Loading...
HomeMy WebLinkAbout20241126 Meeting AGENDA Planning Commission Regular Meeting Tuesday, November 26, 2024 6:30 PM City Council Chambers, City Hall 1. CALL TO ORDER/PLEDGE OF ALLEGIANCE 2. ADDITIONS TO AGENDA 3. AUDIENCE INPUT 4. CONSENT AGENDA a. Minutes of the October 22, 2024 Regular Meeting Minutes 5. OLD BUSINESS 6. PUBLIC HEARINGS a. Request by Frattalone Companies, Inc. for renewal of its Small-Scale Mineral Extraction Permit for 2025. b. Request by Keystone Development Partners, LLC., for approval of a site plan to construct office/warehouses in the Biscayne Business Park. c. Request by Minnesota Paving Materials for renewal of its interim use permit for a seasonal asphalt plant. 7. NEW BUSINESS 8. DISCUSSION 9. ADJOURNMENT Page 1 of 73 ROSEMOUNT PLANNING COMMISSION Pursuant to due call and notice thereof a regular meeting of the Planning Commission was held on Tuesday, October 22, 2024, at 6:30 PM. in Rosemount Council Chambers, 2875 145th Street West. Chairperson Kenninger called the meeting to order with Commissioners Whitman, Ellis, Beadner, Reed, and Rivera. Commissioner Buggi was absent. Staff present included the following: Community Development (CD) Director Kienberger, Senior Planner Anthony Nemcek, and Planner Hogan. The Pledge of Allegiance was said. Staff recommended changing the order of the items under Section 6. Public Hearings to switch item A, a Comprehensive Plan Amendment proposing changes to the Metropolitan Urban Services Area Boundary, and item C, a request by DevCo Preservation LLC for PUD Final Site and Building Plan approval. None. Commissioner Kenninger identified a typo in the Old Business section on page three, motion B which says capacity instead of opacity. Kenninger Second by Whitman to approve the Consent Agenda with the edit to the minutes as sent to staff to correct the typo from capacity to opacity. Page 2 of 73 Ayes: 6. Nays: None. Motion Carried. a. Minutes of the September 24, 2024, Regular Meeting Minutes OLD BUSINESS None. PUBLIC HEARINGS a. Comprehensive Plan Amendment proposing changes to the Metropolitan Urban Services Area boundary. Senior Planner Nemcek presented on two amendments to the City of Rosemount Comprehensive Land Use Plan to expand the Metropolitan Urban Service Area (MUSA). The boundary identifies areas that are anticipated to receive municipal services like sewer and water. The first amendment will expand the MUSA boundary to include the rest of the middle school site that it currently bisects. The second amendment would incorporate 60 acres of the UMore Park into the MUSA boundary as they begin to market land guided for a Business Park in the area for development. Staff is supportive of the changes and there will be no alterations to the land use map designations as a part of the MUSA expansion. Nemcek stated that if the expansion is approved by city council it will also be sent for review by adjacent jurisdictions and the amendments will be sent to the metropolitan council for approval. Chairperson Kenninger opened the public hearing. Motion by Kenninger Second by Beadner Motion to close the public hearing on Item 6a. Ayes: 6. Nays: None. Motion Carried. Motion by Rivera Second by Ellis Motion to recommend the City Council approve two amendments to the Comprehensive Land Use Plan to expand the MUSA to contain the entire site of the new middle school and sixty acres south of Meta's data center project within UMore Park. Ayes: 6. Nays: None. Motion Carried. b. Zoning ordinance text amendments to Title 11 of the Rosemount City Code and revisions to the City of Rosemount’s Zoning Map. Page 3 of 73 Planner Hogan presented on the proposed amendments to sections 11-3-4: Site Dimensions, 11-4-4: Site Dimensions, 11-4-5: District Standards, 11-6-3: Principal Uses, Commercial, 11-7-2: Architectural Standards, 11-7-6: Landscaping, Screening, and Buffering Standards, as well as Zoning Map revisions. Page 4 of 73 that as new questions come up, staff has been keeping a list and, with the code update, had incorporated things like this item to clarify questions from businesses and residents. Page 5 of 73 from the office space or the rooms for amenities that don't count toward the unit space but said that she would be fine removing it. Nemcek noted that staff believes, from the way the code was written, that eight was originally the minimum number of trees. Motion by Kenninger Second by Reed Motion to close the public hearing on Item 6b. Ayes: 6. Nays: None. Motion Carried. Motion by Kenninger Second by Reed Motion to recommend the City Council approve the Text Amendments amending Sections 11-3-4: Site Dimensions, with the modification to include structures of 200 square feet or less have a five-foot setback and structures greater than 200 Ayes: 6. Nays: None. Motion Carried. Motion by Ellis Second by Whitman Motion to recommend the City Council approve the recommended corrections to the City of Rosemount’s Zoning Map. Ayes: 6. Nays: None. Motion Carried. Page 6 of 73 0.4 miles east of Akron Avenue between CSAH 42 and Connemara Trail. The project will consist of two buildings, which will split the 192 units equally. The site was rezoned for high density residential and will generally conform with the zoning requirements except for being unable to meet the 10-foot additional setback from Connemara Trail, due to its status as a collector, and landscaping requirements. Staff recommended approval of the PUD final site and building plan, subject to conditions. Before final approval can be made, there must be a conversion of the subject parcel from an outlot to a buildable lot. Robert Elliott 14349 Acer Avenue Rosemount, MN Trevor Martinez 4275 Large Place Plymouth, MN 55442 Page 7 of 73 Mr. Martinez stated that the project is intended to be workforce housing and there will not be a contract with the government to create individual units paid for and administered through HUD. The project is intended to be for people making around $30,000 to $90,000 a year based on household size and number of occupants. There will be screening standards for all applicants that require them to be making at least two and a half times the amount of monthly rent. Mr. Martinez said that because the housing is aimed toward 50 to 70 percent of the area median income, individuals are less likely to opt for additional services and amenities like underground parking. Page 8 of 73 Mr. Elliot returned to the podium and stated that if the scope of the project were smaller, they would be able to plant more trees. He also said that many of the residents living on Acer Avenue had children, which is why they could not attend meetings. He stated that building codes drive up the cost of building and questioned how a residential building can comply with the various codes and be affordable. Mr. Motion by Kenninger Second by Reed Motion to Close the public hearing on Item 6c. Ayes: 6. Nays: None. Motion Carried. Page 9 of 73 Commissioner Beadner asked if in the future Connemara Trail will have more developments that will increase density. Nemcek responded that the city's transportation plan anticipates extending Connemara Trail down to Bonaire Path as development continues to occur moving east. Motion by Kenninger Second by Beadner Motion to approve the Planned Unit Development Final Site and Building Plan allowing DevCo Preservation LLC to construct a multi-unit residential development, subject to the following conditions: Ayes: 6. Nays: None. Motion Carried. NEW BUSINESS Page 10 of 73 None. DISCUSSION ADJOURNMENT Page 11 of 73 E X E C U T I V E S U M M A R Y Planning Commission Regular Meeting: November 26, 2024 Tenative City Council Meeting: December 17, 2024 AGENDA ITEM: Request by Frattalone Companies, Inc. for renewal of its Small-Scale Mineral Extraction Permit for 2025. AGENDA SECTION: PUBLIC HEARINGS PREPARED BY: Julia Hogan, Planner AGENDA NO. 6.a. ATTACHMENTS: Site Location, DRAFT 2025 Mineral Extraction Permit , Applicant's Narrative, 2023 Conditions, Site Plan, Reclamation Plan , Site Photos, Aerial Imagery, Panoramic Imagery APPROVED BY: AK RECOMMENDED ACTION: Motion to recommend the City Council approve the Frattalone Companies, Inc. Small Scale Mineral Extraction Permit for 2025, subject to the terms and conditions in the attached 2025 Draft Conditions for Mineral Extraction. BACKGROUND SUMMARY Applicant & Property Owner(s): Frattalone Companies, Inc., 3205 Spruce Street, Saint Paul, Minnesota Location: Immediately west of Emery Avenue along CSAH 42 Area: 73.39 Acres (overall site); 26.08 (active mining area) Comp. Guide Plan Designation: CC-Community Commercial, MDR-Medium Density Residential, HDR-High Density Residential Current Zoning: A2 – Agricultural The Planning Commission is being asked to consider a request from Frattalone Companies, Inc. for renewal of a small-scale mineral extraction permit that is located on a 73.39-acre parcel immediately west of Emery Avenue and south of County Highway 42. This small-scale mineral extraction operation was newly approved by the City Council in May 2023. Typically, interim use permits for mineral extraction are valid for one calendar year (January – December 31). However, due to the timing of the initial permit request, staff recommended that the permit be issued through 2024 with administrative staff review at the end of 2023. Staff recommends approval of the renewal request for 2025 based upon a review of the information submitted by the applicant, the mineral extraction standards in Section 11-6-4 M. of the City Code, and the attached permit. BACKGROUND Page 12 of 73 The applicant, Frattalone Companies, Inc., owns a construction and excavation business in Little Canada and is asking to establish a new mineral extraction site along Highway 42 in Rosemount. Because the mineral extraction use will be closely tied to the applicant’s primary business, there will be limited sales of materials to outside projects from the mine. The applicant provided a detailed application packet for the mining operation with their initial submittal in 2023. The mineral extraction site is located along the western frontage of Emery Avenue and south of County Highway 42 (145th Street East). Similar to other neighboring properties along Highway 42, there is a 45-50-foot rise in height between the northern and southerly property lines, with a steep ridge that provides a break/transition between the lower portions of the property along Highway 42 and the higher elevations to the south. Other than the ridge, most of the site is gently rolling, but relatively flat. There are currently no structures on the site, which has been used for agricultural fields for many years, similar to much of the surrounding land. The other uses in the area include single-family residences southeast of the site, and the Danner and Bolander mineral extraction uses to the west. The applicant’s mine will share a common border with Bolander, and as excavation occurs in both gravel pits along this boundary, the final grades for each mine will likely be adjusted to match each other. This shared lot line approach has been used on the other side of the Bolander operation (adjacent to Danner) and the final reclamation plans may be able to eliminate the western slope as currently shown. Because the boundary is within the latter phases of the Bolander mining permit, the reclamation plan should continue to show the slope as proposed until Bolander progresses to its later stages. The proposed extraction activity will take place on 26.08 acres in the southern portion of the site in accordance with the “mine boundary” depicted in the mining plan. The applicant was initially proposing primary access to the active mining area via a new driveway from Highway 42 running along the western property boarder and secondary access was shown off of Emery Avenue near the northeast portion of the mining area. Due to the denial of the entrance permit for access onto County Road 42 by Dakota County, the access entrance to the site was constructed off of Emery Avenue. Mining is proposed to occur over two phases, generally moving from the east to the west on the southern portion of the property. Excavation will lower the active mining portions of the site to the 840-850 elevation range, which represents a cut of roughly 40 feet across the active mining part of the site. The proposed final grades as depicted on the reclamation plan will bring the southern portion of the property very close to the elevation of the northern part of the property. Essentially, the applicant