO A D F 2 3 4 5 6 7 8 9 10 11121314151617 18 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 1314151617181920 21 22 23 24 25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 2 3 3 44 1 3 0 . 0 5 1 2 7 . 7 8 R=3225.00 L=11.77 Δ=0°12'33" C.Br g=S74°35'29"E C.=11.77 N2 1 ° 1 5 ' 2 0 " E 2 8 2 . 1 3 S89°42'13"E 1075.92 4 1 OFFICIAL PLAT AMBER FIELDS FIFTEENTH ADDITION Page 197 of 221 155TH ST. E. AN G U S A V E AK R O N A V E . 155TH ST. E. ROAD A OUTLOT A 16151413 17 16 15 14 13 12 11 18 19 20 21 22 23 16 15 14 13 22232425 21 20 19 18 17 11 10 9 8 7 6 5 4 3 2 1 12 13 14 15 16 17 18 19 20 21 22 23 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 2625242322212019181716 BLOC K 2 BLOCK 5 BL O C K 5 BL O C K 6 ROAD A RO A D B ROAD B RO A D D ROAD E 1 2 3 4 5 6 7 8 9 10 11 12 OUTLOT C OUTLOT B 1 BLO C K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK 5 7 8 9 10 11 12 13 14 27282930 111098765 4 3 25262728293031 32 33 2 3 4 5 6 7 8 9 BLOCK 4 BLOCK 3 1 34 38 37 36 35 34 33 32 31 2 1 6 5 4 3 2 1 10 24 12 26 15 ROAD A ROAD A R O A D B ROAD B ROAD E RO A D F AK R O N A V E N U E ROAD A ROAD A R O A D B ROAD B ROAD E RO A D F AK R O N A V E N U E ROAD A RO A D D RO A D F RO A D F FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 5 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L PH A S I N G P L A N 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 8 SINGLE FAMILY LOT DATA:LEGEND: Page 198 of 221 155TH ST. E. AN G U S A V E AK R O N A V E . 155TH ST. E. OUTLOT A 16151413 17 16 15 14 13 12 11 18 19 20 21 22 23 16 15 14 13 22232425 21 20 19 18 17 11 10 9 8 7 6 5 4 3 2 1 12 13 14 15 16 17 18 19 20 21 22 23 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 2625242322212019181716 BLOC K 2 BLOCK 5 BL O C K 5 BL O C K 6 ROAD A RO A D B ROAD B RO A D D ROAD E 1 2 3 4 5 6 7 8 9 10 11 12 OUTLOT C OUTLOT B 1 BLO C K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK 5 7 8 9 10 11 12 13 14 27282930 111098765 4 3 25262728293031 32 33 2 3 4 5 6 7 8 9 BLOCK 4 BLOCK 3 1 34 38 37 36 35 34 33 32 31 2 1 6 5 4 3 2 1 10 24 12 26 15 ROAD A ROAD A RO A D B ROAD B ROAD E RO A D F AK R O N A V E N U E ROAD A ROAD A RO A D B ROAD B ROAD E RO A D F AK R O N A V E N U E ROAD A RO A D D RO A D F RO A D F VIEW A VIEW C VIEW B VIEW D FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 5 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L SA N I T A R Y S E W E R A N D W A T E R M A I N P L A N - O V E R A L L V I E W 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 27 LEGEND: UTILITY NOTES: SANITARY SEWER SCHEDULE: Page 199 of 221 POND 7 NWL:903 10-DAY SNOWMELT: 913.27 100-YR HWL: 913.23 155TH ST. E. AN G U S A V E AK R O N A V E . 155TH ST. E. OUTLOT A 16151413 17 16 15 14 13 12 11 18 19 20 21 22 23 16 15 14 13 22232425 21 20 19 18 17 11 10 9 8 7 6 5 4 3 2 1 12 13 14 15 16 17 18 19 20 21 22 23 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 2625242322212019181716 BLOC K 2 BLOCK 5 BL O C K 5 BL O C K 6 ROAD A RO A D B ROAD B RO A D D ROAD E 1 2 3 4 5 6 7 8 9 10 11 12 OUTLOT C OUTLOT B 1 BLO C K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BLOCK 5 7 8 9 10 11 12 13 14 27282930 111098765 4 3 25262728293031 32 33 2 3 4 5 6 7 8 9 BLOCK 4 BLOCK 3 1 34 38 37 36 35 34 33 32 31 2 1 6 5 4 3 2 1 10 24 12 26 15 ROAD A ROAD A R O A D B ROAD B ROAD E RO A D F AK R O N A V E N U E ROAD A ROAD A R O A D B ROAD B ROAD E RO A D F AK R O N A V E N U E ROAD A RO A D D RO A D F RO A D F 7 - AB 8 - HL 2 - SL 8 - NF 3 - BH 2 - RB 2 - WP 3 - WP 3 - BH 1 - RB 1 - WP 1 - SW 1 - SW 1 - BH 1 - RB 1 - SW 1 - RB 1 - RB 1 - SW 1 - RB 1 - SW 1 - RB 1 - SW 1 - BH 1 - RB 1 - BH 1 - HL 1 - NF 1 - HL 1 - NF 8 - AE 8 - RO 4 - HL 3 - AB 8 - RO 8 - CH 7 - PO 6 - SL 5 - AB 5 - HL 7 - CH 6 - AB 1 - AB8 - PO 7 - SL 1 - SL 4 - AE 8 - NF 3 - HL 5 - NF 3 - PO 7 - AE 7 - CH 9 - RO 2 - AE 4 - PO 7 - SL VIEW A VIEW C VIEW B VIEW D FOR RE V I E W O N L Y PRELIM I N A R Y NOT FO R C O N S T R U C T I O N AM B E R F I E L D S - 1 5 T H A D D I T I O N PR E L I M I N A R Y P L A T S U B M I T T A L LA N D S C A P E P L A N - O V E R A L L V I E W 733 Marquette Avenue Minneapolis, MN 55402 612.758.3080 www.alliant-inc.com Suite 700 38 TREE PLANTING DETAIL1 LANDSCAPE NOTES: REQUIREMENTS: LANDSCAPE SCHEDULE: MITIGATION & LANDSCAPE Page 200 of 221 