HomeMy WebLinkAbout05272025 Agenda Packet
AGENDA
Planning Commission Regular Meeting
Tuesday, May 27, 2025
6:30 PM
City Council Chambers, City Hall
1. CALL TO ORDER/PLEDGE OF ALLEGIANCE
a. Election of Chair and Vice-Chair
2. ADDITIONS TO AGENDA
3. AUDIENCE INPUT
4. CONSENT AGENDA
a. Minutes of the April 22, 2025 Regular Meeting Minutes
5. OLD BUSINESS
6. PUBLIC HEARINGS
a. Request by Flint Hills Resources for an Interim Use Permit to construct a warehouse
tent.
b. Request by Sonny's Carwash for approval of a Site Plan Review to construct a car
wash facility
7. NEW BUSINESS
8. DISCUSSION
9. ADJOURNMENT
Page 1 of 63
EXECUTIVE SUMMARY
Planning Commission Regular Meeting: May 27, 2025
AGENDA ITEM: Election of Chair and Vice-Chair AGENDA SECTION:
CALL TO ORDER/PLEDGE OF
ALLEGIANCE
PREPARED BY: Liz Kohler, Community Development Technician AGENDA NO. 1.a.
ATTACHMENTS: APPROVED BY:
RECOMMENDED ACTION: Nominate and elect the Chair and Vice-Chair of the Planning Commission.
BACKGROUND
From May 2024 to May 2025, Melissa Kenninger served as Chair and Michael Reed served as Vice-Chair
of the Planning Commission.
RECOMMENDATION
Nominate and elect the Chair and Vice-Chair of the Planning Commission from May 2025 until April
2026.
Page 2 of 63
ROSEMOUNT PLANNING COMMISSION
REGULAR MEETING PROCEEDINGS
APRIL 22, 2025
CALL TO ORDER/PLEDGE OF ALLEGIANCE
Pursuant to due call and notice thereof a regular meeting of the Planning Commission was held
on Tuesday, April 22, 2025, at 6:30 PM. in Rosemount Council Chambers, 2875 145th Street
West.
Commissioner Reed called the meeting to order with Commissioners Rivera, Buggi, Reed,
Beadner, Ellis, and Arnob. Chairperson Kenninger was absent.
Staff present included the following: Community Development (CD) Director Adam Kienberger,
City Administrator Logan Martin, Public Works Director Nick Egger, Senior Planner Anthony
Nemcek, Planner Julia Hogan, and CD Technician Liz Kohler.
a.Oath of Office / Appointment and Re-appointment of Planning Commissioners
Commissioner Reed noted the change to the agenda for the swearing in of the commissioners. Logan
Martin administered the Oath of Office to Brenda Rivera, Jeff Ellis, and Furhath Arnob. Commissioner
Reed thanked Commissioners Ellis and Rivera for continuing to serve and extended a welcome to
Commissioner Arnob.
ADDITIONS TO AGENDA
None.
AUDIENCE INPUT
None.
CONSENT AGENDA
a.Minutes of the March 17, 2025 Regular Meeting Minutes
Motion by Reed Second by Buggi
Motion to approve the minutes of the March 17, 2025 meeting
Ayes: 6.
Nays: None. Motion Carried.
OLD BUSINESS
None.
PUBLIC HEARINGS
a.Request by David Kensinger and Appro Development for approval of a site plan
review to construct a combination coffeeshop and wine bar.
Senior Planner Anthony Nemcek presented on a request by David Kensinger and Appro Development
for approval of a site plan review to construct a combination coffee shop and wine bar. Nemcek stated
the lot currently also hosts the Morrison apartment building. He said there will be drive-through and an
Page 3 of 63
outdoor dining area and that the site had previously been approved for a restaurant. He also said that
the site plan meets the standards of the MX-1 Downtown Mixed-Use zoning district. Nemcek showed
the site location and noted the temporary nature of the parking area. He also stated that the previously
approved restaurant did not have a drive-through component but was a larger building.
He showed the site layout and identified the peninsulas that will facilitate the ability for cars in the
parking lots to reverse out without any issues from the drive-through stacking. He highlighted the
parking for the site and compared it with similar apartment buildings and noted the extra parking at city
hall and the park and ride location adjacent. Nemcek also discussed access and additional signage that
will give cars accessing the lot from Highway 3 the right of way. He showed elevations and discussed a
traffic study from when the Morrison was approved.
Nemcek stated that there is no minimum requirement for car stacking in the drive-through, but the ten-
car stacking exceeds requirements in other business zoning districts. He said that the landscaping
requirements are all met according to the city code. Staff recommended approval. Staff did add
conditions including that a sidewalk be striped, creating a pedestrian connection and lighting guidelines.
Commissioner Reed asked if the sidewalk was intended for the Morrison residents. Nemcek confirmed
that it was. He also asked if the drive-through traffic would be directed left and if there would be
signage identifying yielding to Highway 3. Nemcek confirmed both were correct. Commissioner Ellis
asked if there would be something to deter people leaving the drive-through from turning right.
Commissioner Beadner asked about problems with the shared parking lot. Nemcek responded that it
would be expected and residents could adjust.
Commissioner Reed opened the public hearing.
Mike Waldo
Waldo discussed the history of the Morrison and stated that an original goal for downtown was
maintaining retail spaces. He stated that the Taphouse was an exciting project but then the pandemic
hit and it was unable to go through. He stated that he thought this was the best use for the space and
that the drive-through is an essential component to the business but will not be the main component.
He noted that the sit-down coffee shop space was intended to be the main use of the restaurant. He
said that they paved the area because people were parking on the space while it was dirt anyway. He
also stated that the loss of Morning Glory bakery created space for the new coffee shop to replace it.
Commissioner Reed asked if there will be any additional signage. Waldo responded that they will be
working on it internally with their management team and the coffee shop team will meet on a continual
basis. Commissioner Reed asked if he was comfortable with the current plan. Waldo responded that he
was.
David Kensinger
3585 Clare Downs Path
Kensinger identified that when he and his wife moved to Rosemount they purchased the building their
floral shop resides in. He noted that a drive-through was fairly essential for the success of a coffee shop
and the building they had purchased was not compatible with that, and so they were excited by the
prospect of this space. He stated that the goal is to create an elevated space to reunite people after the
pandemic. He also noted that there will be a component that is more geared toward craft coffee and
wine. He identified the closing of Morning Glory and the need in the community for a local coffee shop.
Page 4 of 63
Commissioner Reed asked about Commissioner Ellis' question regarding the signage exiting the drive-
through. Kensinger replied that he will be working with the Morrison on the project to make the access
safe for everyone. Commissioner Rivera asked about food in the space. Kensinger responded that it
would be a small menu.
Nadia Ritter
21476 Grenada Ave.
Ritter said she works for Appro Development and that they have a team of civil engineers looking into
the issue, but she can answer any questions.
Susan Gjemse
14589 S Robert Trl
Asked if her written comments had been received. Commissioner Reed confirmed that they had been.
Gjemse also asked if they were going to be directing the residents coming out of the garage or not.
Daniel Nas
13665 Carrach Ave
He stated that the concept is really interesting and that he believes it could be good for the city. He
spoke to the character of the owners and described his support.
Motion by Reed Second by Ellis Motion to close public hearing
Ayes: 6.
Nays: None. Motion Carried.
Commissioner Reed asked about residents coming out of the garage and how that would be affected.
Nemcek responded that there would be no change in access because the access that had been brought
up was currently an entrance only and would be staying an entrance only.
Nemcek stated that there were also written comments about snow removal and deferred to the
applicant. Waldo returned to the podium and stated that snow would be hauled away from the site in
cases of heavier snowfall. Commissioner Reed asked if there was a change to the dumpsters with the
plan. Waldo responded that there should be no change to the current process.
Commissioner Reed asked if a condition could be added to push for more signage to prevent drive-
through users from turning the wrong way. Nemcek stated that it probably wasn't needed, but it was an
option. Commissioner Rivera stated that she was on the commission when the original plans were
brought forward and this type of use was always the plan. She also said she felt this was a good project,
and a good fit for downtown. Commissioner Reed agreed.
Motion by Reed Second by Buggi Motion to approve the proposed site plan allowing David Kensinger and Appro Development
to construct a combination coffee shop/wine bar at 14557 South Robert Trail, subject to the
following conditions:
1.Directional signage should be installed near the exit of the drive-thru giving cars
entering from Highway 3 the right of way.
Page 5 of 63
2.If the applicant decides to use landscaping for screening of the drive-through, the
proposed landscaping shall be 6' in height and screen to 90% opacity in conformance
with the zoning ordinance.
3.Only lighting necessary for security shall be illuminated after business hours.
4.A crosswalk shall be striped connecting the sidewalk along The Morrison and that of
the subject property.
5. The applicant will work with engineers to define a safe exit design preventing drive-
through traffic from entering onto Highway 3. Ayes: 6.
Nays: None. Motion Carried.
b.Request for a Planned Unit Development final site and building plan and a minor
amendment to the Prestwick Place Planned Unit Development Agreement to
construct a 10,000 square foot restaurant.
Planner Hogan presented on a request for a PUD final site and building plan and a minor amendment to
the Prestwick Place PUD. Hogan showed the site location and the lot split establishing one parcel as
buildable and one as an outlot for future development. She discussed the site plan, zoning and land use.
The site will be used for a restaurant and will include an outdoor dining area that is allowed as an
accessory use.
She discussed parking and access to the site. She stated that the plan does not meet the parking
requirements but that there is a potential for cross parking with surrounding businesses.
She showed the landscape plan and identified a sanitary easement on the property and that trees in the
easement would need to be moved, and the applicant will be working with city staff to ensure there is
no overlap. Staff recommended the city collect cash-in-lieu of parkland dedication. Hogan showed the
lighting plan, elevations, and floor plan. She also showed photos of an existing restaurant from the
developers. Staff recommended approval.
Commissioner Reed asked about the easement and if plantings would be allowed. Hogan responded
that they would not be allowed. Commissioner Ellis asked about lighting height in regards to the second
floor. Hogan responded that the code referred to pole mounted lighting and clarified that there will be
lights on the second floor. Commissioner Buggi asked for more clarification on the deviation with the
EIFS. Hogan replied that EIFS isn't as heavy so there would need to be additional columns needed if they
used brick instead of EIFS. Commissioner Beadner asked about parking spillover into Lifetime's parking
lot. Hogan stated that the spillover parking will be in the lot to the north, not Lifetime necessarily.
Commissioner Reed asked about sidewalks across the road from lifetime.
Commissioner Reed opened the public hearing.
Cory Bannerman
5511 Southwood Drive
Commissioner Reed asked about the project not meeting parking requirements and pedestrian safety.
Bannerman stated that there is an existing sidewalk on the west side. Commissioner Rivera asked about
the other Copper Pint. Commissioner Ellis asked about the EIFS. Bannerman responded that there
would be columns supporting the second floor and the additional brick would increase the number of
columns necessary. Commissioner Buggi asked if it could be readdressed to meet city standards.
Bannerman replied that they would take a second look at the plans.
Page 6 of 63
Alan Catchpool
Catchpool confirmed there were sidewalks on the south side of the road with crosswalks on the west
side of the roundabout.
Motion by Reed Second by Rivera Motion to close the public hearing.
Ayes: 6.
Nays: None. Motion Carried.
Commissioner Reed asked about any other comments received. Hogan responded that there were
none. Commissioner Rivera stated that she felt it would be a nice addition to the area.
Motion by Beadner Second by Ellis Motion to approve the Planned Unit Development Final Site and Building Plan to allow for
the construction of a 10,000 square foot restaurant with outdoor dining areas on Lot 1, Block
1, Prestwick Place 27thAddition, subject to the following conditions:
1.Approval by the City Council for a minor amendment to the Prestwick Place Planned
Unit Development Agreement.
2.Compliance with all comments and requirements of the City's Engineer detailed in
the Engineer's Memorandum dated April 11, 2025.
3.Conformance with all comments and requirements outlined in the City’s Park and
Recreation Directors Memorandum dated April 17, 2025.
4.The applicant shall apply for a sign permit for any site signage.
5.Submittal of a landscape surety equal to 110% of the value of trees planted on the
property.
6.The applicant shall work with City Staff to address tree location issues on site and
resubmit an updated landscape plan prior to the issuance of a building permit.
7.Conformance with all the required standards associated with outdoor dining.
8.No public address system shall be audible from adjacent non-commercial property
boundaries.
9.Non-essential lighting shall be turned off after business hours.
10.Light fixtures within 100 feet of a residential property line shall be no higher than 20
feet.
Ayes: 6.
Nays: None. Motion Carried.
c.Request for an Amendment to the Rosemount Comprehensive Guide Plan Land Use
Map
Senior Planner Nemcek presented on a request for a comprehensive land use amendment to re-guide
about 420 acres on the eastern side of the city and expand the Metropolitan Urban Services Area
(MUSA) into the site. He showed the location of the proposed land use change and stated that it is
currently being used for agriculture and as a mineral extraction site. The land is in seven different
parcels. The land would be re-guided from residential and commercial to business park. This would
expand the MUSA line to bring urban services into the area. He stated that there was an AUAR
Page 7 of 63
published and that the comments that were received will be incorporated into the AUAR prior to the
council review.
Nemcek showed the current land use designations and discussed the business park designation
specifically. He stated that the comprehensive plan contains ten guided principals and that two of those
principals identify diversifying development. He also called out the economic competitiveness of
chapter six and chapter seven on resilience. He also brought up the City Council's strategic goals. He
noted that there will be a realignment of County Roads 42 and 55. He identified the timeline as
sometime in the 2030s.
Nemcek discussed the utility study and its goals of bringing city utilities to the subject area. He
described the amendment adoption process. Staff recommended approval of the proposed amendment
change.
Commissioner Reed called out that the area to the northwest was waste management. Nemcek
confirmed that and stated that business park land was re-guided for waste management, reducing the
business park designation in that area. Commissioner Reed identified it would be nice to have a buffer
between the waste management area and potential residential areas. He also asked about what
businesses would be included in community commercial. Nemcek replied that it's typically similar to
businesses seen on the south side of County Road 42, including fast food restaurants and grocery
stores, and also stated that it's likely that the amount of community commercial identified in the
comprehensive plan is likely too high for the current and future residential spaces.
Commissioner Reed discussed the AUAR process and asked Nemcek if there was anything that might
arise from the AUAR that the Commission should be aware of. Nemcek stated that it is not yet
complete, but only four comments had been received, and they were regarding water and wildlife and
nothing was surprising. He also said that the AUAR lays out possible impacts and mitigation possibilities.
Commissioner Reed also asked about traffic studies and if MnDOT was aware of possible changes to the
comprehensive plan and traffic impacts they may have. Nemcek confirmed they were.
Commissioner Arnob stated that even with the amendment, the community commercial would still be
more than exists in the city currently. Commissioner Rivera asked about the other steps in the process
and if this area will be seen more in future meetings. Nemcek responded that it would have to be seen
multiple times before any development would occur and many developers try to get amendments done
before putting energy and resources to further planning on a site until the amendment is approved.
Commissioner Beadner asked about the mineral extraction site that currently exists on the site. Nemcek
stated that the reclamation will take place during the mass grading of the site for development.
Commissioner Reed opened the public hearing.
Jacob Stein
8300 Norman Center Drive
Stein represented the applicant and stated that this is the early stage of the project. He said the policies
and principals of the comprehensive plan are supportive of the plan. He said they are working with the
city county, and MnDOT about the right of way needs. They are also looking at extending the utilities
that will bring growth not only to the proposed site but also everything between the site and the other
developed areas of the city. He discussed the jobs created by the data center as well as those created
Page 8 of 63
during the buildout of the site.
Commissioner Reed asked if they could expect a similar approach that was taken for the Meta project in
town. Stein confirmed that they could expect a similar approach.
Kimberly Dimmick
15001 Fisher Ave
She stated that during the State of the City the mayor made comments about history and agriculture in
the area. She voiced her opposition to the amendment and her hope that the city would preserve
agriculture. She also discussed the Dakota County Comprehensive plan and the Rosemount
Comprehensive Plan. She expressed concern about issues caused by data centers. She stated that Tract
wouldn't be the end user of the land. She questioned why this would be approved if the end result is
unknown. She also noted the importance of the farmland in the proposed location. She brought up the
AUAR and the well capacity on the property. She stressed her concerns over water usage. She also
discussed cooling towers and the pollution caused by them. She stated concerns about the accuracy of
the AUAR.
Janice Beltz
14997 Fisher Ave.
She identified the private road that runs along the southeastern corner of the area and stated that Tract
informed them of a 50-foot buffer from their property line. She voiced concerns over the vision of the
city when entering from Hastings.
John Bremer
7048 150th St E
Bremer stated that the township was not informed of the project and asked for more communication
on the project. He also mentioned concerns about roadways being affected by development and noted
that Nininger Township shares the road with Rosemount. He also brought up that the project may be
considered leapfrogging.
Brandon Bourdon
14991 Fisher Avenue
He voiced concerns over changing the comprehensive plan and how they affect choices people had
made prior to the changes. He stated that a data center wouldn't be the best use of the property. He
said he's not against development, but is not in favor of the change because the land use wouldn't be
compatible.
Stephanie Kamen
14995 Fisher Ave.
She voiced concerns over noise and lights from a data center. She stated that everyone in the
surrounding community is present at the meeting and wants to continue to pass down their homes and
properties to their families.
Melissa Johnson
14700 Furlong Circle
She said it feels like overreach, not balanced growth. She is concerned about hazard stacking and
destruction of agriculture. She presented the impacts of past industrial projects in cities and the
Page 9 of 63
negative impacts of data centers. She also expressed concerns over water usage and changes to the
physical space.
Maddie Gunhus
14710 Furlong Circle
She stated that the reason for buying her property was the views and lack of businesses in the
surrounding area. She is concerned about water, radiation from a data center, and property values.
Peter Johnson
14700 Furlong Circle
He discussed his history in Rosemount and identified concerns about traffic. He stressed concerns about
utilities, particularly water and sewage.
Kyle Kaman
14995 Fischer Ave.
He stated his history of living in his home and that he intends to continue to live in his home. He
identified a push toward business and stated that he believed it does not represent the community. He
said he thinks there is not a benefit to this change.
Russel Beltz
14997 Fischer Ave.
He expressed concerns over elevation changes and the grading of the properties and runoff from snow.
He stated safety concerns about student bus stops. He also stressed fears about property values and
the longer-term effects of data centers.
Susan Gjemse
14589 S Robert Trail
She stated concerns about transparency from the city. She asked about construction timelines starting
in 2025.
Motion by Reed Second by Buggi Motion to close the public hearing
Ayes: 6.
Nays: None. Motion Carried.
Commissioner Reed asked about the 2025 timeline. Stein returned to the podium. He stated that the
anticipated timeline was 2027 for horizontal construction and 2028 for vertical construction.
Commissioner Reed asked staff to comment on project Mercury. Nemcek stated that AUARs do not
confirm development approvals, and they reviewed the AUAR but have not heard anything about
further development on the site and therefore could not comment. Kienberger also noted that AUARs
are a common planning tool for large scale development and that AUARs look at problems and
mitigation efforts for a variety of development proposals. He clarified that just because something is in
an AUAR does not necessarily mean that it will be developed into that project.
Commissioner Reed asked about the runoff. Nemcek responded that the current meeting is regarding
the amendment and any further development would be required to adhere to stormwater
requirements. Commissioner Reed asked about street improvements on Fischer Avenue in the case of
Page 10 of 63
development. Nemcek replied that if improvements were needed it would be the responsibility of the
developer to make those improvements. He also said that traffic impacts would be determined as part
of development proposals.
Commissioner Reed asked about the water table. Nemcek stated that the well onsite is an irrigation
well. He stated that the water brought in and sent out through wastewater would be through the
municipal systems. It would be provided by the city wells allocated by the DNR. Commissioner Reed
brought up water usage. Nemcek stated that they would need to provide information related to the
type of cooling and the anticipated amount of water that would be used for the cooling system. He also
noted that even without this amendment the site would be using a large amount of water.
Commissioner Reed brought up the aesthetics of the site. Nemcek stated that the business park zoning
district does have requirements for things like screening and a large project would have other
requirements negotiated in the PUD process.
Commissioner Reed asked about engagement with the surrounding residents. Stein stated that they
have started public engagement and that there will be numerous public hearings. Commissioner Reed
asked about a few other questions from residents on things like cooling towers and if those would need
to be addressed later in the development process. Nemcek confirmed. He also reiterated that Tract is a
master developer that will prepare the land for the developer and that the end user of the site is
unknown.
Commissioner Beadner asked about how staff views approaching balance in development. Nemcek
responded that property owners still have rights, and the city cannot have a say about what gets sold.
Kienberger added that there are other possible outcomes for the site with or without the amendment.
Commissioner Beadner asked about identifying a site and why the specific site was chosen. Stein stated
that they are looking for consolidated large groups of land with a suitable grade. Commissioner Rivera
asked how many people own the land for sale. Nemcek responded that two people own the land for
sale. Commissioner Rivera asked if the landowner is selling for a particular reason or not. Nemcek
responded that he could not speak for the seller.
Commissioner Rivera stated that she does not feel comfortable changing the land use. Commissioner
Reed expressed concerns about the future plans, but also said he felt confident that the city will do a
thorough review of any plans. He also stated that he is in favor of changing the land use because of
concerns over a lack of community commercial coming in. Commissioner Ellis clarified that the planning
commission's role in this particular case was legislative. He also stated that he was in favor of the
change.
Motion by Buggi Second by Ellis Motion to recommend the City Council adopt the proposed Comprehensive Guide Plan
amendment to change the land use designation from CC-Community Commercial, AG-
Agriculture, HDR-High Density Residential, MDR-Medium Density Residential, and LDR-Low
Density Residential to BP-Business Park, and to extend the Metropolitan Urban Services
Boundary to include the subject property, subject to acceptance by the City Council of the
Dakota East AUAR.
Ayes: 5.
Nays: Rivera. Motion Carried.
Page 11 of 63
Nemcek noted that the tentative date for City Council on the staff report said May 20, but it would
actually be going to Council on June 3.
NEW BUSINESS
None.
DISCUSSION
Kienberger identified that the Port Authority would be having a joint meeting with the Planning
Commission on May 20th. Commissioner Reed asked if there would be background material on
the subject. Kienberger responded that all necessary background information would be
provided.
Commissioner Rivera asked about the appreciation on the 29th at the Steeple center. Staff
confirmed the date.
ADJOURNMENT
There being no further business to come before the City Council at the regular Planning
Commission meeting the meeting was adjourned at 8:59 p.m.
Respectfully submitted,
Liz Kohler
Community Development Technician
Page 12 of 63
EXECUTIVE SUMMARY
Planning Commission Regular Meeting: May 27, 2025
Tenative City Council Meeting: June 17, 2025
AGENDA ITEM: Request by Flint Hills Resources for an Interim Use
Permit to construct a warehouse tent.
AGENDA SECTION:
PUBLIC HEARINGS
PREPARED BY: Anthony Nemcek , Senior Planner AGENDA NO. 6.a.
ATTACHMENTS: Site Location, Building Location, Structural
Drawings, Blanket Agreement Area
APPROVED BY: AK
RECOMMENDED ACTION: Motion to recommend the City Council approve the Interim Use Permit for a
warehouse tent, subject to the following conditions:
1. The applicant shall ensure water draining off the tent does not create erosion of the gravel
surface. If erosion is observed, the applicant shall take measures to contain sediment, repair
and prevent future occurrences.
2. The Interim Use Permit expires on December 31, 2029.
3. The applicant shall obtain the required building and grading permits and shall conform to all
applicable building and fire codes.
4. The Heavy Industrial Site and Building Standards are waived to allow metal and fabric buildings
within the areas shown on the Blanket Agreement Area map. No temporary metal or fabric
buildings are allowed within 300 feet of the Rich Valley Boulevard right-of-way.
5. The placement of the warehouse tent is limited to the areas shown on the Blanket Agreement
Area map.
6. The applicant shall pay property taxes on the structures based upon their value.
BACKGROUND
The Planning Commission is being asked to consider a request by Flint Hills Resources (FHR) for what is
essentially a modification of an existing interim use permit to construct a temporary warehouse
building. Temporary buildings are an interim use in the I-2 Heavy Industrial zoning district. Most
recently, in 2019, the City approved an IUP allowing FHR to construct three temporary warehouse
buildings as well as blast-resistant modules and blast-resistant tents. The proposed structure is similar
to the warehouse tents that have already been approved. Staff is recommending approval of the
Interim Use Permit with an expiration date the same as the existing IUP on site so that only one
renewal will be required.
The IUP is intended to permit temporary buildings with an exemption from certain zoning standards
associated with permanent buildings, such as required materials, parking and landscaping. The IUP
process has been used in other situations when the use is expected to be temporary, and the duration
is clearly identified, such as the ancillary uses near the Dakota Aggregates mining operation. An IUP
process is also used when the site use or improvements are of a temporary nature that will not
Page 13 of 63
adversely affect or inhibit future re-use of the site. As with other structures previously approved by
the IUP, staff would prefer permanent structures as they are more visually appealing and, more
importantly, provide tax base for the City. In past discussions with the applicant, they have agreed to
pay taxes on the proposed buildings based upon the value of the structure. As the City is not the
jurisdiction that determines valuation or what structures are, or are not, taxed, staff has again included
this commitment in the conditions of approval.
The City and FHR have identified a Blanket Agreement Area within which the structures described
above may be located. This allows FHR flexibility to place the structures in closer proximity to projects
as they occur without needing additional approvals each time the structures are relocated. The
applicant is not requesting a change to the boundaries of this area, which are shown on a map
contained in the attachments. One of the original conditions of the IUP that was included to mitigate
any impact from the westward expansion of the Blanket Agreement Area is being included in the
recommendation, and that is that no temporary structures can be placed within 300 feet of Rich Valley
Boulevard. Another 2013 condition that required additional conifers to be planted along Rich Valley
Boulevard has been met and therefore is not included in the recommendation.
Legal Authority
The interim use permit approval is a quasi-judicial action, meaning that if the application meets the
City Code and interim use permit regulations, then the interim use permit must be approved. Staff
supports approval of this interim use permit. A detailed analysis of this finding is provided below.
1. The extent, location and intensity of the use will be substantially in compliance with the
Comprehensive Plan.
Finding: The site is designated for General Industrial use in the 2040 Comprehensive Plan. The
warehouse tent will support the refining of petroleum, a permitted use in the Heavy Industrial zoning
district.
2. The use will provide adequate ingress and egress to minimize traffic congestion in the public
streets.
Finding: Access to the site is located along Clark Road, east of the site. No changes are proposed to the
traffic to and from the site.
3. The use will not be detrimental to the existing character of the development in the immediate
neighborhood or endanger the public health, safety and general welfare.
Finding: The refinery complex with its exposed equipment, storage tanks and pipe racks has a heavy
industrial character. Public health, safety and general welfare are served by conformance with building
and fire codes and the IUP being visually screened from the US 52 right-of-way.
4. The use will not impede the normal and orderly development and improvement of the
Page 14 of 63
surrounding property for uses permitted in the district.
Finding: The construction projects that prompt the IUP are further development of the refinery complex
as a permitted use in the I-2 District.
5. The use shall, in all other respects, conform to the applicable regulations of the district in which
it is located.
Finding: The use is consistent with applicable I-2 District standards and the IUP does not waive
performance standards such as setbacks and utilizing existing or future planned parking facilities.
RECOMMENDATION
Staff recommends that the Planning Commission recommend that the City Council approve an Interim
Use Permit for a temporary warehouse building, subject to the staff's recommended conditions. This
recommendation is based on the information submitted by the applicant and the findings made in this
report.
Page 15 of 63
Page 16 of 63
Page 17 of 63
FABRIC COLOR
APPROVE WITH CHANGESAPPROVE
PLEASE SIGN AND CHECK THE APPROPRIATE BOX BELOW THE SIGNATURE AFTER REVIEWING THE DOCUMENTS.
MY SIGNATURE BELOW ACKNOWLEDGES THAT I HAVE READ AND REVIEWED ALL THE SHEETS LISTED IN THE CONTENT GUIDE AND AGREE TO THE SPECIFICATIONS SHOWN UNLESS OTHERWISE NOTED.
UPON ACCEPTANCE OF THE DRAWINGS, ANY DEVIATIONS FROM THE SIGNED DRAWINGS AND SPECIFICATIONS OUTLINED IN THE EXECUTED DRAWINGS ARE SUBJECT TO ADDITIONAL CHARGES AND MAY RESULT IN DELAY OF INSTALLATION OR DELIVERY OF YOUR STRUCTURE. A CHANGE ORDER WILL BE ISSUED TO YOU WITH THE OUTLINED ADDITIONAL COST ASSOCIATED WITH THESE CHANGES AND A PROPOSED NEW DELIVERY SCHEDULE.
NO CHANGES WILL BE ACCEPTED UNLESS WE HAVE A CHANGE ORDER SIGNED BY AN AUTHORIZED REPRESENTATIVE.
CUSTOMER SIGNATURE DATE
CUSTOMER DESIGN APPROVAL
FIRE-RATED OR NON FIRE-RATED
TERMINATION OF FABRIC
OZ.WEIGHT OF MATERIAL
WHITE
12
DAF 12PE##NF** (NON FIRE-RATED)
POUND IN STRIP
40
'
-
1
1
/
4
"
BA
S
E
B
O
T
T
O
M
T
O
O
U
T
S
I
D
E
P
E
A
K
84'-4"PIVOT HOLE CENTERS
36
'
-
6
1
5
/
1
6
"
BA
S
E
B
O
T
T
O
M
T
O
I
N
S
I
D
E
P
E
A
K
GRID SQUARES = 2'
THE INSTRUCTIONS INCLUDE DETAILS NEEDED DURING CONSTRUCTION.
OMITTED
SHEET:
DRAWN BY:
FL
I
N
T
H
I
L
L
S
R
E
S
O
U
R
C
E
S
ENGINEERING SERVICES & PRODUCTS CO.