is proposing to excavate into the ridgeline and maintain these grades (with a slight incline) throughout the mine. The phases have been developed to comply with the City’s extraction requirements that each phase be no more than 15 acres in size. The applicant has stated that they anticipate removing 100,000 cubic yards of material per year, which corresponds to an operational life of the facility of 16 years. The applicant has provided an update on the activity that has been occurring on site since its initial approval. In 2023, no material was extracted from the site. In 2024 22,475 cubic years of sand was extracted from the site during quarter 3. It is estimated that 30,000 cubic yards of sand will be extracted during quarter four of 2024. There have been no cubic yards of imported material brought into the site, though they expect approved material to start being imported in 2025. Mining initially Page 13 of 73 occurred on the northern portion of the site in phase 1. For the remainder of 2024 and into 2025, mining will continue to occur in that area with plans to work their way south. ISSUE ANALYSIS Aggregate mining is reviewed through an interim use permit, which is a Quasi-Judicial action. As such, the City has a set of standards and requirements for review. Generally, if the applications meet the ordinance requirements, they must be approved. The standards and requirements for this mineral extraction are detailed in Section 11-6-4 M. of the Zoning Ordinance and the attached Mineral Extraction permit. The subject property is zoned A2 – Agricultural and meets or exceeds the applicable performance standards for small scale mineral extraction. Small scale mineral extraction is listed as an interim use within the A-2 – Agricultural district. The table below details the current land use, zoning, and future land use information for the surrounding properties. These properties are all currently zoned Agricultural and are located within the 2040 Metropolitan Urban Service Area (MUSA). The 2040 Future Land Use Map anticipates a mixture of residential and commercial uses in this area. Surrounding Land Use and Zoning Information Direction Current Land Use Zoning Guided Land Use North Agriculture Agricultural CC - Community Commercial South Agriculture Agricultural LDR – Low Density Residential East Agriculture Agricultural CC -Community Commercial MDR - Medium Density Residential HDR - High Density Residential West Agriculture/Mining Agricultural CC - Community Commercial LDR - Low Density Residential MDR - Medium Density Residential The 2040 Comprehensive Plan designates commercial development at the intersection of Emery Avenue and County Road 42, while medium- and high-density residential development is designated over the proposed mining and grading area. Future reclamation of the site will need be performed before an impacted area may be developed for housing. Because of the site’s location further east of 52, the development staging of properties in the area should not create as much of an impact on the timing of mining operations in the future as it would on the mining operations to the west, such as the Steiniger pit. The water table is located at an approximate elevation of 800 feet or lower based on information provided by Dakota County, and the lowest mining elevation is well above that number. Throughout the majority of the site, there will be approximately 40 feet between the bottom of the mine and groundwater, which is consistent with other mines in the vicinity. Page 14 of 73 As a part of the annual review of all mineral extraction permits, staff performs an inspection of the site and consults with the Rosemount Police Department regarding any police activity. No ordinance or permit condition violations were apparent during the inspection and police records found no incidents at the subject property during 2024. RECOMMENDATION Staff recommends approval of this request based upon a review of the information submitted by the applicant, the mineral extraction standards in Section 11-6-4 M. of the City Code, and the attached permit with conditions of approval. Page 15 of 73 Page 16 of 73 1 Mineral Extraction Permit 2023-20242025 Conditions for Small Scale Mineral Extraction Permit FRATTALONE COMPANIES, INC. A Frattalone Companies Inc., hereinafter referred to as the “Property Owner”, shall sign a written consent to these conditions binding itself and its successors or assigns to the conditions of said permit. B The property Owner shall comply with all terms of this permit as well as the standards for mineral extraction listed in Section 11-10-04 11-6-4 M. of the City Code. C This permit is granted for the area designated as Phase 1 (approximately 15 acres) on Exhibit A, Mineral Extraction Permit Mine Plan, which is attached hereto as an exhibit. Regrading and reclamation shall occur in the area designated Phase 1 on Exhibit A in accordance with the requirement of Section 11-10-4.4 11-6-4 M.4 of the City Code. Reclamation is not expected to occur in the 2023 or 2024 2025 calendar year, D The term of the permit shall extend from the date approved by the City Council until December 31, 20254 unless revoked prior to that for failure to comply with the permit requirements. An Annual Mining Permit fee shall be paid to the City of Rosemount. E All required permits from the State of Minnesota, County of Dakota and City of Rosemount (hereinafter "City") or any of their agencies shall be obtained and submitted to the City prior to the issuance of the permit. Failure by the Property Owner to comply with the terms and conditions of any of the permits required under this paragraph shall be grounds for the City to terminate said mining permit. F The final grading for the permit area shall be completed in accordance with the Final Reclamation Plan, attached as Exhibit B, or as approved by the City Engineer, and any other conditions that may be imposed by the City from time to time. G Primary access to the site by all gravel trucks and other mining related traffic shall be from County State Aid Highway 42 Emery Avenue. , pending approval by Dakota County of an access permit. It shall be the Property Owner's responsibility to obtain any access permits or easements necessary for ingress and egress. The location of the accesses and/or easements for ingress and egress shall be subject to approval by the City, as well as the County Highway Department if any changes occur relative to the mining process. If an access permit is not granted by the County, access shall be from Emery Avenue, subject to seasonal restrictions. H A plan for dust control shall be implemented and subject to approval by the City. The Property Owner shall clean dirt and debris from extraction or hauling operations related to the Mineral Extraction Permit from streets. After the Property Owner has received 24-hour verbal notice, the City may complete or contract to complete the clean-up at the Property Owner’s expense. In the event of a traffic hazard as determined by the Public Works Director or Rosemount Police Department, the City may proceed immediately to complete or contract cleanup at Property Owner’s expense without prior notification. I The surface water drainage of the mining area shall not be altered so as to interfere, contaminate, or otherwise affect the natural drainage of adjacent property. J No topsoil shall be removed from the site and the Property Owner shall take necessary measures to prevent erosion of the stockpiled topsoil. The location of the stockpiled topsoil shall be as indicated on Exhibit A. Page 17 of 73 2 K Any costs incurred now or in the future in changing the location of existing public or private utilities including but not limited to pipelines, transmission structures and sewer infrastructure located within the permit area shall be the sole obligation and expense of the Property Owner. L All costs of processing the permit, including but not limited to planning fees, engineering fees and legal fees, shall be paid by the Property Owner prior to the issuance of the permit. The Property Owner shall reimburse the City for the cost of periodic inspections by the City Engineer or any other City employee for the purpose of insuring that conditions of the permit are being satisfied. The Property Owner agrees to reimburse the City for any other costs incurred as a result of the granting or enforcing of the permit. M The daily hours of operation for the mining area shall be limited to 7:00 a.m. to 7:00 p.m. Monday through Saturday, subject, however, to being changed by the City Council. N The Property Owner shall deposit with the Planning Department a surety bond or cash escrow in the amount of Seven Thousand Five Hundred Dollars per acre ($7,500.00/acre) of active phase in favor of the City for the cost of restoration, regrading and/or revegetating land disturbed by mining activities and to assure compliance with these conditions by the Property Owner. The required surety bonds must be: (1) With good and sufficient surety by a surety company authorized to do business in the State of Minnesota with the right of the surety company to cancel the same only upon at least thirty (30) days written notice to the permit holder and the City. (2) Satisfactory to the City Attorney in form and substance. (3) Conditioned that the Property Owner will faithfully comply with all the terms, conditions and requirements of the permit; all rules, regulations and requirements pursuant to the permit and as required by the City and all reasonable requirements of the City Engineer, or any other City officials. (4) Conditioned that the Property Owner will secure the City and its officers harmless against any and all claims, or for which the City, the Council or any City officer may be made liable by reason of any accident or injury to persons or property through the fault of the Property Owner. (5) The surety bond or cash escrow shall remain in effect from June 1January 1, 20253 to July 31, 20265. Upon thirty (30) days’ notice to the permit holder and surety company, the City may reduce or increase the amount of the bond or cash escrow during the term of this permit in order to insure that the City is adequately protected. O. The Property Owner shall furnish a certificate of comprehensive general liability insurance issued by insurers duly licensed within the State of Minnesota in an amount of at least Five Hundred Thousand and no/100 ($500,000.00) Dollars for injury or death of any one person in any one occurrence, bodily injury liability in an amount of at least One Million Five Hundred Thousand and no/100 ($1,500,000.00) Dollars and property damage liability in an amount of at least Two Hundred Fifty Thousand and no/100 ($250,000.00) Dollars arising out of any one occurrence. The policy of insurance shall name the City as an additional insured and shall remain in effect from January 1 June 1, 20253 to July 31, 20265. P. The storage of equipment (unrelated to the sand and gravel mining and processing), manure, construction debris, or hazardous materials of any kind shall not be permitted on site. The placement of construction debris, manure, asphalt in any form or hazardous materials within the pit as fill shall be strictly prohibited. Q. No processing or mixing of materials shall occur on the site, except as approved by the Dakota County Environmental Management Department as incidental to a sand and gravel mining operation. Any such activities will be enclosed with snow or cyclone fencing or as approved by City staff. Construction of any ponding areas, wash plants or other processing or equipment brought to the site shall require additional site and grading plan information subject to review and approval of the City Engineer. Page 18 of 73 3 R. The Property Owner shall hold the City harmless from all claims or causes of action that may result from the granting of the permit. The Property Owner shall indemnify the City for all costs, damages or expenses, including but not limited to attorney's fees that the City may pay or incur in consequence of such claims. S. The Property Owner shall comply with such other requirements of the City Council as it shall from time to time deem proper and necessary for the protection of the citizens and general welfare of the community. T. Complete mining and reclamation is required in all phases before any additional mining is authorized. Modifications or expansion of the mining areas must be approved in writing to the City. Property Owner shall submit to the City