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 5 5 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M Memorandum To: Brian Erickson, City Engineer Nick Egger, Director of Public Works Anthony Nemcek, Senior Planner Jane Byron, Storm Water Specialist From: Amanda Sachi, PE Kendra Fallon, PE Kris Keller, PE Date: January 15, 2024 Re: Amber Fields 15th Addition – Phase 1 Final Plat Review WSB Project No. 024360-000 We have reviewed the documents provided by Alliant Engineering on December 23, 2023. Documents reviewed include: •Amber Fields 15th Addition Preliminary Plat Civil Set, dated 12/18/23 •Amber Fields 15th Addition Final Plat Civil Set, dated 12/18/23 •Amber Fields 15th Addition Plat, dated 12/15/23 It should be noted that there are outstanding comments on other previously submitted portions of the development that should be addressed. Applicant should provide responses to each comment. We offer the following comments below. Civil Comments: 1. General a. Update street names when available. b.Provide benchmark elevations on future construction plans. 2. Utilities a.Install hydrant lead valves behind curb as shown in City Details b.Provide minimum vertical 18" separation between watermain and storm sewer i. Insulate when separation is less than 36" ii. Reference City Detail W-7 for all watermain offsets c.There is a gate valve shown in the watermain offset in the intersection of Road A and Road F i. Consider shifting the valve outside of the offset for consistency in valve wrenches d.Potential conflict with storm sewer main and water and sanitary sewer services i. Offset and insulate water services crossing the storm sewer (minimum 18") e.Install sanitary sewer structures after the last active sanitary sewer service i. Lot 10 Block 2 cannot be active until upstream manhole is installed Page 201 of 221 Amber Fields 15th Addition – Phase 1 Final Plat Review January 15, 2024 Page 2 ii. Lots 11-13 Block 2 and Lots 10-12 Block 3 cannot be active until upstream manhole is installed f.Call out the proposed watermain fitting bends (maximum 45 degree) near the connect to existing at the end of Road B i. Show the gate valve at the connect to existing at the end of Road B g.Consider eliminating the 2' drop in sanitary manhole (MH 30) due to the increased maintenance hassle and shaping of the bench 3. Streets, Signage and Street Lighting a. Street centerline grades should be a minimum 1.0% 4. Landscape a. No comments at this time Grading, Drainage, and Erosion Control Comments: 5. General a. No comments 6. Ponds and Wetlands a. The HWL of Pond 7 is noted as 913.06 on the storm profile shown on sheet 30, but as 913.23 on the grading plans of the final plat plans. The last HydroCAD modeling for Pond 7 received (dated 12/01/2022) had a HWL of 913.06 as noted on the Phase 3 Mass Grading plans. If the stormwater management has changed since that time an updated SWMP and proposed conditions HydroCAD model should be provided for review. i. Note the most recent HydroCAD model included 5.43 acres of impervious for the area shown as future on the phasing plan. If additional impervious is planned for that area and will be routed to Pond 7, updated modeling and an updated SWMP should be provided confirming stormwater management requirements are still being met. ii. The internal weir wall of OCS 501 should be set at the Pond HWL and the rim elevation for the OCS should be set higher than the HWL but below the pond EOF to allow space above the weir wall within the structure. 7. Emergency Overflow Routes: a. No comments. 8. Retaining Walls: a. No comments. 9. Erosion Control: a. No comments. 10. Grading: a. No comments. Stormwater Management Plan: 1. General Storm Sewer Design Page 202 of 221 Amber Fields 15th Addition – Phase 1 Final Plat Review January 15, 2024 Page 3 a. Provide a catch basin drainage area map (including the area intended to drain to the proposed stubs) along with storm sewer sizing calculations to confirm storm sewer is sized for a 10-year storm event. b. In the Phase 3 mass grading plans storm sewer was shown in the backyards of Lots 32-41, Block 4 of Phase 2 for the 15th Addition, which is not currently shown on the preliminary plat plans. Applicant should confirm where that drainage is intended to be directed. Note that area was