SH
E
E
T
T
I
T
L
E
:
CO
V
E
R
S
H
E
E
T
CUSTOMER #:
A1
6377211
NO. BY: REVISION DATE:
1
2
3
TJL
SA
I
N
T
P
A
U
L
,
M
N
5
5
1
6
4
-
0
5
9
6
CO
N
T
A
C
T
P
H
O
N
E
:
NOT TO SCALE SHEET SIZE: 11X17
DRAWING DETAILS
T085GPHF024155
ST
R
U
C
T
U
R
E
D
E
S
C
R
I
P
T
I
O
N
:
ORDER #:
7897389
PO
B
O
X
6
4
5
9
6
--
[L1 - L2] ..............
[M1 - M2] ............
[K] .......................
[J1] .....................
[I] ........................
[H1] ....................
[G3] ....................
[G2] ....................
[G1] ....................
[F1] .....................
[E1] .....................
[D1] .....................
[C1] .....................
[B1] .....................
[A1] .....................
'T
E
M
P
L
A
T
E
V
1
.
3
'
WITH THE INSTRUCTION MANUAL SHIPPED WITH THE BUILDING.
65
1
-
4
3
7
-
0
8
5
0
DYERSVILLE, IA 52040
ST
R
U
C
T
U
R
E
S
K
U
#
:
T0
8
5
G
P
H
F
0
2
4
1
5
5
WEST ENDWALL: EW085GPF0743D
F: 563.875.2317
DEVELOPED BY
CU
S
T
O
M
E
R
I
N
F
O
R
M
A
T
I
O
N
:
WWW.ESAPCO.COM
EW085GPF0733D
A DIVISION OF
1440 18TH AVENUE SW
EAST ENDWALL:
85
'
X
1
5
5
'
ST
R
U
C
T
U
R
E
S
I
Z
E
:
CU
S
T
O
M
E
R
C
O
N
T
A
C
T
:
RA
N
D
Y
B
A
U
E
R
REVISIONS:
4
BUILDING CONTENT GUIDE:
P: 563.875.6113
COVER SHEET
GENERAL NOTES
BUILDING PLAN VIEW
MATERIAL SPECIFICATIONS
RAFTER PROFILES
SIDE PROFILES
DETAIL LOCATIONS & BASE DETAILS
GENERAL CONNECTION DETAILS
CABLE LAYOUT & DETAILS
BASE PLATE LAYOUT & DETAILS
OMITTED
BUILDING REACTION DATA
ADDITIONAL INFORMATION
THESE PRINTS IDENTIFY AND SHOW THE MAIN COMPONENTS ANDCONNECTIONS FOR THIS BUILDING. LENGTH, WIDTH, AND OTHERIMPORTANT DIMENSIONS ARE ALSO PRESENT.
TO BEST UNDERSTAND HOW TO CONSTRUCT THIS BUILDING, THEINFORMATION CONTAINED WITHIN THESE SHEETS SHALL BE USED
CREATION DATE:3/7/2025
PREL
I
M
I
N
A
R
Y
Page 18 of 63
ISSUED FOR APPROVAL
Page 19 of 63
ISSUED FOR APPROVAL
Page 20 of 63
Page 21 of 63
EXECUTIVE SUMMARY
Planning Commission Regular Meeting: May 27, 2025
Tenative City Council Meeting: Unless denied and appealed by the applicant, the Planning
Commission's approval is the only action needed.
AGENDA ITEM: Request by Sonny's Carwash for approval of a Site
Plan Review to construct a car wash facility
AGENDA SECTION:
PUBLIC HEARINGS
PREPARED BY: Julia Hogan, Planner AGENDA NO. 6.b.
ATTACHMENTS: Site Location, Existing Conditions, Site Plan, Grading
Plan, Utility Plan, Photometric Plan, Landscape
Plan, Irrigation Plan, Emergency Vehicle
Movements Exhibit , Architectural Elevations ,
Engineer's Memorandum Dated May 21, 2025,
Parks and Recreation Memorandum dated May 21,
2025
APPROVED BY: AK
RECOMMENDED ACTION:
Motion to approve a site plan review allowing Sonny’s Carwash to construct a car was facility at 2550
149th Street West, subject to the following conditions:
1. Compliance with all comments and requirements of the City's engineer detailed in the
Engineer's Memo dated May 21, 2025.
2. Payment of $12,870 in lieu of park land dedication prior to the issuance of a building permit
3. The applicant shall apply for and receive a sign permit prior to the installation of any site
signage.
4. Payment of any remaining development fees not collected during the plat process.
5. All overhead vehicle doors on the building shall remain closed except when a vehicle is entering
or exiting the building.
BACKGROUND
SUMMARY
Applicant: Sonny’s Carwash
Property Owner: Lu-Pa Industries, LLC
Site Location: 2550 149TH ST W (Northwest Quadrant of
Biscayne Avenue and County Road 42)
Site Area in Acres: Approximately 1.43 Acres
Current Zoning: MX-2 - Highway Mixed Use
Comp Plan Designation: CC - Community Commercial
The Planning Commission is being asked to review the site plan submitted by Sonny’s Carwash to
Page 22 of 63
construct a car wash facility at 2550 149th Street West. The subject parcel is located within the
Rosewood Center 2nd Addition plat area on the north side of CSAH 42 and west of Biscayne Avenue.
The plans provided by the applicant meet all requirements of the zoning ordinance within the City
Code, and staff are recommending approval of the site plan review to allow for the construction of a
car wash facility, subject to the conditions listed in the recommended action section above.
BACKGROUND
The site of the proposed car wash is within the Rosewood Center 2nd Addition plat area. The subject
parcel was originally an outlot of the Rosewood Estates single-family neighborhood immediately north
of the business park area along CSAH 42. This area was platted as Rosewood Center in 2014. The
preliminary plat for Rosewood Center showed the area to contain six buildable lots and three outlots.
The final plat approved in 2014 created one buildable lot, which is where the Anytime Fitness building
is currently located, and four outlots which consisted of two for future development, one for
stormwater management, and one remnant parcel. In April 2024, the original applicant for Rosewood
Center requested preliminary and final plat approval for Rosewood Center 2nd Addition to subdivide
two outlots into five buildable lots and one non-buildable lot. City Council approved the preliminary
and final plat for Rosewood Center 2nd Addition in May 2024. Since the plat approval, there has been
one development project that has been approved for construction on one of the buildable parcels.
The subject parcel is zoned MX-2 – Highway Mixed Use, and car washes are listed as a use that is
permitted with standards within that zoning district. In addition to the general site plan, the applicant
has provided architectural drawings, a grading plan, utility plan, a photometric plan, and a landscape
plan, all of which are included in the attachments. A formal review and analysis of this information and
how it relates to the Zoning Ordinance is provided in the next section. No variances are being
requested for the construction of the project, and the proposed development meets the requirements
of the zoning ordinance.
SITE PLAN REVIEW
The purpose of a site plan review is to evaluate each project as it relates to the performance and site
design standards of the zoning ordinance. Site plan approval is required for all commercial, industrial,
institutional and multifamily development projects.
Site plan applications are approved by the Planning Commission and considered a quasi-judicial action.
As such, the city has a set of standards and requirements for review. Generally, if a site plan application
meets the ordinance requirements, it must be approved. These standards are outlined in Section 11-6-
3 (Use Specific Standards) and 11-9-1 (Site Plan and Building Design Review). There are five standards
associated with car washes which will be further outlined in this report.
Site Standards
The site is guided for CC-Community Commercial uses in the City’s comprehensive land use plan, and it
is within the MX-2 Highway Mixed Use zoning district. The proposed building is shown to be located in
the southeastern portion of the site with the main entrance into the car wash facing north.
West/northwest of the principal building will be the parking/vacuum areas. The table below shows the
required setbacks in comparison with those provided in the site plan. The table includes an additional
setback of 20’ from CSAH 42, an arterial road, for structures.
Page 23 of 63
Building Setbacks
Required Setback Provided Setback Frontage
Building Parking Building Parking
North (149th Street West) 30 feet 10 feet 159 feet >10 feet
East (2508 149th Street
West)
10 feet 10 feet 21.2 feet >10 feet
South (CSAH 42) 10+20 feet 10 feet 50.5 feet 10 feet
West (2592 149th Street
West)
10 feet 10 feet >10 feet 23.5 feet
The site plan shows two vacuum motor/equipment enclosures on the property, one south of the
proposed building and one northwest of the building. Both enclosures meet the required setbacks. The
MX-2 – Mixed Use Highway district has a maximum lot coverage of 75%. The applicants' plans show the
lot coverage of the site to be 53%. Lot coverage consists of the building, paving and sidewalks.
Exterior Materials
The building elevations provided show a mix of materials being used on the exterior of the principal
building. The building will consist of gray cultured stone and white and blue fiber cement panels. There
will also be a red steel frame around the top of the building. No EIFS or masonry stucco, of which 10%
of the façade can be comprised, will be used. The MX-2 – Highway Mixed Use zoning district has a
requirement that at least 50% of the exterior must contain natural stone or brick. The elevations meet
that minimum threshold.
The maximum building height allowed within the MX-2 – Highway Mixed Use zoning district is 35-feet.
In the plans submitted by the applicant, it shows the building height to be 25-feet, which falls below
the maximum allowed height restriction.
Parking and Access
Access to the site will come from a private drive that extends west over the adjacent parcel to an
existing curb cut on 149th Street West. This private drive is shown to extend east and then south where
three stacking lanes are shown to enter the car wash building. The private road is then shown to
extend west and then north from the exit of the car wash building where it opens up to the
parking/vacuum station area. This parking area extends north to meet back up with the main private
drive in which the site is accessed by. Traffic flow is shown to circulate clockwise throughout the site.
There are a total of 22 parking stalls shown in the parking lot area with 16 of those stalls having access
to vacuums. The applicant also provided an exhibit showing the turning movements of emergency
vehicles on site which has been reviewed by the City’s Fire Marshal.
Required Provided
6 stacking spaces per car wash 22 stalls
Landscaping
The applicant's landscaping plan includes a mix of deciduous and coniferous trees planted to screen
Page 24 of 63
the site from adjacent properties and public rights of way. Additional trees are provided around the
parking island areas and open space along the perimeter of the site, which includes screening of the
stacking lanes at the north end of the site. The zoning ordinance requires one tree per 3,000 square
feet of site area, which in this case results in a requirement of 21 trees. The landscape plan shows a
total of 61 trees to be planted throughout the site. The additional tree count is to account for the need
for additional parking lot landscaping, perimeter landscaping, and screening requirements.
The City Code also requires foundation planting or shrubbery in an amount based on the total linear
feet of building perimeter. Based on the size of the building, a total of 34 linear feet of foundation
plantings are required. The landscape plan shows a total of 129 linear feet of foundation plantings to
be provided. There will be a total of 243 foundation plantings/shrubbery provided throughout the site.
They are shown on the east side of the building, along the southern property line boundary, along the
open space on the western side of the site and as well as around the two vacuum motor/equipment
enclosures and parking lot islands on site.
The following table lays out the landscaping requirements for the site.
Calculation Formula Number Required Number Provided
Site Trees 1 per 3,000 sf 62,290/3,000=21 trees 61 trees
Foundation Plantings 1 per 10 linear feet 336/10=37 foundation plants 243 foundation
plants
Utilities
Sewer and water service will be provided by existing facilities located at 149th Street West, and
stormwater will exit the site to the storm sewer within 149th Street West. Site stormwater will make
use of the stormwater pond located west of the Anytime Fitness Site. The City’s Engineer has reviewed
the construction plans and provided a memorandum dated May 21, 2025. The memo contains general
comments related to the grading of the site and stormwater management. A stormwater report to
document how stormwater management is achieved must be submitted by the applicant. An updated
SWMP is also needed for the Rosewood Commons/Center developments to assess the necessary
volume needed in the regional pounds. This will need to be approved prior to any work being done on
the site. Conformance with all requirements of the City Engineer is a recommended condition of
approval.
Parks and Open Space
The developer of the Rosewood Center 2nd Addition plat has requested that park dedication be
collected at the time a building permit is issued. The park dedication requirement for commercial
developments is either 10% of the total property area as land dedication or cash-in-lieu of land
dedication. The cash dedication for the 1.43-acre site is $12,870 (1.43 acres x $9,000 per acre). Staff
has included the payment of the park dedication fee with the building permit fee as a recommended
condition of approval.
Site Lighting
The applicant is proposing site lighting that consists of pole-mounted lights and LED tube light attached
to each of the vacuum stations. The LED lights will be set up at a height of 10-feet, while the pole-
Page 25 of 63
mounted lights will be 20-feet in height. The zoning ordinance allows pole-mounted lights to be up to
30-feet tall except in areas within 100-feet of a residential use. In those areas, the maximum height for
lighting is 20-feet. All lights will be located over 100-feet away from any residential properties. The
maximum level of lighting allowed by the code is 0.5 lumen at adjacent residential property lines and
1.0 lumen at non-residential property lines. The applicant has submitted a photometric study that
shows the levels to be within the limits established by the zoning ordinance.
Standards – Car Wash
A car wash is a principal use that is permitted with standards in the MX-2 Highway Mixed Use zoning
district. The proposed use must comply with the specific performance standards for car washes which
are outlined in Section 11-6-3.G. of the City Code. These standards evaluate the city’s land use and
zoning performance standards and the potential impact of the proposed use on the surrounding
neighborhood. These standards and staff findings for each are provided below.
1. The site and structure(s) shall be designed to limit the effects of the washing operation on
adjacent properties and public rights-of-way. No car wash use shall be located abutting any
residential use or district.
Findings: The subject property does not directly abut any residential uses. The properties located to
the east and west of the site are zoned MX-2 – Highway Mixed Use and are designated for commercial
development. CSAH 42 is located south of this property and south of CSAH 42 are properties zoned B-2
– Employement District. Directly north of the site is 149th Street West with the land north of 149th
Street West consisting of either the MX-2 – Highway Mixed Use zoning district or the R-1 – Low Density
Traditional Residential zoning district. The principal structure will be over 290-feet away from the
closest residential home.
2. Stacking lanes shall not interfere with circulation in any required parking, loading, maneuvering,
or pedestrian area.
Findings: The stacking lanes are shown on the north side of the principal building as traffic flows south
through the building and then flows north through the parking/vacuum station area and then
northwest to exit the site. Traffic flow is shown to circulate clockwise throughout the site, giving room
for vehicles to safely maneuver around. There are also sidewalks shown along the western side of the
building which extends north along the parking area and give pedestrian access to the two-vacuum
motor/equipment enclosures.
3. Stacking and exiting areas shall be screened from adjacent properties and/or rights-of-way.
Stacking areas shall have a minimum ninety percent (90%) opacity screen to a height of six (6) feet
while exiting areas shall have a minimum fifty percent (50%) opacity screen to a height of at least
four (4) feet.
a. The principal structure shall be the primary source for screening the stacking and exiting
areas from adjacent properties and/or rights-of-way.
b. Landscaping and berming shall be a secondary source for screening the stacking and exiting
areas. Should landscaping and berming be found ineffective by the city, the city may approve
screening walls and/or decorative fencing as an alternative.
c. Screening walls shall be constructed of the same materials as the principal structure and shall
not extend more than twenty-five (25) feet without a change in architecture to reduce their
Page 26 of 63
mass and appearance.
Findings: The building will be a prime source of screening for the adjacent properties to the east and as
well as to the south. There is an ample amount of landscape screening shown on the site as well with a
total of 41 trees. A majority of those trees are shown to be located on the northern end of the site and
as well as the northeastern end of the site to screen the stacking and entrance/exiting area. There are
also trees shown on the western side of the site to help with screening of the parking/vacuum station
area.
4. All overhead vehicle doors on the building shall remain closed except when a vehicle is entering or
exiting the building.
Finding: A condition of this approval will note that all overhead vehicle doors on the building shall
remain closed except when a vehicle is entering or exiting the building.
5. Untreated water from the car wash shall not be discharged into the storm sewer. If the water is to
be pretreated and discharged into the storm sewer, the pretreatment plans shall be subject to
review and approval of the city engineer and building official, and subject to applicable requirements
of metropolitan council environmental services and MPCA.
Findings: If a pretreatment system is utilized, plans for said system will be reviewed for approval by
the city engineer and building official and subject to any applicable requirements of MCES and the
MPCA.
RECOMMENDATION
Staff finds the plans provided by the applicant meet the standards of the zoning ordinance and is
recommending approval of the site plan allowing Sonny’s Carwash to construct a car wash facility at
2550 149th Street West.
Page 27 of 63
Page 28 of 63
ARCHITECT:
MODERN WASH
5220 SCOTTSVILLE ROAD
BOWLING GREEN, KY 42104
PHONE: (800) 511-7208
CONTACT: JONATHAN ESTES
EMAIL: JONATHON@MODERNWASH.NET
PROPERTY DATA:
PARCEL OWNER:KJ WALK INC
PARCEL ID:364485102030
ADDRESS:2550 149TH ST W
ROSEMOUNT MN 55378
PROPERTY AREA:1.43
ZONING:MX-2
PROPOSED USE: CARWASH
REQUIRED PROPOSED
BUILDING SETBACKS
FRONTAGE ALONG STREET:30'159'
SIDE:10'21.2'
REAR:10'50.5'
PARKING AREA SETBACKS
FRONT:30'30'
SIDE:10'37.7'
REAR:10'10'
MAXIMUM BUILDING HEIGHT:35'25'
PARKING:
TOTAL PARKING SPACES:6 22
ADA PARKING SPACES:1 1
GOVERNING AGENCIES AND UTILITY COMPANIES:
ROSEMOUNT
ENGINEER:
CESO, INC.
3601 RIGBY ROAD, SUITE 300
DAYTON, OH 45342
PHONE: (630) 212-5497
CONTACT: MICHAEL MIHALIK, P.E.
EMAIL: MIKE.MIHALIK@CESOINC.COM
EOR: JEFFREY TIBBITTS
SEWER:
CITY OF ROSEMOUNT WATER/SEWER
UTILITY DEPARTMENT
2875 145TH STREET W.
ROSEMOUNT, MN 55068
PHONE: (651) 322-2099
CONTACT: DERRICK
GAS SERVICE:
MINNESOTA ENERGY RESOURCES
2685 145TH STREET W.
ROSEMOUNT, MN 55068
PHONE: (800) 889-9508
EOR: JEFF TIBBETS
WATER:
CITY OF ROSEMOUNT WATER/SEWER
UTILITY DEPARTMENT
2875 145TH STREET W.
ROSEMOUNT, MN 55068
PHONE:(651) 322-2099
CONTACT: DERRICK
STORMWATER:
CITY OF ROSEMOUNT PUBLIC WORKS/
ENGINEERING DEPARTMENT
2875 145TH STREET W.
ROSEMOUNT, MN 55068
PHONE: (651) 322-2022
CONTACT: BRIAN ERICSON - CITY ENGINEER
ELECTRIC:
XCEL ENERGY
414 NICOLLET MALL
MINNEAPOLIS, MN 55401
PHONE: (800) 895-4999
EMAIL:BUILDERS.CALL.LINE@XCELENERGY.COM
ZONING:
ROSEMOUNT PLANNING & ZONING
2875 145TH STREET W.
ROSEMOUNT, MN 55068
PHONE: (651) 322-2090
CONTACT: ANTHONY NEMCEK - SR. PLANNER
LOCATION MAP
NO SCALE
VICINITY MAP
NO SCALE
SITE
CITY OF ROSEMOUNT, DAKOTA COUNTY COUNTY, MINNESOTA
SITE PLANS
FOR
SONNY'S - ROSEMOUNT MN
SW CORNER OF 149TH & BISCAYNE AVE.
ROSEMOUNT, MINNESOTA
OWNER/DEVELOPER:
SONNY'S ENTERPRISES, LLC
5870 HIATUS ROAD
TAMARAC, FL 33321
PHONE: (800) 327 8723
CONTACT: CHRIS WARREN
PARCEL IS LOCATED WITHIN "ZONE X" AS INDICATED BY THE FLOOD INSURANCE RATE MAP
(FIRM) COMMUNITY PANEL NUMBER 27037C0230E, EFFECTIVE DATE: 12/02/2011; PUBLISHED BY
THE FEDERAL EMERGENCY MANAGEMENT AGENCY.
SURVEY PROVIDED BY:
CBRE LAND SURVEYING
4111 BRADLEY CIRCLE NW
CANTON, OH 44718
PHONE: 800-520-1010
DATED: 2025.01.10
CESO PROVIDES NO GUARANTEE TO THE ACCURACY OF THE
SURVEY PROVIDED BY CBRE LAND SURVEYING. CONTRACTOR TO
VERIFY EXISTING CONDITIONS PRIOR TO BID AND CONSTRUCTION.
BENCHMARK DATUM:
BM "A":
BM "B":
NAVD88
PK NAIL
HORIZONTAL POSITION: N 961,167.93' E 2,853,884.92'
ELEVATION: 954.96'
1/2" IRON PIPE
HORIZONTAL POSITION: N 960,917.10' E 2,854,136.04'
ELEVATION: 955.68'
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
1
0
_
T
i
t
l
e
.
d
w
g
-
5/
8
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C1.0
COVER SHEET
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
ST PAUL
MINNESOTA
ST CLOUD
MINNEAPOLIS
ROCHESTER
DULUTH
BEMIDJI
FORTY-EIGHT (48) HOURS
BEFORE DIGGING IS TO
COMMENCE, THE CONTRACTORS
SHALL NOTIFY THE FOLLOWING
AGENCIES: MINNESOTA UTILITIES
PROTECTION SERVICE AT 811 OR
800-252-1166 AND ALL OTHER
AGENCIES WHICH MIGHT HAVE
UNDERGROUND UTILITIES
INVOLVING THIS PROJECT AND
ARE NONMEMBERS OF STATE
UTILITIES PROTECTION SERVICE
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
C1.0 COVER SHEET
C1.1 GENERAL NOTES
C1.2 ALTA 1
C1.3 ALTA 2
C2.0 EXISTING CONDITION AND DEMOLITION
C3.0 SITE PLAN
C4.0 GRADING PLAN
C5.0 UTILITY PLAN
C6.0 SWPPP
C6.1 SWPPP NOTES
C6.2 SWPPP DETAILS
C7.0 CONSTRUCTION DETAIL
C7.1 CONSTRUCTION DETAIL
C7.2 CONSTRUCTION DETAIL
C7.3 CONSTRUCTION DETAIL
C8.0 PHOTOMETRIC PLAN
L1.0 LANDSCAPE PLAN
L1.1 LANDSCAPE DETAILS & NOTES
L2.0 IRRIGATION PLAN
L2.1 IRRIGATION DETAILS & NOTES
L2.2 IRRIGATION DETAILS & NOTES
Page 29 of 63
GRADING NOTES
1.THE TOPOGRAPHIC SURVEY WAS PERFORMED BY A REGISTERED LAND SURVEYOR. IF CONTRACTOR DOES NOT ACCEPT EXISTING
TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, HE SHALL HAVE MADE, AT HIS EXPENSE, A TOPOGRAPHIC SURVEY BY A
REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW.
2.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME.
3.THE CONTRACTOR SHALL ADHERE TO ALL TERMS & CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S.
PERMIT FOR STORM WATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES.
4.EXISTING AND PROPOSED GRADE CONTOUR INTERVALS ARE SHOWN AT 1 FOOT INTERVALS.
5.ALL SPOT ELEVATIONS REFER TO FINISHED PAVEMENT ELEVATIONS UNLESS OTHERWISE NOTED.
6.ALL ADA ACCESSIBLE PARKING SPACES AND LOADING AREAS SHALL BE GRADED WITH A 2.0% MAXIMUM SLOPE IN ALL DIRECTIONS. ALL ADA
ACCESSIBLE ROUTES SHALL BE GRADED WITH A 2.0% MAXIMUM CROSS SLOPE AND 5.0% MAXIMUM RUNNING SLOPE.
7.MAINTAIN EXISTING DRAINAGE PATTERN THROUGHOUT THE SITE, EXCEPT WITHIN THE LIMITS OF DISTURBANCE (LOD).
8.COORDINATE GRADES AT BUILDING ENTRIES WITH ARCHITECTURAL PLANS.
9.EXISTING DRAINAGE STRUCTURES SHALL BE INSPECTED AND REPAIRED AS NEEDED, AND EXISTING PIPES ARE TO BE CLEANED TO REMOVE
ALL SILT AND DEBRIS AFTER CONSTRUCTION IS COMPLETE.
10.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO A CONDITION EQUAL TO OR BETTER THAN IT'S
CONDITION PRIOR TO DAMAGE.
11.CONTRACTOR SHALL ASSURE POSITIVE DRAINAGE AWAY FROM BUILDING AND WITHIN PAVED AREAS.
12.ALL TOPSOIL MUST BE REMOVED BEFORE FILL MATERIAL IS PLACED.
13.ALL WET, OR OTHERWISE UNSUITABLE SOILS MUST BE STABILIZED. THIS MAY BE ACCOMPLISHED BY DRYING, REMOVAL & REPLACEMENT,
REMOVAL & DRYING & RECOMPACTION, OR SOIL TREATMENT (LIME/CEMENT) UNDER THE SUPERVISION OF A QUALIFIED PROFESSIONAL
GEOTECHNICAL ENGINEER.
14.ALL UNSURFACED AREAS, DISTURBED BY GRADING, OPERATION SHALL RECEIVE 6" OF TOPSOIL. CONTRACTOR SHALL APPLY STABILIZATION
FABRIC TO ALL SLOPES GREATER THAN 3H:1V AND SEED WITH LOW MAINTENANCE GRASS SEED MIX. CONTRACTOR SHALL SEED DISTURBED
AREAS IN ACCORDANCE WITH SPECIFICATIONS UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. ALL EXPOSED SURFACE AREAS SHALL BE
STABILIZED PER THE SWPPP AND LANDSCAPE REQUIREMENTS AS PART OF THIS PLAN SET.
15.ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS SOIL TIGHT.
16.ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM INVERT IN TO INVERT OUT.
17.STORM PIPE SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED:
18.ALL STORM SEWER STRUCTURE GRATES AND FRAMES WITHIN PAVEMENT SHALL BE HEAVY DUTY.
19.ALL STORM DRAINAGE SHALL BE PERFORMED IN ACCORDANCE WITH ALL LOCAL COUNTY AND MDOT STANDARDS.
20.ALL DOWNSPOUT DRAIN LINES OR ROOF LEADERS SHALL HAVE A 1.0% MINIMUM SLOPE, UNLESS OTHERWISE NOTED. CONNECT ALL
DOWNSPOUTS AND ROOF LEADERS TO THE STORM SEWER SYSTEM. REFER TO ARCHITECTURAL PLANS FOR DOWNSPOUT AND ROOF
LEADER LOCATIONS. PROVIDE POSITIVE DRAINAGE AND PAVEMENT REPAIR AS NEEDED.
21.ROOF DRAINS, FOUNDATION DRAINS, AND OTHER CLEAN WATER CONNECTIONS TO THE SANITARY SEWER SYSTEM ARE PROHIBITED.
22.THE STORM SEWER GRADE WILL BE SUCH THAT A MINIMUM COVER IS MAINTAINED TO WITHSTAND AASHTO HS-25 LOADING ON THE PIPE.
PROVIDE MINIMUM 2.0 FEET OF COVER FOR ALL STORM SEWERS UNLESS OTHERWISE NOTED.
23.WHEN A SANITARY SEWER MAIN LIES ABOVE A STORM SEWER, OR WITHIN 18 INCHES BELOW, THE SANITARY SEWER WILL HAVE AN
IMPERVIOUS ENCASEMENT OR BE CONSTRUCTED OF STRUCTURAL SEWER PIPE FOR A MINIMUM OF 10 FEET ON EACH SIDE OF WHERE THE
STORM SEWER CROSSES.
UTILITY NOTES
1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS
BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS
NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE.
2.THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD
LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH
THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
3.CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH THE LATEST STANDARDS OF O.S.H.A. DIRECTIVES OR ANY OTHER AGENCY HAVING
JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR SHALL USE SUPPORT SYSTEMS, SLOPING, BENCHING, AND
OTHER MEANS OF PROTECTION. THIS TO INCLUDE BUT NOT LIMITED FOR ACCESS AND EGRESS FROM ALL EXCAVATION AND TRENCHING.
CONTRACTOR IS RESPONSIBLE TO COMPLY WITH PERFORMANCE CRITERIA FOR O.S.H.A.
4.CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING UTILITY DURING CONSTRUCTION AT NO COST TO THE OWNER.
5.ALL FILL MATERIAL IS TO BE IN PLACE AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES.
6.CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. THE CONTRACTOR
SHALL CONDUCT ALL REQUIRED TESTS TO THE SATISFACTION OF THE RESPECTIVE UTILITY REGULATIONS AND THE OWNER'S INSPECTION
AUTHORITIES.
7.CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITY'S INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE.
8.WATER AND SANITARY UTILITIES SHALL HAVE TEN (10') FEET OF HORIZONTAL CLEARANCE WHEN PARALLEL OR 18" VERTICAL CLEARANCE WHEN
CROSSING. ALL CLEARANCE DISTANCES SHALL BE MEASURE FROM OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE. THE CROSSING SHALL BE
ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER LINE JOINTS.
9.IF A WATER LINE PASSES UNDER THE SANITARY SEWER LINE, THE SEWER LINE SHOULD BE CONSTRUCTED OF A WATERTIGHT MATERIAL
APPROVED BY THE REGULATORY AGENCY FOR USE IN WATER MAIN CONSTRUCTION AND SHALL EXTEND TEN (10') FEET ON BOTH SIDES OF THE
CROSSING, AS MEASURED PERPENDICULAR TO THE WATER LINES. ADEQUATE STRUCTURAL SUPPORT SHALL BE PROVIDED FOR THE SEWER TO
MAINTAIN LINE AND GRADE.
10.UNDERGROUND LINES SHALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFILLING.
11.CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. THE CONTRACTOR
SHALL CONDUCT ALL REQUIRED TESTS TO THE SATISFACTION OF THE RESPECTIVE UTILITY REGULATIONS AND THE OWNER'S INSPECTION
AUTHORITIES.
12.UTILITY TRENCHES WITHIN PAVED AREAS TO BE BACKFILLED PER UTILITY TRENCH DETAIL PROVIDED WITHIN THE CONSTRUCTION DETAILS SHEET.