semiannually a written report indicating the amount of material extracted from the site for the prior six-month period. U. The Property Owner shall incorporate best management practices for controlling erosion and storm water runoff as specified by the Minnesota Pollution Control Agency and the United States Environmental Protection Agency. V. Reclamation shall include the replacement of the entire stockpile of topsoil on the mined area, reseeding and mulching necessary to re-establish vegetative cover for permanent slope stabilization and erosion control. The minimum depth of topsoil shall not be less than two inches after reclamation. No restored slopes may exceed a gradient of 25% or four to 1 (4:1). W. The Property Owner must show how materials stockpiled for recycling will be processed and inform the City of all stockpiled materials. X. The Property Owner may not assign this permit without written approval of the City. The Property Owner will be responsible for all requirements of this permit and all City ordinances on the licensed premises for the permit period unless the Property Owner gives sixty (60) days prior written notice to the City of termination and surrenders the permit to the City. The Property Owner shall identify all Operators prior to their commencement of mineral extraction-related activities in the pit area. The City shall have the authority to cause all mineral extraction activities to cease at any time there is an apparent breach of the terms of this Permit. Y. The Property Owner shall install and maintain a “stock” gate (or equivalent) at the entrance to the property where the mining operation is located. The gate must be secured at 7:00 p.m. and at any time the pit is not in use. Z. There shall be no “haul-back” of materials from any other property or job site that would be imported to the property for fill or other purposes other than incidental concrete recycling as referred to in paragraphs Q, W, and topsoil imported for the purpose of re-establishing turf as accepted by the City. AA. Mining to the elevation of 840 feet above mean sea level provided that the site is reclaimed to the elevation shown on Exhibit A with haul-back, clean-fill material. In no instance shall mining occur in the groundwater aquifer. CC. Blasting or the use of explosives is prohibited. DD. Truck operators within the pit area shall not engage in practices involving slamming tailgates, vibrating boxes, using of “jake” or engine brakes (except in emergency situations) or other such activities that result in excessive noise. Page 19 of 73 4 EE. The City of Rosemount shall have the ability to collect independent soil and water samples. FF. The operator shall install and maintain “No Trespassing” signs consistent with the standards outlined in Minnesota State Statute 609.605. Frattalone Companies, Inc., Property Owner, hereby consents and agrees to the foregoing conditions of said mining permit. IN WITNESS WHEREOF, the Property Owner has hereunto set his hand this _____ day of __________________, 20___23. Frattalone Companies, INC. By:__________________________________ Its: _________________________ STATE OF MINNESOTA ) ) § COUNTY OF __________ ) The foregoing instrument was acknowledged before me this ______day of _________________, 20___23, by __________________________________, on behalf of Frattalone Companies, Inc., Property Owner. ______________________________________ Notary Public Page 20 of 73 3205 Spruce Street · St. Paul, MN 55117 · Phone 651.484.0448 · Fax 651.484.7839 · www.frattaloneco.com • E a r t h w o r k • D e m o l i t i o n • U t i l i t i e s October 28, 2024 Julia Hogan City of Rosemount 2875 145th Street West Rosemount, MN 55068-4997 Re: Application for Renewal of the Small Scale Mineral Extraction Permit for 2025 Dear Ms. Hogan: Enclosed you will find the application to renew our existing Mineral Extraction Permit for 2025. In addition to the permit application, here is a summary of our pit operations. Summary of Activity Since the Permit was Issued: · All required state and county permits have been obtained. · A construction entrance was installed off of Emery Ave and that is where 100% of access has occurred · Here are the quantities of sand material that have been extracted from the site o 2023 0 CY o 2024Q1 0 CY o 2024Q2 0 CY o 2024Q3 22,475 CY o 2024Q4 TBD – Estimating 30,000 CY · There has been 0 CY of imported material to the site. We expect approved material to start being imported in 2025. I have also included a current aerial photo of the pit conditions as well as our originally submitted plans. As you can see, mining has begun on the north portion of Phase 1. The plan for the rest of 2024 and into 2025 is to continue mining in that area and to move south. All within Phase 1 of the original plan. If you have any further questions or concerns, please reach out to me directly and we will address. Thank you in advance for your consideration of this renewal. Sincerely, Nick Frattalone CEO Page 21 of 73 Page 22 of 73 Page 23 of 73 X 10/28/24 Page 24 of 73 Page 25 of 73 1 of 7 INDEX SHEET POLLUTION PREVENTION PLAN FRATTALONE COMPANIES, INC. 3205 SPRUCE STREET, ST. PAUL, MN 55117 DESCRIPTIONREVDATEBYI hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota Print Name: Signature: Date:License #: Drawn: Designed: Date: BLP BLP 15650 36TH AVE N SUITE 110 PLYMOUTH, MN 55446 TEL (952) 346-3900 FAX (952) 346-3901 CARLSONMCCAIN.COM BLP1 BERGER PIT ROSEMOUNT, MN NOTES: AERIAL IMAGE OBTAINED FROM US FISH AND WILDLIFE SERVICE NATIONAL WETLANDS INVENTORY MAPPER. UNIDENTIFIED WETLANDS ON LOCATION MAP ARE NOT ABLE TO RECEIVE A STORMWATER DISCHARGE FROM SITE. LEASE BOUNDARY 1-MILE OFFSET OF PROPERTY BOUNDARY PROPOSED SITE ENTRANCE POLLUTION PREVENTION PLAN BERGER PIT ROSEMOUNT, MN EM E R Y A V E E BOLANDER PED PIT (ADJACENT ACTIVE GRAVEL MINING) TITLESHEET NO. 1 3 4 SITE PLAN INDEX SHEET NARRATIVE 6 INSPECTION FORM TRAINING FORM 5 2 EXISTING CONDITIONS &PROPERTY BOUNDARY RESTORATION PLAN 7 SKB CONTAINMENT CO HWY 42 CO H W Y 4 2 MN H W Y 5 5 ADJACENT LANDOWNERS MINNESOTA STATE MAP PROJECT LOCATION MAP NOT TO SCALE PROJECT LOCATION PROPOSED SITE ENTRANCE Brannon L. Peterson, PE 58910 ISSUED FOR PERMIT APPLICATION 3/22/233/22/23 3/22/23 P: \ P r o j e c t s \ F r a t t a l o n e \ B e r g e r P i t \ N P D E S P e r m i t \ P 2 P l a n \ B e r g e r P i t P 2 P l a n . d w g , 3 / 2 2 / 2 0 2 3 2 : 0 2 : 2 0 P M , D W G T o P D F . p c 3 Page 26 of 73 84 0 84 0 84 0 84 0 84 0 84 0 85 0 85 0 85 0 850 85 0 85 0 850 85 0 860 86 0 86 0 86 0 86 0 87 0 87 0 87 0 87 0 87 0 88 0 88 0 88 0 88 0 88 0 89 0 89 0 89 0 89 0 89 0 890 OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHEOHEOHEOHEOHEOHEOHEOHEOHE >>> >>> Drawn: Designed: Date: BLP BLP 15650 36TH AVE N SUITE 110 PLYMOUTH, MN 55446 TEL (952) 346-3900 FAX (952) 346-3901 CARLSONMCCAIN.COM BLP1 ISSUED FOR PERMIT APPLICATION 2 of 7 EXISTING CONDITIONS & ADJACENT LAND OWNERS POLLUTION PREVENTION PLAN DESCRIPTIONREVDATEBYI hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota Print Name: Signature: Date:License #: EXISTING CULVERT FRATTALONE COMPANIES, INC. 3205 SPRUCE STREET, ST. PAUL, MN 55117 BERGER PIT ROSEMOUNT, MN NOTES: 1.TOPOGRAPHIC CONTOURS FROM MN DNR MNTOPO GIS ELEVATION DATA. 2.PROPERTY BOUNDARIES AND ROADWAYS FROM DAKOTA COUNTY GIS DATA. 3.OVERHEAD ELECTRIC AND WOODS APPROXIMATE FROM AERIAL IMAGERY. STORMWATER FLOW DIRECTION LEASE BOUNDARY TOPOGRAPHIC MAJOR CONTOUR TOPOGRAPHIC MINOR CONTOUR 880 APPROXIMATE OVERHEAD ELECTRIC LEGEND APPROXIMATE WOODS PROPOSED MINING BOUNDARY BOLANDER PED PIT (EXISTING MINING) NEIGHBORING PARCELS APPROXIMATE WELL PROPERTY BOUNDARY EXISTING FIELD ENTRANCE (10' INTERVAL) (2' INTERVAL) EXISTING CULVERT APPROX. ELECTRIC TRANSMISSION LINE GRAVEL ROADWAY APPROX. OVERHEAD ELECTRIC ELECTRIC TRANSMISSION TOWER ELECTRIC TRANSMISSION TOWER APPROX. BURIED HAZARDOUS LIQUID PIPELINE AND 50' EASEMENT PROPOSED MINING BOUNDARY APPROX. BURIED HAZARDOUS LIQUID PIPELINE AND 50' EASEMENT APPROX. IRRIGATION WELL IRRIGATION BOOM RADIUS APPROXIMATE BURIED PIPELINE LEASE BOUNDARY APPROXIMATE EASEMENT Brannon L. Peterson, PE 58910 APPROX. 165' ELECTRIC TRANSMISSION LINE EASEMENT 3/22/233/22/23 3/22/23 P: \ P r o j e c t s \ F r a t t a l o n e \ B e r g e r P i t \ N P D E S P e r m i t \ P 2 P l a n \ B e r g e r P i t P 2 P l a n . d w g , 3 / 2 2 / 2 0 2 3 2 : 0 2 : 4 6 P M , D W G T o P D F . p c 3 Page 27 of 73 84 0 84 0 85 0 86 0 87 0 88 0 89 0 OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHEOHEOHE >> > >>>>>> >>>>>> 840 85 0 850 85 0 850 860 86 0 860 870 87 0 870 880 88 0 880 890 89 0 890 84 0 840 84 0 Drawn: Designed: Date: BLPBrannon L. Peterson, PE BLP 58910 15650 36TH AVE N SUITE 110 PLYMOUTH, MN 55446 TEL (952) 346-3900 FAX (952) 346-3901 CARLSONMCCAIN.COM BLP1 ISSUED FOR PERMIT APPLICATION 3 of 7 SITE PLAN POLLUTION PREVENTION PLAN DESCRIPTIONREVDATEBYI hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota Print Name: Signature: Date:License #: NOTES: 1.PHASE 2 SHALL NOT BE EXCAVATED UNTIL AT LEAST 70% OF PHASE 1 HAS BEEN RECLAIMED AS SHOWN ON SHEET 4. MINERAL EXTRACTION IS NOT TO EXCEED 19.5 ACRES OF OPEN EXCAVATION AT ANY ONE TIME. 2.INSTALL DIVERSION BERMS AS NECESSARY TO CONTAIN ALL STORMWATER AS MINING PROGRESSES. 3.STABILIZE ALL DIVERSION AND SCREENING BERMS WITH VEGETATION ON THE UPSTREAM AND DOWNSTREAM SIDE OF THE BERMS. ENSURE BERMS ARE 70% COVERED WITH VEGETATION BEFORE REMOVING SILT FENCE. MAINTAIN VEGETATION ON THE BERMS AS NECESSARY. 4.MAINTAIN ROADWAYS IN WELL GRADED CONDITION, LIMIT HAUL TRAFFIC TO ROADWAYS, AND LIMIT TRAFFIC TO 15 MPH TO PREVENT OFFSITE SEDIMENT TRACKING, INCLUDING MUD AND OTHER DEBRIS. FRATTALONE COMPANIES, INC. 3205 SPRUCE STREET, ST. PAUL, MN 55117 BERGER PIT ROSEMOUNT, MN PHASE 1 DIVERSION/SCREENING BERM PHASE 1 SILT FENCE LEASE BOUNDARY TOPOGRAPHIC MAJOR CONTOUR (10' INTERVAL) TOPOGRAPHIC MINOR CONTOUR (2' INTERVAL) 880 EXISTING OVERHEAD ELECTRIC LEGEND APPROXIMATE WOODS MINING BOUNDARY NEIGHBORING PARCELS/SUBDIVISIONS PROPERTY BOUNDARY GRAVEL ROADWAY APPROX. ELECTRIC TRANSMISSION LINE APPROX. BURIED HAZARDOUS LIQUID PIPELINE AND 50' EASEMENT PROPOSED MINING BOUNDARY IRRIGATION BOOM RADIUS INSTALL SILT FENCE ALONG LEASE BOUNDARY TEMPORARY INFILTRATION POND; BOTTOM EL. 835 SILT FENCE MAINTAINED AT EAST EDGE OF PHASE 2 MINING PROPOSED PRIMARY ACCESS ROAD WITH LOCKED GATE (PENDING PERMIT APPROVAL FROM DAKOTA COUNTY) JERSEY BARRIERS INSTALLED TO PROTECT TRANSMISSION TOWER 4H : 1 V 1H:1V EXCAVATION SLOPE 1H:1V EXCAVATION SLOPE 1H:1V EXCAVATION SLOPE PROPOSED SECONDARY SITE ACCESS WITH LOCKED GATE EXCAVATION MAJOR CONTOUR (10' INTERVAL) EXCAVATION MINOR CONTOUR (2' INTERVAL) 930 PHASE 2 DIVERSION/SCREENING BERM PHASE 2 SILT FENCE INSTALL ROCK CONSTRUCTION EXIT INSTALL ROCK CONSTRUCTION EXIT APPROXIMATE BURIED PIPELINE APPROXIMATE EASEMENT APPROXIMATE WELL APPROX. 165' ELECTRIC TRANSMISSION LINE EASEMENT 5/10/235/10/23 3/22/23 PROPOSED INITIAL STOCKPILE FOR PHASE 1 PROPOSED INITIAL STOCKPILE FOR PHASE 1 PROPOSED INITIAL STOCKPILE FOR PHASE 1 EXISTING TREES CLEARED AS PHASE 1 DEVELOPS SILT FENCE INSTALLED AROUND DOWNSTREAM PERIMETER IF STOCKPILE IS LOCATED OUTSIDE OF INITIAL MINING PIT BLP2 UPDATED PER CITY COMMENTS5/10/23 P: \ P r o j e c t s \ F r a t t a l o n e \ B e r g e r P i t \ N P D E S P e r m i t \ P 2 P l a n \ B e r g e r P i t P 2 P l a n . d w g , 5 / 1 0 / 2 0 2 3 1 : 2 5 : 1 8 P M , D W G T o P D F . p c 3 Page 28 of 73 84 0 84 0 85 0 86 0 87 0 88 0 89 0 OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHEOHEOHE >> > >>>>>> >>>>>> 85 0 86 0 86 0 870 87 0 880 88 0 890 89 0 APPROX. BURIED HAZARDOUS LIQUID PIPELINE AND 50' EASEMENT Drawn: Designed: Date: BLP BLP 15650 36TH AVE N SUITE 110 PLYMOUTH, MN 55446 TEL (952) 346-3900 FAX (952) 346-3901 CARLSONMCCAIN.COM BLP1 RECLAMATION PLAN POLLUTION PREVENTION PLAN FRATTALONE COMPANIES, INC. 3205 SPRUCE STREET, ST. PAUL, MN 55117 BERGER PIT ROSEMOUNT, MN PROPOSED SILT FENCE LEASE BOUNDARY TOPOGRAPHIC MAJOR CONTOUR (10' INTERVAL) TOPOGRAPHIC MINOR CONTOUR (2' INTERVAL) 880 EXISTING OVERHEAD ELECTRIC LEGEND MINING BOUNDARY NEIGHBORING PARCELS/SUBDIVISIONS PROPERTY BOUNDARY GRAVEL ROADWAY 4 of 7 DESCRIPTIONREVDATEBYI hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota Print Name: Signature: Date:License #: APPROX. ELECTRIC TRANSMISSION LINE IRRIGATION BOOM RADIUS LEASE BOUNDARY 4H : 1 V 4H:1V RECLAMATION SLOPE RECLAMATION MAJOR CONTOUR (10' INTERVAL) RECLAMATION MINOR CONTOUR (2' INTERVAL) 930 4H : 1 V 2% 2% 2% ~6% NOTES: 1.INSTALL SILT FENCE, AS NECESSARY, ALONG ALL DOWNSTREAM PERIMETERS OF RECLAMATION ACTIVITIES. 