included in the SWMP as being directed to Pond 7 for treatment. c. Applicant should address the following concerns with the storm sewer from MH 402 to MH 401 to FES 400: i. MH 401 is currently placed in the basin infiltration shelf for Pond 7. ii. It is unclear where access for future maintenance will be for MH 401. iii. Based on the profile it appears the pipe will be exposed for the last 50 feet prior to the FES. d. Sheet piling will be required for FES 100 and FES 400 per City Standard plate SD-8. The City standard detail should be added to the plans and sheet piling should be noted for the aprons. e. It is recommended an additional structure be placed in the roadway on the lot line east of CBMH 403 to shift storm sewer from being so far into the City’s property. f. Surfaces should be fixed on the profiles in between CB 305 to CBMH 304, CBMH 200 and CBMH 201, and CBMH 201 to CBMH 202. 2. Water Quantity a. No comments. 3. Rate/Volume Control a. No comments. 4. Freeboard a. The City requires 1.5 feet of freeboard between low lying area EOFs and building opening elevations. This requirement was identified as not being met in the following locations, but applicant should confirm freeboard is being met for all proposed buildings: i. Block 4, Lots 10, 11, 12, 25, 26, 27, 28, 29, 33 and 34 (in reference to 941.1 EOF on the north side of Road E) ii. Block 6, Lot 1 (in reference to 938.16 EOF north of the lots) 5. Water Quality a. No comments. 6. Easements a. For storm sewer more than 10 feet deep, additional easement at a 1:1 depth to width ratio is required on both sides of the storm sewer. Additional easement was identified as being needed in the following locations however applicant should confirm proper easement is being provided in all locations: i. CB 256 to CBMH 255 ii. CBMH 232 to CBMH 231 to CBMH 230 iii. CBMH 202 to CBMH 201 b. Storm sewer from MH 402 to MH 401 is shown outside of easement. Note that this storm sewer is also deeper than 10 feet and would require easement at a 1:1 depth to width ratio on both sides of the storm sewer. Page 203 of 221 Amber Fields 15th Addition – Phase 1 Final Plat Review January 15, 2024 Page 4 General Infrastructure design shall be completed in accordance with the City of Rosemount’s Engineering Guidelines and Standards. Infrastructure construction shall be completed in accordance with the latest edition of the City’s General Specifications and Standard Detail Plates for Street and Utility Construction. Page 204 of 221 M E M O R A N D U M To: Adam Kienberger, Community Development Director Anthony Nemcek, Senior Planner Julia Hogan, Planner From: Dan Schultz, Parks and Recreation Director Date: January 17, 2024 Subject: Amber Field 15th Addition The Parks and Recreation Department recently reviewed the plans for the Amber Fields 15th Addition. After reviewing the plans, the Parks and Recreation Department staff has the following comments: Parks Dedication The parks dedication for the 15th addition will be met through developer installed improvements as outlined in the subdivision agreement. Regional Greenway The Vermillion Highlands Regional Greenway is identified in the City’s Parks Master Plan as being located in this area. The developer should propose how they will accommodate a 10-foot-wide Regional Greenway Trail in the 15th addition. Please let me know if you have any questions about this memo. Page 205 of 221 EXECUTIVE SUMMARY Planning Commission Regular Meeting: January 23, 2024 Tenative City Council Meeting: February 20, 2024 AGENDA ITEM: Renewal of the Danner, Inc. Small Scale Mineral Extraction Permit for 2024. AGENDA SECTION: PUBLIC HEARINGS PREPARED BY: Anthony Nemcek , Senior Planner AGENDA NO. 6.e. ATTACHMENTS: Site Location Map, Draft 2024 Mineral Extraction Permit , 2023 Pit Status, Danner Final Grading and Reclamation Plan, Aerials, Site photos APPROVED BY: AK RECOMMENDED ACTION: Motion to recommend the City Council renew the Danner, Inc. Small Scale Mineral Extraction Permit for 2024, subject to the terms and conditions in the attached Draft 2024 Conditions for Mineral Extraction AND subject to the applicant verifying the lowest elevation within the excavation area. BACKGROUND Applicant and Property Owner Marlon Danner of Danner Inc. Location 4594 145th Street East - 1/2 mile