13.ALL WATER LINE WORK SHALL BE PERFORMED IN ACCORDANCE WITH ROSEMOUNT CONSTRUCTION STANDARDS AND STATE REGULATIONS.
14.INSTALL ALL WATER LINES WITH A MINIMUM COVER OF 7'-6".
15.ON-SITE WATER LINE MATERIAL SHALL BE AS FOLLOWS:
16.ON-SITE SANITARY SEWER LINE MATERIAL SHALL BE AS FOLLOWS:
17.REFER TO MEP PLANS FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS, SERVICE SIZES TO BE DETERMINED BY ARCHITECT.
18.CLEAN OUTS AND CURB BOXES WITHIN THE PAVED AREAS MUST HAVE TRAFFIC LOADING FRAMES AND COVERS.
MATERIAL TYPE PIPE SPEC JOINT SPEC INSTALLATION ACCEPTABLE AREAS OF USE
REINFORCED
CONCRETE PIPE
(RCP)
CLASS III, IV, V ASTM C-76 ASTM C443 ASTM C1479 WITHIN R/W, COVER VARIES
WITH PIPE CLASS
HIGH DENSITY
POLY-ETHYLENE
(HDPE)
SMOOTH-WALLED
CORRUGATED ADS-N12
OR EQUAL
AASHTO M294
(TYPE S)ASTM F477 ASTM D2321 ON SITE, 12" TO 60" DIA.
POLY VINYL
CHLORIDE (PVC)SDR 35 ASTM D3034 ASTM D3212 ASTM D2321 ON SITE, 4" TO 10"
GENERAL NOTES
MATERIAL PRESSURE RATING PIPE SPEC FITTINGS INSTALLATION ACCEPTABLE AREAS OF USE
POLY VINYL
CHLORIDE (PVC)
SDR 35 ASTM D3034 ASTM D3212 ASTM D2321 WITH
TYPE 1 BEDDING
ON SITE, 6" TO 8" DIA., LESS
THAN 8.5' OF COVER
POLY VINYL
CHLORIDE (PVC)
SDR 26 ASTM 3034 ASTM D3212 ASTM 2321 WITH TYPE
1 BEDDING
ON SITE, 6" TO 8" DIA.,
GREATER THAN OR EQUAL TO
8.5' OF COVER
DEMOLITION NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. THE DEMOLITION, REMOVAL, AND
DISPOSAL IS TO BE APPROVED BY ALL GOVERNING AUTHORITIES, OF ALL FACILITIES SUCH AS: STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS,
PARKING, DRIVES, DRAINAGE, STRUCTURES, UTILITIES, WELLS, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE
CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED
FILL MATERIAL AS SPECIFIED BY A QUALIFIED PROFESSIONAL GEOTECHNICAL ENGINEER. IF UNDOCUMENTED FACILITIES ARE FOUND ON SITE,
CONTRACTOR SHALL CONTACT THE OWNER AND UTILITY COMPANY PRIOR TO REMOVAL. ALL FACILITIES SHALL BE PLUGGED, ABANDONED, OR REMOVED
PER STATE AND LOCAL REQUIREMENTS.
2.FEDERAL, STATE AND LOCAL CODE REQUIREMENTS SHALL GOVERN THE DISPOSAL OF DEBRIS INCLUDING ANY POTENTIALLY HAZARDOUS AND TOXIC
MATERIALS. ALL MATERIALS AND STRUCTURES DESIGNATED AS "TO BE REMOVED" SHALL BE DISPOSED OF OFF SITE AND AT THE COST OF THE
CONTRACTOR.
3.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING JOB SITE SAFETY PER OSHA REQUIREMENTS AT ALL TIMES.
4.PRIOR TO DEMOLITION, IT IS THE CONTRACTOR'S RESPONSIBILITY TO CALL THE STATE 811 AND NOTIFY ALL UTILITY COMPANIES TO SCHEDULE UTILITY
SERVICE REMOVAL AND/OR ABANDONMENT. ALL UTILITIES SHALL BE REMOVED/RELOCATED PER THE SPECIFICATIONS OF THE UTILITY COMPANIES. THE
CONTRACTOR IS RESPONSIBLE TO PAY ALL FEES AND CHARGES ASSOCIATED WITH THIS WORK
5.CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO INHABITED BUILDINGS ON SITE AND ADJACENT PROPERTIES AT ALL TIMES. INTERRUPTIONS
SHALL BE APPROVED BY THE OWNERS OF THE BUILDINGS/PROPERTIES.
6.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE GIVEN
FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY
DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR ONSITE LOCATIONS OF EXISTING UTILITIES. IF THE LOCATION OR
ELEVATION OF THE EXISTING UTILITIES ARE FOUND TO BE DIFFERENT FROM THE PLANS, CONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY.
7.CONTRACTOR SHALL PROTECT EXISTING SITE FEATURES TO REMAIN INSIDE AND OUTSIDE CONSTRUCTION LIMITS. CONTRACTOR IS RESPONSIBLE TO
DOCUMENT ALL EXISTING DAMAGES AND NOTIFY THE CITY/COUNTY PRIOR TO CONSTRUCTION START. ANY EXISTING SITE FEATURE TO REMAIN THAT IS
DAMAGED DURING CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT, CURB, ETC. SHALL BE REPAIRED TO A CONDITION
THAT IS EQUAL TO, OR BETTER THAN, THE EXISTING CONDITIONS. PRIOR TO BEING DAMAGED, THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY
DAMAGE TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST.
8.CONTINUOUS ACCESS SHALL BE MAINTAINED TO THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING FACILITIES.
9.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC CONTROL. ALL TRAFFIC CONTROL MEASURES SHALL BE IN ACCORDANCE WITH STATE
DEPARTMENT OF TRANSPORTATION REGULATIONS AND LOCAL REGULATIONS.
10.THE CONTRACTOR IS RESPONSIBLE FOR PLACING AND MAINTAINING CONSTRUCTION FENCE, SIGNS, ETC. TO WARN AND KEEP UNAUTHORIZED PEOPLE
OFF SITE FOR THE DURATION OF THE PROJECT.
11.PRIOR TO DEMOLITION, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED PER THE GOVERNING AGENCIES GUIDELINES AND STANDARDS. DUST
CONTROL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
12.SAWCUT LINE PROVIDED IS FOR REFERENCE ONLY. CONTRACTOR WILL BE RESPONSIBLE FOR DETERMINING THE EXTENT OF THE SAWCUT THAT WILL BE
REQUIRED AS WELL AS PAVEMENT REPAIRS TO INSTALL UTILITY TRENCHING. IF ANY DAMAGE OCCURS ON ANY OF THE SURROUNDING PAVEMENT, ETC.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING THAT WHICH IS
NECESSARY TO COMPLETE THE INTENT OF THE PROPOSED IMPROVEMENTS. SAWCUT EXISTING PAVEMENT TO FULL DEPTH, USING CARE TO CUT NEAT,
STRAIGHT LINES. CUT AT EXISTING JOINTS WHERE POSSIBLE.
13.THE CONTRACTOR SHALL MAINTAIN A WELL-DRAINED SITE, FREE OF STANDING WATER DURING CONSTRUCTION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR TEMPORARY DRAINAGE MEASURES DURING CONSTRUCTION.
14.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO STUDY THE PLANS AND VISIT THE SITE TO DETERMINE THE ITEMS THAT MUST BE REMOVED TO
COMPLY WITH THE SITE DEVELOPMENT PLANS. NO EXTRA FEE WILL BE PAID FOR THE REMOVAL OF ANY ITEM NOT LISTED THAT IS VISIBLE UPON A SITE
VISIT. THE DEMOLITION PLAN IS INTENDED TO PRESENT THE SCOPE OF THE DEMOLITION, AND DOES NOT GUARANTEE THAT ALL ITEMS ARE ADDRESSED.
15.THE CONTRACTOR SHALL OBTAIN ALL PERMITS FOR ALL SITE DEVELOPMENT WORK, PAY ALL FEES FOR PERMITS AND CHECK ALL GOVERNING
AUTHORITIES' SPECIFICATIONS FOR BUT NOT LIMITED TO, GUTTERS, SIDEWALKS, POLES, AND OTHER STRUCTURES, INCLUDING THE REMOVAL OR
RELOCATION OF EXISTING UTILITIES OR OTHER PHYSICAL OBJECTS SHOWN ON PLANS OR NOTED OTHERWISE.
16.THE CONTRACTOR SHALL CREATE AND IMPLEMENT AN EROSION AND SEDIMENTATION CONTROL PLAN FOR ALL SITE CONSTRUCTION ACTIVITIES
ASSOCIATED WITH THE PROJECT. THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION REQUIREMENTS OF THE CONSTRUCTION GENERAL
PERMIT OR LOCAL STANDARDS AND CODES, WHICHEVER IS MORE STRINGENT.
17.ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS NOTED OTHERWISE.
SITE NOTES
1. ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY/COUNTY REGULATIONS AND CODES AND O.S.H.A. STANDARDS.
2.ALL MATERIAL NOTED ON DRAWINGS WILL BE SUPPLIED BY THE CONTRACTOR UNLESS OTHERWISE NOTED.
3.CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS TO COORDINATE ACCESS POINTS AND ELEVATIONS. REFER TO ARCHITECTURAL PLANS. FOR
EXACT LOCATIONS AND DIMENSIONS OF DOORS, ENTRY RAMP, AND CANOPY.
4.ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS NOTED OTHERWISE.
5.ACCESSIBILITY STANDARDS SHALL BE IN ACCORDANCE WITH FEDERAL AND LOCAL REQUIREMENTS FOR HANDICAP ACCESSIBILITY, INCLUDING BUT NOT
LIMITED TO THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES. ADA PARKING STALLS SHALL MEET ADA GRADE GUIDELINES.
CONTRACTOR SHALL FIELD VERIFY EXISTING GRADES AT ACCESS POINTS, ACCESSIBLE ROUTES, AND EXISTING PARKING TO REMAIN TO DETERMINE
COMPLIANCE WITH STANDARDS.
6.ALL ADA ACCESSIBLE ROUTES,WITHIN THE PUBLIC RIGHT-OF-WAY, SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT EDITION OF THE
"PUBLIC RIGHT-OF-WAY ACCESSIBILITY GUIDELINES" AND ANY APPLICABLE LOCAL OR STATE REQUIREMENTS. THE MORE STRINGENT REQUIREMENT
SHALL GOVERN.
7.ALL ADA ACCESSIBLE ROUTES, INCLUDING SIGNAGE AND STRIPING WITHIN THE PROJECT LIMITS, SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
CURRENT EDITION OF THE "ADA STANDARDS FOR ACCESSIBLE DESIGN" AND ANY LOCAL OR STATE REQUIREMENTS. THE MORE STRINGENT
REQUIREMENT SHALL GOVERN.
8.ALL DISTURBED AREAS ARE TO RECEIVE 6" OF TOPSOIL, SEED, MULCH AND WATER UNTIL A HEALTHY STAND OF GRASS IS ESTABLISHED.
9.ALL DIMENSIONS AND RADII ARE TO THE FACE OF THE CURB OR EDGE OF PAVEMENT, AS APPLICABLE, UNLESS OTHERWISE NOTED.
10.ALL CURB RADII ARE 5 FEET UNLESS OTHERWISE NOTED.
11.PROVIDE SIGNAGE AND STRIPING AS SHOWN. ALL SIGNAGE AND PAVEMENT MARKINGS SHALL COMPLY WITH THE GOVERNING MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES (M.U.T.C.D.). PAVEMENT MARKINGS ON ASPHALT SHALL BE WHITE. PAVEMENT MARKINGS ON CONCRETE SHALL BE YELLOW.
12.REFER TO ARCHITECTURAL PLANS FOR PROPOSED BUILDING SIGNAGE.
13.REFER TO MECHANICAL PLANS FOR EQUIPMENT LAYOUT.
14.REFER TO ELECTRICAL PLANS FOR ELECTRICAL WORK.
15.REFER TO GEOTECHNICAL ENGINEERING REPORT FOR SITE WORK PREPARATION/RECOMMENDATIONS AND PAVEMENT SECTIONS.
16.REFER TO ORIGINAL SURVEY PROVIDED BY CBRE LAND SURVEYING.
17.ALL LIGHT POLES TO BE LOCATED 3' FROM THE BACK OF CURB, AS MEASURED FROM THE FACE OF POLE FOUNDATION, UNLESS OTHERWISE DENOTED ON
PLANS.
MATERIAL PRESSURE RATING PIPE SPEC FITTINGS INSTALLATION ACCEPTABLE AREAS OF USE
COPPER 1"-3"TYPE "K"ASTM B88 AWWA C800 AWWA C800 DOMESTIC WATERLINES 1"-3"
EXISTING FEATURES LEGEND
APPLIES TO ALL CIVIL SHEETS
RIGHT OF WAY
PARCEL LINE
PROPERTY BOUNDARY
EASEMENT
CURB
EDGE OF PAVEMENT
GAS LINE
WATER LINE
UNDERGROUND ELECTRIC
UNDERGROUND TELE
STORM SEWER
SANITARY SEWER
MAJOR CONTOURS
MINOR CONTOURS
WATER METER STORM INLET BASIN
WATER VALVE STORM MANHOLE
SANITARY MANHOLE
R/W
P/L
G
W
UGE
UGT
STM
SAN
100
102
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
1
0
_
T
i
t
l
e
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C1.1
GENERAL NOTES
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
Page 30 of 63
C1.2
NOTE: ALTA SHEETS ARE PROVIDED IN THIS PLAN
SET FOR INFORMATIONAL PURPOSES. ENGINEER
NEARS NO RESPONSIBILITY FOR THE INFORMATION
PROVIDED IN ALTA SHEETS AND HAS GIVEN NO
DIRECTION IN THEIR CREATION.
Page 31 of 63
NOTE: ALTA SHEETS ARE PROVIDED IN THIS PLAN
SET FOR INFORMATIONAL PURPOSES. ENGINEER
NEARS NO RESPONSIBILITY FOR THE INFORMATION
PROVIDED IN ALTA SHEETS AND HAS GIVEN NO
DIRECTION IN THEIR CREATION.C1.3
Page 32 of 63
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
P
/
L
P
/
L
P
/
L
P
/
L
P/LP/LP/LP/LP/LP/L
P/L
13
Drainage and Utility Easement
BK. 66, PG. 30
55'
10'
10'
13
Drainage and Utility Easement
BK. 66, PG. 30
5'
5'
13
Drainage and Utility Easement
BK. 66, PG. 30
13
Drainage and Utility Easement
BK. 66, PG. 30
13
Drainage and Utility Easement
BK. 66, PG. 30
N
5
8
°
0
1
'
1
1
"
E
3
8
.
3
4
'
(
R
)
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
N
5
8
°
0
1
'
1
1
"
E
1
9
1
.
1
4
'
(
R
)
S 00°25'44" W 405.90' (R)
S
7
5
°
2
7
'
2
4
"
W
1
6
4
.
6
2
'
(
R
)
N 00°27'39" W 255.38' (R)
N 35°0
3
'
0
2
"
W
7
3
.
3
9
'
(
R
)
N
5
5
°
3
1
'
2
0
"
E
5
3
.
9
3
'
(
R
)
BM #1
BM #2
G
G
G
G
G
G
U
G
E
U
G
E
U
G
E
U
G
E
F
O
F
O
F
O
F
O
F
O
G
G
G
U
G
E
F
O
U
G
T
UG
T
UG
T
ROSEWOOD CENTER SECOND EDITION
(BK. 66, PG. 30)
BENCHMARK #1
SET PK NAIL
ELEV: 954.96' (NAVD88)
BENCHMARK #2
1/2" IRON PIPE
ELEV: 955.68' (NAVD88)
5'
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SAN
Storm CB
Rim=954.01'
8"Inv.(NE)=950.56'
Storm CB
Rim=953.89'
24"Inv.(NW)=948.70'
24"Inv.(SW)=949.96'
Sanitary MH
Rim=956.61'
6"Inv.(SE)=941.98'
6"Inv.(SW)=941.94'
6"Inv.(NE)=941.91'
Storm CB
Rim=954.59'
24"Inv.(SE)=948.64'
24"Inv.(SW)=945.64'
18"Inv.(NE)=945.19'
R
/
W
R
/
W
24'
1
2
3
3
4
95
5 952953954956
9
5
0
95
0
955
9
5
5
9
5
1
9
5
1
9
5
2
9
5
2
953
9
5
3
954
9
5
4
956
9
5
6
9
5
7
957
95
5
95
5
9
5
5
9
5
5
9
5
4
95
4
9
5
4
9
5
4
9
5
6
9
5
6
9
5
6
95
6
9
5
7
95
7
9
5
5
9
5
5
95495
6
9
5
6
9
5
7
95
7
2
1
5.4'
7
6
9
5
5
95
6
957
953
956
957
955
LOD
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
LOD
LO
D
L
O
D
L
O
D
L
O
D
LO
D
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD
LOD LOD
LOD LOD LOD
LO
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
L
O
D
L
O
D
LOD
LOD
1.EXISTING UTILITY TO REMAIN AND BE PROTECTED.
CODED NOTES:
GRAPHIC SCALE (IN FEET)
1 in. = 20 ft.
020 20 40
DEMOLITION LEGEND
EXISTING
REFER TO C1.1 FOR EXISTING FEATURES LEGEND
PROPOSED
REMOVE EXISTING PAVEMENT
LIMITS OF DISTURBANCE
SAWCUT LINE
REMOVE EXISTING CURB & GUTTER
LOD
GENERAL NOTES:
SEE SHEET C1.1
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
1
.
2
_
E
x
i
s
t
i
n
g
_
A
n
d
_
D
e
m
o
l
i
t
i
o
n
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C2.0
EXISTING CONDITION
AND DEMOLITION
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
BENCHMARK DATUM:
BM "A":
BM "B":
NAVD88
PK NAIL
HORIZONTAL POSITION: N 961,167.93' E 2,853,884.92'
ELEVATION: 954.96'
1/2" IRON PIPE
HORIZONTAL POSITION: N 960,917.10' E 2,854,136.04'
ELEVATION: 955.68'
FORTY-EIGHT (48) HOURS
BEFORE DIGGING IS TO
COMMENCE, THE CONTRACTORS
SHALL NOTIFY THE FOLLOWING
AGENCIES: MINNESOTA UTILITIES
PROTECTION SERVICE AT 811 OR
800-252-1166 AND ALL OTHER
AGENCIES WHICH MIGHT HAVE
UNDERGROUND UTILITIES
INVOLVING THIS PROJECT AND
ARE NONMEMBERS OF STATE
UTILITIES PROTECTION SERVICE
CODED NOTES:
1.PROTECT EXISTING CURB AND GUTTER.
2.PROTECT EXISTING STORM STRUCTURE / PIPE.
3.PROTECT EXISTING UTILITY LINE/ STRUCTURE TO REMAIN.
4.PROPOSED SAWCUT LINE. CONTRACTOR TO SAWCUT PAVEMENT TO FULL
DEPTH.
5.EXISTING STORM STRUCTURE / PIPE TO BE REMAIN. MODIFY GRATE AND
SURFACE ELEVATION AS NECESSARY.
6.EXISTING SANITARY STUB OUT FOR SITE TO BE CONFIRMED BY
CONTRACTOR PRIOR TO CONSTRUCTION.
7.EXISTING WATER LATERAL DEPTH TO VERIFIED PRIOR TO CONSTRUCTION.
CONTRACTOR NOTE:
1.CONTRACTOR SHALL VERIFY ALL LOCATIONS AND DEPTHS OF EXISTING
UTILITIES PRIOR TO CONSTRUCTION.
2.REFER TO ALTA FOR EXISTING EASEMENTS. REFER TO UTILITY PLAN FOR
EXISTING EASEMENTS PROJECTED ONTO THE PROPOSED SITE.
5
5
Page 33 of 63
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
P
/
L
P
/
L
P
/
L
P
/
L
P/LP/LP/LP/LP/LP/L
P/L
Drainage and Utility Easement
BK. 66, PG. 30
55'
10'
10'
Drainage and Utility Easement
BK. 66, PG. 30
5'
5'
Drainage and Utility Easement
BK. 66, PG. 30
Drainage and Utility Easement
BK. 66, PG. 30
Drainage and Utility Easement
BK. 66, PG. 30
N
5
8
°
0
1
'
1
1
"
E
3
8
.
3
4
'
(
R
)
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
N
5
8
°
0
1
'
1
1
"
E
1
9
1
.
1
4
'
(
R
)
S 00°25'44" W 405.90' (R)
S
7
5
°
2
7
'
2
4
"
W
1
6
4
.
6
2
'
(
R
)
N 00°27'39" W 255.38' (R)
N 35°0
3
'
0
2
"
W
7
3
.
3
9
'
(
R
)
N
5
5
°
3
1
'
2
0
"
E
5
3
.
9
3
'
(
R
)
BM #1
BM #2
ROSEWOOD CENTER SECOND EDITION
(BK. 66, PG. 30)
BENCHMARK #1
SET PK NAIL
ELEV: 954.96' (NAVD88)
BENCHMARK #2
1/2" IRON PIPE
ELEV: 955.68' (NAVD88)
5'
R
/
W
R
/
W
3
0
'
F
R
O
N
T
Y
A
R
D
S
E
T
B
A
C
K
1
0
'
R
E
A
R
Y
A
R
D
S
E
T
B
A
C
K
10' SIDE YARD SETBACK
10' SIDE YARD SETBACK
T P
A
D
DO
N
O
T
E
N
T
E
R
WM
WASH BAY
101
A:3,204 SQ. FT.
EQMT. RM.
103
A:1,163 SQ. FT.
CONTROL
102
A:181 SQ. FT.
R.R.
103
A: 50 SQ. FT.
17'
17'
6'
5'6'
22'12.5'
12.5'
5'
22'12.5'
6'
13.5'
13'
11'
5'
20'
17'
23.3'
15.56'
24'
15.56'
21.2'
5'
5'
9
4'
4'
3
1 R12'
R29'
R15'
45°
45°
R10'
R10'
R10'
R45'
R62'
R62'
R29'
14.2'
R3'
18'
24'
12'
8.6'
12'
12'
12'
9'
9'
9'
R17'
24'
12'
12'
R17'
R20'
9'
4
5
7
6
6
7
8
9
(TYP.)
9
(TYP.)
13
(TYP.)
15
(TYP.)
14
(TYP.)
130'
38'
3 17
17
17
17
3
18
20
6
6
5
21
21
21
3
R10'
15.2'
6'5'
5'
5'
22
22
23
23
50.5'
159'
10'
30'
R1'
7.2'
55'
65'
10'
10'
PROPOSED ACCESS EASEMENT
10
10
10
10
10
10
6'6'
35'
9'
9'
9'
11
(TYP.)
11
(TYP.)
1919
9
(TYP.)
5'5'
25
26
26
26
27
26
23
23.5'
27'
47'
25
25
20'
GRAPHIC SCALE (IN FEET)
1 in. = 20 ft.
020 20 40
SITE LEGEND
EXISTING
REFER TO C1.1 FOR EXISTING FEATURES LEGEND
PROPOSED
PROPOSED STANDARD DUTY
ASPHALT PAVEMENT
PROPOSED HEAVY DUTY CONCRETE
PAVEMENT
PROPOSED CONCRETE PAVEMENT
PROPOSED CONCRETE SIDEWALK
SETBACK
BUILDING
CONCRETE CURB
PAVEMENT/WALK
PARKING SPACE COUNT
SIGN
LIGHT POLE
7
GENERAL NOTES:
SEE SHEET C1.1
CODED NOTES:
1.PROPOSED 4,598 SF BUILDING. REFER TO ARCHITECTURAL PLANS FOR
DETAILS.
2.PROPOSED TRASH ENCLOSURE PER LOCAL REQUIREMENTS. SEE
ARCHITECTURAL PLAN FOR DETAILS.
3.PROPOSED 6" STRAIGHT CURB. REFER TO CONSTRUCTION DETAILS,
SHEET C7.0.
4.PROPOSED INTEGRAL CONCRETE CURB AND SIDEWALK. REFER TO
CONSTRUCTION DETAILS, SHEET C7.0.
5.PROPOSED CONCRETE SIDEWALK. REFER TO CONSTRUCTION DETAILS,
SHEET C7.0.
6.PROPOSED CURB RAMP (TYPE II). REFER TO CONSTRUCTION DETAILS,
SHEET C7.0.
7.ADA ACCESSIBLE PARKING SPACE WITH SIGNAGE. REFER TO
CONSTRUCTION DETAILS, SHEET C7.0.
8.ADA ACCESSIBLE RAMP (TYPE I) WITH DETECTABLE WARNING STRIP.
REFER TO CONSTRUCTION DETAILS, SHEET C7.0.
9.PROPOSED PARKING LOT PAVEMENT MARKINGS.
10.PROPOSED LIGHT POLE. REFER TO PHOTOMETRIC PLANS FOR DETAILS,
SHEET C8.0.
11.PROPOSED VACUUMS. REFER TO MEP PLANS FOR DETAILS.
12.PROPOSED VACUUM MOTOR/EQUIPMENT ENCLOSURE. REFER TO MEP
PLANS FOR DETAILS. REFER TO CONSTRUCTION DETAILS ON SHEET C7.0
FOR CONCRETE PAD DETAIL.
13.PROPOSED DIRECTIONAL ARROW. REFER TO CONSTRUCTION DETAILS,
SHEET C7.0.
14.PROPOSED PAY STATION WITH BARRIER GATE. REFER TO MEP PLANS
FOR DETAILS.
15.PROPOSED TRAFFIC CONES.
16.PROPOSED SIGN TO BE DESIGNED BY OTHERS. CONTRACTOR TO
COORDINATE WITH SIGN COMPANY FOR SIZE AND FINAL LOCATION.
17.PROPOSED ROLLED CURB. REFER TO CONSTRUCTION DETAILS, SHEET
C7.0.
18.PROPOSED FOOTER AND WAIT/STOP SIGNAGE. REFER TO
ARCHITECTURAL PLANS FOR DETAILS.
19.PROPOSED RADIANT SLAB HEAT. REFER TO EQ PLANS FOR DETAILS.
20.PROPOSED PARKING TO BE USED FOR FUTURE VACUUM EXPANSION.
21.PROPOSED CURB TRANSITION. REFER TO CONSTRUCTION DETAILS ON
SHEET C7.0.
22.PROPOSED 6" CONCRETE BOLLARD. REFER TO CONSTRUCTION DETAILS
ON SHEET C7.0.
23.PROPOSED PAVED AREA FOR SNOW STORAGE
24.PROPOSED STOP BAR AND STOP SIGN. REFER TO CONSTRUCTION
DETAILS ON SHEET C7.0.
25.PROPOSED CURB TAPER. REFER TO CONSTRUCTION DETAILS ON SHEET
C7.1.
26.PROPOSED 5' RAMP LANDING.
27.PROPOSED PAVEMENT TIE-IN TO EXISTING PAVEMENT. REFER TO
SAW-CUT PAVEMENT INTERFACE DETAIL ON SHEET C7.1.
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
3
0
_
S
I
T
E
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C3.0
SITE PLAN
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
FORTY-EIGHT (48) HOURS
BEFORE DIGGING IS TO
COMMENCE, THE CONTRACTORS
SHALL NOTIFY THE FOLLOWING
AGENCIES: MINNESOTA UTILITIES
PROTECTION SERVICE AT 811 OR
800-252-1166 AND ALL OTHER
AGENCIES WHICH MIGHT HAVE
UNDERGROUND UTILITIES
INVOLVING THIS PROJECT AND
ARE NONMEMBERS OF STATE
UTILITIES PROTECTION SERVICE
2
3
3
3
3
3
3
3
12
12
10.9'
3.6'
6'
24
25
25
Page 34 of 63
STORM SEWER STRUCTURE SCHEDULE
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
STRUCTURE
EX STORM CB
CURB INLET (SD-1)
MANHOLE (SD-3)
CATCH BASIN
48" MH
CATCH BASIN
CURB INLET (SD-1)
YARD INLET
CURB INLET (SD-1)
MANHOLE (SD-3)
YARD INLET
MANHOLE (SD-3)
ADS DURASLOT
12" TRENCH DRAIN
(LOWER INV END)
ADS DURASLOT
12" TRENCH DRAIN
(UPPER INV END)
RIM
954.57
953.65
954.70
954.80
955.27
954.70
954.62
953.00
954.72
956.20
954.08
956.09
956.55
956.55
INVERT
949.08 (15") SE
948.70 (24") NW
949.96 (8") SW
949.30 (15") NE
949.30 (15") SE
949.30 (15") NW
949.57 (15") SE
949.57 (15") NE
949.57 (15") SW
949.82 (15") S
950.82 (15") SE
949.82 (15") NW
950.42 (15") S
950.42 (15") N
950.59 (15") S
950.59 (15") N
950.98 (15") N
950.33 (15") NW
950.46 (12") S
950.21 (15") SW
950.74 (12") S
950.74 (12") N
951.19 (12") N
953.77 (6") SE
952.67 (15") NW
954.37 (6") E
954.37 (6") NW
954.54 (6") W
▲▼
▲
▼
▲
▼
▲
▼
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
P
/
L
P
/
L
P
/
L
P
/
L
P/LP/LP/LP/LP/LP/L
P/L
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
BM #1
BM #2
U
G
T
UG
T
UG
T
Storm CB
Rim=954.01'
8"Inv.(NE)=950.56'
Storm CB
Rim=953.89'
24"Inv.(NW)=948.70'
24"Inv.(SW)=949.96'
Sanitary MH
Rim=956.61'
6"Inv.(SE)=941.98'
6"Inv.(SW)=941.94'
6"Inv.(NE)=941.91'
Storm CB
Rim=954.59'
24"Inv.(SE)=948.64'
24"Inv.(SW)=945.64'
18"Inv.(NE)=945.19'
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
P
/
L
P
/
L
P
/
L
P
/
L
P/LP/LP/LP/LP/LP/L
P/L
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
BM #1
BM #2
U
G
T
UG
T
UG
T
Storm CB
Rim=954.01'
8"Inv.(NE)=950.56'
Storm CB
Rim=953.89'
24"Inv.(NW)=948.70'
24"Inv.(SW)=949.96'
Sanitary MH
Rim=956.61'
6"Inv.(SE)=941.98'
6"Inv.(SW)=941.94'
6"Inv.(NE)=941.91'
Storm CB
Rim=954.59'
24"Inv.(SE)=948.64'
24"Inv.(SW)=945.64'
18"Inv.(NE)=945.19'
R
/
W
R
/
W
STM STM STM
STM
STM STM
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
STM
STM
SAN
SAN SAN SANCO CO
T P
A
D
S
S
D
STM
WM
STM
STM STMD
DS DS DS DS
CO
SANSANSA
N
COCOCO
D
S
A
N
SAN
D
WASH BAY
101
A:3,204 SQ. FT.