2.ALL TEMPORARY ACCESS ROADS SHALL BE SALVAGED AND REMOVED FROM THE SITE. 3.ALL RECLAIMED AREAS SHALL RECEIVE A MINIMUM OF 6" OF TOPSOIL. APPROXIMATE BURIED PIPELINE APPROXIMATE EASEMENT Brannon L. Peterson, PE 58910 ISSUED FOR PERMIT APPLICATION APPROXIMATE WELL APPROX. 165' ELECTRIC TRANSMISSION LINE EASEMENT 3/22/23 5/10/235/10/23 BLP2 UPDATED PER CITY COMMENTS5/10/23 APPROXIMATE WOODS P: \ P r o j e c t s \ F r a t t a l o n e \ B e r g e r P i t \ N P D E S P e r m i t \ P 2 P l a n \ B e r g e r P i t P 2 P l a n . d w g , 5 / 1 0 / 2 0 2 3 1 : 1 2 : 5 0 P M , D W G T o P D F . p c 3 Page 29 of 73 Page 30 of 73 Page 31 of 73 August 2023 October 2024 Page 32 of 73 April 2023 April 2024 Page 33 of 73 E X E C U T I V E S U M M A R Y Planning Commission Regular Meeting: November 26, 2024 Tenative City Council Meeting: Site Plan Reviews are solely the purview of the Planning Commission, and unless denied and appealed are not reviewed by the City Council. AGENDA ITEM: Request by Keystone Development Partners, LLC., for approval of a site plan to construct office/warehouses in the Biscayne Business Park. AGENDA SECTION: PUBLIC HEARINGS PREPARED BY: Anthony Nemcek , Senior Planner AGENDA NO. 6.b. ATTACHMENTS: Site Location, Existing Conditions, Site and Landscape Plan, Elevations and Floorplans, Renderings, Utility Plan, Engineering Review Memo dated November 18, 2024, Parks and Recreation Review Memo dated November 18, 2024 APPROVED BY: AK RECOMMENDED ACTION: Motion to approve the site plan for Keystone Development Partners proposed office/warehouses in the Biscayne Business Park, subject to the following conditions being met prior to the issuance of a building permit: 1. Vacation of perimeter easements along existing interior parcel boundaries. 2. The applicant shall update the landscape plan to relocate two trees and provide an additional 65 foundation plantings. 3. The applicant shall combine the subject property into a single parcel. 4. The applicant shall provide verification of site lighting and, if necessary, a photometric study to prove conformance with site lighting standards. 5. If centralized waste collection is utilized, the applicant shall provide plans for a trash enclosure that meets the requirements of City Code Section 5-1-3. 6. Payment of $42,330 cash-in-lieu of park land dedication, as detailed in the Parks and Recreation Director's memo dated November 18, 2024. 7. Conformance with the requirements of the City's engineer as detailed in the attached review memo dated November 18, 2024. 8. Conformance with any requirements of the City's fire marshal. BACKGROUND The Planning Commission is being asked to review the site plan submitted by Keystone Development Partners, LLC., to construct a series of multi-tenant buildings that will house primarily warehousing space with small offices and waiting areas near the entrances. The subject property is located within the Biscayne Business Park on a site comprised of three existing parcels. The plans submitted by the applicant meet all the requirements of the zoning ordinance within the City Code, and staff is recommending approval of the site plan, subject to conditions listed in the recommended action above. Page 34 of 73 Applicant Keystone Development Partners, LLC. Property Owner Stordahl Partnership, LLLP Site Location 2501, 2511, and 2521 158th Circle West Site Area in Acres 4.70 Acres Current Zoning B-2 PUD: Employment Planned Unit Development Comp Plan Designation Business Park GENERAL INFORMATION The site of the proposed warehouses is within the Biscayne Business Park Planned Unit Development that was approved in 2019. The business park was designed with a private roadway that serves the parcels, and stormwater is managed by several ponds that are located around the business park's perimeter. It's located in the southern portion of the city near the intersection of Biscayne Ave and 160th Street West (CSAH 46). The business park so far has seen the development of a single building that was built on spec by the developer. That building currently houses Valley's Own Bakehouse and Conquer Ninja Gym. The applicant is proposing to construct five buildings and rent office/warehouse space within the units to tenants. The buildings will be constructed in a manner that allows the various spaces to be right-sized for specific tenants. The Biscayne Business Park is zoned B-2 Employment with a PUD overlay. Office/warehousing is an allowed use in that zoning district. The approved PUD for the site includes provisions that allow for shared driveways and buildings to be constructed on lots without frontage on a public street. Because the buildings would be constructed across existing parcel boundaries, the applicant must combine the parcels into one. The zoning ordinance allows for multiple principal structures within PUDs. SITE PLAN REVIEW The purpose of a site plan review is to evaluate each project as it relates to the performance and site design standards of the zoning ordinance. Site plan approval is required for all commercial, industrial, institutional, and multi-family development projects. Site Plan Review applications are approved by the Planning Commission and considered a quasi-judicial action. As such, the City has a set of standards and requirements for review. Generally, if a site plan application meets the ordinance requirements, it must be approved. These standards are outlined in Section 11-6-3 (Use-Specific Standards) and 11-9-1 (Site Plan and Building Design Review). Site Standards The five proposed buildings will consist of two types. The buildings located more centrally to the site will be double loaded with units placed back to back. Two buildings in the northwest portion of the site will be single-loaded. Parking will be provided near each entrance to the buildings, and additional parking is provided around the periphery. The table below shows the required setbacks in comparison with those provided by the site plan. Frontage Required Setback Provided Setback Page 35 of 73 Building Parking Building Parking North, Rear Yard 10' 10' 35.13' 91.5' East, Side Yard 10' 10' 57.25' 14.32' South, Front Yard 30' 20' 31.54' 43.27' West, Side Yard 10' 10' 143.52' 75.82' in addition to the setback standards listed in the table above, the B-2 Employment zoning district also has a maximum lot coverage standard of 75%. The proposed site plan shows impervious surfaces covering just 52% of the site. Building Massing and Materials The applicant provided architectural plans and renderings that depict buildings that meet the zoning code requirements. The exteriors feature architectural metal panels with a striated pattern in varying colors. Staff finds this material to be better than precast concrete panels or other materials specifically listed in the zoning ordinance, both from a durability and visual standpoint. Focus is drawn to the corners of the buildings through the use of contrasting colors and parapet accents along the roofline. Glass entrance areas are augmented by awnings to provide further variation along the facades. The proposed buildings, at 20' tall, are well below the maximum height of 50'. Access and Parking There will be two curb cuts that allow access into the site from the private 158th Circle West. Vehicular traffic will be allowed to circulate through the site and around the buildings. Parking will be provided both at each entrance and also along the perimeter of the site. A total of 60 stalls are required and the applicant's plans show 66 stalls provided. The fire marshal will review the plans to verify enough ADA stalls are provided and if their location meets statutory requirements. The excess 6 parking stalls will allow the applicant to replace some of the parking stalls closest to building entrances with wheelchair loading zones. The table below describes how parking needs are calculated as required by the zoning ordinance. Use Required Warehousing (49,130 s.f. @ 1 stall per 2,000 s.f.) 25 stalls Office (10,350 @ 1 stall per 300 s.f.) 35 stalls Total Required 60 stalls (66 provided) Landscaping The applicant's submittal includes a landscaping plan that meets the minimum planting requirement for trees, but falls short of the minimum foundation planting requirement. Areas where trees can be planted are limited by the onsite stormwater ponding, although the applicant could have made use of some of the areas outside those easements, particularly in the western portion of the site. The applicant's landscape plan shows trees planted along the building perimeter and along Biscayne Page 36 of 73 Avenue and 158th Circle West. The City's engineer has reviewed the landscape plan and found no conflicts between the proposed planting and City utilities except for two trees in the western portion of the site that will need to be relocated from the easement area that contains stormwater infrastructure. The applicant will need to ensure that private utilities, such as fiberoptic cable, will not be impeded by its proposed placement of trees. This is noted in the conditions of approval as well as the requirement to provide additional foundation plantings. Staff recommends their placement along the eastern drive aisle that is most visible from Biscayne Avenue. Parking lot landscaping, equal to 5% of the parking areas, is provided along the perimeter of the parking areas in the north and west areas of the site. Planting Type Required Provided Trees 69 trees (1 per 3,000 s.f. site area) 69 trees Foundation Plantings 215 (1 per 10 linear feet of building perimeter) 150 shrubs (short 65) Site Lighting The applicant's plans do not indicate any site lighting, although the rendering provided shows some lighting beneath the awnings at each entrance. The applicant will need to confirm the presence or absence of site lighting and provide proof that any lighting provided is within the maximum lumen allowed at the property boundaries. Given the site layout, staff expects the site will be able to comply with the standards of the code. Engineering The site will be served by existing utilities installed in 158th Circle West, and stormwater will be collected and managed onsite. The City's engineer has provided a review memo that is attached to this report. In addition to technical comments, the engineer notes that turning radii should be provided to ensure larger vehicles are able to maneuver. The applicant has since provided those to the City. Additionally, the City's engineering memo includes a comment on the location of trash containers. The applicant is working on a centralized location for waste management. This must meet the requirements of Section 5-1-3 of the City Code. Specifically, it must be enclosed in a structure that matches the principal buildings on site. Staff has included a condition of approval related to this in the recommended action. If centralized trash collection is not utilized, all waste containers must be stored inside each unit. Park Dedication Park land dedication is typically determined and collected at the time of plat approval. In this case, the developer asked that park land dedication be collected as each site is developed. Parks and Recreation staff has provided a memo describing the park dedication requirement for this project, and is recommending cash-in-lieu in the amount of $42,330. RECOMMENDATION Staff is recommending approval of the site plan, subject to specific conditions that, when met, will Page 37 of 73 ensure conformance of the proposed development with the Zoning Ordinance. None of the shortfalls within the applicant's submittal are significant enough that they could not be met prior to the issuance of a building permit. Page 38 of 73 Page 39 of 73 S89°59'39"W 610.88 N0 0 ° 0 0 ' 2 1 " W 2 6 2 . 5 6 N89°34'05"E 689.25 S0 0 ° 1 0 ' 4 3 " W 3 0 2 . 9 2 EXISTING/ REMOVAL PLAN C2 Co n s u l t a n t : Sheet Title: Revision: Pr o j e c t : Sheet No.: En g i n e e r s + S u r v e y o r s 51 5 S o u t h W a s h i n g t o n A v e . A l b e r t L e a , M N 5 0 7 - 3 7 3 - 4 8 7 6 No.: Drawn: Project Manager: Project Status: Date: Checked:bjj 10/22/2024 1"=30' KD P W A R E H O U S E Page 40 of 73 23.81' 10.16' 20.00' 22.00'24.82' 23.33' 10.16' 24.00' 26.91' 31.54' 57.25' 35.36' 20.90'20.61' S89°59'39"W 610.88 N0 0 ° 0 0 ' 2 1 " W 2 6 2 . 5 6 N89°34'05"E 689.25 S0 0 ° 1 0 ' 4 3 " W 3 0 2 . 