east of Highway 52 and 1/4 mile south of County Rd 42 Area 75 Acres Comp Plan Designation LDR-Low Density Residential; MDR-Medium Density Residential; HDR-High Density Residential Current Zoning AG-Agriculture The Planning Commission is being asked to consider an application from Danner, Inc. requesting renewal of their annual small-scale mineral extraction permit for the 2024 calendar year. The small- scale mineral extraction operation is located at 4594 145th Street East in the eastern portion of the City. Small Scale Mineral Extraction is permitted in the City as an Interim Use within specified areas, and the permit for such uses expires after one year. The Danner site has been operating as a mine for several years, and the request for renewal is consistent with similar renewals that have previously been issued for the site. Staff is not aware of any significant issues associated with site mining and haul-back since the last review. Please note that the approved permit allows the applicant to perform grading work in the northern portion of the site, outside the approved mining area. While this work is acceptable under the terms of the permit, the applicant should ensure there is adequate fill and topsoil remaining for reclamation of the mining site. After requesting a modification to the phasing of the grading work that was ultimately approved by the City, the work commenced four years ago and has been part of the ongoing mining and reclamation operation being conducted on the site. All such grading is taking place in the “Phase 1” grading area adjacent to County Road 42. It does not appear that much, if any, Page 206 of 221 additional material was placed in the Phase 1 fill area in 2023 and that area has been stabilized with vegetation. The applicant did not provide an updated status map with their submittal materials, but review and comparison of aerials between 2022 and 2023 show minimal changes to the site. Due to this, staff does not find an updated map necessary to renew the permit. That being said, staff is recommending the applicant verify that mining is not occurring below the 840’ elevation, in conformance with the applicant’s permit. BACKGROUND The Danner operation extracted approximately 40,000 tons of sand and gravel in 2014 and approximately 65,000 tons of material each year from 2015 through 2017. For 2018 and 2019, the applicant reported the extraction of 60,000 tons of material and this was the case for 2020 as well. 2021 saw about 30,000 tons removed, and 22,000 tons were removed in 2022. With their 2023 renewal submittal, the applicant has noted that they expected to extract a larger amount than the previous year with 60,000 cubic yards, but is reporting only 20,000 tons removed in 2023. In addition to the excavation activity, Danner continues to import material to the site for future reclamation. Over the past year, the applicant reports that there were 10,000 cubic yards of excess material brought to the site from the applicant's South St. Paul yard. Testing of this material has not been performed since 2018; at that time, the annual review included a report describing the testing performed by Braun Intertec on this haul-back material in late 2016 and early 2017. Braun Intertec’s testing found that the soils “meet the requirements of the 2014 Conditions for Small Scale Mineral Extraction Permit for Danner and the Borrow Pit Reclamation Protocol, along with complying with the MPCA guidance for Best Management Practices for the Off-Site reuse of Unregulated Fill.” The material brought to the site over the past few years originated in the same stockpiles from Danner’s South St. Paul yard. Given the relatively small amount of material brought to the site in recent years, and the fact it was coming from the same location, there hasn’t been a sense of urgency to have testing completed. Staff will work with the applicant to get that testing done in 2024 and a condition in the permit has been updated to reflect that. Staff has previously asked that the haul-back from recent years be maintained in one location so that testing of all material can occur. Near map aerials indicate that active mining is continuing in the southerly portions of Phases One and Two of the overall site. Based upon the plan and site