EQMT. RM.
103
A:1,163 SQ. FT.
CONTROL
102
A:181 SQ. FT.
R.R.
103
A: 50 SQ. FT.
9
5
0
9
5
0
9
5
5
9
5
5
95
5
9
5
5
9
5
5
9
5
5
9
5
5
9
5
5
9
5
5
9
5
5
9
5
1
9
5
1
9
5
2
95
2
953
95
3
9
5
3
9
5
3
9
5
4
95
4
9
5
4
9
5
4
9
5
4
9
5
4
9
5
4
9
5
4
9
5
6
9
5
6
9
5
6
9
5
6
95
6
95
6
9
5
6
9
5
6
95
6
9
5
7
9
5
7
9
5
7
9
5
7
9
5
7
9
5
7
957
955
954
956
95
6
955
956
9
5
5
9
5
6
955
956
955
956
957
955
954
95
6
9
5
6
▲
▼
▲▼
TC=956.50
FG=956.00
TC=956.33
FG=956.00 TC=955.92
FG=955.59
TC=956.09
FG=955.59
TC=955.71
FG=955.38
TC=955.66
FG=955.33
TC=955.81
FG=955.48
TC=955.62
FG=955.12
955.61TC=956.45
FG=955.95
RIM=954.70
TC=956.38
FG=955.88
956.30
956.37
956.40
956.34
956.21
956.15
955.55
955.55
955.77
955.77
TC=955.56
FG=955.23
TC=955.48
FG=955.15
TC=957.01
FG=956.68
TC=956.83
FG=956.50
TC=957.00
FG=956.50
TC=957.41
FG=956.91
TC=957.28
FG=956.78
956.90
TC=956.34
FG=956.01
956.47
956.50
TC=955.60
FG=955.10
RIM=954.70
RIM=954.80
TC=956.59
FG=956.09
TC=955.89
FG=955.39
TC=955.92
FG=955.42
TC=956.04
FG=955.54
TC=956.45
FG=955.95
TC=956.12
FG=955.62
TC=956.17
FG=955.84
TC=956.71
FG=956.21
TC=956.95
FG=956.62
TC=956.76
FG=956.26
TC=956.30
FG=955.80
TC=956.08
FG=955.58
TC=955.94
FG=955.61
TC=955.22
FG=954.72
956.20
955.50
TC=954.88
FG=954.38
TC=954.41
FG=953.91
TC=954.81 M.E.
FG=954.31 M.E.
954.62
TC=954.51 M.E.
FG=954.01 M.E.
956.50
TC=956.45
FG=955.95
956.42
956.63
956.63
956.63
955.25
956.52
TC=956.45
FG=955.95
TC=955.12
FG=954.62
TC=955.65
FG=955.15
TC=956.02
FG=955.52
TC=956.05
FG=955.55
TC=955.92
FG=955.42
TC=954.45
FG=953.95
TC=955.51
FG=955.01
955.26
955.10
954
955
955
955
954
956
9
5
5
95
5
FEE = 956.50
4
9
6
3
7
1
2
79'~15" STM @ 0.50%31'~15" ST
M
@
0
.
5
4
%
51'~
1
5
"
S
T
M
@
0
.
5
0
%
43'~15" STM @ 0.62%
45'~
1
5
"
S
T
M
@
0
.
5
0
%
127'~15" STM @ 0.50%
8
38'~15" STM @ 2.71%
TC=955.33
FG=954.83
TC=955.73
FG=955.23
TC=955.67
FG=955.17
TC=956.05
FG=955.55
TC=955.47
FG=954.97
RIM=953.00
956
95
7
TC=956.25
FG=955.75
TC=956.73
FG=956.23
TC=956.25
FG=955.75
TC=956.75
FG=956.25TC=956.27
FG=955.77
TC=956.69
FG=956.19
952
953
956
955.93
956.01
955.83
955.91
955.45
TC=955.97
FG=955.47
TC=955.85
FG=955.35
955.38
956.73
956.62
SEE ADA
GRADING DETAIL
9
5
6
955.54
TC=957.32
FG=956.82
TC=956.43
FG=955.93 955.23
RIM=954.08
RIM=956.2057'~12" STM @ 0.50%10 90'~12" STM @ 0.50%
11
>o o o>o o o>o o o>o o o>o o o>o o o>o o o>o o o>o o o
955.60
5120'~15" STM @ 0.50%
14 17'~6" STM @ 1.00%
13
21'~6" STM @ 2.82%
12
48'~15" STM @ 3.84%
RIM=955.12
TC=954.17
FG=953.67
95
4
9
5
5
955.83
955.73
955.54
955.30
SEE SWALE DETAIL
956
9
5
6
956.15
955.51
TC=955.42
FG=954.92
TC=955.59
FG=955.59
TC=956.05
FG=955.55
954.94
955.37
955.13
TC=956.68
FG=956.18
TC=955.60
FG=955.10
STORM SEWER PIPE TABLE
PIPE NAME
1-2
2-3
2-8
3-9
3-4
4-5
4-12
5-6
6-7
9-10
10-11
12-13
13-14
DIAMETER
15"
15"
15"
15"
15"
15"
15"
15"
15"
12"
12"
6"
6"
LENGTH
45 '
43 '
38 '
127 '
51 '
120 '
48 '
31 '
79 '
57 '
90 '
21 '
17 '
SLOPE
0.50%
0.62%
2.71%
0.50%
0.50%
0.50%
3.84%
0.54%
0.50%
0.50%
0.50%
2.82%
1.00%
D
955.66 955.66
955.88 955.88
TC=956.38
FG=955.88
TC=956.38
FG=955.88
TC=956.11
FG=955.61
TC=956.09
FG=955.59
TC=955.93
FG=955.43
955.73
956.38
956.44
TC=956.51
FG=956.01
955.78
955.90
TC=955.70
FG=955.20
955.85
955.58
-1.07%-1.
0
0
%
-1.0
0
%
-1.5
2
%
956.00 956.49956.00956.49
TC=956.38
FG=955.88
956.34
956.28
955.80
TC=956.74
FG=956.24
-8.12%-8.12%
-1
.
9
9
%
-8
.
3
3
%
-2.06%
-7.
4
4
%
-1
.
4
9
%
TC=956.01
FG=955.51
955.74
955.69
955.56
956.30
956.19
956.24
956.25 -0.73%
-1
.
2
6
%
9
5
6
RIM=956.09
TC=956.38
FG=955.88
956.50
-3.
3
7
%
GRADING LEGEND
EXISTING
REFER TO C1.1 FOR EXISTING FEATURES LEGEND
PROPOSED
RIGHT-OF-WAY
PROPERTY LINE
SETBACK
EASEMENT
BUILDING
MAJOR CONTOUR
MINOR CONTOUR
GRADE BREAK
SWALE LINE
STRUCTURE NUMBER
CATCH BASIN
STORM MANHOLE
CLEANOUT
DOWNSPOUT
FINISHED GRADE ELEVATION
RIM ELEVATION
TOP OF CURB ELEVATION
FINISHED GRADE ELEVATION
M.E.MATCH EXISTING ELEVATION
SLOPE ARROW
FLOOD ROUTE
R/W
960
962
▲▼
>o o o >o o o >o o o
1
D
CO
DS
XXX.XX
RIM=XXX.XX
TC=XXX.XX
FG=XXX.XX
X.XX%
GENERAL NOTES:
SEE SHEET C1.1
GRAPHIC SCALE (IN FEET)
1 in. = 20 ft.
020 20 40
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
4
0
_
G
R
A
D
I
N
G
_
P
L
A
N
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C4.0
GRADING PLAN
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
BENCHMARK DATUM:
BM "A":
BM "B":
NAVD88
PK NAIL
HORIZONTAL POSITION: N 961,167.93' E 2,853,884.92'
ELEVATION: 954.96'
1/2" IRON PIPE
HORIZONTAL POSITION: N 960,917.10' E 2,854,136.04'
ELEVATION: 955.68'
FORTY-EIGHT (48) HOURS
BEFORE DIGGING IS TO
COMMENCE, THE CONTRACTORS
SHALL NOTIFY THE FOLLOWING
AGENCIES: MINNESOTA UTILITIES
PROTECTION SERVICE AT 811 OR
800-252-1166 AND ALL OTHER
AGENCIES WHICH MIGHT HAVE
UNDERGROUND UTILITIES
INVOLVING THIS PROJECT AND
ARE NONMEMBERS OF STATE
UTILITIES PROTECTION SERVICE
SEE ADA GRADING
DETAIL
ADA GRADING DETAIL
SCALE 1" = 10'
GRAPHIC SCALE (IN FEET)
1 in. = 10 ft.
010 10 20
TYPICAL SWALE
SECTION DETAIL
NTS
EXISTING
GRADE
TIE-OUT
BACK OF BUILDING
33%
SWALE RUN
SLOPE 1%
10 TO 33%
SLOPE
Page 35 of 63
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
P
/
L
P
/
L
P
/
L
P
/
L
P/LP/LP/LP/LP/LP/L
P/L
N
5
8
°
0
1
'
1
1
"
E
3
8
.
3
4
'
(
R
)
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
BM #1
BM #2
G
G
G
G
G
G
U
G
E
U
G
E
U
G
E
U
G
E
F
O
F
O
F
O
F
O
F
O
G
G
G
U
G
E
F
O
U
G
T
UG
T
UG
T
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SAN
Storm CB
Rim=954.01'
8"Inv.(NE)=950.56'
Storm CB
Rim=953.89'
24"Inv.(NW)=948.70'
24"Inv.(SW)=949.96'
Sanitary MH
Rim=956.61'
6"Inv.(SE)=941.98'
6"Inv.(SW)=941.94'
6"Inv.(NE)=941.91'
Storm CB
Rim=954.59'
24"Inv.(SE)=948.64'
24"Inv.(SW)=945.64'
18"Inv.(NE)=945.19'
R
/
W
R
/
W
STM STM STM
STM
STM STM
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
STM
STM
UGE
UGE
UGE UGE UGE UGE UGE UGE
UG
E
UGT
UGT
UGT
UGT UGT UGT UGT UGT
UGT
UG
T
W
W
W
W
W W W
GAS
GAS
GAS
GAS GAS GAS GAS GAS
GA
S
SAN
SAN SAN SANCO CO
T P
A
D
DO
N
O
T
E
N
T
E
R
S
S
D
STM
WM
STM
STM STMD
DS DS DS DS
CO
SANSANSA
N
COCOCO
D
S
A
N
SAN
D
WASH BAY
101
A:3,204 SQ. FT.
EQMT. RM.
103
A:1,163 SQ. FT.
CONTROL
102
A:181 SQ. FT.
R.R.
103
A: 50 SQ. FT.
6
1
2
3
3
2 3
4
5
32'~6" SAN @ 8.62%
80'~6" SAN @ 1.00%50'~6" SAN @ 5.44%
19'~6" SAN @ 1.00%
10'~6" SAN @ 1.00%
50'~6" SAN @ 1.00%
2'~6" SAN @ 8.62%
9
9
1
7
8
10
11
12
12
32
'
~
6
"
S
A
N
@
5
.
0
9
%
8
12
14
14
10'~6" SAN @ 1.00%
SANITARY SEWER PIPE TABLE
PIPE NAME
S1-S2
S2-S3
S3-S4
S4-S5
S4-S10
S5-S6
S7-S8
S8-S9
S8-S12
S10-S11
DIAMETER
6"
6"
6"
6"
6"
6"
6"
6"
6"
6"
LENGTH
10'
50'
80'
45'
32'
50'
10'
19'
32'
2'
SLOPE
1.00%
5.44%
1.00%
1.00%
8.62%
1.00%
1.00%
1.00%
5.09%
8.62%
SANITARY SEWER STRUCTURE SCHEDULE
NO.
S1
S2
S3
S4
S5
S6
S7
S8
S9
S10
S11
S12
STRUCTURE
STUB OUT
SAN. MANHOLE (SS-1)
SAN. MANHOLE (SS-2)
6" CO
6" CO
OWS (OUT)
OWS (IN)
6" CO
6" CO
6" CO
BLDG CONNECTION 1
BLDG CONNECTION 1
RIM
943.00
957.00
955.63
956.69
955.18
955.47
955.36
955.26
955.05
956.48
956.50
956.50
INVERT
942.46 (6") SE
942.46 (6") NW
944.56 (6") S
942.56 (6") NW
949.26 (6") S
947.26 (6") N
950.06 (6") S
950.06 (6") SW
950.06 (6") N
950.51 (6") S
950.51 (6") NE
951.01 (6") S
951.01 (6") N
951.26 (6") S
951.26 (6") N
951.36 (6") S
951.36 (6") E
951.36 (6") N
951.55 (6") N
952.79 (6") S
952.79 (6") N
953.00 (6") N
953.00 (6") W
UTILITY CROSSING SCHEDULE
NO.UTILITY ELEVATIONS DIFF.
1
BOTTOM OF STORM
SEWER (UPPER UTILITY)950.02'
2.05'TOP SANITARY SEWER
(LOWER UTILITY)947.97'
2
BOTTOM OF STORM
SEWER (UPPER UTILITY)949.59'
1.98'TOP OF WATER (LOWER
UTILITY)947.61'
3
BOTTOM OF STORM
SEWER (UPPER UTILITY)951.71'
3.61TOP OF WATER (LOWER
UTILITY)948.10'
4
BOTTOM OF STORM
SEWER (UPPER UTILITY)952.09'
1.28'TOP SANITARY SEWER
(LOWER UTILITY)950.81'
5
BOTTOM OF SANITARY
SEWER (UPPER UTILITY)950.37'
2.17'TOP OF WATER (LOWER
UTILITY)948.20'
6
BOTTOM OF STORM
SEWER (UPPER UTILITY)953.98'
1.22'TOP SANITARY SEWER
(LOWER UTILITY)952.76'
UTILITY LEGEND
EXISTING
REFER TO C1.1 FOR EXISTING FEATURES LEGEND
PROPOSED
BUILDING
CONCRETE CURB
PAVEMENT/WALK
STORM SEWER LINE
SANITARY SEWER LINE
DOMESTIC WATER SERVICE LINE
GAS SERVICE LINE
UNDERGROUND ELECTRIC LINE
UNDERGROUND TELEPHONE LINE
CATCH BASIN
STORM SEWER
SANITARY SEWER
CLEANOUT
DOWNSPOUT
ELECTRICAL TRANSFORMER PAD
WATER VALVE
WATER SERVICE METER
STM
W
G
UGE
UGT
D
S
CO
DS
T
PAD
WM
GENERAL NOTES:
SEE SHEET C1.1
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
5
0
_
U
T
I
L
I
T
Y
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C5.0
UTILITY PLAN
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
FORTY-EIGHT (48) HOURS
BEFORE DIGGING IS TO
COMMENCE, THE CONTRACTORS
SHALL NOTIFY THE FOLLOWING
AGENCIES: MINNESOTA UTILITIES
PROTECTION SERVICE AT 811 OR
800-252-1166 AND ALL OTHER
AGENCIES WHICH MIGHT HAVE
UNDERGROUND UTILITIES
INVOLVING THIS PROJECT AND
ARE NONMEMBERS OF STATE
UTILITIES PROTECTION SERVICE
1.CONNECT 6" SDR-35 PVC SANITARY LATERAL (MINIMUM 1.00% SLOPE) TO
EXISTING STUB OUT. CONTRACTOR TO CONFIRM STUB OUT FOR SITE
TIE-IN PRIOR TO CONSTRUCTION.
2.CONTRACTOR SHALL FURNISH AND INSTALL 2" WATER LINE FROM WATER
VALVE TO BUILDING. WATER LINE SHALL BE TYPE "K" ASTM B88, WITH
AWWA C800 FITTINGS, INSTALLED PER AWWA C800, OR APPROVED
EQUAL.
3.PROPOSED UNDERGROUND ELECTRIC SERVICE LINE. CONTRACTOR TO
COORDINATE WITH SERVICE PROVIDER AND MEP PLANS FOR
CONNECTION.
4.PROPOSED TRANSFORMER PAD. CONTRACTOR TO COORDINATE WITH
SERVICE PROVIDER FOR CONNECTION.
5.PROPOSED UNDERGROUND TELEPHONE SERVICE LINE. CONTRACTOR TO
COORDINATE WITH SERVICE PROVIDER AND MEP PLANS FOR
CONNECTION.
6.PROPOSED OIL/WATER SEPARATOR. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
7.PROPOSED 2000 GAL. RECLAIM TANK. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
8.PROPOSED RECLAIM TANK SERVICE LINE. SEE MECHANICAL SHEETS FOR
ADDITIONAL INFORMATION.
9.PROPOSED GAS LINE. CONTRACTOR TO COORDINATE WITH SERVICE
PROVIDER AND MEP PLANS FOR CONNECTION.
10.PROPOSED 6" PVC STORM LINE FROM DOWNSPOUTS (MIN. SLOPE 1.00%).
REFER TO ARCHITECTURAL PLANS FOR EXACT BUILDING DOWNSPOUT
LOCATIONS.
11.PROPOSED REDUCED PRESSURE BACKFLOW PREVENTER TO BE
INSTALLED BY CONTRACTOR ACCORDING TO CITY OF ROSEMOUNT
STANDARDS.
12.UTILITY CONNECTION WILL NEED TO BE COMNFIRMED BY CONTRACTOR
PRIOR TO CONSTRUCTION.
13.PROPOSED WATER METER TO BE INSTALLED BY CONTRACTOR
ACCORDING TO CITY OF ROSEMOUNT STANDARDS.
14.PROPOSED FITTINGS WITH MEGA-LUGS AND 3
4" TIE RODS INSTALLED AS
NECESSARY TO RESTRAIN ALL JOINTS.
GRAPHIC SCALE (IN FEET)
1 in. = 20 ft.
020 20 40
UTILITY
CROSSING #1
CODED NOTES:
UTILITY
CROSSING #2
BLDG. INV. = 953.00'
BLDG. INV. = 953.00'
UTILITY
CROSSING #6
UTILITY
CROSSING #4
UTILITY
CROSSING #3 UTILITY
CROSSING #5
Page 36 of 63
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
P
/
L
P
/
L
P
/
L
P
/
L
P/LP/LP/LP/LP/LP/L
P/L
N
5
8
°
0
1
'
1
1
"
E
3
8
.
3
4
'
(
R
)
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
N
5
8
°
0
1
'
1
1
"
E
1
9
1
.
1
4
'
(
R
)
S 00°25'44" W 405.90' (R)
S
7
5
°
2
7
'
2
4
"
W
1
6
4
.
6
2
'
(
R
)
N 00°27'39" W 255.38' (R)
N 35°0
3
'
0
2
"
W
7
3
.
3
9
'
(
R
)
N
5
5
°
3
1
'
2
0
"
E
5
3
.
9
3
'
(
R
)
BM #1
BM #2
U
G
T
UG
T
UG
T
Sanitary MH
Rim=956.61'
6"Inv.(SE)=941.98'
6"Inv.(SW)=941.94'
6"Inv.(NE)=941.91'
R
/
W
R
/
W
3
0
'
F
R
O
N
T
Y
A
R
D
S
E
T
B
A
C
K
1
0
'
R
E
A
R
Y
A
R
D
S
E
T
B
A
C
K
10' SIDE YARD SETBACK
10' SIDE YARD SETBACK
STM STM STM
STM
STM STM
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
STM
STM
CO CO
S
S
D
STM
WM
STM
STM STMD
DS DS DS DS
CO
COCOCO
D
D
WASH BAY
101
A:3,204 SQ. FT.
EQMT. RM.
103
A:1,163 SQ. FT.
CONTROL
102
A:181 SQ. FT.
R.R.
103
A: 50 SQ. FT.
9
5
7
95
5
95
5
955
956
955
954
956
9
5
6
955
954
956955
95
4
9
5
6
956
956
9
5
6
955
956
95795
6
956
955
9
5
5
CE
IP
FS
CW
IP
IP
IP
IP
IP
IP
IP
HW
PS
TS
PS
PS
PS
PS
TS
TS
TS
PS TS
S
F
S
F
S
F
S
F
SF
SF
S
F
S
F
S
F
S
F
SF SF SF SF SF SF SF SF
SF SF SF SF SF
S
F
S
F
S
F
SF
S
F
S
F
S
F
SFSFSF
SF
SF
SF
SFSF
SF
SF
SF
SF
SF
SF
S
F
S
F
SF
SF
LOD
L
O
D
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
LOD
LO
D
L
O
D
L
O
D
L
O
D
LO
D
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD
LOD LOD
LOD LOD LOD
LO
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
L
O
D
L
O
D
LOD
LOD
IP
95
6
955
956FFE = 956.50
9
5
0
9
5
0
9
5
5
9
5
1
9
5
1
9
5
2
9
5
2
9
5
3
9
5
4
9
5
6
9
5
6
9
5
7
9
5
7
95
5
9
5
2
9
5
3
95
4
956
95
7
95
5
9
5
5
95
3
95
4
9
5
4
95
6
9
5
6
955
954
955
954
956
95
5
9
5
5
9
5
6
957
9
5
5
9
5
5
9549
5
6
9
5
6
9
5
7
95
7
955
953
954
24'
42.9'
17'
24'
GRAPHIC SCALE (IN FEET)
1 in. = 20 ft.
020 20 40
SWPPP LEGEND
EXISTING
REFER TO XXX FOR EXISTING FEATURES LEGEND
PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
PAVEMENT/WALK
STORM SEWER
SILT FENCE
COMPOST SOCK
GRADING/SEEDING LIMITS
LIMIT OF DISTURBANCE
STABILIZED CONSTRUCTION
ENTRANCE
STORAGE AREA
BASIN SEDIMENT FILTER
STORM MANHOLE
CATCH BASIN
STABILIZED CONSTRUCTION
ENTRANCE
TEMPORARY SEEDING
PERMANENT SOD
HAZARDOUS WASTE STORAGE AREA
FUEL STORAGE AREA
CONCRETE WASHOUT AREA
INLET PROTECTION
960
962
STM
SF
LOD
D
CE
TS
PS
HW
FS
CW
IP
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
6
0
_
S
W
P
P
P
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C6.0
SWPPP
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
Page 37 of 63
SWPPP GENERAL NOTES
1.ALL EROSION AND SEDIMENTATION CONTROL SHALL BE PERFORMED ACCORDING TO:
SWPPP AND DETAIL PLANS; ACCORDING TO THE LATEST EPA AUTHORIZATION FOR
CONSTRUCTION ACTIVITY UNDER THE "NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM" (NPDES); ANY AND ALL REQUIRED PERMITS, REPORTS, AND RELATED
DOCUMENTS. ALL CONTRACTORS AND SUBCONTRACTORS MUST BECOME FAMILIAR WITH
ALL OF THE ABOVE.
2.CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) AS REQUIRED
BY THE SWPPP. ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS
DICTATED BY CONDITIONS AND GRADE CHANGES TO THE SITE AT NO ADDITIONAL COST
TO OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION.
3.CONTRACTOR SHALL MINIMIZE CLEARING AND DISTURBANCE TO THE ENVIRONMENT TO
THE MAXIMUM EXTENT POSSIBLE OR AS REQUIRED BY THE GENERAL PERMIT.
4.SEDIMENT STRUCTURES AND PERIMETER SEDIMENT BARRIERS SHALL BE IMPLEMENTED
AS THE FIRST STEP OF GRADING WITHIN SEVEN (7) DAYS FROM THE START OF CLEARING
AND GRUBBING, AND SHALL CONTINUE TO FUNCTION UNTIL THE DEVELOPMENT AREA IS
STABILIZED.
5.PERMANENT SOIL STABILIZATION OF DISTURBED AREAS BY MEANS OF VEGETATION,
LANDSCAPE TYPE MULCHING, MATTING, SOD, RIP RAP, AND OTHER APPROVED
LANDSCAPING TECHNIQUES TO BE APPLIED AS FOLLOWS:
·WITHIN SEVEN (7) DAYS OF ANY AREA THAT WILL BE DORMANT FOR ONE (1) YEAR
OR MORE.
·WITHIN TWO (2) DAYS OF ANY AREA WITHIN 50 FEET OF A STREAM AT FINAL GRADE.
·WITHIN SEVEN (7) DAYS FOR ANY OTHER AREA AT FINAL GRADE.
6.TEMPORARY SOIL STABILIZATION OF DISTURBED AREAS BY MEANS OF TEMPORARY
VEGETATION, MULCHING, GEOTEXTILES, SOD, PRESERVATION OF EXISTING VEGETATION,
AND OTHER APPROVED TECHNIQUES TO BE APPLIED AS FOLLOWS:
·WITHIN TWO (2) DAYS OF ANY AREA WITHIN 50 FEET OF A STREAM NOT AT FINAL
GRADE.
·WITHIN SEVEN (7) DAYS OF ANY AREA THAT WILL BE DORMANT FOR MORE THAN
TWENTY ONE (21) DAYS, BUT LESS THAN ONE (1) YEAR.
·PRIOR TO THE ONSET OF WINTER WEATHER FOR AREAS THAT WILL BE IDLE OVER
WINTER.
7.TEMPORARY SEEDING, MULCHING, AND FERTILIZER SPECIFICATIONS:
SEEDING: ANNUAL RYEGRASS AT 2.02 POUNDS PER 1,000 S.F.
MULCHING: STRAW MATERIAL SHALL BE UNROTTED SMALL GRAIN STRAW APPLIED AT
A RATE OF TWO (2) TON/ACRE, OR 80-100 POUNDS PER 1,000 S.F. MULCH MATERIALS
SHALL BE RELATIVELY FREE OF ALL KINDS OF WEEDS AND SHALL BE FREE OF
PROHIBITIVE NOXIOUS WEEDS. MULCH SHALL BE SPREAD UNIFORMLY BY HAND OR
MECHANICAL MEANS. FROM NOVEMBER 01 THRU MARCH 15 INCREASE THE RATE OF
STRAW MULCH TO THREE (3) TON/ACRE.
FERTILIZER: APPLY FERTILIZER AT HALF THE RATE OF PERMANENT APPLICATION AND
AS PER SPECIFICATIONS. IF PROJECT CONDITIONS PREVENT FERTILIZING THE SOIL,
THEN THIS ITEM MAY BE WAIVED.
8.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO
REDUCE RUNOFF VELOCITIES AND EROSION. ALL SLOPES GREATER THAN 3:1 SHALL BE
FERTILIZED, SEEDED, AND CURLEX BLANKETS BY AMERICAN EXCELSIOR COMPANY,
NORTH AMERICAN GREEN, INC. OR AN APPROVED EQUAL AS SPECIFIED IN THE PLANS
SHALL BE INSTALLED ON THE SLOPES.
9.NO SOLID (OTHER THAN SEDIMENT) OR LIQUID WASTE, INCLUDING BUILDING MATERIALS,
SHALL BE DISCHARGED IN STORM WATER RUNOFF. ALL NON-SEDIMENT POLLUTANTS
MUST BE DISPOSED OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL GUIDELINES.
WASH OUT OF CEMENT TRUCKS SHOULD OCCUR IN DESIGNATED PIT OR DIKED AREAS,
WHERE WASHINGS CAN BE REMOVED AND PROPERLY DISPOSED OFF-SITE WHEN THEY
HARDEN. STORAGE TANKS SHOULD ALSO BE LOCATED IN PIT OR DIKED AREAS. IN
ADDITION, SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS
TO CLEAN AND CONTAIN FUEL AND CHEMICAL SPILLS MUST BE KEPT ON SITE.
10.IF THE ACTION OF VEHICLES TRAVELING OVER THE STABILIZED CONSTRUCTION EXIT
DOES NOT SUFFICIENTLY REMOVE MOST OF THE DIRT AND MUD, THEN THE TIRES MUST
BE WASHED BEFORE VEHICLES ENTER A PUBLIC ROAD. PROVISIONS MUST BE MADE TO
INTERCEPT THE WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE SITE.
11.RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DISPOSED
INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE SITE
THROUGH THE ACTION OF WIND OR STORM WATER DISCHARGE INTO DRAINAGE DITCHES
OR WATERS OF THE STATE.
12.DUST CONTROL USING APPROVED MATERIALS MUST BE PERFORMED AT ALL TIMES. THE
USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST
SUPPRESSION IS PROHIBITED.
13.ON-SITE AND OFF-SITE STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM
EROSION AND SEDIMENTATION BY THE USE OF BEST MANAGEMENT PRACTICES. THESE
AREAS MUST BE SHOWN IN THE SITE MAP AND PERMITTED IN ACCORDANCE WITH
GENERAL PERMIT REQUIREMENTS. AT A MINIMUM SILT FENCE TO BE PLACED AT
PERIMETER OF STOCKPILE AREA TO PREVENT SOIL FROM LEAVING THE STOCKPILE AREA.
14.ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED ONTO THE ROADWAYS OR
INTO THE STORM SEWERS MUST BE REMOVED IMMEDIATELY.
15.ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH DAY; THIS INCLUDES
BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL
OR ASPHALT FOR ROAD CONSTRUCTION.
16.THE LAST LAYER OF SOIL, INCLUDING TOP SOIL SHOULD BE COMPACTED TO 80% - 85% OF
THE MAXIMUM STANDARD PROCTOR DENSITY, IN AREAS OUTSIDE THE PARKING LOT THAT
WILL RECEIVE VEGETATION. THIS IS PARTICULARLY IMPORTANT IN CUT SLOPE AND
EMBANKMENT AREAS. IN PAVEMENT AND ISLAND AREAS, IT IS RECOMMENDED THAT THE
SOIL BE COMPACTED TO 98% AND 95% OF THE MAXIMUM STANDARD PROCTOR DENSITY
RESPECTIVELY; THE LAST COMPACTED LAYER MAY BE SCARIFIED TO IMPROVE THE SOIL
GROWTH CHARACTERISTICS.