9 2 HARDSCAPE & LANDSCAPE PLAN C3 Co n s u l t a n t : Sheet Title: Revision: Pr o j e c t : Sheet No.: En g i n e e r s + S u r v e y o r s 51 5 S o u t h W a s h i n g t o n A v e . A l b e r t L e a , M N 5 0 7 - 3 7 3 - 4 8 7 6 No.: Drawn: Project Manager: Project Status: Date: Checked:bjj ZONING NOTES B2 EMPLOYMENT DISTRICT BUILDING SETBACKS: FRONT: 30' SIDE: 10' REAR: 10' 10/22/2024 1"=30' KD P W A R E H O U S E LOT AREA (LOTS 6,7,8): 4.70 ACRES PROPOSED IMPERVIOUS AREA: 2.45 ACRES WATER QUALITY VOLUME REQUIRED: 8892 CU. FT. WATER QUALITY VOLUME PROVIDED: SEE DRAINAGE PLAN/REPORT BY OTHERS IMPERVIOUS COVERAGE Page 41 of 73 ABBREVIATIONS SYMBOL ANNOTATION W-X WINDOW NUMBER OPENING NUMBER ELEVATIONS TO XXXX EL = XXX'-XX" XXX ROOM NAME BUILDING SECTIONKEY NOTE XX X XX X XX X WALL TYPE TYPICAL DETAIL INDICATOR ELEVATION INDICATORS X X X X XXX X XX X XX TYPICAL WALL SECTION X XX ROOM NUMBER XX X X'-X" DEMOLITION X REVISION XX NORTH ARROW STRUCTURAL GRID X X MATERIAL GRAPHICS VICINITY MAP (NOT TO SCALE) INSULATION RIGID INSULATION WOOD BLOCKING HD FIBERBOARD FINISHED WOOD ACOUSTICAL CEILING TILE PARTICLE BOARD BLACK DIRT GRANULAR FILL EARTH BACK FILL PEA ROCK UNDISTURBED EARTH CONCRETE BRICK CMU / HWC BLOCK CLAY TILE STEEL GYPSUM BOARD/ STONE PLYWOOD Oleson + Hobbie Architects, LLC. 330 Stadium Road, Suite 202 Mankato, MN 56001 T: 507.385.1158 www.oharchitects.com Architect SHEET INDEX KDP WAREHOUSE DEVELOPMENT ROSEMOUNT, MN JONES HAUGH SMITH Civil Engineer112 East Oakland Avenue Austin, MN 55912 T: 507.373.4876 www.jhseng.com COMPANY NAME Consultant Address City, ST, Zip T: Phone Number F: Fax Number website RISE STRUCTURAL Structural Engineer6909 S Lyncrest Place Suite 110 Sioux Falls, SD 57108 T: 605.743.2510 www.riseincorp.com PROJECT LOCATION PROJECT # DATE DRAWN BY CHECKED BY SHEET TITLE SHEET 2024 OLESON+HOBBIE ARCHITECTS, LLC.C REVISIONS ARCHITECTURE + INTERIORS + PLANNING + SUSTAINABILITY W W W . O H A R C H I T E C T S . C O M ARCHITECT OF RECORD CONSULTANT XX PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N 330 Stadium Road, Suite 202, Mankato, MN 56001 T: 507.385.1158 10 / 2 9 / 2 0 2 4 1 1 : 0 1 : 1 2 A M KDP WAREHOUSES ROSEMOUNT, MN T1.1 TITLE SHEET AJK 24-039RM TAA 10/18/2024 TITLE SHEETS T1.1 TITLE SHEET T1.2 STANDARD MOUNTING HEIGHTS T1.3 CODE PLAN - LOWER LEVEL T1.4 CODE PLAN - MAIN LEVEL CIVIL C1.0 SITE PLAN ARCHITECTURAL AS1.1 ARCHITECTURAL SITE PLAN A1.0 FLOOR PLAN - 8-UNIT A1.1 FLOOR PLAN - 3-UNIT A2.1 DOOR & WINDOW SCHEDULE A2.2 CONSTRUCTION ASSEMBLIES A3.0 EXTERIOR ELEVATIONS - 8-UNIT A3.1 EXTERIOR ELEVATIONS - 3-UNIT A4.1 BUILDING SECTIONS STRUCTURAL S1.0 STRUCTURAL NOTES S1.1 STRUCTURAL FLOOR PLANS SET NO. AB ANCHOR BOLT AC ACOUSTIC ACT ACOUSTICAL CEILING TILE ADJ ADJUSTABLE AFF ABOVE FINISH FLOOR ALT ALTERNATE ALUM ALUMINUM ANCH ANCHOR AP ACCESS PANEL APPROX APPROXIMATE(LY) ARCH ARCHITECT AWC ACOUSTICAL WALL COVERING BC BOTTOM OF CURB BCS BABY CHANGING STATION BD BOARD BF BOTH FACES BIT BITUMINOUS BK BRICK BL BORROWED LITE BLDG BUILDING BLK BLOCK BLKG BLOCKING BM BEAM, BENCH MARK BO BY OTHERS, BY OWNER BOT BOTTOM BRDG BRIDGING BRG BEARING BRKT BRACKET BS BACKSET BSMT BASEMENT BUR BUILT-UP ROOF(ING) CAB CABINET CB CATCH BASIN, CHART BOX CER CERAMIC CG CORNER GUARD CI CAST IRON CJ CONTROL JOINT CLG CEILING CLO CLOSET CLR CLEAR CMU CONCRETE MASONRY UNIT CO CLEAN OUT COL COLUMN COMP COMPOSITION CONC CONCRETE COND CONDUCTOR, CONDUIT CONST CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR CONV CONVECTOR CORR CORRIDOR CRS COURSE CSK COUNTERSINK CT CERAMIC TILE CTR CENTER CUH CABINET UNIT HEATER CWT CERAMIC WALL TILE DBL DOUBLE DEMO DEMOLITION DET DETAIL DF DRINKING FOUNTAIN DIA DIAMETER DIM DIMENSION DN DOWN DR DOOR DS DOWNSPOUT DW DISH WASHER DWG DRAWING DWL DOWEL EA EACH EC ELECTRICAL CONTRACTOR EF EXHAUST FAN EHD ELECTRIC HAND DRYER EIFS EXTERIOR INSULATION AND FINISH SYSTEM EJ EXPANSION JOINT EL ELEVATION ELEC ELECTRICAL ELEV ELEVATOR ENCL ENCLOSURE EP ELECTRICAL PANEL EQ EQUAL EQUIP EQUIPMENT EW EACH WAY EWC ELECTRIC WATER COOLER EXC EXCAVATE EXIST EXISTING EXP EXPANSION, EXPOSED STRUCTURE EXT EXTERIOR FA FRESH AIR FC FIRE CODE FD FLOOR DRAIN FDN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF FINISHED FLOOR FIN FINISH FLEX FLEXIBLE FLR FLOOR FLSHG FLASHING FOS FACE OF STUD(S) FP FIREPROOF(ING) FR FRAME FRP FIBERGLASS REINFORCED PANEL FTG FOOTING GA GAUGE GALV GALVANIZED GB GRAB BAR GC GENERAL CONTRACTOR GEN GENERAL GI GALVANIZED IRON GL GLASS, GLAZED GMU GLAZED MASONRY UNIT GR GRILLE GYP GYPSUM GYP BD GYPSUM BOARD HB HOSE BIB HC HOLLOW CORE HD HEAD HDR HEADER HDW HARDWARE HM HOLLOW METAL HORIZ HORIZONTAL HR HOUR HT HEIGHT HW HOT WATER ID INSIDE DIAMETER, INSIDE DIMENSION INSUL INSULATION INT INTERIOR JAN JANITOR JST JOIST JT JOINT KD KNOCKED DOWN LAM LAMINATED LAV LAVATORY LB POUND (WEIGHT) LLV LONG LEG VERTICAL LONG LONGITUDINAL LSJ LONG SPAN JOIST LT LIGHT LWC LIGHT WEIGHT CONCRETE MAS MASONRY MAT MATERIAL MAX MAXIMUM MC MECHANICAL CONTRACTOR MECH MECHANICAL MEMB MEMBRANE MET METAL MEZZ MEZZANINE MFG MANUFACTURER MGR MANAGER MH MANHOLE MIN MINIMUM MISC MISCELLANEOUS ML METAL LATH MO MASONRY OPENING ND NAPKIN DISPOSAL NIC NOT IN CONTRACT NOM NOMINAL OAL OVERALL LENGTH OBS OBSCURE OC ON CENTER OD OUTSIDE DIAMETER, OUTSIDE DIMENSION OFCI OWNER FURNISHED/ CONTRACTOR INSTALLED OFOI OWNER FURNISHED/ OWNER INSTALLED OH OVERHEAD OPG OPENING OPP OPPOSITE OZ OUNCE P PAINT PAR PARALLEL PART PARTITION PB PARTICLE BOARD PC PRECAST CONCRETE PERIM PERIMETER PERP PERPENDICULAR PL PLATE PLAM PLASTIC LAMINATE PLAS PLASTER PLBG PLUMBING PLWD PLYWOOD POL POLISHED PP POLISHED PLATE PR PAIR PREFAB PREFABRICATED PREFIN PREFINISHED PS PROJECTION SCREEN PSF POUNDS PER SQUARE FEET PSI POUNDS PER SQUARE INCH PT PORCELAIN TILE PTD PAPER TOWEL DISPENSER QT QUARRY TILE R RISER, RADIUS R/W REINFORCED WITH RAD RADIATION RCP REFLECTED CEILING PLAN, REINFORCED CONCRETE PIPE RD ROOF DRAIN RDWD REDWOOD REC RECESSED REF REFRIGERATOR REINF REINFORCE(ED), REINFORCING REQD REQUIRED REV REVERSE RFG ROOFING RFM RECESSED FLOOR MAT RH ROBE HOOK RI RIGID INSULATION RL RAIN LEADER RM ROOM RO ROUGH OPENING RT RUBBER TREADS S SINK SB SOIL BORING SC SOLID CORE, SEALED CONCRETE SCHED SCHEDULE SD SEE DETAIL, SOAP DISPENSER SECT SECTION SF SQUARE FOOT SGT STRUCTURAL GLAZED TILE SHT SHEET SIM SIMILAR SM SMOOTH SND SANITARY NAPKIN DISPENSER SPEC SPECIFICATIONS SPK SPEAKER SQ SQUARE SS STAINLESS STEEL, SOLID SURFACE ST STREET, STORM WATER STAG STAGGERED STD STANDARD STL STEEL STOR STORAGE STRUCT STRUCTURAL SUSP SUSPEND(ED) SV SHEET VINYL SW SLAT WALL SYM SYMMETRICAL T TREAD T&G TONGUE & GROOVE TB TACKBOARD TC TOP OF CURB TD TRENCH DRAIN TEMP TEMPORARY, TEMPERED TERR TERRAZZO THK THICK(NESS) THRESH THRESHOLD TO TOP OF TOB TOP OF BEAM TOD TOP OF DECK TOF TOP OF FOOTING TOJ TOP OF JOIST TOS TOP OF STEEL TP TOP OF PAVEMENT TPH TOILET PAPER HOLDER TR TRASH RECEPTACLE TRANS TRANSVERSE TYP TYPICAL UH UNIT HEATER UNEX UNEXCAVATED UNFIN UNFINISHED UON UNLESS OTHERWISE NOTED UR URINAL UV UNIT VENTILATOR VB VINYL BASE VCT VINYL COMPOSITION TILE VERT VERTICAL VFY VERIFY VOL VOLUME VWC VINYL WALL COVERING W WIDTH W/WITH W/O WITHOUT WC WATERCLOSET WD WOOD WDB WOOD BASE WDF WOOD FLOORING WDSC WOOD SOLID CORE WDW WINDOW WH WALL HYDRANT WI WROUGHT IRON WP WATERPROOF(ING) WR WATER RESISTANT WS WEATHERSTRIPPING WSCT WAINSCOT WWM WELDED WIRE MESH Page 42 of 73 BI S C A Y N E A V E OUTLOT A 123 4 8765 260.98 261.95213.65 213.64 N0 0 ° 1 1 ' 0 4 " E 6 7 2 . 0 5 N0 0 ° 2 0 ' 0 3 " E 6 7 0 . 2 4 1.87 ACRES 1.47 ACRES 1.81 ACRES N89°34'26"E 993.29 N89°41'05"E 995.03 10 ' - 0 " 10 ' - 0 " 10' - 0" 10' - 0" 1.95 ACRES 69 PARKING SPACES 11 30 UNITS 11 6 3-UNIT 3-UNIT 8-UNIT 8-UNIT 8-UNIT6666 6 5 6 24 ' - 0 " 24 ' - 0 " 22 ' - 0 " 22 ' - 0 " 22 ' - 0 " PROJECT # DATE DRAWN BY CHECKED BY SHEET TITLE SHEET 2024 OLESON+HOBBIE ARCHITECTS, LLC.C REVISIONS ARCHITECTURE + INTERIORS + PLANNING + SUSTAINABILITY W W W . O H A R C H I T E C T S . C O M ARCHITECT OF RECORD CONSULTANT XX PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N NORTH 330 Stadium Road, Suite 202, Mankato, MN 56001 T: 507.385.1158 10 / 2 9 / 2 0 2 4 1 1 : 0 1 : 1 7 A M KDP WAREHOUSES ROSEMOUNT, MN AS1.1 ARCHITECTURAL SITE PLAN AJK 24-039RM TAA 10/18/2024 SCALE:AS1.1 1" = 40'-0" 1 ARCHITECTURAL SITE PLAN Page 43 of 73 A3.0 A3.0 3 33 ' - 0 " 33 ' - 0 " 33 ' - 0 " 33 ' - 0 " 60' - 0"60' - 0" 5' - 3 " 8' - 0 " 8' - 0 " 5' - 3 " 5' - 3 " 8' - 0 " 8' - 0 " 5' - 3 " 4 5' - 3 " 8' - 0 " 8' - 0 " 5' - 3 " 5' - 3 " 8' - 0 " 8' - 0 " 5' - 3 " 13 ' - 3 " 13 ' - 3 " 1 3 524 A B C D E F G UNIT 1 102 UNIT 2 118 UNIT 3 106 Room 122 Room 110 Room 126 Room 114 Room 130 ENTRY 100 RESTROOM 101 ENTRY 104 RESTROOM 105 ENTRY 108 OFFICE 111 ENTRY 112 RESTROOM 109 ENTRY 116 ENTRY 120 ENTRY 124 ENTRY 128 RESTROOM 129 RESTROOM 125 OFFICE 123 RESTROOM 121 RESTROOM 117 OFFICE 119 13' - 0"8' - 6"9' - 4" 13' - 0"8' - 6"9' - 4"9' - 4"8' - 6"13' - 0" 9' - 4"8' - 6"13' - 0" 1' - 1 0 " 1' - 1 0 " 1' - 1 0 " 19 ' - 9 " 13 ' - 3 " 13 ' - 3 " 19 ' - 9 " 19 ' - 9 " 13 ' - 3 " 13 ' - 3 " 19 ' - 9 " 1' - 1 0 " 100.1 104.1 10 2 . 1 112.1 128.1 124.1 10 6 . 1 11 4 . 1 13 0 . 1 120.1 116.1 11 8 . 1 1 A4.1 20 ' - 0 " 20 ' - 0 " 5' - 0"5' - 0" 22' - 0" 22' - 0" 1' - 1 0 " 1' - 1 0 " 108.1 5' - 0" A1.0 2 22' - 0" 2' - 2 " 16 ' - 0 " 2' - 2 " 2' - 2 " 2' - 2 " OFFICE 103 OFFICE 107 OFFICE 115 OFFICE 131 OFFICE 127 22' - 0" 116.2 120.2 124.2 128.2112.2 108.2 100.2 104.2 10 5 . 1 10 7 . 1 10 3 . 1 10 1 . 1 10 9 . 1 11 1 . 1 11 5 . 1 11 3 . 1 12 9 . 1 13 1 . 1 12 7 . 1 12 5 . 1 11 7 . 1 12 1 . 1 12 3 . 1 11 9 . 1 11 0 . 1 RESTROOM 113 2 A4.1 FUTURE STAIRS FUTURE STAIRS FUTURE STAIRS FUTURE STAIRS 20 0 . 4 20 0 . 3 20 ' - 0 " 20 ' - 0 " 5' - 0" A1.0 3 5 4 6 PROJECT # DATE DRAWN BY CHECKED BY SHEET TITLE SHEET 2024 OLESON+HOBBIE ARCHITECTS, LLC.C REVISIONS ARCHITECTURE + INTERIORS + PLANNING + SUSTAINABILITY W W W . O H A R C H I T E C T S . C O M ARCHITECT OF RECORD CONSULTANT XX PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N NORTH 330 Stadium Road, Suite 202, Mankato, MN 56001 T: 507.385.1158 10 / 2 9 / 2 0 2 4 1 1 : 0 1 : 1 8 A M KDP WAREHOUSES ROSEMOUNT, MN A1.0 FLOOR PLAN - 8-UNIT AJK 24-039RM TAA 10/18/2024 SCALE:A1.0 1/8" = 1'-0" 1 FLOOR PLAN - 8-UNIT SCALE:A1.0 1/4" = 1'-0" 2 01 Floor Plan - Callout 1 SCALE:A1.0 1/4" = 1'-0" 3 RESTROOM - WEST ELEV SCALE:A1.0 1/4" = 1'-0" 4 RESTROOM - SOUTH ELEV SCALE:A1.0 1/4" = 1'-0" 5 RESTROOM - NORTH ELEV SCALE:A1.0 1/4" = 1'-0" 6 RESTROOM - EAST ELEV Page 44 of 73 A3.1 1 A3.1 2 A3.1 3 A3.14 21' - 9"5' - 3"8' - 0"8' - 0"5' - 3"21' - 9"21' - 9"5' - 3"8' - 0" 2' - 10"12' - 0"2' - 10"2' - 10" 9' - 4 " 8' - 6 " 13 ' - 0 " 55 ' - 0 " Room 202 Room 200 Room 201 OFFICE 203 OFFICE 207 RESTROOM 205 Room 204 Room 206 Room 210 Room 208 Room 209 OFFICE 211 20 0 . 1 20 4 . 1 205.1201.1 20 2 . 2 203.1 207.1 20 6 . 2 21 0 . 2 211.1 209.1 20 8 . 1 210.1206.1202.1 35' - 0"35' - 0"35' - 0" 5' - 0 " 5'-0" CONCRETE APRON 5'-0" CONCRETE APRON 5'-0" CONCRETE APRON 5'-0" CONCRETE APRON 5'-0" CONCRETE APRON A3.1 1 A3.1 2 A3.1 3 A3.14 FUTURE MEZZANINE 301 FUTURE MEZZANINE 302 OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW PROJECT # DATE DRAWN BY CHECKED BY SHEET TITLE SHEET 2024 OLESON+HOBBIE ARCHITECTS, LLC.C REVISIONS ARCHITECTURE + INTERIORS + PLANNING + SUSTAINABILITY W W W . O H A R C H I T E C T S . C O M ARCHITECT OF RECORD CONSULTANT XX PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N NORTH 330 Stadium Road, Suite 202, Mankato, MN 56001 T: 507.385.1158 10 / 2 9 / 2 0 2 4 1 1 : 0 1 : 1 9 A M KDP WAREHOUSES ROSEMOUNT, MN A1.1 FLOOR PLAN - 3-UNIT AJK 24-039RM TAA,DGH 10/18/2024 SCALE:A1.1 1/8" = 1'-0" 1 FLOOR PLAN - 3-UNIT SCALE:A1.1 1/8" = 1'-0" 2 FLOOR PLAN - SECOND LEVEL Page 45 of 73 MAIN LEVEL 100' - 0" 1 3 524 T.O. UPPER WALL 122' - 6"T.O. LOWER WALL 120' - 0" 7.2 STRIATED PANELFLAT PANELS OR MESA PANELS FLAT PANELS OR MESA PANELS TO INT WALLS 110' - 0" 2 A4.1 MAIN LEVEL 100' - 0" ABCDEFG T.O. UPPER WALL 122' - 6"T.O. LOWER WALL 120' - 0"7.2 STRIATED PANEL FLAT PANELS OR MESA PANELS FLAT PANELS OR MESA PANELS 7.2 STRIATED PANEL 26' - 7"46' - 10"26' - 7" TO INT WALLS 110' - 0" 1 A4.1 MAIN LEVEL 100' - 0" 1 35 2 4 T.O. UPPER WALL 122' - 6"T.O. LOWER WALL 120' - 0" 7.2 STRIATED PANEL FLAT PANELS OR MESA PANELS FLAT PANELS OR MESA PANELS TO INT WALLS 110' - 0" 2 A4.1 MAIN LEVEL 100' - 0" A B C D E F G T.O. UPPER WALL 122' - 6"T.O. LOWER WALL 120' - 0" 7.2 STRIATED PANEL FLAT PANELS OR MESA PANELS 7.2 STRIATED PANEL FLAT PANELS OR MESA PANELS TO INT WALLS 110' - 0" 1 A4.1 PROJECT # DATE DRAWN BY CHECKED BY SHEET TITLE SHEET 2024 OLESON+HOBBIE ARCHITECTS, LLC.C REVISIONS ARCHITECTURE + INTERIORS + PLANNING + SUSTAINABILITY W W W . O H A R C H I T E C T S . C O M ARCHITECT OF RECORD CONSULTANT XX PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N 330 Stadium Road, Suite 202, Mankato, MN 56001 T: 507.385.1158 10 / 2 9 / 2 0 2 4 1 1 : 0 1 : 2 5 A M KDP WAREHOUSES ROSEMOUNT, MN A3.0 EXTERIOR ELEVATIONS - 8-UNIT AJK 24-039RM TAA 10/18/2024 SCALE:A3.0 1/8" = 1'-0" 1 SOUTH ELEVATION 8-UNIT SCALE:A3.0 1/8" = 1'-0" 2 EAST ELEVATION - 8-UNIT SCALE:A3.0 1/8" = 1'-0" 3 NORTH ELEVATION - 8-UNIT SCALE:A3.0 1/8" = 1'-0" 4 WEST ELEVATION - 8-UNIT Page 46 of 73 GENERAL NOTES 1. 