inspection, stockpiling is occurring in the northern portion of Phase One and Two or areas designated for future phases. The attached 2023 drawing illustrates the area outlined in blue is a combination of stockpiling, circulation, and material handling activity. This work area is greater than just the mining function. The application previously stated that little restoration is occurring on the site due to stockpiling of material. Staff recommended that some restoration work be completed in 2020 and 2021. The project narrative indicates that some filling has been occurring on the southern property line, and the updated aerial imagery for the property does show that restoration continues to be completed in the southeast corner of the mine. In general, the City expects reclamation to occur as mining reaches the approved elevations, and staff is recommending that this restoration continue in 2024. The applicant has started to run out of room for excavation in the first two phases and will need to continue restoration work in these phases while moving forward into Phase 3. Filling and sloping from east to west has been occurring. An updated topographic survey was not submitted with the current request and staff does not find a need for one to approve the renewal, although staff is recommending the renewal be Page 207 of 221 conditioned on verifying the lowest elevation of the mine to confirm compliance with the requirements of the applicant’s permit. The most recent survey noted that the lowest elevation of the mine is at 839.8 feet, which is at the lowest elevation allowed in the permit. During the previous reviews, staff noted that there was storage taking place on the property unrelated to the mining activity. The permit was therefore updated in 2017 to limit the number of storage trailers allowed on the property. Based on staff’s site visit in 2023 and evidence from recent air photographs of the site, the applicant is following the requirement. Grading work is expected to continue throughout 2023 and must adhere to the approved grading plan (as updated to reflect the revised phasing plan). The intent of the grading is to create a level site with access from County Road 42 for future development. It is staff’s understanding that some of the material is from the mining site. The property/owner will be expected to fulfill the reclamation plans using additional on-site material or bring additional topsoil etc. from off site. ISSUE ANALYSIS The subject property is zoned AG – Agriculture and meets or exceeds the applicable performance standards for small scale mineral extraction. Small scale mineral extraction is listed as an interim use within the Agriculture district. The table below details the current land use, zoning, and future land use information for the surrounding properties. These properties are all currently zoned Agricultural or Agricultural Preserve and are located within the 2030 or 2040 Metropolitan Urban Service Area (MUSA). The 2040 Future Land Use Map anticipates a mixture of residential, business park, and industrial uses in this area. Surrounding Land Use and Zoning Information Direction Current Land Use Zoning Guided Land Use North Agriculture Agricultural BP – Business Park and LI – Light Industrial South Agriculture Agricultural Preserve LDR – Low Density Residential East Agriculture Agricultural LDR – Low Density Residential and MDR – Medium Density Residential West Agriculture/Mining Agricultural LDR – Low Density Residential, MDR – Medium Density Residential and HDR – High Density Residential Access to the Danner mine comes from County Road 42 via a gravel road along the eastern edge of the property. This road is shared with the Bolander mine to the east. The applicant maintains a private access agreement with the neighboring property to coordinate mining levels and allow continued access to both the sites. The permit application notes that haul roads within the City will continue to be County Road 42 to State Highway 52. The annual renewal for mineral extraction permits includes a site inspection and consultation with the Rosemount Police Department regarding any police activity. Police records noted no activity at (or calls to) the subject property in 2023. Page 208 of 221 RECOMMENDATION Staff recommends renewal