17.ALL DEWATERING ACTIVITIES SUCH AS PUMPING DOWN OF FLOODED FOUNDATION AND
UTILITY TRENCHES MUST PASS THROUGH THE RETROFITTED DETENTION BASIN OR A
SEDIMENT CONTROL PRACTICE PRIOR TO WATER LEAVING THE SITE.
18.SILT FENCE AND OTHER PERIMETER EROSION CONTROL MEASURES SHOWN OFF LIMITS
OF DISTURBANCE FOR CLARITY PURPOSES ONLY. CONTRACTOR TO ENSURE PERIMETER
EROSION CONTROL MEASURES ARE PLACED AT THE LIMITS OF DISTURBANCE. ANY
DISCREPANCIES SHOULD BE BROUGHT TO THE ENGINEER PRIOR TO PLACEMENT OF ANY
EROSION CONTROL MEASURES.
SWPPP MAINTENANCE NOTES
1.ALL CONTROL MEASURES STATED IN THE SWPPP SHALL BE MAINTAINED IN FULLY
FUNCTIONAL CONDITION UNTIL TEMPORARY OR PERMANENT STABILIZATION OF THE SITE
IS ACHIEVED. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE
INSPECTED BY A QUALIFIED PERSON IN ACCORDANCE TO THE CONTRACT DOCUMENTS
OR THE APPLICABLE PERMIT, WHICHEVER IS MORE STRINGENT, AND REPAIRED
ACCORDING TO THE FOLLOWING:
2.INLET PROTECTION DEVICES AND CONTROLS SHALL BE REPAIRED OR REPLACED WHEN
THEY SHOW SIGNS OF UNDERMINING AND OR DETERIORATION. INLET PROTECTION
DEVICES SHOULD BE ROUTINELY CLEANED AND MAINTAINED.
3.ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD
STANDING OF GRASS IS MAINTAINED. AREAS SHOULD BE FERTILIZED, WATERED, AND
RESEEDED AS NEEDED.
4.MINIMIZE OFF-SITE SEDIMENT TRACKING OF VEHICLES BY THE USE OF STONE MATERIAL
IN ALL CONSTRUCTION ENTRANCES, ALONG WITH REGULARLY SCHEDULED
SWEEPING/GOOD HOUSEKEEPING. STABILIZED CONSTRUCTION ENTRANCES TO BE
PROPERLY MAINTAINED BY GENERAL CONTRACTOR AND IN GOOD WORKING ORDER AT
ALL TIMES; THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE STONE AS CONDITIONS
DEMAND.
5.THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION
(SUITABLE FOR PARKING AND STORAGE) BY GENERAL CONTRACTOR. THIS MAY REQUIRE
PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS CONDITIONS DEMAND.
6.CONTRACTORS AND SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING ALL
SEDIMENT FROM THE SITE, AND STORM SEWER SYSTEMS. SEDIMENT DEPOSITION DURING
SITE STABILIZATION MUST ALSO BE REMOVED.
7.STONE CONSTRUCTION EXIT TO BE MAINTAINED BY GENERAL CONTRACTOR UNTIL SITE
HAS BEEN PAVED OR IS NO LONGER REQUIRED.
8.ALL CATCH BASIN GRATES ARE TO BE PROTECTED WITH INLET BAGS AFTER THEY ARE
INSTALLED. THEY SHOULD BE ROUTINELY CLEANED AND MAINTAINED.
9.CONTAINERS SHALL BE AVAILABLE FOR DISPOSAL OF DEBRIS, TRASH, HAZARDOUS OR
PETROLEUM WASTES. ALL CONTAINERS MUST BE COVERED AND LEAK-PROOF. ALL
WASTE MATERIAL SHALL BE DISPOSED OF AT FACILITIES APPROVED FOR THE PERTINENT
MATERIAL
10.BRICKS, HARDENING CONCRETE AND SOIL WASTE SHALL BE FREE FROM CONTAMINATION
WHICH MAY LEACH CONSTITUENTS TO WATERS OF THE STATE.
11.CLEAN CONSTRUCTION WASTES THAT WILL BE DISPOSED INTO THE PROPERTY SHALL BE
SUBJECT TO ANY LOCAL PROHIBITIONS FROM THIS TYPE OF DISPOSAL.
12.ALL CONSTRUCTION AND DEMOLITION DEBRIS (C&DD) WASTE SHALL BE DISPOSED OF IN
A STATE APPROVED C&DD LANDFILL. CONSTRUCTION DEBRIS MAY BE DISPOSED OF
ON-SITE, BUT DEMOLITION DEBRIS MUST BE DISPOSED IN A STATE APPROVED LANDFILL.
ALSO, MATERIALS WHICH CONTAIN ASBESTOS MUST COMPLY WITH ALL LOCAL AND STATE
REGULATIONS.
13.AREA SHALL BE DESIGNATED BY CONTRACTOR AND SHOWN ON SWPPP MAP FOR MIXING
OR STORAGE OF COMPOUNDS SUCH AS FERTILIZERS, LIME ASPHALT, OR CONCRETE,
THESE DESIGNATED AREAS SHALL BE LOCATED AWAY FROM WATERCOURSES, DRAINAGE
DITCHES, FIELD DRAINS, OR OTHER STORMWATER DRAINAGE AREA.
14.EQUIPMENT FUELING & MAINTENANCE SHALL BE IN DESIGNATED AREAS ONLY.
15.A SPILL PREVENTION CONTROL AND COUNTERMEASURE (SPCC) PLAN MUST BE
DEVELOPED FOR SITES WITH ONE ABOVE-GROUND STORAGE TANK OF 660 GALLONS OR
MORE, TOTAL ABOVE-GROUND STORAGE OF 1,330 GALLONS OR BELOW-GROUND
STORAGE OF 4,200 GALLONS OF FUEL.
16.ALL DESIGNATED CONCRETE WASHOUT AREAS SHALL BE LOCATED AWAY FROM
WATERCOURSES, DRAINAGE DITCHES, FIELD DRAINS OR OTHER STORMWATER DRAINAGE
AREAS.
17.ALL CONTAMINATED SOIL MUST BE TREATED AND/OR DISPOSED IN AN EPA APPROVED
SOLID WASTE MANAGEMENT FACILITY OR HAZARDOUS WASTE TREATMENT, STORAGE OR
DISPOSAL FACILITIES.
18.THE CONTRACTOR SHALL CONTACT THE STATE EPA, THE LOCAL FIRE DEPARTMENT AND
THE LOCAL EMERGENCY PLANNING COMMITTEE IN THE EVENT OF A PETROLEUM SPILL
(>25 GALLONS) OR THE PRESENCE OF SHEEN.
19.OPEN BURNING IS NOT PERMITTED ON THE SITE.
20.CONTRACTOR TO ENSURE STREETS SHALL BE CLEARED OF DEBRIS FROM SITE AND
SWEPT CLEAN ON AN AS NEEDED BASIS.
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) PROJECT NARRATIVE:
PLAN ENGINEERS: CESO, INC.DEVELOPER: SONNY'S ENTERPRISES, LLC
3601 RIGBY ROAD, SUITE 300 5870 HIATUS ROAD
MIAMISBURG, OH 45342 TAMARC, FL 33321
PHONE: (937) 648-3213 PHONE: (800) 327-8723 X 10379
CONTACT: MIKE MIHALIK CONTACT: CHRIS WARREN
EMAIL:MIKE.MIHALIK@CESOINC.COM EMAIL:CHRIS.WARREN@SONNYSDIRECT.COM
THE PROPOSED PROJECT IS THE CONSTRUCTION OF A CAR WASH WITH ASSOCIATED PARKING AREAS THE SUBJECT
PARCEL IS 1.429 ACRES. THE TOTAL DISTURBED AREA IS 1.13 ACRES.
THE SITE DRAINS IN TWO DIRECTION, MAJORITY OF THE SITE DRAINS TO THE NORTH TOWARDS THE 149TH STREET RIGHT
OF WAY AND A SMALLER PORTION TOWARDS THE SOUTH INOT THE 150TH STREET RIGHT OF WAY.
ON-SITE SOILS:WAUKEGAN SILT LOAD (0-1%)56%
WAUKEGAN SILT LOAD (1-6%)44%
HYDROLOGIC SOIL GROUP = B
THE PRE-EXISTING CONDITIONS ON-SITE IS OPEN SPACE AREA.
NOI #XXX
SEQUENCE OF CONSTRUCTION
1.NOTIFY CITY/COUNTY ENGINEER BEFORE WORK IS TO BEGIN.
2.INSTALL ALL TEMPORARY EROSION CONTROL MEASURES INCLUDING SILT FENCE, CONSTRUCTION EXIT, FILTER
SACKS, CONCRETE WASHOUT.
3.SITE DEMOLITION AND CLEARING.
4.ROUGH GRADING. PROVIDE TEMPORARY SEEDING OF DISTURBED AREAS WHICH ARE INACTIVE.
5.STORM SEWER AND UNDERGROUND UTILITY CONSTRUCTION.
6.BUILDING PAD.
7.CURB CONSTRUCTION.
8.FINE GRADING AND PAVEMENT SUBGRADE PREPARATION
9.ASPHALT PAVING AND REMAINING CONCRETE FLATWORK.
10.FINAL SEEDING.
* CONTRACTOR SHALL MODIFY THE SEQUENCE OF CONSTRUCTION BASED ON SITE CONDITIONS. CONTRACTOR TO NOTIFY
PROJECT MANAGER PRIOR TO CHANGING SEQUENCE OF CONSTRUCTION.
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
6
0
_
S
W
P
P
P
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C6.1
SWPPP NOTES
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
Page 38 of 63
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
6
0
_
S
W
P
P
P
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
CONCRETE
WASHOUT
NOTES:
1. ACTUAL LAYOUT DETERMINED IN THE FIELD.
2. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE TEMPORARY CONCRETE WASHOUT FACILITY.
3. THE WASHOUT MUST HAVE SUFFICIENT VOLUME TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS INCLUDING BUT NOT LIMITED TO OPERATIONS ASSOCIATED WITH GROUT AND MORTAR.
10 mil PLASTIC LINING
A A
STAPLE DETAIL
CONCRETE WASHOUT SIGN DETAIL
SECTION "A-A"
ABOVE GRADE W/ HAYBALES
10 mil
PLASTIC LINING
A A
SECTION "A-A"
BELOW GRADE
A A
SECTION "A-A"
ABOVE GRADE WITH WOOD PLANKS
10 mil
PLASTIC LINING
SANDBAG
10 mil PLASTIC LINING
VARIES
SEE NOTE 3 SIDE SLOPES TO BE
NO STEEPER THAN
4:1
WOOD FRAME SECURELY FASTENED
AROUND ENTIRE PERIMETER WITH
TWO WOOD STAKES
10 mil
PLASTIC
LINING
10 mil PLASTIC LINING
STAPLES
(2 PER
BALE)
WOOD OR METAL
STAKES (2 PER
BALE)
NATIVE
MATERIAL
(OPTIONAL)
BINDING WIRE
STRAW BALE (TYP.)
10' MIN.
10' MIN.
LATH AND
FLAGGING
ON 3 SIDES
SANDBAG (TYP.)BERM
10' MIN.
10' MIN.
STAKE (TYP.)TWO STACKED
2x12 ROUGH
WOOD FRAME
10' MIN.
10' MIN.
STAKE (TYP.)STRAW BALE (TYP.)
3'
3'
PLYWOOD
PAINTED WHITE
(4' x 2')
BLACK LETTERS
6" HEIGHT)
LAG
SCREWS
(0.5")
WOOD POST
(3.5" x 3.5" x 8')
8"
2"
STEEL
WIRE
0.115" DIA.
CONCRETE WASHOUT
NTS
PLAN
NTS
AREA TO BE PROTECTEDWORK AREA
WORK AREA
AREA TO BE
PROTECTEDWATER FLOW
COMPOST SOCK ON PAVEMENT
NTS
NOTES:
1.ALL MATERIAL TO MEET
SPECIFICATIONS.
2.FILTER MEDIA TO MEET APPLICATION
REQUIREMENTS.
3.FILTER MEDIA TO BE DISPERSED ON
SITE, AS DETERMINED BY ENGINEER.
CONCRETE BLOCKS OR SAND BADS
SIZED AS NEEDED (10' O.C.)
COMPOST SOCK
SIZE TO BE DETERMINED
BY MANUFACTURER
SECTION
NTS
CONCRETE BLOCKS OR SAND
BAGS SIZED AS NEEDED (10' O.C.)
COMPOST SOCK
SIZE TO BE DETERMINED BY MANUFACTURER
PAVEMENT OR
IMPERVIOUS SURFACE
18" MIN. OVERLAP
C6.2
SWPPP DETAILS
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
Page 39 of 63
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
7
0
_
C
O
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C7.0
CONSTRUCTION
DETAIL
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
X X X X X
1.ALL CONCRETE CURBS AND SIDEWALKS TO
BE 4000 P.S.I. CONCRETE.
2.SIDEWALK TO BE SLOPED 2% MAX. AWAY
FROM BUILDING.
3.ALL SIDEWALKS SHALL BE BROOM FINISHED.
EXPANSION JOINTS 20'-0" oc.
MAXIMUM4 SPACES @ 5'-0" oc. OR AS DIRECTED OR SHOWN ON THE SITE
PLAN
1/2" EXPANSION JOINT
LAWN OR PLANTING IF SHOWN ON SITE
PLAN
1/2" EXPANSION
JOINT
AA
SE
E
P
L
A
N
S
VA
R
I
E
S
VA
R
I
E
S
SE
E
PL
A
N
S
PLAN VIEW
1"
1/4"
R=1/8"
TROWELED JOINT
4"
1/2" EXPANSION JOINT
WITH SEALANT
4" MINIMUM COMPACTED GRAVEL BASE
SECTION A-A
4"
EXPANSION JOINT
CONCRETE SIDEWALK
NTS
TROWELED JOINT( TYP.)
6" X 6" W1.4xW1.4 WWF
TROWELED JOINT
COMPACTED SUBGRADE
TO 95% MAXIMUM DRY
DENSITY PER ASTM D1557SEALANT
1" THICK MIN.
FIBER EXPANSION
JOINT MATERIAL
NOTES:
CURB OR GUTTER LINE
6"
1.ALL CONCRETE CURBS TO BE 4,000 P.S.I. CONCRETE AT 28 DAYS.
2.TRANSVERSE EXPANSION JOINTS, 1/2" WIDE, SHALL BE INSTALLED IN THE CURB
20'-0" APART MAXIMUM.
3.EXPANSION JOINTS SHALL BE FILLED WITH 1/2" PREFORMED JOINT FILLER,
RECESSED 1/4" FROM TOP AND FACE OF CURB.
4.MAXIMUM HEIGHT OF CURB TO PAVING IS 6".
6"
18
"
1" R
1/
4
"
R
5"
CONCRETE CURB
NTS
TOPSOIL
1" JOINT SEALER
REFER TO PAVEMENT
SECTION DETAILS
AGGREGATE BASE
MATERIAL
COMPACTED SUBGRADE
CAST IN PLACE
CONCRETE CURB
NOTES:
1" PREFORMED JOINT FILLER.
DEPTH OF FILLER EQUAL TO
PAVEMENT THICKNESS LESS 1".
4"
4"
2"
18
"
6"
6"
5"
XXXX
REFER TO SITE
GRADING PLAN
1.ALL CONCRETE CURBS AND SIDEWALK TO BE 4,000 P.S.I. CONCRETE AT 28 DAYS.
2.TRANSVERSE EXPANSION JOINTS, 1/2" WIDE, SHALL BE INSTALLED IN THE CURB
20'-0" APART MAXIMUM. SPACING SHALL MATCH SIDEWALK.
3.EXPANSION JOINTS SHALL BE FILLED WITH 1/2" PREFORMED JOINT FILLER,
RECESSED 1/4" FROM TOP AND FACE OF CURB.
4.MAXIMUM HEIGHT OF CURB TO PAVING IS 6".
1"
R
CONCRETE CURB W/ SIDEWALK
NTS
1" JOINT SEALER
TROWELED JOINT
CONCRETE SIDEWALK
AGGREGATE
BASE MATERIAL
COMPACTED SUBGRADE
CONCRETE CURB
COMPACTED SUBGRADE
SUBBASE
6 x 6 x W1.4 x W1.4 WWM
REFER TO PAVEMENT
SECTION DETAILS
NOTES:
1" PREFORMED BITUMINOUS
JOINT FILLER. DEPTH OF
FILLER EQUAL TO
PAVEMENT THICKNESS
LESS 1"
CONCRETE
(4,000 PSI)
14
"
R=1"12"
R=1"
COMPACTED SUBGRADE 1" PREFORMED JOINT FILLER.
DEPTH OF FILLER EQUAL TO
PAVEMENT THICKNESS LESS 1".
PAVEMENT SURFACE
(REFER TO PAVEMENT
SECTIONS DETAILS)
1 "
2"
2"
MOUNTABLE CURB
NTS
1" JOINT SEALER
2' 0"
TYP.
3'
-
9
"
1'
-
9
"
TY
P
.
1'-0"
TYP.
4'-9"
TYP.
1'-0"
TYP.
2'-0" R
TURN ARROW
PAVEMENT MARKINGS
NTS
VARIES
2'
-
0
"
STOP BAR
ARROW
STOP2'
-
0
"
B
C
D
A A.ASPHALT PAVEMENT SURFACE COURSE
B.ASPHALT PAVEMENT BINDER COURSE
C.AGGREGATE BASE MATERIAL
D.SUBGRADE-COMPACT PER
GEOTECHNICAL REPORT SECTION
ASPHALT PAVEMENT
A
B
C
A.PORTLAND CEMENT CONCRETE
PAVEMENT, 4000 P.S.I.
B.AGGREGATE BASE MATERIAL
C.SUBGRADE-COMPACT PER
GEOTECHNICAL REPORT SECTION
CONCRETE PAVEMENT
PAVEMENT LAYER DEPTHS
ASPHALT CONCRETE
A B C A B
STANDARD DUTY
RE
F
E
R
E
N
C
E
C
H
A
R
T
FO
R
D
E
P
T
H
S
RE
F
E
R
E
N
C
E
C
H
A
R
T
FO
R
D
E
P
T
H
S
PAVEMENT SECTIONS
NTS
8.7
8.7
ACCESSIBLE PARKING SPACE STRIPING
NTS
LE
N
G
T
H
O
F
S
T
A
L
L
P
E
R
P
L
A
N
8'
MIN.LOADING ZONE PER PLAN VARIES PER PLAN
2' (TYP.)
4" SOLID LINE,
COLOR TO
MATCH PLAN
4" SOLID BLUE LINE
(TYP.)
4" WIDE SOLID BLUE
LINE @ 45° (TYP.)
3"
(TYP.)
24" MIN
28"
MIN
PAINT WHITE SYMBOL
WITH BLUE BACKGROUND
4'-
0
"
3" MIN
24"
CONCRETE FOOTING
4,000 PSI
ACCESSIBLE PARKING SIGN IN BOLLARD
NTS
FINISHED GRADE
6" SCHEDULE 40 STEEL PIPE,
PAINTED BLUE, CONCRETE FILLED
PENALTY SIGN WITH WORDING AS
REQUIRED BY STATE OR LOCAL LAW
(12"X9")
12" X 6"
(WHERE NOTED ON SITE PLAN)
12" X 18"
DOME TOP OF CONCRETE
4'
-
0
"
5'
-
0
"
T
O
G
R
A
D
E
INSTALL 1/2" PREFORMED JOINT
FILLER WHEN INSTALLING WITHIN
CONCRETE PAVEMENT
NOTE:
SIGNS LOCATED WITHIN AN ADA
ACCESSIBLE ROUTE, OR OTHER
PEDESTRIAN ROUTE, SHALL BE 7'
MIN. MEASURED FROM FINISHED
GRADE TO THE BOTTOM OF THE
LOWEST SIGN. SIGNS MAY ALSO
BE PERMANENTLY POSTED ON A
WALL AT THE INTERIOR END OF
THE PARKING SPACE.
6' (TYPICAL)SEE SITE PLAN
4' MIN.
6' (TYPICAL)
2'
DETECTABLE WARNING APPLIED TO
FULL WIDTH PER DETAIL
MAX 1:12 SLOPE MAX 1:50 SLOPE
ACCESSIBLE CURB RAMP (TYPE I)
NTS
DIMENSION PER PLAN
MIN WIDTH = 5'
CONCRETE CURB HEADER
WHERE SHOWN ON SITE PLAN RETURN CURB TO BE
FLUSH WITH TOP OF
WALK
ACCESSIBLE CURB RAMP (TYPE II)
NTS
1'-6
"
TRA
N
S
I
T
I
O
N
LIM
I
T
S
O
F
DE
P
.
C
U
R
B
1'
-
6
"
TR
A
N
S
I
T
I
O
N
24"
SLOPED CONCRETE
1:12 (MAX.) CURB RAMP
(CHECK LOCAL CODES)
DETECTABLE WARNING
APPLIED TO FULL WIDTH PER
DETAIL
MEET EXISTING SIDEWALK
PE
R
P
L
A
N
CONCRETE SIDEWALK
1.
5
0
MA
X
.
CURB TRANSITION
NTS
12"
FRONT OF CURB
BACK OF CURB
TOP VIEW 1'
6"
2"2"8"6"4"
48
"
48
"
6" MIN 24"
6" SCHEDULE 40 STEEL PIPE, FILLED
WITH CONCRETE. PAINT WITH
YELLOW REFLECTIVE TRAFFIC PAINT
CONCRETE FOOTING
4,000 PSI
BOLLARD
NTS
FINISHED GRADE
1" MIN
DOME TOP OF CONCRETE
INSTALL 1/2" PREFORMED JOINT
FILLER WHEN INSTALLING WITHIN
CONCRETE PAVEMENT
2'2'2'
TYPICAL SAWCUT DETAIL
PROPOSED BASE
PROPOSED LEVELING COURSE
PROPOSED SURFACE COURSE
PROPOSED PAVEMENT SECTION
EXISTING SURFACE COURSE
EXISTING LEVELING COURSE
EXISTING BASE COURSE
EXISTING SUBGRADE
SAWCUT LINE
Page 40 of 63
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
7
0
_
C
O
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C7.1
CONSTRUCTION
DETAIL
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
BOTTOM OF CURB
TOP OF CURB
PAVEMENT / GUTTER LINE
4'
1" MAX.
CURB TAPER
NTS
Page 41 of 63
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
7
0
_
C
O
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C7.2
CONSTRUCTION
DETAIL
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
PLAN DESIGNATION - CB 2X2, 3X3, 4X4 SIZE
DEPENDENT ON LARGEST CONNECTING SEWER
SIZE AND MATERIAL
2X2 - HDPE AND PVC - UP TO 21"
RCP - UP TO 18"
3X3 - HDPE AND PVC - 24" TO 30"
RCP - 21" TO 24"
4X4 - HDPE AND PVC - 36" TO 42"
RCP - 30" TO 36"
3x3 AND 4x4
PRECAST CATCH BASIN
NTS
2x2
GRADE RINGS - 16" MAX.FRAME EJIW #5250
GRATE XXXX (OR
APPROVED EQUAL)
PAVEMENT
PAVEMENT
BASECRUSHED #57
AGGREGATE
3'x3', 4'x4', 5'x5', OR 6'x6'
PRECAST CONCRETE CATCH
BASIN
6" MIN.
3" AGGREGATE BASE
COMPACTED SUBGRADE
2'-6" MIN.
2'x2' OPENING
DE
P
T
H
V
A
R
I
E
S
SE
E
P
L
A
N
20 L.F. 4"
PERFORATED PVC
PIPE WITH END CAP
(TYPICAL EACH
SIDE)
DE
P
T
H
V
A
R
I
E
S
SE
E
P
L
A
N
GRADE RINGS - 16" MAX.
RIM ELEVATION
REFER TO THIS POINT
FRAME EJIW #5250
GRATE XXXX (OR
APPROVED EQUAL)PAVEMENT
CRUSHED #57
AGGREGATE
6" MIN.
2'x2' PRECAST CONCRETE
CATCH BASIN
2'-6" MIN.
3" AGGREGATE BASE
COMPACTED SUBGRADE
6" MIN
NOTES:
1.TOP OF GRATES SHALL BE CAST WITH "DUMP NO WASTE" AND "DRAINS TO WATERWAY".
JOINTS BETWEEN SECTIONS SHALL CONFORM TO THE REQUIREMENTS OF ASTM C-990 OR
LATEST EDITION. PRECAST SECTIONS SHALL CONFORM TO THE REQUIREMENTS TO ASTM
C-478. CONCRETE SHALL BE 4000 PSI.
2.ADJUSTMENT TO GRADES TO BE PRECAST GRADE RINGS. CASTINGS TO BE MORTARED WITH
TYPE "M" MASONRY MORTAR.
8" REINFORCED PRECAST
CONCRETE SLAB
PAVEMENT BASE
Page 42 of 63
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
7
0
_
C
O
N
S
T
R
U
C
T
I
O
N
D
E
T
A
I
L
S
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C7.3
CONSTRUCTION
DETAIL
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
CLEAN OUT
NTS
CAST IRON FERRULE ADAPTER WITH
BRASS CAP TO BE FLUSH WITH
FINISHED GRADE (TYP.)
45° SWEEPING BEND
PROVIDE PLUG AT END
OF LINE ONLY
2' LENGTH OF PIPE
WYE BRANCH (TYP.)
FLOW
FINISHED GRADE
NOTE:
SEE PLANS FOR PIPE MATERIAL AND SIZE.
PIPE BEDDING SEE
UTILITY PIPE TRENCH
AND BEDDING DETAIL
DE
P
T
H
V
A
R
I
E
S
(
P
E
R
P
L
A
N
)
6" PVC
SLOPED TO INLET
FINISHED GRADE
ZURN 154-CAST IRON
DECK DRAIN W/ HEEL
(2
'
M
I
N
.
)
HARDSCAPE
GRATE SPECIFICATION
LANDSCAPE/GRASS
PROOF GRATE
(OR APPROVED EQUAL)
(OR APPROVED EQUAL)
EAST JORDAN 6104
LANDSCAPE /GRASS
HARDSCAPE
PIPE
YARD INLET
NTS
PIPE BEDDING SEE UTILITY PIPE
TRENCH AND BEDDING DETAIL
NOTE:
YARD INLET SHALL BE INSTALLED IN AREAS NOT
INTENDED FOR VEHICULAR TRAFFIC
SCHEDULE
DOWNSPOUT PVC PIPE
8"x8" (8" DIA.)
4"x6"
6"x6" (6" DIA.)
10"x10"
12"x12"
8" DIA.
10" DIA.
12" DIA.
15" DIA.
18" DIA.
6"
1"
FINISH FLOOR
DOWNSPOUT COLLECTOR DETAIL
NTS
DR
A
I
N
A
G
E
WO
R
K
B
Y
G
E
N
E
R
A
L
CO
N
T
R
A
C
T
O
R
DR
A
I
N
A
G
E
W
O
R
K
B
Y
CI
V
I
L
C
O
N
T
R
A
C
T
O
R
2'-
O
"
M
A
X
METAL DOWNSPOUT
SCREEN PIPE CAP
STAINLESS STEEL HOSE CLAMP TO
SECURE SCREEN
SCH. 40 PVC PIPE WITH BELL FITTING. RE:
SCHEDULE FOR SIZE
REDUCER FITTING
CONNECT
TO STORMWATER
MANAGEMENT SYSTEM
UTILITY PIPE TRENCH AND BEDDING
NTS
UNPAVEDPAVED
NEW PAVEMENT OR
"PATCHING" TO MATCH
EXISTING PAVEMENT
SECTION. SAWCUT JOINT
WITH EMULSION APPLIED
BEFORE PAVING/PATCHING
1'-6"
FINAL BACKFILL
HAUNCHING
BEDDING
MIN. D+18"
MAX. D+24"
MINIMUM BURIAL DEPTH
(FINISHED GRADE TO
TOP OF PIPE)
COMPACTED
GRAVEL
MOUND
BACKFILL 6" ±
SPRINGLINE
SUITABLE
FOUNDATION
1.IN THE CASE OF TRENCH BOTTOM BEING UNSTABLE, THE CONTRACTOR SHALL REPLACE FOUNDATION WITH SUITABLE
MATERIAL AS SPECIFIED BY GEOTECHNICAL ENGINEER.
2.COMPACTION PERCENTAGES SPECIFIED REFER TO STANDARD PROCTOR PERCENT COMPACTION.
3.CONTRACTOR TO MANDATE DEWATERING IN TRENCHES DURING CONSTRUCTION.
4.TRENCHING OPERATIONS SHALL CONFORM TO ALL OSHA REQUIREMENTS.
5.FOR HDPE AND PVC WATERLINES AND LONG SEWER LATERALS, INSTALL METALLIC LOCATOR TAPE 12" (MIN) AND 18" (MAX)
BELOW FINISHED SUBGRADE ELEVATION. INSTALL TRACER WIRE LOCATED AT THE TOP OF THE PIPE WITHIN THE INITIAL
BACKFILL.
NOTES:
PVC PIPE
ZONE DEPTH / SOIL MATERIAL
FINAL BACKFILL CLASS I-V*
INITIAL BACKFILL MINIMUM DEPTH = D/2 (12" COMMON)**
CLASS I, II, AND III*
HAUNCHING DEPTH = D/2**
CLASS I, II, AND III COMPACTED*
BEDDING DEPTH = 4-6"
CLASS I, II, AND III COMPACTED*
NOTE: HAUNCHING ZONE MUST BE COMPACTED PRIOR TO PLACEMENT AND COMPACTION OF
INITIAL AND FINAL BACKFILLS TO PREVENT PIPE DEFLECTION.