2. 3. 4. XXX XXX XXX XXX PROJECT # DATE DRAWN BY CHECKED BY SHEET TITLE SHEET 2024 OLESON+HOBBIE ARCHITECTS, LLC.C REVISIONS ARCHITECTURE + INTERIORS + PLANNING + SUSTAINABILITY W W W . O H A R C H I T E C T S . C O M ARCHITECT OF RECORD CONSULTANT XX PR E L I M I N A R Y N O T F O R C O N S T R U C T I O N 330 Stadium Road, Suite 202, Mankato, MN 56001 T: 507.385.1158 10 / 2 9 / 2 0 2 4 1 1 : 0 1 : 2 6 A M KDP WAREHOUSES ROSEMOUNT, MN A3.1 EXTERIOR ELEVATIONS - 3-UNIT AJK 24-039RM TAA 10/18/2024 EXTERIOR FINISH LEGEND MARK MFR MODEL COLOR COMMENTS BRICK BR-1 BR-2 ENGINEERED WOOD EW-1 EW-2 PAINT PNT-1 PNT-2 PRECAST PC-1 PC-2 PREFINSHED METAL MTL-1 MTL-2 ROOFING RF-1 RF-2 RF-3 SIDING S-1 S-2 STONE STN-1 STN-2 WOOD WD-1 WD-2 SCALE:A3.1 1/8" = 1'-0" 1 SOUTH ELEVATION - 3-UNIT SCALE:A3.1 1/8" = 1'-0" 2 WEST ELEVATION - 3-UNIT SCALE:A3.1 1/8" = 1'-0" 3 NORTH ELEVATION - 3-UNIT SCALE:A3.1 1/8" = 1'-0" 4 EAST ELEVATION - 3-UNIT Page 47 of 73 Page 48 of 73 Page 49 of 73 Page 50 of 73 Page 51 of 73 Page 52 of 73 S89°59'39"W 610.88 N0 0 ° 0 0 ' 2 1 " W 2 6 2 . 5 6 N89°34'05"E 689.25 S0 0 ° 1 0 ' 4 3 " W 3 0 2 . 9 2 UTILITY PLAN C4 Co n s u l t a n t : Sheet Title: Revision: Pr o j e c t : Sheet No.: En g i n e e r s + S u r v e y o r s 51 5 S o u t h W a s h i n g t o n A v e . A l b e r t L e a , M N 5 0 7 - 3 7 3 - 4 8 7 6 No.: Drawn: Project Manager: Project Status: Date: Checked:bjj PLUMBING SPECIFICATIONS 1.All plumbing shall be installed in accordance with the Minnesota Plumbing Code (see Minnesota Rules, Chapter 4714). 2.The water distribution system shall be disinfected per City of St. Peter Public Works. 3.PVC sanitary sewers will meet one of the following ASTM Standards: D3034, F789, D2665, or F891. ASTM D2241 pipe may be used for sewers 6_inch and larger. The installation will comply with ASTM D2321, which requires installation by open trench on a continuous granular bed. 4.PVC solvent weld joints will include a primer of contrasting color to the pipe and cement. 5.RCP storm sewers must comply with ASTMC76. 6.All joints and connections in the storm sewer system shall be gastight or watertight. Approved resilient rubber joints must be used to make watertight connections to manholes, catchbasins, and other structures. Cement mortar joints are permitted only for repairs and connections of existing lines constructed with such joints. 7.Polyethylene (PE) water services must meet ASTM D2239 or D2737 installed perASTM D2774. Joints must use approved insert fittings with metal clamps. No more than two feet may be exposed within the building. 8.The bottom of the water service pipe located within ten feet of the sewer crossing must be at least 18 inches above the top of the sewer. When this is not feasible, the sewer pipe must be constructed of materials listed in the Minnesota Rules. The water service should not contain any joints or connections within 10 feet of the crossing. See City Standard Plate 6005. 9.All portions of the storm sewer system located within 10 feet of the building or water service line must be tested in accordance with Minnesota Rules. 10/22/2024 1"=30' KD P W A R E H O U S E Page 53 of 73 7 0 1 X E N I A A V E N U E S | S U I T E 3 0 0 | M I N N E A P O L I S , M N | 5 5 4 1 6 | 7 6 3 . 5 4 1 . 4 8 0 0 | W S B E N G . C O M Memorandum To: Brian Erickson, City Engineer Nick Egger, Director of Public Works From: Amanda Sachi, PE Bill Alms, PE Emma Rae Roberts, EIT Kris Keller, PE Date: November 18, 2024 Re: KDP Warehouse Engineering Review WSB Project No. 027246-000 We reviewed the documents provided by Jones Haugh Smith Engineers + Surveyors on October 29, 2024. Documents reviewed include: •KDP Warehouse - Civil Plans – prepared by Jones Haugh Smith, dated 10/22/24 Additional redline comments are provided on the submitted civil plans. Applicant should provide responses to each comment and redline comment. We offer the following comments below. Engineering Review: 1. General a.The project consists of the construction of a 30-unit warehouse facility on a 4.7- acre site as part of combining Lots 6-8 Block 1 of the Biscayne Business Park. b.The site is located north of 158th Street and west of Biscayne Avenue. c.Provide copies all required permits to City. 2. Existing Conditions/Removal Plan a.Verify with Public Works whether the existing service serving Lot 6 Block 1 would need to be removed or abandoned. b.Show salvaging the existing hydrant assembly (w/ gate valve) and removing an additional length of hydrant lead pipe. i. Show installing salvaged hydrant assembly on Utility Plan 3. Hardscape and Landscape Plan a.Provide turning movements for all expected vehicles including emergency, garbage, and delivery vehicles (note impact of vehicles parked at loading bay doors on potential access) i. Provide garbage enclosure location and access ii. Fire Official to review emergency access iii. Parking in front of the large doors for each end unit will need to be restricted so that clear turning movements will be maintained b.Install commercial entrance per current City Standard Detail Plates Page 54 of 73 KDP Warehouse Site Review i. Provide radii for turning at entrance ii. Provide transitions (beaver tails) for any curb terminations c.Verify minimum drive lane requirements are being met between and around buildings d.Verify whether all drive lanes are bi-directional or whether some segments are one way i. Provide signage and/or pavement markings as necessary ii. Consider curb/barrier between building and driving lanes (typ.) e.Label typical parking spaces i. Verify whether all spaces are 10'x20' f.Provide wheel stops or barrier between parking spaces and building (typ.) g.Parking spaces shown in front of entry doors (typ.) h.Verify need for minimum walking area in front of access doors (typ.) 4. Utility Plan a.Fire official to review fire coverage and emergency access i. Show all existing and proposed hydrants. ii. Demonstrate that the requirements of MSFC Appendix C – Fire Hydrant Locations and Distribution are being met b.Provide top and bottom of pipe elevations at utility crossings i. Maintain minimum 18" separation between water and sewer ii. Insulate if separation between storm sewer and water is less than 36" c.Show all existing gate valves on service stubs and adjacent watermain. d.Label watermain and water service material type as PVC C900 SDR 18 i. Provide proposed pipe lengths ii. Label all fittings e.Call out connection to existing 8" PVC C900 water stub with 8" to 6" reducer i. Provide length of 6" PVC C900 installed from connection to building ii. Verify with Fire Official based on building characteristics whether need for sizing for both fire and domestic supply f.Call out connection to existing 6" PVC SDR 26 sanitary sewer service stub i. Provide proposed pipe service lengths and grades(assumed minimum 2%) ii. Western 8” sanitary sewer service is shown connecting to a 6 service stub. 1. Verify necessary capacity and potentially utilize the third 6’ sanitary sewer service to the west. g.Deeper sumps (3-4') are typically only installed at the last accessible structure prior to discharge to the basin/bmp instead of with each structure h.Minimal cover (~1’) over several storm sewer pipe segments i. Typically minimum 2.5’ cover under paved surfaces ii. Typical minimum storm sewer structure 4’ build without sump iii. Issues with damaging the pipe as part of construction and compaction of the parking area section (17”+) Page 55 of 73 KDP Warehouse Site Review 5. Grading and SWPPP Plan a.Provide all existing basin characteristics (NWL, 100 YR HWL, EOF, etc.) b.Call out and provide EOF elevations and routes for all low points in the parking areas and green spaces i. Maintain minimum required freeboard from lowest opening elevations (LOE/FFE) of impacted buildings ii. Provide FFE First Floor Elevation for all buildings c.Areas exceed maximum 3:1 Slopes. d.Any grading on adjacent property will require the approval and permission of the adjacent property owner. 6. Erosion and Sediment Control Plans a. No comments. 7. Details & Specifications a. Utilize current City Standard Detail Plates b. Provide detail for commercial entrance Stormwater Management General Storm Sewer Design 1. Provide rational method storm sewer sizing calculations to confirm storm sewer is sized for a 10-year storm event. 2. Verify storm sewer is meeting the minimum slope requirements to maintain a velocity of 3 fps. 3. Junction manholes should be designed to limit the hydraulic head increase by matching flow lines. 4. Increase junction manholes 7 and 16 to a 48” diameter structure. Water Quantity – No comments Rate/Volume Control – No comments Freeboard – No comments Water Quality – No comments Easements – No comments Erosion Control 5. Install inlet protection devices on all stormwater inlets. Page 56 of 73 M E M O R A N D U M To: Adam Kienberger Community Development Director Anthony Nemcek, Senior Planner Julia Hogan, Planner From: Dan Schultz, Parks and Recreation Director Date: November 18, 2024 Subject: Biscayne Business Park Site Plan Review Plans The Parks and Recreation Department recently reviewed the plans for the Biscayne Business Park. After reviewing the plans, the Parks and Recreation Department staff has the following comments: PARKS DEDICATION As approved in 2019, the parks dedication requirement for this business park development was 10% of the land area or the cash in lieu of land at $8,500 per acre. The total cash in lieu of land dedication for the entire development was $112,880 ($8,500 per acre x 13.28 acres, which does not include road ROW). Staff recommend that the city collect cash in lieu of land for the Biscayne Business Park and that the cash payment should be paid for each lot being created at the time of issuance of the building permit for each lot in the plat. The price per lot is $14,110. At this time, staff is recommending the parks dedication be collected for three lots in the amount of $42,330. Please let me know if you have any questions about this memo. Page 57 of 73 E X E C U T I V E S U M M A R Y Planning Commission Regular Meeting: November 26, 2024 Tenative City Council Meeting: December 17, 2024 AGENDA ITEM: Request by Minnesota Paving Materials for renewal of its interim use permit for a seasonal asphalt plant. AGENDA SECTION: PUBLIC HEARINGS PREPARED BY: Anthony Nemcek , Senior Planner AGENDA NO. 6.c. ATTACHMENTS: Site Location, Applicant's Narrative, Site Plan, Site Aerial APPROVED BY: AK RECOMMENDED ACTION: Motion to recommend the CIty Council approve the renewal of an Interim Use Permit allowing Minnesota Paving Materials to operate a seasonal asphalt plant, subject to the following conditions: 1. Compliance with the Interim Use Permit Application for the Primary Asphalt Plant dated July 23, 2014. 2. Compliance with the Large Scale Mineral Extraction Permit for Dakota Aggregates (Resolution 2012-105). 3. The Interim Use Permit expires on December 31, 2034. 