of the Small Scale Mineral Extraction Permit based upon a review of the information submitted by the applicant, the mineral extraction standards in Section 11-10-4 of the City Code, City Police records and the attached draft permit. Page 209 of 221 Danner Mine Property Information 0 1,750 3,500875 ft 0 525 1,050262.5 m 1:19,200 Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.Page 210 of 221 1 Mineral Extraction Permit 2024 Conditions for Small Scale Mineral Extraction Permit DANNER, INC. A Danner Inc., hereinafter referred to as the “Property Owner”, shall sign a written consent to these conditions binding itself and its successors or assigns to the conditions of said permit. B The property Owner shall comply with all terms of this permit as well as the standards for mineral extraction listed in Section 11-10-04 of the City Code. C This permit is granted for the area designated as the eastern half of Phase Two and the entire Phase One (approximately 19.5 acres) on Exhibit A, Mineral Extraction Permit Status Map, which is attached hereto as an exhibit. Regrading and reclamation is granted for the area designated Phase I on Exhibit A. Mineral Extraction Permit dated 10-24-2016. Reclamation in Phase I should occur over the 2024 calendar year. D The term of the permit shall extend from the date approved by the City Council until December 31, 2024 unless revoked prior to that for failure to comply with the permit requirements. An Annual Mining Permit fee shall be paid to the City of Rosemount. E All required permits from the State of Minnesota, County of Dakota and City of Rosemount (hereinafter "City") or any of their agencies shall be obtained and submitted to the City prior to the issuance of the permit. Failure by the Property Owner to comply with the terms and conditions of any of the permits required under this paragraph shall be grounds for the City to terminate said mining permit. F The final grading for the permit area shall be completed in accordance with the Final Reclamation Plan, attached as Exhibit B, or as approved by the City Engineer, and any other conditions that may be imposed by the City from time to time. G All gravel trucks and other mining related traffic shall enter and exit the mining area from County State Aid Highway 42. It shall be the Property Owner's responsibility to obtain any access permits or easements necessary for ingress and egress. The location of the accesses and/or easements for ingress and egress shall be subject to approval by the City, as well as the County Highway Department if any changes occur relative to the mining process. H A plan for dust control shall be implemented and subject to approval by the City. The Property Owner shall clean dirt and debris from extraction or hauling operations related to the Mineral Extraction Permit from streets. After the Property Owner has received 24-hour verbal notice, the City may complete or contract to complete the clean-up at the Property Owner’s expense. In the event of a traffic hazard as determined by the Public Works Director or Rosemount Police Department, the City may proceed immediately to complete or contract cleanup at Property Owner’s expense without prior notification. I The surface water drainage of the mining area shall not be altered so as to interfere, contaminate, or otherwise affect the natural drainage of adjacent property. J No topsoil shall be removed from the site and the Property Owner shall take necessary measures to prevent erosion of the stockpiled topsoil. The location of the stockpiled topsoil shall be as indicated on Exhibit A. K Any costs incurred now or in the future in changing the location of existing public or private utilities including but not limited to pipelines, transmission structures and sewer infrastructure located within the permit area shall be the sole obligation and expense of the Property Owner. Page 211 of 221 2 L All costs of processing the permit, including but not limited to planning fees, engineering fees and legal fees, shall be paid by the Property Owner prior to the issuance of the permit. The Property Owner shall reimburse the City for the cost of periodic inspections by the City Engineer or any other City employee for the purpose of insuring that conditions of the permit are being