HDPE PIPE
ZONE DEPTH / SOIL MATERIAL
FINAL BACKFILL
MINIMUM COVER UNPAVED AREAS = 12"
MINIMUM COVER PAVED AREAS (D <=48") = 12"**,***
MINIMUM COVER PAVED AREAS (D>48") = 24"**,***
CLASS I AND II (COMPACTED 90% SPD) AND CLASS III (COMPACTED
95% SPD)*
INITIAL BACKFILL
MINIMUM DEPTH = D/2 (CAN EXTEND TO THE CROWN OF THE PIPE)**
CLASS I, II, AND III (TYPE IV CAN BE USED WITH THE APPROVAL OF
GEOTECHNICAL ENGINEER)*
HAUNCHING
DEPTH = D/2**
CLASS I, II, AND III (TYPE IV CAN BE USED WITH THE APPROVAL OF
GEOTECHNICAL ENGINEER)*
BEDDING
DEPTH (D <= 24") = 4"**
DEPTH (D > 24") = 6"**
CLASS I, II, AND III (TYPE IV CAN BE USED WITH THE APPROVAL OF
GEOTECHNICAL ENGINEER)*
NOTE: THE MIDDLE 1
3 BENEATH THE PIPE INVERT IN THE BEDDING ZONE SHALL BE LOOSELY
PLACED
DI PIPE
ZONE DEPTH / SOIL MATERIAL
FINAL BACKFILL CLASS I-V*
INITIAL BACKFILL
DEPTH = D/2**
CLASS I, II, AND III (APPROX. 90% STANDARD PROCTOR PER AASHTO
T-99)*
HAUNCHING DEPTH = D/2**
CLASS I, II, AND III*
BEDDING MINIMUM DEPTH = 4"
CLASS I, II, AND III*
RC PIPE
ZONE DEPTH / SOIL MATERIAL
FINAL BACKFILL CATEGORY I, II, III*
INITIAL BACKFILL
DEPTH = D/2**
CATEGORY I (85-95% COMPACTION), CATEGORY II (90-95%
COMPACTION), OR CATEGORY III (85-95% COMPACTION)*
HAUNCHING
DEPTH = D/2**
CATEGORY I (85-95% COMPACTION), CATEGORY II (90-95%
COMPACTION), OR CATEGORY III (85-95% COMPACTION)*
BEDDING
MINIMUM DEPTH = D/24 (NOT LESS THAN 3")**
IF ROCK FOUNDATION, MINIMUM DEPTH = D/12 (NOT LESS THAN 6")**
CATEGORY I (85-95% COMPACTION), CATEGORY II (90-95%
COMPACTION), OR CATEGORY III (85-95% COMPACTION)*
NOTE: FOR ELLIPTICAL AND ARCH PIPE, D SHALL REPRESENT HORIZONTAL SPAN OF PIPE.
PIPE DIAMETER, D
TABLE 1: BACKFILL AND EMBEDMENT MATERIALS
SOIL CLASSIFICATIONS (AS DEFINED IN ASTM D2487 AND D2321)
CLASS I CRUSHED ROCK ANGULAR (CLEAN).
CLASS II GRAVEL AND/OR SANDS, WITH LITTLE OR NO FINES.
CLASS III SAND/SILT AND SAND/CLAY MIXTURES.
CLASS IV INORGANIC CLAYS
CLASS V ORGANIC SILTS, CLAYS, AND PEATS.
SOIL CLASSIFICATIONS (AS DEFINED IN ASCE 15-98)
CATEGORY I GRAVELLY SAND
CATEGORY II SANDY SILT
CATEGORY III SILTY CLAY
*SEE TABLE 1 FOR SPECIFICATIONS ON SOIL MATERIALS
** D = PIPE DIAMETER
*** MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TO TOP OF RIGID
PAVEMENT.
INITIAL BACKFILL
12" MIN.
MI
N
I
M
U
M
C
O
V
E
R
T
O
F
L
E
X
I
B
L
E
P
A
V
E
M
E
N
T
MI
N
I
M
U
M
C
O
V
E
R
T
O
R
I
G
I
D
P
A
V
E
M
E
N
T
Page 43 of 63
R/W
R/W
R/W
R/W
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/
L
P/L
P/L
P/
L
P/
L
P/
L
P/
L
P
/
L
13
13
13
13
13
149TH
S
T
R
E
E
T
W
E
S
T
Public
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
R/W
R/W CO
CO
DO NOT ENTER
WM
CO
CO
CO
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
INST PS LED LIGHT BAR
MH: 10
4M BLS
MH: 20
4M BLS
MH: 20
4M BLS
MH: 20
4M BLS
MH: 20
4M BLS
MH: 20
4M BLS
MH: 20
0.0
0.0 0.0 0.0 0.1 0.1
0.0 0.7 1.0
0.0 1.8 0.9 0.6
0.1 0.5 0.2 0.1
0.1 0.2
0.1 0.5
0.1 0.3
0.1 0.2
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.1
0.1 0.0
0.1 0.0
0.1 0.0
0.1 0.0
0.1 0.0
0.1 0.0
0.1 0.0
0.1 0.1
0.1 0.1
0.1 0.2
0.1 0.2
0.2 0.3
0.2 0.3
0.3 0.2
0.1 0.2
0.0 0.1 0.2
0.0 0.3
0.0 0.3
0.0 0.0 0.4
0.1 0.5
0.1 0.2 0.5
0.2 0.3
0.1 0.2 0.2
0.2 0.1
0.1 0.2 0.1
0.1 0.1 0.0
0.0 0.0
0.0 0.0 0.0
0.0 0.0
0.0 0.0
0.3
1.1 1.2 1.2 1.3 1.5
2.6 2.6 2.9 2.8 2.6 3.2 3.5 3.8
3.3 3.3 3.6 3.6 3.8 4.1 3.8 3.4 3.7
4.1 3.6 4.1 3.9 4.5 4.5 4.1 4.1 3.8 3.2
4.4 3.6 4.3 4.0 5.1 6.1 4.4 3.6 3.5 3.2
3.6 3.8 4.0 4.2 6.5 15.5 5.6 3.2 3.2 2.5
3.4 3.8 3.7 3.9 6.5 10.4 4.3
4.2 6.4 2.8 2.5 5.8 11.5 3.5
6.9 10.7 2.5 1.7 4.8 10.4 3.2
5.0 8.5 2.6 1.6 4.2 10.1 3.4
5.8 9.8 2.6 1.5 4.9 12.8 3.2
6.5 9.5 2.4 1.5 4.2 8.4 3.1
5.8 8.1 2.6 1.5 5.0 13.3 3.1
5.6 13.0 2.9 1.5 4.1 7.7 2.8
4.5 6.8 2.4 1.5 4.6 12.3 3.2
7.6 10.9 2.3 1.4 4.0 9.8 3.0
4.9 8.7 2.7 1.3 3.1 9.1 2.9
5.4 10.4 2.6 1.2 2.2 3.2 1.8
5.1 9.5 2.7 1.3 3.8 12.2 3.1
5.6 9.1 2.6 1.2 2.3 5.1 2.7 1.5 1.3 1.5
6.3 11.4 2.3 0.9 1.1 1.7 2.4 3.0 2.8 3.0
3.3 3.8 1.5 0.7 0.8 1.5 2.7 3.3 3.4 3.4
2.6 2.4 1.9 1.2 0.8 0.8 1.5 2.6 3.3 3.9 3.4
2.0 3.4 3.4 3.0 2.0 1.2 1.0 1.5 2.6 3.3 3.9 3.4 2.7
1.0 4.1 3.6 3.9 3.7 2.7 1.4 1.0 1.6 2.6 3.3 3.5 3.4 2.2
1.9 4.0 3.8 4.3 3.6 2.7 1.5 1.1 1.4 2.3 3.0 3.0 3.0 1.9
0.4 2.8 3.7 4.6 4.7 4.3 3.0 1.7 1.3 1.3 1.7 1.8 1.7 1.8 1.2
0.1 0.9 2.9 3.5 4.7 5.7 5.1 3.5 2.5 1.8 1.5 1.6 1.8 1.8 1.6 1.5
1.6 2.8 4.7 5.7 4.9 3.8 3.1 2.7 2.1 2.1 2.9 3.2 2.8 2.8
2.0 4.2 4.4 4.4 4.4 3.6 3.4 2.6 2.5 3.1 3.5 3.4 3.4
4.0 3.9 3.7 3.6 3.3 2.3 2.3 2.9 3.6 3.5 4.1
4.0 3.4 2.4 1.7 2.2 2.9 3.7 3.4 4.4
2.4 1.8 1.3 2.2 3.1 3.4 3.3 3.4
0.9 1.5 2.5 2.8 2.9
0.8 1.0 1.2
0.3 0.4
Luminaire Schedule
Symbol Qty Label Arrangement Description Tag LLF Luminaire
Lumens
Luminaire
Watts
Total
Watts
Mounting Height
16 INST PS LED LIGHT BAR SINGLE GPX6-SO 1.000 3600 104 1664
6 4M BLS SINGLE OSQ-ML-B-DA + OSQM-B-16L-40K7-
4M BLS (Back Light Shield)-UL-
NM-BK-PML-20KV
1.000 12350 104 624
GRAPHIC SCALE (IN FEET)
1 in. = 30 ft.
030 30 60
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
P
L
A
N
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
C
8
0
_
P
H
O
T
O
M
E
T
R
I
C
.
d
w
g
-
5/
6
/
2
0
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
I hereby certify that this plan, speci- fication,or report was prepared by me or under mydirect supervision and that I am a duly
Licensed Professional Engineer under the
laws of the State of Minnesota.
Print Name:
Signature:
Date:Registration No.
Jeffrey Alan Tibbitts
42586
C8.0
PHOTOMETRIC PLAN
NOT FOR CONSTRUCTION
04/24/2025
CG
MRM
SEE SHEET
766009
FINISH GRADE
8'
-
0
"
M
I
N
A
N
D
D
O
W
N
TO
S
O
L
I
D
B
E
A
R
I
N
G
4" X 6" GASKETED HAND HOLE
CYLINDRICAL FORMED CONCRETE BASE 2'-0"
DIAMETER PAINTED SAFETY YELLOW.
4 - 40" X 1"Ø ANCHOR BOLTS
#3 REINFORCING TIES 12" ON CENTER
(TYPICAL FOR THREE)
#5 BARE GROUND WIRE
CADWELD CONNECTION (BOTH ENDS)
3/4" X 10' COPPER WELD GROUND ROD
(LIGHTNING PROTECTION)
PVC - SCHEDULE 40 CONDUIT
(PROVIDE SCHEDULE 80 UNDER
HEAVY TRAFFIC AREAS)
GALVANIZED STEEL TO PVC
CONDUIT CONNECTOR
GALVANIZED CONDUIT 90° ANGLE
4 - #8 STEEL VERTICAL REINFORCING BARS
2'-0" DIA.
CONCRETE
BASE
3" COVER
2'
-
0
"
2'
-
0
"
1" x 45° CHAMFER
ELECTRICAL CONTRACTOR
TO CONNECT OR CADWELD
GROUND WIRE TO POLE BASE
LIGHT POLE BASE
NTS
Page 44 of 63
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
P
/
L
P/
L
P
/
L
P/
L
P/LP/LP/LP/LP/LP/L
P/L
R
/
W
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
BM #1
BM #2
G
G
G
G
G
G
U
G
E
U
G
E
U
G
E
U
G
E
F
O
F
O
F
O
F
O
F
O
G
G
G
U
G
E
F
O
U
G
T
UG
T
UG
T
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SAN
R/
W
STM STM STM
STM
STM STM
S
T
M
S
T
M
S
T
M
S
T
M
S
T
M
STM
STM
UGE
UGE
UGE UGE UGE UGE UGE UGE
UG
E
UGT
UGT
UGT
UGT UGT UGT UGT UGT
UGT
UG
T
W
W
W
W
W W W
GAS
GAS
GAS
GAS GAS GAS GAS GAS
GA
S
SAN
SAN SAN SANCO CO
T P
A
D
DO
N
O
T
E
N
T
E
R
S
S
D
STM
WM
STM
STM STMD
DS DS DS DS
CO
SANSANSA
N
COCOCO
D
S
A
N
SAN
D D.S.D.S.D.S.D.S.
WASH BAY
101
A:3,204 SQ. FT.
EQMT. RM.
103
A:1,163 SQ. FT.
CONTROL
102
A:181 SQ. FT.
R.R.
103
A: 50 SQ. FT.
9
5
4
954
95
4
954954
9
5
4
95
6
95
6
95
6
954 954
95
6
956
95
6
9
5
4
954
956
956956956
95
6
956
95695
6
956956
3
0
'
F
R
O
N
T
Y
A
R
D
S
E
T
B
A
C
K
1
0
'
R
E
A
R
Y
A
R
D
S
E
T
B
A
C
K
10' SIDE YARD SETBACK
10' SIDE YARD SETBACK
27
10
10
20
4
7
24
30
5
34
12
5' DRAINAGE AND UTILITY EASEMENT
5' DRAINAGE AND UTILITY EASEMENT
1
0
'
D
R
A
I
N
A
G
E
A
N
D
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
9
LANDSCAPE REQUIREMENTS
OVERSTORY TREE REQUIREMENTS
1) 1 OVER STORY TREE PER 3,000 SF OF TOTAL LANDSCAPE AREA
*50% OF THE TOTAL REQUIRED OVER STORY TREES SHALL BE DEC.
TOTAL SITE AREA- 1.43 AC ( 62,290 SF)
TOTAL LANDSCAPE AREA: 29,033 SF
OVER STORY TREES REQUIRED: 10
OVER STORY TREES PROPOSED: 10
PERIMETER LANDSCAPE REQUIREMENTS
2) 50 LF MAX SPACING ALONG PERIMETER OF SITE ADJACENT TO ROADWAY
*SHALL BE A SHADE TREE OR FLOWERING TREE
(NORTH) 149TH ST W
TREES REQUIRED: 5 (245 LF/50')
TREES PROPOSED: 5
(SOUTH) 150TH STREET W
TREES REQUIRED: 3 (165 LF/50')
TREES PROPOSED: 3
FOUNDATION LANDSCAPE REQUIREMENTS
3) 1 LF OF FOUNDATION PLANTING PER 10 LF OF BUILDING PERIMETER
*SHRUBS & GROUNDCOVER PLANTING
TOTAL BUILDING PERIMETER- 336 LF
FOUNDATION PLANTING REQUIRED: 34 LF
FOUNDATION PLANTING PROPOSED: 129 LF
PARKING LOT LANDSCAPE REQUIREMENTS
1) MIN 10% OF THE PARKING AREA SHALL BE LANDSCAPED
TOTAL PARKING AREA- 22,511 SF
PARKING LANDSCAPE AREA REQUIRED- 2,251 SF
PARKING LANDSCAPE AREA PROPOSED- 2,399 SF
2) 1 TREE PER 10 PARKING SPACES
*REMAINING AREA SHALL BE LANDSCAPED WITH SHRUBS & GROUNDCOVER NOT TO EXCEED 2' HEIGHT
TOTAL PARKING SPACES - 22
TREES REQUIRED: 2
TREES PROPOSED: 2
LANDSCAPE SCREENING REQUIREMENTS
ENTERING STACKING AREA REQUIRED
90% SCREENING @ 6' HEIGHT
TREES PROPOSED: 41 TREES (90% SCREENING )
EXITING AREA REQUIRED
50% SCREENING @ 4' HEIGHT
SHRUBS PROPOSED: 55 SHRUBS (50% SCREENING)
LEGEND
RIGHT-OF-WAY
PROPERTY LINE
SETBACK
EASEMENT
BUILDING
CONCRETE CURB
PAVEMENT/WALK
SIGN
CATCH BASIN
STORM MANHOLE
SANITARY MANHOLE
FIRE HYDRANT
LIGHT POLE
R/W
P/L
D
S
MINOR EXISTING CONTOUR
100
102
MAJOR EXISTING CONTOUR
960
962
MAJOR ENGINEERED CONTOUR
MINOR ENGINEERED CONTOUR
SYMBOL QTY BOTANICAL / COMMON NAME SIZE MIN HT / SPR SPACING
TREES
7 ACER RUBRUM
RED MAPLE 2.5" CAL 10-12` HT AS SHOWN
8 GINKGO BILOBA 'PRINCETON SENTRY'
PRINCETON SENTRY MAIDENHAIR TREE 2.5" CAL 10-12` HT AS SHOWN
14 JUNIPERUS VIRGINIANA
EASTERN REDCEDAR ---8-10` HT 10`-0" OC
16 PICEA GLAUCA
WHITE SPRUCE ---10` HT 10`-0" OC
5 SYRINGA RETICULATA `IVORY SILK`
IVORY SILK JAPANESE TREE LILAC 2" CAL 6` HT AS SHOWN
11 THUJA OCCIDENTALIS 'SMARAGD'
EMERALD GREEN ARBORVITAE ---8-10` HT 8`-0" OC
PLANT SCHEDULE
SHRUBS
97 ILEX GLABRA
INKBERRY HOLLY ---24" HT 4`-0" OC
56 JUNIPERUS CHINENSIS 'SEA GREEN'
SEA GREEN JUNIPER ---24" HT 4`-0" OC
40 PINUS MUGO 'COMPACTA'
DWARF MUGO PINE ---24" HT 4`-0" OC
18 SPIRAEA X BUMALDA `LITTLE PRINCESS`
LITTLE PRINCESS SPIREA ---18" HT 4`-0" OC
32 TAXUS X MEDIA 'HICKSII'
HICKS ANGLO-JAPANESE YEW ---36" HT 4`-0" OC
GROUND COVERS
26 COTONEASTER DAMMERI 'EICHHOLZ'
EICHHOLZ COTONEASTER ---3 GAL 3`-0" OC
166 LIRIOPE MUSCARI 'VARIEGATA'
VARIEGATED LILYTURF ---1 GAL 2`-0" OC
SOD/SEED
21,013 SF POA PRATENSIS
KENTUCKY BLUEGRASS SOD
MULCH
NUMBER INDICATED ON HATCH THROUGHOUT THE DRAWING
REFLECTS THE NUMBER OF PLANTS IN THAT PARTICULAR AREA
25
GRAPHIC SCALE (IN FEET)
1 in. = 20 ft.
020 20 40
CODED NOTES:
1.PROPOSED 4,507 SF BUILDING
2.PROPOSED TRASH ENCLOSURE PER LOCAL REQUIREMENTS
3.ADA ACCESSIBLE PARKING SPACE WITH SIGNAGE
4.PROPOSED DIRECTIONAL ARROW
5.PROPOSED LIGHT POLE
6.PROPOSED VACUUMS MOTOR
7.PROPOSED VACUUM MOTOR/EQUIPMENT ENCLOSURE
8.PROPOSED SIGN TO BE DESIGNED BY OTHERS
9.PROPOSED FOOTER AND WAIT/STOP SIGNAGE
10.PROPOSED PARKING TO BE USED FOR FUTURE VACUUM EXPANSION
11.PROPOSED 6" CONCRETE BOLLARD
12.PROPOSED PAVED AREA FOR SNOW STORAGE
13.PROPOSED STOP BAR AND STOP SIGN
L1.0
LANDSCAPE PLAN
NOT FOR CONSTRUCTION
04/30/2025
JL
JC
SEE SHEET
766009
FORTY-EIGHT (48) HOURS
BEFORE DIGGING IS TO
COMMENCE, THE CONTRACTORS
SHALL NOTIFY THE FOLLOWING
AGENCIES: MINNESOTA UTILITIES
PROTECTION SERVICE AT 811 OR
800-252-1166 AND ALL OTHER
AGENCIES WHICH MIGHT HAVE
UNDERGROUND UTILITIES
INVOLVING THIS PROJECT AND
ARE NONMEMBERS OF STATE
UTILITIES PROTECTION SERVICE
2
3
10
12
13
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
6
-
L
A
_
P
L
A
N
\
_
C
D
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
L
1
.
0
_
L
A
N
D
S
C
A
P
E
P
L
A
N
.
d
w
g
-
5/
1
2
/
2
0
2
5
-
Je
f
f
L
a
p
e
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
1
7
7
10
11
3
11
12
6
9
7
6
6
4
2025-05-09
12
Page 45 of 63
L1.1
LANDSCAPE DETAILS
& NOTES
NOT FOR CONSTRUCTION
04/30/2025
JL
JC
SEE SHEET
766009
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
6
-
L
A
_
P
L
A
N
\
_
C
D
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
L
1
.
0
_
L
A
N
D
S
C
A
P
E
P
L
A
N
.
d
w
g
-
5/
1
2
/
2
0
2
5
-
Je
f
f
L
a
p
e
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
EQ
U
A
L
EQU
A
L
EQUAL
GROUND COVER SPACING
N.T.S.
EVERGREEN / DECIDUOUS SHRUB
N.T.S.N.T.S.N.T.S.
AND RECOMPACT
SCARIFY 4" DEEP
6"
FINISH GRADE
6"
NOTE: LOCATE TOP OF
ROOTBALL A MINIMUM OF 1"
ABOVE ADJACENT FINISH
GRADE.
TRENCH EDGING
N.T.S.
EVERGREEN TREE STAKING
12"
FINISH GRADE
12"
DECIDUOUS TREE STAKING N.T.S.
FINISH GRADE
3"
GRASS
3"4"
7"
NOTE: USE TRENCH DETAIL ON ALL PLANTING
BEDS TRANSITIONING TO TURF AREAS
MULCH OF PLANT BED
ALL GROUND COVER SHALL BE PLANTED AT
EQUAL TRIANGULAR SPACING PER ON CENTER
SPACING AS SPECIFIED ON PLANTING PLAN.
LOCATE GROUND COVER ONE HALF OF SPECIFIED
SPACING DISTANCE FROM ANY CURB, SIDEWALK, OR
OTHER HARD SURFACE, UNLESS OTHERWISE NOTED.
1 3/4"x1 3/4"X18" WOOD STAKE DRIVEN
APPROXIMATELY 15-16" BELOW
UNDISTURBED SOIL.
NOTE: WHEN USING THE HOSE &
WIRE METHOD, AS SHOWN, MAKE
THE LENGTH OF HOSE LARGER
THAN THE TRUNKS
CIRCUMFERENCE.
NOTE: LOCATE TOP OF
ROOTBALL A MINIMUM OF 1"
ABOVE ADJACENT FINISH
GRADE.
ROLL BACK TOP 1/3 OF
BURLAP FROM ROOTBALL
PRIOR TO BACKFILLING.
FORM BARK MULCH IN 3" HT.
CIRCULAR SAUCER. SAUCER
SHALL BE SOAKED WITH WATER
AFTER PLANTING.
3/4" WIDTH PLASTIC TREE TIE
CHAINLOCK #4 OR APPROVED EQUAL
SCARIFY 4" DEEP
AND RECOMPACT
BACKFILL WITH TOP SOIL
AS PER SPEC.
FORM MULCH IN 3" HT.
CIRCULAR SAUCER. SAUCER
SHALL BE SOAKED WITH WATER
AFTER PLANTING.
BACKFILL WITH TOP SOIL
AS PER SPEC.
NOTE: WHEN USING THE HOSE &
WIRE METHOD, AS SHOWN, MAKE
THE LENGTH OF HOSE LARGER
THAN THE TRUNK
CIRCUMFERENCE.
LOCATE TOP OF ROOTBALL A
MINIMUM OF 1" ABOVE
ADJACENT FINISH GRADE.
1 3/4"x1 3/4"X18" WOOD STAKE DRIVEN
APPROXIMATELY 15-16" BELOW
UNDISTURBED SOIL.
BACKFILL WITH TOP SOIL
AS PER SPEC.
REMOVE BURLAP AND
WIRE BASKET FROM
ROOTBALL PRIOR TO
BACKFILLING.
FORM MULCH IN 3" HT. CIRCULAR
SAUCER. SAUCER SHALL BE
SOAKED WITH WATER AFTER
PLANTING.
DO NOT CUT
MAIN LEADER
SCARIFY 4" DEEP
AND RECOMPACT
3 TIMES ROOTBALL
DIAMETER. MINIMUM 4 1/2
FT WIDTH.
3/4" WIDTH PLASTIC TREE TIE
CHAINLOCK #4 OR APPROVED EQUAL
1.CONTRACTOR TO VERIFY WITH OWNER AND UTILITY COMPANIES THE LOCATIONS OF ALL
UTILITIES PRIOR TO CONSTRUCTION, TO DETERMINE IN THE FIELD THE ACTUAL LOCATIONS
AND ELEVATIONS OF ALL EXISTING UTILITIES, WHETHER SHOWN ON THE PLANS OR NOT. THE
CONTRACTOR SHALL CALL UTILITY LOCATE SERVICE 72 HOURS PRIOR TO CONSTRUCTION.
2.SITE CONDITIONS BASED UPON SURVEY PROVIDED BY OWNER. CONTRACTOR TO FIELD
VERIFY EXISTING CONDITIONS BY DETAILED INSPECTION PRIOR TO SUBMITTING BID AND
BEGINNING CONSTRUCTION.
3.REFER TO SITE CIVIL DRAWINGS FOR ADDITIONAL REQUIREMENTS AND COORDINATE WORK
WITH OTHER SITE RELATED DEVELOPMENT DRAWING AS NEEDED.
4.REESTABLISH EXISTING TURF IN AREAS DISTURBED BY GRADING OR UTILITY TRENCHING,
INCLUDING AREAS IN RIGHT-OF-WAY, TO MATCH EXISTING SPECIES.
5.CONTRACTOR SHALL EXAMINE FINISH SURFACE, GRADES, TOPSOIL QUALITY AND DEPTH. DO
NOT START ANY WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
VERIFY LIMITS OF WORK BEFORE STARTING.
6.CONTRACTOR TO REPORT ALL DAMAGES TO EXISTING CONDITIONS AND INCONSISTENCIES
WITH PLANS TO LANDSCAPE ARCHITECT.
7.CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE IN ALL LANDSCAPE BEDS AND ALL LAWN
AREAS.
8.CONTRACTOR TO FINE GRADE AND ROCK-HOUND ALL TURF AREAS PRIOR TO SEEDING, TO
PROVIDE A SMOOTH AND CONTINUAL SURFACE, FREE OF IRREGULARITIES (BUMPS OR
DEPRESSIONS) & EXTRANEOUS MATERIAL OR DEBRIS.
9.REMOVE EXISTING WEEDS FROM PROJECT SITE PRIOR TO THE ADDITION OF ORGANIC
AMENDMENTS AND FERTILIZER. APPLY AMENDMENTS AND FERTILIZER AS NEEDED.
10.QUANTITIES SHOWN ARE INTENDED TO ASSIST CONTRACTOR IN EVALUATING THEIR OWN
TAKE OFFS AND ARE NOT GUARANTEED AS ACCURATE REPRESENTATIONS OF REQUIRED
MATERIALS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS BID QUANTITIES AS
REQUIRED BY THE PLANS AND SPECIFICATIONS. IF THERE IS A DISCREPANCY BETWEEN THE
NUMBER LABELED ON THE PLANT LEGEND AND THE QUANTITY OF GRAPHIC SYMBOLS
SHOWN, THE GREATER QUANTITY SHALL GOVERN.
11.COORDINATE LANDSCAPE INSTALLATION WITH INSTALLATION OF UNDERGROUND SPRINKLER
AND DRAINAGE SYSTEMS.
12.ALL SIZES AND QUALITY OF PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS OF
THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014). THE LANDSCAPE
CONTRACTOR SHALL INSTALL ALL PLANT MATERIAL IN SIZE AS INDICATED IN THE PLANT
SCHEDULE UNLESS OTHERWISE SPECIFIED ON THE PLAN SET. ALL PLANTS THAT DO NOT
MEET THE SIZE AND SPECIFICATIONS SET FORTH BY THE AMERICAN STANDARD FOR
NURSERY STOCK WILL BE REJECTED BY LANDSCAPE ARCHITECT AT NO COST TO OWNER.
13.ONCE PROJECT IS AWARDED, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE TO
SECURE ALL PLANT MATERIAL IN THE SIZE SPECIFIED ON PLAN PRIOR TO INSTALLATION. IN
THE EVENT THE PLANT MATERIAL IS NOT AVAILABLE IN THE SIZE SPECIFIED, THE
CONTRACTOR SHALL INSTALL LARGER AT NO COST TO OWNER.
14.THE LANDSCAPE CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ALL PLANT
MATERIAL SUBSTITUTIONS FROM THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
PLANT SUBSTITUTIONS WITHOUT PRIOR WRITTEN APPROVAL THAT DO NOT COMPLY WITH
THE DRAWINGS AND SPECIFICATIONS MAY BE REJECTED BY THE LANDSCAPE ARCHITECT
AND REPLACED BY CONTRACTOR AT NO COST TO THE OWNER.
15.PRIOR TO MOBILIZATION THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT, IN
WRITING, IF HE/SHE BELIEVES ANY OF THE PLANT MATERIAL IDENTIFIED ON THE PLAN MAY
NOT BE SUITABLE FOR THE SITE OR MAY DIE. SUBSTITUTION REQUESTS WILL BE GRANTED
BY THE LANDSCAPE ARCHITECT PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. IF
NOTIFICATION IS NOT GIVEN TO THE LANDSCAPE ARCHITECT ALL PLANTING WHICH FAILS TO
GROW (EXCEPT FOR DEFECTS RESULTING FROM LACK OF ADEQUATE MAINTENANCE AS
DETERMINED BY THE OWNER, NEGLECT, OR VANDALISM) SHALL BE REPLACED BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
16.WHERE PROPOSED TREE LOCATIONS OCCUR UNDER EXISTING OVERHEAD UTILITIES OR
CROWD EXISTING TREES, NOTIFY LANDSCAPE ARCHITECT TO ADJUST TREE LOCATIONS.
17.ALL PLANT MASSES TO BE TOP DRESSED WITH MULCH AS SPECIFIED IN PLANT SCHEDULE,
SPREAD UNIFORMLY IN DEPTH OVER THE PLANTING BEDS AS DELINEATED ON THE PLANS
UNLESS OTHERWISE NOTED.
18.BED EDGE TO BE NO LESS THAN 12" AND NO MORE THAN 18" FROM OUTER EDGE OF PLANT
MATERIAL BRANCHING. WHERE GROUND-COVER OCCURS, PLANT TO LIMITS OF AREA AS
SHOWN.
19.ALL PLANTS SHALL BE GUARANTEED FOR 1 YEAR AFTER SUBSTANTIAL COMPLETION OCCURS
AND FINAL ACCEPTANCE BY OWNER.