4. Asphalt trucks shall access CSAH 46 either via the Station Trail access or the Akron Avenue access only. Asphalt trucks may not use Biscayne Avenue or any UMore roadway (Akron, Angus, Barbara or Blaine Avenues) to access CSAH 42. BACKGROUND Dakota Aggregates (a partnership of Ames Construction and Cemstone) currently operates under a Large Scale Mineral Extraction (LSME) permit. The LSME includes an Ancillary Use Facility (AUF) which is essentially an industrial park of businesses that use significant amounts of aggregate in their production. The approved ancillary uses include recycled aggregate production (RAP), asphalt production, concrete production, concrete product casting yard and a maintenance facility for the vehicles used in the mine and AUF businesses. The Zoning Ordinance requires that each of the AUF businesses apply for and receive their own Interim Use Permit (IUP). The applicant, originally known as Hardrives, is requesting renewal of its IUP for a seasonal asphalt plant within the AUF for another 10- year term. Staff has received no complaints related to the applicant's operation, nor has the police department fielded any calls. SUMMARY Applicant: Minnesota Paving Materials Owner: Regents of the University of Minnesota Location: Northwest corner of CSAH 46 and Akron Avenue Net Acres: 17.35 Acres Page 58 of 73 Comprehensive Plan Designation: AGR – Agricultural Research Current Zoning: A2 – Agriculture Legal Authority The interim use permit approval is a quasi-judicial action, meaning that if the application meets the City Code, the large scale mineral extraction permit conditions and interim use permit regulations, then the interim use permit must be approved. Staff supports approval of this interim use permit renewal and finds that it is substantially in conformance with the approved large scale mineral extraction permit and the interim use permit regulations with recommended conditions. The detailed analysis of this finding is provided below. Site Layout The 17.35 acre site is located within the designated ancillary use facility and is approximately 250 feet north of CSAH 46, directly west of Akron Avenue and directly south of the private AUF access drive (158th Street). Within the 250-foot separation between the asphalt plant and CSAH 46, there is an area of existing trees 125 feet wide and a berm that is 16 feet in height. The plant site is located at the northwest corner of CSAH 46 and Akron Avenue. The site has two accesses to 158th Street with the western access being used by the concrete delivery trucks. The site is divided into three general areas. On the western third of the site is the asphalt plant, associated asphalt oil tanks, truck access and employee parking. The asphalt plant is located about 550 feet north of CSAH 46 and the asphalt oil tanks are located about 400 feet north of CSAH 46. The northwest portion of the site is the raw aggregate storage that is brought to the site from Dakota Aggregates’ aggregate processing facility located about ½ mile to the west. The southwest portion of site is recycled asphalt product (RAP) storage and portable crusher that will grind the used asphalt brought from Hardrives construction projects. The RAP crusher is located about 400 feet north of CSAH 46. The asphalt trucks leave CSAH 46 at Akron Avenue, head north to 158th Street, turn left on 158th Street and then turn left into the paved plant area. The trucks head south, turn 180 degrees and drive under the storage silos to be loaded with asphalt. The plant features three storage silos that will supply one lane of trucks. A set of two storage tanks were installed following approval of an amendment to the applicant's IUP in 2016. Once loaded, the trucks leave the through 158th Street and Akron Avenue to CSAH 46. The asphalt plant is made up of multiple pieces of equipment that heat and combine all the materials needed to make various types of asphalt. The equipment starts with 12 cold feed material bins in which front end loaders load the various bins with various size of aggregate. A conveyor carries the cold material into a rotating heated drum that mixes the aggregate with RAP and asphalt oil to create the various asphalt recipes. The mixed asphalts are conveyed to the three storage silos to be loaded into trucks. The exhaust from the plant is feed into a baghouse to remove pollutants. The fines (removed pollutants) from the baghouse are fed into drum for future asphalt mixes. Following the 2016 IUP amendment, the site now includes two large above-ground storage tanks that are 40 feet in height and hold 1,217,000 gallons each. In addition to the storage tanks, the facility also Page 59 of 73 features two let-down tanks which each hold 240,000 gallons as well as an additive tank, a wetting tank, and two blending tanks all with capacities of 30,000 gallons. The original plan consisted of a liquid asphalt storage tank, three let-down tanks, and two blending tanks. The asphalt plant is described as seasonal because asphalt is only installed during the summer and fall in Minnesota. The application narrative describes the typical season as May 1 through December 15 each year. While the plant is described as seasonal, MPM expects to install the plant and leave it in place for 40 years, which the same time period that Cemstone expects to use its concrete plant and the same time period as the Dakota Aggregates’ Large Scale Mineral extraction period approval. Staff is proposing a 10-year interim use permit for MPM, the same term as the IUP Cemstone has for the concrete plant. Staff does not support an IUP for any longer period because staff expects that the operational conditions of approval may need to change as development occurs around the asphalt plant. The asphalt plant is a part of the Dakota Aggregates’ Minnesota Total Facility Operating Permit (Air permit #03700370-001) and NPDES stormwater permit. Stormwater from the site flows north to the ditch on the south side of 158th Street, then north through a culvert under 158th Street to a stormwater and infiltration pond. This pond was designed and built to handle all the stormwater from the entire AUF, including the asphalt plant. Large Scale Mineral Extraction Ordinance and Permit 11-10-4-1 G. 3. a. Location: The asphalt plant and all equipment associated with it shall be located a minimum of six hundred sixty feet (660') from any nonagricultural zoned land: The nearest nonagricultural zoned land is the southernmost extent of the Amber Fields development, located more than 1,700 feet north. Currently, this standard is met, but development is expected to move closer to the asphalt plant as UMore continues to develop. For this reason, staff does not support an IUP renewal longer than 10 years in length. 11-10-4-1 G. 3. b. Setback And Buffering: The plant and all equipment and materials associated with it shall be set back a minimum of seventy-five feet (75') from any EIS boundary line and screened by natural features including berming or vegetation. Year round one hundred percent (100%) opaque screening with earthen berms and landscaping shall be required from ground level to the first thirty percent (30%) of the overall height and fifty percent (50%) opaque to fifty percent (50%) of the overall height of the plant as viewed from eye level from surrounding rights of way or roadways: The plant is located at least 300 feet from Akron Avenue and 400 feet from CSAH 46 (the EIS boundary). There is a 100-foot wide stand of mature trees directly north of CSAH 46 followed by a 16-foot tall berm. Along the west side of Akron Avenue, there is a ten-foot tall grassy berm. Staff finds that these setbacks and screening meet the City standards. 11-10-4-1 G. 3. c. Haul Routes: Traffic generated by this use shall utilize haul routes approved by the city and other agencies as required. The plant owner shall be responsible for road improvements and easements needed for ingress and egress subject to approval by the city. The haul routes may require Dakota County highway department or the Minnesota department of transportation approval as well: The main access to the asphalt plant is CSAH 46 via Akron Avenue. From CSAH 46, the asphalt trucks can access various County, State and U.S. highways to reach the neighborhood of the construction project requiring the asphalt. Staff finds that this standard has been met. Page 60 of 73 11-10-4-1 G. 3. d. Access: Traffic generated by this use shall enter onto streets consistent with city access and design standards. The owner of these uses shall be responsible for all costs associated with road improvements required to serve the use: The trucking to and from the asphalt plant site will access CSAH 46 using the private AUF road (158th Street) at either of the accesses at Station Trail or Akron Avenue. Asphalt trucks may not use Biscayne Avenue or any UMore roadway (Akron, Angus, Barbara or Blaine Avenues) to access CSAH 42, although they are currently being allowed to use these internal roadways to reach the site of Meta's new data center. With this specific condition within the IUP, staff finds that this requirement is achieved. 11-10-4-1 G. 3. e. Material Stockpiles: Stockpiles associated with these uses shall be limited to a height of sixty feet (60'): Material stockpiles are identified in the application narrative to be no more than 60 feet in height. This is a specific recommended condition of approval. Staff finds that with this condition, this standard has been met. 11-10-4-1 G. 3. f. Outdoor Storage: There shall be no outdoor storage of finished material or products. All equipment and raw material associated with the asphalt plant must be screened from view from an adjacent residential use or public right of way in conformance with section 11-6-8 D., "Outdoor Storage", of this title: The plant, tanks, stockpiles and equipment are described in detail in the sections above. All these elements are integral to the operation of the asphalt plant. The screening and setbacks are described in City Code Section 11-6-4 F. With that screening and setbacks, staff finds that this standard has been met. 11-10-4-1 G. 3. g. Air Emissions: Asphalt operations shall comply with Minnesota rules, part 7011 for testing, monitoring and operational requirements: The asphalt plant is a part of the Dakota Aggregates’ Minnesota Total Facility Operating Permit (Air permit #03700370-001). As long as this permit is active, staff finds that this standard is met. 11-10-4-1 G. 3. h. Waste Byproducts: This use shall operate so as not to discharge onto the soils within the EIS boundary, across the boundaries of the EIS boundary line or through percolation into the subsoil within the EIS boundary or beyond the EIS boundary line where such use is located, toxic or noxious matter in such concentrations as to be detrimental to or endanger the public health, safety, comfort or welfare; or, cause injury or damage to property or business: Trucks travel and are filled on a paved surface. The asphalt tanks will be installed with appropriate containment structures. These measures will control any asphalt spills. Staff finds that that this standard is met. 11-10-4-1 G. 3. i. Odors: This use shall operate so as to prevent the emission of odorous matter of such quality as to be detectable beyond EIS boundary line: The exhaust from the asphalt plant is run through a baghouse that will treat the air emissions. Staff finds that this standard is met. 11-10-4-1 G. 3. j. Surety Bond: This use shall comply with the applicable operating, special requirements and bonding for restoration standards for mineral extraction specified in subsection K7 of this section: The proposed grading for the asphalt plan matches the reclamation grades of the site. The equipment and tanks (except the large 70-foot diameter tank) of the asphalt plant are able to be mounted on to a truck and moved after the asphalt plant stops operating. The City is holding a letter Page 61 of 73 of credit in the amount of 110% the cost of removing the 70-foot-diameter tank. 11-10-4-1 G. 3. k. Hours Of Operation: The hours of operation shall be limited to seven o'clock (7:00) A.M. to seven o'clock (7:00) P.M. Monday through Saturday unless special permission is granted by the city council within the interim use permit. The extra hours of operation may be conditioned on more restrictive performance standards to address the adverse impacts caused by the extra hours: MPM is requesting 24 hour, 7 day a week operation. Often, transportation construction projects require night and weekend delivery. In recognition of this demand and recognition that urban development is currently more than a mile from this site, staff supports 24 hour, 7 day a week operation during the term of this IUP. At this time, staff finds that development remains far enough away that 24-hour operation can continue. As urban development continues to move into the UMore property there may come a time when the City will determine that 24 hour operations would be too disruptive to adjoining residential development. LSME 2012-105 Condition 18: The path of any road licensed vehicles using the concrete processing, asphalt processing, and vehicle maintenance facility shall be paved with curbing per the City Code: Akron Avenue and 158th Street have been constructed by Dakota Aggregates with a concrete pavement. The site features an asphalt parking lot and drive lanes for the over the road asphalt trucks. Staff finds that this standard is met. Interim Use Permit Regulations 11-10-8 E. 1. The extent, location and intensity of the use will be substantially in compliance with the Comprehensive Plan: The Comprehensive Plan states that asphalt plants are incompatible with adjacent residential uses and discourages interim uses within the 2030 MUSA. Within the timeframe of this recommended IUP, staff finds that the request is compliant with the Comprehensive Plan. 11-10-8 E. 2. The use will provide adequate ingress and egress to minimize traffic congestion in the public streets: With the accesses to CSAH 46 via Station Trail or Akron Avenue and the recommended condition limiting the access to CSAH 42, staff finds the access adequate. 