satisfied. The Property Owner agrees to reimburse the City for any other costs incurred as a result of the granting or enforcing of the permit. M The daily hours of operation for the mining area shall be limited to 7:00 a.m. to 7:00 p.m. Monday through Saturday, subject, however, to being changed by the City Council. N The Property Owner shall deposit with the Planning Department a surety bond or cash escrow in the amount of Seven Thousand Five Hundred Dollars per acre ($7,500.00/acre) of active phase in favor of the City for the cost of restoration, regrading and/or revegetating land disturbed by mining activities and to assure compliance with these conditions by the Property Owner. The required surety bonds must be: (1) With good and sufficient surety by a surety company authorized to do business in the State of Minnesota with the right of the surety company to cancel the same only upon at least thirty (30) days written notice to the permit holder and the City. (2) Satisfactory to the City Attorney in form and substance. (3) Conditioned that the Property Owner will faithfully comply with all the terms, conditions and requirements of the permit; all rules, regulations and requirements pursuant to the permit and as required by the City and all reasonable requirements of the City Engineer, or any other City officials. (4) Conditioned that the Property Owner will secure the City and its officers harmless against any and all claims, or for which the City, the Council or any City officer may be made liable by reason of any accident or injury to persons or property through the fault of the Property Owner. (5) The surety bond or cash escrow shall remain in effect from January 1, 2024 to July 31, 2025. Upon thirty (30) days’ notice to the permit holder and surety company, the City may reduce or increase the amount of the bond or cash escrow during the term of this permit in order to insure that the City is adequately protected. O. The Property Owner shall furnish a certificate of comprehensive general liability insurance issued by insurers duly licensed within the State of Minnesota in an amount of at least Five Hundred Thousand and no/100 ($500,000.00) Dollars for injury or death of any one person in any one occurrence, bodily injury liability in an amount of at least One Million Five Hundred Thousand and no/100 ($1,500,000.00) Dollars and property damage liability in an amount of at least Two Hundred Fifty Thousand and no/100 ($250,000.00) Dollars arising out of any one occurrence. The policy of insurance shall name the City as an additional insured and shall remain in effect from January 1, 2024 to July 31, 2025. P. The storage of equipment (unrelated to the sand and gravel mining and processing), manure, construction debris, or hazardous materials of any kind shall not be permitted on site. The placement of construction debris, manure, asphalt in any form or hazardous materials within the pit as fill shall be strictly prohibited. Q. The Property Owner shall hold the City harmless from all claims or causes of action that may result from the granting of the permit. The Property Owner shall indemnify the City for all costs, damages or expenses, including but not limited to attorney's fees that the City may pay or incur in consequence of such claims. R. The Property Owner shall comply with such other requirements of the City Council as it shall from time to time deem proper and necessary for the protection of the citizens and general welfare of the community. S. Complete mining and reclamation is required in all phases before any additional mining is authorized. Modifications or expansion of the mining areas must be approved in writing to the City. Property Owner Page 212 of 221 3 shall submit to the City semiannually a written report indicating the amount of material extracted from the site for the prior six-month period. T. The Property Owner shall incorporate best management practices for controlling erosion and storm water runoff as specified by the Minnesota Pollution Control Agency and the United States Environmental Protection Agency. U. Reclamation shall include the replacement of the entire stockpile of topsoil on the mined area, reseeding and mulching necessary to re-establish vegetative cover for permanent slope stabilization and