20.LANDSCAPE MAINTENANCE PERIOD BEGINS IMMEDIATELY AFTER THE COMPLETION OF ALL
PLANTING OPERATIONS AND WRITTEN ACCEPTANCE FROM THE OWNER AND LANDSCAPE
ARCHITECT. MAINTAIN TREES, SHRUBS, LAWNS, AND OTHER PLANTS AS PER THE PROJECT
MANUAL AND/OR WRITTEN SPECIFICATIONS, IF APPLICABLE. LANDSCAPE MAINTENANCE IS
THE LANDSCAPING CONTRACTORS RESPONSIBILITY UNTIL FINAL ACCEPTANCE BY THE
OWNER.
21.ALL LANDSCAPE MAINTENANCE SHALL BE IN ACCORDANCE WITH LOCAL GOVERNING
STANDARDS.
22.REFER TO PROJECT MANUAL OR WRITTEN SPECIFICATIONS, IF AVAILABLE, FOR ADDITIONAL
REQUIREMENTS.
1. THE LANDSCAPE CONTRACTOR SHALL FURNISH FROM THEIR SOURCE A GOOD CLEAN, NATIVE SOIL
WHICH SHALL MEET THE APPROVAL OF THE OWNER'S REPRESENTATIVE. THIS SOIL SHALL BE USED
FOR THE PLANTING MIXTURE AS FOLLOWS:
A. ONE PART COMPOST/MANURE PLANTING MIX, TOPSOIL OR APPROVED EQUAL
B. ONE PART NATIVE SOIL
2. SOILS WITHIN PLANTING AREAS MUST BE SUITABLE FOR PROPOSED PLANTED MATERIAL & SOD WITH
REGARD TO: pH, SOIL TEXTURE, SOIL STRUCTURE, AND SEASONAL HIGH WATER TABLE. THE
CONTRACTOR SHALL ANALYZE EXISTING SOILS LOCATED IN PROXIMITY TO PROPOSED PLANT
MATERIAL AND BE RESPONSIBLE TO AMEND THE SOIL TO OBTAIN ESSENTIAL REQUIREMENTS
NECESSARY FOR THE ESTABLISHMENT AND GROWTH OF PLANT LIFE. LANDSCAPE CONTRACTOR TO
PROVIDE SOILS REPORT AND APPROPRIATE RECOMMENDATIONS PRIOR TO INSTALLATION TO
OWNER'S REPRESENTATIVE FOR REVIEW. FAILURE TO PROVIDE REPORT MAY RESULT IN PLANT
MATERIAL BEING REJECTED BY OWNER'S REPRESENTATIVE AND REPLACED AT NO COST TO OWNER.
3. THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE IN WRITING PRIOR
TO PLANTING, WHEN CONDITIONS DETRIMENTAL TO PLANT GROWTH ARE ENCOUNTERED, SUCH AS
RUBBLE FILL, POOR PLANTING SOIL, ADVERSE DRAINAGE CONDITIONS, OR OBSTRUCTIONS.
SOIL PLANTING MIXTURE (MIX ONSITE)
GENERAL NOTES: LANDSCAPE PLAN
21 3
54
2025-05-09
Page 46 of 63
DO
N
O
T
E
N
T
E
R
WM
D.S.D.S.D.S.D.S.
WASH BAY
101
A:3,204 SQ. FT.
EQMT. RM.
103
A:1,163 SQ. FT.
CONTROL
102
A:181 SQ. FT.
R.R.
103
A: 50 SQ. FT.
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
P/L P/L P/L P/L P/L P/L P/L P/L P/L P/L
P
/
L
P
/
L
P
/
L
P
/
L
P/LP/LP/LP/LP/LP/L
P/L
R
/
W
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
BM #2
UG
T
U
G
T
U
G
T
R
/
W
BF
MV
FS
1212
12 12
8
8
81212
1210
12
10
10
10
10
8
8
8
10
10
12
L
R
L
R
L
12
10
10
8
12
15 15
15
12
15
15
12 8 LR
8
12
R
10 10
10
R
L
R
10 10 12 12
12
15
15 15
15
8
10
12
10
12
12
12
12
12
12
12
10
8
8
15
15 12
15
15
15
12
10
1215
L
R
L
R
L
R
L
R
L
R
L
8
8
8
10
8
15 15
15
15 15
15 15
15 12 12
12 12 15
15
15
15
15
15 15 12
15 15 15 15
10
10
10
12
12
15
15
10
10
12
88
88
15 15 15
8
8 1512
8
R
12
8
888
8 8
8
128
8
15
R
L
R
L
R
L
R
L
R
L
8
1210
10
121515
15 12 10
15
15
15
15
15
15
15
15
15
15151515151515
151515
1515
15
12
12
15 15 15 15 15 15 15 15
15 15 15 15 15 15 15
15
1515
15
8
10
10
10
15
15
10 12
10
8
8
8
8
C RS8
8
10
10
12
12
12
12
12
10
10
8
10
8
88
R
L
1
27.0112"
2
18.61"
3
25.9112"
6
29.7112"
7
10.41"
8
28.3112"
9
29.8112"
10
29.6112"
12
4.521"
13
25.4112"
14
28.9112"
15
26.6112"
2 3
4
1
6 7 8
9
10
111213
14
158
8
15
15
8
15
10
8 15
88
8
8
8
88
11
28.7112"
5
15.11"
5
4
5.971"
R
L RL
R
F3.70, TQ2.78, H1.85, Q.92
F2.60, TQ1.95, H1.3, Q.65
F1.58, H.79, Q.39
F1.05, H.52, Q.26
.61, 1.21
GPMSYMBOLMANUFACTURER/MODEL/DESCRIPTION PSI
RAIN BIRD 1804-PRS 15 STRIP SERIES 30
RAIN BIRD 1804-PRS 8 SERIES MPR 30
RAIN BIRD 1804-PRS 10 SERIES MPR 30
RAIN BIRD 1804-PRS 12 SERIES MPR 30
RAIN BIRD 1804-PRS 15 SERIES MPR 30
SYMBOL MANUFACTURER/MODEL/DESCRIPTION
XERIGATION COMMERCIAL CONTROL ZONE KIT
GPM 0.2-15 MFG.: 1" RAINBIRD VALVE (MODEL: XCZ-100-PRB-FLOW)
GPM 15-40 MFG.: 1 1/2" RAINBIRD VALVE (MODEL: XCZ-150-PRB-FLOW)
USE PSI-M30X REGULATOR FOR FLOWS EXCEEDING 5 GPM
AREA TO RECEIVE DRIPLINE
SHRUB ZONE
RAIN BIRD XFS-06-18 - XFS SUB-SURFACE PRESSURE COMPENSATING
DRIPLINE. 0.6 GPH EMITTERS AT 18" O.C. LATERALS SPACED AT 18"
APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN.
EST CST SSTRCSLCS
E L R C S
FHTQ
8 8 8 8
Q T H F
10 10 10 10
Q TQ FHT
12 12 12 12 12
Q TQ FHT
15 15 15 15 15
IRRIGATION_SCHEDULE
LEGEND
RIGHT OF WAY LINE
LOT LINE
R/W
PROPERTY BOUNDARY LINE
PROPOSED CONCRETE
SIDEWALK
SYMBOL MANUFACTURER/MODEL/DESCRIPTION
REMOTE CONTROL VALVE
RAIN BIRD PEB-PRS-D
GPM 0-20 MFG.: 1" RAINBIRD VALVE (MODEL: 100-PEB-PRS-D)
GPM 20-50 MFG.: 1 1/2" RAINBIRD VALVE (MODEL: 150-PEB-PRS-D)
STAINLESS STEEL BALL VALVE
LEEMCO LBT-XX-SS
MASTER VALVE 1"
RAIN BIRD EFB-CP-PRS-D- 1-1/2"-BRASS
BFP-REDUCED PRESSURE ASSEMBLY 1"
ZURN 950XL
RAIN BIRD ESP4ME3
13 STATION TRADITIONALLY-WIRED, COMMERCIAL CONTROLLER.
TO BE LOCATED INSIDE BUILDING IN APPROXIMATE LOCATION AS
SHOWN. COORDINATE FINAL LOCATION WITH OWNER'S
REPRESENTATIVE.
WIRELESS RAIN/FREEZE SENSOR
RAIN BIRD WR2-RFC - TO BE INSTALLED ON ROOF GUTTER.
COORDINATE FINAL LOCATION WITH OWNER'S REPRESENTATIVE
PRIOR TO INSTALLATION.
FLOW SENSOR
RAIN BIRD FS-200-P- 2IN. PLASTIC PVC MODEL. SUGGESTED
OPERATING RANGE 10.0 GPM TO 200.0 GPM. SIZE FOR FLOW NOT
ACCORDING TO PIPE SIZE.
IRRIGATION LATERAL LINE: PVC CLASS 200 SDR 21
LATERAL FLOW CHART
3/4" = 0-10 GPM
1" = 11-16 GPM
1 1/4" = 17-26 GPM
1 1/2" = 27-35 GPM
2" = 35-55 GPM
IRRIGATION MAINLINE: PVC CLASS 200 SDR 21
PIPE SLEEVE: PVC SCHEDULE 40
MV
BF
C
RS
FS
PIPE SLEEVE: PVC SCHEDULE 40
ALL ROADWAY MAINLINE CROSSINGS SHALL HAVE (1) 4" SLEEVE WITH
(2) 2" SLEEVES. ALL OTHER SLEEVES TO BE 3" UNLESS OTHERWISE
NOTED. CONTRACTOR TO PROVIDE ANY NECESSARY SLEEVING UNDER
PAVEMENT NOT SHOWN IN PLANS
Valve Number
Valve Flow
Valve Size
Valve Callout
#
##"
GENERAL NOTES:
1.IRRIGATION SYSTEM DESIGN BASED ON 30 GPM AND 70 PSI.
2.IRRIGATION DESIGN IS FROM THE POINT OF CONNECTION (POC) ONLY. THE
DESIGN IS BASED ON GALLONS PER MINUTE (GPM) AND POUNDS PER SQUARE
INCH (PSI) AS FURNISHED BY OTHERS.
3.IRRIGATION CONTRACTOR TO VERIFY POINT OF CONNECTION IN THE FIELD
AND CONFIRM MINIMUM DISCHARGE REQUIRED AT POINT OF CONNECTION AS
REQUIRED BY PROPOSED IRRIGATION EQUIPMENT PRIOR TO INSTALLATION.
CONTACT OWNER'S REPRESENTATIVE WITH ANY DISCREPANCIES
IMMEDIATELY BEFORE INSTALLATION.
4.THE PRESSURE REQUIREMENT AT THE POINT OF CONNECTION IS BASED ON
NO MORE THAN 5 FEET OF ELEVATION CHANGE IN THE AREAS OF IRRIGATION.
5.DETAILED AS-BUILTS WILL BE REQUIRED UPON COMPLETION OF PROJECT.
AS-BUILTS TO INCLUDE ALL DECODER ADDRESSES AS WELL AS GPS
LOCATIONS OF EACH VALVE BOX. SEE DETAIL SHEET FOR FURTHER
INFORMATION
6.CONTRACTOR TO USE CONTINUOUS RUNS FOR ALL PROPOSED CONTROL
WIRES. IF NECESSARY, LOCATE ALL WIRE SPLICES IN VALVE BOX. BUNDLE
WIRES IN VALVE BOX WITH MINIMUM 24" OF EXCESS CABLE PER BUNDLE. ALL
SPLICES MUST BE WATERPROOF WITH 3M DBY/DBR-6 CONNECTORS.
7.ALL MATERIAL USED SHALL BE INSTALLED AS PER PLAN AND AS PER
MANUFACTURER'S SPECIFICATIONS. ALL DEVIATIONS FROM DRAWINGS OR
MATERIALS SHALL BE APPROVED BY THE OWNER OR LANDSCAPE ARCHITECT.
8.PIPE LAYOUT AND VALVE LOCATION IS DIAGRAMMATIC. VALVES AND PIPES
SHOWN IN BUILDING, PAVED AREAS OR UNDERNEATH EXISTING TREE DRIP
LINES ARE FOR GRAPHIC CLARITY ONLY. ALL VALVES AND MAINLINE SHALL BE
INSTALLED WITHIN LANDSCAPE AREAS BETWEEN RIGHT-OF-WAY AND
PROPERTY LINE. LOCATION OF IRRIGATION COMPONENTS SHOWN ON
DRAWING IS APPROXIMATE. ACTUAL PLACEMENT MAY VARY SLIGHTLY AS
REQUIRED TO ACHIEVE FULL, EVEN COVERAGE AND/OR TO AVOID CONFLICTS
WITH UTILITIES AND/OR EXISTING TREE ROOTS. CONTRACTOR TO REFERENCE
PLANTING PLANS FOR EXISTING TREE INFORMATION AS APPLICABLE.
9.CONTRACTOR TO PROVIDE ANY STAKING NECESSARY FOR PROPERTY LINES,
EASEMENT LINES, ETC. TO INSTALL PLANTING AND IRRIGATION AS PER PLANS
10.LOCATE VALVES AND VALVE BOXES IN SHRUB BED WHENEVER POSSIBLE. IF
NECESSARY TO LOCATE IN LAWN, LOCATE A MINIMUM OF 36" AWAY FROM
PLANTER BED EDGE.
11.SEE DETAIL SHEET LS 3.1 & LS 3.2 FOR FURTHER IRRIGATION NOTES &
DETAILS
DRIP IRRIGATION NOTES:
1.ALL 1/2" POLY TUBING TO BE SECURED BY RAINBIRD EASY FIT
COMPRESSION FITTINGS
2.1/4" TUBING NOT TO EXCEED 5 LF, RAINBIRD MODEL PT-025. 1/4" BARB
TRANSFER FITTINGS TO BE RAINBIRD
3.INSTALL ONE RAINBIRD XERI-SPRAY (MODEL XS-90) ON 12" POLY FLEX
RISER ON EACH DRIP ZONE FOR USUAL INSPECTION OF SYSTEM.
INSTALL 3' FROM VALVE BOX, ABOVE GRADE MINIMUM 5' FROM
PAVEMENT EDGE.
4.EMITTER SCHEDULE - 2.5" CALIPER TREES (PLANTING BEDS ONLY) - 14
GPH; SHRUB - 5 GPH; GROUNDCOVER - 1 GPH.
NOTE: NO MAINLINE SHALL BE INSTALLED IN RIGHT OF WAY.
CONTRACTOR TO LIMIT THE AMOUNT OF LATERALS WITHIN RIGHT
OF WAY AT ALL TIMES.
NOTE: EASEMENT LINES HAVE BEEN REMOVED FROM
IRRIGATION PLAN FOR GRAPHICAL CLARITY. REFER TO
PLANTING AND SITE PLAN FOR EASEMENT LINE AND LOCATION.
NOTE: PIPE LAYOUT IS DIAGRAMMATIC. VALVES, LATERALS,
AND MAINLINE SHOWN IN BUILDING, RETAINING WALLS, OR
PAVED AREAS ARE FOR GRAPHIC CLARITY ONLY. ALL VALVES
AND MAINLINE SHALL BE INSTALLED WITHIN LANDSCAPE ARE
BETWEEN CURB AND PROPERTY LINE.
GRAPHIC SCALE (IN FEET)
1 in. = 20 ft.
020 20 40
L2.0
IRRIGATION PLAN
NOT FOR CONSTRUCTION
04/30/2025
JL
JC
SEE SHEET
766009
FORTY-EIGHT (48) HOURS
BEFORE DIGGING IS TO
COMMENCE, THE CONTRACTORS
SHALL NOTIFY THE FOLLOWING
AGENCIES: MINNESOTA UTILITIES
PROTECTION SERVICE AT 811 OR
800-252-1166 AND ALL OTHER
AGENCIES WHICH MIGHT HAVE
UNDERGROUND UTILITIES
INVOLVING THIS PROJECT AND
ARE NONMEMBERS OF STATE
UTILITIES PROTECTION SERVICE
6'
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
6
-
L
A
_
P
L
A
N
\
_
C
D
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
L
3
.
0
_
I
R
R
I
G
A
T
I
O
N
P
L
A
N
.
d
w
g
-
5/
1
2
/
2
0
2
5
-
Je
f
f
L
a
p
e
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
2025-05-09
Page 47 of 63
L2.1
IRRIGATION DETAILS &
NOTES
NOT FOR CONSTRUCTION
04/30/2025
JL
JC
SEE SHEET
766009
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
6
-
L
A
_
P
L
A
N
\
_
C
D
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
L
3
.
0
_
I
R
R
I
G
A
T
I
O
N
P
L
A
N
.
d
w
g
-
5/
1
2
/
2
0
2
5
-
Je
f
f
L
a
p
e
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
N.T.S.
N.T.S.
N.T.S.N.T.S.N.T.S.
N.T.S.N.T.S.N.T.S.
QUICK COUPLER VALVE
6" AND 12" POP-UP SPRINKLER HEAD
N.T.S.
ROTARY POP-UP SPRINKLER
MAINLINE OR LATERAL LINE
SCH. 40 STREET ELL.
SCH. 40 TEE OR ELL., TYP.
±4
"
BRICK OR CONC. BLOCK, TYP.
SCH. 40 STREET ELL.
SCH. 80 NIPPLE
SCH. 40 ELL.
QUICK COUPLER IN VALVE BOX WITH LID
DRAIN ROCK MIN. 3" DEEP
FINISH GRADE
SCH. 80 NIPPLE
1" MIN.
3" MAX.
SCH. 80 NIPPLE
BARBED MARLEX INSERT
SCH. 40 TEE OR ELL., TYP.
SCH. 40 STREET ELL.
LATERAL LINE LATERAL LINE
& THREADED ELL.
SCH. 40 TEE
SCH. 40 ELL.
SCH. 40 STREET ELL.
SCH. 80 NIPPLE
PAVEMENT OR CURB
POP-UP ROTOR
TOP OF SPRINKLER FLUSH WITH
FINISH GRADE, AFTER SETTLING
1" MIN.
3" MAX.
POLY SWING PIPE- MIN. 15"
BARBED MARLEX INSERT
POP-UP SPRINKLER
& THREADED ELL.
LENGTH, MAX 30" LENGTH
PAVEMENT OR CURB
NOTES:
SWING JOINTS AS SHOWN ABOVE SHALL BE PROVIDED FOR ALL ROTARY HEADS THAT ARE DESIGNED TO
PROVIDE 5 GPM OR GREATER. ALL OTHER IRRIGATION HEADS THAT HAVE VOLUMES BELOW 5 GPM SHALL
UTILIZE FUNNY PIPE AS SHOWN WITHIN DETAIL #7 THIS SHEET
LOCATION OF ALL SPRINKLER HEADS SHALL BE SITE ADJUSTED TO MINIMIZE WATER OVERTHROW ONTO
BUILDING SURFACES AND WALKWAYS. THROTTLE VALVES ON SPRAY ZONES AS REQUIRED TO PREVENT
FOGGING. USE LOW TRAJECTORY NOZZLES WHENEVER POSSIBLE.
TOP OF SPRINKLER
FLUSH WITH FINISH
GRADE, AFTER
SETTLING
MAINLINE SUPPLY LINE SLEEVE AT PAVING
24
"
M
I
N
.
12
"
M
I
N
.
DE
P
T
H
LA
T
E
R
A
L
MA
I
N
L
I
N
E
CLEAN AND LIGHTLY
COMPACTED BACKFILL
TRACKING WIRE, 6"
ROOFING NAIL
ABOVE MAINLINE
PAVING
TO MARK SLEEVE
2 - 4" CLASS 160 SLEEVES
FOR WIRING AND OTHER
IRRG APPURTENCES
SCH 40 SLEEVE -
TWICE THE NOMINAL
SIZE OF MAINLINE
18
"
-
3
6
"
12
"
M
I
N
.
DE
P
T
H
LA
T
E
R
A
L
MA
I
N
L
I
N
E
LATERAL LINE
INTERVALS OF 25'-0"
TO MAINLINE AT
ATTACH IRRIGATION WIRE
MAINLINE - SIZE AS REQUIRED
CLEAN AND LIGHTLY
COMPACTED BACKFILL
TRACKING WIRE, 6"
ABOVE PIPE
FINISH GRADE
IRRIGATION TRENCH
1'
N.T.S.N.T.S.
POINT OF CONNECTION
DOMESTIC WATER MAIN
M
BACKFLOW PREVENTER
(PER LOCAL CODE)
TO
S
Y
S
T
E
M
FLOW SENSOR
F
MASTER VALVE
MV WATER FLOW
WATER FLOW
TURF OR MULCH, REFER
TO LANDSCAPE MATERIAL
SCHEDULE FOR MORE
INFO
3/8" PEA GRAVEL, 4" DEEP - LINE BOX w/
FILTER FABRIC
STANDARD RECTANGULAR VALVE
BOX w/ OVERLAPPING LID AND
LOCKING BOLT - SET BOX SO THAT
TOP IS FLUSH w/ TURF FINISH
GRADE OR MULCH
MIN. 10x
PIPE DIAMETER
24
"
MI
N
.
MIN. 5x
PIPE DIAMETER
MASTER VALVE PER IRRIGATION
MATERIAL SCHEDULE
PVC MAIN LINE, SIZE PER PLAN OR PIPE SIZING
SCHEDULE
NOTE:
INLET PIPE LENGTH OF SENSOR MUST BE MIN. 10X PIPE DIAMETER STRAIGHT, CLEAN RUN OF PIPE, NO FITTINGS OR TURNS.
OUTLET PIPE LENGTH OF SENSOR MUST BE MIN. 5X PIPE DIAMETER OF STRAIGHT, CLEAN RUN OF PIPE, NOT FITTINGS OR
TURNS.
FINISH GRADE
10" ROUND VALVE BOX w/
OVERLAPPING LID AND LOCKING
BOLT - SET BOX SO THAT TOP IS
FLUSH w/ TURF FINISH GRADE OR
LAYER OF ROCK/BARK MULCH
INL
E
T
O
U
T
L
E
T
FLOW SENSOR W/ PE 39
COMMUNICATION CABLE OR TWO
WIRE CABLE TO IRRIGATION
CONTROLLER
MASTER VALVE AND FLOW SENSOR
SLEEVING NOTES
1.CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ALL SLEEVING FOR THE PROJECT UNLESS
OTHERWISE NOTED. UNLESS OTHERWISE INDICATED, ALL SLEEVES ARE TO BE PVC SCH 40 AND TWO (2)
NOMINAL SIZES LARGER THAN THE PIPE TO BE SLEEVED. FOR EXAMPLE: THE SLEEVE FOR A 2" PIPE
SHALL BE 3". NO IRRIGATION SLEEVE SHALL BE SMALLER THAN 2".
2.ALL SLEEVES ARE TO BE INSTALLED WITH A MINIMUM OF 24" DEPTH OF COVER.
3.ALL SLEEVES TO EXTEND A MINIMUM OF 24" BEYOND THE EDGE OF PAVEMENT (WHEN POSSIBLE).
4.IDENTIFY ALL SLEEVES LOCATIONS BY STAKING THE SLEEVE ENDS WITH COLOR CODED BLUE REBAR
AND/OR MARKING THE BACK OF CURB (OR PAVEMENT). COORDINATE WITH OWNER'S REPRESENTATIVE
FOR PREFERRED METHOD.
NOTE:
LOCATION OF ALL SPRINKLER HEADS SHALL BE SITE ADJUSTED TO MINIMIZE WATER OVERTHROW ONTO
BUILDING SURFACES AND WALKWAYS. THROTTLE VALVES ON SPRAY ZONES AS REQUIRED TO PREVENT
FOGGING. USE LOW TRAJECTORY NOZZLES WHENEVER POSSIBLE.
NOTE: IRRIGATION CONTRACTOR IS REQUIRED TO INSTALL TRACING WIRE OVER ALL MAINLINE
PIPE AND CONTROLLER WIRE (INCLUDING) WIRE WHICH IS NOT INSTALLED IN TRENCH WITH PIPE.
N.T.S.
REMOTE CONTROL VALVE INSTALLATION
REMOTE CONTROL VALVE.
ISOLATION VALVE SAME SIZE AS
THE SAME AS SIZE THE MAINLINE.
THE ISOLATION VALE TO BE
PVC PIPE & FITTINGS UPSTREAM OF
BRICK OR CONC. BLOCK
SCH. 40 TEE OR ELL., TYP.
SCH. 80 NIPPLE
SCH. 40 MAINLINE
SCH. 40 ELL.
REMOTE CONTROL VALVE WITH
VALVE BOX
18" COIL OF WIRE & MALE REDUCER
PVC ISOLATION BALL VALVE
SCH. 40 ELL.
SCH. 80 NIPPLE (S X T)
LATERAL LINE
FINISH GRADE
WITH MALE REDUCER
ALL WIRE CONNECTIONS SPLICED WITH
DIRECT BURY SPLICE KIT
(3M DBY/DBR-6) CONNECTORS.
DRAIN ROCK MIN. 3" DEEP AND 2"
BELOW BOTTOM OF PIPE
BALL VALVE
4" MIN. DRAIN ROCK
BRICK OR CONC. BLOCK
MALE ADAPTER/ REDUCER,
BOTH SIDES
FINISH GRADE
MAINLINE
VALVE BOX WITH
LOCKABLE LID
COMPRESSION UNION BOTH
SIDES
STAINLESS STEEL BALL VALVE
4" MULCH LAYER
1/2" INSERT TEE
FINISH GRADE
PVC SUB MAIN
PVC TEE (SxSxT)
3/4" SCH 80 PVC
NIPPLE
DRIP TUBING
NOTE: PROVIDE
12" MIN. SPACE
BETWEEN ALL
DRIPLINES AND
ANY WALL OR
STRUCTURE
PVC-DRIP CONNECTION
PVC MAIN LINE
SCH. 40 PVC FITTING
3" GRAVEL SUMP
WIRE CONNECTORS
FINISH GRADE
REMOTE CONTROL VALVE
STD. RECT. VALVE BOX
(2) 1" 200 MESH PRESS. REG. FILTER
PVC SCH 80 90 TxT ELL
PVC SCH 80 MALE ADP.
CONTROL WIRES
PVC SCH 80 NIPPLE
W/ LANDSCAPE FABRIC
DRIP ZONE CONTROL VALVE
20 GPM MAX.40 GPM MAX.
JUMBO VALVE BOX
STANDARD VALVE BOX
REMOTE CONTROL VALVE
1" FILTER
DRIP ZONE VALVE - PLAN VIEW
PVC ISOLATION BALL VALVE
WITH MALE REDUCER
9
5
10
6 7
3
12
8
1 2
(BY-OTHERS)
(BY-OTHERS)
STUB-OUT
METER:
MAINLINE
4
11
2025-05-09
Page 48 of 63
L2.2
IRRIGATION DETAILS &
NOTES
NOT FOR CONSTRUCTION
04/30/2025
JL
JC
SEE SHEET
766009
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
C:
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
6
-
L
A
_
P
L
A
N
\
_
C
D
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
_
M
N
_
L
3
.
0
_
I
R
R
I
G
A
T
I
O
N
P
L
A
N
.
d
w
g
-
5/
1
2
/
2
0
2
5
-
Je
f
f
L
a
p
e
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
1 REVISION #1 2025/05/09
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
BLDG
PAVEMENT
SIDEWALK
E.O.P.
24" BELOW GRADE
5' FROM E.O.P.
LIGHTPOLE
36" BELOW GRADE
18'
16' FROM B.O.C.
9' FROM B.O.C.
24" BELOW GRADE
B.O.C.
ROADWAY
10' FROM CORNER OF BLDG
VALVE #16
4' FROM SIDEWALK
VALVE #21
11' FROM B.O.C.
26' FROM LIGHTPOLE
26'
SPLICE BOX
15' FROM B.O.C.
17' FROM CORNER
17'
2" MAINLINE
NOTES:
·PROVIDE DIMENSIONS FROM TWO PERMANENT FIXED
OBJECTS* AND "DEPTH OF COVER" ON ALL MAINLINE AND
SLEEVES.
·PROVIDE GPS COORDINATES AND DIMENSIONS FROM
TWO PERMANENT FIXED OBJECTS* FOR ALL VALVES,
SPLICE BOXES, STUB-OUTS, QUICK CONNECTS, EARTH
GROUNDS AND ANY OTHER IMPORTANT COMPONENTS
NECESSARY TO OPERATE THE SYSTEM
* THE TWO REFERENCE OBJECTS SHOULD BE
PERPENDICULAR TO THE DIMENSIONED ITEM.
·PROVIDE VALVE LABELS WITH GPM TOTALS AND
DECODER ADDRESS AS UTILIZED.
·CONTRACTOR IS REQUIRED TO PROVIDE A COLOR
CODED PLAN (SEPARATE THAN "AS BUILT") THAT
CORRELATES EACH ZONE WITH ITS RESPECTIVE
VALVES. COLOR CODED PLAN SHOULD UTILIZE PLANTING
PLAN AS BASE
·FINAL APPROVAL WILL NOT BE GIVEN WITHOUT A
SUBMITTED AND APPROVED AS-BUILT AND COLOR
CODED PLAN.
1.THE IRRIGATION DISTRIBUTION MAINLINE SHALL BE INSTALLED PER LOCAL AND STATE WATER STANDARDS. ALL
IRRIGATION SYSTEMS SHALL BE OPERATED AND MAINTAINED IN ACCORDANCE TO LOCAL, REGIONAL, AND/OR
STATE STANDARDS, WHICHEVER PRECEDES. CONTACT OWNER'S REPRESENTATIVE WITH ANY DISCREPANCIES.
2.IF REQUIRED, THE IRRIGATION CONTRACTOR SHALL PROVIDE THE NECESSARY RIGHT-OF-WAY USE
ENCROACHMENT PERMIT(S)
3.IRRIGATION CONTRACTOR TO VERIFY WITH OWNER AND UTILITY COMPANIES THE LOCATIONS OF ALL UTILITIES
PRIOR TO CONSTRUCTION AND TO DETERMINE IN THE FIELD THE ACTUAL LOCATIONS AND ELEVATIONS OF ALL
EXISTING UTILITIES WHETHER SHOWN ON THE PLAN OR NOT. THE IRRIGATION CONTRACTOR SHALL CALL UTILITY
PROTECTION SERVICE 72 HOURS PRIOR TO CONSTRUCTION.