11-10-8 E. 3. The use will not be detrimental to the existing character of the development in the immediate neighborhood or endanger the public health, safety, and general welfare: The immediate neighborhood land uses are currently agriculture or agricultural research. Within the term of this IUP, staff finds that the request will not be detrimental to the public or the neighboring land uses. 11-10-8 E. 4. The use will not impede the normal and orderly development and improvement of the surrounding property for uses permitted in the district: In 2013, the City adopted the UMore Alternative Urban Areawide Review (AUAR) which anticipates the development of this area over the next 40 years. Within the timeframe of this IUP, staff finds that the request will not impede the development or improvement of the surrounding properties. 11-10-8 E. 5. The use shall, in all other respects, conform to the applicable regulations of the district in which it is located: With the recommended conditions, staff finds that the request will conform to the applicable regulations. Page 62 of 73 RECOMMENDATION Staff recommends approval of the interim use permit renewal for the operation of the seasonal asphalt plant with the conditions within the recommended action. This recommendation is based on the information submitted by the applicant, findings made in this report and the conditions detailed in the attached memorandum. Page 63 of 73 Page 64 of 73 October 29, 2024 City of Rosemount 2875 14th Street West Rosemount, MN 55068 Via email to: anthony.nemcek@rosemountmn.gov RE: IUP Renewal Application for a Seasonal Asphalt Plant 1. Ancillary Use Facility Legal Description That part of the southwest Quarter of Section 34 and the Southeast Quarter of Section 33, all in township 115, range 19, Dakota County, Minnesota, described as follows: Beginning at the southwest corner of said Southwest Quarter of Section 34; thence South 89 degrees 42 minutes 10 seconds Ease, assumed bearing along the south line of said Southwest Quarter of Section 34, a distance of 2192.17 feet; thence North 04 degrees 21 minutes 18 seconds East a distance of 142.12 feet; thence North 01 degrees 12 minutes 32 seconds West a distance of 368.88 feet; thence North 01 degrees 58 minutes 09 seconds West a distance of 266.72 feet; thence northeasterly 112.50 feet, along a tangential curve, concave to the southeast, having a central angle of 56 degrees 02 minutes 58 seconds and a radius of 115.00 feet; thence northerly 56.43 feet, along a non-tangential curve, concave to the east, having a central angle of 35 degrees 55 minutes 23 seconds, a radius of 90.00 feet and a chord which bears North 17 degrees 26 minutes 35 seconds West; thence North 00 degrees 31 minutes 07 seconds East, tangent to last described curve, a distance of 206.76 feet; thence northerly 83.26 feet, along a ta ngential curve, concave to the west, having a central angle of 34 degrees 04 minutes 23 seconds and a radius of 140.00 feet; thence North 56 degrees 26 minutes 44 seconds East a distance of 45.08 feet; thence North 00 degrees 31 minutes 07 seconds East a distance of 299.38 feet; thence North 88 degrees 50 minutes 09 seconds West a distance of 537.90 feet; thence North 01 degrees 06 minutes 55 seconds East a distance of 542.56 feet to the following described line; Commencing at the northwest corner of said southwest quarter of Section 34; thence South 00 degrees 11 minutes 58 seconds West, along the west line of said Southwest Quarter of Section 34, a distance of 549.45 feet to the point of beginning of the line to be described; thence South 89 degrees 28 minutes 53 seconds East a distance of 2646.92 feet to the east line of said Southwest Quarter of Section 34 and there terminating. Thence North 89 degrees 28 minutes 53 seconds West, along said described line, a distance of 1701.18 feet to said west line of the southwest Quarter of Section 34; thence South 89 degrees 42 minutes 48 seconds West a distance of 133.00 feet; the North 89 degrees 25 minutes 32 seconds West a distance of 1911.08 feet; thence South 00 degrees 00 minutes 00 seconds West a distance of 6.69 feet; thence South 24 degrees 59 minutes 14 seconds East a distance of 32.7 feet; thence South 38 degrees 36 minutes 54 seconds East a distance of 58.76 feet; thence South 24 degrees 48 minutes 30 seconds East a distance of 21.39 feet; the South 08 degrees 35 minutes 01 seconds East a distance of 17.27 feet; thence South 01 degrees 13 minutes 27 seconds East a distance of 55.61 feet; thence South 20 degrees 01 minutes 53 seconds East a distance of 40.77 feet; thence South 20 degrees 03 minutes 43 seconds East a distance of 111.64 feet; thence South 15 degrees 03 minutes 51 seconds East a distance of 118.93 feet; thence South 27 degrees 25 minutes 38 seconds East a distance of 247.59 feet; thence South 21 degrees 09 minutes 19 seconds East a distance of 78.57 feet; thence South 18 degrees 19 minutes 12 seconds East a distance of 190.08 feet; thence South 26 degrees 25 minutes 05 seconds East a distance of 227.06 feet; thence South 46 degrees 46 minutes 51 seconds East a distance of 98.15 feet; thence South 33 degrees 47 minutes 16 seconds East a distance of 171.67 feet; thence South 23 degrees 42 minutes 30 seconds East a distance of 90.20 feet; thence South 17 degrees 56 minutes 04 seconds East a distance of 178.92 feet; thence South 17 degrees 54 minutes 28 seconds East a distance of 132.38 feet; the South 25 degrees 39 minutes 33 seconds East a distance of 126.20 feet; thence South 30 degrees 29 minutes 59 seconds East a distance of 103.92 feet; Page 65 of 73 thence South 28 degrees 45 minutes 36 seconds East a distance of 250.67 feet to the south line of said Southeast Quarter of Section 33; thence North 89 degrees 34 minutes 22 seconds East, along said south line, a distance of 1060.22 feet to the point of beginning. EXCEPT that part lying southerly of north right of way line of County State Aid Highway No. 46 per DAKOTA COUNTY ROAD RIGHT OF WAY MAP NO. 254 according to the recorded plats thereof, Dakota County, Minnesota. OVERALL GROSS AREA (Entire AUF): 171.86 ACRES NET USABLE AREA (Entire AUF) : 100.30 ACRES NET USABLE AREA: 30.00 ACRES Land Owner: Regents of the University of Minnesota 335 Morrill Hall 100 Church St SE Minneapolis, MN 55455 Applicant: Minnesota Paving and Materials 14475 Quiram Drive Rogers, MN 55374 Operator: Minnesota Paving and Materials 14475 Quiram Drive Rogers, MN 55374 2. Seasonal Asphalt Plant A seasonal asphalt plant is in the Ancillary Use Facility. Production in this area requires an asphalt plant capable of storing and mixing the ingredients for various asphalt mix designs. The asphalt plant site with the AUF has 3 asphalt material storage silos each having a 300 ton capacity, 5 AC liquid storage tanks at 30,000 gallons each, 1 Diesel fuel tank at 15,000 gallons, 12 aggregate cold feed binds, 3 RAP bins, 1 counter flow mixing drum 11’x54’, 1ea. 100,000 CFM bag house, 1 control house center, 5 material conveyors, 1 material slat conveyor, 1 AC tank heat er, 1 lab trailer, 2ea. 980k CAT loaders to feed the seasonal asphalt plant facility. Once per year we will move in a portable crushing plant to process the bituminous millings and chunks. This will take about one to two weeks to complete this process. The 3. Site plan and plant layout The seasonal asphalt plant is in the south-central portion of the AUF site. The plant is not located near any residential property; however, it is located just north of CSAH 46. The asphalt plant and all aggregate stockpiles are screened from view from the public right of way by berms and existing mature trees on the north side of CSAH 46. The AUF site is surrounded by land owned by the Regents of the University of Minnesota, who also own the AUF site. The asphalt plant site has a fully paved parking lot and a paved pad where the asphalt plant sits. The site has designated employee parking and truck parking areas. All traffic associated with the asphalt plant facility at the AUF site enter and exit the AUF site from Akron Ave onto CSAH 46 to the east of the asphalt plant site. Any lighting that is required for nighttime operations is shielded to prevent lights from being directed at traffic on public roadways , and to not disturb any traffic or surrounding properties, the level of lighting shall not exceed 1 lumen at the EIS boundary. Noise levels comply with the regulations established by the MPCA. The asphalt plant facility does not require a well for water. Portable water will be in the control house and lab facility on site for employee use and a portable toilet will be provided for the seasonal asphalt plant facility by an on-site sanitation service company. The height of the seasonal asphalt plant is 89 ’ tall to the top of the material storage silos. A cordoned off southern section of the AUF site is sub-sub leased to Flint Hills Resources and is utilized as a liquid AC blending facility. A portion of the blending facilities product is introduced into the asphalt plant’s production process. See attached aerial photo dated 8-20-24. Page 66 of 73 4. Hours of Operations The hours of operations for the asphalt plant facility are 24 hours per day 7 days per week; job driven only to meet the bid requirements for MnDOT and local counties and cities that are now calling for more and more nighttime and weekend construction projects. The normal operating hours for the asphalt pant facility is 6am to 9pm Monday through Saturday. The seasonal asphalt plant facility will operate only form May 1st through December 15th each year. 5. Aggregate Materials & Bituminous Milling Stockpiles The material stockpiles are primarily located along the perimeters of the asphalt plant facility. The stockpiles vary in height but should not exceed 60’ in height at any point. Most of the aggregate material used is mined on site by Dakota Aggregates and transported to MPM stockpile area by off road trucks. Bituminous millings and chunks are imported, stockpiled and processed once per year. The processed millings are inserted back into new bituminous mix being made at the plant. This process of using recycled asphalt back into the new bituminous mix is a very good way to practice environmental stewardship by conserving natural resources. The stockpiles and associated equipment are screened from view from the public right by way of berms and existing trees on the north side of CSAH 46. The aggregate stockpiles act as natural sound barriers. 6. Dust Control The AUF site Haul roads are all paved hard surfaces. There is a 15-mph speed limit on all paved/unpaved areas in the AUF site. Water trucks are used intermittently to help control the dust along with at least one calcium chloride application per year. 7. Required Permits for the AUF site. The seasonal asphalt plant facility is covered under the Minnesota Total Facility Operating Permit (Air Permit # 03700370- 001) issued to Dakota Aggregates, LLC. The plant will be required by the MPCA to run an emissions source stack test within 180 days of startup and if any major emissions components on the plant are changed. The plant is covered under the Minnesota Total Facility Operating Permit issued by the MPCA on completion of the stack test. This permit places limits on the production throughput of the plant and lays out maintenance requirements for control equipment. The plant is covered under the previously issued Minnesota (NPDES) permit # MNG 490289, covering stormwater discharges and the on-site handling of process water. All stormwater and spill procedures can be found in the previously submitted SWPPP and SPCC plans. These plans encompass the entire site, including the asphalt plant. MPM is required by our lease agreement with Dakota Aggregates to comply with all requirements of Dakota Aggregates’ NPDES, SWPPP and SPCC permits for the AUF site. Page 67 of 73 Drone Flight Aerial Photo Taken 8-20-24 Page 68 of 73 Page 69 of 73 Page 70 of 73 Page 71 of 73 Page 72 of 73 Page 73 of 73