erosion control. The minimum depth of topsoil shall not be less than two inches after reclamation. No restored slopes may exceed a gradient of 25% or four to 1 (4:1). V. The Property Owner must show how materials stockpiled for recycling will be processed and inform the City of all stockpiled materials. W. All recycling must be completed with the completion of the current phase and materials removed from the site. No recycling processes shall be allowed to continue into subsequent phases. X. The Property Owner may not assign this permit without written approval of the City. The Property Owner will be responsible for all requirements of this permit and all City ordinances on the licensed premises for the permit period unless the Property Owner gives sixty (60) days prior written notice to the City of termination and surrenders the permit to the City. The Property Owner shall identify all Operators prior to their commencement of mineral extraction-related activities in the pit area. The City shall have the authority to cause all mineral extraction activities to cease at any time there is an apparent breach of the terms of this Permit. Y. The Property Owner shall install and maintain a “stock” gate (or equivalent) at the entrance to the property where the mining operation is located. The gate must be secured at 7:00 p.m. and at any time the pit is not in use. Z. The fill area regrading and reclamation shall follow the procedures described in the Danner Inc. Borrow Pit Reclamation Protocol Rosemount, Minnesota including a report submitted to the City describing the quantities of material brought in, where the material came from, and the test result of the material. The reports submitted shall describe the quantities of material brought in, where the material came from, and the test results, including supporting analytical results of the materials. AA.No gravel mining is permitted in the Fill Area as shown on Exhibit A. BB.Mining to the elevation of 840 feet above mean sea level provided that the site is reclaimed to the elevation shown on Exhibit A with haul-back, clean-fill material in accordance with the Danner Inc. Borrow Pit Reclamation Protocol Rosemount, Minnesota. In no instance shall mining occur in the groundwater aquifer. CC. Blasting or the use of explosives is prohibited in the mining of the Danner gravel pit. DD. The City of Rosemount shall have the ability to collect independent soil and water samples. EE. The operator shall install and maintain “No Trespassing” signs consistent with the standards outlined in Minnesota State Statute 609.605. Page 213 of 221 4 FF. The operator is permitted to have two trailers for storage of items directly related to the operation of the mine and mining equipment. Storage of more than two trailers would be a violation of the conditions of the mining permit and could be cause for revocation of the approval. GG. Testing of all haul-back material brought to the site shall be completed, and the results submitted to the City, by May 1, 2024. That Danner, Inc., Property Owner, hereby consents and agrees to the foregoing conditions of said mining permit. IN WITNESS WHEREOF, the Property Owner has hereunto set his hand this _____ day of __________________, 20_____. DANNER, INC. By:__________________________________ Its: _________________________ STATE OF MINNESOTA ) ) § COUNTY OF __________ ) The foregoing instrument was acknowledged before me this ______day of _________________, 20___, by __________________________________, on behalf of Danner, Inc., Property Owner. ______________________________________ Notary Public Page 214 of 221 107221 PIT STATUS 2017 LANDSCAPE ARCHITECTS I hereby certify that this plan was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of 2422 Enterprise Drive,Mendota Heights, MN 55120 (651)681-1914 Fax:681-9488 CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS Date Designed Drawn Name Reg. No. Date OF 11-2-21 NAP NAP 11DANNER, INC. SOUTH ST. PAUL, MINNESOTA 55075 ROSEMOUNT PIT - CO. RD. 42 ROSEMOUNT, MINNESOTA MINERAL EXTRACTION PERMIT 843 HARDMAN AVENUE SOUTH 2023 - STATUS LOCATION MAP LOWEST VERIFIED ELEVATION: 839.8 1-20-23 LicenseState Page 215 of 221 Page 216 of 221 2023 2022 Page 217 of 221 Page 218 of 221 Page 219 of 221 Page 220 of 221 Page 221 of 221