4.IRRIGATION CONTRACTOR WILL ARRANGE INSPECTIONS REQUIRED BY LOCAL AGENCIES & ORDINANCES DURING
CONSTRUCTION AS REQUIRED. ALL PRODUCTS, WIRING AND BACKFLOW PREVENTER TO BE INSTALLED IN
ACCORDANCE WITH LOCAL AND STATE PLUMBING CODES
5.IRRIGATION CONTRACTOR TO REPORT ALL DAMAGES TO EXISTING CONDITIONS OR INCONSISTENCIES WITH
PLANS TO LANDSCAPE ARCHITECT.
6.IRRIGATION CONTRACTOR SHALL EXAMINE FINISH SURFACE, GRADES, TOPSOIL QUALITY AND DEPTH. DO NOT
START ANY WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. VERIFY LIMITS OF WORK
BEFORE STARTING.
7.IRRIGATION CONTRACTOR SHALL COORDINATE IRRIGATION INSTALLATION WITH INSTALLATION OF LANDSCAPING,
WALL CONSTRUCTION AND DRAINAGE SYSTEMS. IRRIGATION CONTRACTOR WILL BE RESPONSIBLE FOR
COORDINATION WITH OTHER SUBCONTRACTORS FOR INSTALLATION OF UNDERGROUND SLEEVING.
8.ALL PRODUCTS OR ANY OTHER EQUIPMENT REQUIRED THAT IS NOT OTHERWISE DETAILED OR SPECIFIED SHALL
BE INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS AND ACCORDING TO LOCAL BUILDING,
ELECTRICAL, AND PLUMBING CODES.
9.PRIOR TO BACKFILLING TRENCHES CONTACT OWNER'S REPRESENTATIVE TO VERIFY WIRE PATH ROUTING,
CONTROLLER WIRE AND SPLICING CONNECTIONS.
10.LAYOUT OF THE SYSTEM AS SHOWN ON DRAWINGS IS DIAGRAMMATIC. IRRIGATION LINES SHOWN WITHIN PAVED
AREAS ARE FOR GRAPHIC CLARITY ONLY. IRRIGATION HEADS AND PIPES ARE TO BE PLACED WITHIN LANDSCAPED
AREAS WITH THEIR LOCATIONS MODIFIED AS REQUIRED TO AVOID PLANT MATERIALS, UTILITIES AND OTHER
OBSTRUCTIONS.
11.IRRIGATION CONTRACTOR SHALL COMPLY WITH PIPE SIZES AS INDICATED.
12.CONTRACTOR TO PROVIDE OWNER WITH KEYS AND HOSE SWIVELS FOR EACH QUICK COUPLER VALVE.
13.CONTRACTOR SHALL PROVIDE A REPRODUCIBLE DIGITAL AS-BUILT IRRIGATION PLAN. PLAN SHALL BE PREPARED,
PRIOR TO FINAL ACCEPTANCE OF IRRIGATION INSTALLATION, ON A REPRODUCIBLE SITE PLAN (PROVIDED TO
CONTRACTOR BY LANDSCAPE ARCHITECT). AS-BUILT PLAN SHALL BE SUBMITTED TO LANDSCAPE ARCHITECT FOR
REVIEW AND APPROVAL PRIOR TO SUBSTANTIAL COMPLETION INSPECTION. AS-BUILTS SHALL INCLUDE A MASTER
VALVE/ZONE SCHEDULE INCLUDING SPECIFICATIONS FOR INSTALLED VALVES, ZONE TYPE AND GALLONS PER
MINUTE. SEE SPECS FOR FURTHER INFORMATION.
14.IRRIGATION CONTRACTOR SHALL PROVIDE A COLOR-CODED MAP OF THE AREA SERVED BY EACH CONTROLLER,
SEALED IN PLASTIC OR LAMINATED, AND PLACE IT IN EACH CONTROLLER BOX UPON FINAL ACCEPTANCE.
15.CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ALL PRODUCT SUBSTITUTIONS BY THE LANDSCAPE
ARCHITECT PRIOR TO INSTALLATION. PRODUCTS, MANUFACTURERS, AND MODELS NOT IN COMPLIANCE WITH
DRAWINGS AND SPECIFICATIONS MAY BE REJECTED BY THE LANDSCAPE ARCHITECT WITHOUT PRIOR WRITTEN
APPROVAL. AT NO COST TO THE OWNER THESE ITEMS MAY BE REQUIRED TO BE REPLACED WITH PRODUCTS
THAT ARE IN COMPLIANCE WITH THE MANUFACTURERS AND MODELS ON THE IRRIGATION PLAN.
16.CONTRACTOR TO INSTALL IRRIGATION CONTROL EQUIPMENT UNIT (CONTROL CABINET(S)) AT LOCATION SHOWN
ON DRAWINGS. STAKE OUT EXACT LOCATION FOR OWNER'S REPRESENTATIVE'S REVIEW PRIOR TO EXCAVATING
FOR THE FOOTING. INSTALL LEVEL AND PLUMB ON COMPACTED SUBSOIL AND BASE ROCK AS SHOWN ON
DRAWINGS.
17.IRRIGATION CONTRACTOR SHALL PROVIDE POWER AND WATER FOR ALL LANDSCAPE ELEMENTS TO PROVIDE A
COMPLETE OPERATING IRRIGATION SYSTEM. THE GENERAL CONTRACTOR AND/OR OWNER SHALL PROVIDE
120-VOLT POWER TO THE CONTROLLER LOCATION(S), COORDINATE AS NEEDED. THE IRRIGATION CONTRACTOR
SHALL PROVIDE AND INSTALL ELECTRICAL CONDUITS AND WIRING TO PROVIDE POWER FROM ELECTRICAL
BRANCH PANEL TO THE IRRIGATION CONTROL EQUIPMENT UNIT. IRRIGATION CONTRACTOR WILL BE RESPONSIBLE
TO COORDINATE WITH AN ELECTRICIAN AS NEEDED.
18.AT EACH IRRIGATION CONTROLLER, INSTALL A "SECONDARY SURGE ARRESTER" TO THE INCOMING (120-VOLT)
POWER SUPPLY (INTERMATIC #AG2401 OR EQUAL).
19.PROVIDE AND INSTALL CONDUIT SWEEPS AND STRAIGHT SECTIONS FROM IRRIGATION TRENCHES TO THE
CONTROLLER. ROUTE CONTROL WIRE THROUGH CONDUITS INTO CONTROLLER CABINET. NEATLY CONNECT
WIRES TO TERMINAL STRIPS PROVIDED IN THE CONTROLLER CABINET.
20.THE WIRELESS RAIN SHUTOFF DEVICE SHALL BE INSTALLED TO MEET LOCAL CODES AND/OR MINIMUM
MANUFACTURER'S RECOMMENDATIONS. OBSTRUCTIONS, VANDALISM, AND EASE OF SERVICE SHALL BE
CONSIDERED IN LOCATING THE DEVICE. DO NOT LOCATE IN AN AREA SHELTERED FROM RAIN.
21.ALL WIRE SPLICES OR CONNECTIONS SHALL BE MADE WITH APPROVED WATERPROOF WIRE CONNECTIONS AND
BE IN A VALVE OR SPLICE BOX.
22.PROTECT IRRIGATION CONTROL EQUIPMENT UNIT FROM DAMAGE AFTER INSTALLATION AND UNTIL FINAL
ACCEPTANCE. THE UNIT SHALL BE IN BRAND NEW CONDITION WHEN FULL OPERATION OF THE SYSTEM IS TURNED
OVER TO THE OWNER AFTER FINAL ACCEPTANCE. THE CONTRACTOR SHALL, AT THEIR OWN EXPENSE, REPLACE
ALL OR PART OF THE UNIT THAT IS DAMAGED AND UNACCEPTABLE TO THE OWNER.
23.WHEREVER PRACTICAL, INSTALL VALVES IN MULCHED BEDS AND/OR OUT OF HIGH TRAFFIC AREAS. IF INSTALLED
IN LAWN, INSTALL 36" AWAY FROM BED EDGE. ONE VALVE PER VALVE BOX UNLESS OTHERWISE NOTED. ALL
VALVES, FLUSH VALVES AND WIRE SPLICES SHALL BE INSTALLED IN RAIN BIRD WIDE FLANGED, STRUCTURAL FOAM
"PLASTIC" VALVES BOXES WITH LIDS (OR APPROVED EQUAL) AS FOLLOWS:
REMOTE CONTROL VALVES #VB-STD, 12" STD. RECT. BOX
ISOLATION GATE VALVES #VB-10RND, 10" ROUND BOX
WIRE SPLICES #VB-10RND, 10" ROUND BOX
DRIP ZONE VALVE / FILTER ASSY #VB-SPR, SUPER JUMBO RECT. BOX
24.LOCATE VALVE MANIFOLDS IN CLOSE PROXIMITY FOR EASE OF MAINTENANCE, BUT NOT CLOSER THAN 4'-0"
BETWEEN VALVE BOXES.
25.INSTALL DRIP TUBING AT GRADE AND COVER WITH MULCH. TYPICAL SPACING FOR DRIP TUBING IS 18" TO 24" ON
CENTER. SPACING TO BE DETERMINED BY SOIL TYPE. ANCHOR TUBING EVERY 7' WITH 8" LONG WIRE TUBING
STAKES. INSTALL FLUSH VALVE ASSEMBLIES AT ALL TUBING "DEAD ENDS".
28.SET AND UTILIZE CONTROLLER TO WATER NEW PLANTINGS FOR THE DURATION OF THE PROJECT UNTIL FINAL
ACCEPTANCE.
29.IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE RUN TIMES SO THAT TURF AND PLANTS
ARE NOT OVER-WATERED AND SHALL BE RESPONSIBLE FOR KEEPING THE SITE FREE OF STANDING WATER.
30.IRRIGATION CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE IN ALL LANDSCAPE BEDS AND ALL LAWN AREAS.
31.THE INSTALLING CONTRACTOR MUST HOLD A CURRENT, VALID MINNESOTA IRRIGATION CONTRACTOR'S LICENSE.
32.THE DESIGN IS BASED ON SITE INFORMATION AND /OR DRAWING SUPPLIED WITH THE DESIGN CRITERIA BEING SET
(AREA TO BE IRRIGATED, EQUIPMENT MANUFACTURER AND MODEL TO BE USED, WATER SOURCE INFORMATION.
ELECTRICAL POWER AVAILABILITY, ETC...) CESO BEARS NO RESPONSIBILITY OR LIABILITY FOR ANY ERRORS IN
DESIGN OR INSTALLATION THAT ARISE DUE TO INACCURACIES IN THE ABOVE REFERENCED INFORMATION
SUPPLIED TO CESO IN RELATION TO THIS PROJECT, UNLESS OTHERWISE NOTED.
TYPICAL "AS BUILT"
18
"
M
I
N
.
AS
P
E
R
LO
C
A
L
CO
D
E
ADAPTOR
FEMALE
NIPPLE
PVC TOE
GALVANIZED
FINISH GRADE
ELL
GALVANIZED
(AS NEEDED)
PRESSURE REGULATOR
WILKINS #500C
FLOW
WILKINS #950XL
BACKFLOW PREVENTOR
DIELECTRIC UNION,
SEE LEGEND.
GALVANIZED
MAIN, TYP.TYP.
PVC MAINLINE
METER IRRIGATION
SYSTEM
4" PVC
SLEEVE, TYP.
NOTE: COORDINATE SLEEVE LOCATION
IN SHED WITH PLUMBER AND GENERAL
CONTRACTOR.
PRESSURE REGULATED BACKFLOW PREVENTER N.T.S.
N.T.S.N.T.S.
N.T.S.
N.T.S.
GENERAL NOTES: IRRIGATION PLAN
PVC SWEEP ELL
(1 1/2" OR LARGER)
6 AWG SOLID BARE
COPPER WIRES
GROUND PLATE
EARTH CONTACT
MATERIAL
ELECTRODE
SPHERE OF
INFLUENCE
BOUNDARIES *
8'COPPER GROUND PLATE
(4" X 96" X .0625")
* DO NOT INSTALL ANY OTHER WIRES OR CABLE
WITHIN THE SPHERE OF INFLUENCE
CONTROLLER
CONCRETE PAD
#6 AWG SOLID
BARE COPPER WIRE
8'
#6 AWG SOLID
BARE COPPER WIRE
C
30" MIN.
12"
CONTROLLER
CONCRETE PAD
MIM. 8' FROM CONT.
10'
8'
3'
MINIMUM ACCEPTABLE RESISTANCE TO GROUND IS 25 OHMS.
USE ADDITIONAL GROUND PLATES OR GROUND RODS AS NEEDED.
CONTROLLER GROUNDING
for the latest rev. go to http://www.asic.org/design_guides.htm
FINISH GRADE.
VALVE BOX.
ALL WIRE CONNECTIONS SPLICED
WITH DIRECT BURY SPLICE KIT (3M
DBY/DBR-6) CONNECTORS.
(SPLICE ALL WIRE PAIRS)
DIRECT BURIAL WIRE
WIRE SPLICE
FINISH GRADE.
10" ROUND VALVE BOX.
MANUAL LINE FLUSH VALVE
DRIP TUBE OR
LATERAL PIPE
MANUAL LINE FLUSHING VALVE
3/4" GRAVEL SUMP (10"
TO 12" DIAMETER)
BRICK SUPPORTS (3)
19
151314
16
2025-05-09
Page 49 of 63
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
R
/
W
13
Drainage and Utility Easement
BK. 66, PG. 30
55'
10'
10'
13
Drainage and Utility Easement
BK. 66, PG. 30
5'
5'
13
Drainage and Utility Easement
BK. 66, PG. 30
13
Drainage and Utility Easement
BK. 66, PG. 30
13
Drainage and Utility Easement
BK. 66, PG. 30
N
5
8
°
0
1
'
1
1
"
E
3
8
.
3
4
'
(
R
)
1
4
9
T
H
S
T
R
E
E
T
W
E
S
T
P
u
b
l
i
c
R
i
g
h
t
o
f
W
a
y
V
a
r
i
e
s
-
A
s
p
h
a
l
t
P
a
v
e
m
e
n
t
N
5
8
°
0
1
'
1
1
"
E
1
9
1
.
1
4
'
(
R
)
S 00°25'44" W 405.90' (R)
S
7
5
°
2
7
'
2
4
"
W
1
6
4
.
6
2
'
(
R
)
N 00°27'39" W 255.38' (R)
N 35°0
3
'
0
2
"
W
7
3
.
3
9
'
(
R
)
N
5
5
°
3
1
'
2
0
"
E
5
3
.
9
3
'
(
R
)
BM #1
BM #2
U
G
T
UG
T
ROSEWOOD CENTER SECOND EDITION
(BK. 66, PG. 30)
BENCHMARK #1
SET PK NAIL
ELEV: 954.96' (NAVD88)
BENCHMARK #2
1/2" IRON PIPE
ELEV: 955.68' (NAVD88)
5'
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SAN
R
/
W
R
/
W
3
0
'
F
R
O
N
T
Y
A
R
D
S
E
T
B
A
C
K
1
0
'
R
E
A
R
Y
A
R
D
S
E
T
B
A
C
K
10' SIDE YARD SETBACK
10' SIDE YARD SETBACK
DO
N
O
T
E
N
T
E
R
WM
WASH BAY
101
A:3,204 SQ. FT.
EQMT. RM.
103
A:1,163 SQ. FT.
CONTROL
102
A:181 SQ. FT.
R.R.
103
A: 50 SQ. FT.
C:
\
U
s
e
r
s
\
m
a
r
v
i
n
.
m
a
l
d
o
n
a
d
o
\
D
C
\
A
C
C
D
o
c
s
\
C
E
S
O
\
S
o
n
n
y
s
R
o
s
e
m
o
u
n
t
M
N
\
P
r
o
j
e
c
t
F
i
l
e
s
\
_
C
E
S
O
\
0
3
-
C
I
V
I
L
\
P
L
A
N
\
E
X
H
I
B
I
T
\
S
o
n
n
y
s
_
R
o
s
e
m
o
u
n
t
M
N
-
A
U
T
O
T
U
R
N
E
X
H
I
B
I
T
.
d
w
g
-
05
/
0
5
/
2
5
-
Ma
r
v
i
n
M
a
l
d
o
n
a
d
o
Project Number:
Scale:
Drawn By:
Checked By:
Date:
Issue:
Drawing Title:
Revisions / Submissions
ID Description Date
3601 Rigby Rd., Suite 300
Miamisburg, OH 45342
Phone: 937.435.8584 Fax: 888.208.4826
THE
I
N
F
O
R
M
A
T
I
O
N
O
N
T
H
I
S
DO
C
U
M
E
N
T
I
S
P
R
E
L
I
M
I
N
A
R
Y
O
R
INC
O
M
P
L
E
T
E
,
N
O
T
F
O
R
CO
N
S
T
R
U
C
T
I
O
N
,
R
E
C
O
R
D
I
N
G
PU
R
P
O
S
E
S
,
O
R
I
M
P
L
E
M
E
N
T
A
T
I
O
N
.
SW
C
O
R
N
E
R
O
F
1
4
9
T
H
&
B
I
S
C
A
Y
N
E
A
V
E
.
RO
S
E
M
O
U
N
T
,
M
N
5
5
0
6
8
SO
N
N
Y
'
S
C
A
R
W
A
S
H
SO
N
N
Y
'
S
EX-1
AUTOTURN
EXHIBIT
NOT FOR CONSTRUCTION
05/09/2025
CG
MRM
AS SHOWN
766009
SITE LEGEND
EXISTING
REFER TO XXX FOR EXISTING FEATURES LEGEND
PROPOSED
RIGHT-OF-WAY
PROPERTY LINE
BUILDING
CONCRETE CURB
PAVEMENT/WALK
SIGN
R/W
GRAPHIC SCALE (IN FEET)
1 in. = 20 ft.
020 20 40
FORTY-EIGHT (48) HOURS
BEFORE DIGGING IS TO
COMMENCE, THE CONTRACTORS
SHALL NOTIFY THE FOLLOWING
AGENCIES: MINNESOTA UTILITIES
PROTECTION SERVICE AT 811 OR
800-252-1166 AND ALL OTHER
AGENCIES WHICH MIGHT HAVE
UNDERGROUND UTILITIES
INVOLVING THIS PROJECT AND
ARE NONMEMBERS OF STATE
UTILITIES PROTECTION SERVICE
Page 50 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024
BAR DOWN EXPRESS
BISCAYNE AVE & COUNTRY ROAD
42
ROSEMOUNT, MN
5220 SCOTTSVILLE RD.BOWLING GREEN, KY 42104
800.511.7208
info@modernwash.net
5/5/25
1
Page 51 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024 BAR DOWN EXPRESS5/5/25 ROSEMOUNT, MN 2
Page 52 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024 BAR DOWN EXPRESS5/5/25 ROSEMOUNT, MN 3
Page 53 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024 BAR DOWN EXPRESS5/5/25 ROSEMOUNT, MN 4
Page 54 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024 BAR DOWN EXPRESS5/5/25 ROSEMOUNT, MN 5
Page 55 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024 BAR DOWN EXPRESS5/5/25 ROSEMOUNT, MN 6
12' CLEAR
19'-8"
5'-10"
11'-10"
12' CLEAR
107'23'
130'
12'
10'-11"
10'
2'-10"
6'-4"
38'
EQMT. RM.
103
A:1,163 sq ft
WASH BAY
101
A:3,204 sq ft
CONTROL
102
A:181 sq ft
R.R.
103
A:50 sq ft
SCALE: 1" = 10'1 FIRST FLOOR PLAN
Page 56 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024 BAR DOWN EXPRESS5/5/25 ROSEMOUNT, MN 7
100'
112'
116'-9 1/4"
100'
112'
116'-9 1/4"
FIBER CEMENT PANELS - WHITE
STEEL FRAME - RED
FIBER CEMENT
PANELS - WHITE
FIBER CEMENT PANELS - BLUE
FIBER CEMENT PANELS - BLUE
CULTURED STONE -
GREY
CULTURED STONE - GREY
100'
110'
113'-4"
100'
113'-4"
120'-4"MEGA-RIB METAL ROOF - SILVER
METALLIC
FIBER CEMENT PANELS - WHITE
CULTURED STONE - GREY
FIBER CEMENT PANELS - WHITESTEEL FRAME - RED
SCALE: 3/32" = 1'-0"1 PLAN SOUTH ELEVATION
SCALE: 3/32" = 1'-0"2 PLAN NORTH ELEVATION
MATERIAL PERCENTAGES:
FIBER CEMENT PANELS: 717 S.F. = 43%
CULTURED STONE: 936 S.F. = 57%
MATERIAL PERCENTAGES:
FIBER CEMENT PANELS: 806 S.F. = 47%
CULTURED STONE: 899 S.F. = 53%
OVERALL PERCENTAGES:
FIBER CEMENT PANELS: 1,964 S.F. = 46%
CULTURED STONE: 2,322 S.F. = 54%
Page 57 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024 BAR DOWN EXPRESS5/5/25 ROSEMOUNT, MN 8
120'-4"
100'
110'
112'
116'-8"
100'
107'-2"
113'-6"
FIBER CEMENT PANELS - WHITE
CULTURED STONE - GREY
STEEL FRAME - RED
100'
110'
116'-8"
120'-4"
100'
113'-6"
FIBER CEMENT PANELS - WHITE
CULTURED STONE - GREY
STEEL FRAME - RED
SCALE: 3/32" = 1'-0"1 PLAN WEST ELEVATION SCALE: 3/32" = 1'-0"2 PLAN EAST ELEVATION
MATERIAL PERCENTAGES:
FIBER CEMENT PANELS: 229 S.F. = 48%
CULTURED STONE: 249 S.F. = 52%
MATERIAL PERCENTAGES:
FIBER CEMENT PANELS: 212 S.F. = 47%
CULTURED STONE: 238 S.F. = 53%
OVERALL PERCENTAGES:
FIBER CEMENT PANELS: 1,964 S.F. = 46%
CULTURED STONE: 2,322 S.F. = 54%
Page 58 of 63
2024-11_Bar Down Express C.pln
modernwash COPYRIGHT 2024 BAR DOWN EXPRESS5/5/25 ROSEMOUNT, MN 9
TYPICAL SPECIFICATIONS :
1. I-5 High Strength Tubular Steel (HSS) structural frame
members. Designed to the most recent IBC or current local
building codes with standard design loads of the greater
value of 30lbs. per S.F. live load and 100 mph sustained wind
load or site specific conditions and applicable zone
regarding seismic loads. Connecting bolts shall be A-307 or
A-325 specifications, hidden at al connections. all frame
members shall be structural steel tube sized according to
structural engineering calculations minimum .120 wall
thickness.
2. All frame members designed according to the American
Institute of Steel Construction (AISC) for cold formed
structural members.All fabrication welds shall be in
accordance with the guidelines of the American Welding
Society (AWS). Field welding is not required.
3. Structural Calculations and Stamped Engineering is
provided to meet federal, local codes and site conditions
determined by zones.
FRAME FINISH :
1. All tubular structural steel members shall be prepared
with our i-5 Finish System which is a TGIC Poly Powder Coating
with a zinc enriched applied primer in multiple layers.
ROOFING :
1. Pre-finished Mega-Rib roof panel.
2. Topgal 21mm polycarbonate standing seam roof system.
Other roof systems available. See Manufacturer for specific
materials specs.
GLAZING :
1. All Standard Glass Systems shall be Storefront Type
Systems with 1/4” uninsulated or 1” insulated
(inColdWeatherPackage) SafetyGlass: secured within 41/2”
Anodized Aluminum Framework with urethane seals.
KNEE WALL PANELS :
1. Knee wall glazing panels shall be 3mm Aluminum Composite
Material (ACM) in coordinating colors.
2. screw on stacked cultured stone.
PVC TUNNEL DIVISOR WALLS :
1. Shall consist of galvanized steel 18 Gauge studs forming a
wall frame with solid sheeting applied to the Tunnel side,
covered with a water resistant wrap (similar to Dupont
Tyvek) with a 1/2” Tongue and Groove PVC Panels applied with
matching trims.
MAN DOORS :
1. Equipment Room: steel slab painted man doors @ entrance /
exterior.
2. PVC wrapped Fiberglass Man door for Equipment Room to
Tunnel access.
3. Aluminum Man Doors with glass at all exterior office area
locations.
- FUEL STATION -
Car Wash
MONOSLOPE ROOF DESIGN
Features:
Decorative Fascia System
Fiber Cement Panel + Stone Cladding
Metal Roof Panels
Page 59 of 63
G:\2025\Planning Cases\25-23-SP Sonny's Carwash Site Plan Review\028948-000 Sonnys Carwash - Plan Review Memo 2025.05.21.docx
70
1
X
E
N
I
A
A
V
E
N
U
E
S
|
SU
I
T
E
3
0
0
| MI
N
N
E
A
P
O
L
I
S
,
M
N
|
55
4
1
6
|
76
3
.
5
4
1
.
4
8
0
0
|
WS
B
E
N
G
.
C
O
M
Memorandum
To: Brian Erickson, City Engineer
Nick Egger, Director of Public Works
Anthony Nemcek, Senior Planner
Jane Byron, Storm Water Specialist
From: Amanda Sachi, PE
Laura Pietila, PE
Kris Keller, PE
Date: May 21, 2025
Re: Sonny’s Carwash - Site Review
WSB Project No. 028948-000
We reviewed the documents provided by CESO on May 9, 2025. Documents reviewed include:
• Site Plan Application Set of Drawings, dated 5/9/25
Additional redline comments are provided on the submitted civil plans. Applicant should provide
responses to each comment and redline comment. We offer the following comments below.
Civil Comments:
1. General
a. Submit for and provide copies to the City of all required permits from regulatory
agencies (MCES, Minnesota Pollution Control Agency, Minnesota Department of
Health, NPDES, etc.)
b. Address redline comments on attached plan sheets
2. Utilities
a. Applicant to submit for Minnesota Department of Labor plumbing plan review and
provide approved plans to City prior to permit issuance
b. Label existing services on the land survey
c. The existing Sanitary Sewer Service Stub shown is 8” per as-built (57' - 8" PVC
SDR 35 @0.40%)
i. If that service is used, match pipe slope to first structure
ii. Note, DOLI requires minimum 2% slope for all services less than 8"
iii. There is a second 6" sanitary sewer service stub provided near the
entrance that could be utilized with less impact (see plan comments and
linework)
d. Provide an additional hydrant as shown on the plans
i. Extend 6" water service from stub to required new hydrant location
e. Recommend minimum 18” vertical separation between utilities for compaction
f. Recommend insulating when separation between storm sewer and water is less
than 36"
Page 60 of 63
Sonny’s Carwash Site Review
May 21, 2025
Page 2
g. A ‘PROPOSED REDUCED PRESSURE BACKFLOW PREVENTER’ is shown in
the parking area near the right of way.
i. This is typically found in building mechanical room
h. Core drill existing storm sewer structure for connection
i. Match existing crowns INV (15") 948.61
1. Note existing Storm CB (1) information per as-built
RIM 953.10
INV (24") 947.86 NW
INV (15") 949.29 SW
3. Streets, Signage and Street Lighting
a. Minimum 20’ radius for entrance
b. Coordinate entrance connection with Today's Life Child Care project as part of
the Rosewood Center Second Addition (see attached plan sheet)
4. Landscape
a. No comments.
Grading, Drainage, and Erosion Control Comments:
1. General
a. Submit all permits once obtained.
2. Grading Plan
a. Add a callout for the regional basin name, NWL, HWL, and snowmelt event HWL
that the site discharges to.
b. Provide EOF locations, elevations, and routes for all low points on the site
c. Consider separating the storm sewer plan from the grading plan to avoid an
overly busy page.
d. Extend the existing contours beyond the plat boundaries by 200’ or more to
completely show the limits of drainage.
e. Label the pavement slopes.
3. Erosion Control
a. Show inlet protection on the CBs on 149th Street downstream of the site.
Stormwater Management Plan:
1. General
a. Submit a stormwater report to document how stormwater management is
achieved.
b. Submit soil borings.
2. General Storm Sewer Design
a. All storm sewer facilities shall be designed to accommodate a 10-year rainfall
event. Provide rational calculations and a drainage area map.
b. Add the casting types to the plans.
c. The minimum lateral pipe size shall be 15” in diameter.
d. Storm sewer structures in unpaved areas shall be marked per the City’s
Structure Marker Sign Detail.
3. Freeboard
a. Provide at least 1.5 feet of separation from the emergency overflow elevation of
the low points to the building low opening.
Page 61 of 63
Sonny’s Carwash Site Review
May 21, 2025
Page 3
4. Water Quality
a. An updated SWMP is needed for the Rosewood Commons/Center
Developments to assess the necessary volume needed in the regional
stormwater ponds. Since Sonny’s Carwash is proposing to use regional storage,
the SWMP updates for the Rosewood Commons/Center Developments need to
be approved before this site can be approved.
General
Infrastructure design shall be completed in accordance with the City of Rosemount’s Engineering
Guidelines and Standards. Infrastructure construction shall be completed in accordance with the
latest edition of the City’s General Specifications and Standard Detail Plates for Street and Utility
Construction.
Page 62 of 63
M E M O R A N D U M
To: Adam Kienberger, Community Development Director
Anthony Nemcek, Senior Planner
Julia Hogan, Planner
From: Dan Schultz, Parks and Recreation Director
Date: May 21, 2025
Subject: Sonny’s Car Wash Site Plan Review
The Parks and Recreation Department recently reviewed the plans for the Sonny’s Car Wash
project. After reviewing the plans, the Parks and Recreation Department staff has the following
comments:
Parks Dedication
The parks dedication requirement for a commercial development is either a 10% of the total
property area as land dedication, a cash dedication in-lieu of land or combination of the two.
Staff is recommending that the City collect cash in-lieu of land for the development that is currently
being processed. The cash dedication for the 1.43-acre development is $12,870 (1.43 acres x $9,000
per acre). This amount is to be paid when the building permit is issued.
Please let me know if you have any questions about this memo.
Page 63 of 63